1 Contractor Guidelines This Guideline has been written to detail the minimum expectations with regards to contractor safety at Sodexo business units. It is the responsibility of the contractor to understand and implement these requirements for employees and sub-contractors when engaged by Sodexo. At any time, the Sodexo Contact may request documentation with regards to a contractor s safety system. The contractor must be able to provide this information in a timely manner. Compliance with Relevant Legislation It is the responsibility of the contractor to know, understand, abide by and enforce all Federal, Provincial and Municipal laws governing its activities. Rules applicable to contractors are also applicable to subcontractors, vendors, suppliers and consultants. Where there is a difference between relevant legislation, site specific requirements and the information provided within this document, then the stricter standards shall apply. Compliance with Sodexo Occupational Health and Safety System (OHSMS) Sodexo expects all contractors to implement their own safety systems when completing work. Where a contractor does not have a system in place or the system does not meet the minimum requirement set out in this Contractor Guideline then you will be required to review the Scope of Work with your Sodexo Contact. Third Party Verification Sodexo Canada may elect to utilize a third party verification service for contractors. This service will act on Sodexo s behalf to complete preliminary screening of contractors. Should a contractor satisfactorily complete the screening process the Contractor Guideline and its requirements will remain applicable. Insurances Sodexo Canada requires that all contractors engaged to work on behalf of Sodexo must meet the following minimum requirements: A minimum level of liability insurance of $5,000,000 per occurrence. (This may be as a standard liability policy or in combination with an umbrella liability policy.) o Exceptions must be reviewed with the Sodexo Unit Team and may require the contractor to comply with additional requirements in order to mitigate any increased risk. Good standing with the provincial workers compensation boards (WCB/WSIB/CNESST) in which work is being completed In both of the cases above, documented evidence must be available to verify that the contractor meets the requirements. Contractors must provide this information in advance of arriving on site. Contractors must also be able to provide this information on request from either Sodexo or the Client. Where a client s expectation regarding insurance(s) and documentation storage exceed those provided in this Standard, then the contractor is expected to comply. Contractor Discipline Process There are no exceptions to this Standard for a contractor or for the Unit Team. If at any time it is found that a contractor is not meeting the expectations of this Standard, they will be ordered to stop work until the condition is corrected and may be subject to dismissal. Any costs incurred by noncompliance will be borne by the contractor. Safety Guidelines Page 1 of 7
2 1. General Requirements: Dealing with an Emergency In order to ensure personal safety, contractors are required to be aware of all the emergency response procedures for the location of work. Review this information with your Sodexo Contact. The contractor shall provide emergency response procedures for the work site, which are in compliance with Sodexo Emergency Response Procedures for the site, and shall communicate such procedures to all contractor personnel. At a minimum, the Emergency Response Procedures will include: Emergency telephone numbers; Additional information that may be required and is dependent on the work being completed will include; First Aid process (including names, incident management protocol and resourcing for lone workers where applicable); and Emergency evacuation protocols for the work area. All contractors are responsible to ensure that first aid, emergency medical services and transportation are provided to its employees as defined by the applicable local legislation. Contractors are also required to provide trained first aid services, supplies, and equipment as applicable. NOTE: Some locations may have medical personnel/treatment areas on site. It is the contractor s responsibility to know where these are located and to use them in the manner for which they are provided. Incident Sodexo classification of incidents includes: Near Miss First aid No Treatment Medical Aid/Lost Time Serious or Critical Injury Contractors will report near miss, injuries, illnesses, environmental incidents and security breaches to the Sodexo Contact. The Sodexo Contact will report all events to the Client Contact, unless other arrangements are agreed upon and are documented. Contractors are expected to comply with the following requirements: All incidents (safety, environment and security), regardless of severity or outcome are to be reported immediately; The contractor will inform the Sodexo Contact prior to a report being made to any other parties including authorities having jurisdiction (this is required to ensure that appropriate authorities are informed in a timely and efficient manner); Damage to materials, structures, tools, equipment and property shall be reported to the Sodexo Contact immediately after occurrence; An investigation of the event will be conducted by the contractor. The Sodexo Contact will participate in any investigation process. Further participants will join the investigation as required; The contractor will provide timely response to Sodexo, or Sodexo s Client s, requests; The contractor will be required to implement any corrective measures which are identified as part of the investigation to prevent a reoccurrence of the incident; If the investigation reveals that the contractor has committed an unsafe act, violated a known rule Safety Guidelines Page 2 of 7
3 or regulation or created an unsafe condition which jeopardized them, others or the environment, the Sodexo Contact will decide on appropriate action. This can include instant removal from site and the cancellation of any work offered to the contractor. Contractors will report injuries, illnesses, environmental incidents and security breaches to the appropriate agencies. The contractor will be knowledgeable of the local reporting requirements. Regulatory reporting requirements will be met by the contractor without exception. General Behavior All contractors will conduct themselves professionally. Behavior or actions which violates Sodexo or Client safety programs, or has the potential to endanger the safety and well-being of any of the facility occupants, is grounds for removal from the site. Inappropriate behavior includes but is not limited to: Use, possession, distribution, offering, sale or being under the influence of alcohol, illicit drugs, illicit drug paraphernalia or non-prescribed drugs for which a prescription is legally required in Canada, while on company business or premises; Disorderly or violent conduct; Theft or intentional damage to property; Misuse of property; Entering restricted areas; Bullying or harassment; and/or Criminal activities. Site Orientation Contractors are required to participate in site orientation programs. The requirements are dependent on the work location and client requirements. The Sodexo Contact will communicate all relevant client policies (for example drug & alcohol policy) as part of the orientation process. The frequency of an orientation is at the discretion of the Unit Team. Site orientation does not incorporate task specific safety requirements. Contractors are expected to be able to demonstrate to the Unit Team, through documentation and other measures, how tasks will be completed safely. Training and Certification Where a task is required to have a qualified person, the contractor is expected to provide all relevant information prior to commencing work and upon request from Sodexo. Should there be a gap or any concern regarding the qualifications, the task shall not proceed. If there are additional expectations regarding demonstration of skill set by our clients, then the contractor will be informed in advance by Sodexo. Security Access Unless contractors have appropriate security clearance, they are not to work in areas without prior approval by Sodexo. Where expenses are incurred due to security access requirements or issues, they shall be the responsibility of the contractor. The contractor is to immediately inform their Sodexo Contact of any security or facility access issues. Risk & Permit to Work The contractor will provide risk assessments for all tasks prior to commencement. A risk assessment is documented evidence that hazards associated with the work have been assessed and how hazards will be controlled. Sodexo recognizes the contractor as the competent authority of its services provided. Safety Guidelines Page 3 of 7
4 If a contractor does not have their own risk assessment process, then the Sodexo Contact will provide Sodexo Workplace Risk Assessment Form (OHSMS-SF-0142) for completion by the contractor. Some sites may require a Permit to Work to better control the work being completed by contractors. Permits enable greater control over the work being completed, and identify additional actions which may be required prior to work commencing (for example the disengagement of fire protection systems). Contractors are required to review site Permit to Work requirements with their Sodexo Contact prior to commencing work. Contractors are responsible to be aware of all dangers or hazards associated with the work being performed. Contractors will act to remove and / or control the hazards prior to commencement and during the work. All uncontrolled potential or existing hazards observed by the contractor shall be reported to the Sodexo Contact. Where the contractor or any Sodexo employee reasonably believes that an imminent risk to persons or property is present; the contractor is obligated to stop work so that the risk is eliminated or reasonably controlled. For the purposes of this Guideline, a risk may include, but is not limited to: A situation for which the individual is not properly trained or experienced; A situation for which the individual is not equipped (i.e. safety or personal protective equipment); A situation where the individual believes that proper procedures and work practices are not being followed; A hazard that is not typical to the individual s work activities or job; A worker unfit for work due to the influence of alcohol or illegal or mind-altering substances; A danger that would normally stop work in the affected area; A situation where the environment may be adversely affected and regulatory authorities would be involved; and/or A situation which may result in equipment / property damage. Any stop work situations are to be reported immediately to the Sodexo Contact. The Sodexo Contact is to be advised of the risk, the corrective action and when the situation is resolved. Worksite Inspections Sodexo requires all contractor worksites to be inspected by the contractor. From time to time, or as required, Sodexo employees may also conduct inspections. At all times, authorities having jurisdiction have the ability to conduct inspections or work areas. The frequency and type of inspections conducted will be commensurate with the level of risk identified in the risk assessment. On demobilization of a job, Sodexo will conduct an inspection of the work area with the contractor to ensure that new hazards do not exist. Communications Prior to commencing work the contractor and Sodexo Contact should review all site communication procedures, including incident reporting, notifications and questions related to the work. The Sodexo Contact and contractor should review plans for mobilization and demobilization, as well as ongoing management of the work. For large or complex projects it is recommended that weekly or bi-weekly project meetings be held with all stakeholders to discuss all project issues including site safety. Contractors who are on site for more than seven consecutive days are to conduct regular safety meetings (one (1) meeting per week on-site). These are to be attended by all workers and documented. A copy of Safety Guidelines Page 4 of 7
5 attendance and topics covered during the meeting is to be made available to Sodexo on request. Sodexo reserves the right to attend these meetings with prior notice provided to the contractor. Housekeeping Contractors will keep the job site clean and orderly at all times. The contractor shall regularly clean up and dispose of waste material and debris generated in connection with the work. Waste and debris disposal is to be completed off-site and is the responsibility of the contractor unless prior arrangements are made with the Unit Team. On completion of the work, Sodexo will work with the contractor to ensure that the work area is in a clean and orderly state. Hygiene Where access into food service areas is required, food safety standards will apply. This includes, but is not limited to, washing hands upon entering into the kitchen and before leaving the washroom. Personal food and drinks are not permitted in food handling and kitchen areas. Jewelry restrictions will apply, in accordance with HACCP procedures. Hair must be suitably restrained in accordance with HACCP procedures. Protection of the Environment Contractors will be knowledgeable of and comply with all environmental laws, rules and regulations for materials and work under their control. Contractors will not dump, release or otherwise discharge or dispose of any such material, unless they have the necessary permits and authorization from the necessary authorities having jurisdiction. Any event that results in an uncontrolled, unplanned or accidental release of a substance into the environment; or a substance that will, or is known to, cause environmental damage will be considered an environmental incident. Any environmental incidents must be reported to the Sodexo Contact immediately. Work Area Protection All work areas must be clearly barricaded and identified. Contractors are responsible for providing signs, cones, plastic sheets, guardrails, lighting, hoarding and other materials to create an effective barricade to isolate the work environment from facility occupants and to prevent unauthorized access. Contractors must work in a manner that does not create a disruption to the normal course of business. Any activity that produces noise, dust, odors, affects lighting or other facility environment conditions must be approved by the Sodexo Contact prior to commencement of work. Equipment and Materials All equipment and materials used for a task will be compliant with relevant regulations and site specific requirements. Where applicable, equipment should conform to CSA or ANSI standards. Contractors are responsible for the availability of documentation, training requirements, regular equipment inspections, storage requirements and use of the equipment or material. Contractors are responsible to provide, and ensure safe operation of, their own tools, equipment and vehicles. No contractor is permitted to operate any piece of equipment that is under the control of Sodexo without prior approval. Mobile Equipment and Vehicles All contractors operating motor vehicles must have and maintain a valid driver s license. Contractors must be aware of and be in compliance with all traffic rules, including those established by sites. No contractor is permitted to operate a Sodexo vehicle unless they have completed the Sodexo Driver Safety Guidelines Page 5 of 7
6 Awareness program. All contractors operating industrial powered vehicles must be trained and licensed or certified in the operation of the particular equipment to be used. If a contractor will be using industrial powered equipment (forklift, cleaning equipment etc), they must first check with their Sodexo Contact regarding authorization of use and area specific safety requirements. Personal Protective Equipment Contractors are responsible for verifying that their employees are provided with and trained on proper use of the appropriate and approved personal protective equipment. All PPE must meet CSA or ANSI standards where applicable. Where fit testing is required by the authorities having jurisdiction, it is the responsibility of the contractor to complete. The Sodexo Contact will inform contractors of specific PPE requirements within the designated work area. Chemical All contractors engaged by Sodexo are expected to fully understand and comply with WHMIS/GHS regulations. All contractors must provide and maintain SDS s for all controlled products or chemicals which they will be storing and using at the work location. No chemical is permitted on site without prior approval, the Sodexo Contact will advise of any site specific approval processes. Potential Facility Environmental Hazards Due to the age of many of the buildings in which contractors may be engaged to work, there is the potential to be exposed to hazardous material. Hazardous material encountered may include: Silica Asbestos Lead-based paint PCBs Mercury Ozone depleting substances Sodexo Contact and the contractor will discuss and identify any risks associated to hazardous materials which may be encountered during the task during scope review. Specific plans, notifications and risk mitigation methods may be required and guidance shall be sought from the Unit Team. In certain cases, especially when dealing with asbestos, notification may need to be given to relevant government departments. 2. High Risk Work High Risk Activities Certain activities are considered High Risk on Sodexo managed sites. These activities demand an increased level of management to control the associated hazards. Activities listed below will constitute High Risk work and may be subject to additional site specific controls. Work Involving Fire and Life Safety Equipment Any requirements to disable, to block means of egress, or access to fire, life or other safety equipment must first be approved by the Sodexo Contact as identified in the applicable Permit to Work. In the event that Fire or Life Safety equipment must be disabled, even temporarily, during the course of work prior coordination must occur with the Sodexo Contact. It is the responsibility of the contractor to provide Fire Watch as required by applicable regulations or site specific requirements. Safety Guidelines Page 6 of 7
7 Energy Isolation and Electrical Safety All contractors performing energy isolation will submit their process to the Sodexo Contact for review, prior to commencing any work. Energy isolation processes must apply to all energy sources i.e. compressed air, hydraulics, steam, gravity, electricity, pipelines and vessels. Contractors must not work on any level of voltage electrical equipment unless qualified. It is the responsibility of the contractor to ensure that all temporary hook-up and connections to sources including, but not limited to electricity, natural gas, propane and water are: Identified and isolated to prevent accidental injury or damage; Connected to or in accordance with the required specifications or codes; Communicated to all personnel; and In use for a minimum period of time only. Working at heights All contractors performing work at heights in excess of 2.0m (~6.5 ) will submit their process including rescue plan to the Sodexo Contact for review prior to commencing any work. All equipment for use of working at heights including fall protection, fall arrest, scaffolding, work platforms, hoists, cranes and other lifting equipment must conform to governing legislation. Hot Work All contractors performing Hot Work including cutting, grinding welding or other tasks that may generate heat, sparks or flame will submit their process including Fire Watch plans to the Sodexo Contact for review prior to commencing any work. Where a fire watch is required, the contractor must provide competent personnel. The persons performing the fire watch cannot perform any other tasks other than monitoring for fires for the duration required. Confined Space All contractors performing work in confined spaces (as defined either by authorities having jurisdiction or the site) will submit their process including rescue plan to the Sodexo Contact for review prior to commencing any work. Trenching and Excavation All contractors performing work involving trenching and excavation will submit their process to the Sodexo Contact for review prior to commencing any work. The contractor is responsible to obtain all utility location information prior to commencing work. Hazardous Materials All contractors performing work involving hazardous materials (i.e. asbestos, lead, mercury, PCBs, ozone depleting substances, silica, etc.) will submit their process to the Sodexo Contact for review prior to arriving on site. The contractor is responsible for any notifications to the authorities having jurisdiction as may be required by the work. It will be the contractor s responsibility for ongoing environmental monitoring, including indoor air quality clearance samples as required. END OF DOCUMENT Safety Guidelines Page 7 of 7
Power Construction Company CCIP Program Safety Requirements
Introduction The following safety requirements (herein known as safety requirements) apply to all subcontractors including tier subcontractors, employees, consultants, vendors, deliveries, visitors and
More informationPOWER CONSTRUCTION COMPANY CCIP PROGRAM SAFETY REQUIREMENTS
POWER CONSTRUCTION COMPANY CCIP PROGRAM SAFETY REQUIREMENTS The following requirements apply to all subcontractors including tier subcontractors, vendors, deliveries, visitors and the like (herein known
More informationSafety & Health Manual
Safety & Health Manual Chapter 8 Sub-Contractor Policy 8-1 Sub-Contractor Policy engages the services of sub-contractors and values its relationships with these essential service providers. In the interest
More information2016 CDM Smith All Rights Reserved July 2016 SECTION SAFETY, HEALTH, AND EMERGENCY RESPONSE
PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 01 11 01 SAFETY, HEALTH, AND EMERGENCY RESPONSE A. Pursuant to Section 107 of the Contract Work Hours and Safety Standards Act and DOL Regulations set forth in
More informationContractor Health and Safety Code of Practice. Updated June 4, 2018
Contractor Health and Safety Code of Practice 2018 Updated June 4, 2018 Updated June 4, 2018 TABLE OF CONTENTS A. DEFINITIONS...3 B. PURPOSE...7 C. STRATEGIC ALIGNMENT...7 D. REGULATORY CONSIDERATIONS...7
More informationATTACHMENT "I" SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS)
ATTACHMENT "I" SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS) Swinerton Builders, Inc. (SWINERTON) constantly strives to provide a safe and productive work environment.
More informationContractor Pre-qualification Questionnaire
Contractor Pre-qualification Questionnaire This document shall be used to determine qualifications of contractors who shall work under Anderson Engineering Co., Inc. (AECI). AECI shall use this document
More informationDISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS
DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS Page 1 of 5 RFP 18-PR-DMS-49 ANNUAL MAINTENANCE AND REPAIR OF INDUSTRIAL ELECTRICAL CONTROL EQUIPMENT
More informationSUB CONTRACTOR INDUCTION PACK
REQUIREMENTS FOR WORKING ON ROYAL MAIL PREMISES 1. INTRODUCTION AND PURPOSE This document sets out the arrangements that Royal Mail Property & Facilities Solutions Limited and Royal Mail [hereinafter jointly
More informationWork Health and Safety Conditions
Work Health and Safety Conditions Table of Contents PURPOSE AND SCOPE... 1 RESPONSIBILITIES... 1 DEFINITIONS, ABBREVIATIONS AND ACRONYMS... 1 GENERAL WH&S & ELECTRICAL SAFETY REQUIREMENTS... 1 Compliance...
More informationThis policy aims to ensure the health, safety and welfare of contractors working on UEL premises and those affected by their work.
HR Services UEL Health and Safety Handbook Contractor Health and Safety Management Policy This policy is a sub-policy of the main University Health and Safety Policy Statement Introduction The University
More informationWORKING WITH CONTRACTORS POLICY AND PROCEDURE
WORKING WITH CONTRACTORS POLICY AND PROCEDURE CROWN SECURITY CONTRACTORS & OSH (i) Preface Contract work is becoming increasingly common in the modern workplace management culture, and has been a feature
More informationLONG ISLAND UNIVERSITY STANDARD TERMS AND CONDITIONS
LONG ISLAND UNIVERSITY STANDARD TERMS AND CONDITIONS CONTENTS I. Scope II. Review of Contract Documents III. Responsible Business Practices IV. Schedules and Time of Completion V. Plans, Specifications,
More informationCONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]
CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category] RFP Language Contract Language 1. Contractor recognizes the importance of performing the work in a safe and responsible manner
More informationGuideline for external contractors working on the premise of MANN+HUMMEL
Guideline for external contractors working on the premise of MANN+HUMMEL 1 Purpose MHG-HS-I-0011 describes the regulations for health, safety and environment for external contractors working on the premise
More informationContractors Induction Booklet. Contractor s Name:
Contractors Induction Booklet Date Contractor s Name: Business Name: The following information relates to Work Health & Safety and has been designed and implemented by the Owner s Corporation (OC) and
More informationOccupational Safety & Health Policy & Guidelines for Contractors
Occupational Safety & Health Policy & Guidelines for Contractors Occupational Safety & Health Policy & Guidelines for Contractors Table of Contents Forward..1 Introduction... 1 Policy.1 City of Kalamunda
More informationContractor Management Procedure
Contractor Management Procedure Purpose Skillset Limited ( Skillset ) has a duty under the NSW Work Health and Safety Act and Regulations 2011 (the Legislation ) to prevent and/or to minimise risk in the
More informationHealth & Safety Policy
Health & Safety Policy K4S Security Ltd Imperial Office 2a Heigham Road East Ham London E6 2JG Registered Company Number: 09646212 Policy Date: 12 April 2018 1/14 Contents Page 1.0 General Statement of
More informationContractor s Environmental Health & Safety Disclosure
Contractor s Environmental Health & Safety Disclosure Company Name: Application Date: Address: Phone#: Fax #: Email : Company Contacts: Name Position Environmental Health & Safety (EHS) Personnel: Name
More informationRISK CONTROL SOLUTIONS
RISK CONTROL SOLUTIONS A Service of the Michigan Municipal League Liability and Property Pool and the Michigan Municipal League Workers Compensation Fund CONTRACTORS Municipalities often need services
More informationLEDCOR CONTRACTORS SUBCONTRACTOR HS&E STANDARD PAGE 1 OF 25 DATE ISSUED: NOVEMBER 14, 2014 LAST REVISION: NOVEMBER 14, 2014 VERSION: 00
LEDCOR CONTRACTORS SUBCONTRACTOR HS&E STANDARD PAGE 1 OF 25 DATE ISSUED: NOVEMBER 14, 2014 INDEX 1 PURPOSE... 4 2 SCOPE... 4 3 GENERAL HS&E RESPONSIBILITIES... 4 4 SUBCONTRACTOR HS&E REQUIREMENTS... 7
More information1.3 All employees are equally responsible for complying with the Ontario Occupational Health & Safety Act and its Regulations.
Revision No: 1 Page: 1 of 14 1.0 PURPOSE 1.1 The purpose of this policy is to establish guidelines for contractors in order to provide and maintain a safe work environment for all employees. Advance planning
More informationSAFETY POLICY. Office Address 5195 W. 58 th Ave. Unit F Arvada, CO
SAFETY POLICY Office Address 5195 W. 58 th Ave. Unit F Arvada, CO 80002 303-223-5716 info@valiantcc.com www.valiantcc.com I. Objective Safety Policy Table of Contents II. Policy III. Applicability IV.
More informationACCIDENT PREVENTION POLICY Signature Page Assign, Sign, & Return this page only to DiFiore Construction
To all Subcontractors: ACCIDENT PREVENTION POLICY Signature Page Assign, Sign, & Return this page only to DiFiore Construction Excellence in safety and loss prevention is an objective of all operations
More informationHULCHER CONTRACTOR SAFETY MANAGEMENT PROCESS
Hulcher Services is initiating a mission to improve safety for its employees, contractors, subcontractors, visitors, and general public. The Hulcher Contractor Safety Management Process (HCSMP) was developed
More informationDiversified Engineering & Plastics General Safety & Environmental Process for Contractors
STATUS: Issued TITLE: Diversified Engineering & Plastics General Safety & Environmental Process for Contractors NUMBER: PUR-OP-12 EFFECTIVE: 03/12/2018 LATEST REV: 5 PAGES: 5 Purpose Scope The purpose
More informationGASCADE Gastransport GmbH HSE-GUIDELINE-CONTRACTORS. Version 5 Status: 15th May 2017
GASCADE Gastransport GmbH HSE-GUIDELINE-CONTRACTORS Version 5 Status: 15th May 2017 CONTENT 1. Preamble... 2. Scope... 3. General requirements, access, intoxicants... 4. Responsibility / organisation /
More informationCONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]
CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category] RFP Language Contract Language 1. Contractor recognizes the importance of performing the Work in a safe and responsible manner
More informationRULES, REGULATIONS AND GENERAL SPECIFICATIONS FOR SUB CONTRACT WORK
AGS AUTOMOTIVE SYSTEMS RULES, REGULATIONS AND GENERAL SPECIFICATIONS FOR SUB CONTRACT WORK All Contractors working on the premises of A.G. Simpson Automotive Inc. or A.G. Simpson (USA), Inc., (as the case
More informationInfo Sheet for Contractor Personnel
Page 1 of 6 I. Introduction To assure smooth operations on our premises it is necessary to read the information in this policy prior to accepting the contract. The contractor and its employees are required
More informationNorthern Territory Airports
Northern Territory Airports SITE RULES for CONTRACTORS at ALICE SPRINGS AIRPORT AND TENNANT CREEK AIRPORT Date Approved: Approved by: Date Issued: Date for Review: PRIOR TO ANY WORKS TAKING PLACE. Page
More informationHIGH RISK CONSTRUCTION WORK
CONTRACTOR WHS SYSTEM STANDARD HIGH RISK CONSTRUCTION WORK EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION
More informationSan Antonio Water System PROJECT CONSTRUCTION PROGRAM HEALTH AND SAFETY PROGRAM
PROJECT CONSTRUCTION PROGRAM HEALTH AND SAFETY PROGRAM SEPTEMBER 2007 TABLE OF CONTENTS INTRODUCTION... 2 SAFETY RESPONSIBILITIES, AUTHORITY AND ACCOUNTABILITY... 3 REGULATORY AGENCIES... 3 SAWS... 4
More informationContractor Safety!!!
Sample Written Program For Your Company For Contractor Safety Provided By: P.O. Box 2136 Slidell, LA 70458 Phone: 985-781-1444 Fax: 985-718-4957 Email: info@se-safety.com Contractor Safety Program Purpose
More informationSUBCONTRACTOR MANAGEMENT PLAN
SUBCONTRACTOR MANAGEMENT PLAN Steingass Mechanical Contracting, Inc. 754 Progress Drive Medina, Ohio 44256 (330) 725-6090 0 Steingass Mechanical Contracting, Inc. Subcontractor Management Plan Safety Pre-Qualification
More informationPrime Contractor Requirements Revised: April 2015
Prime Contractor Requirements Revised: April 2015 Prime Contractor Requirements April 2015 Page 1 Introduction The University of Lethbridge is committed to promoting the health, safety and well-being of
More informationHealth and Safety statement of intent
Health and Safety statement of intent 1. Our company strives to take strict measures to monitor and control Health & Safety as an integral part of running our business operation. 2. We will, so far as
More informationTAMPA ELECTRIC COMPANY ENERGY SUPPLY CONTRACTOR SAFETY COMPLIANCE PROGRAM
TABLE OF CONTENTS TITLE PAGE # PURPOSE / INTRODUCTION 1 ROLES & RESPONSIBILITIES 1 EMPLOYEE TRAINING 2 SAFETY RULES FOR CONTRACTORS 3 ZERO TOLERANCE RULE VIOLATION REVIEW PROCESS 4 PERIODIC PROGRAM EVALUATION
More informationSupplier Code of Conduct
Supplier Code of Conduct Contractors Responsibilities towards Safety & Environment Contractor's Responsibility to Ensure Safety: 1. Site Operations and Safety Regulations The Contractor shall be solely
More informationMARKET OH&S PLAN 1 INTRODUCTION 2 OH&S RESPONSIBILITIES
1 INTRODUCTION Melbourne Market Authority (MMA) is committed to a safety culture and practices that provide for a healthy and safe working environment. The health and safety of all those who work for us
More informationContractor Safety Policy
Page 1 of 9 I. PURPOSE A. To ensure contractors perform work on our sites without posing a threat to their safety, the safety of our employees and guests, and the environment. B. To ensure contractors
More informationHazard Assessment, Analysis and Control
Hazard Assessment, Analysis and Control Page 1 Section 2 Hazard Assessment, Analysis and Control HAZARD ASSESSMENT POLICY Hazard Assessment Policy - Sample 1...4 Hazard Assessment Policy Sample 2...5 HAZARD
More informationWORKPLACE VIOLENCE AND HARASSMENT POLICY
7490 Sideroad 7 W, PO Box 125, Kenilworth, ON N0G 2E0 www.wellington-north.com 519.848.3620 1.866.848.3620 FAX 519.848.3228 WORKPLACE VIOLENCE AND HARASSMENT POLICY DEPARTMENT CHIEF ADMINISTRATIVE OFFICE
More informationSan Antonio Water System Standard Specifications for Construction
ITEM NO. 902 Construction Safety And Health Program 902.1 DESCRIPTION: This item shall govern the preparation and implementation of the contractor s Constuction Safety and Health Program for the specified
More informationCarson, CA Inland Star Distribution Centers, Inc. PSM/CalARP
Carson, CA Inland Star Distribution Centers, Inc. PSM/CalARP CONTRACTOR PROGRAM Revision History Rev. # Description of Change Date Revised By 0 Initial Issues July 2016 PSM RMP Solutions Purpose The purpose
More informationTOOLS FOR SAFETY ENFORCEMENT ON CONSTRUCTION AND CONTRACT PROGRAM MANAGEMENT PROCEDURES THAT APPLY TO CONSTRUCTION ALTERATION & REPAIR PROJECTS
TOOLS FOR SAFETY ENFORCEMENT ON CONSTRUCTION AND CONTRACT PROGRAM MANAGEMENT PROCEDURES THAT APPLY TO CONSTRUCTION ALTERATION & REPAIR PROJECTS 1 NAVFAC ATLANTIC WRITTEN CONTRACT DOCUMENTS & CLAUSES NO
More informationSecurity, Safety, and Environmental Guidelines for Contractor Employees EXHIBIT S-1
Security, Safety, and Environmental Guidelines for Contractor Employees EXHIBIT S-1 Security, Safety, and Environmental Policy Vision Beliefs Zero Injuries / Illnesses Nothing we do is worth someone being
More informationHAZARD IDENTIFICATION AND ASSESSMENT
SOP-28 Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 11 Purpose To provide guidelines for identifying, assessing and controlling workplace hazards; To ensure the potential
More informationWorkplace Safety and Loss Prevention Incentive Program (Safety, Drug and Alcohol Prevention, and Return to Work Incentive Programs)
Part 60 Workplace Safety and Loss Prevention Incentive Program (Safety, Drug and Alcohol Prevention, and Return to Work Incentive Programs) Part 60 Workplace Safety and Loss Prevention Incentive Program
More informationSUPPLY OF PEST CONTROL SERVICES
. SUPPLY OF PEST CONTROL SERVICES TENDER DETAILS: DURATION: Tenders should be prepared on the basis of a twelve (12) month arrangement commencing 1 st July 2018. CLOSING DATE: Monday 28th May 2018. TENDER
More informationSupplier Code of Conduct
Supplier Code of Conduct VERIZON SUPPLIER CODE OF CONDUCT The Verizon Supplier Code of Conduct ( Supplier Code ) sets forth principles that Verizon has adopted to promote ethical conduct in the workplace,
More informationInstructions for Investigation Report
1. COMPANY 2. DEPARTMENT 3. LOCATION OF INCIDENT 4. DATE OF INCIDENT 5. TIME A AM PM 6. DATE OF REPORT INJURY OR ILLNESS PROPERTY DAMAGE OTHER INCIDENTS IDENTIFYING INFORMATION 7. INJURED S NAME 13. PROPERTY
More informationDenver Public Schools. Bond Construction. Construction Safety Standards West Seventh Avenue Denver, CO 80204
Denver Public Schools Bond Construction Construction Safety Standards 2800 West Seventh Avenue Denver, CO 80204 Copyright Notice 2009 Information contained within these Construction Safety Standards is
More informationEvolution and Ecology
Evolution and Ecology Reviewed and Revised December 2015 UC DAVIS Evolution and Ecology INJURY AND ILLNESS PREVENTION PROGRAM This Injury and Illness Prevention Program has been prepared by the University
More informationJob Safety Analysis Preparation And Risk Assessment
Job Safety Analysis Preparation And Risk Assessment Sample Only Reference CPL_PCR_JSA_Risk_Assessment Revision Number SAMPLE ONLY Document Owner Sample Date 2015 File Location Procedure Revision Date Major
More informationA Safety, Environmental and Labour rights Guide for Suppliers to British Airways
A Safety, Environmental and Labour rights Guide for Suppliers to British Airways Introduction The relationship between British Airways and its Suppliers is crucial in achieving our Mission of providing
More informationUC DAVIS. Plant Biology INJURY AND ILLNESS PREVENTION PROGRAM
Plant Biology UC DAVIS Plant Biology INJURY AND ILLNESS PREVENTION PROGRAM This Injury and Illness Prevention Program has been prepared by the University of California, Plant Biology department in accordance
More informationSingle Contractor Agreement for Occupational Health & Safety Workers Compensation Act
Single Contractor Agreement for Occupational Health & Safety Workers Compensation Act Instructions This is a fillable form. However, you must first save the form before entering information or the data
More informationSample Risk Evaluation Report Card
Gym / Address: Date: Contact Name / E-mail / Phone: Names of Those Completing the Risk Assessment: Risk Management Framework Risk Management Policy To reduce or eliminate costs associated with risks of
More informationCN Course Exercise. c. Ensure all employees have received the required training for their work.
CN Course Exercise First Name Last Name If you facilitated this course and persons other than you went through this course, please fill out their names below. Each student must be individually regis tered
More informationCONTRACTOR SAFETY AGREEMENT
CONTRACTOR SAFETY AGREEMENT All contractors and self-employed persons working on Pembina Trails School Division property must comply with the Safety and Health Act and Regulations of Manitoba in the performance
More informationAGREEMENT ON OCCUPATIONAL HEALTH AND SAFETY IN TERMS OF SECTION 37(2) OF THE OCCUPATIONAL HEALTH AND SAFETY ACT 85 OF 1993 (AS AMENDED) between
AGREEMENT ON OCCUPATIONAL HEALTH AND SAFETY IN TERMS OF SECTION 37(2) OF THE OCCUPATIONAL HEALTH AND SAFETY ACT 85 OF 1993 (AS AMENDED) between TELKOM SA SOC LIMITED (Registration number: 1991/005476/07)
More informationAccident Prevention Plans (APP) Appendix A EM (15 SEPTEMBER 2008 edition)
Accident Prevention Plans (APP) Appendix A EM 385-1-1 (15 SEPTEMBER 2008 edition) FEAD/ROICC/FSC/OICC offices with the new safety requirements of EM 385 dated 15 SEPTEMBER 2008 assist our Contractors in
More informationHow to complete a Risk Assessment (RA)
How to complete a Risk Assessment (RA) All Exhibitors/Contractors are reminded of their duty in law to undertake written RAs on behalf of their employees and to develop safe working practices arising from
More informationSample Safety Program for Mississippi Employers
Master A MEMBER OF GREAT AMERICAN INSURA NCE GRO U P Sample Safety Program for Mississippi Employers About This Sample Safety Program As prescribed by Mississippi state workers compensation laws, insurance
More informationHealth and Safety. Version 5. Category: Corporate. Latest Review Date: December Review Frequency: Annual. Owner: Company Secretary
Health and Safety Version 5 Category: Corporate Latest Review Date: December 2016 Review Frequency: Annual Owner: Company Secretary Contributors: H&S Facilitator, Facilities Manager, Customer Service Manager,
More informationPUBLIC COMPANY ORLEN LIETUVA OCCUPATIONAL HEALTH AND SAFETY PROCEDURE FOR CONTRACTORS BDS-40 I. GENERAL. Purpose and Scope of Application
PUBLIC COMPANY ORLEN LIETUVA APPROVED BY Director of Quality, Labour Safety and Environmental Control 12 October 2017 Order No TV1(1.2-1)-348 OCCUPATIONAL HEALTH AND SAFETY PROCEDURE FOR CONTRACTORS BDS-40
More informationProperty Inspection Guidelines
Property Inspection Guidelines www.tridentinsurance.net Lines of Business: Property, General Liability, Worker s Compensation, Public Official Liability Risk Control Strategy/Key Issues: Provide a tool
More information1. MANAGEMENT OF HEALTH, SAFETY, SECURITY AND ENVIRONMENT
1. MANAGEMENT OF HEALTH, SAFETY, SECURITY AND ENVIRONMENT 1.1 General principles of HSSE 1.1.1 At the core of the Company s business philosophy, no operational priorities are more important than the protection
More informationOSHA 1926 Subpart A General
OSHA 1926 Subpart A General 1926.2 Variances (a) Variances from the standards may be granted (b) To obtain a variance, a specific request must be made to OSHA 1926.3 Inspections Right of Entry (a) Authorized
More informationPolicy for Occupational Health, Safety and Environment Requirements for Contracted Construction and Maintenance Work
Policy for Occupational Health, Safety and Environment Requirements for Contracted Construction and Maintenance Work Policy Statement Rationale Construction and Maintenance work undertaken by contracted
More informationMemorandum of Understanding Victorian WorkCover Authority and Energy Safe Victoria
Memorandum of Understanding Victorian WorkCover Authority and Energy Safe Victoria PARTIES Victorian WorkCover Authority ABN 90 296 467 627 ( WorkSafe Victoria ) the statutory authority responsible for
More informationTitle: Environmental, Health and Safety Revision No.: 4 Effective Date: January 1, 2017
Notice: A printed copy of this document may not be the latest version. Always check online (L3 Internal Homepage, click Company Policies ) for latest version. Copyright by L3 Technologies, Inc. 2017 Corporate
More informationRisk assessment Policy and Procedures
Risk assessment Policy and Procedures 1. Introduction The purpose of risk assessment is to identify hazards and evaluate any associated risks to health and safety arising from Youth Works activities, enabling
More informationPREQUALIFICATION QUESTIONNAIRE
PREUALIFICATION UESTIONNAIRE 1.0 COMPANY DETAILS 1.1 Please complete the company details below: Company: Post Code: Tel: E-mail Contact: Title: CRN: Fax: Website: 1.2 Does this Company have a Parent Company
More informationSCHEDULE 16 SAFETY REQUIREMENTS
SCHEDULE 16 SAFETY REQUIREMENTS 1. GENERAL 1.1 Capitalized Terms Capitalized terms used in this Schedule have the definitions as set out in the Agreement to Design, Build, Finance and Operate Evan-Thomas
More informationContract appendix: Health and Safety (HAS)
Based on the fundamental principle of perpetuating a preventive mindset and effective control of operational risks, this contract appendix establishes the legal and managerial principles for maintaining
More informationCooperation with the University s representatives, addressing specific safety issues at the Project.
01 35 23 OCIP PROJECT SAFETY REQUIREMENTS GENERAL The work specified in this section consists of the following: Preliminary Work that shall be completed prior to commencing construction Compliance with
More informationAttachment no. 9 to PS-12
Number of pages number 5 1 GENERAL PRINCIPLES OF CONDUCTING AND ORGANIZING WORK ON THE PREMISES OF - KWIDZYN CONTRACTOR IS OBLIGED TO CONFIRM ORDER ACCEPTANCE IN WRITING. Order acceptance means unequivocal
More informationTable of contents. SaskPower Orientation Sign-off Form Contractor HSE Orientation Checklist... 37
Contractor Handbook Table of contents Introduction... 2 Health, Safety and Environment (HSE) Policy... 3 Responsibilities... 5 Qualifications and competency... 7 Hazard/Aspect and risk assessment... 8
More informationContractor Safety Management Element November 2018
Contractor Safety Management Element November 2018 Table of Contents 1.0 Purpose... 1 2.0 Scope... 1 3.0 Definitions... 1 4.0 Roles and Responsibilities... 2 4.1 Project Management Team... 2 4.2 Contractors...
More informationLabor Law Regulation Part 60 Pursuant to Section 134 of the Workers. Compensation Law as amended by Chapter 6 of the Laws of 2007
DRAFT as of 08/25/08 Labor Law Regulation Part 60 Pursuant to Section 134 of the Workers Compensation Law as amended by Chapter 6 of the Laws of 2007 PART 60 WORKPLACE SAFETY AND LOSS PREVENTION INCENTIVE
More informationPAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S220 Hazard Communication Program REV /13/2012
PAGE 1 OF 7 Hazard Communication Program Right to Know PURPOSE: It is the intention of BMT and all of its subsidiary companies to conduct its operations in such a manner that not only complies with health,
More informationCONSTRUCTION SUBCONTRACT. (Subcontract No.) EXHIBIT "F" ENVIRONMENT, SAFETY AND HEALTH PROVISIONS. (Date)
CONSTRUCTION SUBCONTRACT (Subcontract No.) EXHIBIT "F" ENVIRONMENT, SAFETY AND HEALTH PROVISIONS (Date) Revised: 8/9/13 SAVANNAH RIVER REMEDIATION LLC EXHIBIT "F" ENVIRONMENT, SAFETY AND HEALTH PROVISIONS
More informationlinked to the Australian National University s Work health and safety policy and is one of the procedures within the WHS Management System.
Purpose This procedure describes how the Australian National University evaluates and monitors contractors work health and safety for all activities performed at the University. This procedure ensures
More informationHSE MANUAL. PO Box 14659, Zayed bin Sultan Street, Al Ain, U.A.E.., Tel: , Fax
HSE MANUAL PO Box 14659, Zayed bin Sultan Street, Al Ain, U.A.E.., Tel: 03-7640177, Fax 03-7640188 HSE 1 Health and Safety Policy Statement 1.0 The policy is to ensure, as far as is reasonably practicable,
More informationThe University of North Texas at Dallas Policy Manual Chapter
The University of North Texas at Dallas Policy Manual Chapter 12.000 12.004 Risk Management Campus Safety & Security Policy Statement. The University is committed to protecting and conserving university
More information1042 FORUM DRIVE BROUSSARD, LA PHONE: (337) FAX: (337) Products & Services JANUARY 2015
1042 FORUM DRIVE BROUSSARD, LA 70518 PHONE: (337) 231-1323 FAX: (337) 231-1327 Products & Services JANUARY 2015 TABLE OF CONTENTS Description PAGE Industrial Training Classes 3 Industrial Training Classes
More informationKERANG DISTRICT HEALTH CONTRACTORS HANDBOOK
KERANG DISTRICT HEALTH CONTRACTORS HANDBOOK SEPTEMBER 2014 Document History Details Date Notes Document Prepared May 1995 Revised May 2000 Review Revised February 2004 Review Revised November 2004 Review
More informationContractor Policy and Procedures. Contractor. Policy and Procedures. Working Together. November Borders College 4/12/ Working Together
Contractor Working Together Policy and Procedures November 2017 Borders College 4/12/2017 1 Working Together History of Changes Version Description of Change Authored by Date 1.1 This document combines
More informationAppendix I: Safety Orientation Checklist GENERAL Department Safety Program, Crop and Soil Sciences, Washington State University
Appendix I: Safety Orientation Checklist GENERAL Department Safety Program, Crop and Soil Sciences, Washington State University Employee: Supervisor: NOTE: Ensure that employees/students who use English
More informationAPPLICATION FOR ALTERATIONS OR ADDITIONS
APPLICATION FOR ALTERATIONS OR ADDITIONS TO: ASSOCIATION OF APARTMENT OWNERS OF MANA KAI-MAUI RE: MANA KAI-MAUI APARTMENT # APPLICATION DATE: As the Owner of the referenced apartment (apartment) I am submitting
More informationElectric Transmission Texas, LLC Supplemental Safety Terms and Conditions
Electric Transmission Texas, LLC Supplemental Safety Terms and Conditions These Supplemental Safety Terms and Conditions are intended to supplement and not replace the safety provisions in the general
More informationWorking with third parties
Working with third parties 1 Safety arrangements 1.1 Obligations of third-party employees Third-party employees carrying out works at AIM Recycling nv always have to take care of their own safety as well
More informationDEMOLITION 535 Fraser Street
DEMOLITION 535 Fraser Street Request for Quotations 201602 Quotations are invited for the demolition and removal of a house and site remediation located at 535 Fraser Street, Esquimalt. The Township of
More informationPLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.
PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this Act, current to January 1, 2009. It is intended for information and reference purposes only. This
More informationSafety Manual > Operational Safety and Loss Prevention Plan
Safety Manual > Operational Safety and Loss Prevention Plan Louisiana State University Baton Rouge Operational Safety & Loss Prevention Plan This serves as the master document addressing the sixteen point
More informationProcurement ANNEX A Page 1 of 19. Annex A: PROVISIONS REGARDING LABOUR REGULATIONS AND THE PREVENTION OF OCCUPATIONAL HAZARDS
Procurement ANNEX A Page 1 of 19 Procurement Annex A: PROVISIONS REGARDING LABOUR REGULATIONS AND THE PREVENTION OF OCCUPATIONAL HAZARDS Common provisions regarding labour regulations Occupational health
More informationMotor Trade Submission Form
Motor Trade Submission Form Broker Details Broker: Telephone No: Contact Name: Email Address: Client Details Insured(s) full trading name (include names of all subsidiary companies to be insured): Postal
More information