2 Ireland in the wider European energy market MOP Breakfast Briefing Stephen Woodhouse 24 March 2011
3 Pöyry what do we do? employees across 49 countries
4 Pöyry Management Consulting, Energy Europe s leading specialist energy management consultancy. Offering expert advice from strategy to implementation on policy, regulation, business operations, financing and valuation and sustainability. Providing in-depth market intelligence across Europe. Pöyry offices (c) grafikdienst.com Pöyry Management Consulting offices Over 200 energy market experts in 14 offices across Europe: Düsseldorf Oxford Helsinki Stockholm London Stavanger Madrid Paris Milan Vienna Moscow Villach Oslo Zurich 4
5 Agenda 1. Background 2. GB energy market reform and carbon price support 3. European Framework guidelines and future market options 5
6 SEM Long-term uncertainty remains an issue Internal SEM issues driven by expectations of future wind growth and need for flexible plant Wide-ranging consultation on dispatch and scheduling Many issues unanswered What is the future interaction with renewable support payments Review of Capacity Payment Mechanism (CPM) and potential development of ancillary service payments Locational incentives (TLAFs and TUoS) Two wider European developments will could also have a large impact on the SEM over the coming years: Energy Market Reform (EMR) and UK carbon price support and European Target model 6
7 Agenda 1. Background 2. GB energy market reform and carbon price support 3. European Framework guidelines and future market options 7
8 EMR proposals seek to improve investment environment for a sustainable generation mix using four central policy instruments A carbon price underpin to reduce downside carbon price volatility, making low carbon investments more attractive Carbon Price Support Feed-in Tariff Long-term contracts to remunerate low carbon generators at a defined tariff (in addition to, or instead of, energy market revenue) EMR To remunerate capacity providers based on their availability, allowing investment in flexible plant Capacity Mechanism Emissions Performance Standard A regulated limit upon point CO2 emissions allowed from new (or life extended) power stations 8 * The individual application of each of these policies to Northern Ireland is not yet clearly established
9 Carbon price support (CPS) to deliver a defined Target Price Headlines: Fossil fuels used to generate electricity in UK will be taxed at rates relating to their average carbon content upstream carbon tax Applies to all fossil fuel generation in GB and Northern Ireland including CCS (perhaps at a reduced rate), CHP and autoproducers Bid price of NI generators (and potentially SMP) price would rise Paid on exported but not imported electricity potential benefits for RoI generators Source: HM Treasury 9
10 CPS Merit order impact: baseline Merit order: 2010 January business day * NI OCGTs NI CCGT NI steam gas NI coal 10
11 CPS Merit order impact: 25/tCO 2 increment Merit order: 2010 January business day * NI OCGTs NI CCGT NI steam gas NI coal 11 There is a shift in the merit order of plant in the SEM, with those in the North at a disadvantage to those in the Republic
12 CfD FiT preferred option for low carbon generation in GB Difference payments plus wholesale price CfD FIT Difference payments made with reference to an average electricity price difference payment = contract tariff average wholesale price Difference payments not affected by trade price realised by generator Flat revenue stream if match market price Incentive for generator to beat the market price Renewables Obligation (RO) becomes a legacy support after 2017 Other possible features: based on hourly output to reduce cannibalisation risk? allowance for balancing costs? Interaction between capacity covered by FIT contracts and the residual wholesale market will influence future wholesale prices in GB and potentially also in SEM 12
13 What is the impact of the CfD FiT in the SEM? Uncertainty over future of NIRO Can NIRO continue without the GB RO? No firm proposals yet for future rules of renewable support in Northern Ireland in the context of the EMR reforms Complicated by the fact that energy policy is a devolved issued, but funding for renewable support is not Would a CFD FiT be suitable for the SEM market design? 13
14 Other aspects of EMR Emissions Performance Standard (EPS) May impact future power plant investments in Northern Ireland Affects new-build and existing plants that undertake significant investments for life extension Initially will affect conventional coal fired generation, but future reductions in the limits could affect CCGTs Currently no exemption for low-load factor plants Capacity Payment Mechanism (CPM) No indication that this will have a direct impact in Northern Ireland government recognises the need to provide commercial incentives for flexible/peaking capacity in order to create a sustainable generation mix proposals suggest a targeted capacity mechanism to secure a flexible/peaking capacity only a central body will tender to contract with capacity providers in order to secure anticipated capacity requirements 14
15 Agenda 1. Background 2. GB energy market reform and carbon price support 3. European Framework guidelines and future market options 15
16 EU decisions on market design affect all electricity markets in member states The EU third package came into force on 3 March 2011 Aim is to deepen electricity market integration through two stage process: 1. development of framework guidelines (FG) on specific topics by ACER 2. transformation of FGs into legally binding network codes by ENTSO-E Final draft framework guidelines on capacity allocation and congestion management published by ERGEG in Feb 2011 and outlines the principles of: network transmission capacity calculation; day-ahead markets; forward markets; and intraday markets. Defines the target model for European electricity markets 16
17 New European target model represents a strong move to implicit auctions Future development into legally binding network code Energy and i/c capacity traded separately Implicit auctions: Energy and i/c capacity bundled together The target model includes day-ahead and intraday implicit price coupling with: use of a single pricing algorithm compatible bids / products sharing of all bid data between power exchanges harmonized gate closure times Guidelines suggest implementation of all aspects by 2014 though some uncertainty over specific timelines 17
18 How are the Irish RAs responding to European developments? SEM consultation on integration with other European markets issued in September 2009 and SEM decision in March 2010 this was before the most recent EU framework guidelines were published Three separate workstreams have been developed and continue to progress: 18
19 How will the Framework guidelines affect the SEM? Day-ahead market Uncertainty over compatibility of the SEM with the European target model? would need firm day-ahead prices SEM work on day-ahead issues may need to focus on price coupling Is fixing prices at the day-ahead stage appropriate for the SEM with high dayahead wind uncertainty? Barrier to efficient interconnector usage and revealing value of flexible generation? Legally binding code may not be much room for manoeuvre. Intraday Market Framework guidelines also put a strong focus on continuous trading as close to real time as possible Will current SEM intraday modification (3 gate closures) be sufficient to cover the, as yet unknown, future legal (and market) requirements? Implication for SEM market design Breaking point? 19
20 What are the options from here? Regulatory aims have been to maintain core principles of the SEM and minimise any changes to the market rules Can this withstand the internal and external market pressures, as well as legal requirements? Alternative regulatory approaches can be envisaged over the coming years: Can a suitable SEM solution be found that mitigates the identified issues around high wind generation, complies with all EU requirements and causes minimal disruption to the current arrangements? 20
21 Stephen Woodhouse +44 (0) , Pöyry Management Consulting (UK) Ltd King Charles House Park End Street Oxford, UK OX1 1JD +44 (0) Pöyry Management Consulting (UK) Ltd. Registered in England No King Charles House, Park End Street, Oxford OX1 1JD.
22 22 Company presentation
ARE MARKETS DEAD? ARE WE HEADING FOR A REGULATED FUTURE? DOES COMPETITION STILL STAND A CHANCE?
ARE MARKETS DEAD? ARE WE HEADING FOR A REGULATED FUTURE? DOES COMPETITION STILL STAND A CHANCE? RIDING THE WAVE TUESDAY, TALLINN STEPHEN WOODHOUSE PÖYRY MANAGEMENT CONSULTING ENERGY Pöyry offices (c) grafikdienst.com
More informationADAPTING THE TARGET MODEL TO VALUE FLEXIBILITY
ADAPTING THE TARGET MODEL TO VALUE FLEXIBILITY Stephen Woodhouse 3 November 2015 AGENDA ADAPTING THE TARGET MODEL TO VALUE FLEXIBILITY To be covered in this session: What is flexibility? Reality and misconceptions
More informationThe Road to the I-SEM
The Road to the I-SEM 1 Agenda Development of power markets in Ireland and Northern Ireland Development of power markets across Europe Market coupling explained The road to the I-SEM The elements of the
More informationContents 1. Introduction Executive Summary EAI Response Main Concerns Assumptions on Costs
ESB GWM Response: Capacity Remuneration Mechanism (CRM) T-4 Capacity Auction for 2022/23 Best New Entrant Net Cost of New Entrant (BNE Net CONE) Consultation Paper (SEM-18-025) 15 th June 2018 i Contents
More informationThe North Seas Countries Offshore Grid Initiative
The North Seas Countries Offshore Grid Initiative Deliverable 1 - final report This report identifies areas where the incompatibility of national market and regulatory regimes acts as a barrier to coordinated
More informationViridian Group Investments Limited. Consolidated Financial Statements 31 March 2018
Viridian Group Investments Limited Consolidated Financial Statements 31 March 2018 CONTENTS Page Group Financial Highlights 3 Strategic and Director s Report - Operating Review 4 - Summary of Financial
More informationSTATEMENT ON SSE S APPROACH TO HEDGING 14 November 2018
STATEMENT ON SSE S APPROACH TO HEDGING 14 November 2018 INTRODUCTION SSE is working towards its vision of being a leading energy company in a low carbon world by focusing on core businesses of regulated
More informationTABLE OF CONTENTS... 2
Information Paper on Modifications to the EirGrid Market Operator and EirGrid Transmission System Operator, necessitated to implement the Integrated Single Electricity Market (I-SEM) Reference: CER/16/368
More informationBrexit and electricity interconnectors. Jason Mann
Brexit and electricity interconnectors Jason Mann 12 May 2018 Expansion of UK interconnection capacity driven by strong fundamentals and benign policies - but complicated by Brexit Mounting political pressures
More informationViridian Group Investments Limited. Consolidated Financial Statements 31 March 2016
Viridian Group Investments Limited Consolidated Financial Statements 31 March 2016 CONTENTS Page Group Financial Highlights 3 Strategic and Directors Report - Operating Review 4 - Summary of Financial
More informationQuick Guide to the Integrated Single Electricity Market. Version 1
Quick Guide to the Integrated Single Electricity Market Version 1 1 Contents 1. What is the I-SEM? 2. Market coupling 3. Administration 4. Markets 5. Participation and roles 6. Trading options 7. Settlement
More informationPower Trading in the Coupled European Markets
Power Trading in the Coupled European Markets Challenges for policy-makers February 2016-1 - Europe Economics is registered in England No. 3477100. Registered offices at Chancery House, 53-64 Chancery
More informationNordREG Activities 2008
NordREG Activities 2008 NordREG Activities 2008 NordREG c/o Norwegian Water Resources and Energy Directorate P.O. Box 5091, Majorstua N-0301 Oslo Norway Telephone: +47 22 95 95 95 Telefax: +47 22 95 90
More informationChapter 2: Market Governance, Administration and Operation. Industry Guide to the I-SEM
Chapter 2: Market Governance, Administration and Operation Industry Guide to the I-SEM 1 2.1 I-SEM governance and administration SEM Committee The SEM Committee (SEMC) is the governing body for the I-SEM,
More informationA Closer Examination of Wind Generation in Ireland
Industry Insight June 2015 A Closer Examination of Wind Generation in Ireland How the changing market is making it hard for generators to forecast revenues With enviable wind resources, ambitious renewables
More informationIntegrated Single Electricity Market (I-SEM)
Integrated Single Electricity Market (I-SEM) Laura Brien, Director of Electricity Markets, CER Ibec Energy Conference Portlaoise Heritage Hotel 12 June 2014 Agenda The I-SEM Energy Trading Arrangements
More informationThe policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner
The policy and regulatory aspects of a bankable solar power project Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner Contents 1. The restriction of subsidies and policy priorities. 2.
More informationViridian Group Investments Limited
Viridian Group Investments Limited Annual Report and Accounts For the year ended 31 March Viridian Group Investments Limited Annual Report and Accounts - 1 CONTENTS Page Group Financial Highlights 3 Directors
More informationViridian Group Investments Limited
Viridian Group Investments Limited Annual Report and Accounts For the year ended 31 March 2013 Viridian Group Investments Limited Annual Report and Accounts - 2013 1 CONTENTS Page Group Financial Highlights
More informationThe effects of Brexit on the UK power market Part One
The effects of Brexit on the UK power market Part One In part one of a two part Brexit briefing, we look at the potential impact of the UK s vote to leave the EU on the UK electricity market. We have developed
More informationBusiness Process. BP_SO_13.1 Interim Long-Term Coordinated Capacity Calculation
Business Process BP_SO_13.1 Interim Long-Term Coordinated Capacity Calculation EirGrid and SONI support the provision of information to the marketplace by publishing operational data, processes, methodologies
More informationIU TSOs proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a
IU TSOs proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management
More informationAnnex C Renewables Obligation transition
Annex C Renewables Obligation transition INTRODUCTION 188. The Government recognises that significant investments have been made under the current Renewables Obligation (RO), with around 9 GW of installed
More informationThe voice of the energy industry. Brexit & the future EU-UK energy relationship
The voice of the energy industry Brexit & the future EU-UK energy relationship February 2018 Executive Summary Energy UK was pleased to see the negotiations on the UK s departure from the European Union
More informationViridian Group Investments Limited
Viridian Group Investments Limited Interim Consolidated Financial Statements GROUP FINANCIAL HIGHLIGHTS Underlying Business Results 1 Group pro-forma Earnings Before Interest, Tax, Depreciation and Amortisation
More informationSSE Consolidated Segmental Statement (CSS) - year ending 31 March 2013
SSE Consolidated Segmental Statement (CSS) - year ending 31 March 2013 Generation Electricity Supply Gas Supply Aggregate Nondomestic Non- Supply Unit Domestic Domestic domestic Business 2013 2013 2013
More informationSEM, BETTA and Beyond Approach to Interconnector Modelling
SEM, BETTA and Beyond Approach to Interconnector Modelling Energy Exemplar EU Conference Lisbon June 17 th 2013 Marie-Therese Campbell Dr. Eoin Clifford Background Interconnector Modelling Difficult to
More informationSEMOpx. Operating Procedures: DAM, IDA, IDC. Updated Draft: 09/03/18. Draft prepared for discussion at the BLG meeting, 14 March 2018.
SEMOpx Updated Draft: 09/03/18 Operating Procedures: DAM, IDA, IDC Draft prepared for discussion at the BLG meeting, 14 March 2018. 1 CONTENTS A. Introduction 5 A.1 General provisions 5 A.1.1 Purpose and
More informationDraft. COMMISSION REGULATION (EU) No /
EN EN EN EUROPEAN COMMISSION Brussels, C(2010) XXX final Draft COMMISSION REGULATION (EU) No / of on laying down guidelines relating to the inter-transmission system operator compensation mechanism and
More informationRESEARCH ON THE EFFECTS OF A CARBON PRICE FLOOR
RESEARCH ON THE EFFECTS OF A CARBON PRICE FLOOR A report for Energie-Nederland 9 July 218 Frontier Economics Ltd is a member of the Frontier Economics network, which consists of two separate companies
More informationDeveloping the internal energy market further - the European Network Codes
Developing the internal energy market further - the European Network Codes E-Control Fachtagung "Netzkodizes Hintergrund und Auswirkungen" Wien 28.11.2016 Matti Supponen DG ENER unit B2: Wholesale markets
More informationDECISION ON MODIFICATIONS TO THE ELECTRICITY INTERCONNECTOR OPERATOR LICENCE
An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities DECISION ON MODIFICATIONS TO THE ELECTRICITY INTERCONNECTOR OPERATOR LICENCE Decision Paper Reference: CRU/18/049 Date Published: 23/03/2018
More informationSupport mechanisms for RES-e
Support mechanisms for RES-e Regional ECREEE Training Workshop on National Renewable Energy Policy and Incentive Schemes Praia, 9-11 April 2012 Sofía Martínez International Relations Department Table of
More informationSSE Consolidated Segmental Statement (CSS) - year ending 31 March 2014
SSE Consolidated Segmental Statement (CSS) - year ending 31 March 2014 Generation Electricity Supply Gas Supply Aggregate Nondomestic Non- Supply Unit Domestic Domestic domestic Business 2014 2014 2014
More informationRESPONSE TO ACER'S CONSULTATION ON TARIFFS
RESPONSE TO ACER'S CONSULTATION ON TARIFFS Question 1: What other issues should be dealt with in this Framework Guideline? What is the evidence for including these issues? Please provide justification.
More informationParticipants Forum 2014
Participants Forum 2014 Programme of the day 13.15 hrs Introduction 13.30 hrs Intraday 14.15 hrs Survey Results 14.30 hrs BritNed Operational Updates 15.00 hrs Tea / Coffee break 15.15 hrs New code 15.45
More informationCan The EU Be An Example To Turkish Electricity Market Liberalisation?
Can The EU Be An Example To Turkish Electricity Market Liberalisation? Istanbul Energy Day 8 September 2015 Dr. Jan Haizmann Managing Director CORREGGIO CONSULTING Introduction Dr. Jan Haizmann Academia
More informationIreland and Brexit: What happens next? seminar, 4 October The electricity sector in Ireland. Iain Wright.
Ireland and Brexit: What happens next? seminar, 4 October 2017 The electricity sector in Ireland Iain Wright (iain.wright@glasgow.ac.uk) The Electricity Sector in Ireland, Slide 1 of 18 Introduction Scope
More informationCROSS BORDER CAPACITY ALLOCATION FOR THE EXCHANGE OF ANCILLARY SERVICES
CROSS BORDER CAPACITY ALLOCATION FOR THE EXCHANGE OF ANCILLARY SERVICES A POSITION PAPER BY THE ENTSO-E ANCILLARY SERVICES WORKING GROUP JANUARY 2012 Purpose & objectives of the paper This paper further
More informationResponse by Power NI Energy (PPB)
Power NI Energy Limited Power Procurement Business (PPB) I-SEM Balancing Market Principles Code of Practice Consultation Paper SEM-17-026 Response by Power NI Energy (PPB) 12 May 2017. Introduction Power
More informationScottishPower Consolidated Segmental Statement for the year ended 31 December 2017
ScottishPower Consolidated Segmental Statement for the year ended 31 December 2017 Required under Standard Condition 16B of Electricity Generation Licences and Standard Condition 19A of Electricity and
More informationWhat next for UK auctions of renewable Contracts for Difference?
What next for UK auctions of renewable Contracts for Difference? In February we saw the results of the first competitive auction for Contracts for Difference (CfDs), the primary support mechanism for incentivising
More informationI-SEM Business Liaison Group NEMO. 26 January 2018
I-SEM Business Liaison Group NEMO 26 January 2018 1 Agenda SEMOpx Implementation Update Block Orders for the Intraday Continuous Market Foreign Exchange Rate SEMOpx Statement of Charges SEMOpx Interim
More informationUK ELECTRIC MARKET REFORM APPLICATION TO TEXAS POWER MARKET. Ingmar Sterzing CEIC Seminar April 10, 2013
UK ELECTRIC MARKET REFORM APPLICATION TO TEXAS POWER MARKET Ingmar Sterzing CEIC Seminar April 10, 2013 1 Ingmar Sterzing, Pittsburgh, PA, 2013 UK and ERCOT Strikingly Similar Similar generation infrastructure
More informationViridian Group Investments Limited
Viridian Group Investments Limited Interim Consolidated Financial Statements GROUP FINANCIAL HIGHLIGHTS Underlying Business Results 1 Group pro-forma Earnings Before Interest, Tax, Depreciation and Amortisation
More informationGas Innovation Reporting Framework
An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Gas Innovation Reporting Framework Information Paper Information Paper Reference: CRU/18/180 Date Published: 30/08/2018 Closing Date:
More informationIntegrated Single Electricity Market (I-SEM)
Integrated Single Electricity Market (I-SEM) Balancing Market Principles Code of Practice SEM-17-049 11 th July 2017 COMPLEX BID OFFER DATA IN THE I-SEM BALANCING MARKET 1 I. INTRODUCTION 1. This Code
More informationCHARGING METHODOLOGY STATEMENT FOR THE ELECLINK INTERCONNECTOR
CHARGING METHODOLOGY STATEMENT FOR THE ELECLINK INTERCONNECTOR ISSUE 1.0 1 Contents 1. Introduction... 3 2. Interconnector charging methodology... 3 2.1 Introduction... 3 2.2 Objectives of the Charging
More informationUK New Nuclear: Hinkley Point C Case Study
UK New Nuclear: Hinkley Point C Case Study COP23 Side Event, Bonn Anurag Gupta Global Sector Head for Power Infrastructure, Deal Advisory November 2017 Important Notice This presentation has been prepared
More informationCOMMISSION REGULATION (EU)
24.9.2010 Official Journal of the European Union L 250/5 COMMISSION REGULATION (EU) No 838/2010 of 23 September 2010 on laying down guidelines relating to the inter-transmission system operator compensation
More informationEuropean transmission tariff structures Cambridge Economic Policy Associates
European transmission tariff structures Cambridge Economic Policy Associates 24 March 2015 Cambridge Economic Policy Associates (CEPA) We are an economic and financial policy consulting business Our energy
More informationSEMOpx Statement of Charges
SEMOpx Statement of Charges 25 June 2018 Document History Version 1 Baseline version published 06/01/2018 Version 2 Revised to include GBP costs ( based on Annual 16/02/2018 Capacity Exchange Rate) and
More informationTNUoS Tariffs in 10 minutes March 2018
TNUoS s in 10 minutes March 2018 An overview of TNUoS tariffs This information paper provides an overview of National Grid s Transmission Network Use of System (TNUoS) tariffs, applicable to transmission
More informationImpact of Brexit. for Interconnectors
Impact of Brexit for Interconnectors Contents Introduction 4 A snap shot of what Brexit may look like for the UK 5 1. EEA + EFTA 5 2. Customs Union 5 3. Bilateral agreements + EFTA 5 4. Free Trade Agreement
More informationResponse to ENTSOE public consultation. Network Code on Capacity Allocation and Congestion Management for. Electricity
Response to ENTSOE public consultation On Network Code on Capacity Allocation and Congestion Management for Electricity 23 May 2012 EUROPEX Rue Montoyer 31 Bte 9 BE-1000 Brussels T. : +32 2 512 34 10 E.:
More informationThe implementation of the Electricity Target Model in Greece. Angeliki D. Mourtzikou Director of Markets Monitoring and Competition, RAE
The implementation of the Electricity Target Model in Greece Angeliki D. Mourtzikou Director of Markets Monitoring and Competition, RAE Thessaloniki, September 11, 2018 Agenda What is the Electricity Target
More informationEAI Response to ACER Consultation on Forward Risk-Hedging Products and Harmonisation of Long-Term Capacity Allocation Rules
Version 1.0 ACER Consultation on Forward Risk-Hedging Products and Harmonisation of Long-Term Capacity Allocation Rules EAI Response to ACER Consultation on Forward Risk-Hedging Products and Harmonisation
More informationESB. Debt Investor Presentation Business Update. Pat Fenlon Group Finance Director. Gerry Tallon Group Treasurer
ESB Debt Investor Presentation Business Update Pat Fenlon Group Finance Director Gerry Tallon Group Treasurer Ted Browne Manager, Investor Relations & Credit Rating December 2017 esb.ie/ir Disclaimer Forward
More informationViridian Group Investments Limited. Consolidated Financial Statements 31 March 2017
Viridian Group Investments Limited Consolidated Financial Statements 31 March 2017 CONTENTS Page Group Financial Highlights 3 Strategic and Directors Report - Operating Review 4 - Summary of Financial
More informationIndustry Guide to the I-SEM
I-SEM Project Version 1.0 2017 EirGrid plc. Disclaimer This guide ( Guide ) has been produced by EirGrid Group, including without limitation EirGrid plc, SONI Limited and affiliated subsidaries, to provide
More informationTrading across borders - The key to manage portfolios at a regional scale
Trading across borders - The key to manage portfolios at a regional scale Jérôme Le Page Manager for European Electricity Markets EFET European Federation of Energy Traders Energy Community Secretariat
More informationERGEG Public Consultation on Guidelines on Transmission Tarification 1. - Evaluation of the Comments Received
ERGEG Public Consultation on Guidelines on Transmission Tarification 1 - Evaluation of the Comments Received - 18-07-2005 INTRODUCTION This document contains the evaluation by ERGEG of the comments received
More informationWholesale Electricity Market Monitoring Report for the Energy Community Contracting Parties and Georgia
Wholesale Electricity Market Monitoring Report for the Energy Community Contracting Parties and Georgia Reporting Period 2014 Publication date April 2016 Contents Contents... 1 List of Tables... 2 List
More informationHalf Year Results 6 Months Ended 30 June July 2018
Half Year Results 6 Months Ended 30 June 2018 24 July 2018 Agenda Operations and Business Review Will Gardiner, CEO Financial Review Den Jones, Interim CFO Delivering the Strategy Will Gardiner, CEO 2
More informationREQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM ON
REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM ON ALL TSO s PROPOSAL FOR CONGESTION INCOME DISTRIBUTION METHODOLOGY 24.01.2017 I. Introduction and legal context
More informationScottishPower Segmental Generation and Supply Statements for the year ended 31 December 2012
ScottishPower Segmental Generation and Supply Statements for the year ended 31 December 2012 Required under Standard Condition 16B of Electricity Generation Licences and Standard Condition 19A of Electricity
More informationEuropean Update. 1 st October 2015
European Update Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. 1 st October 2015 1. General
More information18 April 2016 Draft for consultation
All TSOs proposal for intraday cross-zonal gate opening and gate closure times in accordance with Article 59 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity
More informationBrexit: potential impacts on energy markets and regulation
Brexit: potential impacts on energy markets and regulation November 2016 Overview This briefing note reviews the possible impacts of the UK s Brexit vote on energy regulation in the UK, in two scenarios:
More informationConsolidated Segmental Statement (CSS) For the year ended 31 March 2015
Consolidated Segmental Statement (CSS) For the year ended 31 March 2015 SSE Consolidated Segmental Statement (CSS) year ended 31 March 2015 Generation Aggregate Electricity Supply Gas Supply Aggregate
More informationIntraday Cross-Zonal Gate Opening and Gate Closure Times. Consultation document. PC_2018_E_01 9 January 2018
Consultation document PC_2018_E_01 9 January 2018 Trg republike 3 1000 Ljubljana Slovenia T: +386 (0)8 2053 400 info@acer.europa.eu www.acer.europa.eu This consultation document is issued to invite comments
More informationEUROPEA U IO. Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 E ER 173 CODEC 704
EUROPEA U IO THE EUROPEA PARLIAMT THE COU CIL Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 ER 173 CODEC 704 LEGISLATIVE ACTS A D OTHER I STRUMTS Subject: REGULATION OF THE EUROPEAN PARLIAMENT
More informationReview of the second GB capacity auction
Review of the second GB capacity auction ELECTRICITY MARKET REFORMS On the 11th December 2015 National Grid and the Department of Energy and Climate Change (DECC) published the results of the second T-4
More informationENTSO-E Network Code on Electricity Balancing
Annex II to Recommendation of the Agency for the Cooperation of Energy Regulators No 03/2015 of 20 July 2015 on the Network Code on Electricity Balancing Proposed amendments to the Network Code ENTSO-E
More informationHarmonisation of Electricity Retail Markets in Ireland &Northern Ireland
Harmonisation of Electricity Retail Markets in Ireland &Northern Ireland Seán mac an Bhaird, Commission for Energy Regulation, Ireland CEER Workshop Brussels, 10 th February 2011 Agenda 1. Introduction
More informationENTSO-E recommendations for Market Design Trilogue negotiations
ENTSO-E recommendations for Market Design Trilogue negotiations ENTSO-E congratulates the Bulgarian Presidency, the European Parliament and the European Commission on the successful conclusion of the first
More informationResults Presentation Six month period ended 31 December 2010
Results Presentation Six month period ended 31 December 2010 22 February 2011 Disclaimer This presentation may contain projections or forward looking statements regarding a variety of items. Such forward-looking
More informationTariff for Virtual Reverse Flow Product at Moffat
Tariff for Virtual Reverse Flow Product at Moffat DOCUMENT TYPE: REFERENCE: DATE PUBLISHED: FURTHER INFORMATION: Decision Paper CER/11/190 11 th November 2011 cjohnston@cer.ie The Commission for Energy
More informationWholesale power market challenges:
EU Electricity Market Reform Seminar Dublin 13 March 2013 Wholesale power market challenges: from simplicity and efficiency to complexity and regulation Peter Styles European Federation of Energy Traders
More informationCapacity Allocation and Congestion Management (CACM) Code Overview
Capacity Allocation and Congestion Management (CACM) Code Overview Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size
More informationFTR Trading Information Pack February 2018
FTR Trading Information Pack February 2018 Moyle and East West Interconnectors 20 th February 2018 Version 2.2 Contents 1. Introduction... 3 2. I-SEM and The Forwards Electricity Market... 5 2.1 New market
More informationIntroduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal
Explanatory Document to all TSOs proposal for intraday cross-zonal gate opening and gate closure times in accordance with Article 59 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing
More informationPöyry Point of View: Shaping the next future. Europe s energy future the shape of the beast
Pöyry Point of View: Shaping the next future Europe s energy future the shape of the beast How can we meet the decarbonisation challenge? Decarbonisation requires large scale investment by European energy
More informationSEMO PX MARKET DESIGN
SEMO PX MARKET DESIGN November 2017 EirGrid 2017. Commercial In Confidence. Table of Contents 1. Background... 4 2. High Level Processes for Ex-Ante Markets... 6 2.1 Day-ahead MRC and Intraday Coupled
More informationWholesale Energy Markets Overview. Jeff Klarer Market Strategist
Wholesale Energy Markets Overview Jeff Klarer Market Strategist Wisconsin Electric Utility Fuel Rules (PSC-116) Fuel Cost Components Fuel for generation (coal, natural gas, uranium, etc.) Energy market
More information29 June 2016 Disclaimer This explanatory document is submitted by all TSOs to all NRAs for information and clarification purposes only accompanying the All TSOs proposal for methodology for congestion
More informationCID Methodology Explanatory note
29 June 2016 Disclaimer This explanatory document is submitted by all TSOs to all NRAs for information and clarification purposes only accompanying the All TSOs proposal for methodology for congestion
More informationCross border participation in CRMs Presentation materials. 30 June 2015
Cross border participation in CRMs Presentation materials 30 June 2015 Interaction between CRMs is important to ensure least cost to customers Objectives of IEM demand is met by the cheapest resources
More informationDraft Outline of the 2019 Work Programme
Draft Outline of the 2019 Work Programme This document presents an outline of the tasks the Agency plans to perform in 2019. As such, it focuses primarily on the external deliverables the Agency expects
More informationMr Alberto Pototschnig, Director ACER. CC: Dr Klaus-Dieter Borchardt, Director Internal Energy Market DG ENER European Commission
Mr Alberto Pototschnig, Director ACER CC: Dr Klaus-Dieter Borchardt, Director Internal Energy Market DG ENER European Commission Mr Laurent Schmitt, Secretary General ENTSO-E 14 June 2017 Dear Alberto,
More informationIntroduction to Power Exchanges
For Public Use Introduction to Power Exchanges Presented by: Mr. S.K. Ray on behalf of IEX In this presentation Introduction to Indian Power Markets Power Exchange functioning and Market Snapshot International
More informationElectricity Market Reform
Electricity Market Reform Jonathan Brearley, Director, Energy Markets and Networks, DECC 27 September 2012 Our objectives for the electricity market mirror those of the wider energy system Climate change:
More informationMETIS Technical Note T3. Market module configuration for study S12. Focus on day-ahead, intraday and balancing markets
METIS Technical Note T3 Market module configuration for study S12 Focus on day-ahead, intraday and balancing markets METIS Technical Notes November 2016 Prepared by Christopher Andrey (Artelys) Maxime
More informationThe new electricity market arrangements in Ukraine
The new electricity market arrangements in Ukraine A report prepared by ECS Project Office April 2016 FINAL DRAFT Revisions Table Version Date Description FINAL DRAFT 1.0 November16, 2015 Internal Draft
More informationTSOs perspective of the CACM requirements. Athanasios Troupakis Market Advisor ENTSO-E
TSOs perspective of the CACM requirements Athanasios Troupakis Market Advisor ENTSO-E Energy Community Secretariat Energy Community Secretariat Table of contents 1. Introductory remarks 2. Elements of
More informationElectricity trading and risk management in liberalised market
www.pwc.com/jp Electricity trading and risk management in liberalised market PricewaterhouseCoopers Agenda Page 1 Current electricity trading in Japan 1 2 Evolution of trading in a deregulated market 5
More informationcc. Robert O Rourke Jo Aston Paul Bell Denis Kelly Robbie Ahern Michael Beggs Tony Hearne 1st April 2015 Dear Sir and Madam,
Jenny Pyper Utility Regulator Queens House 14 Queen Street Belfast BT1 6ED Gareth Blaney Commission for Energy Regulation The Exchange Belgard Square North Tallaght Dublin 24 cc. Robert O Rourke Jo Aston
More informationThe North Seas Countries Offshore Grid Initiative
The North Seas Countries Offshore Grid Initiative NSCOGI 2013/2014 progress report August 2014 1 Objectives of the North Seas Countries Offshore Grid Initiative In December 2012, Ministers of the North
More informationGREEK RENEWABLES SUPPORT SCHEME PROPOSALS
BRIEFING GREEK RENEWABLES SUPPORT SCHEME PROPOSALS MARCH 2016 BRIEF OUTLINE OF THE SCHEME PHOTOVOLTAIC PROJECTS TRANSITIONAL PROVISIONS NON-INTERCONNECTED ISLANDS COMPETITIVE BIDDING PROCESS FROM 2017
More informationStandard Market Design: FERC Process and Issues
Standard Market Design: FERC Process and Issues Richard O Neill and Udi Helman Division of the Chief Economic Advisor, Office of Markets, Tariffs and Rates Federal Energy Regulatory Commission IEEE PES
More information