1 18 December 2015 Company Announcements Office Australian Securities Exchange LITHIUM PROJECT TRANSACTION AND $3.6M CAPITAL RAISING Dakota Minerals Limited (ASX:DKO) ( Dakota or the Company ) has entered into an agreement to acquire a package of tenements and interests in tenements in the Pilbara region of Western Australia from Asgard Metals Pty. Ltd. ( Asgard ), an 86%-owned Australian subsidiary of Ariana Resources plc (AIM:AUU) "Ariana") and Slipstream Resources Group ( Slipstream ). This package of tenements contains part of an extensive lithium-tantalum bearing pegmatitic dyke swarm, which was recognised recently as containing the second-largest hard-rock spodumene (lithium-tantalum) deposit in the world 1. Highlights: Dakota will acquire from Asgard and Slipstream interests in six tenements in the Pilgangoora area of Western Australia ( Pilgangoora Project ). Consideration for the transaction comprises a cash payment of $300,000 payable in two tranches and the issue of 50,000,000 fully paid ordinary shares in Dakota. A further 60,000,000 shares will be issued to Slipstream and Asgard upon the achievement of certain project milestones. Dakota is undertaking a A$3.6 million capital raising by way a share placement to raise up to A$3.6 million in two tranches through Argonaut Securities Pty Ltd( Argonaut ), to fund acquisition costs and exploration on the tenements. Argonaut has received irrevocable commitments for the full amount of $3.6m, to be split into a first tranche of approximately $525,000, which is due to settle on 24 December, and a second tranche of approximately $3.075m, which is due to settle in February 2016 after Dakota shareholders approve the issue and the transaction. David Frances will be appointed as Chief Executive Officer of Dakota and Dr. Francis Wedin will be appointed as Technical Director. The Board will be further enhanced through the appointment of experienced mining company director John Fitzgerald as Chairman. Completion of the transaction is subject to various conditions, including the grant of the core tenement, Dakota shareholder approval and Dakota completing the capital raising. Pilgangoora Project The Pilgangoora Project is located on and in the vicinity of an extensive lithium-tantalum bearing pegmatitic dyke swarm. Peer activity in the immediate area includes Pilbara Minerals Limited and Altura Mining Limited, which have both discovered significant lithium and tantalum resources in 1 Pilbara Minerals ASX announcement, 1 st October 2015

2 recent times. Pilbara Minerals has identified a total Indicated and Inferred resource 2 of 1.28% Li 2O and 0.022% Ta 2O 5. On a neighbouring property, Altura Mining has identified an Indicated and Inferred resource 3 of 1.20% Li 2O. Following recent exploration activity, the Pilgangoora area has been confirmed to contain one of the world s largest hard-rock lithium deposits, mostly in the form of the mineral spodumene. The identification of resources on neighbouring properties provides no assurance that any resource will be identified on the Pilgangoora Project tenements. The Pilgangoora Project tenements and interests proposed to be acquired from Asgard and Slipstream comprise: exploration licence E45/3648 (from Asgard Metals Pty Ltd); prospecting licence P45/2783 (from Asgard Metals Pty Ltd); a contractual right, upon the grant of exploration licence application E45/4523 to Wildviper Pty Ltd, to acquire a 100% legal and beneficial interest in E45/4523, subject to Ministerial consent to the transfer under the Mining Act 1978 (WA) if the transfer is to occur before the first anniversary of grant; and all of the shares in Slipstream LP Pty Ltd, which holds a contractual right, upon the grant of exploration licence applications E45/4624, E45/4633 and E45/4640 to Slipstream Resources Investments Pty Ltd, to acquire a 100% legal and beneficial interest in E45/4624, E45/4633 and E45/4640, subject to Ministerial consent to the transfers under the Mining Act in respect of any transfer that is to occur before the first anniversary of grant. 2 Pilbara Minerals ASX announcement, 24 th September Altura Mining ASX announcement, 14 th September 2015

3 Figure 1: Location of Dakota Pilgangoora tenements in relation to recent lithium discoveries in the Pilbara Region of Western Australia

4 Summary of Agreement Asgard and Slipstream have agreed to jointly sell their interests in their interests in the Pilgangoora Project to Dakota, in consideration for: a cash payment of A$300,000, to be split between Asgard and Slipstream on a 49:51 basis; and the issue of 50,000,000 fully paid Dakota shares, to be issued to Asgard and Slipstream on a 45:55 basis. Completion of the acquisition is subject to satisfaction of various conditions, including the grant of E45/4523 (presently the subject of an application for grant), Dakota shareholder approval for the purposes of ASX listing rule requirements and Dakota completing a share placement of up to A$3.6 million in two tranches to fund the acquisition of the tenements and their exploration. Completion of the acquisition will occur 5 business days after satisfaction of the conditions to completion. The cash payment is to be made in two tranches, as follows: A$125,000 to be paid within 5 business days of completion of the first tranche of the Dakota share placement; and A$175,000 to be paid at the later of completion or within 10 business days after the grant of E45/4523. The issue of 50,000,000 Dakota shares to Asgard and Slipstream will occur at the later of completion of the acquisition or within 10 business days after the grant of E45/4523 ( Completion Shares ). Asgard and Slipstream may also be issued the following further ordinary shares in Dakota ( Milestone Shares ), on the basis of a 49:51 split respectively, subject to the achievement of the following milestones: 30,000,000 shares upon an Inferred Mineral Resource of 5 Mt at 1.2% Li 2O being identified on any or all of the Asgard and Slipstream tenements and announced to the ASX by Dakota in accordance with the requirements of the JORC Code; and 30,000,000 shares upon an Inferred Mineral Resource of 15 Mt at 1.2% Li 2O being identified on any or all of the Asgard and Slipstream tenements and announced to the ASX by Dakota in accordance with the requirements of the JORC Code. Asgard and Slipstream will also enter in to a consultancy services agreement with Dakota for a fixed term of 12 months to provide geological and exploration consultancy services for the introduction of new projects to Dakota. Consideration for the consultancy services agreement will be A$200,000 payable per annum in monthly instalments to Asgard and Slipstream on the basis of a 49:51 split respectively.

5 Board and Management Changes It is proposed that the following changes to the Dakota Board and management will be made upon the issue of the first tranche of Placement shares: Mr David Frances will be appointed as Chief Executive Officer. Mr Frances has considerable experience in successfully exploring, funding and developing projects as well as proven corporate strategic and capital markets skills. He was recently President and CEO of Mawson West Ltd (TSX: MWE), where during his seven year tenure, he led Mawson through the transition from a Western Australian gold explorer to an international copper producer, developer, and explorer in the Democratic Republic of Congo. Mr John Fitzgerald will be appointed as non executive Chairman. Mr Fitzgerald is an experienced mining and finance executive and is also a non-executive director of Northern Star Resources Limited and Danakali Resources Limited. He was previously Chairman of Integra Mines and Atherton Resources. As part of this transaction, Ariana is assigning its Exploration Manager, Dr. Francis Wedin to Dakota where he will take up the position of Technical Director. In his previous role Dr. Wedin was focused on lithium exploration opportunities In Australia and Europe and was instrumental in Asgard acquiring an interest in the tenements that are being vended into Dakota. He is very well placed to develop the lithium strategy for Dakota. Mr Wade Guo and Mr Joshua Wellisch will remain on the Board as non-executive directors and Mr Anthony Rechner and Mr Timothy Neesham will resign from the Board. The Company would like to thank Mr Rechner and Mr Neesham for their contribution during their tenures as Directors and in particular their work in facilitating the current project acquisition. Capital Raising Dakota has entered into a Mandate with Argonaut as lead manager to raise up to A$3.6 million in a 2 tranche share placement to fund acquisition costs and exploration on the tenements, as follows: The Placement will be conducted in two tranches: 1. Tranche 1: Placement of up to 17,483,000 shares at $0.03 per share to raise $524,490 (before costs) without Dakota shareholder approval under Dakota s existing placement capacity under ASX Listing Rule 7.1; and 2. Tranche 2: Placement of up to 102,517,000 shares at $0.03 per share to raise $3,075,510 (before costs). Subject to Dakota obtaining prior shareholder approval under ASX Listing Rule 7.1, the cleared Tranche 2 funds must be received by DKO within 5 business days of grant of E45/4523 occurring and the Tranche 2 shares must be issued by Dakota within 10 business days of grant of E45/4523 occurring. Argonaut will receive a fee of 6% of funds raised under the placement and, subject to shareholder approval, Dakota will issue 40 million unquoted options to Argonaut (or its nominees) to subscribe for Dakota shares as follows: 10,000,000 options exercisable at $0.035 expiring on 31 December 2017; 20,000,000 options exercisable at $0.06 expiring on 31 December 2017; and

6 10,000,000 options exercisable at $0.09 expiring on 31 December The proposed Capital Structure of the Company after completion of the transaction is set out in Annexure A Regulatory Approvals and General Meeting Completion of the acquisition of the Pilgangoora Project is subject to Dakota obtaining all required third party, regulatory and shareholder approvals and ASX waivers necessary to effect the transaction, including the grant by ASX of waivers from the listing rules to permit: 1. the issue of the Completion Shares within one year following the Dakota shareholder meeting; and 2. the issue of the Milestone Shares within 5 years following the shareholder meeting. ASX has informed the Company that the acquisition of the Pilgangoora Project will require shareholder approval for the purposes of ASX listing rule Dakota proposes to convene a General Meeting of Shareholders on or around 12 February 2015 to consider and approve: the acquisition of the Pilgangoora Project; the issue of the Completion Shares and the Milestone Shares; the issue of the Tranche 2 Placement shares; and the grant of 40,000,000 options to Argonaut or its nominees. The current Directors have advised the Company that they intend to vote in favour of the transaction in respect of any Dakota shares held or controlled by them at the date of the General Meeting. Competent Persons Statement The information in this document that relates to exploration results is based upon information compiled by Dr Francis Wedin, who will become a fulltime employee of Dakota Minerals Limited. Dr Wedin is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the December 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Dr Wedin consents to the inclusion in the report of the matters based upon the information in the form and context in which it appears. Contacts: Dakota Minerals Limited Tel: +61 (8) David Frances, Chief Executive Officer Mathew Whyte, Company Secretary

7 ANNEXURE A PROPOSED CAPITAL STRUCTURE DKO Capital structure SHARES Current shares on issue 69,933,906 Proposed placement of $0.03 to raise $524,490 (Tranche 1) 17,483,000 Proposed placement of shares@ $0.03 to raise $3,075,510 (Tranche 2) 102,517,000 Proposed issue of shares to Vendors (Vendor Shares) 50,000,000 Proposed maximum total shares on issue after Settlement 239,933,906 Milestone Shares- Tranche 1 30,000,000 Milestone Shares- Tranche 2 30,000,000 Proposed maximum total shares on issue if Milestones are met 299,933,906 OPTIONS : Current Options on Issue (DKOAA) Unlisted Options exercisable at $0.016 (1.6 cents) on or before 31 December 2018 Proposed issue of Unquoted DKO Options exercisable: 10,000,000 40,000,000 10,000,000 at 3.5 cents on or before December 31, ,000,000 at 6 cents on or before December 31, ,000,000 at 9 cents on or before December 31, 2017 Proposed total Options on issue after settlement 50,000,000 The above is indicative only and can be varied by mutual agreement of both parties in writing.

For personal use only

For personal use only 19 October 2016 Australian Securities Exchange (ASX) Level 40, Central Park 152-158 St Georges Terrace Perth WA 6000 HIGHLIGHTS: SPODUMENE BEARING PEGMATITE STRIKE EXTENDED Recent work identifies Spodumene

More information

For personal use only

For personal use only ASX ANNOUNCEMENT ASX: DKO 31 October 2016 CORPORATE DIRECTORY Non-Executive Chair John Fitzgerald Managing Director & CEO David J Frances Executive Technical Director Dr. Francis Wedin Non-Executive Director

More information

LARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA

LARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA 3 MAY 2017 LARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA Highlights New zone of spodumene pegmatites discovered, with main body outcropping along 1300 metres in strike extent Widths up

More information

For personal use only

For personal use only ASX ANNOUNCEMENT ASX: DKO 27 January 2017 CORPORATE DIRECTORY Non-Executive Chair John Fitzgerald Managing Director & CEO David J Frances Executive Technical Director Dr. Francis Wedin Non-Executive Director

More information

QUARTERLY ACTIVITIES REPORT & APPENDIX 5B For the period ending 30 September 2017

QUARTERLY ACTIVITIES REPORT & APPENDIX 5B For the period ending 30 September 2017 ASX ANNOUNCEMENT ASX: NLI. Frankfurt: ORM 25 October 2017 CORPORATE DIRECTORY Non Executive Chair John Fitzgerald President & CEO David J Frances Executive Technical Director Francis Wedin Non Executive

More information

Mining Projects to acquire the Pilbara Lithium-Gold Project in WA

Mining Projects to acquire the Pilbara Lithium-Gold Project in WA January 28, 2016 Mining Projects to acquire the Pilbara Lithium-Gold Project in WA Pilbara adjoins the lithium projects of both Pilbara Minerals and Altura Mining Mining Projects Group Limited (ASX: MPJ)

More information

Pathway to Production

Pathway to Production For personal use only Charging forward with Lithium Pathway to Production 8th Lithium Supply & Markets Conference 24 26 May 2016 Las Vegas Disclaimer This presentation has been prepared by Altura Mining

More information

VENUS METALS CORPORATION LIMITED

VENUS METALS CORPORATION LIMITED VENUS METALS CORPORATION LIMITED Company Presentation May 2016 ASX Code - VMC Disclaimer This presentation has been prepared by Venus Corporation Limited ( Venus ) and contains background information about

More information

For personal use only

For personal use only Highlights Completion of Due Diligence on European Cobalt Projects ASX Announcement Thursday, 30 March 2017 Fast Facts Shares on Issue: 47.3M 1 Market Cap: $6.5M 1 Cash in Bank: $4.5M 1,2 Subject to shareholder

More information

For personal use only

For personal use only KINGSTON RESOURCES LIMITED ASX Announcement Corporate Strategy: Building a new mining company 29 November 2016 ASX Code: KSN Share Price: A$0.022 Shares Outstanding: 660,269,985 Market Capitalisation:

More information

For personal use only

For personal use only ASX Announcement 20 March 2017 GB Energy Limited is an exploration company focused on energy metals Directors Chairman Mr Stuart Rechner Executive Director Mr Nick Burn Director Dr David Detata Operations

More information

For personal use only

For personal use only March 11, 2016 New name, new projects, new funding for MPJ to fast-track gold and lithium exploration Restructured company will offer investors highly leveraged exposure to two emerging project hubs in

More information

For personal use only

For personal use only ASX CODE: CHK ASX CODE: CHK TO: COMPANY ANNOUNCEMENTS OFFICE ASX LIMITED DATE: 30 JANUARY 2017 QUARTERLY REPORT 31 DECEMBER 2016 Cash at the end of the quarter was $490,059. The net cash outflow for the

More information

For personal use only

For personal use only 30 July 2018 Quarterly Report for the period ending 30 June 2018 ASX: AVZ HIGHLIGHTS Manono Lithium Project, DRC JORC compliant Mineral Resource Estimate to be completed by end of July 2018 AVZ commences

More information

For personal use only NT LITHIUM PROJECTS. ASX code: CXO

For personal use only NT LITHIUM PROJECTS. ASX code: CXO NT LITHIUM PROJECTS ASX code: CXO DISCLAIMER 2 WHY INVEST IN CXO 3 Largest lithium tenement holding in the NT with early mover advantage Largest pegmatite mine in the NT Largest lithium pegmatite target

More information

ANNUAL GENERAL PRESENTATION

ANNUAL GENERAL PRESENTATION ANNUAL GENERAL MEETING PRESENTATION 18 November 2015 Charging forward with lithium Disclaimer This presentation has been prepared by Altura Mining Limited ( Altura or the Company ). It should not be considered

More information

For personal use only

For personal use only U 15 March 2011 ASX ANNOUNCEMENT Further drilling results confirms additional shallow and thick mineralisation at Pilgangoora Lithium Project WA Pilgangoora Lithium (Western Australia) 100% Altura Mining

More information

ORION METALS LIMITED ACN

ORION METALS LIMITED ACN ORION METALS LIMITED ACN 096 142 737 INTERIM FINANCIAL REPORT FOR THE HALF-YEAR ENDED 31 AUGUST 2012 Contents Page No. Corporate information 2 Directors report 3 Auditor s independence declaration 5 Half-year

More information

QUARTERLY ACTIVITIES REPORT

QUARTERLY ACTIVITIES REPORT ASX ANNOUNCEMENT 30 April 2018 QUARTERLY ACTIVITIES REPORT FOR THE QUARTER ENDED 31 MARCH 2018 HIGHLIGHTS Sherlock Bay Nickel-Copper-Cobalt and Gold Project in the Pilbara, WA Verification of drilling

More information

SAYONA MINING LIMITED AND CONTROLLED ENTITIES

SAYONA MINING LIMITED AND CONTROLLED ENTITIES FINANCIAL REPORT FOR THE HALF - YEAR ENDED 31 DECEMBER 2016 The information contained in this report is to be read in conjunction with the Company s 2016 annual report and any announcements made to the

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 14 February 2014 SIRIUS RESOURCES NL ASX: SIR ABN: 46 009 150 083 Street address: 253 Balcatta Road, Balcatta, Western Australia 6021 Postal address: PO Box 1011, Balcatta, Western Australia

More information

For personal use only

For personal use only ASX Announcement and Media Release Wednesday, 25 October 2017 Acquisition of prospective Pilbara Conglomerate Gold Project and Capital Raising Highlights Acquiring one of the few remaining project areas

More information

LATIN SECURES LITHIUM PROJECTS IN SAN LUIS, ARGENTINA

LATIN SECURES LITHIUM PROJECTS IN SAN LUIS, ARGENTINA LATIN RESOURCES LIMITED ACN: 131 405 144 Unit 3, 32 Harrogate Street West Leederville, Western Australia, 6007. P 08 6181 9798 F 08 9380 9666 E info@latinresources.com.au 16 February 2018 LATIN SECURES

More information

ABN Interim Financial Report 31 December 2017

ABN Interim Financial Report 31 December 2017 ABN 64 612 531 389 Interim Financial Report CONTENTS DIRECTORS REPORT... 2 AUDITOR S INDEPENDENCE DECLARATION... 5 CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME. 6 CONDENSED

More information

BMO 2018 Global Metals and Mining Conference

BMO 2018 Global Metals and Mining Conference BMO 2018 Global Metals and Mining Conference Corporate Overview February 2018 2018 Hollywood, Florida Disclaimer This presentation has been prepared and issued by Kidman Resources Limited ( the Company

More information

For personal use only

For personal use only Bligh signs development Joint Venture Agreement for the Bundarra Gold Project in WA Bligh Resources Limited ACN 130 964 162 ASX: BGH ASX Release 28 October 2015 Level 9, 53 Walker St North Sydney New South

More information

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA 13 July 2012 NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA This release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The

More information

14 March ASX Announcements Platform Bridge Street Sydney NSW 2000

14 March ASX Announcements Platform Bridge Street Sydney NSW 2000 ABN 95 112 425 788 14 March 2016 ASX Announcements Platform Bridge Street Sydney NSW 2000 Pilbara Minerals Presentation Global Institutional Roadshow Resources Rising Stars Investor Lunch- Australia We

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 21 January 2015 SIGNIFICANT RESOURCE PROJECT ACQUISITION INTERNATIONAL GOLDFIELDS TO ACQUIRE PROSPECTIVE MINING & EXPLORATION PERMITS WITH POLYMETALLIC JORC RESOURCE HIGHLIGHTS International

More information

Viking Mines Limited ABN

Viking Mines Limited ABN Interim report for the half year ended 31 December 2016 Contents Corporate information 3 Directors report 4 Auditor s independence declaration 8 Condensed statement of comprehensive income 9 Condensed

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 6 th July 2016 ASX: CXO Core doubles lithium landholding as new large scale pegmatites found and lithium potential increases HIGHLIGHTS Core has doubled its tenement holding in the Finniss

More information

MARCH 2018 QUARTERLY ACTIVITIES REPORT

MARCH 2018 QUARTERLY ACTIVITIES REPORT MARCH 2018 QUARTERLY ACTIVITIES REPORT Valor Resources Limited ( VAL or the Company, ASX: VAL) is pleased to provide its report for the quarter ended 31 March 2018. Highlights: 80% increase in total Resources

More information

For personal use only

For personal use only ASX Announcement ASX: ERM ABN: 53 117 086 745 12 June 2014 Emmerson secures landmark transaction with Evolution Mining Emmerson Joint Venture with Evolution Mining (ASX: EVN) to fast-track exploration

More information

For personal use only

For personal use only ALTURA MINING LIMITED INVESTOR UPDATE 20 November 2013 James Brown Managing Director www.alturamining.com ASX: AJM DISCLAIMER This presentation has been prepared by Altura Mining Limited ( Altura or the

More information

GREAT WALL MOTOR COMPANY LIMITED *

GREAT WALL MOTOR COMPANY LIMITED * Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

For personal use only

For personal use only Chile s star in copper-gold ESTRELLA RESOURCES LIMITED ACN 151 155 207 AUSTRALIAN REGISTERED OFFICE: Level 51 MLC Centre 19-29 Martin Place Sydney NSW 2000 Australia CONTACT DETAILS: Email: jb@estrellaresources.com.au

More information

For personal use only

For personal use only ABN 65 009 131 533 Titanium Sands Limited (Formerly Windimurra Vanadium Limited) Interim Financial Report for the Half Year Ended 31 December 2016 1 Contents Page Corporate information 2 Directors report

More information

For personal use only NT LITHIUM PROJECTS

For personal use only NT LITHIUM PROJECTS NT LITHIUM PROJECTS ASX code: CXO DISCLAIMER 2 COMPANY INFORMATION 3 Shares Price A$ ~$0.025 Shares on issue 175M Options (CXOOA 5c Aug17) 55M Market cap (undil) ~$4M Cash (31/12/15) ~$0.21M Top 20 (consolidated)

More information

For personal use only

For personal use only Exploring the Emerging World-Class Albany-Fraser Region Outstanding leverage to new discoveries in WA s newest mining province Resources Rising Stars Investor Series March/April 2015 David J. Frances,

More information

For personal use only

For personal use only Chile s star in copper-gold ESTRELLA RESOURCES LIMITED ACN 151 155 207 AUSTRALIAN REGISTERED OFFICE: Level 51 MLC Centre 19-29 Martin Place Sydney NSW 2000 Australia Email: admin@estrellaresources.com.au

More information

For personal use only

For personal use only 11 January 2018 ASX Code: WCN $1 MILLION PLACEMENT White Cliff Minerals Limited ( White Cliff or the Company ) is pleased to report that drilling approvals have been granted for a substantial drilling

More information

ALTURA MINING LIMITED ANNUAL GENERAL MEETING

ALTURA MINING LIMITED ANNUAL GENERAL MEETING ALTURA MINING LIMITED ANNUAL GENERAL MEETING 19 November 2013 James Brown Managing Director www.alturamining.com ASX: AJM DISCLAIMER This presentation has been prepared by Altura Mining Limited ( Altura

More information

SAVANNAH RESOURCES PLC AIM: SAV. AN ENERGY METALS GROUP 25 September Savannah Resources Plc

SAVANNAH RESOURCES PLC AIM: SAV. AN ENERGY METALS GROUP 25 September Savannah Resources Plc Savannah Resources Plc SAVANNAH RESOURCES PLC AIM: SAV AN ENERGY METALS GROUP 25 September 2018 Significant Resource Potential Identified in Area Near Mina do Barroso Lithium Project, Option to Acquire

More information

For personal use only

For personal use only 29 July 2016 ASX Code: RER QUARTERLY ACTIVITIES REPORT JUNE 2016 HIGHLIGHTS Corporate Completed negotiations with Traxys and GICC in relation to increasing Regal s stake in the Kalongwe Project. Completed

More information

Strategic Entry into the Lithium Market

Strategic Entry into the Lithium Market Sourcing the raw materials of the future ASX: SYA APRIL 2016 Investor Presentation Strategic Entry into the Lithium Market The Green Energy Revolution Creating Demand for Graphite & Lithium for Use in

More information

For personal use only

For personal use only 25 JUNE 2018 ASX/MEDIA RELEASE SPITFIRE AND EXCELSIOR GOLD TO MERGE, CREATING +2Moz CONSOLIDATED JORC RESOURCE The combined company, to be led by Managing Director Mr John Young, aims to fast-track the

More information

For personal use only

For personal use only ASX Release: 31 January 2018 ASX Code: BEM BLACKEARTH QUARTERLY ACTIVITIES REPORT Quarter ended 31 December 2017 BlackEarth Minerals NL (ASX: BEM) lists on 19 January 2018; BEM raised $5.45m as part of

More information

Company Presentation ASX:TAW

Company Presentation ASX:TAW ASX RELEASE 16 March 2018 ASX:TAW CORPORATE DIRECTORY Non-Executive Chairman Robert Benussi Managing Director Mark Calderwood Non-Executive Directors Robert Vassie Mark Turner Wei (Vicki) Xie Joint Company

More information

For personal use only

For personal use only ABN 62 159 819 173 INTERIM FINANCIAL REPORT FOR THE PERIOD 8 AUGUST 2012 TO This interim financial report does not include all the notes of the type normally included in an annual financial report. This

More information

For personal use only

For personal use only European Metals Holdings Limited ARBN 154 618 989 Level 4, 66 Kings Park Road West Perth WA 6005 PO Box 52 West Perth WA 6872 Phone + 61 8 6141 3500 Fax + 61 6141 3599 Website: www.europeanmet.com Directors

More information

For personal use only

For personal use only Quarterly Activities Report for the period ended 30 September 2018 ASX ANNOUNCEMENT 31 October 2018 Highlights Manono Scoping Study confirms potential for a world-class, high margin, long life mining project

More information

Advancing a Portfolio of Lithium Projects

Advancing a Portfolio of Lithium Projects Sourcing the raw materials of the future ASX: SYA MAY 2016 Investor Presentation Advancing a Portfolio of Lithium Projects The Green Energy Revolution Creating Demand for Graphite & Lithium for Use in

More information

Cohiba Minerals Limited

Cohiba Minerals Limited ABN 72 149 026 308 Half-year Financial Report - Contents Corporate directory 2 Directors' report 3 Auditor's independence declaration 5 Statement of profit or loss and other comprehensive income 6 Statement

More information

For personal use only

For personal use only 21 st July 2016 UPDATE ON LAKE JOHNSTON LITHIUM PROJECT Highlights Geochemical sampling technicians commenced field work Chemical analysis applied for finger printing of Lake Johnston pegmatites Two new

More information

Hot Chili Raises A$8.1m via Placement

Hot Chili Raises A$8.1m via Placement ASX ANNOUNCEMENT Monday 15 th June 2015 Hot Chili Raises A$8.1m via Placement Major shareholders, including strategic partner CAP, underpin placement - ensuring Productora PFS will be completed with no

More information

Quarterly Activities Report

Quarterly Activities Report ASX: CYL Quarterly Activities Report Quarter ended 30 September 2011 SUMMARY Drilling due to commence on Four Eagles Gold Project before the end of October 2011 after no drilling activity during the September

More information

Quarterly activities report For Qtr ended 30 June 2013 OPERATIONS

Quarterly activities report For Qtr ended 30 June 2013 OPERATIONS Quarterly activities report For Qtr ended 30 June 2013 ASX:AWV Anova Metals Limited ABN 20 147 678 779 OPERATIONS 26 July 2013 Directors Jon Parker Chairman & NED Tim Dobson Managing Director Bill Fry

More information

METAL BANK TO ACQUIRE ROAR RESOURCES PTY LTD

METAL BANK TO ACQUIRE ROAR RESOURCES PTY LTD 2 October 2013 About Metal Bank Limited Metal Bank Limited is an ASXlisted diversified mineral exploration company. Metal Bank s corporate strategy is to maximise shareholder returns through a combination

More information

For personal use only

For personal use only NOVEMBER 2016 Investor Presentation Charging Ahead at the Authier Lithium Project ASX: SYA Sourcing the raw materials of the future Buoyant Lithium Macro DEMAND SUPPLY Renewable grid storage Transportation

More information

GAINING MOMENTUM: DRILLING TWO HIGH POTENTIAL AUSTRALIAN LITHIUM PROJECTS MARCH 2018 ASX : LTR

GAINING MOMENTUM: DRILLING TWO HIGH POTENTIAL AUSTRALIAN LITHIUM PROJECTS MARCH 2018 ASX : LTR GAINING MOMENTUM: DRILLING TWO HIGH POTENTIAL AUSTRALIAN LITHIUM PROJECTS MARCH 2018 ASX : LTR 1 Competent Person s Statement and Disclaimer: The Information in this report that relates to the Exploration

More information

For personal use only

For personal use only - CHILE On 14 th November 2016, Emu signed a Heads of Agreement (HoA) with Prospex SpA and BLC SpA, Chilean registered companies which are owned 49% by Altius Minerals Corporation of Canada (collectively

More information

MERGER PRESENTATION JULY 2018

MERGER PRESENTATION JULY 2018 MERGER PRESENTATION JULY 2018 ASX: SPI ASX: EXG PAGE 1 1 CREATING A LEADING ASX-LISTED GOLD DEVELOPER The combined company, to be led by Managing Director Mr John Young, aims to fast-track the creation

More information

Consolidated Tin Mines Limited

Consolidated Tin Mines Limited 31 January 2013 DECEMBER 2012 QUARTER ACTIVITIES & CASHFLOW REPORT ASX RELEASE ABN: 57 126 634 606 Phone: +61 (7) 4032 3319 info@csdtin.com.au Snapshot: ASX: CSD Registered Office: 395 Lake Street, Cairns

More information

For personal use only ABN

For personal use only ABN ABN 33 124 792 132 Financial statements for the half year ended 30 June 2011 Corporate directory Corporate directory Board of Directors Mr Murray McDonald Mr Ian Cowden Ms Emma Gilbert Company Secretary

More information

For personal use only AND ITS CONTROLLED ENTITIES (ABN )

For personal use only AND ITS CONTROLLED ENTITIES (ABN ) AND ITS CONTROLLED ENTITIES (ABN 52 147 413 956) HALF YEAR REPORT for the financial period ended 31 December 2016 CONTENTS Corporate Directory... 1 Directors' Report... 2 1. Directors... 2 2. Principal

More information

For personal use only

For personal use only ASX Code: GMM A Multi Asset, Rare Metal Development Company Disclaimer Competent Persons Statement James Bay The information in this report that relates to Mineral Resources is based on work completed

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 17 October 2018 ASX Market Announcements ASX Limited 20 Bridge Street Sydney NSW 2000 US$35M COMMITTED OFFER OF DEBT FUNDING SECURED FOR THE ADIDI-KANGA GOLD PROJECT Key Highlights: The

More information

For personal use only

For personal use only ABN 77 141 335 364 INTERIM FINANCIAL REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER 2017 Contents Page Corporate Information 2 Directors Report 3 Auditor s Independence Declaration 10 Condensed Consolidated

More information

For personal use only

For personal use only Top End Minerals Ltd 31 January 2013 Manager Companies Australian Securities Exchange Level 6, 20 Bridge Street Sydney NSW 2000 By ELodgement REPORT FOR THE QUARTER ENDED 31 DECEMBER 2012 Top End Minerals

More information

29 th July 2016 JUNE QUARTER ACTIVITIES REPORT 2016

29 th July 2016 JUNE QUARTER ACTIVITIES REPORT 2016 29 th July 2016 JUNE QUARTER ACTIVITIES REPORT 2016 ASX Symbol: NMM Level 1, 11 Ventnor Avenue West Perth WA 6005 Phone: +61 8 6141 3500 Fax: +61 8 6141 3599 www.noblemetals.com.au BOARD OF DIRECTORS AND

More information

QUARTERLY ACTIVITIES REPORT September 2017

QUARTERLY ACTIVITIES REPORT September 2017 ASX ANNOUNCEMENT 30 October 2017 QUARTERLY ACTIVITIES REPORT September 2017 Altura is fully funded into production following completion of its US$110 million debt facility Successful placement to international

More information

AVZ Minerals Limited ABN

AVZ Minerals Limited ABN AVZ Minerals Limited ABN 81 125 176 703 Interim Financial Report 31 December AVZ Minerals Limited 1 Corporate Directory Executive Chairman Klaus Eckhof Managing Director Nigel Ferguson Executive Director

More information

For personal use only

For personal use only alturamining.com ASX : AJM ANNUAL GENERAL MEETING PRESENTATION 27 November 2014 DISCLAIMER This presentation has been prepared by Altura Mining Limited ( Altura or the Company ). It should not be considered

More information

Mithril remains focussed on developing copper and nickel targets across its two Meekatharra projects Nanadie Well and Copper Hills.

Mithril remains focussed on developing copper and nickel targets across its two Meekatharra projects Nanadie Well and Copper Hills. Quarterly Report For the Period Ending 30 June 2014 Highlights Meekatharra Projects Western Australia Mithril remains focussed on developing copper and nickel targets across its two Meekatharra projects

More information

For personal use only

For personal use only 17 th January 2017 Dampier : Vango K2 Mine Development The Directors of Dampier Gold Limited (ASX:DAU) are pleased to announce that the Company and Vango Mining Limited (ASX:VAN) have entered into a non

More information

o Placement and Framework Agreement Sinomine to invest A$10,000,000 via a share placement in Prospect at A$0.05 per share.

o Placement and Framework Agreement Sinomine to invest A$10,000,000 via a share placement in Prospect at A$0.05 per share. PROSPECT EXECUTES CONDITIONAL OFFTAKE AND CONDITIONAL PLACEMENT AND FRAMEWORK AGREEMENT TO FULLY FUND CONSTRUCTION OF MINE AND PLANT FOR PROSPECT S ARCADIA LITHIUM PROJECT Highlights: Prospect Resources

More information

For personal use only

For personal use only a Level 14, 31 Queen Street Melbourne, Victoria 3000 t +61 3 8610 8633 f +61 3 8610 8666 e info@aruntaresources.com.au www.aruntaresources.com.au ABN 73 089 224 402 20 August 2015 ASX ANNOUNCEMENT (ASX:

More information

Bligh Strikes Joint Venture Agreement to develop Bundarra Gold Project in WA

Bligh Strikes Joint Venture Agreement to develop Bundarra Gold Project in WA Bligh Strikes Joint Venture Agreement to develop Bundarra Gold Project in WA Bligh Resources Limited ACN 130 964 162 Contacts: Bill Richie Yang ASX: BGH ASX Release 2 September 2015 Level 9, 53 Walker

More information

For personal use only

For personal use only Quarterly Report For the three months ending 30 September 2015 ASX Release: 30 October 2015 Summary & Highlights for the Quarter Capital raising completed via a Placement and Rights Issue to raised $811,421

More information

AZUMAH MINING LEASES GRANTED

AZUMAH MINING LEASES GRANTED AZUMAH MINING LEASES GRANTED WA GOLD PROJECT, GHANA ASX & Media Release ASX Code AZM 28 th July 2014 Perth-based gold explorer and developer Azumah Resources Limited (ASX:AZM) (Azumah or the Company) is

More information

Golden State Mining Limited

Golden State Mining Limited Golden State Mining Limited ABN 52 621 105 995 INTERIM FINANCIAL REPORT FOR THE PERIOD FROM 15 AUGUST TO 31 DECEMBER This interim financial report does not include all the notes of the type normally included

More information

ALLIANCE RESOURCES L I M I T E D

ALLIANCE RESOURCES L I M I T E D ALLIANCE RESOURCES L I M I T E D THE FOUR MILE URANIUM PROJECT Australia s next uranium mine Australian Uranium Conference Fremantle, Western Australia Patrick Mutz Managing Director 22-23 July 2009 Corporate

More information

Sourcing the raw materials of the future. Authier Lithium Project JORC Resource Overview ASX: SYA JULY 2016

Sourcing the raw materials of the future. Authier Lithium Project JORC Resource Overview ASX: SYA JULY 2016 Sourcing the raw materials of the future ASX: SYA JULY 2016 Authier Lithium Project JORC Resource Overview Disclaimer COMPETENT PERSON STATEMENTS Authier - The information in this report that relates to

More information

Shareholder Presentation. Michael Mulroney - Managing Director July 2012

Shareholder Presentation. Michael Mulroney - Managing Director July 2012 Shareholder Presentation Michael Mulroney - Managing Director July 2012 Cautionary Statement The information contained in this document ( Presentation ) has been prepared by Venturex Resources Limited

More information

Quarterly Activities Report Quarter Ended 31 March 2015

Quarterly Activities Report Quarter Ended 31 March 2015 ASX Announcement & Media Release 30 April 2015 Quarterly Activities Report Quarter Ended 31 March 2015 HIGHLIGHTS Announcement of proposed equal access buyback at $0.0353 per share Sale of 51% interest

More information

MARCH 2011 QUARTERLY REPORT AND STATEMENT OF CASHFLOWS

MARCH 2011 QUARTERLY REPORT AND STATEMENT OF CASHFLOWS MARCH 2011 QUARTERLY REPORT AND STATEMENT OF CASHFLOWS About TriAusMin (ASX:TRO) (TSX:TOR) TriAusMin Limited ( TriAusMin ) is an Australian development stage base and precious metals company, which is

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 30 July 2018 Quarterly Report For the period ending 30 June 2018 PIOP Maturation Work During the quarter ending 30 June 2018, Flinders Mines Limited (Flinders Mines or the Company) completed

More information

For personal use only

For personal use only SOUTHERN CROWN RESOURCES LIMITED ABN: 52 143 416 531 FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2015 Southern Crown Resources Limited HALF YEAR FINANCIAL REPORT 1 CORPORATE DIRECTORY BOARD OF

More information

Gold Road Announces $6M Share Purchase Plan

Gold Road Announces $6M Share Purchase Plan ASX ANNOUNCEMENT 7 October 2011 Gold Road Announces $6M Share Purchase Plan Highlights ASX Code: GOR $6M Share Purchase Plan ABN 13 109 289 527 Funds will accelerate aggressive exploration program on Yamarna

More information

RE: QUARTERLY ACTIVITIES REPORT FOR THE QUARTER ENDED 30 SEPTEMBER

RE: QUARTERLY ACTIVITIES REPORT FOR THE QUARTER ENDED 30 SEPTEMBER Activities Report Quarter Ended 30 September 2010 21 October 2010 Company Announcements Office ASX Limited RE: QUARTERLY ACTIVITIES REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2010 As part of its expansion

More information

For personal use only

For personal use only QUARTERLY ACTIVITIES REPORT FOR THE 3 MONTH PERIOD ENDING 31 DECEMBER 2016 31 January 2017 HIGHLIGHTS FOR THE QUARTER Shareholders approved the acquisition of a 70% interest in the advanced and highly

More information

TRAKA RESOURCES LTD (A.B.N )

TRAKA RESOURCES LTD (A.B.N ) TRAKA RESOURCES LTD (A.B.N. 63 103 323 173) Quarterly Activity Report for the three months ended 30 th June 2008 Suite 2 Ground floor, 43 Ventnor Avenue, West Perth Western Australia 6005 Telephone: (+61)

More information

For personal use only

For personal use only QUARTERLY OPERATIONS REPORT TO 30 JUNE 2016 OPERATIONS SRI LANKAN MINERAL SANDS PROJECT Windimurra Vanadium Ltd (the Company ) has exercised an option to acquire 100% of the issued capital of Srinel Holdings

More information

Quarterly Activities Report For The Period Ending 30 September 2018

Quarterly Activities Report For The Period Ending 30 September 2018 Quarterly Activities Report For The Period Ending 30 September 2018 31 October 2018 HIGHLIGHTS The feasibility study drilling program on the Caula Vanadium-Graphite Project in Northern Mozambique was completed

More information

VULCAN RESOURCES AND UNIVERSAL RESOURCES MERGER TO CREATE SIGNIFICANT COPPER-FOCUSSED GLOBAL DEVELOPMENT COMPANY

VULCAN RESOURCES AND UNIVERSAL RESOURCES MERGER TO CREATE SIGNIFICANT COPPER-FOCUSSED GLOBAL DEVELOPMENT COMPANY Level 2, 91 Havelock Street, West Perth Western Australia 6005 Phone: +61 (0)8 9486 8400 ABN 60 100 072 624 Facsimile: +61 (0)8 9486 8700 Ground Floor, 1 Altona Street, West Perth WA 6005 www.universalresources.com.au

More information

SIGNATURE METALS LIMITED ABN NOTICE OF ANNUAL GENERAL MEETING EXPLANATORY STATEMENT PROXY FORM. 9:30 am (WST) DATE: 26 November 2009

SIGNATURE METALS LIMITED ABN NOTICE OF ANNUAL GENERAL MEETING EXPLANATORY STATEMENT PROXY FORM. 9:30 am (WST) DATE: 26 November 2009 SIGNATURE METALS LIMITED ABN 86 106 293 190 NOTICE OF ANNUAL GENERAL MEETING EXPLANATORY STATEMENT PROXY FORM TIME: 9:30 am (WST) DATE: 26 November 2009 PLACE: Level 1 33 Richardson Street West Perth,

More information

Lepidico Drilling Update: lithium pegmatites intersected in each of three programs

Lepidico Drilling Update: lithium pegmatites intersected in each of three programs ASX/Media Announcement 20 December 2018 Lepidico Drilling Update: lithium pegmatites intersected in each of three programs Exploration drilling within the Alvarrões mining lease area identifies additional

More information

QUARTERLY ACTIVITES REPORT AS AT 31 MARCH 2012

QUARTERLY ACTIVITES REPORT AS AT 31 MARCH 2012 Perth Office 108 Outram Street PO Box 1346 West Perth,WA, 6005 West Perth WA 6872 T: +61 8 9476 4500 E: info@epicresources.com.au F: +61 8 6314 1587 W: www.epicresources.com.au QUARTERLY ACTIVITES REPORT

More information

For personal use only

For personal use only 24 August 2018 Placement and Fully Underwritten Entitlement Offer to raise approximately $75 million Highlights Placement for approximately $5.8 million successfully completed Launch of underwritten entitlement

More information

ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 28 th February 2018

ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 28 th February 2018 ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 28 th February 2018 EXPLORATION ACTIVITIES Expressions of interest in Orion Metals Tanami West Project from external parties during

More information