Emerging Producer in the. Murchison Goldfields

Size: px
Start display at page:

Download "Emerging Producer in the. Murchison Goldfields"

Transcription

1 Emerging Producer in the Kirkalocka Gold Project Update April 2012 Murchison Goldfields ASX:MUM

2 Release of Feasibility Study Released April 2, 2012 Demonstrates the recommissioning of Kirkalocka is economic Project has been de-risked and is moving towards 50,000ozpa NPV of $66 million and an IRR of 72% at a gold price of A$1600 Every $50 increase in the price of gold o NPV increases by $9 million or more o IRR increases by 9% or more Debt providers in discussions with the company to fund the project Exploration provides upside potential for the company including significant higher grade near surface targets to increase life of mine and head grade 6,000m drilling program to be completed by June 2

3 Financial Parameters Gold price A$1,500 (base case) A$1,650 (base case +10%) A$1,350 (base case - 10%) A$1,600 (spot price) Net cash flow (before tax) $66 million $100 million $31 million $88 million NPV $48 million $75 million $19 million $66 million IRR 55% 81% 28% 72%

4 Capital Cost Parameters Item Initial A$ million Year 2 A$ million Pre-production mining $8.6 - Treatment plant refurbishment costs $2.6 - Scrubber and regrind mill $1.4 - Communications & IT $1.1 - Environmental bonds $1.0 - Fine ore stockpile system $0.8 - Leach agitators $0.6 - Intensive leach reactor $0.5 - Lift 1 tailings storage facility $0.5 - Secondary and tertiary crushing - $6.8 Other $4.4 $1.1 Total $21.5 $7.9

5 Feasibility Parameters Parameter Ore processed - g/t Au 1 Strip Ratio Average Annual throughput oxide / primary FS Result 7M 1.1 g/t Au 3.5 :1 Waste:Ore ratio 2.1 Mtpa / 1.6 Mtpa Process Recovery oxide / primary 95% / 89% Initial capital expenditure Mining Costs Processing Costs Administration Costs Life of Mine (LOM) Average LOM Cash Operating Cost/Oz Au (C1) 2 $21.5 million $19.43/t ore $12.36/t ore $2.29/t ore 4.75 years $1,073/Oz Au Notes: 1 The difference between the Ore Reserve and estimated processed tonnes and grade is that it is anticipated as part of the Life of Mine (LOM) plan that low grade material will be stockpiled. The low grade material may be processed towards the end of the LOM. 2 C1 definition includes operating and administration costs, and excludes royalties.

6 Kirkalocka Development Done Completion of feasibility study Q Define near surface mineralisation along 2.8km strike Target an increase life of mine, grade and resource base Q3 Project funding 2012 Q4 Re-commission and re-license Kirkalocka Plant 2012 Q1/Q2 Commence Production

7 Project History Discovered by CRA Exploration in early 1990 s Campaign mined by Equigold from October 2002 until October 2005 Processing ceased August 2008 MMS acquired the Kirkalocka pit and surrounding tenements from Equigold in April 2008 MMS acquires Kirkalocka processing facility

8 Refurbished CIL Processing Plant

9 Refurbished Primary Crusher

10 Partially Refurbished SAG Mill

11 Refurbished Leach Tanks

12 106 Room Camp

13 Airstrip and Tailings Pond Airstrip Tailings Pond

14 2012 Mineral Resource & Ore Reserve 2012 Ore Reserve Reserve Category Dry Tonnes (million) Gold Grade (g/t Au) Gold In Situ (koz) Probable Reserve Mineral Resource Classification Ore Tonnage (Mt) Au Grade (g/t) In Situ Au (oz) Indicated ,000 Inferred ,000 TOTAL ,000

15 Ore Reserve and mineralisation extension Ore Reserve pit design excluding laterite pits Shallow near surface resource not currently included in Ore Reserve

16 Mount Magnet South Ore Reserve pit designs Ore Reserve laterite pit design Ore Reserve pit design

17 May - June 2012 Drilling Program Stage Number of holes Metres Objective 4A 24 2,240 South2 Supergene drilling and mining optimisation 4B 16 1,440 South3 Supergene drilling and mining optimisation 4C Step out drilling Southern Supergene under laterite 4D Laterite drilling ROM Pad Total

18 Opportunities within 900m of existing Ore Reserve Mount Magnet South future pit designs Future oxide pits Southern cutback extension Feasibility Study pit

19 May - June 2012 Drilling Program

20 Opportunities along strike Current Reserve Extents Poorly Tested Area Curara Well South 3.03 g/t Au 1.64 g/t Au 3.05 g/t Au 2.9 g/t Au 2.26 g/t Au

21 Board & Project Management Mr Reg Gillard, Non-Executive Chairman +30 years experience in corporate finance, management and governance. Non-Executive Chairman of Perseus Mining Ltd market cap of $A3.5M to A$1.2B in 7 years. Former Chairman of Moto Goldmines Ltd resource over 20Moz Au. Former Chairman Mt Edon Gold Mines Pty Ltd taken over by Teck Corporation and Camelot Resources for C$200M Mr Mark Pitt, Director Mining engineer with +40 years of experience. Former COO and Director for Dioro Exploration NL prior to takeover by Avoca Resources Ltd market cap of C$2.3B. Former General Manager of Operations for Saracen Mineral Holdings - 100,000 oz per annum production. Mr Patrick Flint, Director +17 years experience in management, development funding, project acquisitions and joint venture negotiations. Former CFO for Moto Goldmines Ltd. Instrumental in bringing Tiger Resources Ltd s DRC copper projects to production (current market cap of A$325M). Graham Howard, General Manager Projects Geologist with over 26 years of project and operations mining experience. Competent Person reporting the trebling of the resource at Newcrest Mining Ltd s Telfer project, (+600,000oz per annum operation). Managed Boddington Gold Project s feasibility study for Newcrest Mining Ltd, Australia s largest open cut gold mine with annual production of over 700,000oz per annum. Amy Barker, Environmental Manger Proven Achievement in Permitting and Licensing including FMG s Mainline Duplication and Christmas Creek Projects.

22 Capital Structure Shares on Issue 369,315,612 Listed options ($0.07 expiring 31 August 2014) Unlisted options ($0.06/$0.10 expiring 2012/2013) 42,479,275 7,750,000 Performance rights 16,999,998 Convertible notes ($0.10 November 2012) 10,000,000 Fully diluted shares 446,544,885 Top 40 shareholding 58.3% Share price (April 10, 2012) $0.065 Market Capitalisation (fully diluted $0.065) Enterprise Value (on a fully diluted basis) $24.0m $27.3m 22

23 Competent Persons statement The optimisation, mine design and Ore Reseve reporting was completed by Anthony Keers (CP) MAusIMM and Roselt Croeser MAusIMM, who are directors of Auralia Mining Consultants. Anthony Keers and Roselt Croeser have sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity being undertaken to qualify as Competent Persons as defined in the 2004 edition of the Australasian Code for Reporting of Exploration, Results, Mineral Resource and Ore Reserves (JORC, 2004). Anthony Keers and Roselt Croeser consent to the inclusion in this report of the matters based on the information in the form and context that the information appears. The information including Ore Reserve database compilation, project parameters and costs were completed under the overall supervision and direction of Graham Howard MAusIMM, who is a full time employee of Mount Magnet South NL. Graham Howard has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code for Reporting of Exploration, Results, Mineral Resource and Ore Reserves (JORC, 2004). Graham Howard consents to the inclusion in this report of the matters based on the information in the form and context in which it appears. Rounding, conforming to the JORC Code, may cause some computation discrepancies.

24 Competent Persons statement Competent Persons Statement Mineral Resource The estimation, depletion and reporting was completed by Lynn Olssen MAusIMM (CP) who is a full-time employee of Snowden Mining Industry Consultants. Lynn Olssen has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code for Reporting of Exploration, Results, Mineral Resource and Ore Reserves (JORC, 2004). Lynn Olssen consents to the inclusion in this report of the matters based on the information in the form and context that the information appears. The information including database compilation, geological interpretation and mineralisation wireframing were completed under the overall supervision and direction of Graham Howard, MAusIMM, who is a full time employee of Mount Magnet South NL. Graham Howard has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code for Reporting of Exploration, Results, Mineral Resource and Ore Reserves (JORC, 2004). Graham Howard consents to the inclusion in this report of the matters based on the information in the form and context in which it appears. Rounding, conforming to the JORC Code, may cause some computation discrepancies.

25 Disclaimer and Forward Looking Statements This presentation has been prepared by Mount Magnet South NL ( MMS or the Company ). This document contains background information about MMS current at the date of this presentation. The presentation is in summary form and does not purport to be all inclusive or complete. Recipients should conduct their own investigations and perform their own analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and opinions contained in this presentation. This presentation is for information purposes only. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction. This presentation may not be distributed in any jurisdiction except in accordance with the legal requirements applicable in such jurisdiction. Recipients should inform themselves of the restrictions that apply in their own jurisdiction. A failure to do so may result in a violation of securities laws in such jurisdiction. This presentation does not constitutes investment advice and has been prepared without taking into account the recipient s investment objectives, financial circumstances or particular needs and the opinions and recommendations in this presentation are not intended to represent recommendations of particular investments to particular persons. Recipients should seek professional advice when deciding if an investment is appropriate. All securities transactions involve risks, which include (among others) the risk of adverse or unanticipated market, financial or political developments. To the fullest extent permitted by law, MMS, its officers, employees, agents and advisers do not make any representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of any information, statements, opinions, estimates, forecasts or other representations contained in this presentation. No responsibility for any errors or omissions from this presentation arising out of negligence or otherwise is accepted. Certain statements made during or in connection with this presentation contain or comprise certain forward-looking statements regarding MMS s Mineral Resources and Reserves, exploration operations, project development operations, production rates, life of mine, projected cash flow, capital expenditure, operating costs and other economic performance and financial condition as well as general market outlook. Although MMS believes that the expectations reflected in such forward-looking statements are reasonable, such expectations are only predictions and are subject to inherent risks and uncertainties which could cause actual values, results, performance or achievements to differ materially from those expressed, implied or projected in any forward looking statements and no assurance can be given that such expectations will prove to have been correct. Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic and market conditions, delays or changes in project development, success of business and operating initiatives, changes in the regulatory environment and other government actions, fluctuations in metals prices and exchange rates and business and operational risk management. Except for statutory liability which cannot be excluded, each of MMS, its officers, employees and advisors expressly disclaim any responsibility for the accuracy or completeness of the material contained in this statement and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this statement or any error or omission. MMS undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today s date or to reflect the occurrence of unanticipated events other than required by the Corporations Act and ASX Listing Rules. Accordingly, you should not place undue reliance on any forward-looking statements. 25

26 Suite 2, Ground Floor 10 Outram Street West Perth WA 6005 T: F: E: admin@mountmagnet.com.au 26

For personal use only

For personal use only Mount Magnet South NL ABN 93 096 635 246 Quarterly Activities & Cashflow Report 30 September 2011 Summary Upgraded Mineral Resource Estimate at Kirkalocka finalised increasing Indicated category by 13%

More information

For personal use only

For personal use only Sandfire Resources NL ABN 55 105 154 185 Level 2, 31 Ventnor Ave, West Perth Western Australia 6005 Phone: +61 8 6430 3800 Fax: +61 8 6430 3849 Email: info@sandfire.com.au Web: www.sandfire.com.au ASX/Media

More information

For personal use only

For personal use only 3 July 2017 ASX: MOD MOD Enters Agreement to Sell Sams Creek Gold Project for A$3.8 million MOD to receive total consideration of A$3.8 million for the sale of Sams Creek MOD to retain up to 15% interest

More information

RNI INCREASES GROSVENOR GOLD ORE RESERVES TO 523,000oz

RNI INCREASES GROSVENOR GOLD ORE RESERVES TO 523,000oz ASX Announcement 29 November 2013 RNI INCREASES GROSVENOR GOLD ORE RESERVES TO 523,000oz Resource and Investment NL (ASX: RNI) is pleased to announce an update of Mineral Ore Reserves at the Grosvenor

More information

TUNKILLIA GOLD PROJECT

TUNKILLIA GOLD PROJECT TUNKILLIA GOLD PROJECT Positive Scoping Study establishes that Mungana (ASX: MUX) can become costcompetitive gold producer in South Australia Highlights Technical and economic assessment provides confidence

More information

SYDNEY MINING CLUB FEBRUARY 2019 DUNCAN GIBBS MANAGING DIRECTOR & CEO

SYDNEY MINING CLUB FEBRUARY 2019 DUNCAN GIBBS MANAGING DIRECTOR & CEO SYDNEY MINING CLUB FEBRUARY 2019 DUNCAN GIBBS MANAGING DIRECTOR & CEO DISCLAIMER IMPORTANT NOTICES Nature of this document: The purpose of this presentation is to provide general information about Gold

More information

ACTIVITIES REPORT FOR THE QUARTER ENDED 30 JUNE 2018

ACTIVITIES REPORT FOR THE QUARTER ENDED 30 JUNE 2018 ASX ANNOUNCEMENT 31 JULY 2018 ACTIVITIES REPORT FOR THE QUARTER ENDED 30 JUNE 2018 OVERVIEW Horseshoe Metals Limited (ASX: HOR) ( Horseshoe or the Company ), through its wholly owned subsidiary, Murchison

More information

ASX ANNOUNCEMENT QUARTERLY REPORT PERIOD ENDED 30 SEPTEMBER 2017 SUMMARY. 31 October ASX Code: HOR. Management

ASX ANNOUNCEMENT QUARTERLY REPORT PERIOD ENDED 30 SEPTEMBER 2017 SUMMARY. 31 October ASX Code: HOR. Management ASX ANNOUNCEMENT 31 October 2017 ASX Code: HOR Management Mr Michael Fotios Non-Executive Chairman Mr Neil Porter Non-Executive Director Mr Alan Still Non-Executive Director Issued Capital Shares: 194.6

More information

20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa

20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa 10 August 2018 ASX: MOD 20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa T3 plant throughput capacity increased to 3Mtpa, a 20% increase to the PFS Base Case Sedgman appointed as Feasibility

More information

RAMELIUS TAKEOVER OFFER FOR EXPLAURUM LTD

RAMELIUS TAKEOVER OFFER FOR EXPLAURUM LTD Ramelius Resources Limited ASX:RMS RAMELIUS TAKEOVER OFFER FOR EXPLAURUM LTD 10 SEPTEMBER 2018 EXPLAURUM TAKEOVER TAKEOVER OFFER OFFER SEPTEMBER SEPTEMBER 2018 2018 1 QUALIFICATION Forward Looking Statements

More information

For personal use only

For personal use only 20 June 2017 SIANA GOLD PROJECT AND COMPANY UPDATE Key Points Siana Gold Project, Philippines Key milestones achieved with underground development prior to suspension of underground activities: o Combined

More information

KBL Mining Limited (ASX: KBL) Presentation May 2015 Resources Investment Symposium BROKEN HILL

KBL Mining Limited (ASX: KBL) Presentation May 2015 Resources Investment Symposium BROKEN HILL KBL Mining Limited (ASX: KBL) Presentation May 2015 Resources Investment Symposium BROKEN HILL Disclaimer This presentation and these materials (together the Presentation ) has been prepared by KBL Mining

More information

TAMPIA GOLD PROJECT FEASIBILITY STUDY

TAMPIA GOLD PROJECT FEASIBILITY STUDY TAMPIA GOLD PROJECT FEASIBILITY STUDY DEVELOPING A NEW GOLD MINE EXPLORING A POTENTIAL NEW GOLD FIELD ASX:EXU 1 TAMPIA GOLD PROJECT Western Australian gold explorer focused on developing the shallow high

More information

PRESS RELEASE. Banro Files NI Technical Report on Namoya Project, Democratic Republic of the Congo

PRESS RELEASE. Banro Files NI Technical Report on Namoya Project, Democratic Republic of the Congo PRESS RELEASE Banro Files NI 43-101 Technical Report on Namoya Project, Democratic Republic of the Congo Toronto, Canada May 13, 2014 Banro Corporation ("Banro" or the "Company") (NYSE MKT - "BAA"; TSX

More information

MERGER PRESENTATION JULY 2018

MERGER PRESENTATION JULY 2018 MERGER PRESENTATION JULY 2018 ASX: SPI ASX: EXG PAGE 1 1 CREATING A LEADING ASX-LISTED GOLD DEVELOPER The combined company, to be led by Managing Director Mr John Young, aims to fast-track the creation

More information

For personal use only. Investor presentation

For personal use only. Investor presentation Investor presentation May 2018 ASX: GPR For personal use only Investment highlights 1 Advanced 100Koz.pa development project 5 AISC below A$800/oz in first two years 6 Strong cashflow delivers 2.2-year

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 28th November 2012 MATILDA MINE DEMONSTRATES ROBUST ECONOMICS Matilda open pit design confirms o 2.45Mt milled tonnes @ 2.11 g/t au head grade o 150,000oz gold production over four years

More information

ASX RELEASE 28 February, Half Year Ended 31 December 2006

ASX RELEASE 28 February, Half Year Ended 31 December 2006 Half Year Ended ember This document provides a review of the financial results and operations of Equigold NL for the half year ended ember. Highlights Profit before tax and hedge accounting adjustments

More information

For personal use only

For personal use only For personal use only Investor Presentation MARCH 2016 1 Disclaimer The purpose of this presentation is to provide general information about Aphrodite Gold Limited (Company) and it is presented for informational

More information

For personal use only

For personal use only Annual General Meeting Presentation 20 November 2017 Pilbara Gold Project Camels on The Sisters Tenement 1 Competent Persons Statements The information in this presentation that relates to the exploration

More information

AZUMAH MINING LEASES GRANTED

AZUMAH MINING LEASES GRANTED AZUMAH MINING LEASES GRANTED WA GOLD PROJECT, GHANA ASX & Media Release ASX Code AZM 28 th July 2014 Perth-based gold explorer and developer Azumah Resources Limited (ASX:AZM) (Azumah or the Company) is

More information

For personal use only

For personal use only ASX Code: GMM A Multi Asset, Rare Metal Development Company Disclaimer Competent Persons Statement James Bay The information in this report that relates to Mineral Resources is based on work completed

More information

Resource and Investment NL ASX: RNI Paydirt s Gold Conference Presentation 3 April 2014

Resource and Investment NL ASX: RNI Paydirt s Gold Conference Presentation 3 April 2014 An Emerging Western Australian Miner With a dominant copper-gold exploration portfolio Resource and Investment NL ASX: RNI Paydirt s Gold Conference Presentation 3 April 2014 1 Competent Person s Statement

More information

An Australian gold miner for global investors Macquarie Securities Conference - May 2018

An Australian gold miner for global investors Macquarie Securities Conference - May 2018 An Australian gold miner for global investors Macquarie Securities Conference - May 2018 Disclaimer Competent Persons Statements The information in this announcement that relates to exploration results,

More information

Building a quality gold business. Mark Clark

Building a quality gold business. Mark Clark Building a quality gold business Mark Clark Managing Director May2011 This presentation contains only a brief overview of Regis Resources Limited and its associated entities ( Regis or RRL") and their

More information

Dragon Energy Limited

Dragon Energy Limited Dragon Energy Limited Corporate Presentation September 2012 Disclaimer This document has been prepared by Dragon Energy Ltd ( DLE ) (ABN 38 119 992 175) and provided as a basic overview on the Company.

More information

MEDIA RELEASE. OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated)

MEDIA RELEASE. OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated) MEDIA RELEASE 26 June 2017 OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated) (MELBOURNE) OceanaGold Corporation (TSX/ASX: OGC) (the

More information

KBL Mining Limited (ASX: KBL) Investor Presentation October KBL Mining Limited : : Investor Presentation

KBL Mining Limited (ASX: KBL) Investor Presentation October KBL Mining Limited : : Investor Presentation KBL Mining Limited (ASX: KBL) Investor Presentation October 2014 Corporate Snapshot KBL Mining Limited (ASX:KBL) - Producer, developer and explorer of base and precious metals with substantial exposure

More information

Successful $15 million Capital Raise and Response to Media Speculation

Successful $15 million Capital Raise and Response to Media Speculation 21 January 2019 ASX/LSE: MOD Highlights: Successful $15 million Capital Raise and Response to Media Speculation Successfully raised $10 million through an oversubscribed institutional Placement at $0.30/sh.

More information

Mt Morgans Gold Project

Mt Morgans Gold Project Mt Morgans Gold Project Fully funded and fully permitted $15m exploration campaign in full swing Rohan Williams, Executive Chairman Grant Dyker, CFO September 2017 Important Notice & Disclaimer The purpose

More information

SOUTH AUSTRALIA EXPLORATION AND MINING CONFERENCE STEVEN MCCLARE IIIII GENERAL MANAGER 28 NOVEMBER 2013

SOUTH AUSTRALIA EXPLORATION AND MINING CONFERENCE STEVEN MCCLARE IIIII GENERAL MANAGER 28 NOVEMBER 2013 SOUTH AUSTRALIA EXPLORATION AND MINING CONFERENCE STEVEN MCCLARE IIIII GENERAL MANAGER 28 NOVEMBER 2013 ASSETS, BOARD AND MANAGEMENT TEAM Production and cash flow in Australia Kanmantoo Copper Mine (100%

More information

For personal use only. Drilling at Torrecillas July 2011

For personal use only. Drilling at Torrecillas July 2011 Drilling at Torrecillas July 2011 Mundo Mineracao Ltda - Overview Presentation December 2012 1 Disclaimer & Forward-Looking Statements Competent Person s Statement The information in this report that relates

More information

For personal use only

For personal use only Big Assets + Leverage = Big Opportunity Presentation to Investor Express August 2012 Disclaimer and Important Information Forward Looking Statements This document may include forward looking statements.

More information

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA 13 July 2012 NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA This release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The

More information

The financial information contained in this market update presentation has not been reviewed or reported on by the Company's external auditors.

The financial information contained in this market update presentation has not been reviewed or reported on by the Company's external auditors. SUNRISE DAM 5 JULY 2018 Mike Erickson SVP Australia DISCLAIMER Certain statements contained in this document, other than statements of historical fact, including, without limitation, those concerning the

More information

Resource and Investment NL ASX: RNI November 2013 AGM Presentation

Resource and Investment NL ASX: RNI November 2013 AGM Presentation An Emerging Western Australian Miner With a dominant copper-gold exploration portfolio Resource and Investment NL ASX: RNI November 203 AGM Presentation Corporate Snapshot Chairman: Miles Kennedy 28 years

More information

Significant Advance: CSD Snow Peak Mining Asset Sale Agreement

Significant Advance: CSD Snow Peak Mining Asset Sale Agreement Significant Advance: CSD Snow Peak Mining Asset Sale Agreement John Banning Managing Director Consolidated Tin Mines Limited P: (07) 4032 3319 M: +61 (0) 448 101 507 E: jb@csdtin.com.au www.csdtin.com.au

More information

INVESTOR PRESENTATION March 2017

INVESTOR PRESENTATION March 2017 INVESTOR PRESENTATION March 2017 1 1 Overview 100% owner of Big Springs Gold Project, north-east Nevada, USA 1 Mil ounce resource Fully permitted to commence mining operations Low capex requirement Mining

More information

Investor Presentation

Investor Presentation ASX/Media Release 28 September 2011 Investor Presentation Australian gold exploration and development company, Westgold Resources Limited (ASX: WGR, Westgold ) lodges an updated investor presentation which

More information

For personal use only. Investor presentation Europe

For personal use only. Investor presentation Europe Investor presentation Europe July 2018 ASX: GPR For personal use only Investment highlights 1 Advanced 100Koz.pa gold development project 6 Strong cashflow delivers 2.2-year payback 7 Mining, environmental

More information

ACTIVITIES REPORT SEPTEMBER QUARTER 2017

ACTIVITIES REPORT SEPTEMBER QUARTER 2017 ACTIVITIES REPORT SEPTEMBER QUARTER 2017 HIGHLIGHTS ASX ANNOUNCMENT 30 October 2017 ASX Code: CMM ABN: 84 121 700 105 Board of Directors: Mr Heath Hellewell Executive Chairman Mr Guy LeClezio Non-Executive

More information

For personal use only

For personal use only Company Presentation The year Northern Star catches up with its peers as a gold mid- cap producer April 2012 Disclaimer Competent Persons Statements The information in this announcement that relates to

More information

The Yamarna Gold Belt: Exploration Upside To Be Funded From Production

The Yamarna Gold Belt: Exploration Upside To Be Funded From Production The Yamarna Gold Belt: Exploration Upside To Be Funded From Production Mr Gordon Murray Business Development Manager Disclaimer Important Notices Nature of this document: The purpose of this presentation

More information

Investing in Tin Seminar London 5 th December 2011

Investing in Tin Seminar London 5 th December 2011 Investing in Tin Seminar London 5 th December 2011 Disclaimer This presentation has been prepared by Consolidated Tin Mines Ltd (CSD) based on information from its own and third party sources and is not

More information

A$37M INSTITUTIONAL PLACEMENT TO ACCELERATE EXPLORATION PROGRAMS AT WESTRALIA AND CAMERON WELL AND EXTINGUISH JUPITER LIFE OF MINE ROYALTY OBLIGATION

A$37M INSTITUTIONAL PLACEMENT TO ACCELERATE EXPLORATION PROGRAMS AT WESTRALIA AND CAMERON WELL AND EXTINGUISH JUPITER LIFE OF MINE ROYALTY OBLIGATION Not for release to US wire services or distribution in the United States 11 JULY 2018 A$37M INSTITUTIONAL PLACEMENT TO ACCELERATE EXPLORATION PROGRAMS AT WESTRALIA AND CAMERON WELL AND EXTINGUISH JUPITER

More information

Creating value from a major goldfield

Creating value from a major goldfield Creating value from a major goldfield November 2017 Investor presentation on the Woodlark Gold Project (ASX: GPR) Corporate snapshot (ASX: GPR) Geopacific Resources is an emerging gold producer focused

More information

An Australian gold miner for global investors BMO Conference - February 2018

An Australian gold miner for global investors BMO Conference - February 2018 An Australian gold miner for global investors BMO Conference - February 2018 Disclaimer Competent Persons Statements The information in this announcement that relates to exploration results, data quality,

More information

12,178gpt intersection at Paulsens

12,178gpt intersection at Paulsens Maiden 2.5c fully-franked dividend for FY12 (3% yield) $65-85m surplus cash forecast for CY13 Resources to underpin +5-year mine life at Paulsens Clear strategy to grow group production to +200,000ozpa

More information

Asia s newest major gold producer Tujuh Bukit Oxide Gold Silver Heap Leach

Asia s newest major gold producer Tujuh Bukit Oxide Gold Silver Heap Leach Asia s newest major gold producer Tujuh Bukit Oxide Gold Silver Heap Leach Mines and Money Asia Company Spotlight Presentation Paul Muddy Willis April 2017 1 Disclaimer PT Merdeka Copper Gold Tbk ( PT

More information

Annual General Meeting Perth WA. 15 November 2017 Bruce Kay Technical Director

Annual General Meeting Perth WA. 15 November 2017 Bruce Kay Technical Director Annual General Meeting Perth WA 15 November 2017 Bruce Kay Technical Director Disclaimer & Forward Looking Statements This presentation has been prepared by Catalyst Metals Limited ( Catalyst ). This document

More information

Pilbara Copper Zinc Projects

Pilbara Copper Zinc Projects Pilbara Copper Zinc Projects Right Metals Right Project Right Time Read Corporate Rising Stars Conference 30-31 May 2017 JOHN NITSCHKE, MANAGING DIRECTOR ASX: VXR 1 Disclaimers Cautionary Statement The

More information

A New Growth Story in Western Australian Gold

A New Growth Story in Western Australian Gold A New Growth Story in Western Australian Gold Gold production imminent following execution of mining alliance & toll milling agreements Cash flow by Q4 2016 Outstanding exploration upside in world-class

More information

The Turnaround Continues. Value Over Volume

The Turnaround Continues. Value Over Volume The Turnaround Continues Value Over Volume Doray Minerals Limited Investor Update August 2017 Disclaimer This presentation has been prepared by Doray Minerals Limited ( Doray ) to provide an update regarding

More information

Mine Gold. Create Value. Full Year Results for the year ending 30 June 2017

Mine Gold. Create Value. Full Year Results for the year ending 30 June 2017 Mine Gold. Create Value. Full Year Results for the year ending 30 June 2017 Cautionary Statement This presentation includes certain statements, estimates and projections with respect to the future performances

More information

For personal use only

For personal use only Developing the outstanding Fekola Project September 2014 Click to edit Master title style Click to edit Master subtitle style ASX:PIR 1 Executive Summary Papillon is an ASX-listed gold development company

More information

Tropicana Gold Mine Duncan Gibbs General Manager MAY 2014 JULY 2014

Tropicana Gold Mine Duncan Gibbs General Manager MAY 2014 JULY 2014 Tropicana Gold Mine Duncan Gibbs General Manager MAY 2014 JULY 2014 AngloGold Ashanti Ltd Disclaimer Certain statements contained in this document, other than statements of historical fact, including,

More information

PNG Mining & Petroleum Investment Conference Hidden Valley PNG s Newest Mine

PNG Mining & Petroleum Investment Conference Hidden Valley PNG s Newest Mine PNG Mining & Petroleum Investment Conference Hidden Valley PNG s Newest Mine December 2010 Harmony Gold Disclosure Statement This presentation contains "forward-looking statements" within the meaning of

More information

Investor Update - June 2012

Investor Update - June 2012 DORAY MINERALS LTD Investor Update - June 2012 Developing WA s next high grade gold mine Allan Kelly Managing Director ASX:DRM Disclaimer This presentation is not a prospectus nor an offer for securities

More information

PERFORMANCE UPDATE FROM HILLGROVE'S KANMANTOO OPERATION GREG HALL IIIII CEO & MANAGING DIRECTOR 1 MAY 2013

PERFORMANCE UPDATE FROM HILLGROVE'S KANMANTOO OPERATION GREG HALL IIIII CEO & MANAGING DIRECTOR 1 MAY 2013 FROM HILLGROVE'S KANMANTOO OPERATION GREG HALL IIIII CEO & MANAGING DIRECTOR 1 MAY 2013 AUSTRALIAN AND INDONESIA FOCUS PRODUCTION AND EXPLORATION ASSETS Bird s Head project Production and cash flow in

More information

For personal use only

For personal use only 12,178gpt intersection at Paulsens Maiden 2.5c fully-franked dividend for FY12 (3% yield) $65-85m surplus cash forecast for CY13 Resources to underpin +5-year mine life at Paulsens Clear strategy to grow

More information

DRAGON MINING LIMITED An Established Nordic Gold Producer with an Exciting Future RIU Melbourne Resources Round-up 29 September 2011

DRAGON MINING LIMITED An Established Nordic Gold Producer with an Exciting Future RIU Melbourne Resources Round-up 29 September 2011 DRAGON MINING LIMITED An Established Nordic Gold Producer with an Exciting Future RIU Melbourne Resources Round-up 29 September 2011 Disclaimer The purpose of this presentation is to provide general information

More information

West African Resources awards underground mining contract for M1 South to Byrnecut

West African Resources awards underground mining contract for M1 South to Byrnecut Press Release 28 th November 2018 West African Resources awards underground mining contract for M1 South to Byrnecut Gold developer West African Resources Limited (ASX, TSXV: WAF) is pleased to announce

More information

June 2016 Annual Results Webcast

June 2016 Annual Results Webcast June 2016 Annual Results Webcast 30 August 2016 Access this presentation at: http://webcasting.boardroom.media/broadcast/57b3 9986f2668ad859df3956 or www.sandfire.com.au Important Information and Disclaimer

More information

SOUTHERNGOLD GOLD PRODUCER. Cannon Mine, Early February 2016 ASX Ticker: SAU

SOUTHERNGOLD GOLD PRODUCER. Cannon Mine, Early February 2016 ASX Ticker: SAU SOUTHERNGOLD GOLD PRODUCER Cannon Mine, Early February 2016 ASX Ticker: SAU Disclaimer Forward-looking statements The information in this presentation is published to inform you about Southern Gold Limited

More information

For personal use only

For personal use only ASX/MEDIA RELEASE 20 March 2013 Crest Minerals Ltd signs binding MOU to acquire high-grade gold mine in WA from Reed Resources Ltd Highlights Crest enters into binding, conditional Memorandum of Understanding

More information

2017 Results Presentation

2017 Results Presentation Consistently Delivering On Commitments February 22, 2018 2017 Results Presentation Cautionary & Technical Statements Cautionary Notes - Information Purposes Only The information contained in this presentation

More information

September 2014 Quarterly Results

September 2014 Quarterly Results September 2014 Quarterly Results Sandeep Biswas Managing Director and Chief Executive Officer 21 October 2014 Disclaimer Forward Looking Statements These materials include forward looking statements. Often,

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 21 January 2015 SIGNIFICANT RESOURCE PROJECT ACQUISITION INTERNATIONAL GOLDFIELDS TO ACQUIRE PROSPECTIVE MINING & EXPLORATION PERMITS WITH POLYMETALLIC JORC RESOURCE HIGHLIGHTS International

More information

More Than a One Trick Pony

More Than a One Trick Pony More Than a One Trick Pony Diggers & Dealers August 2014 ASX: RXL 1 Disclaimers Forward-Looking Statements This presentation has been prepared by Rox Resources Limited. This document contains background

More information

Presentation August ASX Code: TNG

Presentation August ASX Code: TNG Presentation August 2011 ASX Code: TNG Disclaimer Forward-Looking Statements This presentation has been prepared by TNG Ltd. This document contains background information about TNG Ltd current at the date

More information

For personal use only

For personal use only 25 July 2013 ASX Code: BAB, AIM Code: BGL QUARTERLY ACTIVITY REPORT FOR THE THREE MONTHS ENDED 30 JUNE 2013 Highlights Exploration and Resource Development Resources upgraded at the Gryphon and Edwards

More information

Combination to create the premier ASX mid-tier gold producer

Combination to create the premier ASX mid-tier gold producer Kingsgate Consolidated Dominion Mining Combination to create the premier ASX mid-tier gold producer 20 October 2010 Kingsgate Disclaimer Forward Looking Statements These materials include forward looking

More information

Path to Near Term Gold Production. Diggers & Dealers, Kalgoorlie, 7-9 August 2017

Path to Near Term Gold Production. Diggers & Dealers, Kalgoorlie, 7-9 August 2017 Path to Near Term Gold Production Diggers & Dealers, Kalgoorlie, 7-9 August 2017 Important Notice Disclaimer This presentation ("Presentation") has been prepared by Mincor Resources NL ("MCR") based on

More information

FOCUS MINERALS LIMITED

FOCUS MINERALS LIMITED FOCUS MINERALS LIMITED FFT:FZA ASX:FML Driving Sustainable Profitable Production Focus 1.2Mtpa Three Mile Hill processing plant in Coolgardie, WA ASX Spotlight Conference, New York Thursday 1 st March

More information

Celebrating 21 years of African gold mining. Presentation by Lee-Anne de Bruin, Chief Financial Officer Mining Indaba 2018, Cape Town

Celebrating 21 years of African gold mining. Presentation by Lee-Anne de Bruin, Chief Financial Officer Mining Indaba 2018, Cape Town Celebrating 21 years of African gold mining Presentation by Lee-Anne de Bruin, Chief Financial Officer Mining Indaba 2018, Cape Town Important Notices and Disclaimers Not an offer of securities This presentation

More information

The Syama Transformation Story

The Syama Transformation Story The Syama Transformation Story Mine Gold. Create Value. Ms Lee-Anne de Bruin, Chief Financial Officer JP Morgan Australian Gold Forum September 2018 Important Notices and Disclaimers This presentation

More information

For personal use only

For personal use only Monday, 31 March 2014 ASX Market Announcement Australian Securities Exchange Level 4 Exchange Centre 20 Bridge Street Sydney NSW 2000 Dear Sir or Madam: LODGEMENT OF APPENDIX 4E YEAR ENDED 31 JANUARY 2014

More information

HIGH GRADE SHALLOW WA GOLD EXPANDING OUR 712,000 OZ RESOURCE BASE

HIGH GRADE SHALLOW WA GOLD EXPANDING OUR 712,000 OZ RESOURCE BASE HIGH GRADE SHALLOW WA GOLD EXPANDING OUR 712,000 OZ RESOURCE BASE CORPORATE PRESENTATION- RIU FEBRUARY 2018 ASX:CAI DISCLAIMER DISCLAIMER This presentation does not constitute investment advice. Neither

More information

Sean Gregory Managing Director & CEO RIU Explorers Conference 22 February 2018

Sean Gregory Managing Director & CEO RIU Explorers Conference 22 February 2018 Sean Gregory Managing Director & CEO RIU Explorers Conference 22 February 2018 Key Messages Barra s dual commodity strategy Mt Thirsty Advanced Cobalt Nickel Oxide Project Coolgardie Gold Projects Best

More information

PAYDIRT AUSTRALIAN NICKEL CONFERENCE OCTOBER 2016

PAYDIRT AUSTRALIAN NICKEL CONFERENCE OCTOBER 2016 PAYDIRT AUSTRALIAN NICKEL CONFERENCE OCTOBER 2016 Important Notice Disclaimer This presentation ("Presentation") has been prepared by Mincor Resources NL ("MCR") based on information available to it from

More information

For personal use only

For personal use only 5 AUGUST 2011 ASX:SXG Southern Cross Goldfields Ltd ABN 71 124 374 321 Dominant 3,500km 2 tenement and gold rights holding in prolific Marda & Southern Cross regions of Western Australia Over 430,000 ounces

More information

HANKING GOLD MINING. Diggers & Dealers. August 2016

HANKING GOLD MINING. Diggers & Dealers. August 2016 HANKING GOLD MINING Diggers & Dealers August 2016 Important Notice and Disclaimer IMPORTANT: YOU MUST READ THE FOLLOWING BEFORE CONTINUING The following Important Notice applies to this presentation and

More information

Mining Resources Convention-Brisbane. For personal use only. Producing. Exploring. Growing ASX: AIS. 30 August 2017

Mining Resources Convention-Brisbane. For personal use only. Producing. Exploring. Growing ASX: AIS. 30 August 2017 Mining Resources Convention-Brisbane Producing Exploring Growing 30 August 2017 Andre Labuschagne - Executive Chairman ASX: AIS Disclaimer Forward-Looking Information Certain statements contained in this

More information

RE: ASX Release Presentation Today at the Resources & Energy Symposium at Broken Hill, May 2012

RE: ASX Release Presentation Today at the Resources & Energy Symposium at Broken Hill, May 2012 ASX Release RE: ASX Release Presentation Today at the Resources & Energy Symposium at Broken Hill, 21-23 May 2012 Attached is the presentation to be given today by Managing Director, Mr Morrie Goodz, which

More information

For personal use only

For personal use only Highlights: ASX ANNOUNCEMENT 20 th January 2014 Blackham consolidates Wiluna gold belt, plant and infrastructure Wiluna Gold Plant acquisition unlocks the value of the Matilda Gold Project with all deposits

More information

QUARTERLY REPORT OCTOBER TO DECEMBER 2014

QUARTERLY REPORT OCTOBER TO DECEMBER 2014 QUARTERLY REPORT OCTOBER TO DECEMBER 2014 Highlights Outlook for March Quarter 2015 TUNGSTEN & MOLYBDENUM Molyhil NT Revised feasibility study completed demonstrating robust economics Continue off-take

More information

MOUNT BUNDY GOLD PROJECT

MOUNT BUNDY GOLD PROJECT MOUNT BUNDY GOLD PROJECT Investor Update Developing the Mount Bundy Gold Province July 2016 ASX: PGO www.primarygold.com.au Cautionary Statement Statements and material contained in this Presentation,

More information

INDEPENDENCE GROUP NL

INDEPENDENCE GROUP NL INDEPENDENCE GROUP NL Growing a Great Company Annual General Meeting 25 November 2009 Chris Bonwick Managing Director FORWARD LOOKING STATEMENTS Certain oral and written statements contained or incorporated

More information

Media Announcement (For Immediate Release)

Media Announcement (For Immediate Release) LionGold Corp Ltd (Incorporated in Bermuda) 59 Mohamed Sultan Road Sultan Link 02-08 Singapore 238999 Tel: (65) 6690 6860 Fax: (65) 6690 6844 info@liongoldcorp.om www.liongoldcorp.com Media Announcement

More information

For personal use only

For personal use only For personal use only Indaba/121 Cape Town 5-6 February 2018 Botswana Copper Charging ahead in 2018 Disclaimer & Forward Looking Statements Competent Person s Statement Information in this presentation

More information

December 2015 Half Year Results Webcast 25 February 2016

December 2015 Half Year Results Webcast 25 February 2016 December 2015 Half Year Results Webcast 25 February 2016 Access this presentation at: http://webcasting.brrmedia.com/broadcast/56ba66a3c23d9659538e20af http://www.sandfire.com.au 1 Important Information

More information

Results for Announcement to the Market

Results for Announcement to the Market 28 February 2018 ASX Announcement Results for Announcement to the Market Current reporting period: 6 months ended 31 December 2017 Previous corresponding reporting period: 6 months ended 31 December 2016

More information

Skouries Update March 2018

Skouries Update March 2018 Skouries Update March 2018 Cautionary Note About Forward Looking Statements and Information Certain of the statements made and information provided in this presentation are forward-looking statements or

More information

Paulsens Project resource soars 41% to 318,000oz as 2012 surplus cashflow forecast hits $35m

Paulsens Project resource soars 41% to 318,000oz as 2012 surplus cashflow forecast hits $35m ASX ANNOUNCEMENT 21 FBRUARY 2012 Australian Securities Exchange Code: NST Board of Directors Mr Chris Rowe Non-Executive Chairman Mr Bill Beament Managing Director Mr Michael Fotios Non-Executive Director

More information

SOUTHERNGOLD A GOLD EXPLORER WITH GOLD PRODUCTION. AMEC Beyond the Horizon Convention 2016

SOUTHERNGOLD A GOLD EXPLORER WITH GOLD PRODUCTION. AMEC Beyond the Horizon Convention 2016 SOUTHERNGOLD A GOLD EXPLORER WITH GOLD PRODUCTION In-Pit Diamond Drilling at Cannon Mine, June 2016 ASX Ticker: SAU AMEC Beyond the Horizon Convention 2016 Disclaimer Forward-looking statements The information

More information

NEWCREST PROFITABLE GROWTH

NEWCREST PROFITABLE GROWTH NEWCREST PROFITABLE GROWTH Gerard Bond Finance Director and Chief Financial Officer Disclaimer Forward Looking Statements This presentation includes forward looking statements. Forward looking statements

More information

SCOTGOLD RESOURCES LIMITED

SCOTGOLD RESOURCES LIMITED SCOTGOLD RESOURCES LIMITED Proactive Investor Forum Presentation London 12 January 2017 Disclaimer This presentation is provided for the sole purpose of providing preliminary technical, financial and other

More information

Darlot and King of the Hills: A new growth chapter in WA s Eastern Goldfields. ASX Code: RED

Darlot and King of the Hills: A new growth chapter in WA s Eastern Goldfields. ASX Code: RED Denver Gold Forum 2017, 24-27 September 2017 Mark Williams, Managing Director 1 Darlot and King of the Hills: A new growth chapter in WA s Eastern Goldfields ASX Code: RED Competent Person s Statement

More information

ASX Announcement $26M CAPITAL RAISING TO POSITION BLACKHAM FOR TRANSITION TO +100,000OZ PER ANNUM GOLD PRODUCER 1

ASX Announcement $26M CAPITAL RAISING TO POSITION BLACKHAM FOR TRANSITION TO +100,000OZ PER ANNUM GOLD PRODUCER 1 Not for release to US wire services or distribution in the United States of America 20 March 2019 Highlights ASX Announcement $26M CAPITAL RAISING TO POSITION BLACKHAM FOR TRANSITION TO +100,000OZ PER

More information

Dragon Mining A Decade of Nordic Gold Production

Dragon Mining A Decade of Nordic Gold Production Dragon Mining A Decade of Nordic Gold Production Prospectors and Developers Association of Canada Nordic Mining Days 2 March 2015 Disclaimer The purpose of this presentation is to provide general information

More information