Contractor Information and Registration Package
|
|
- Jonathan Stanley
- 5 years ago
- Views:
Transcription
1 Contractor Information and Registration Package
2 Introduction Marmong Point Marina (the Marina) complies with the Work Health and Safety Act 2011 and the Protection of the Environment Operations Act 1997 to ensure the safety and wellbeing of all employees, visitors, guests, contractors and for the protection of the environment. In support of this commitment, contractors conducting business at the Marina have an obligation to comply with marina policies and procedures. In this document we outline your responsibilities, obligations and rights. Management reserves the right to refuse entry to any contractor who does not fully comply with the requirements set out in this document. Registration Why: With the current strict Environmental Legislation, WH&S, Insurance and Liability issues, the Marina is required to ensure that all contractors understand their rights and accept their responsibilities in these matters. Only legitimate businesses with adequate insurance cover are allowed to provide Subcontractor services at our facility. When: Once this document is read, understood, application form signed, and all required information is provided and approved, you and each of your employees will be required to register at the marina office in and out every day you visit our facility. You will record the boat details you are working on, and specify the type of work you will be doing. Approval is only granted for your specified core business service, which must be complimentary to services currently provided by the Marina. Who: It is important that each employee of your business understands the registration procedure, and acknowledges the conditions. We request that all contractors register with us prior to job commencement, even if your services are arranged through our on-site tenants, or directly through the boat owner. Duration: Your registration with Marmong Point Marina will be valid for the duration of your insurance cover (refer to specific insurance requirements). It is important that you provide us with updated insurance documents when applicable. Cost: Currently we do not charge for registration however this is subject to review. A fee may apply per day of work at the marina. Please discuss this with the Marina office. Disclaimer: Marmong Point Marina reserves the right, at its absolute discretion, to reject or withdraw the privilege of entry or provision of services from our facility from any person or company at any time. Please Note: Any New South Wales Workplace Health, Safety & Environmental Legislation or other applicable Statutes will take precedence over the following conditions. MPM Contractor page 2 of 11
3 Required Information The Marina requires outside contractors to provide the following Certificates of Currency (copies must be provided with your registration); Public Liability Insurance (a minimum value AUD$10 million) Ship Repairers Liability Insurance (a minimum value AUD$10 million) Workers Compensation Insurance (unless sole trader) Personal Accident Cover (this particular insurance is only required for Sole Traders who do not hold Workers Compensation Insurance) Trade Qualifications (must show evidence of qualification for all personnel, for tasks that require such competencies) BIA Marine Card You must hold a current BIA Marine Card to gain entry to work on our site. Information about the Marine Card is available from Health & Safety These requirements apply in full to all work done at Marmong Point Marina. Contractors will not be allowed to commence work at the Marina until such time as the necessary certificates are provided. A separate Safe Work Method Statement (SWMS) is required for all work that could potentially harm the environment, threaten personal safety or cause damage to property. Refer to the Safe Work Method Statement (SWMS) template provided in this package. For regular contractors who perform reoccurring jobs, a generic SWMS, or risk assessment, indicating all specific tasks and associated risks will be accepted to replace the individual SWMS. This generic document could be supplemented by individual SWMS for less frequent jobs. Contractors are required to ensure that they are physically fit and capable of undertaking the work for which they have been contracted. Accidents and Incidents Any accident or incident that results in property damage or injury, or in environmental harm, or threatens environmental harm, must be reported immediately to Marina staff. Any person requiring first aid treatment is to contact Marina Management. Safe Work Method Statement (SWMS) The contractor is required to provide a risk assessment (SWMS) prior to commencing any job that involves a certain risk to marina property, vessels or the environment. SWMS forms are available at marina administration. Compressed Air / Cylinders Safety valves are to be utilised in the use of compressed air. Cylinders are to be stored and used in a secure and upright position. All air-lines are to be securely joined to prevent separation during operation. Confined Space Entry You must notify the Marina verbally and via your SWMS if you intend to perform any confined space work. Details can be found on the BIA s website to assist you when determining if your work qualifies -CONFINED-SPACE.pdf and WorkCover ry=confined+space&btnsearch=submit MPM Contractor page 3 of 11
4 Hot Work / Welding A Hot Work Permit must be obtained from the Marina by the owner or qualified tradesman prior to any work commencing. Adequate fire protection must be provided. A suitable fire extinguisher must be readily available or securely attached to each electric or oxyacetylene or Oxy-LPG welding plant brought on site. Welding operations must be screened to protect all personnel against flashes. All gas cylinders, including propane, must be restrained i.e. in a trolley. Appropriate trade qualifications must be presented with your Hot Work Permit. Diving Work No diving work whatsoever is permitted on the Marina. All diving work MUST be approved by the Marina Management. If electrocution occurs DO NOT TOUCH the victim unless you have been able to turn of the power supply. Call 000 and notify marina staff. Explosive-Powered Tools (EPT) An Explosive-Powered Tool (EPT) uses an explosive charge to drive a fastener against, onto or through building materials. EPTs are not to be used at this Marina without prior consultation with the Marina Manager/Supervisor. The Marina Manager will set strict conditions for the use of such EPT when deemed that such tool is required to perform a specific job. EPT may then only be used by a qualified tradesman, following WorkCover s safe-use guidelines Operators of Explosive-Powered Tools (refer to Electrical Electricity and water are a lethal combination. All electrical equipment must be recently tested (expires in twelve months) and tagged before being used at the Marina. Any equipment supplied and/or installed by your organisation at the Marina must be tested and tagged before handing over. On arrival on site, or during your work at the Marina, your electrical equipment may be inspected by a Marina representative. Extra care must be exercised during and immediately following periods of rainfall. Electrical leads must be switched off at the point of power supply and removed when not in use. Extension leads must be kept as short as possible and must be located and protected in such a manner as to prevent damage from vehicular traffic, hot equipment and the water. Use of safety switches for all portable equipment is mandatory. Taped joints, double adapters and piggyback plugs are not to be used. Where possible, use battery powered tools. Petroleum Fuel Where petrol or diesel powered equipment is used on site, fuel must be stored in satisfactory approved safety containers. Contractors are to ensure that adequate ventilation is provided when using petrol or diesel powered equipment and that sufficient non-smoking signs are displayed. Never use fuel powered equipment in an enclosed space. Fire Hose Reels (FHR) Fire hoses are not to be used for any purpose other than for fire fighting. This is a WorkCover NSW requirement. Hazardous Substances A Material Safety Data Sheet (MSDS) for all substances brought and used onsite must be available upon request by the Marina. All users must be familiar with, and understand the first aid and control measures required. Machine Guarding No machinery, hand tool or other equipment is to be used without effective guards. MPM Contractor page 4 of 11
5 Personal Protective Equipment and Clothing Appropriate personal protective equipment and clothing, including shoes, must be worn at all times. Working at Heights Any working platform must conform to the relevant Standards. Hoists and scaffolding must be to the standard required by local authorities and approved in writing where Environmental Considerations Any work undertaken on the Marina facility that could result in a pollution incident must be safeguarded against. This may require the pre-deployment of floating booms or drop sheets. Any contractor found in breach of Environmental Legislative Requirements will be suspended from the marina immediately. Any penalties and/or costs incurred by the marina as a result of a contractor s breach of Environmental Legislation will be recovered from the contractor. It is the contractor s responsibility to determine whether or not the activities that they are to undertake on the marina could result in a pollution incident. If any doubt exists, consult with the Marina Manager before commencing your work. Mechanical Repairs and Servicing Any mechanical repairs and/or engine servicing are to be conducted in such a manner as to prevent any oil or waste oil products from entering the vessel s bilge, into the water, or waste water collection system. All chemicals need to be bunded. Noise and Fumes All operations and activities occurring on the premises must be conducted in such a manner that will not cause offensive noise or fumes. Painting and Antifouling Only work of a minor nature is to take place on vessels in wet berths. Major applicable. Ladders must be of industrial standard and be tied off at the top. No one is permitted to work from the top step of a ladder including freestanding industrial ladders. It is advisable to always have one hand holding the ladder and the ladder must not be used as a work platform. Safety harnesses must be worn and properly secured at heights greater than 2.4 metres and must always be worn in cherry-pickers and other mobile working platforms, and when working atop flybridge cruisers. sanding, scraping and painting is only to occur in areas designated by the Marina. All residues from such operations are to be disposed of correctly, in accordance with Environmental Legislation. Under no circumstances is residue to be placed in the Marina s waste bins, unless prior approval has been gained from the Marina Manager. Any paint or antifouling spillages on a hardstand area are to be wiped up. Spillages are not to be hosed down into the wastewater collection system or drains. The use of a drop sheet is required when scraping paint. Refuelling Activities Refuelling of vessels is only permitted at the fuel wharf by trained marina staff. These restrictions are in place to safeguard the marina and the environment from the risks associated with refuelling. Designated fire fighting equipment and spill kits are located at the fuel wharf. Marina staff are trained in emergency response procedures. Washing of Boats (including Detailing) When washing and cleaning boats, care is to be taken to minimise the amount of run off that goes into the water. Only appropriate bio-degradable detergents are to be used. The use of a trigger nozzle device on the hose to prevent excess water being wasted is recommended. MPM Contractor page 5 of 11
6 Waste No waste should be allowed to enter the water. Waste includes, but is not limited to, paint, varnish, wood and fiberglass dust, oil or oil based products and oily General bilge water. Oil, oil products and drained oil filters, scrap metal (including anodes), batteries, acids and all other harmful waste is to be taken off-site by the contractor. Contractor Activities Contractors are only to carry out activities they are lawfully able to perform in New South Wales. Damage Marina property damaged by a contractor will be repaired at the contractor s expense. Discipline The Marina reserves the right to refuse access to any contractor. Dress and Conduct Contractors are to wear clothing that is in keeping with safety requirements and standards appropriate to the overall presentation of the marina. Contractors must at all times conduct themselves in an acceptable manner. Loud, coarse, or abusive language and music will not be tolerated. Housekeeping Work areas must be kept clean and tidy with prompt removal of all garbage. Oily rags, and any flammable material residue are to be disposed of correctly. The marina structure and walkways are to be kept clear at all times. It is the responsibility of the contractor to remove all rubbish unless otherwise agreed with a Marina representative. A clean up fee may apply. Courtesy Trolleys These are provided for the convenience of boat owners only. Courtesy trolleys are not to be used by contractors. Car Parking Contractors must use the car park outside the vessel hardstand area only, and are not permitted to use the car park on the foreshore (this area is reserved for marina customers). Marina Operating Times The marina operating hours are 8:00am to 5:00pm. Any work undertaken by contractors outside these times, or on weekends, is to be by prior arrangement only. Power supply Under no circumstances is a contractor to unplug any vessel s power supply to operate power tools or accessories. Permission must be given by the vessel s owner or marina management. Smoking Smoking is not permitted on marina piers. Dispose of cigarette butts in the bins provided. Always be considerate of nonsmokers at this facility. Observe No Smoking signs. Workshop The Marina workshops are restricted areas and are not for contractor use. It is the Marina policy that tools and equipment will not be lent or hired out. Advertising Contractors are prohibited from distributing promotion or advertising pamphlets, business cards or samples whilst working at our facility. See the Chandlery office regarding acceptable distribution. Alcohol The Marina is committed to providing and maintaining a safe environment, free from drugs and alcohol. Contractors shall not possess, consume or be under the influence or effects of illegal drugs or alcohol while undertaking work at the Marina. MPM Contractor page 6 of 11
7 Site Induction: Marmong Point Marina Marina Lay-out and Emergency Equipment MPM Contractor Page 7 of 13
8 YARD PLAN MUSTER POINTS FIRE EXTINGUISHERS HAZMAT INFORMATION MPM Contractor Page 8 of 13
9 MPM Contractor Page 9 of 13
10 How to Apply Once you have read and understood the content of this Information Package: Complete the Contractor Registration Application Form and sign the Contractor Declaration section Complete the SWMS form detailing works to be carried out. Use the Application Checklist to ensure all relevant information is supplied with your application Incomplete applications may delay approval of your application. Please allow at least two (2) working days for processing of your application. If you require assistance completing the SWMS or any part of your application form, please contact Marina Management. We suggest you keep a copy of this Contractor Information Package for your records Marmong Point Marina 1 Nanda Street Marmong Point NSW 2284 P F admin@marmongpointmarina.com.au MPM Contractor Page 10 of 13
11 Contractor Registration Application Form Name of Applicant/s (in full) Company Name Trading Name ABN/ACN Contact Details of Applicant/s Contact Person Mailing Address State Postcode Business Phone Mobile Phone Core Business A brief description of the service/s you provide References Please provide contact details of two recent customers or companies that are able to give us further information on your services. Information will be treated confidentially and will be used for this internal reference check only. Contact Name Contact Number Company Reference 1 Reference 2 Contractor Declaration I hereby apply for registration as an approved contractor at Marmong Point Marina. I acknowledge receiving and understanding Marmong Point Marinas' Terms and Conditions regarding Health, Safety & Environmental requirements and should my application be successful, agree to abide by them. I declare the information I have provided is accurate and true. I agree to participate in a personal site induction prior to carrying out any work or services at Marmong Point Marina. I further agree to ensure that all of my employees, agents or subcontractors are fully aware of these requirements and obligations and shall agree to abide by them at all times. Signature of Contractor. Date. (please print name) The Contractor shall be liable for, and shall keep Marmong Point Marina indemnified against, any legal liability, loss, claim or proceedings for personal injury to or death of any person, or for injury or damage to property or for any penalties incurred as a result of any direct or indirect act of the Contractor or its employees, agents or subcontractors Application Checklist (Please ensure copies of all relevant insurances are supplied with your application) Certificate of Currency for Required Insurances Expiry Date Copy/s Attached Public Liability (minimum AUD$10m) Ship Repairers Liability (minimum AUD$10m) Workers Compensation Personal Accident Cover (Sole Traders only) Risk Assessment - SWMS form/s yes / no yes / no yes / no yes / no yes / no BIA Marine Card yes / no Personal Site Induction organised?? yes / no date: OFFICE USE ONLY Date Received: / / Signed: MPM Contractor Page 11 of 13
12 Safe Work Method Statement Form Company Name Employee Name Description of Activity Business Phone Mobile Phone Vessel Details Berth Number Critical Steps of Activity Potential Hazards / Risks Risk Control Measures Responsibility Personal Protective Equipment Required [ ] Gloves [ ] Protective Clothing [ ] Safety Glasses [ ] Safety Footware [ ] Face Shield [ ] Respirator [ ] First Aid Kit [ ] Safety Harness [ ] Hearing Protection [ ] Other: Environmental & Safety Precautions [ ] Isolate Power supply (12/24/240 V) [ ] RCD fitted to power outlet [ ] Place Oil Absorbing Pads in bilges [ ] Place Spill Boom around Vessel [ ] Basic Oil Spill / Recovery Kit on hand [ ] Spill Proof Container for all Chemicals [ ] Fire Fighting Equipment in reach [ ] Observe Strict NO SMOKING [ ] Dust Extraction System in place [ ] Floating mats to collect shavings/dust [ ] Check for Trip or Slip Hazards [ ] Ensure Adequate Ventilation MPM Contractor Page 12 of 13
13 Critical Steps of Activity Potential Hazards / Risks Risk Control Measures Responsibility Explanations - Critical Steps of Activity List steps in the sequence they are carried out Potential Hazards / Risks Identified List against each step hazards that could cause personal or environmental harm or damage Risk Control Measures Used to eliminate or minimise the hazard or risk Responsibility Person implementing control measures OFFICE USE ONLY Authorised by Marina Management: Date: / / 20 MPM Contractor Page 13 of 13
Contractors Registration Package
SYDNEY SUPERYACHT MARINA PTY LTD Contractors Registration Package Ph: 02 9818 0605 Fax: 02 9818 0622 Email: info@superyachtmarina.com.au Introduction Sydney Superyacht Marina Pty Ltd complies with the
More informationWORKING WITH CONTRACTORS POLICY AND PROCEDURE
WORKING WITH CONTRACTORS POLICY AND PROCEDURE CROWN SECURITY CONTRACTORS & OSH (i) Preface Contract work is becoming increasingly common in the modern workplace management culture, and has been a feature
More informationContractors Induction Booklet. Contractor s Name:
Contractors Induction Booklet Date Contractor s Name: Business Name: The following information relates to Work Health & Safety and has been designed and implemented by the Owner s Corporation (OC) and
More informationContractor Management Procedure
Contractor Management Procedure Purpose Skillset Limited ( Skillset ) has a duty under the NSW Work Health and Safety Act and Regulations 2011 (the Legislation ) to prevent and/or to minimise risk in the
More informationWorking with third parties
Working with third parties 1 Safety arrangements 1.1 Obligations of third-party employees Third-party employees carrying out works at AIM Recycling nv always have to take care of their own safety as well
More informationSafety & Health Manual
Safety & Health Manual Chapter 8 Sub-Contractor Policy 8-1 Sub-Contractor Policy engages the services of sub-contractors and values its relationships with these essential service providers. In the interest
More informationMARKET OH&S PLAN 1 INTRODUCTION 2 OH&S RESPONSIBILITIES
1 INTRODUCTION Melbourne Market Authority (MMA) is committed to a safety culture and practices that provide for a healthy and safe working environment. The health and safety of all those who work for us
More informationProperty Inspection Guidelines
Property Inspection Guidelines www.tridentinsurance.net Lines of Business: Property, General Liability, Worker s Compensation, Public Official Liability Risk Control Strategy/Key Issues: Provide a tool
More informationSUB CONTRACTOR INDUCTION PACK
REQUIREMENTS FOR WORKING ON ROYAL MAIL PREMISES 1. INTRODUCTION AND PURPOSE This document sets out the arrangements that Royal Mail Property & Facilities Solutions Limited and Royal Mail [hereinafter jointly
More informationKERANG DISTRICT HEALTH CONTRACTORS HANDBOOK
KERANG DISTRICT HEALTH CONTRACTORS HANDBOOK SEPTEMBER 2014 Document History Details Date Notes Document Prepared May 1995 Revised May 2000 Review Revised February 2004 Review Revised November 2004 Review
More informationRULES, REGULATIONS AND GENERAL SPECIFICATIONS FOR SUB CONTRACT WORK
AGS AUTOMOTIVE SYSTEMS RULES, REGULATIONS AND GENERAL SPECIFICATIONS FOR SUB CONTRACT WORK All Contractors working on the premises of A.G. Simpson Automotive Inc. or A.G. Simpson (USA), Inc., (as the case
More informationBUNKERING LICENCE. Name of Licensed Operator:. Registered physical address from where principal business is carried on: ...
BUNKERING LICENCE Licence Number: Issued in terms of the Port Rules for the commercial ports of South Africa, adopted in terms of the National Port Act No. 12 of 2005 ( the Act ) THIS LICENCE IS NOT TRANSFERABLE
More informationNorthern Territory Airports
Northern Territory Airports SITE RULES for CONTRACTORS at ALICE SPRINGS AIRPORT AND TENNANT CREEK AIRPORT Date Approved: Approved by: Date Issued: Date for Review: PRIOR TO ANY WORKS TAKING PLACE. Page
More informationKalkara Marina Company Ltd. Yacht Marina Rules
All users of this Marina is subject to these rules. 1. DEFINITIONS: Kalkara Marina Company Ltd Yacht Marina Rules 1.1 Company means Kalkara Marina Co Limited, its employees and agents. 1.2 Marina means
More informationSUPPLY OF PEST CONTROL SERVICES
. SUPPLY OF PEST CONTROL SERVICES TENDER DETAILS: DURATION: Tenders should be prepared on the basis of a twelve (12) month arrangement commencing 1 st July 2018. CLOSING DATE: Monday 28th May 2018. TENDER
More informationDISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS
DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS Page 1 of 5 RFP 18-PR-DMS-49 ANNUAL MAINTENANCE AND REPAIR OF INDUSTRIAL ELECTRICAL CONTROL EQUIPMENT
More informationPollution Incident Response Management Plan
Pollution Incident Response Management Plan 24-28 Childs Road Chipping Norton NSW 2170 Version 1 Initial Release Date: 2 nd February 2015 PIRMP Barca Metals 24-28 Childs Road, Chipping Norton NSW 2170
More informationSite-Specific Health and Safety Agreement
: Company Site Name Complete pre-start This agreement establishes the basis on which businesses (including trades and other organisations) agree to work on a specific construction site. A Site-Specific
More informationBurnham Market (2) Horse Trials 9 th September 2018 EXHIBITORS APPLICATION PACK
COMPANY NAME: Burnham Market (2) Horse Trials 9 th September 2018 EXHIBITORS APPLICATION PACK Please complete clearly in CAPITAL Letters and return by Friday 3 rd August 2018 to: Musketeer Event Management,
More informationCOMPANY POLICY FOR HEALTH AND SAFETY
Breakfire Ltd, Unit 2 Woodview Business Centre, Lockwood Close, Nottingham, NG5 9JN COMPANY POLICY FOR HEALTH AND SAFETY January 2018 TABLE OF CONTENTS SECTION 1 TITLE NUMBER REVISION Policy & Administration
More informationATTACHMENT "I" SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS)
ATTACHMENT "I" SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS) Swinerton Builders, Inc. (SWINERTON) constantly strives to provide a safe and productive work environment.
More informationab0cd EBRD CONTRACTOR CODE OF CONDUCT AND HEALTH AND SAFETY POLICY C:\WINDOWS\Temp\Temporary Internet Files\Contractor Code of Conduct.
ab0cd EBRD CONTRACTOR CODE OF CONDUCT AND HEALTH AND SAFETY POLICY 1 TABLE of CONTENTS SECTION SUBJECT 1.0 INTRODUCTION 3 2.0 DEFINITIONS 3 3.0 STATUTORY OBLIGATIONS OF CONTRACTORS 3 4.0 OBLIGATIONS SET
More informationVend Engineering Pty Ltd. Residential & Commercial construction Site Safety Pack For subcontractors
Vend Engineering Pty Ltd Residential & Commercial construction Site Safety Pack For subcontractors Version 3 2015 Disclaimer The authors of the VEND Engineering Site Safety Pack (the Site Safety Pack)
More informationContractor Guidelines
Contractor Guidelines This Guideline has been written to detail the minimum expectations with regards to contractor safety at Sodexo business units. It is the responsibility of the contractor to understand
More informationGuideline for external contractors working on the premise of MANN+HUMMEL
Guideline for external contractors working on the premise of MANN+HUMMEL 1 Purpose MHG-HS-I-0011 describes the regulations for health, safety and environment for external contractors working on the premise
More informationContractor Information
Contractor Information Contractor Induction Program Table of Contents Introduction... 1 Contractor Occupational Safety and Health Management Systems... 2 Safety Orientation Sessions for Contractors Employees...
More informationCREATIVE SPACE GALLERY Terms and Conditions of Hire
CREATIVE SPACE GALLERY Terms and Conditions of Hire The Terms and Conditions of Hire should be read in full as your agreeance on the application form and your payment on the invoice commits you and your
More informationCONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]
CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category] RFP Language Contract Language 1. Contractor recognizes the importance of performing the work in a safe and responsible manner
More informationJob Safety Analysis Preparation And Risk Assessment
Job Safety Analysis Preparation And Risk Assessment Sample Only Reference CPL_PCR_JSA_Risk_Assessment Revision Number SAMPLE ONLY Document Owner Sample Date 2015 File Location Procedure Revision Date Major
More informationRISK CONTROL SOLUTIONS
RISK CONTROL SOLUTIONS A Service of the Michigan Municipal League Liability and Property Pool and the Michigan Municipal League Workers Compensation Fund CONTRACTORS Municipalities often need services
More informationSHOPPING & CRAFT BOOKING FORM (Closing Date 31 st July 2018)
Saturday 8th September 2018 FOR OFFICE USE ONLY Confirm App. Received On SMACS STAND NO. Paid () Receipt Sent Paid by: SHOPPING & CRAFT BOOKING FORM (Closing Date 31 st July 2018) Trading Name: Contact
More informationYork St Nicholas Christmas Fair 2018 GENERAL TRADER TERMS & CONDITIONS
York St Nicholas Christmas Fair 2018 GENERAL TRADER TERMS & CONDITIONS Please find below our Christmas Trader Terms and Conditions, which we will require you to follow throughout. If you have any questions
More informationDiversified Engineering & Plastics General Safety & Environmental Process for Contractors
STATUS: Issued TITLE: Diversified Engineering & Plastics General Safety & Environmental Process for Contractors NUMBER: PUR-OP-12 EFFECTIVE: 03/12/2018 LATEST REV: 5 PAGES: 5 Purpose Scope The purpose
More informationFairchildes Academy Community Trust Letting Policy
Fairchildes Academy Community Trust Letting Policy - 2017 By order of the Trust, we approve Chair of Trust: Print name: Sign: Date: Introduction A letting may be defined as any use of the school premises
More informationSAFETY MANAGEMENT PLAN. WassonMoyCreativeCompliance
SAFETY MANAGEMENT PLAN WassonMoyCreativeCompliance TABLE OF CONTENTS FOREWORD... 3 LEGAL NOTICE... 3 1. INTRODUCTION TO THE PRODUCTION SAFETY MANAGEMENT PLAN... 4 1.1 SETTING OBJECTIVES AND TARGETS FOR
More informationA Safety, Environmental and Labour rights Guide for Suppliers to British Airways
A Safety, Environmental and Labour rights Guide for Suppliers to British Airways Introduction The relationship between British Airways and its Suppliers is crucial in achieving our Mission of providing
More informationSAFETY POLICY. Office Address 5195 W. 58 th Ave. Unit F Arvada, CO
SAFETY POLICY Office Address 5195 W. 58 th Ave. Unit F Arvada, CO 80002 303-223-5716 info@valiantcc.com www.valiantcc.com I. Objective Safety Policy Table of Contents II. Policy III. Applicability IV.
More informationHealth & Safety Policy
Health & Safety Policy K4S Security Ltd Imperial Office 2a Heigham Road East Ham London E6 2JG Registered Company Number: 09646212 Policy Date: 12 April 2018 1/14 Contents Page 1.0 General Statement of
More informationAPPLICATION FOR TRADE SPACE Please read attached notes. CARTMEL AGRICULTURAL SHOW WEDNESDAY 7 AUGUST 2019
APPLICATION FOR TRADE SPACE Please read attached notes. CARTMEL AGRICULTURAL SHOW WEDNESDAY 7 AUGUST 2019 Name of Company/Applicant: Address:. Postcode: Tel :. E mail address:..web Site:.. Brief but clear
More informationPOWER CONSTRUCTION COMPANY CCIP PROGRAM SAFETY REQUIREMENTS
POWER CONSTRUCTION COMPANY CCIP PROGRAM SAFETY REQUIREMENTS The following requirements apply to all subcontractors including tier subcontractors, vendors, deliveries, visitors and the like (herein known
More informationTRANSFLO MOTOR CARRIER OPERATING PROVISIONS
Purpose The purpose of this document is to establish operating and safety requirements, policies and procedures for motor carriers conducting operations within a TRANSFLO terminal. Motor Carrier Access
More informationApplication for Single Event Hall Hire. Community Hall at St James Parish Church Silsden
Application for Single Event Hall Hire Community Hall at St James Parish Church Silsden 1 Name of hiring organisation (the "Organization") 2 Describe the nature & role of the Organisation. 3 Date and Time
More informationContractor Safety Plan
Contractor Safety Plan INSTRUCTIONS Scope This form is to be completed by the contractor that has been identified as a major contract. This Plan expires at the completion of the contract work or 12 months
More informationAPPLICATION FOR STANDS IN THE FOOD HALL Please read attached notes. CARTMEL AGRICULTURAL SHOW WEDNESDAY 7 August 2019
APPLICATION FOR STANDS IN THE FOOD HALL Please read attached notes. CARTMEL AGRICULTURAL SHOW WEDNESDAY 7 August 2019 Name of Company/Applicant: Address:...Postcode:.. Tel : E mail address:..web Site:..
More informationCOVERED TRADE STAND APPLICATION FORM 2018
COVERED TRADE STAND APPLICATION FORM 2018 CONTACT DETAILS (Please complete in BLOCK CAPITALS) Name of Company or Individual: Address: Post Code: Contact Name: Telephone: E-Mail: Mobile: Website: Brief
More informationAO PO GRAND MARINA CO., LTD. RULES AND REGULATIONS
AO PO GRAND MARINA CO., LTD. RULES AND REGULATIONS The following rules and regulations ( as amended from time to time ) ( the Rules ) shall govern the use of any vessel or its gear and equipment ( Vessels
More informationSITE RULES FOR CONTRACTORS At Darwin International Airport Version 3.0 August 2014
SITE RULES FOR CONTRACTORS At Darwin International Airport Version 3.0 August 2014 Version 3, August 2014 Tel: (08) 8920 1890 Email: maintenance@ntairports.com.au www.darwinairport.com.au Contents 1 PURPOSE...
More informationRULES AND HIRERS AGREEMENT FOR USERS OF THE PARISH FACILITIES
St Teresa of the Child Jesus, Roman Catholic Church 291 Shenley Road Borehamwood WD6 1TG 0208 953 1294 RULES AND HIRERS AGREEMENT FOR USERS OF THE PARISH FACILITIES 1 INTRODUCTION The Parish of St Teresa
More informationBus Hire Agreement 2017 Between St George Community Transport And
Bus Hire Agreement 2017 Between St George Community Transport And Name of Organisation/ Hiring Group: Terms and Conditions of Bus Hire Agreement (1 January 2017 to 31 December 2017) St George Community
More informationlinked to the Australian National University s Work health and safety policy and is one of the procedures within the WHS Management System.
Purpose This procedure describes how the Australian National University evaluates and monitors contractors work health and safety for all activities performed at the University. This procedure ensures
More informationCONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]
CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category] RFP Language Contract Language 1. Contractor recognizes the importance of performing the Work in a safe and responsible manner
More informationSHEDLEY THEATRE APPLICATION TO HIRE. 1. Contact Details. 2. Event Details. 3. Bump In / Rehearsal Times (*Includes Technical Support)
1. Contact Details Name of Organisation / Group: Contact Person: Postal Address: Suburb: Phone: Email: Postcode: Mobile: Website: 2. Event Details Title of Event / Performance: Event / Performance Type:
More informationContractor Policy and Procedures. Contractor. Policy and Procedures. Working Together. November Borders College 4/12/ Working Together
Contractor Working Together Policy and Procedures November 2017 Borders College 4/12/2017 1 Working Together History of Changes Version Description of Change Authored by Date 1.1 This document combines
More informationHow to complete a Risk Assessment (RA)
How to complete a Risk Assessment (RA) All Exhibitors/Contractors are reminded of their duty in law to undertake written RAs on behalf of their employees and to develop safe working practices arising from
More informationElectric Transmission Texas, LLC Supplemental Safety Terms and Conditions
Electric Transmission Texas, LLC Supplemental Safety Terms and Conditions These Supplemental Safety Terms and Conditions are intended to supplement and not replace the safety provisions in the general
More informationRoofers and Scaffolders Enquiry Form
Broker: Address inc Pcode: Contact Name: Telephone No: Proposer Details Name of Client: Full Address: Post Code: Website: Current Insurer: Current Broker: Expiring Premium: + Insurance Premium Tax Work
More informationIF LIVESTOCK FORMS PART OF YOUR DISPLAY PLEASE STATE TYPE & NUMBER ATTENDING
Application for Space in AGRI-CENTRE MARQUEE THE ROYAL CHESHIRE COUNTY SHOW 18th & 19th June 2019 The Royal Cheshire County Show attracts around 80,000 visitors over the two Days USE BLOCK CAPITALS For
More informationPower Construction Company CCIP Program Safety Requirements
Introduction The following safety requirements (herein known as safety requirements) apply to all subcontractors including tier subcontractors, employees, consultants, vendors, deliveries, visitors and
More informationFederal Department of Transport Vessel Registration or Pleasure Craft Licence (Required the first year you lease a slip)
MARINA SLIP RENTAL APPLICATION FORM Please complete and return this form with your payment on or before: May 1 st, 2018. Applications received after this date will not be accepted and access to marina
More informationPolicy reference Type of schedule Date of issue. MQBI585915XB New business 10 April 2016
This document is a summary of the insurance you ve bought. It includes information you or anyone acting on your behalf provided before we agreed to insure you. This includes details of the cover given,
More informationBetween the Western Sydney Parklands Trust (the Trust) (LAND OWNER) and
PERMIT TO ENTER Between the Western Sydney Parklands Trust (the Trust) (LAND OWNER) and (ENTRANT) DEED made the day of, over land at / known as: Address Western Sydney Parklands Certificate of Title LAND
More informationACCESS REQUEST AND REGULATIONS FOR CONTRACTORS AND CREW
Access Regulations and Arrangements: ACCESS REQUEST AND REGULATIONS FOR CONTRACTORS AND CREW 1. This Access Request document must be completed for each job and must be submitted to SHEQ and Logistics Departments
More informationTrader Site Application
Trader Site Application P a g e 1 of 5 ALBURY SHOW (Incomplete applications will not be accepted). ABN: 74 590 596 593 Friday 3rd, Saturday 4th th November 2017 ALBURY SHOW 2017 The Albury Show is being
More informationGuidelines and Example Risk Assessment for Exhibition, Exhibitors and Stand Staff
Guidelines and Example Risk Assessment for Exhibition, Exhibitors and Stand Staff All exhibitors need to register their arrival at Reception. All exhibitor staff must acquaint themselves with the emergency
More informationYsgol Y Bont Faen Cowbridge Comprehensive School
Ysgol Y Bont Faen Cowbridge Comprehensive School SCHOOL LETTINGS POLICY Formulated by: DTS, BWS Adopted by: Premises and Health & Safety Committee Date: 24 th April 2018 Review: 3 Years or subject to changes
More informationPREQUALIFICATION QUESTIONNAIRE
PREUALIFICATION UESTIONNAIRE 1.0 COMPANY DETAILS 1.1 Please complete the company details below: Company: Post Code: Tel: E-mail Contact: Title: CRN: Fax: Website: 1.2 Does this Company have a Parent Company
More informationWork and Environmental Guideline of voestalpine BÖHLER Edelstahl GmbH & Co KG for External Companies
page 1 of 11 Work and Environmental Guideline of voestalpine BÖHLER Edelstahl GmbH & Co KG for External Companies Ref. No. Remark/Change Created by / on Approved by /on 0 First edition Law, insurances
More informationHONDA AUSTRALIA MOTORCYCLE AND POWER EQUIPMENT PTY LTD Hume Highway Campbellfield VIC OCCUPATIONAL HEALTH AND SAFETY
AUSTRALIA MOTORCYCLE AND POWER EQUIPMENT PTY LTD 1954-1956 Hume Highway Campbellfield VIC. 3061 APRIL 2004 OCCUPATIONAL HEALTH AND SAFETY RISK ASSESSMENT REPORT - - THIS REPORT IS PREPARED BY RISKPLANT
More informationWCS4. Auto Owners WCS4 Account / Account Code: Insured: Policy #: Survey Address: Policy Information. General Information
WCS4 Auto Owners WCS4 Account / Account Code: Agency: Insured: Policy #: Survey Address: Telephone: Alt. Phone: Policy Information Report Status: (Choose one value) [_]Productive [_]Non-Productive (describe)
More informationTo provide all new employees with a standardized orientation to the county s safety program.
Duplin County New Hire Orientation Personnel Policies Page 1 of 5 Adopted 10-20-08 PURPOSE To provide all new employees with a standardized orientation to the county s safety program. INTRODUCTION The
More informationCOMMUNITY FACILITIES HIRE AGREEMENT KEYSTONE HALL
COMMUNITY FACILITIES HIRE AGREEMENT KEYSTONE HALL Please complete all relevant information CONTACT DETAILS Applicants Name: Organisation Name: Position: Phone Number: B/H A/H MBL Fax Number: Email: Postal
More informationRULES & REGULATIONS. Important Dates & Times at a glance. Friday, January 11, 2019
Important Dates & Times at a glance Compulsory Forms Staff Badges Public Liability Insurance Emergency Contact Company Sign Detail (Modular Package Only) Additional Forms Additional Electrical, Lighting
More informationACCIDENT PREVENTION POLICY Signature Page Assign, Sign, & Return this page only to DiFiore Construction
To all Subcontractors: ACCIDENT PREVENTION POLICY Signature Page Assign, Sign, & Return this page only to DiFiore Construction Excellence in safety and loss prevention is an objective of all operations
More informationProtecting and supporting your community. Construction Hazards. Know the risks and take steps to mitigate them White Paper
Protecting and supporting your community Construction Hazards White Paper Introduction Whether your organization is looking to build a new facility, add space to an existing structure or simply undertake
More informationCity/Town Postcode Country
Car Parking UNSW Village Pty Limited ABN 19 125 227 401 (the Owner) has limited parking available at UNSW Village (the Village). All cars parked in the Village are required to have a parking permit at
More informationPolicy reference Type of schedule Date of issue. MABI740931XB New business 09 September 2016
This document is a summary of the insurance you ve bought. It includes information you or anyone acting on your behalf provided before we agreed to insure you. This includes details of the cover given,
More informationLETTINGS POLICY. The Governing Body is responsible for the Letting s Policy, for agreeing lettings charges and for reviewing them annually.
LETTINGS POLICY Policy Summary The Governing Body recognises that its premises are a valuable resource within the community and as such welcomes the opportunity to enable other users to benefit from them.
More informationSUPPLEMENTARY TERMS AND CONDITIONS FOR PURCHASE ORDERS ISSUED FOR CONSTRUCTION, INSTALLATION OR REPAIR WORK TO BE PERFORMED ON OUR PREMISES
SUPPLEMENTARY TERMS AND CONDITIONS FOR PURCHASE ORDERS ISSUED FOR CONSTRUCTION, INSTALLATION OR REPAIR WORK TO BE PERFORMED ON OUR PREMISES Whereas, ( you ) and the TopBuild company identified on the purchase
More informationTerms & Conditions of Hire
Alleyn s Terms & Conditions of Hire These Terms and Conditions of Hire must be agreed to by the Hirer at the time a facility is booked. It is the Hirer s responsibility to ensure that all members of their
More informationGOOSNARGH AND LONGRIDGE AGRICULTURAL SHOW
GOOSNARGH AND LONGRIDGE AGRICULTURAL SHOW Notes, Terms and Conditions relating to application for Trade, Craft stands and Food stands. 1 Electricity will not be supplied to craft stands. 2 The committee
More informationSecurity, Safety, and Environmental Guidelines for Contractor Employees EXHIBIT S-1
Security, Safety, and Environmental Guidelines for Contractor Employees EXHIBIT S-1 Security, Safety, and Environmental Policy Vision Beliefs Zero Injuries / Illnesses Nothing we do is worth someone being
More informationENVIRONMENTAL INCIDENT RESPONSE
ENVIRONMENTAL INCIDENT RESPONSE PURPOSE SCOPE PROCEDURE Coastal Quarry Products Pty Ltd have systems in place to ensure all environmental/pollution incidents and hazards are controlled and monitored in
More informationEvent Name: Smokin Hot Stanley Date of Event: 7 th May 2017 Contact Name: Jade Miles Contact Number: EVENT MANAGEMENT PLAN
Event Name: Smokin Hot Stanley Date of Event: 7 th May 2017 Contact Name: Jade Miles Contact Number: 0418520554 EVENT MANAGEMENT PLAN 1. EVENT DETAILS Event place and time Name of event: Smokin Hot Stanley
More informationWork Health and Safety Conditions
Work Health and Safety Conditions Table of Contents PURPOSE AND SCOPE... 1 RESPONSIBILITIES... 1 DEFINITIONS, ABBREVIATIONS AND ACRONYMS... 1 GENERAL WH&S & ELECTRICAL SAFETY REQUIREMENTS... 1 Compliance...
More informationOccupational Safety & Health Policy & Guidelines for Contractors
Occupational Safety & Health Policy & Guidelines for Contractors Occupational Safety & Health Policy & Guidelines for Contractors Table of Contents Forward..1 Introduction... 1 Policy.1 City of Kalamunda
More informationWork Method and OH&S Statement
Work Method and OH&S Statement for (Customer name) Work Site: (TBA) Quotation ref: (TBA) Produced by: Accredited Epoxy Applicators Pty Ltd (date) ACCREDITED EPOXY APPLICATORS PTY LTD 2007 Page 1 CONTENTS
More informationMARINA AND SHIPYARD AGREEMENT
OUR DETAILS Name: REFERENCE SCHEDULE Rivergate Marina & Shipyard Pty Limited ABN 12 116 163 912 ( RMS ) Address: Rivergate Place, Murarrie, Queensland 4172 Contact Numbers: (Phone) +61 (0) 7 3907 1600
More informationBetween the Parramatta Park Trust (the Trust) (LAND OWNER) and
PERMIT TO ENTER Between the Parramatta Park Trust (the Trust) (LAND OWNER) and (ENTRANT) DEED made the day of, over land at / known as: Address Parramatta Park Certificate of Title LAND OWNER Parramatta
More informationSCHOOL TOUR INFORMATION PACKAGE AND BOOKING FORM
SCHOOL TOUR INFORMATION PACKAGE AND BOOKING FORM The Sydney Tower Dining School Tour has been in place for more than 25 years now and continues to be a successful and integral part of our operations. Tours
More informationPlease ensure you read this document carefully as it sets out the contractual terms and conditions for the booking that you have made with us.
Conference Room Hire Terms and Conditions Please ensure you read this document carefully as it sets out the contractual terms and conditions for the booking that you have made with us. 1. Definitions 1.1
More informationWhitianga Marina - Contractors License.
WHITIANGA MARINA SOCIETY INCORPORATED Box 66 Whitianga Phone: 07 8662456 Fax: 07 8665545 April 2010 Whitianga Marina - Contractors License. The Committee of the Marina advises that Contractors wishing
More informationOSHA 1926 Subpart A General
OSHA 1926 Subpart A General 1926.2 Variances (a) Variances from the standards may be granted (b) To obtain a variance, a specific request must be made to OSHA 1926.3 Inspections Right of Entry (a) Authorized
More informationHSE MANUAL. PO Box 14659, Zayed bin Sultan Street, Al Ain, U.A.E.., Tel: , Fax
HSE MANUAL PO Box 14659, Zayed bin Sultan Street, Al Ain, U.A.E.., Tel: 03-7640177, Fax 03-7640188 HSE 1 Health and Safety Policy Statement 1.0 The policy is to ensure, as far as is reasonably practicable,
More informationHall Hire Policy February 2018
February 2018 Policy No. PDSC 1.2013 Title Version Approved Date B B. Devine 11 March 2013 C A. Wilson 6 February 2018 Table of Contents PART A: HALL HIRE POLICY... 1 1 Overview... 1 2 Basis for approval...
More informationSubcontractor Handbook Safety Beliefs
Subcontractor Handbook Safety Beliefs All Injuries can be prevented Working safely is a condition of engagement Employee involvement and action are essential I will get the level of safety I demonstrate
More informationRules & Regulations Renovation Works
Rules & Regulations Renovation Works Administration 1. A Subsidiary Proprietor must seek approval from the Management before carrying out renovation works. In this context, renovation works shall include
More informationCole Street Methodist Church
Cole Street Methodist Church Standard Booking Form & Licence & Conditions of Hire Form If the Hirer is in any doubt as to the meaning of the following or questions safeguarding implications, the Managing
More informationHealth and Safety statement of intent
Health and Safety statement of intent 1. Our company strives to take strict measures to monitor and control Health & Safety as an integral part of running our business operation. 2. We will, so far as
More informationTrader Application Form
ST NEOTS ARMED FORCES DAY GALA Saturday 18 June 2016 Trader Application Form ALL APPLICATIONS MUST BE RECEIVED BY FRIDAY 13 TH MAY 2016 Complete all sections of this application form and send with all
More informationCity Of Mississauga Conditions For The Acceptance Of Applications For Slip Rental In Lakefront Promenade Public Marina
City Of Mississauga Conditions For The Acceptance Of Applications For Slip Rental In Lakefront Promenade Public Marina 1. Must fill in Application for boat docking space form in full. 2. Must make two
More information