11 11
12 12
13 13
14 14
15 15
16 Plan Risk Responses: Tools and Techniques Strategies for Negative Risks or Threats Avoid Transfer Mitigate Accept
17 Plan Risk Responses: Tools and Techniques Strategies for Positive Risks or Opportunities Exploit Enhance Share Accept
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 Question Risk management should be done: a. Just before meeting with a client b. Consistently throughout the project life cycle c. As soon as time and cost estimates are ready d. Early in the execution phase 25
26 Answer Risk management should be done: a. Just before meeting with a client b. Consistently throughout the project life cycle c. As soon as time and cost estimates are ready d. Early in the execution phase 26
27 Question The risk management plan may include all of the following except: a. Methodology b. Definitions of risk probability and impact matrix c. Responses to individual risks d. Stakeholders tolerances 27
28 Question The risk management plan may include all of the following except: a. Methodology b. Definitions of risk probability and impact matrix c. Responses to individual risks d. Stakeholders tolerances 28
29 Question Risk transfer could involve all of the following except: a. Cost type of contracts b. Fixed price contract c. Eliminating risk through beta testing d. Performance bonds 29
30 Answer Risk transfer could involve all of the following except: a. Cost type of contracts b. Fixed price contract c. Eliminating risk through beta testing d. Performance bonds 30
31 31
32 Contract Types Fixed-price contracts Firm Fixed Price Contracts (FFP) Fixed Price Incentive Fee Contracts (FPIF) Fixed Price with Economic Price Adjustment Contracts (FP-EPA).
33 Contract Types Fixed-price contracts Firm Fixed Price Contracts (FFP) Fixed Price Incentive Fee Contracts (FPIF) Fixed Price with Economic Price Adjustment Contracts (FP-EPA). Cost-reimbursable contracts Cost Plus Fixed Fee Contracts (CPFF) Cost Plus Incentive Fee Contracts (CPIF). Cost Plus Award Fee Contracts (CPAF)
34 Contract Types Fixed-price contracts Firm Fixed Price Contracts (FFP) Fixed Price Incentive Fee Contracts (FPIF) Fixed Price with Economic Price Adjustment Contracts (FP-EPA). Cost-reimbursable contracts Cost Plus Fixed Fee Contracts (CPFF) Cost Plus Incentive Fee Contracts (CPIF). Cost Plus Award Fee Contracts (CPAF) Time and Material Contracts (T&M)
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 Question The fixed price contract is advantageous to the buyer because it: A. requires extremely well defined specifications B. requires formal procedures for scope changes C. seller assumes financial and technical risk D. a known cost 42
43 Answer The fixed price contract is advantageous to the buyer because it: A. requires extremely well defined specifications B. requires formal procedures for scope changes C. seller assumes financial and technical risk D. a known cost 43
44 Question Procurement documents should have all of the following attributes except: a. Flexible enough to allow consideration of seller suggestion b. Contract statement of Work c. Describing the desired form of response d. Including the qualified sellers list 44
45 Answer Procurement documents should have all of the following attributes except: a. Flexible enough to allow consideration of seller suggestion b. Contract statement of Work c. Describing the desired form of response d. Including the qualified sellers list 45
46 Question Bidder's conferences used to: a. Plan contracting b. Perform contract administration c. Ensure that all prospective sellers have a clear, common understanding of the procurement d. Select sellers 46
47 Answer Bidder's conferences used to: a. Plan contracting b. Perform contract administration c. Ensure that all prospective sellers have a clear, common understanding of the procurement d. Select sellers 47
48 Question With which type of contract is seller MOST concerned about project scope of work a. Fixed price b. Cost reimbursable c. Time and Material d. Purchase Order 48
49 Answer With which type of contract is seller MOST concerned about project scope of work a. Fixed price b. Cost reimbursable c. Time and Material d. Purchase Order 49
50 50
51 51
52 52
53 53
54 54
55 55
56 56
57 57
58 58
59 59
60 60
Project Management Certification. Multiple Choice Questions
Project Management Certification (PMP) Project Management Certification (PMP) Multiple Choice Questions QUESTION 1 In Project Cost Management, which input is exclusive to the Determine Budget process?
More informationInformation Technology Project Management Fifth Edition
Information Technology Project Management Fifth Edition By Jack T. Marchewka Northern Illinois University 4-1 Copyright 2015 John Wiley & Sons, Inc. Project Planning: The Project Infrastructure Chapter
More informationProject Procurement Management
Project Procurement Introduction Unit 1 Unit 2 Unit 3 PMP Exam Preparation Project Integration Project Scope Project Time Unit 4 Unit 5 Unit 6 Unit 7 Project Cost Project Quality Project Human Resource
More informationLCS International, Inc. PMP Review. Chapter 6 Risk Planning. Presented by David J. Lanners, MBA, PMP
PMP Review Chapter 6 Risk Planning Presented by David J. Lanners, MBA, PMP These slides are intended to be used only in settings where each viewer has an original copy of the Sybex PMP Study Guide book.
More informationINSE 6230 Total Quality Project Management. Project Quality Management Project Procurement Management
Project Quality Management Project Procurement Management Definitions based on: Ability to satisfy the needs The totality of characteristics of an entity that bear on its ability to satisfy stated or
More informationProject Risk Management
Project Risk Management Introduction Unit 1 Unit 2 Unit 3 PMP Exam Preparation Project Integration Management Project Scope Management Project Time Management Unit 4 Unit 5 Unit 6 Unit 7 Project Cost Management
More informationMODULE 5 PROJECT RISK MANAGEMENT, PROCUREMENT AND CONTRACTS
Advanced Project Management MODULE 5 PROJECT RISK MANAGEMENT, PROCUREMENT AND CONTRACTS 06 07 November 2018 Facilitator: Mr Mondli Mbambo Module Purpose Project Risk & Procurement Managment Knowledge Risk
More informationFor the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.
For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com
More information1. What are the five major processes associated with every project? These are the same as the five Process Groups according to the PMBOK.
CTC/ITC 310 Program Management California State University Dominguez Hills Instructor: Howard Rosenthal Final Exam May 15, 2018 All questions are 4 points unless indicated otherwise Answer Key 1. What
More informationAchieve PMP Exam Success Five-Day Course Syllabus
Course Delivery Format: Traditional class room 5-day format, 35 hrs. Achieve PMP Exam Success Five-Day Course Syllabus Course Description: Achieve PMP Exam Success is a 35-hour PMP exam preparation course
More informationPMP (2018) PMBOK 6th Edition PMI. Project Management Professional (PMBOK 6th Edition)
PMI PMP (2018) PMBOK 6th Edition Project Management Professional (PMBOK 6th Edition) Download Full Version : https://killexams.com/pass4sure/exam-detail/pmi-001 QUESTION 903 Which process documents the
More informationComparison of Major Contract Types. Incentive Firm (FPIF) Moderately uncertain
Principal Risk to be Mitigated Firm Fixed-Price (FFP) None. Thus, the contractor assumes all cost risk. Use When.. The requirement is well-defined. Contractors are experienced in meeting it. Market conditions
More informationFive-Day Schedule and Course Content
Five-Day Schedule and Course Content The following sequence is suggested to balance out the material over five sessions. Note that Chapter 10 is placed with Chapters 12 and 13 on Day 5. DAY 1 DAY 1 Course
More informationJOURNAL OF PUBLIC PROCUREMENT, VOLUME 8, ISSUE 3,
JOURNAL OF PUBLIC PROCUREMENT, VOLUME 8, ISSUE 3, 289-301 2008 FINANCING INFRASTRUCTURE: FIXED PRICE VS. PRICE INDEX CONTRACTS Robert J. Eger III and Hai (David) Guo* ABSTRACT. This paper looks at a common
More informationFormulas to Know for EXAM
Formulas to Know for EXAM Activity & Project Duration Formulas In order to calculate Estimated Activity Duration (EAD) of an activity, Optimistic (O), Most Likely (M) and Pessimistic (P) estimates for
More informationKey Aspects for Managing a Project
Key Aspects for Managing a Project What is a Project? Definition: A project is a temporary endeavor undertaken to create a unique product, service or result. The temporary nature of projects indicates
More informationRisk Management Made Easy. I. S. Parente 1
Risk Management Made Easy I. S. Parente 1 1 Susan Parente, MS Engineering Management, PMP, CISSP, PMI-RMP, PMI-ACP, CSM, CSPO, PSM I, ITIL, RESILIA, CRISC, MS Eng. Mgmt.; S3 Technologies, LLC, Principal
More informationPMI - Dallas Chapter. Sample Questions. March 22, 2002
PMI - Dallas Chapter PMP Exam Sample Questions March 22, 2002 Disclaimer: These questions are intended for study purposes only. Success on these questions is not necessarily predictive of success on the
More informationCONTRACT INCENTIVES AND DISINCENTIVES
CONTRACT INCENTIVES AND DISINCENTIVES June 20, 2018 Fred Schlich Fred.Schlich@DAU.mil +1 334 728 2256 CONTRACT INCENTIVES AND DISINCENTIVES Why What How How Much How Many and much more 2 WHY HAVE INCENTIVES
More informationManaging Project Risk
Managing Project Risk By James N. Salapatas, PE, PMP www.suncam.com Copyright 2015 James N. Salapatas Page 1 of 36 Table of Contents Title Page List of Figures 3 About the Course 4 Course Map 5 Introduction
More informationThe Project Management Cer9ficate Program. Project Procurement Management
PMP cross-cutting skills have been updated in the PMP Exam Content Outline June 2015 (PDF of the Examination Content Outline - June 2015 can be found under the Resources Tab). Learn about why the PMP exam
More informationRisk Manage Manag ment men & the PMBOK John H. Dittmer, VI PMP, PMP CISSP CISSP ISSMP
Risk Management & the PMBOK John H. Dittmer, VI PMP, CISSP ISSMPISSMP Disclaimer Please note that theviews expressed in this presentation are the presenter s only. Theses views do not represent any official
More informationEvery project is risky, meaning there is a chance things won t turn out exactly as planned.
PMBOK 5 Ed. DEI- Every project is risky, meaning there is a chance things won t turn out exactly as planned. percent of runaway projects Did no risk management at all 38 percent did some, and 7 percent
More informationRevisions to Cost-type Contracts: Controlling Scope, Schedule, and Cost
Revisions to Cost-type Contracts: Controlling Scope, Schedule, and Cost Breakout Session #D03 Jo Ellyn Cunningham July 23, 2013 11:15 AM 1 Contract Types Two Basic Pricing Arrangements: Fixed Price: FFP,
More informationProject Management for the Professional Professional Part 3 - Risk Analysis. Michael Bevis, JD CPPO, CPSM, PMP
Project Management for the Professional Professional Part 3 - Risk Analysis Michael Bevis, JD CPPO, CPSM, PMP What is a Risk? A risk is an uncertain event or condition that, if it occurs, has a positive
More informationCan Profit Policy and Contract Incentives Improve Defense Contract Outcomes?
INSTITUTE FOR DEFENSE ANALYSES Can Profit Policy and Contract Incentives Improve Defense Contract Outcomes? Scot A. Arnold, Project Leader David L. McNicol Kenton G. Fasana February 2009 Approved for public
More information[Project Name] Project Risk Management Plan. [Sub-Project, phase, etc.] [Company] [Company Address] Marc Arnecke, PMP
[Company] [Company Address] Tel: Fax: [Company Phone] [Company Fax] [Company E-mail] May 16, 2015 [Ref. number] Marc Arnecke, PMP [Project Name] [Sub-Project, phase, etc.] The project risk management plan
More informationEFFECTIVE TECHNIQUES IN RISK MANAGEMENT. Joseph W. Mayo, PMP, RMP, CRISC September 27, 2011
EFFECTIVE TECHNIQUES IN RISK MANAGEMENT Joseph W. Mayo, PMP, RMP, CRISC September 27, 2011 Effective Techniques in Risk Management Risk Management Overview Exercise #1 Break Risk IT Exercise #2 Break Risk
More informationDATA ITEM DESCRIPTION
DATA ITEM DESCRIPTION Title: DD Form 1921, Cost Data Summary Report Number: Approval Date: 20031031 AMSC Number: D7514 DTIC Applicable: Preparing Activity: (D) OSD/PA&E/CAIG Limitation: GIDEP Applicable:
More informationRisk Management Made Easy 1, 2
1, 2 By Susan Parente ABSTRACT Many people know and understand risk management but are struggling to integrate it into their project management processes. How can you seamlessly incorporate project risk
More informationRISK MANAGEMENT PROFESSIONAL. 1 Powered by POeT Solvers Limited
RISK MANAGEMENT PROFESSIONAL 1 www.pmtutor.org Powered by POeT Solvers Limited This presentation is copyright 2009 by POeT Solvers Limited. All rights reserved. This presentation is protected by the Nigerian
More informationFundamentals of Project Risk Management
Fundamentals of Project Risk Management Introduction Change is a reality of projects and their environment. Uncertainty and Risk are two elements of the changing environment and due to their impact on
More informationProject Theft Management,
Project Theft Management, by applying best practises of Project Risk Management Philip Rosslee, BEng. PrEng. MBA PMP PMO Projects South Africa PMO Projects Group www.pmo-projects.co.za philip.rosslee@pmo-projects.com
More informationCost Risk Assessment Building Success and Avoiding Surprises Ken L. Smith, PE, CVS
Cost Risk Assessment Building Success and Avoiding Surprises Ken L. Smith, PE, CVS 360-570-4415 2015 HDR, Inc., all rights reserved. Addressing Cost and Schedule Concerns Usual Questions Analysis Needs
More informationProject Initiation, Planning, Executing, Monitoring and Controlling Process Groups (Workshops 1, 2, 3 & 4) Certified Program
438 Project Initiation, Planning, Executing, Monitoring and Controlling Process Groups (Workshops 1, 2, 3 & 4) Certified Program 3 19 October 2010, Kuwait Program Objectives: The Project Management Body
More informationRisk Management and Assessment Overview Alistair Nairn
Risk Management and Assessment Overview Alistair Nairn Purpose of risk management To define what may happen in the future and to choose among alternatives is a question that lies at the heart of contemporary
More informationAerospace Industry - Audit Techniques Guide - January 2005
Aerospace Industry - Audit Techniques Guide - January 2005 NOTE: This guide is current through the publication date. Since changes may have occurred after the publication date that would affect the accuracy
More informationACCOUNTING SYSTEMS for SBIR/STTR AWARDS. Presented by: Mike Anderson
ACCOUNTING SYSTEMS for SBIR/STTR AWARDS Presented by: Mike Anderson Seminar Objectives What is the Difference Between a Grant and a Contract Accounting Requirements For Cost-Type Awards What are Audit
More informationManaging Project Risk DHY
Managing Project Risk DHY01 0407 Copyright ESI International April 2007 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or
More informationProject Organization Part 2 & 3 Payment & Award Method
1.040/1.401 Project Management Spring 2007 Project Organization Part 2 & 3 Payment & Award Method Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute of Technology
More informationRISK MANAGEMENT. Budgeting, d) Timing, e) Risk Categories,(RBS) f) 4. EEF. Definitions of risk probability and impact, g) 5. OPA
RISK MANAGEMENT 11.1 Plan Risk Management: The process of DEFINING HOW to conduct risk management activities for a project. In Plan Risk Management, the remaining FIVE risk management processes are PLANNED
More informationProject Risk Management. Prof. Dr. Daning Hu Department of Informatics University of Zurich
Project Risk Management Prof. Dr. Daning Hu Department of Informatics University of Zurich Learning Objectives Understand what risk is and the importance of good project risk management Discuss the elements
More informationGuidance on Using Incentive and Other Contract Types
Guidance on Using Incentive and Other Contract Types April 2016 Table of Contents Page 4-5 Background Contract Type as an Element of Overall Compensation Contract Performance Risk Page 5-7 Market Risk
More informationPMI - Dallas Chapter. PMP Exam Sample Questions
PMI - Dallas Chapter PMP Exam Sample Questions June 4, 1999 Disclaimer: These questions are intended for study purposes only. Success on these questions is not necessarily predictive of success on the
More informationGuidance on Using Incentive and Other Contract Types
Guidance on Using Incentive and Other Contract Types April 2016 Table of Contents Page 4-5 Background Contract Type as an Element of Overall Compensation Contract Performance Risk Page 5-7 Market Risk
More informationPOLYTECHNIC OF NAMIBIA
POLYTECHNIC OF NAMIBIA SCHOOL OF MANAGEMENT SCIENCES DEPARTMENT OF MANAGEMENT PROJECT MANAGEMENT BACHELOR OF BUSINESS ADMINISTRATION 07BBMA SUBJECT CODE: PRM422S DATE: DURATION: MARKS: EXAMINERS: MODERATOR:
More informationPresented to: Eastern Idaho Chapter Project Management Institute. Presented by: Carl Lovell, PMP Contract and Technical Integration.
Project Risk Management Tutorial Presented to: Eastern Idaho Chapter Project Management Institute Presented by: Carl Lovell, PMP Contract and Technical Integration March 2009 Project Risk Definition An
More informationDATA ITEM DESCRIPTION
DATA ITEM DESCRIPTION Title: Cost Data Summary Report (DD Form 1921) Number: DI-FNCL-81565B Approval Date: 20070420 AMSC Number: D7721 DTIC Applicable: Preparing Activity: (D)OSD/PA&E/CAIG Limitation:
More informationRISK ANALYSIS GUIDE FOR PRIVATE INITIATIVE PROJECTS
N A T I O N A L C O N C E S S I O N C O U N C I L RISK ANALYSIS GUIDE FOR PRIVATE INITIATIVE PROJECTS PREPARED BY: ENGINEER ÁLVARO BORBON M. PRIVATE INITIATIVE PROGRAM DECEMBER 2008 INDEX Guide Purpose...
More informationRISK MANAGEMENT MADE EASY. Susan Parente Project Management Symposium.
http://pmsymposium.umd.edu/pm2018/ RISK MANAGEMENT Susan Parente MADE EASY PMP, PMI-RMP, PMI-ACP, CSM, CSPO, PSM I, CISSP, CRISC, RESILIA, ITIL, MS Eng. Mgmt. Associate Professor, Post University, CT,
More informationProcurement Fraud s Anatomy. By Tom Caulfield CFE/CIG/CIGI
Procurement Fraud s Anatomy By Tom Caulfield CFE/CIG/CIGI LEARNING OBJECTIVES 1. Identify statutes, regulations, and key personnel associated with the contracting process. 2. Identify the primary acquisition
More informationISO/IEC INTERNATIONAL STANDARD. Information technology Security techniques Information security risk management
INTERNATIONAL STANDARD ISO/IEC 27005 Second edition 2011-06-01 Information technology Security techniques Information security risk management Technologies de l'information Techniques de sécurité Gestion
More informationPRINCE2. Number: PRINCE2 Passing Score: 800 Time Limit: 120 min File Version:
PRINCE2 Number: PRINCE2 Passing Score: 800 Time Limit: 120 min File Version: 1.0 Exam M QUESTION 1 Identify the missing word(s) from the following sentence. A project is a temporary organization that is
More informationEssentials of Government Contracting Post-Award
Essentials of Government Contracting Post-Award Presented by: Marsha Cervantez Sofia Iqbal Chris Mikaelian Manager, Government Contracts Contract Negotiator Manager, Government Contracts GDC4 Systems,
More informationCOPYRIGHTED MATERIAL. Index
Index Note to the reader: Throughout this index boldfaced page numbers indicate primary discussions of a topic. Italicized page numbers indicate illustrations. A A+ certification, 28 acceptance criteria
More informationTypes of Government Contracts
Types of Government Contracts A primer on four common types found in RFPs There are several types of government contracts, and the differences between them are not trivial. Each requires a unique approach
More informationGCS 224 Surviving DCAA Audits with GCS Premier. Presented by: Nicole Mitchell, Aronson & Company
GCS 224 Surviving DCAA Audits with GCS Premier Presented by: Nicole Mitchell, Aronson & Company Agenda Government Contract Audits and the Role of DCAA and DCMA Basic Attributes of a Government Approved
More informationIT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps://
IT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps://www.certqueen.com Exam: PMI-002 Title : Certified Associate in Project Management (CAPM) Certification Version : DEMO 1 / 7 1.A
More informationDATA ITEM DESCRIPTION
DATA ITEM DESCRIPTION Title: Cost Data Summary Report (DD Form 1921) Number: DI-FNCL-81565C Approval Date: 20110518 AMSC Number: D9193 Limitation: DTIC Applicable: GIDEP Applicable: Preparing Activity:
More informationAn economic analysis of the truth in negotiations act
Calhoun: The NPS Institutional Archive Reports and Technical Reports All Technical Reports Collection 2016-01 An economic analysis of the truth in negotiations act Wang, Chong http://hdl.handle.net/10945/50645
More informationM_o_R (2011) Foundation EN exam prep questions
M_o_R (2011) Foundation EN exam prep questions 1. It is a responsibility of Senior Team: a) Ensures that appropriate governance and internal controls are in place b) Monitors and acts on escalated risks
More informationTop 10 Problems with Problems with Multiple Award Task Order/Deliver Order IDIQ RFP s
Top 10 Problems with Problems with Multiple Award Task Order/Deliver Order IDIQ RFP s Top 10 Problems with Multiple Award Task Order/Deliver Order IDIQ RFP s Brian Greenberg, CPCM, Fellow Chief Operating
More informationRISK MANAGEMENT GUIDE FOR DOD ACQUISITION
RISK MANAGEMENT GUIDE FOR DOD ACQUISITION Sixth Edition (Version 1.0) August, 2006 Department of Defense Table of Contents. Key Activity - Risk Analysis... 11.1. Purpose... 11.2. Risk Reporting Matrix...
More informationChallenges of Contracting with the Federal Government November 19 th, 2015
Challenges of Contracting with the Federal Government November 19 th, 2015 The Fundamentals of Government Contracting Webinar Series 1 Your Presenters David King Dixon Hughes Goodman, LLP 703.970.0433
More informationRISK MANAGEMENT: I SURVIVED WITHOUT IT BUT NOW I CANT LIVE WITHOUT IT.
Can Stock Photo Inc. / iqoncept PMINEO 23 May 2013 Presented By Michael Garner MBA, PMP, PMI-RMP RISK MANAGEMENT: I SURVIVED WITHOUT IT BUT NOW I CANT LIVE WITHOUT IT. PROJECT OVERVIEW Charter: Create
More informationA Case for Project Revenue Management. Peter Varani PMP
A Case for Project Revenue Management Peter Varani PMP A Case for Project Revenue Management PMBOK GUIDE (4 th edition) Cost 845 Revenue 3 Unisys Annual Report (2008) Cost 174 Revenue 152 2 Balanced Approach
More informationMonthly Acquisition Report (MAR) Guidebook
Monthly Acquisition Report (MAR) Guidebook March 2016 Version 3.0 Table of Contents Purpose and Control... 3 MAR Reporting Overview... 4 Page 1: Program Assessment / Top Issues... 5 Assessments Area...
More informationBest Practices in Project Risk Management. Presented by: Jeff Miller, PMP - Director of Project Management Interstates Control Systems, Inc.
Best Practices in Project Risk Management Presented by: Jeff Miller, PMP - Director of Project Management Interstates Control Systems, Inc. What is Project Risk Management? PMBOK Definition of Project
More informationSKIPPER & HOSTESS ACADEMY BOOKING TERMS & CONDITIONS
SKIPPER & HOSTESS ACADEMY BOOKING TERMS & CONDITIONS This document sets out the standard booking terms and conditions of Quarterdeck Life Ltd ( QD ), a company registered in the United Kingdom with company
More informationProject Management Certificate Program
Project Management Certificate Program Risk Management Terry Skaggs ( Denver class) skaggst@centurytel.net 719-783-0880 Lee Varra-Nelson (Fort Collins class) lvarranelson@q.com 970-407-9744 or 970-215-4949
More informationBusiness Auditing - Enterprise Risk Management. October, 2018
Business Auditing - Enterprise Risk Management October, 2018 Contents The present document is aimed to: 1 Give an overview of the Risk Management framework 2 Illustrate an ERM model Page 2 What is a risk?
More informationTitle of the Paper: Integrating Management and cost management to arrive at a realistic Estimate at Completion Theme: Project Management leadership -> To accelerate Economic Growth Keywords: Cost overrun,
More informationDisplaySoft. Close It. Balance Sheet, Loan Settlement Statement, and Modify Balance Sheet. Real Estate Software User s Guide
DisplaySoft Close It Balance Sheet, Loan Settlement Statement, and Modify Balance Sheet Real Estate Software User s Guide Close It Balance Sheet Title Page DisplaySoft 2018 Display Systems, Inc. Balance
More informationPMP EXAMINATION PREP CHAPTER 11 RISK MANAGEMENT. PMP Exam Prep
PMP EXAMINATION PREP CHAPTER 11 RISK MANAGEMENT PMP Exam Prep RISK MANAGEMENT Page 441 Communications Management Process : Contains 7 of the 49 total processes Plan Risk Management Identify Risks Perform
More informationBUILDING AFRICAN FINANCIAL MARKETS Capacity Building Seminar 10 to 12 September 2014
BUILDING AFRICAN FINANCIAL MARKETS 2014 Capacity Building Seminar 10 to 12 September 2014 SESSION NAME The building blocks of a commodity derivatives exchange SESSION DATE AND TIME 12 September, 11:00
More information17. Communication, Dissemination and Exploitation
HORIZON 2020 WORK PROGRAMME 2014 2015 17. Important Notice on the First Horizon 2020 Work Programme This Work Programme covers 2014 and 2015. Due to the launching phase of Horizon 2020, parts of the Work
More informationINSE 6230 Total Quality Project Management
INSE 6230 Total Quality Project Management Lecture 6 Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding to risk throughout the life of a project
More informationRISK MANAGEMENT POLICY October 2015
RISK MANAGEMENT POLICY October 2015 1. INTRODUCTION 1.1 The primary objective of risk management is to ensure that the risks facing the business are appropriately managed. 1.2 Paringa Resources Limited
More informationRisk-Based Return On Sales (ROS) for Proposals with Mitigating Terms and Conditions
Risk-Based Return On Sales (ROS) for Proposals with Mitigating Terms and Conditions SCEA/ISPA National Conference 02-05 June 2009 Peter J. Braxton Technical Fellow R.L. Coleman, E.R. Druker, B.L. Cullis,
More informationRisk Management Plan for the <Project Name> Prepared by: Title: Address: Phone: Last revised:
for the Prepared by: Title: Address: Phone: E-mail: Last revised: Document Information Project Name: Prepared By: Title: Reviewed By: Document Version No: Document Version Date: Review Date:
More informationGrow your business 2016 Issue 09
2016 ISSUE 09 CONTENTS How to pay too much income tax on the sale of your business. Consider these marketing priorities to grow your profit. Business succession is not just the seller s issue. How to pay
More informationDFARS Procedures, Guidance, and Information
PGI 216.4 INCENTIVE CONTRACTS PGI 216.401 General. (Revised June 14, 2018) (c) Incentive contracts. DoD has established the Award and Incentive Fees Community of Practice (CoP) under the leadership of
More informationGlossary of Terms for the Government Acquisition Process
Glossary of Terms for the Government Acquisition Process Every PTAC Counselor must have a good command of the terminology used in the government acquisition process. To assist you, we have created this
More informationUniversity of the Sunshine Coast (USC) Risk Appetite Statement
Vision and strategic goals University of the Sunshine Coast (USC) Risk Appetite Statement The University of the Sunshine Coast will be a university of international standing, a driver of capacity building
More informationMGMT 627 SOLVED MCQs
MGMT 627 SOLVED MCQs Question # 1 of 15 ( Start time: 07:53:55 PM ) Total Marks: 1 All of the following are the characteristics of a project, EXCEPT: A start and an end A multi-disciplinary team brought
More informationChild Welfare Digital Services Project. Cost Management Plan
Child Welfare Digital Services Project Cost Management Plan January 2017 CWDS Cost Management Plan January 2017 Revision History Revision / Version # Date of Release Author Summary of Changes V 1.0 4/22/14
More informationDownload slides on SEO Südwest
Risk management in SEO projects Introduction and process model Download slides on SEO Südwest Risk-boosting factors in all projects Lack of time, deadlinesdli Bad acquisition and controlling of key performance
More informationSUBPART CONTRACT PRICING (Revised November 24, 2008)
SUBPART 215.4--CONTRACT PRICING (Revised November 24, 2008) 215.402 Pricing policy. Follow the procedures at PGI 215.402 when conducting cost or price analysis, particularly with regard to acquisitions
More informationWebinar: Making the Right Choices in Government Contracting Part 2
Public Contracting Institute LLC Webinar: Making the Right Choices in Government Contracting Part 2 Presented by Richard D. Lieberman, FAR Consultant, Website: www.richarddlieberman.com, Email rliebermanconsultant@gmail.com.
More informationGrowing Pains: The Art of Subcontract Management for Small Business
Growing Pains: The Art of Subcontract Management for Small Business Breakout Session # B02 Jeffery A. White, C.P.M, President/CEO J.A. White & Associates, Inc. Date: March 17, 2016 Time: 2:00pm 3:15pm
More informationKeyCorp Basel III Pillar 3 Regulatory Capital Disclosures For the Quarterly Period Ended June 30, 2016
KeyCorp Basel III Pillar 3 Regulatory Capital Disclosures For the Quarterly Period Ended June 30, 2016 KeyCorp Basel III Pillar 3 Regulatory Capital Disclosures For the quarterly period ended June 30,
More informationProject Management Professional (PMP) Exam Prep Course 11 - Project Risk Management
Project Management Professional (PMP) Exam Prep Course 11 - Project Slide 1 Project Looking Glass Development, LLC (303) 663-5402 / (888) 338-7447 4610 S. Ulster St. #150 Denver, CO 80237 information@lookingglassdev.com
More informationTECHNICAL BRIEF PAY FOR PERFORMANCE STRATEGIES FOR WESTERN STATES
TECHNICAL BRIEF PAY FOR PERFORMANCE STRATEGIES FOR WESTERN STATES PAY FOR PERFORMANCE STRATEGIES FOR WESTERN STATES TECHNICAL BRIEF V1.0 The Pay for Performance Strategies for Western States project is
More informationRisk Management Mock Exam. Lab for PMP Exam Prep Course Part 2 #347 Instructor: Neal L. Rowland, PMP
Risk Management Mock Exam Lab for PMP Exam Prep Course Part 2 #347 Instructor: Neal L. Rowland, PMP 10 Practice Questions Move at Your Own Pace Track your progress! Question 1 You need 4 additional project
More informationFund Fact Sheet. ExxonMobil Savings Plan
Fund Fact Sheet ExxonMobil Savings Plan ExxonMobil Stock When you buy Exxon Mobil Corporation Common Stock (ExxonMobil stock), you become an ExxonMobil shareholder and an owner of the company. As an owner
More informationResearch Infrastructures and Horizon 2020
Mariano Menna DG Research & DERri Final Meeting, Milano, Italy, 10 th -11 th October 2013 Research Infrastructures and Horizon 2020 The EU Framework Programme for Research and 2014-2020 Research and Europe
More informationProject Risk Management
Project Skills Team FME www.free-management-ebooks.com ISBN 978-1-62620-986-4 Copyright Notice www.free-management-ebooks.com 2014. All Rights Reserved ISBN 978-1-62620-986-4 The material contained within
More informationConceptualisation Stage Continued
Conceptualisation Stage Continued Conceptualisation Inputs to conceptualisation stage Influencing factors Stakeholder analysis Feasibility Risk Outputs from conceptualisation stage Risk Structured Approach
More informationBournemouth Primary MAT Risk Management Policy
Bournemouth Primary MAT Risk Management Policy 1. Introduction The Bournemouth Primary Multi-Academy Trust (the Trust) operates a risk management system in order to identify and manage key exposures and
More informationBest Practices in ENTERPRISE RISK MANAGEMENT. [ Managing Risks Holistically ]
Best Practices in ENTERPRISE RISK MANAGEMENT [ Managing Risks Holistically ] INTRODUCTIONS MODERATOR: Bob Lipps, JD, CPA PANELISTS: Ron Wilcox Abel Pomar Karen Gordon, Esq. THE EVOLUTION OF RISK Traditional
More information