FP7 Simplification Workshop

Size: px
Start display at page:

Download "FP7 Simplification Workshop"

Transcription

1 FP7 Simplification Workshop WG 1 Community financial contribution Report

2 General Remarks Generally, WG participants supported the extended use of lump-sum and flat-rate financing as a major mode to simplify the implementation of EC funded research actions Participants also support continuity as way to avoid new complexity: no change for the sake of change! WG Participants also considered that the use of three forms a grant may take lump sums flat-rate financing taking the form of a scale of unit costs reimbursement of eligible costs (including flat-rates and pre-set lumps) should be analysed according to the characteristics and objectives of the different funding schemes ( a Marie Curie action is not identical to a collaborative research project ) However, as far as the form (and its detailed implementation) a grant may take is concerned, sensitive divergent views exist among participants.

3 1- Forms of EC Grant (1) Each form has its own advantages and disadvantages (1/2) : Lump-sum and scale of unit costs: advantages: avoid justification of costs easy to calculate and pay simplify reports disadvantages: may provide (substantially) less support than a reimbursement of eligible costs for the same level of efforts; may be contrary (especially scale of unit costs) to attraction of best researchers in university/industry by attractive wages.

4 1- Forms of EC Grant (2) Each form has its own advantages and disadvantages (2/2) : Reimbursement of eligible costs: advantages: guarantee that all eligible costs will be taken into consideration for the calculation and the payment of the support ( more in line with the reality of the activity ); can be based on existing practices, in particular participants usual accounting and management practices. disadvantages: requires justification of eligible costs; may lead to micro-management if usual accounting and management principles of contractors are (each time) questioned; may provide less financial security (reimbursement of actual costs) by opposition to a lump sum where the EC contribution is fixed.

5 1- Forms of EC Grant (3) Participants saw potential for a significant reduction of time-to-contract, especially in negotiation phase, for all three forms of grants: For Lump-sum and scale of unit costs: no negotiation on the costs of the resources expected to be involved ; For Reimbursement of eligible costs: the same result may be achieved if: definition of eligible costs is simplified; the cost of the resource is not questioned as being in conformity with participant usual accounting and management practices; possibility to use flat-rates and/or pre-set lump-sums for certain items is allowed.

6 1- Forms of EC Grant (4) Some WG participants considered that the use of scale of unit costs (flat-rate financing) must be implemented for funding schemes where SMEs are involved. But other WG participants prefer the use of reimbursement of eligible costs, also for funding schemes where SMEs are involved. The same opposition also applied for universities. Some WG participants considered that a form of simplification should be to propose an alternative to the consortium: either a scale of unit costs or a reimbursement of eligible costs It must be highlighted that no WG participant evoked the possibility of an alternative between lump sum and scale of unit costs or between lump sum and reimbursement of eligible costs (reason: scale of unit cost appears as a proxy of costs of resources)

7 1- Forms of EC Grant (5) Some WG participants highlighted the fact that proposing an alternative (scale of unit costs or reimbursement of eligible costs) at the level of the consortium has however the disadvantage to require an agreement among the members of a consortium. Other WG participants mentioned that proposing the alternative at the level of each participant may also lead to another complexity which is the use of two different form of funding inside the same consortium. All participants agreed that in any case, the reporting must be adapted to each form of grant.

8 2- Lump- sums As far as lump sum financing is concerned, no suggestion on how to calculate the EC contribution for Networks of Excellence has been proposed by WG participants. However, it has been mentioned by some WG participants that at least cost of the wages of staff involved in the NoE must be covered by the lump sum and that as a consequence, the staff dimension must be part of the calculation method.

9 3- Scale of unit costs As far as items to be used in order to design a scale of unit costs are concerned, the following items have been proposed: categories of personnel involved coefficient per country to be applied on categories of personnel a flat rate in order to cover other items like indirect costs, equipment, travel,... Some WG participants also mentioned the necessity to take into account: the field of research concerned and moreover the case of multidisciplinary project Some WG participants highlighted the difficulty to establish the value of these items, mentioning, as an example, huge disparities existing in the same country between the same kind of personnel even working in the same field of research.

10 4- Reimbursement of eligible costs (1) A large consensus among WG participants on: the possibility for any participant to charge its actual direct and indirect eligible costs, according to its usual accounting and management practices the possibility for any participant to opt for a flat rate deemed to cover its indirect eligible costs However, the question of the amount of the flat rate: 20%? Is it sufficient?

11 4- Reimbursement of eligible costs (2) Some WG participants also proposed to: allow the possibility for participants to use for certain type of costs, especially for personnel costs, their own usual scale of unit costs (confere: scale of wages of universities). use pre-set flat rates or lump sums for certain type of costs such as travel costs.

12 4- Reimbursement of eligible costs (3) European Court of Auditors representatives proposed an approach based on the definition of 3 categories of eligible costs: Personnel costs Main other direct costs: to be negotiated project by project (equipment, ) A flat-rate deemed to cover other costs like indirect costs and some small costs like travel and subsistence, Some WG participants supported this approach, other were in disagreement considering that any eligible costs must be able to be reported.

13 4- Reimbursement of eligible costs (4) As far as level of support rates are concerned (1/2): Some WG participants mentioned that universities without economic activities (=> no other source of revenue) have to receive a contribution allowing them to cover 100% of their specific direct costs (especially the costs of staff specifically hired for the project). It was also mentioned that it is important that such level of support is achieved, concerns were raise in this respect with a view to envisaged abolition of the traditional additional cost model. Several participants underlined the importance to maintain of the principle of cofinancing and to avoid double funding. In this context, the definition of cofinancing and receipts must be adressed. It has also to be taken into account that some EU universities have now the obligation to move to a full economic costs accounting system;

14 4- Reimbursement of eligible costs (5) As far as level of support rates are concerned (2/2): Some WG participants have evoked the question of the level of support rate for R&D and demonstration activities, depending on the results of the current revision of the Community State Aid Framework on Research and Development. It has also been proposed to allow the reimbursement of eligible costs incurred during the negotiation of the project and for the design and the modification of the content of the consortium agreement (especially for small actors, like SMEs)

15 4- Reimbursement of eligible costs (6) As far as audit certificates are concerned (1/2): All WG participants agreed that the number of audit certificates per contractor and per project must be reduced (1 or 2 maximum); Some WG participants evoked the possibility to exonerate some contractors to provide an audit certificate if the share of the EC contribution they generate is under a certain ceiling to be established. In this context, some WG participants have proposed: either to remove the 7% ceiling for management activities or to consider the costs of audit certificates as not being part of the 7% ceiling.

16 4- Reimbursement of eligible costs (7) As far as audit certificates are concerned (2/2): It has also been evoked the fact that by removing the term necessary costs and replacing it by costs determined and used according to participants usual accounting and management practices, in implementing the principles of economy, efficiency and effectiveness, audit certificates will certify that costs declared by the contractor are fully in conformity with the definition of eligible costs (which is not the case under FP6: necessity is not certified and must be justified by contractor and assessed by Commission officials).

17 5- Other issues All WG participants request a uniform interpretation of financial and legal rules in any Commission services They also request for stabilised and clear rules before the launch of FP7 More specific questions have also been addressed: VAT: is it possible to make it eligible costs for legal entity which are not allowed to get it back? Delays for reporting: is it possible to extend the delay for periodic reports from 45 to 60 calendar days? Co-financing: How to ensure co-financing where a funding scheme propose a support up to 100% of eligible costs? Financial liability: which form?

18 Nota Bene It must be noted that any position provided by the WG participants are not necessarily their final position but only personal positions or positions resulting from the WG brainstorming.

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 10.12.2013 C(2013) 8197 final COMMISSION DECISION of 10.12.2013 authorising the use of reimbursement on the basis of unit costs for the personnel costs of the owners of small

More information

Guide to Financial Issues relating to Indirect Actions of the Sixth Framework Programmes

Guide to Financial Issues relating to Indirect Actions of the Sixth Framework Programmes Guide to Financial Issues relating to Indirect Actions of the Sixth Framework Programmes VERSION APRIL 2004 EXECUTIVE SUMMARY 1 - First Principles The Financial Regulation (FR) of the Communities 1, and

More information

Financial Rules in FP7 Projects

Financial Rules in FP7 Projects FP7 Financial Management and Audits Financial Rules in FP7 Projects Mr. Gabor Kitley Managing Director Europa Media PSC 13 November 29, Budapest Content Basic Facts Forms of financing Eligibility rules

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 25.11.2016 C(2016) 7553 final COMMISSION DECISION of 25.11.2016 modifying the Commission decision of 7.3.2014 authorising the reimbursement on the basis of unit costs for

More information

Belarus, 28 February 2008

Belarus, 28 February 2008 National Documentation Center (EKT/NHRF) FP7 Rules of Participation Funding schemes Financial issues Evaluation Criteria Implementation Submission Maria Samara, Administrative project officer Maria Koutrokoi,,

More information

Administrative and financial aspects: recommendations for the preparation of proposals

Administrative and financial aspects: recommendations for the preparation of proposals Environment (including climate change) Theme 2012 Calls 17 June 2011 Administrative and financial aspects: recommendations for the preparation of proposals Vincent Favrel Deputy Head of Unit Unit I.6 Administration

More information

July Opt for indirect costs closer to reality :

July Opt for indirect costs closer to reality : CPU [French University Rectors Conference] summary following the questionnaire from the MESR [Ministry of Higher Education and Research] to gauge the impact of the financing rules proposed for Horizon

More information

Financial errors in FP7 How to improve the quality of financial statements?

Financial errors in FP7 How to improve the quality of financial statements? Financial errors in FP7 How to improve the quality of financial statements? Oslo, 26 April 2013 Doroteya PETROVA ERC Executive Agency Marcin BARAN European Commission Introduction This presentation is

More information

Guide to Financial Issues relating to FP7 Indirect Actions

Guide to Financial Issues relating to FP7 Indirect Actions Guide to Financial Issues relating to FP7 Indirect Actions Version 18/03/2013 Disclaimer This guide is aimed at assisting beneficiaries. It is provided for information purposes only and its contents are

More information

Audit certificates. Training Seminar Brussels 28 November 2006

Audit certificates. Training Seminar Brussels 28 November 2006 Audit certificates Training Seminar Brussels 28 November 2006 Overview Introduction Audit certificate requirements What When By whom Audit certificate template Audit certificate guidance notes for contractors

More information

MARIE CURIE INITIAL TRAINING NETWORK

MARIE CURIE INITIAL TRAINING NETWORK ANNEX III SPECIFIC PROVISIONS MARIE CURIE INITIAL TRAINING NETWORK [MULTI BENEFICIARY] III. 1 Definitions In addition to the definitions in Article II.1, the following definitions apply to this grant agreement:

More information

Practicalities in the Financial Management of FP7 projects - An outlook to audits and Horizon 2020 rules

Practicalities in the Financial Management of FP7 projects - An outlook to audits and Horizon 2020 rules Practicalities in the Financial Management of FP7 projects - An outlook to audits and Horizon 2020 rules Gabor Kitley Chief Executive Officer Europa Media Is the FP7 Financial Audit really a nightmare?

More information

Call title: FP7-SCIENCE-IN-SOCIETY

Call title: FP7-SCIENCE-IN-SOCIETY Call title: FP7-SCIENCE-IN-SOCIETY-2010-1 Call identifier: FP7-SCIENCE-IN-SOCIETY-2010-1 Date of publication: Thursday 30 July 2009 Deadline 1 : Thursday 21 January 2010 at 17.00.00, Brussels local time.

More information

The EU Framework Programme For Research and Innovation ( )

The EU Framework Programme For Research and Innovation ( ) The EU Framework Programme For Research and Innovation (2014-2020) ITRE Committee, 23 January 2012 Robert-Jan Smits Director-General, DG Research & Innovation European Commission Outline of the presentation

More information

Short-term measures under FP7 (the so-called quick gains) (COM Decision C/2011/174)

Short-term measures under FP7 (the so-called quick gains) (COM Decision C/2011/174) Simplifying the implementation of FP7 COM Decision C/2011/174 European Commission- DG INFSO Unit S4 - Legal aspects Short-term measures under FP7 (the so-called quick gains) (COM Decision C/2011/174) Revision

More information

FINAL. FP7 AUDIT MANUAL (Restricted Use)

FINAL. FP7 AUDIT MANUAL (Restricted Use) FINAL FP7 AUDIT MANUAL (Restricted Use) PREPARED BY THE AUDIT MANUAL WORKING GROUP: DG RESEARCH AND INNOVATION (RTD) DG CONNECT (CNECT) DG MOBILITY AND TRANSPORT (MOVE) DG ENERGY (ENER) DG ENTERPRISE AND

More information

FP6 Contract and Financial Reporting. The Basics for EC Consortia. Linda Polik Research Services

FP6 Contract and Financial Reporting. The Basics for EC Consortia. Linda Polik Research Services FP6 Contract and Financial Reporting The Basics for EC Consortia Linda Polik Research Services linda.polik@admin.ox.ac.uk Overview of Presentation 1) Contractual Issues 2) Financial Issues 3) Reporting

More information

Guide to Financial Issues relating to ICT PSP Grant Agreements

Guide to Financial Issues relating to ICT PSP Grant Agreements DG COMMUNICATIONS NETWORKS, CONTENT AND TECHNOLOGY ICT Policy Support Programme Competitiveness and Innovation Framework Programme Guide to Financial Issues relating to ICT PSP Grant Agreements Version

More information

Rules on eligibility of expenditure

Rules on eligibility of expenditure Rules on eligibility of expenditure 2014-2020 Financial management of IPA Programme 18-19 October 2016 Belgrade, Serbia @InteractEU Mattias Assmundson, Interact Programme Dimensions of eligibility discussed

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 10.12.2013 C(2013) 8196 final COMMISSION DECISION of 10.12.2013 authorising the use of reimbursement on the basis of unit costs for energy efficiency measures in buildings

More information

CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS

CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS MATERIALS PREPARED BY THE WORKING GROUP ON CERTIFICATE ON THE METHODOLOGY UNDER FP7: DG RESEARCH AND INNOVATION DG

More information

Project costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs.

Project costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs. Financial issues Extract from the guide for BONUS applicants 1 8. How to prepare project budget? Only the real costs required for the implementation should be indicated in the planned budget for the project.

More information

WORKING DOCUMENT. EN United in diversity EN

WORKING DOCUMENT. EN United in diversity EN EUROPEAN PARLIAMT 2009-2014 Committee on Budgetary Control 30.9.2013 WORKING DOCUMT on European Court of Auditors' Special Report 2/2013: 'Has the Commission ensured efficient implementation of the Seventh

More information

Research Infrastructures and Horizon 2020

Research Infrastructures and Horizon 2020 Mariano Menna DG Research & DERri Final Meeting, Milano, Italy, 10 th -11 th October 2013 Research Infrastructures and Horizon 2020 The EU Framework Programme for Research and 2014-2020 Research and Europe

More information

FCH 2 JU Grant Agreement.

FCH 2 JU Grant Agreement. FCH 2 JU Grant Agreement Nicolas.brahy@fch.europa.eu Why should I care about the GA at this stage? Time to Grant reduced 5 months for evaluation 3 months for signature no time for real negotiation! no

More information

Administrative, Financial and Operational Aspects of Project Management

Administrative, Financial and Operational Aspects of Project Management Administrative, Financial and Operational Aspects of Project Management European Commission Directorate General Environmental Technologies Unit Presentation 1. General overview of Grant Agreement 2. Duties

More information

Call title: FP7-SSH Collaborative projects (large scale integrating research projects)

Call title: FP7-SSH Collaborative projects (large scale integrating research projects) Call fiche: SSH-2011-1- s research projects) Call title: FP7-SSH-2011- s research projects) Call identifier: FP7-SSH-2011-1 Date of publication: 20 July 2010: Deadline 1 : 2 February 2011 at 17.00.00 Brussels

More information

Guide for Applicants

Guide for Applicants The Romanian-EEA Research Programme 2012-2017 RO14 - Programme Area: Research within priority Sectors Monica Cruceru Program Coordinator UEFISCDI I. Definitions II. Eligibility of applicants and project

More information

Horizon The EU Framework Programme for Luigi Scarpa de Masellis. Delegation of the EU to Canada. Research and Innovation

Horizon The EU Framework Programme for Luigi Scarpa de Masellis. Delegation of the EU to Canada. Research and Innovation Horizon 2020 The EU Framework Programme for Research and Luigi Scarpa de Masellis Delegation of the EU to Canada 2014-2020 Research and The Multiannual Financial Framework 2014-2020: Commission s proposals

More information

CERTIFICATES ISSUED BY EXTERNAL AUDITORS FREQUENTLY ASKED QUESTIONS

CERTIFICATES ISSUED BY EXTERNAL AUDITORS FREQUENTLY ASKED QUESTIONS CERTIFICATES ISSUED BY EXTERNAL AUDITORS FREQUENTLY ASKED QUESTIONS VERSION MAY 2011 Disclaimer This document is aimed at assisting beneficiaries and auditors. It is provided for information purposes only

More information

Appendix 4 Model for Audit certificates

Appendix 4 Model for Audit certificates Appendix 4 Model for Audit certificates Proposed model for an audit certificate Proposed model for an audit certificate provided by an external auditor Option 1: one contractor / no third party(ies) =>

More information

European Union Regional Policy Employment, Social Affairs and Inclusion. EU Cohesion Policy Proposals from the European Commission

European Union Regional Policy Employment, Social Affairs and Inclusion. EU Cohesion Policy Proposals from the European Commission EU Cohesion Policy 2014-2020 Proposals from the European Commission 1 Legislative package The General Regulation Common provisions for cohesion policy, the rural development policy and the maritime and

More information

POLICY AREA: RESEARCH AND INNOVATION

POLICY AREA: RESEARCH AND INNOVATION 11. Research and Innovation TYPE OF ACTION / MEASURE Reducing number of Programmes Single sector framework POLICY AREA: RESEARCH AND INNOVATION SECTORAL COMMISSION PROPOSALS 14 - All existing Union research

More information

PROVISIONS FOR IMPLEMENTING SPECIFIC SUPPORT ACTIONS

PROVISIONS FOR IMPLEMENTING SPECIFIC SUPPORT ACTIONS PROVISIONS FOR IMPLEMENTIN SPECIFIC SUPPORT ACTIONS Background document This is a practical guide on the provisions for implementing specific support actions in the Sixth Framework Programme. This document,

More information

Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities

Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities Ann Van Menxel DG CNECT H6 Brussels, 17 December 2013 Legal references Reimbursement

More information

COMMUNICATION FROM THE COMMISSION. on the revision of the method for setting the reference and discount rates

COMMUNICATION FROM THE COMMISSION. on the revision of the method for setting the reference and discount rates COMMUNICATION FROM THE COMMISSION on the revision of the method for setting the reference and discount rates (This communication replaces the previous notices on the method for setting the reference and

More information

Horizon The EU Framework Programme for Johannes Klumpers DG RTD. Research and Innovation. Research and Innovation

Horizon The EU Framework Programme for Johannes Klumpers DG RTD. Research and Innovation. Research and Innovation Horizon 2020 The EU Framework Programme for Research and Johannes Klumpers DG RTD 2014-2020 Research and What is Horizon 2020 Commission proposal for a 80 billion euro research and innovation funding programme

More information

Question 1: Are you sufficiently informed about upcoming calls for proposals in a timely manner? What improvements would you suggest?

Question 1: Are you sufficiently informed about upcoming calls for proposals in a timely manner? What improvements would you suggest? The European League of Institutes of the Arts ELIA has experience with operational and project grants within the Culture Programme and the Lifelong Learning Programme, administered by the Executive Agency

More information

ARTICLE EUROPEAN COMMISION PROPOSAL AMENDMENT RATIONALE

ARTICLE EUROPEAN COMMISION PROPOSAL AMENDMENT RATIONALE REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL establishing Horizon Europe the Framework Programme for Research and Innovation, laying down its rules for participation and dissemination ARTICLE

More information

Towards Horizon 2020

Towards Horizon 2020 Towards Horizon 2020 Wolfgang Burtscher, DG Research and EUROTECH Meeting, Stuttgart, 30 April 2012 Research and The Multiannual Financial Framework 2014-2020: Commission s proposals 29 June 2011 Key challenge:

More information

H. REFERENCE/DISCOUNT RATES AND RECOVERY INTEREST RATES

H. REFERENCE/DISCOUNT RATES AND RECOVERY INTEREST RATES H. REFERENCE/DISCOUNT RATES AND RECOVERY INTEREST RATES C 14/6 EN 19.1.2008 II (Information) INFORMATION FROM EUROPEAN UNION INSTITUTIONS AND BODIES COMMISSION Communication from the Commission on the

More information

Katerina Tzitzinou, FP7 Legal & Financial NCP A practical guide for understanding EC funding and rules of participation

Katerina Tzitzinou, FP7 Legal & Financial NCP A practical guide for understanding EC funding and rules of participation Katerina Tzitzinou, FP7 Legal & Financial NCP katerina@help-forward.gr A practical guide for understanding EC funding and rules of participation 1st training, Sochi, 20-21 January 2010 Presentation Content

More information

Marina ZANCHI DG Research Directorate N International scientific cooperation

Marina ZANCHI DG Research Directorate N International scientific cooperation Marina ZANCHI DG Research Directorate N International scientific cooperation E-mail: marina.zanchi@cec.eu.int 1 Kick-off meeting Sofia 27 May 2005 Contract Reporting and Deliverables Financial Statements

More information

HORIZON The New EU Framework Programme for Research and Innovation Piero Venturi European Commission DG Research and Innovation

HORIZON The New EU Framework Programme for Research and Innovation Piero Venturi European Commission DG Research and Innovation HORIZON 2020 The New EU Framework Programme for Research and Innovation 2014-2020 Piero Venturi European Commission DG Research and Innovation The Multiannual Financial Framework 2014-2020: European Council

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 26.1.2017 C(2017) 308 final COMMISSION DECISION of 26.1.2017 authorising the use of reimbursement of indirect costs on the basis of a maximum flatrate of 25% for the actions

More information

Financial rules in FP7

Financial rules in FP7 Financial rules in FP7 Some basics - normal accounting and management principles - no special solutions for FP7 - necessary, economic - within contract period Direct costs = actual costs (accounting) (*)

More information

An overview of the eligibility rules in the programming period

An overview of the eligibility rules in the programming period Rules and conditions applicable to actions co-financed from Structural Funds and Cohesion Fund An overview of the eligibility rules in the programming period 2007-2013 FEBRUARY 2009 1 Table of contents

More information

European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer

European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer Alexandros IATROU Deputy Head of Administration and Finance Unit, Directorate for Energy DG Research and Innovation JOPRAD

More information

Full Costing. EUIMA Project Final Event Horizon 2020 and the modernisation of European universities Dialogue with European policy makers

Full Costing. EUIMA Project Final Event Horizon 2020 and the modernisation of European universities Dialogue with European policy makers Thomas A. H. Schöck Chancellor Friedrich-Alexander-Universität Erlangen-Nürnberg Full Costing EUIMA Project Final Event Horizon 2020 and the modernisation of European universities Dialogue with European

More information

AUDIT CERTIFICATE WORKING NOTES 6 TH FRAMEWORK PROGRAMME

AUDIT CERTIFICATE WORKING NOTES 6 TH FRAMEWORK PROGRAMME AUDIT CERTIFICATE WORKING NOTES 6 TH FRAMEWORK PROGRAMME WORKING NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP VERSION 1 APPROVED

More information

Brussels, 11 May FP7 Audit. DG RTD Unit M2

Brussels, 11 May FP7 Audit. DG RTD Unit M2 Brussels, 11 May 2011 FP7 Audit DG RTD Unit M2 1 Contents 1. Purpose of the audits 2. When, by whom and how selected 3. Phases of the audit 4. Common Mistakes 5. Systemic errors 6. Questions 2 Purpose

More information

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME WORKING NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP/ COORDINATION GROUP

More information

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE COUNCIL EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 10.12.2009 COM(2009) 682 final REPORT FROM THE COMMISSION TO THE COUNCIL on the follow-up to 2007 Discharge Decisions (Summary) - Council Recommendations

More information

ECHO.C - Resources, Partnerships and Operational Support

ECHO.C - Resources, Partnerships and Operational Support EUROPEAN COMMISSION DIRECTORATE-GENERAL HUMANITARIAN AID AND CIVIL PROTECTION - ECHO ECHO.C - Resources, Partnerships and Operational Support Brussels, 30 October 2013 C3 REVISION OF THE PARTNERSHIP AGREEMENTS

More information

IMI Financial Guidelines

IMI Financial Guidelines Innovative Medicines Initiative IMI Financial Guidelines VERSION 2 of 20 June 2013 These guidelines aim at assisting all IMI consortia during the negotiation phase and all individual participants during

More information

Revised 1 Guidance Note on Financial Engineering Instruments under Article 44 of Council Regulation (EC) No 1083/2006

Revised 1 Guidance Note on Financial Engineering Instruments under Article 44 of Council Regulation (EC) No 1083/2006 REVISED VERSION 08/02/2012 COCOF_10-0014-05-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY Revised 1 Guidance Note on Financial Engineering Instruments under Article 44 of Council Regulation

More information

From FP7 to Horizon 2020: Opportunities for EU - Russia Scientific Cooperation. Anna Bezlepkina EU Delegation to the RF 21 March 2012

From FP7 to Horizon 2020: Opportunities for EU - Russia Scientific Cooperation. Anna Bezlepkina EU Delegation to the RF 21 March 2012 From FP7 to Horizon 2020: Opportunities for EU - Russia Scientific Cooperation Anna Bezlepkina EU Delegation to the RF 21 March 2012 EU-Russia Cooperation in Science & Technology In FP7 Russia has been

More information

Investing in your future

Investing in your future Investing in your future ESF Certifying Authority, Department of Education and Skills Circular 1/2012 (Replacing ESF Certifying Authority, Department of Enterprise Trade and Employment Circular 1/2008)

More information

Official Journal of the European Union. (Acts whose publication is not obligatory) COMMISSION

Official Journal of the European Union. (Acts whose publication is not obligatory) COMMISSION L 67/18 II (Acts whose publication is not obligatory) COMMISSION COMMISSION DECISION of 3 February 2004 on the implementation of the Preparatory Action on the Enhancement of the European industrial potential

More information

The Marie Curie Actions FP7 Financial Guidelines

The Marie Curie Actions FP7 Financial Guidelines The Marie Curie Actions FP7 Financial Guidelines SPECIFIC PROVISIONS RELATED TO MARIE CURIE ACTIONS FINANCED UNDER THE FP7 "PEOPLE" PROGRAMME Part 3: Projects funded in the PEOPLE Work Programmes calls

More information

Budget. Sapienza Università di Roma 11/12 Giugno 2012

Budget. Sapienza Università di Roma 11/12 Giugno 2012 Budget Chiara Pocaterra Punto di Contatto Nazionale Tema 2 "Prodotti Alimentari, Agricoltura e Pesca e Biotecnologie" 7PQ Tema 5 "Energia" 7PQ Programma Euratom Sapienza Università di Roma 11/12 Giugno

More information

Multi-Beneficiary Model Grant Agreement

Multi-Beneficiary Model Grant Agreement H2020 Programme Multi-Beneficiary Model Grant Agreement Pre-Commercial Procurement (PCP) and Procurement of Innovative Solutions (PPI) (H2020 MGA PCP/PPI Multi) Version 5.0 18 October 2017 Disclaimer This

More information

Official Journal of the European Union L 111/13

Official Journal of the European Union L 111/13 28.4.2007 Official Journal of the European Union L 111/13 COMMISSION REGULATION (EC, EURATOM) No 478/2007 of 23 April 2007 amending Regulation (EC, Euratom) No 2342/2002 laying down detailed rules for

More information

The EU Framework Programme For Research And Innovation ( ) Krastio Preslavsky DG Research & Innovation European Commission

The EU Framework Programme For Research And Innovation ( ) Krastio Preslavsky DG Research & Innovation European Commission The EU Framework Programme For Research And Innovation (2014-2020) Krastio Preslavsky DG Research & Innovation European Commission The Multiannual Financial Framework 2014-2020: Commission s proposals

More information

Effective as of 1 January 2007 Promulgated, SG, No 78 of 28 September 2007

Effective as of 1 January 2007 Promulgated, SG, No 78 of 28 September 2007 DECREE No 231 OF 20 SEPTEMBER 2007 ON ADOPTION OF DETAILED RULES FOR ELIGIBILITY OF EXPENDITURE UNDER OPERATIONAL PROGRAMME ADMINISTRATIVE CAPACITY, CO-FINANCED BY THE EUROPEAN SOCIAL FUND, FOR THE 2007-2013

More information

ITN 2010 Finance and Budget

ITN 2010 Finance and Budget Brussels, February 2011 ITN Coordinators meeting ITN 2010 Finance and Budget Research Executive Agency Marie Curie host-driven actions Financial Management of ITN Projects 1. The EU contribution The cost

More information

Horizon The EU Framework Programme for Katerina PTACKOVA. DG RTD/Directorate Energy/Unit K.4. Research and Innovation

Horizon The EU Framework Programme for Katerina PTACKOVA. DG RTD/Directorate Energy/Unit K.4. Research and Innovation Horizon 2020 The EU Framework Programme for Research and Katerina PTACKOVA DG RTD/Directorate Energy/Unit K.4 2014-2020 Research and What is Horizon 2020 Commission proposal for a 80 billion euro research

More information

MARIE CURIE INTRA-EUROPEAN FELLOWSHIP FOR CAREER DEVELOPMENT

MARIE CURIE INTRA-EUROPEAN FELLOWSHIP FOR CAREER DEVELOPMENT ANNEX III SPECIFIC PROVISIONS MARIE CURIE INTRA-EUROPEAN FELLOWSHIP FOR CAREER DEVELOPMENT III. 1 Definitions In addition to the definitions in Article II.1, the following definitions apply to this grant

More information

FP7 & Horizon Past, Present & Future Research for a Safe, Secure and Nutritious Food Supply. ir. Dieter BRIGITTA

FP7 & Horizon Past, Present & Future Research for a Safe, Secure and Nutritious Food Supply. ir. Dieter BRIGITTA FP7 & Horizon 2020 ir. Dieter BRIGITTA EC, DG Research &, Unit E.3 (Food, Health & Well-being) Past, Present & Future Research for a Safe, Secure and Nutritious Food Supply Slide 1 of 23 Table of contents

More information

FP7 Specific Programme. «People» Policies and Marie Curie Actions. Dr. Barbara Rhode

FP7 Specific Programme. «People» Policies and Marie Curie Actions. Dr. Barbara Rhode FP7 Specific Programme «People» Policies and Marie Curie Actions Dr. Barbara Rhode Adviser to the Director of Directorate T Directorate General Research 1 Structure of the presentation Introduction: Policy

More information

Summary Report Responses to the public consultation on the special scheme for small enterprises under the VAT Directive

Summary Report Responses to the public consultation on the special scheme for small enterprises under the VAT Directive EUROPEAN COMMISSION DIRECTORATE-GENERAL TAXATION AND CUSTOMS UNION Indirect Taxation and Tax administration Value added tax Brussels, 11 Apr. 17 taxud.c.1(2017) 2171823 Summary Report Responses to the

More information

How to Manage and Administer Integrated Projects and Networks of Excellence

How to Manage and Administer Integrated Projects and Networks of Excellence How to Manage and Administer Integrated Projects and Networks of Excellence EARMA Annual Conference Budapest 14th June 2002 ** Based on Information published by EC to June 2002** PRESENTER Sean McCarthy

More information

The EU Framework Programme For Research And Innovation ( )

The EU Framework Programme For Research And Innovation ( ) The EU Framework Programme For Research And Innovation (2014-2020) Brendan Hawdon DG Research & Innovation European Commission The Multiannual Financial Framework 2014-2020: Commission s proposals of 29

More information

IMI Financial Guidelines

IMI Financial Guidelines IMI Financial Guidelines VERSION 1.0 of 17 January 2012 These guidelines aim at assisting all IMI consortia during the negotiation phase and all individual participants during the implementation of IMI

More information

ANNEX A - I. Note: it is important that each tenderer has read the Working Practice and its annexes very carefully.

ANNEX A - I. Note: it is important that each tenderer has read the Working Practice and its annexes very carefully. ANNEX A - I Note: it is important that each tenderer has read the Working Practice and its annexes very carefully. WORKING PRACTICE 1.GENERAL INFORMATION 1.1.THE AUDIT CO-ORDINATOR 1.1.1.The Audit Co-ordinator

More information

LIST OF FINAL GUIDANCE NOTES APPROVED BY COCOF FROM 2006 TO 2011

LIST OF FINAL GUIDANCE NOTES APPROVED BY COCOF FROM 2006 TO 2011 EUROPEAN COMMISSION DIRECTORATE-GERAL REGIONAL POLICY Policy coordination The Director LIST OF FINAL GUIDANCE NOTES APPROVED BY COCOF OM 2006 TO 2011 No. COCOF ref. No. Title ( in ) Linguistic 1 COCOF

More information

Can you do the SaMBA? (The UK s Small and Micro-Business Assessment)

Can you do the SaMBA? (The UK s Small and Micro-Business Assessment) Can you do the SaMBA? (The UK s Small and Micro-Business Assessment) Joanne Lawson Deputy Head EU & International Team Better Regulation Executive 2 Why is there a UK SME test? SMEs say regulation is an

More information

Financial Regulation applicable to the general budget of the Union and its rules of application July 2017

Financial Regulation applicable to the general budget of the Union and its rules of application July 2017 Financial Regulation applicable to the general budget of the Union and its rules of application July 2017 Synoptic presentation And a selection of legal texts relevant to the budget Budget Financial Regulation

More information

Call for Proposals Action 1 Promoting Cluster Excellence (62/G/ENT/CIP/13/C/N04C031) Financial Aspects

Call for Proposals Action 1 Promoting Cluster Excellence (62/G/ENT/CIP/13/C/N04C031) Financial Aspects Call for Proposals Action 1 Promoting Cluster Excellence (62/G/ENT/CIP/13/C/N04C031) Action 2 Clusters and Entrepreneurship in Support of Emerging Industries (64/G/ENT/CIP/13/C/N04C02) Information Day

More information

Multi-Beneficiary Model Grant Agreement

Multi-Beneficiary Model Grant Agreement European Research Council (ERC) Multi-Beneficiary Model Grant Agreement ERC Starting Grants, Consolidator Grants and Advanced Grants (H2020 ERC MGA Multi) Version 5.0 18 October 2017 Disclaimer This document

More information

Horizon 2020 FINANCE ACADEMY October 2018 Budapest

Horizon 2020 FINANCE ACADEMY October 2018 Budapest Horizon 2020 FINANCE ACADEMY 16-19 October 2018 Budapest DAY 1: FUNDAMENTALS OF FINANCES IN H2020 09:00 09:30 Registration and Welcome 09:30 10:00 Event opening: Introduction to the course and the participants

More information

Definitive VAT-system for Cross-Border Trade

Definitive VAT-system for Cross-Border Trade POSITION PAPER 21 December 2017 Definitive VAT-system for Cross-Border Trade KEY MESSAGES 1 2 3 We welcome the European Commission s commitment to the creation of a single VAT-area based on maximum simplicity,

More information

Mono-Beneficiary Model Grant Agreement

Mono-Beneficiary Model Grant Agreement European Research Council (ERC) Mono-Beneficiary Model Grant Agreement ERC Proof of Concept (H2020 ERC MGA PoC Mono) Version 5.0 18 October 2017 Disclaimer This document is aimed at assisting applicants

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2006R1828 EN 01.12.2011 003.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B C1 COMMISSION REGULATION (EC) No 1828/2006 of

More information

UK Higher Education Sector Position on the Horizon 2020 Framework for Research and Innovation. UK Higher Education International Unit Universities UK

UK Higher Education Sector Position on the Horizon 2020 Framework for Research and Innovation. UK Higher Education International Unit Universities UK UK Higher Education Sector Position on the Horizon 2020 Framework for Research and Innovation UK Higher Education International Unit Universities UK March 2012 UK higher education sector position on the

More information

WORKSHOP ON THE HORIZON 2020 MODEL GRANT AGREEMENT

WORKSHOP ON THE HORIZON 2020 MODEL GRANT AGREEMENT WORKSHOP ON THE HORIZON 2020 MODEL GRANT AGREEMENT Brussels April 2013 Research and Innovation Workshops and consultations with NCPs' and stakeholders on the Horizon 2020 A first NCPs workshop on 15 November

More information

Official Journal of the European Union

Official Journal of the European Union L 63/22 28.2.2004 COMMISSION REGULATION (EC) No 364/2004 of 25 February 2004 amending Regulation (EC) No 70/2001 as regards the extension of its scope to include aid for research and development THE COMMISSION

More information

New Financial Regulation No 966/2012

New Financial Regulation No 966/2012 New Financial Regulation No 966/2012 changes guided by three objectives to increase: Simplification of rules and procedures Accountability in the implementation Leverage of Union funds accompanied by Rules

More information

European Commission THE FIFTH FRAMEWORK PROGRAMME. This document can be downloaded from URL:

European Commission THE FIFTH FRAMEWORK PROGRAMME. This document can be downloaded from URL: European Commission THE FIFTH FRAMEWORK PROGRAMME The Fifth Framework Programme focuses on Community activities in the field of research, technological development and demonstration (RTD) for the period

More information

Monalisa 2010-EU S Start: End: Total costs: 22,468,006 EC contribution: 11,234,003

Monalisa 2010-EU S Start: End: Total costs: 22,468,006 EC contribution: 11,234,003 Action Kick-off Meeting Monalisa 2010-EU-21109-S Start: 01.09.2010 End: 31.12.2013 Total costs: 22,468,006 EC contribution: 11,234,003 Jaroslaw KOTOWSKI Stockholm, 14/06/2011 Content - Objectives - Reporting

More information

Some Comments on the Promised Commission Guidance on Direct Costing of Research Infrastructures in Horizon 2020

Some Comments on the Promised Commission Guidance on Direct Costing of Research Infrastructures in Horizon 2020 15 th April 2013 Some Comments on the Promised Commission Guidance on Direct Costing of Research Infrastructures in Horizon 2020 Background At the Competitiveness Council meeting of 10 th October 2012,

More information

Financial relations within the 6th Framework Programme

Financial relations within the 6th Framework Programme Financial relations within the 6th Framework Programme Preamble: This is a succinct summary of the relations and financial procedures within the 6th Framework Programmes R&D contracts. These reminders

More information

FAQ. Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014)

FAQ. Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014) FAQ Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014) CORRIGENDUM: In the first version of the Application Guide,

More information

22.6/23/1 15 July 2002 UNICE COMMENTS

22.6/23/1 15 July 2002 UNICE COMMENTS 22.6/23/1 15 July 2002 TOWARDS AN EU REGIME ON TRANSPARENCY OBLIGATIONS FOR ISSUERS WHOSE SECURITIES ARE ADMITTED TO TRADING ON A REGULATED MARKET Second Consultation by the Services of the Internal Market

More information

LIFE WRITERS WORKSHOP: CONCEPT NOTE

LIFE WRITERS WORKSHOP: CONCEPT NOTE LIFE WRITERS WORKSHOP: CONCEPT NOTE VILNIUS MAY 11, 2018 DIEGO MATTIOLI WHAT S THE MORNING PROGRAMME 9.15 9.45 Project Planning how to select the right funding line for your idea Spotlight on LIFE priority

More information

Webinar on Introduction to Lump Sum funding in Horizon Martin Baumgartner (FFG Austria) Morten Gylling (DAFSHE Denmark)

Webinar on Introduction to Lump Sum funding in Horizon Martin Baumgartner (FFG Austria) Morten Gylling (DAFSHE Denmark) Webinar on Introduction to Lump Sum funding in Horizon 2020 Martin Baumgartner (FFG Austria) Morten Gylling (DAFSHE Denmark) Who are we? A key objective of the NCP Academy project is to provide harmonised

More information

Horizon Public-Public partnerships the road ahead. Jörg NIEHOFF DG Research & Innovation European Research Area Unit B4 - Joint Programming

Horizon Public-Public partnerships the road ahead. Jörg NIEHOFF DG Research & Innovation European Research Area Unit B4 - Joint Programming Horizon 2020 Public-Public partnerships the road ahead Jörg NIEHOFF DG Research & Innovation European Research Area Unit B4 - Joint Programming Coordination of national programmes in FP7 ERA-NET Like in

More information

Eligibility of costs in the Horizon 2020 funded EUROfusion project

Eligibility of costs in the Horizon 2020 funded EUROfusion project Eligibility of costs in the Horizon 2020 funded EUROfusion project Garching, 3 December 2015 Subcontractors and other third party support Presented by: Michael Erdmann, EUROfusion Coordinator Unit, Max-Planck-Institute

More information

Evaluation questions are shown in blue and will be deleted once we upload the questionnaires

Evaluation questions are shown in blue and will be deleted once we upload the questionnaires COSME Evaluation Survey questionnaire -----For internal use----- Code SO Target group SO10005 SO1 Other organisations Evaluation questions are shown in blue and will be deleted once we upload the questionnaires

More information

EARTO FP8 Task Force. 24 June 2011 Helmholtz Offices, Brussels

EARTO FP8 Task Force. 24 June 2011 Helmholtz Offices, Brussels EARTO FP8 Task Force 24 June 2011 Helmholtz Offices, Brussels Agenda Common Strategic Framework for EU Research and Innovation June 10 th wrap-up event: programme, speakers ERAC draft opinion on CSF EP

More information