1 Quarterly Activities Report for the period ended 30 September 2018 ASX ANNOUNCEMENT 31 October 2018 Highlights Manono Scoping Study confirms potential for a world-class, high margin, long life mining project AVZ intends to proceed to a Definitive Feasibility Study (DFS) to be completed in Q2 2019, which will consider the potential for tin byproduct credits Maiden Mineral Resource estimate of 259.9Mt grading 1.63% Li 2O (spodumene), confirming Manono s potential to become a world leader in the global lithium market AVZ received further high-grade lithium results from a resource drilling program at the Manono Lithium Project in Democratic Republic of Congo which were not included in the Company s maiden Mineral Resource announced in August 2018 Updated Mineral Resource Estimate for Manono expected to be complete by the end of 2018 Scoping Study for 5Mtpa and 10Mtpa scenarios progressing Corporate Graeme Johnston appointed as Technical Director. AVZ Minerals Limited Level 2, Suite Oxford Street Mt Hawthorn, WA 6016 Australia T: F: E: admin@avzminerals.com.au W: ABN Directors Managing Director: Nigel Ferguson Technical Director: Graeme Johnston Non-Executive Director: Rhett Brans Non-Executive Director: Honliang Chen Non-Executive Director: Guy Loando Issued Capital 1,888 M Ordinary Shares Market Cap $136 M ASX Code: AVZ

2 AVZ Minerals Ltd (ASX: AVZ) is pleased to provide the following report on its activities for the quarter ended 30 September MANONO LITHIUM PROJECT, DRC Scoping Study Subsequent to quarter end, AVZ released results from its Manono Lithium Project Scoping Study undertaken by CPC Project Design Pty Ltd (CPC) in conjunction with Alan Dickson & Associates (ADA). Highlights of the study included: - Case 1 of 2 Million tonnes per annum (Mtpa) pre-tax, pre-royalties NPV 10 of approximately US$1.6 Billion (Bn) (AVZ s 60% share is approximately US$0.93Bn) with an estimated IRR greater than 90%. - Scope for annual production of approximately 440,000 tonnes per annum (tpa) at a minimum of 5.8% Li 2O concentrate from Case 1 throughput of 2Mtpa of pegmatite ore with low strip ratio of 0.7:1. - F.O.B. Operating costs to Dar-es-Salaam estimated at approximately US$355 per tonne (t) of concentrate. - Metallurgical test work indicates recoveries in excess of 80% are achievable. - Capex estimated for Case 1 throughput at approximately US$150 to $160 Million (accurate to ±35% and includes US$36M contingency). - Study for Case 2 for 5Mtpa and Case 3 for 10Mtpa in progress and will be completed as soon as practicable. The Study confirmed Manono as the largest undeveloped hard rock lithium project globally in terms of grade, mine life and expandability and demonstrated its potential for excellent economic outcomes. AVZ expects that the project economics can be further improved, especially regarding transport, processing, power costs and recovery of tin as a by-product. The Scoping Study did not analyse the potential for tin by-product credits once metallurgical test work is completed, however it is expected that these credits will be included in a Definitive Feasibility Study, which AVZ intends to commence immediately. More detail on the Scoping Study can be found in the ASX Announcement dated 9 October Positive Preliminary Metallurgical Test Work Initial metallurgical test work was completed on coarse assay reject material from holes MO17DD001 and MO17DD002. The simple spodumene mineralogy of the Roche Dure pegmatite responds well to a range of industry standard concentration techniques. Initial mineral characterisation investigations of the Roche Dure Pegmatite, support the potential for high value mineralisation within the Roche Dure pegmatite. Roche Dure Pegmatite is essentially homogenous and spodumene confirmed as the lithium mineral species present within the pegmatite. The mean concentrations of penalty elements are low with 0.1% F, 0.3% P 2O 5 and 0.4% Fe 2O 3 and should allow the Manono concentrate to trade at a premium to other products on the market.

3 Rock Chip Sample collected showing white spodumene (the large, long prism to right of the blue pen) in a quartz feldspar matrix The initial metallurgical test work demonstrates the Roche Dure prospect at the Manono Lithium Project can produce up to 6.3% Li 2O DMS concentrate (+3.35mm) using standard metallurgical laboratory test standards. The concentrate specification shows the material is suitable for supply of a chemical grade concentrate to the growing lithium battery market. An upgrade in specification is possible through further metallurgical test work. Metallurgical test work drilling is now underway combined with completion of the resource drilling. This metallurgical test work will be undertaken as part of the Definitive Feasibility Study and should be finalised in Q2/2019. Maiden Mineral Resource AVZ Minerals announced a maiden Mineral Resource for the Manono Project in August 2018 of 259.9Mt grading 1.63% Li 2O. This confirmed Manono s potential to become a world leader in the global lithium market. The initial Mineral Resource included assay data from only 31 drill holes on 980m of strike length and geological data from 42 drill holes to enable interpretation of a geological model. All drill holes except two, MO17DD001 and MO17DD002, were completed in AVZ completed a total of 13,576m of diamond core, mainly PQ (3,129m) and HQ (10,447m) in size, at the Roche Dure pegmatite.

4 The Mineral Resource is reported in Table 1 at a cut-off grade of 0.5% Li 2O and areas have been classified as Measured, Indicated or Inferred Resources in accordance with the guidelines of the JORC Code (2012). Fresh Pegmatite Category Tonnes Li 2O Sn Ta 2O 5 Fe 2O 3 SG (Millions) % ppm ppm % Measured Indicated Inferred Total Table 1: Manono Roche Dure Mineral Resource at a 0.5% Li 2O cut-off The overall Roche Dure Mineral Resource comprised 4.25 million tonnes of lithium oxide (Li 2O), 219kt of tin as cassiterite grading 844ppm Sn and 11.2kt of tantalum grading 43ppm Ta 2O 5. Ongoing drilling has indicated potential for the Manono Mineral Resource to increase, given that assay data from only an approximate 50% of the total strike length at Roche Dure was included in this statement. AVZ has planned further drilling to test the Mpete and Tempete pegmatites at Kitotolo Sector just north of Roche Dure and the Carrier de L Est pegmatite at Manono sector. Further details on the maiden Mineral Resource are in the ASX announcement dated 2 August Drilling Results AVZ s mineral resource drilling program continued throughout the quarter, with results defining mineralised pegmatite at Roche Dure over a strike length of more than 800m. Highlights of results reported during and post the quarter included: - MO18DD018 intersected 1.69% Li 2O and 905ppm Sn from 75.00m down-hole - MO18DD019 intersected 1.38% Li 2O and 1205ppm Sn from m down-hole - MO18DD020 intersected 1.41% Li 2O and 816ppm Sn from 133m down-hole - MO18DD024 intersected 1.06% Li 2O & 1261ppm Sn from 65.17m down-hole - MO18DD027 intersected 1.72% Li 2O and 872ppm Sn from 68.0m down-hole - MO18DD031 intersected 1.56% Li 2O and 799ppm Sn from 71.46m down-hole - MO18DD035 intersected 1.74% Li 2O & 822ppm Sn from 54.55m down-hole - MO18DD036 intersected 1.70% Li 2O & 422ppm Sn from m down-hole - MO18DD037 intersected 1.33% Li 2O & 596ppm Sn from 78.14m down-hole - MO18DD041 intersected 1.31% Li 2O & 551ppm Sn from 88.30m down- hole - MO18DD043 intersected 1.76% Li 2O & 1015ppm Sn from 41.00m down-hole - MO18DD044 intersected 1.73% Li 2O & 953ppm Sn from 50.55m down-hole - MO18DD045 intersected 1.78% Li 2O & 358ppm Sn from m down-hole - MO18DD049 intersected 1.43% Li 2O & 1091ppm Sn from 12.10m down-hole

5 - MO18DD050 intersected 1.44% Li2O & 376ppm Sn from 146.3m down-hole - MO18DD052 intersected 1.76% Li2O & 1175ppm Sn from 99.13m down-hole - MO18DD054 intersected 1.63% Li2O & 1173ppm Sn from 35.2m down-hole * Down-hole length. Additional drilling is required to confirm the true thickness of the pegmatites. Latest drilling has identified additional high-grade lithium and tin mineralisation, pointing to further resource growth on the Company s maiden Mineral Resource announced in early August Pegmatite intervals in more recent infill holes showed zones of lower lithium grade in more oxidised and weathered material but drilling also continued to demonstrate substantial thicknesses of higher-grade material ranging in depth from just under the weathered zones to deeper in the deposit. Again, there appears to be no zonation in the pegmatite intersected based on the results from eight new holes reported by AVZ on 19 September AVZ s infill drilling is expected to be completed late in November, with an update to the Mineral Resource Estimate for Manono due before the end of the year. Core samples of MO18DD050 showing existence of spodumene and tin with interval downhole from 281m to 282m reporting 4.28% Li 2O & 103ppm Sn CORPORATE Management changes During the quarter, AVZ appointed Graeme Johnston as its Technical Director. He had been AVZ s Project Manager at Manono since May Mr Johnston is a geologist with more than 30 years experience operating Australia, the Middle East, Romania, Malaysia and recently the DRC. Leonard Math was appointed Joint Company Secretary in July. Later in the quarter, the Company accepted the resignation of Mathew O Hara as Joint Company Secretary, and Mr Math assumed full responsibility of the Company Secretary role.

6 For further information, visit or contact: Mr. Leonard Math Company Secretary AVZ Minerals Limited Phone: admin@avzminerals.com.au Competent Person s Statement The information in this report that relates that relates to geology and the exploration results is based on information compiled by Mr. Michael Cronwright, a Competent Person whom is a fellow of The Geological Society of South Africa and Pr. Sci. Nat. (Geological Sciences) registered with the South African Council for Natural Professions. Mr. Cronwright is a full-time employee of The MSA Group Pty Ltd. Mr Cronwright has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Cronwright consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The information in this report that relates to the Mineral Resource estimate is based on information compiled by Mr Anton Geldenhuys (BSc Hons, MEng) who is a geologist with 17 years experience in exploration and mining as well as Mineral Resource evaluation and reporting. He is a Principal Mineral Resource Consultant for The MSA Group (an independent consulting company), is a member in good standing with the South African Council for Natural Scientific Professions (SACNASP) and is a Member of the Geological Society of South Africa (GSSA). Mr Geldenhuys has the appropriate relevant qualifications and experience to be considered a Competent Person for the activity being undertaken as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Information required under ASX Listing Rule List of current mining and exploration tenements (as at 30 September 2018): Country / Project Tenement Interest Status DRC Manono Project PR % Granted DRC Manono Extension Project PR 4029 PR % Granted DRC - Katanga Regional PR 12436, PR 12449, PR 12450,PR 12454, 60% Granted

7

8 Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16 Name of entity AVZ Minerals Limited ABN Quarter ended ( current quarter ) September 2018 Consolidated statement of cash flows 1. Cash flows from operating activities 1.1 Receipts from customers 1.2 Payments for (a) exploration & evaluation Current quarter Year to date (3 months) (7,655) (7,655) (b) development - - (c) production - - (d) staff costs (375) (375) (e) administration and corporate costs (358) (358) 1.3 Dividends received (see note 3) Interest received Interest and other costs of finance paid Income taxes paid Research and development refunds Other (net GST/FBT activity) (68) (68) 1.9 Net cash from / (used in) operating activities (8,403) (8,403) 2. Cash flows from investing activities 2.1 Payments to acquire: (a) property, plant and equipment (341) (341) (b) tenements - - (c) investments 1 (1,059) (1,059) (d) other non-current assets See chapter 19 for defined terms 1 September 2016 Page 1

9 Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Consolidated statement of cash flows 2.2 Proceeds from the disposal of: (a) property, plant and equipment Current quarter Year to date (3 months) - - (b) tenements - - (c) investments - - (d) other non-current assets Cash flows from loans to other entities Dividends received (see note 3) Other (provide details if material) Net cash from / (used in) investing activities (1,393) (1,393) 1. Advance payment of US$750,000 to Cominiere SPRL, as part of acquisition cost. 3. Cash flows from financing activities 3.1 Proceeds from issues of shares Proceeds from issue of convertible notes Proceeds from exercise of share options Transaction costs related to issues of shares, convertible notes or options Proceeds from borrowings Repayment of borrowings Transaction costs related to loans and borrowings Dividends paid Other (provide details if material) Net cash from / (used in) financing activities Net increase / (decrease) in cash and cash equivalents for the period 4.1 Cash and cash equivalents at beginning of period 4.2 Net cash from / (used in) operating activities (item 1.9 above) 4.3 Net cash from / (used in) investing activities (item 2.6 above) 4.4 Net cash from / (used in) financing activities (item 3.10 above) 4.5 Effect of movement in exchange rates on cash held 4.6 Cash and cash equivalents at end of period 16,337 16,337 (8,403) (8,403) (1,393) (1,393) - - 6,541 6,541 + See chapter 19 for defined terms 1 September 2016 Page 2

10 Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report 5. Reconciliation of cash and cash equivalents at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts Current quarter Previous quarter 5.1 Bank balances 6,541 16, Call deposits Bank overdrafts Other (provide details) Cash and cash equivalents at end of quarter (should equal item 4.6 above) 6,541 16, Payments to directors of the entity and their associates Current quarter $A' Aggregate amount of payments to these parties included in item Aggregate amount of cash flow from loans to these parties included in item Include below any explanation necessary to understand the transactions included in items 6.1 and $A'000 Payment to directors and related entities director fees and corporate services (excluding GST) Payment to director related entity technical services (excluding GST) Payments to related entities of the entity and their associates Current quarter $A' Aggregate amount of payments to these parties included in item Aggregate amount of cash flow from loans to these parties included in item Include below any explanation necessary to understand the transactions included in items 7.1 and See chapter 19 for defined terms 1 September 2016 Page 3

11 Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report 8. Financing facilities available Add notes as necessary for an understanding of the position Total facility amount at quarter end Amount drawn at quarter end 8.1 Loan facilities Credit standby arrangements Other (please specify) Include below a description of each facility above, including the lender, interest rate and whether it is secured or unsecured. If any additional facilities have been entered into or are proposed to be entered into after quarter end, include details of those facilities as well. 9. Estimated cash outflows for next quarter 9.1 Exploration and evaluation 3, Development Production Staff costs Administration and corporate costs Other Total estimated cash outflows 3, Changes in tenements (items 2.1(b) and 2.2(b) above) 10.1 Interests in mining tenements and petroleum tenements lapsed, relinquished or reduced 10.2 Interests in mining tenements and petroleum tenements acquired or increased Tenement reference and location PR PR PR (DRC) Nature of interest Interest at beginning of quarter Direct Interest 60% Nil Interest at end of quarter + See chapter 19 for defined terms 1 September 2016 Page 4

12 Compliance statement Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A. 2 This statement gives a true and fair view of the matters disclosed. Sign here: Date: 30 October 2018 (Company secretary) Print name: Leonard Math Notes 1. The quarterly report provides a basis for informing the market how the entity s activities have been financed for the past quarter and the effect on its cash position. An entity that wishes to disclose additional information is encouraged to do so, in a note or notes included in or attached to this report. 2. If this quarterly report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report. 3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity. + See chapter 19 for defined terms 1 September 2016 Page 5

For personal use only

For personal use only 30 July 2018 Quarterly Report for the period ending 30 June 2018 ASX: AVZ HIGHLIGHTS Manono Lithium Project, DRC JORC compliant Mineral Resource Estimate to be completed by end of July 2018 AVZ commences

More information

For personal use only

For personal use only ASX ANNOUNCEMENT Quarterly Activities Report for the quarter ended 31 December 2018 30 January 2019 Highlights Manono Scoping Study released confirming Manono as the largest undeveloped hard rock lithium

More information

AVZ Minerals Limited ABN

AVZ Minerals Limited ABN AVZ Minerals Limited ABN 81 125 176 703 Interim Financial Report 31 December AVZ Minerals Limited 1 Corporate Directory Executive Chairman Klaus Eckhof Managing Director Nigel Ferguson Executive Director

More information

20,000m drilling program expected to commence in mid-january, aiming to define initial JORC compliant mineral resources.

20,000m drilling program expected to commence in mid-january, aiming to define initial JORC compliant mineral resources. 8 January 2018 AVZ Minerals Limited Quarterly Report for the period ending 31 December 2017 ASX: AVZ HIGHLIGHTS Exploration at the Manono Lithium Project, DRC Additional strike length confirmed through

More information

QUARTERLY ACTIVITIES REPORT AND APPENDIX 5B FOR THE QUARTER ENDING 31 MARCH 2018

QUARTERLY ACTIVITIES REPORT AND APPENDIX 5B FOR THE QUARTER ENDING 31 MARCH 2018 30 April 2018 QUARTERLY ACTIVITIES REPORT AND APPENDIX 5B FOR THE QUARTER ENDING 31 MARCH 2018 The Board of European Lithium Limited (ASX:EUR, FRA:PF8, VSE:ELI)(the Company) is pleased to present its activities

More information

SEPTEMBER 2018 QUARTERLY REPORT

SEPTEMBER 2018 QUARTERLY REPORT ASX RELEASE October 31, 2018 ASX:PLL; NASDAQ:PLLL SEPTEMBER 2018 QUARTERLY REPORT Piedmont Lithium Limited (ASX: PLL; NASDAQ: PLLL) ( Piedmont or Company ) is pleased to present its September 2018 quarterly

More information

For personal use only

For personal use only ASX QUARTERLY REPORT MARCH 216 Quarterly Report March 216 Highlights 29 April 216 Maiden JORC resource of 131.1Mt @7.9% TGC at the Mahenge Project including 37.6Mt @1.2% TGC or 16.7Mt@ 11.1% TGC Largest

More information

For personal use only

For personal use only +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

AVZ Minerals Limited ABN Annual Report AVZ Minerals Limited

AVZ Minerals Limited ABN Annual Report AVZ Minerals Limited AVZ Minerals Limited ABN 81 125 176 703 Annual Report 2017 AVZ Minerals Limited Contents Corporate Directory 1 Review of Operations 2 Directors Report 11 Corporate Governance Statement 21 Auditor s Independence

More information

QUARTERLY ACTIVITIES REPORT

QUARTERLY ACTIVITIES REPORT BLINA MINERALS NL ASX ANNOUNCEMENT Board: 31 July 2017 David Porter Non-Executive Director Brett Fraser Non-Executive Chairman Jay Stephenson Non-Executive Director Capital Structure: QUARTERLY ACTIVITIES

More information

For personal use only

For personal use only +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

PROSPECT ANNOUNCES SIGNIFICANT VALUE UPGRADE OF ARCADIA LITHIUM PROJECT FOLLOWING UPDATED PRE-FEASIBILITY STUDY

PROSPECT ANNOUNCES SIGNIFICANT VALUE UPGRADE OF ARCADIA LITHIUM PROJECT FOLLOWING UPDATED PRE-FEASIBILITY STUDY PROSPECT ANNOUNCES SIGNIFICANT VALUE UPGRADE OF ARCADIA LITHIUM PROJECT FOLLOWING UPDATED PRE-FEASIBILITY STUDY POSITIVE IMPROVEMENTS IN KEY PROJECT PARAMETERS FURTHER ENHANCES THE ECONOMICS OF THE PROJECT

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

For personal use only. Accelerating high grade lithium production in Africa Annual General Meeting 2018, 25 May 2018

For personal use only. Accelerating high grade lithium production in Africa Annual General Meeting 2018, 25 May 2018 Accelerating high grade lithium production in Africa Annual General Meeting 2018, 25 May 2018 1 DISCLAIMER This presentation has been prepared by Force Commodities Limited based on information from its

More information

For personal use only

For personal use only Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Name of entity BUXTON RESOURCES LIMITED ABN Quarter ended ( current quarter ) 86 125 49 55 31 March 218 1. Cash flows

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

For personal use only

For personal use only ACN 072 692 365 Report for September Quarter 26 October 2016 ASX Code: HEG, HEGOA CORPORATE A subscription agreement was signed with Bao Industry Pty Ltd (01.08.2016) for a number of placements to raise

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity

Appendix 5B. Mining exploration entity and oil and gas exploration entity Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

Consolidated Tin Mines Limited

Consolidated Tin Mines Limited Snapshot: Registered Office: 395 Lake Street, Cairns North, QLD, 4870 Ph: (07) 4032 3319 Current CSD Share Price: $0.08 Current LME Tin Price: $28,775 Detailed information at www.csdtin.com.au JUNE QUARTER

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report +Rule 5.5 Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

For personal use only

For personal use only +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report SAYONA MINING LIMITED. Consolidated statement of cash flows

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report SAYONA MINING LIMITED. Consolidated statement of cash flows Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 30 March 2017 ASX: CXO Test work Produces High Quality 6% Spodumene Concentrate HIGHLIGHTS Initial metallurgical test work demonstrates the Grants Prospect at the Finniss Lithium Project

More information

For personal use only

For personal use only Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Name of entity Accent Resources NL ABN Quarter ended ( current quarter ) 67 113 025 808 31 December 2016 1. Cash flows

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report. Consolidated statement of cash flows

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report. Consolidated statement of cash flows Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

Quarterly Activities Report For The Period Ending 30 September 2018

Quarterly Activities Report For The Period Ending 30 September 2018 Quarterly Activities Report For The Period Ending 30 September 2018 31 October 2018 HIGHLIGHTS The feasibility study drilling program on the Caula Vanadium-Graphite Project in Northern Mozambique was completed

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

For personal use only

For personal use only We find it. We prove it. We make it possible. ABN : 63 095 117 981 ASX : CAP 25 JANUARY 2017 ABOUT CARPENTARIA: Carpentaria is an emerging producer of iron ore in eastern Australia. The company has a majority

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report +Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16 Name

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

For personal use only

For personal use only Mount Magnet South NL ABN 93 096 635 246 Quarterly Activities & Cashflow Report 30 September 2011 Summary Upgraded Mineral Resource Estimate at Kirkalocka finalised increasing Indicated category by 13%

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report. Consolidated statement of cash flows

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report. Consolidated statement of cash flows +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

LARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA

LARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA 3 MAY 2017 LARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA Highlights New zone of spodumene pegmatites discovered, with main body outcropping along 1300 metres in strike extent Widths up

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity

Appendix 5B. Mining exploration entity and oil and gas exploration entity Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

For personal use only

For personal use only ASX CODE: CHK ASX CODE: CHK TO: COMPANY ANNOUNCEMENTS OFFICE ASX LIMITED DATE: 30 JANUARY 2017 QUARTERLY REPORT 31 DECEMBER 2016 Cash at the end of the quarter was $490,059. The net cash outflow for the

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

For personal use only

For personal use only European Metals Holdings Limited ARBN 154 618 989 Level 4, 66 Kings Park Road West Perth WA 6005 PO Box 52 West Perth WA 6872 Phone + 61 8 6141 3500 Fax + 61 6141 3599 Website: www.europeanmet.com Directors

More information

Appendix 5B. quarterly report

Appendix 5B. quarterly report +Rule 5.5 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16 Name of entity ACCELERATE RESOURCES LIMITED (ASX CODE: AX8) ABN Quarter ended

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity

Appendix 5B. Mining exploration entity and oil and gas exploration entity Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Name of entity EQUUS MINING LIMITED ABN 44 065 212 679 Quarter ended ( current quarter ) 30 September

More information

For personal use only

For personal use only +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

AVZ MINERALS LTD THE MANONO LITHIUM, TIN AND TANTALUM PROJECT. AGM 29 th November 2017

AVZ MINERALS LTD THE MANONO LITHIUM, TIN AND TANTALUM PROJECT. AGM 29 th November 2017 AVZ MINERALS LTD THE MANONO LITHIUM, TIN AND TANTALUM PROJECT AGM 29 th November 2017 I m p o r t a n t N o t i c e a n d D i s c l a i m e r This presentation should be considered in its entirety. If

More information

For personal use only

For personal use only ASX Announcement 30 October 2017 Quarterly Activities Report for Period Ended 30 September 2017 Drilling in full swing with two rigs at Kildare Zinc Project having early success extending McGregor Prospect;

More information

For personal use only

For personal use only +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report +Rule 5.5 Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Introduced

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

Quarterly Activities Report & Appendix 5B

Quarterly Activities Report & Appendix 5B 31 JULY 2018 Quarterly Activities Report & Quarter Ending June 30, 2018 Lustrum Minerals Limited (ASX: LRM) (Lustrum) (Company) is pleased to provide a summary of its activities for the three (3) months

More information

For personal use only

For personal use only +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

ACTIVITIES REPORT FOR THE QUARTER ENDED 30 JUNE 2018

ACTIVITIES REPORT FOR THE QUARTER ENDED 30 JUNE 2018 ASX ANNOUNCEMENT 31 JULY 2018 ACTIVITIES REPORT FOR THE QUARTER ENDED 30 JUNE 2018 OVERVIEW Horseshoe Metals Limited (ASX: HOR) ( Horseshoe or the Company ), through its wholly owned subsidiary, Murchison

More information

For personal use only

For personal use only ASX ANNOUNCEMENT ASX: DKO 31 October 2016 CORPORATE DIRECTORY Non-Executive Chair John Fitzgerald Managing Director & CEO David J Frances Executive Technical Director Dr. Francis Wedin Non-Executive Director

More information

ASX Release: 31 July 2017 Quarterly Activities Report - for the period ended 30 June 2017

ASX Release: 31 July 2017 Quarterly Activities Report - for the period ended 30 June 2017 ASX Release: 31 July 2017 Quarterly Activities Report - for the period ended 30 June 2017 ASX Code: WRM Issued Securities Shares: 870.7 million Options: 183.4 million Cash on hand (30 June 2017) $3.2M

More information

QUARTERLY ACTIVITIES REPORT QUARTER ENDED 31 DECEMBER 2017

QUARTERLY ACTIVITIES REPORT QUARTER ENDED 31 DECEMBER 2017 30 JANUARY 2018 QUARTERLY ACTIVITIES REPORT QUARTER ENDED 31 DECEMBER 2017 Chesser Resources Limited ( Chesser or the Company ) is pleased to present its Quarterly Activities Report for the period ending

More information

Panda Hill Niobium Project. January 2014

Panda Hill Niobium Project. January 2014 Panda Hill Niobium Project January 2014 ASX Capital Structure Issued Shares* 128,675,017 Unlisted options (May 2016 at 26.7c) 7,687,500 Listed options (January 2015 at 26.7c) 15,962,506 Total Options 23,650,006

More information

For personal use only

For personal use only 23 DECEMBER 2016 ASX ANNOUNCEMENT EXPLORATION ACTIVITIES REPORT FOR THE MONTH OF NOVEMBER 2016 Global Fortune Investment Limited (ASX: GFI or the Company ) is pleased to provide its monthly activities

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT ASX ANNOUNCEMENT 31 October 2018 SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT HIGHLIGHTS Compelling results for Mahenge Definitive Feasibility Study, demonstrating major geological and geographical advantages

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

For personal use only

For personal use only +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

ASX ANNOUNCEMENT QUARTERLY REPORT PERIOD ENDED 30 SEPTEMBER 2017 SUMMARY. 31 October ASX Code: HOR. Management

ASX ANNOUNCEMENT QUARTERLY REPORT PERIOD ENDED 30 SEPTEMBER 2017 SUMMARY. 31 October ASX Code: HOR. Management ASX ANNOUNCEMENT 31 October 2017 ASX Code: HOR Management Mr Michael Fotios Non-Executive Chairman Mr Neil Porter Non-Executive Director Mr Alan Still Non-Executive Director Issued Capital Shares: 194.6

More information

QUARTERLY ACTIVITIES REPORT JUNE 2018

QUARTERLY ACTIVITIES REPORT JUNE 2018 European Metals Holdings Limited ARBN 154 618 989 Suite 12, Level 1 11 Ventnor Avenue West Perth WA 6005 PO Box 1240 West Perth WA 6872 Phone + 61 8 6245 2050 Fax + 61 6245 2055 Website: www.europeanmet.com

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

For personal use only

For personal use only 31st March 2013 Quarterly Report March 2012 Forte Energy NL ( Forte Energy or the Company ) (ASX/AIM: FTE) is an emerging international uranium company focused on the exploration and development of a portfolio

More information

INVESTOR PRESENTATION

INVESTOR PRESENTATION Suite 9, 5 Centro Ave, Subiaco WA 6008 P.O. Box 457, West Perth, WA 6872, Australia Ph+61 8 9286 3045 Fax: +61 8 9226 2027 info@birimian.com ABN 11 113 931 105 12 September 2016 via electronic lodgement

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Name of entity Kin Mining NL ABN Quarter ended ( current quarter ) 30 150 597 541 30 September 2018 Consolidated

More information

For personal use only

For personal use only NOVEMBER 2016 Investor Presentation Charging Ahead at the Authier Lithium Project ASX: SYA Sourcing the raw materials of the future Buoyant Lithium Macro DEMAND SUPPLY Renewable grid storage Transportation

More information

Visible Lithium Mineralisation extended to depth by Diamond Drilling

Visible Lithium Mineralisation extended to depth by Diamond Drilling ASX Announcement 28 July 2016 Visible Lithium Mineralisation extended to depth by Diamond Drilling Wide zones of lithium-bearing pegmatite confirmed to depth with step out diamond drilling at the Goulamina

More information

Offtake and Mining FINNISS LITHIUM PROJECT

Offtake and Mining FINNISS LITHIUM PROJECT Offtake and Mining FINNISS LITHIUM PROJECT Company Update December 2017 ASX code: CXO DISCLAIMER The information in this report that relates to Exploration Results and Mineral Resources is based on information

More information

Quarterly Report for March 2018

Quarterly Report for March 2018 Quarterly Report for March 2018 Highlights ASX ANNOUNCEMENT 30 April 2018 Australian Securities Exchange Code: RND Board of Directors: Mr Otakar Demis Chairman and Joint Company Secretary Mr Anton Billis

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

For personal use only

For personal use only (Formerly Fission Energy Ltd) ACN 119 057 457 ASX QUARTERLY REPORT FOR PERIOD ENDED 30 TH JUNE 2013 Mt Thirsty Cobalt Nickel Oxide Project positive results continue Highlights Further metallurgical test

More information

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2016

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2016 31 January 2017 ASX RELEASE ASX:AWV QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2016 HIGHLIGHTS Exploration and geotechnical drilling program completed at Big Springs. High grade zones intersected

More information

For personal use only

For personal use only MARCH 2011 QUARTERLY REPORT Equatorial Resources Limited ( Equatorial or the Company ) is pleased to present its quarterly report for the period ended 31 March 2011. HIGHLIGHTS Drilling commenced at the

More information

FINNISS LITHIUM. PROJECT Sydney Resources Round-Up Conference May ASX code: CXO

FINNISS LITHIUM. PROJECT Sydney Resources Round-Up Conference May ASX code: CXO FINNISS LITHIUM PROJECT Sydney Resources Round-Up Conference May 2017 ASX code: CXO DISCLAIMER 2 3 WHY INVEST IN CXO 2017 Drilling re-commences this month to build on Core s Lithium Resource at Finniss

More information

QUARTERLY ACTIVITIES REPORT For the Quarter ended 31 March 2018

QUARTERLY ACTIVITIES REPORT For the Quarter ended 31 March 2018 QUARTERLY ACTIVITIES REPORT For the Quarter ended 31 March 2018 Liontown steps-up lithium drilling following strong results at Kathleen Valley and significant new discovery at Buldania; Vanadium potential

More information

6 September 2017 AFRICA DOWN UNDER AMENDED PRESENTATION

6 September 2017 AFRICA DOWN UNDER AMENDED PRESENTATION 6 September 2017 AFRICA DOWN UNDER AMENDED PRESENTATION Birimian Limited (ASX: BGS; Birimian or the Company) encloses an amended presentation for the Africa Down Under Conference in relation to a correction

More information

QUARTERLY ACTIVITIES REPORT & APPENDIX 5B For the period ending 30 September 2017

QUARTERLY ACTIVITIES REPORT & APPENDIX 5B For the period ending 30 September 2017 ASX ANNOUNCEMENT ASX: NLI. Frankfurt: ORM 25 October 2017 CORPORATE DIRECTORY Non Executive Chair John Fitzgerald President & CEO David J Frances Executive Technical Director Francis Wedin Non Executive

More information

Aeon Metals Limited. Quarterly Report For the three months ending 30 June ASX Announcement 31 July 2018

Aeon Metals Limited. Quarterly Report For the three months ending 30 June ASX Announcement 31 July 2018 ASX Announcement 31 July 2018 Quarterly Report For the three months ending 30 June 2018 Aeon Metals Limited ABN 91 121 964 725 Level 7, 88 Pitt Street, Sydney, NSW 2000, Australia P.O. Box 8155, GCMC.

More information

Developing First Lithium Resource in NT

Developing First Lithium Resource in NT Developing First Lithium Resource in NT RIU Conference Sydney & Melbourne September 2017 ASX code: CXO DISCLAIMER 2 3 Developing the first Lithium Resource in the NT Core has established the first Lithium

More information

Highlights QUARTERLY REPORT MARCH Corporate. Projects. Broken Hill Prospecting Ltd (ASX: BPL) Murray Basin Heavy Mineral Sands Project, NSW

Highlights QUARTERLY REPORT MARCH Corporate. Projects. Broken Hill Prospecting Ltd (ASX: BPL) Murray Basin Heavy Mineral Sands Project, NSW QUARTERLY REPORT Broken Hill Prospecting Ltd (ASX: BPL) An Australian Exploration company focussed on the discovery & development of strategic technology mineral resources Commodity Exposure Heavy Mineral

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity

Appendix 5B. Mining exploration entity and oil and gas exploration entity Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Name of entity ADX Energy Ltd ABN 50 009 058 646 Quarter ended ( current quarter ) 31 March 2018 1. Cash

More information

QUARTERLY ACTIVITIES REPORT SEPTEMBER 2017

QUARTERLY ACTIVITIES REPORT SEPTEMBER 2017 European Metals Holdings Limited ARBN 154 618 989 Suite 12, Level 1 11 Ventnor Avenue West Perth WA 6005 PO Box 52 West Perth WA 6872 Phone + 61 8 6141 3500 Fax + 61 6141 3599 Website: www.europeanmet.com

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity

Appendix 5B. Mining exploration entity and oil and gas exploration entity Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Name of entity Resource Mining Corporation Limited ABN Quarter ended ( current quarter ) 97 008 045 083

More information

Developing NT s First Lithium Resource

Developing NT s First Lithium Resource Developing NT s First Lithium Resource Mining The Territory Conference Darwin August 2017 ASX code: CXO 2 Developing the first Lithium Resource in the NT Core has established the first Lithium Resource

More information

GALAXY RESOURCES LIMITED

GALAXY RESOURCES LIMITED GALAXY RESOURCES LIMITED 2017 Q2 Results Presentation July 2017 ASX: GXY [xx] Slide 1 Disclaimer This document contains forward looking statements concerning the projects owned by Galaxy. Statements concerning

More information

For personal use only

For personal use only ASX Announcement 31 January 2013 QUARTERLY ACTIVITIES REPORT AND APPENDIX 5B FOR THE PERIOD ENDING 31 DECEMBER 2012 Kaboko Mining Limited ( Kaboko or the Company ) the manganese exploration, development

More information

Quarterly Activities Report For the quarter to 30 June 2017 Highlights

Quarterly Activities Report For the quarter to 30 June 2017 Highlights Tawana Resources NL (Incorporated in Australia) (Registration number ACN 085 166 721) Share code on the JSE Limited: TAW JSE ISIN: AU0000TAWDA9 Share code on the Australian Securities Exchange Limited:

More information