Full Costing. EUIMA Project Final Event Horizon 2020 and the modernisation of European universities Dialogue with European policy makers

Size: px
Start display at page:

Download "Full Costing. EUIMA Project Final Event Horizon 2020 and the modernisation of European universities Dialogue with European policy makers"

Transcription

1 Thomas A. H. Schöck Chancellor Friedrich-Alexander-Universität Erlangen-Nürnberg Full Costing EUIMA Project Final Event Horizon 2020 and the modernisation of European universities Dialogue with European policy makers Brussels, 10 May 2012

2 Table of contents 2 A. FAU - facts and figures B. Implementation of full costing I. Definition full costing II. Benefits of full costing III. 6 steps to full costing at universities IV. Difficulties for Bavarian universities

3 Table of contents 3 C. Implementing full costing at FAU I. Method II. Online-tool data D. Current legal requirements for implementing full costing I. R&D&I Framework II. FP 7

4 Table of contents 4 E. New legal requirements Horizon 2020 Preface I. Alterations in respect of full costing II. Other important alterations III. Road map to the implementation of Horizon 2020 IV. Consequences of Horizon 2020 F. Conclusion

5 5 Beyond the horizon What dreams may come? Shakespeare s Hamlet

6 A. FAU - facts and figures (2011) 6 Structure: 5 faculties 12,000 members of staff University Hospital with 24 Clinics 640 professorships Teaching: 149 courses of studies 33,487 students (2,537 of which international students)

7 A. FAU - facts and figures (2011) 7 Research: 144 million third party funding (= 14,4% of the total budget funds) Excellence Initiative (established by the German Federal Government and the Federal State Governments to promote sciences and research at German universities) 1 Graduate School in Advanced Optical Technologies (SAOT) = interdisciplinary research and education program of excellence within a broad international network of distinguished experts to promote innovation and leadership, very broad education provided across the faculties in the fundamentals of optical technologies and different application

8 A. FAU facts and figures (2011) 8 1 Excellence Initiative Research Cluster Engineering of Advanced Materials (EAM) = the only interdisciplinary research collaboration of its type in Germany to focus on the investigation of functional materials and their processing at all length scales 11 DFG (Germany s largest research funding organisation) Research Units 7 DFG Research Training Groups

9 A. FAU - facts and figures 9 Third party funding in Mio

10 A. FAU - facts and figures 10 External research funding 2010 DFG; 47 Mio. Federal donations; 20 Mio. EU-projects; 6 Mio. iscellaneous; 1 Mio. Third-party donations (industry, etc.); 50 Mio. Endowed professorships; 1 Mio.

11 B. Implementation of full costing 11 I. Definition full costing A managerial accounting method that describes when all fixed and variable costs are used to compute the total costs per unit. Full costing includes these costs when computing the amount of money it takes to produce and distribute one unit of output. Alternative: the use of a single flat rate

12 B. Implementation of full costing 12 II. Benefits of full costing higher awareness of private and public financiers concerning the amount of the indirect costs higher transparency increase of efficiency of universities strengthening of universities competitiveness and therefore strengthening of the European research area

13 B. Implementation of full costing 13 III. 6 steps to full costing at universities 1. Distribution of direct costs to cost centres and cost units 2. Liquidation of clearing cost centres (overhead) and distribution to cost centres 3. Distribution of the costs of central services to cost centres

14 B. Implementation of full costing Distribution of the costs of the data centre to cost centres and cost units 5. Distribution of the costs of library to cost centres and cost units 6. Distribution of the costs of faculty administration to cost centres and cost units

15 B. Implementation of full costing 15 IV. Difficulties for Bavarian universities 1. Rent and house maintenance: university buildings are property of the State of Bavaria or are real estate of corporation bodies (owner-tenant-model, management-model) buildings are very old and depreciated; at the same time the utility costs are very high IMBY = state controlled agency in charge of all real estates belonging to the Free State of Bavaria

16 B. Implementation of full costing Staff costs: necessity to allocate the actual costs of permanent staff, which are part of the indirect costs (administration staff, technicians)

17 C. Implementing full costing 17 at FAU I. Method FAU will provide an online-tool for the calculation of costs within the scope of R&D projects planned starting date June 2012 all relevant cost categories are taken into account the users of the online-tool are encouraged to demand a higher price than the calculated price

18 C. Implementing full costing 18 at FAU II. Online-tool datas E. Implementing full costing at FAU 1. General information to be documented project title acronym client duration of the project chair chair holder principal investigator calculation number into scientific and non-scientific personal

19 2. Costs in detail at FAU 19

20 D. Current legal requirements for 20 implementing full costing I. R&D&I Framework = Community Framework for State Research and Development and Innovation 1. Field of application The R&D&I Framework applies to all R&D projects which are funded by business enterprises. At FAU it applies to an amount of 50 Mio. /year.

21 D. Current legal requirements for 21 implementing full 2. Requirements of Art. 107 (1) TFEU *Treaty on the functioning of the European Union Save as otherwise provided in the Treaties, any aid granted by a Member State or through State resources in any form whatsoever which distorts or threatens to distort competition by favouring certain undertakings or the production of certain goods shall, in so far as it affects trade between Member States, be incompatible with the internal market. * * Treaty on the functioning of the European Union Save as otherwise provided in the

22 D. Current legal requirements for 22 implementing full costing 3. Consequences for research organisations The public funding of the non-economic activities will not fall under Art. 107 (1) TFEU, if the two kinds of activities and their costs and funding can be clearly separated. The public funding of the economic activities will not fall under Art. 107 (1) TFEU, if the service is offered at market prices or at full costs plus an appropriate profit margin.

23 D. Current legal requirements for 23 implementing full costing II. FP 7 1. Field of application FP 7 applies to all projects funded by the European Union during the 7 th Framework Programme. At FAU it applies to about 6 Mio. /year. 2. Determination methods of indirect costs actual direct costs = aim of FP 7 requires the implementation of full costing simplified method (indirect costs can be calculated for the legal person as a whole) = is an exemption and is barely used by German universities

24 D. Current legal requirements for 24 implementing full costing general transitional flat rate of 60% of the direct costs by recovering 75% (RTD) of the sum of direct and indirect costs for universities and research organisations (temporary solution until the end of 2013, than full costing required) The rules for participating in FP 7 stipulate the need to implement full costing. Due to the necessary extensive changes and challenges, the EU provided a transitional flat rate only for the transitional period.

25 D. Current legal requirements for 25 implementing full costing 3. Eligibility of costs in FP 7; actual problems eligible costs are: direct costs: especially personal, depreciation on equipment, travel costs and consumables indirect costs (overhead): depreciation on premises, utility costs, maintenance, costs for legal and finance departments etc.

26 D. Current legal requirements for 26 implementing full Problems with direct costs: recording of working time: use of timesheets hourly rates: calculation method salary of permanent staff: double financing

27 D. Current legal requirements for 27 implementing full costing Problems with indirect costs: VAT: non-eligible rent: calculation allocation of personal costs (administrative staff, technicians) separation of research and teaching

28 E. New legal requirements 28 - Horizon 2020 Preface: The R&D&I Framework will remain unchanged. FP 7 will be replaced by Horizon Consequences: It would still be necessary to implement full costing for R&D projects funded by business enterprises (FAU: 50 Mio. /year). It would not be necessary to implement full costing for Horizon 2020 projects (FAU: 6 Mio. /year).

29 E. New legal requirements 29 - Horizon 2020 I. Alterations in respect of full costing 1. A single set of rules adapted for the whole research and innovation cycle covering all research programmes and funding bodies up to now a whole range of specific funding rules exists

30 E. New legal requirements 30 - Horizon One project one funding rate maximum of 100% of the total eligible costs it is extremely important to ensure that the 100% rate will be applied Indirect costs: a flat rate of 20% of direct eligible costs = 100% + 20% = 120%

31 E. New legal requirements 31 - Horizon 2020 II. Other important alterations 1. Simple evaluation criteria excellence impact implementation replace uncertain evaluation criteria 2. Simpler rules for grants e.g.: no time-sheets for personal working full time on a project 3. Fewer and better targeted controls and audits focused on risk and fraud prevention frequency of audits increased during FP 7

32 E. New legal requirements 32 - Horizon 2020 III. Road map to the implementation of Horizon 2020 Mid 2012: Final calls under 7th Framework Programme for research to bridge gap towards Horizon 2020 Mid 2013: Adoption of legislative acts by Parliament and Council on Horizon Horizon 2020 starts, launch of first calls

33 E. New legal requirements 33 - Horizon 2020 IV. Consequences of Horizon 2020 For R&D activities within Horizon 2020: no need to demonstrate full costs For other R&D projects: no direct consequences Horizon 2020 may reduce the motivation to implement full costing

34 F. Conclusion 34 Beyond the horizon: Consequences of Horizon 2020: Contradiction between the fact that full costing is required by the R&D&I Framework for R&D projects with others than the European Commission and the fact that no full costing would be required for R&D projects of the European Commission within Horizon 2020.

35 Thank you very much for your attention! 35

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 25.11.2016 C(2016) 7553 final COMMISSION DECISION of 25.11.2016 modifying the Commission decision of 7.3.2014 authorising the reimbursement on the basis of unit costs for

More information

Horizon The EU Framework Programme for Katerina PTACKOVA. DG RTD/Directorate Energy/Unit K.4. Research and Innovation

Horizon The EU Framework Programme for Katerina PTACKOVA. DG RTD/Directorate Energy/Unit K.4. Research and Innovation Horizon 2020 The EU Framework Programme for Research and Katerina PTACKOVA DG RTD/Directorate Energy/Unit K.4 2014-2020 Research and What is Horizon 2020 Commission proposal for a 80 billion euro research

More information

Project costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs.

Project costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs. Financial issues Extract from the guide for BONUS applicants 1 8. How to prepare project budget? Only the real costs required for the implementation should be indicated in the planned budget for the project.

More information

Neue Anforderungen der EU an die Rechnungslegung -

Neue Anforderungen der EU an die Rechnungslegung - Neue Anforderungen der EU an die Rechnungslegung - Modelle zur Umsetzung in den Hochschulen Expectations of the European Commission - Perspectives of the EU Research Policy Walter Schwarzenbrunner GD INFSO

More information

Horizon The EU Framework Programme for Luigi Scarpa de Masellis. Delegation of the EU to Canada. Research and Innovation

Horizon The EU Framework Programme for Luigi Scarpa de Masellis. Delegation of the EU to Canada. Research and Innovation Horizon 2020 The EU Framework Programme for Research and Luigi Scarpa de Masellis Delegation of the EU to Canada 2014-2020 Research and The Multiannual Financial Framework 2014-2020: Commission s proposals

More information

Towards Horizon 2020

Towards Horizon 2020 Towards Horizon 2020 Wolfgang Burtscher, DG Research and EUROTECH Meeting, Stuttgart, 30 April 2012 Research and The Multiannual Financial Framework 2014-2020: Commission s proposals 29 June 2011 Key challenge:

More information

Horizon Observations and Call for Amendments by Fraunhofer Gesellschaft

Horizon Observations and Call for Amendments by Fraunhofer Gesellschaft Brussels, 01 February 2012 Horizon 2020 - Observations and Call for Amendments by Fraunhofer Gesellschaft Observations Fraunhofer commends the focus of Horizon 2020 on innovation and applied research in

More information

From FP7 to Horizon 2020: Opportunities for EU - Russia Scientific Cooperation. Anna Bezlepkina EU Delegation to the RF 21 March 2012

From FP7 to Horizon 2020: Opportunities for EU - Russia Scientific Cooperation. Anna Bezlepkina EU Delegation to the RF 21 March 2012 From FP7 to Horizon 2020: Opportunities for EU - Russia Scientific Cooperation Anna Bezlepkina EU Delegation to the RF 21 March 2012 EU-Russia Cooperation in Science & Technology In FP7 Russia has been

More information

The EU Framework Programme For Research and Innovation ( )

The EU Framework Programme For Research and Innovation ( ) The EU Framework Programme For Research and Innovation (2014-2020) ITRE Committee, 23 January 2012 Robert-Jan Smits Director-General, DG Research & Innovation European Commission Outline of the presentation

More information

Practicalities in the Financial Management of FP7 projects - An outlook to audits and Horizon 2020 rules

Practicalities in the Financial Management of FP7 projects - An outlook to audits and Horizon 2020 rules Practicalities in the Financial Management of FP7 projects - An outlook to audits and Horizon 2020 rules Gabor Kitley Chief Executive Officer Europa Media Is the FP7 Financial Audit really a nightmare?

More information

Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities

Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities Ann Van Menxel DG CNECT H6 Brussels, 17 December 2013 Legal references Reimbursement

More information

Article 185 of the TFEU Main features. Ministry for Education, University and Research Department for University, AFAM and Research

Article 185 of the TFEU Main features. Ministry for Education, University and Research Department for University, AFAM and Research Article 185 of the TFEU Main features Content of the Presentation Definition Criteria and Rules for participation Actions for the implementation 2 Public-public Partnerships in H2020 Public sector bodies

More information

Financial Rules in FP7 Projects

Financial Rules in FP7 Projects FP7 Financial Management and Audits Financial Rules in FP7 Projects Mr. Gabor Kitley Managing Director Europa Media PSC 13 November 29, Budapest Content Basic Facts Forms of financing Eligibility rules

More information

Call title: FP7-SCIENCE-IN-SOCIETY

Call title: FP7-SCIENCE-IN-SOCIETY Call title: FP7-SCIENCE-IN-SOCIETY-2010-1 Call identifier: FP7-SCIENCE-IN-SOCIETY-2010-1 Date of publication: Thursday 30 July 2009 Deadline 1 : Thursday 21 January 2010 at 17.00.00, Brussels local time.

More information

FP7 & Horizon Past, Present & Future Research for a Safe, Secure and Nutritious Food Supply. ir. Dieter BRIGITTA

FP7 & Horizon Past, Present & Future Research for a Safe, Secure and Nutritious Food Supply. ir. Dieter BRIGITTA FP7 & Horizon 2020 ir. Dieter BRIGITTA EC, DG Research &, Unit E.3 (Food, Health & Well-being) Past, Present & Future Research for a Safe, Secure and Nutritious Food Supply Slide 1 of 23 Table of contents

More information

Administrative, Financial and Operational Aspects of Project Management

Administrative, Financial and Operational Aspects of Project Management Administrative, Financial and Operational Aspects of Project Management European Commission Directorate General Environmental Technologies Unit Presentation 1. General overview of Grant Agreement 2. Duties

More information

Horizon Public-Public partnerships the road ahead. Jörg NIEHOFF DG Research & Innovation European Research Area Unit B4 - Joint Programming

Horizon Public-Public partnerships the road ahead. Jörg NIEHOFF DG Research & Innovation European Research Area Unit B4 - Joint Programming Horizon 2020 Public-Public partnerships the road ahead Jörg NIEHOFF DG Research & Innovation European Research Area Unit B4 - Joint Programming Coordination of national programmes in FP7 ERA-NET Like in

More information

European Month of the Brain Horizon DG Research & Innovation Unit F2 Medical Research Neurosciences

European Month of the Brain Horizon DG Research & Innovation Unit F2 Medical Research Neurosciences European Month of the Brain Horizon 2020 DG Research & Innovation Unit F2 Medical Research Neurosciences Issues at stake of brain research Understanding the human brain and its diseases remains one of

More information

PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL

PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL Establishing the European Geological Surveys Research Area to deliver a Geological Service for Europe PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL Joint Call on applied geoscience

More information

Competitive neutrality in the EU

Competitive neutrality in the EU Global Forum on Competition, Paris, 16-17 February 2012 Competitive neutrality - focus on EU State Aid policy Gert-Jan Koopman Deputy Director-General for State aids DG Competition, European Commission

More information

The EU Framework Programme For Research And Innovation ( )

The EU Framework Programme For Research And Innovation ( ) The EU Framework Programme For Research And Innovation (2014-2020) Brendan Hawdon DG Research & Innovation European Commission The Multiannual Financial Framework 2014-2020: Commission s proposals of 29

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Amended proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES. Amended proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Amended proposal for a Brussels, 24.5.2006 COM(2005) 119 final/2 2005/0043 (COD) 2005/0044 (CNS) DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL concerning

More information

Proposal for a COUNCIL DECISION

Proposal for a COUNCIL DECISION EUROPEAN COMMISSION Brussels, 24.10.2014 COM(2014) 658 final 2014/0306 (NLE) Proposal for a COUNCIL DECISION on the signing and provisional application on behalf of the Union of the Agreement for scientific

More information

Financial errors in FP7 How to improve the quality of financial statements?

Financial errors in FP7 How to improve the quality of financial statements? Financial errors in FP7 How to improve the quality of financial statements? Oslo, 26 April 2013 Doroteya PETROVA ERC Executive Agency Marcin BARAN European Commission Introduction This presentation is

More information

Horizon The EU Framework Programme for Johannes Klumpers DG RTD. Research and Innovation. Research and Innovation

Horizon The EU Framework Programme for Johannes Klumpers DG RTD. Research and Innovation. Research and Innovation Horizon 2020 The EU Framework Programme for Research and Johannes Klumpers DG RTD 2014-2020 Research and What is Horizon 2020 Commission proposal for a 80 billion euro research and innovation funding programme

More information

July Opt for indirect costs closer to reality :

July Opt for indirect costs closer to reality : CPU [French University Rectors Conference] summary following the questionnaire from the MESR [Ministry of Higher Education and Research] to gauge the impact of the financing rules proposed for Horizon

More information

EUROPEAN COMMISSION. The Commission has based its decision on the following considerations:

EUROPEAN COMMISSION. The Commission has based its decision on the following considerations: EUROPEAN COMMISSION Brussels, 1.2.2017 C(2017) 693 final Subject: State aid Germany SA.43902 (2016/N-2) Saxony Natural heritage: nature protection related public relation and education activities Sir,

More information

Legal and financial issues in Horizon Bonn,

Legal and financial issues in Horizon Bonn, Legal and financial issues in Horizon 2020 Bonn, 01.02.2017 www.nks-ruf.de National Contact Point Legal & Financial Issues Located in the EU-Bureau of the BMBF in Bonn and Berlin Advice on legal and financial

More information

State aid rules for environmental protection with focus on low-emission mobility

State aid rules for environmental protection with focus on low-emission mobility State aid rules for environmental protection with focus on low-emission mobility Seminar on State Aid for Environmental Protection Brussels, 24 September 2018 The views expressed in this document are those

More information

Guide to Financial Issues relating to Indirect Actions of the Sixth Framework Programmes

Guide to Financial Issues relating to Indirect Actions of the Sixth Framework Programmes Guide to Financial Issues relating to Indirect Actions of the Sixth Framework Programmes VERSION APRIL 2004 EXECUTIVE SUMMARY 1 - First Principles The Financial Regulation (FR) of the Communities 1, and

More information

Tackling Aggressive Tax Planning in the European Union - Recent Developments

Tackling Aggressive Tax Planning in the European Union - Recent Developments Tackling Aggressive Tax Planning in the European Union - Recent Developments Dr Christiana HJI Panayi Senior Lecturer in Tax Law Queen Mary University of London 1 Important recent developments Digital

More information

FP7 Simplification Workshop

FP7 Simplification Workshop FP7 Simplification Workshop WG 1 Community financial contribution Report General Remarks Generally, WG participants supported the extended use of lump-sum and flat-rate financing as a major mode to simplify

More information

Horizon 2020 & Smart Specialisation

Horizon 2020 & Smart Specialisation Horizon 2020 & Smart Specialisation Ciaran Dearle Unit C/5 (Regional Dimension of ) DG Research & 2014-2020 Research and Challenges for Europe Europe faces: Lack of growth, bleak economic climate; Increasing

More information

Multi-Beneficiary Model Grant Agreement

Multi-Beneficiary Model Grant Agreement H2020 Programme Multi-Beneficiary Model Grant Agreement Pre-Commercial Procurement (PCP) and Procurement of Innovative Solutions (PPI) (H2020 MGA PCP/PPI Multi) Version 5.0 18 October 2017 Disclaimer This

More information

The EU Framework Programme For Research And Innovation ( ) Krastio Preslavsky DG Research & Innovation European Commission

The EU Framework Programme For Research And Innovation ( ) Krastio Preslavsky DG Research & Innovation European Commission The EU Framework Programme For Research And Innovation (2014-2020) Krastio Preslavsky DG Research & Innovation European Commission The Multiannual Financial Framework 2014-2020: Commission s proposals

More information

Reporting of Transfers of Value to HCPs and HCOs Methodological Note for Reporting of 2017 Data in 2018

Reporting of Transfers of Value to HCPs and HCOs Methodological Note for Reporting of 2017 Data in 2018 Reporting of Transfers of Value to HCPs and HCOs Methodological Note for Reporting of 2017 Data in 2018 AstraZeneca UK Limited Registered in England No 3674842 Registered Office, 2 Kingdom Street, London,

More information

FP6 Contract and Financial Reporting. The Basics for EC Consortia. Linda Polik Research Services

FP6 Contract and Financial Reporting. The Basics for EC Consortia. Linda Polik Research Services FP6 Contract and Financial Reporting The Basics for EC Consortia Linda Polik Research Services linda.polik@admin.ox.ac.uk Overview of Presentation 1) Contractual Issues 2) Financial Issues 3) Reporting

More information

Official Journal of the European Union

Official Journal of the European Union L 63/22 28.2.2004 COMMISSION REGULATION (EC) No 364/2004 of 25 February 2004 amending Regulation (EC) No 70/2001 as regards the extension of its scope to include aid for research and development THE COMMISSION

More information

CERTIFICATES ISSUED BY EXTERNAL AUDITORS FREQUENTLY ASKED QUESTIONS

CERTIFICATES ISSUED BY EXTERNAL AUDITORS FREQUENTLY ASKED QUESTIONS CERTIFICATES ISSUED BY EXTERNAL AUDITORS FREQUENTLY ASKED QUESTIONS VERSION MAY 2011 Disclaimer This document is aimed at assisting beneficiaries and auditors. It is provided for information purposes only

More information

Multi-Beneficiary Model Grant Agreement

Multi-Beneficiary Model Grant Agreement European Research Council (ERC) Multi-Beneficiary Model Grant Agreement ERC Starting Grants, Consolidator Grants and Advanced Grants (H2020 ERC MGA Multi) Version 5.0 18 October 2017 Disclaimer This document

More information

Financial Reporting What s new?

Financial Reporting What s new? Financial Reporting What s new? EARMA Luleå Financial reporting in H2020-what s new? 21 June 2016 Poul Petersen Senior Executive Officer Research & Innovation, EU Office Universitetsparken 1 2100 Copenhagen

More information

Mono-Beneficiary Model Grant Agreement

Mono-Beneficiary Model Grant Agreement European Research Council (ERC) Mono-Beneficiary Model Grant Agreement ERC Proof of Concept (H2020 ERC MGA PoC Mono) Version 5.0 18 October 2017 Disclaimer This document is aimed at assisting applicants

More information

Proposal for a COUNCIL DECISION

Proposal for a COUNCIL DECISION EUROPEAN COMMISSION Brussels, 11.8.2017 COM(2017) 432 final 2017/0198 (NLE) Proposal for a COUNCIL DECISION on the signing, on behalf of the Union, and provisional application of the Agreement for scientific

More information

European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement. (EMPIR MGA - Multi)

European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement. (EMPIR MGA - Multi) European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement (EMPIR MGA - Multi) Version 5.0 12 March 2018 Version Publication Date 1.0 16.07.2015 Initial version

More information

Audrey Richard, doctoral student, Geomatic Engineering and Planning

Audrey Richard, doctoral student, Geomatic Engineering and Planning The high standard of research at ETH is only possible thanks to third-party funding, as it requires not just highly qualified professors, but also the right infrastructure. Audrey Richard, doctoral student,

More information

VADEMECUM COMMUNITY RULES ON STATE AID

VADEMECUM COMMUNITY RULES ON STATE AID VADEMECUM COMMUNITY RULES ON STATE AID Note of caution: The factsheets attached give a concise, and sometimes simplified, summary of State aid legislation applicable to areas that are considered most relevant

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) L 46/8 Official Journal of the European Union 19.2.2013 REGULATIONS COMMISSION IMPLEMENTING REGULATION (EU) No 135/2013 of 18 February 2013 amending Implementing Regulation (EU) No 926/2011 for the purposes

More information

Multi-beneficiary Model Grant Agreement

Multi-beneficiary Model Grant Agreement Partnership for Research and Innovation in the Mediterranean Area Programme (PRIMA) Multi-beneficiary Model Grant Agreement Version 5.0 30 January 2018 Disclaimer This document is aimed at assisting applicants

More information

EFTA SURVEILLANCE AUTHORITY DECISION OF 22 OCTOBER 2003 ON A NEW TEMPORARY REGIONAL LOAN SCHEME (NORWAY)

EFTA SURVEILLANCE AUTHORITY DECISION OF 22 OCTOBER 2003 ON A NEW TEMPORARY REGIONAL LOAN SCHEME (NORWAY) Doc. No 03-70931 Ref.No SAM030.03005 Dec No.: 185/03/COL 1 EFTfl SURVEILLANCE AUTHORITY DECISION OF 22 OCTOBER 2003 ON A NEW TEMPORARY REGIONAL LOAN SCHEME (NORWAY) THE HAVING REGARD TO the Agreement on

More information

14587/17 ADD 4 LJP/kg 1 DG G 2A

14587/17 ADD 4 LJP/kg 1 DG G 2A Council of the European Union Brussels, 27 November 2017 (OR. en) 14587/17 ADD 4 FIN 738 'A' ITEM NOTE From: To: General Secretariat of the Council Council Subject: General budget of the European Union

More information

HORIZON The New EU Framework Programme for Research and Innovation Piero Venturi European Commission DG Research and Innovation

HORIZON The New EU Framework Programme for Research and Innovation Piero Venturi European Commission DG Research and Innovation HORIZON 2020 The New EU Framework Programme for Research and Innovation 2014-2020 Piero Venturi European Commission DG Research and Innovation The Multiannual Financial Framework 2014-2020: European Council

More information

Reporting of Transfers of Value to HCPs and HCOs Methodological Note for Reporting of 2017 Data in 2018

Reporting of Transfers of Value to HCPs and HCOs Methodological Note for Reporting of 2017 Data in 2018 Reporting of Transfers of Value to HCPs and HCOs Methodological Note for Reporting of 2017 Data in 2018 AstraZeneca Pharma Poland Sp. z o.o. 0000117902 Postepu 14, 02-676 Warsaw Contents 1. Introduction...

More information

Evaluation questions are shown in blue and will be deleted once we upload the questionnaires

Evaluation questions are shown in blue and will be deleted once we upload the questionnaires COSME Evaluation Survey questionnaire -----For internal use----- Code SO Target group SO10005 SO1 Other organisations Evaluation questions are shown in blue and will be deleted once we upload the questionnaires

More information

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME WORKING NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP/ COORDINATION GROUP

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 10.12.2013 C(2013) 8197 final COMMISSION DECISION of 10.12.2013 authorising the use of reimbursement on the basis of unit costs for the personnel costs of the owners of small

More information

FP7 CERTIFICATION MODALITIES

FP7 CERTIFICATION MODALITIES KP7 bijeenkomst Nederlandse accoutants Nijenrode Business Universiteit, Breukelen 12 January 2010 FP7 CERTIFICATION MODALITIES Laurence DECHEVRE European Commission - DG Research, Unit A5 1 Overview of

More information

ESI funds in compliance with State aid rules

ESI funds in compliance with State aid rules ESI funds in compliance with State aid rules Stephen Moore External expert This training has been organised by EIPA-Ecorys-PwC under the Framework Contract Nr 2013.CE.16 B.AT 044. The opinions expressed

More information

ARTICLE EUROPEAN COMMISION PROPOSAL AMENDMENT RATIONALE

ARTICLE EUROPEAN COMMISION PROPOSAL AMENDMENT RATIONALE REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL establishing Horizon Europe the Framework Programme for Research and Innovation, laying down its rules for participation and dissemination ARTICLE

More information

VADEMECUM COMMUNITY RULES ON STATE AID

VADEMECUM COMMUNITY RULES ON STATE AID VADEMECUM COMMUNITY RULES ON STATE AID Note of caution: The factsheets attached give a concise, and sometimes simplified, summary of State aid legislation applicable to areas that are considered most relevant

More information

ECTRI INPUT Public consultation on EU funds in the area of investment, research & innovation, SMEs and single market March 2018

ECTRI INPUT Public consultation on EU funds in the area of investment, research & innovation, SMEs and single market March 2018 ECTRI INPUT Public consultation on EU funds in the area of investment, research & innovation, SMEs and single market The European Conference of Transport Research Institutes (ECTRI) is an international

More information

Proposal for a COUNCIL DECISION

Proposal for a COUNCIL DECISION EUROPEAN COMMISSION Brussels, 18.2.2016 COM(2016) 75 final 2016/0047 (NLE) Proposal for a COUNCIL DECISION amending Decision 2008/376/EC on the adoption of the Research Programme of the Research Fund for

More information

RULES ON ELIGIBILITY OF COSTS

RULES ON ELIGIBILITY OF COSTS Annex 1 of the Call for proposals RULES ON ELIGIBILITY OF COSTS These rules present various possible categories of eligible costs. The call for proposal may then stipulate that only some of the below categories

More information

Brussels, 11 May FP7 Audit. DG RTD Unit M2

Brussels, 11 May FP7 Audit. DG RTD Unit M2 Brussels, 11 May 2011 FP7 Audit DG RTD Unit M2 1 Contents 1. Purpose of the audits 2. When, by whom and how selected 3. Phases of the audit 4. Common Mistakes 5. Systemic errors 6. Questions 2 Purpose

More information

Incentive Guidelines R&D Feasibility Studies

Incentive Guidelines R&D Feasibility Studies Incentive Guidelines R&D Feasibility Studies 2014-2020 Issue Date: 1 st November 2014 Version: 1 http://support.maltaenterprise.com Contents Incentive Guidelines 1 Contents 1 1. Introduction 2 1.1 Scope

More information

Proposal for a COUNCIL REGULATION

Proposal for a COUNCIL REGULATION EUROPEAN COMMISSION Brussels, XXX COM(2018) 398/2 2018/0222 (NLE) Proposal for a COUNCIL REGULATION amending Council Regulation (EU) 2015/1588 of 13 July 2015 on the application of Articles 107 and 108

More information

POLICY ON CONTRACT REVIEW, SIGNING AND REQUIRED APPROVALS TABLE OF CONTENTS PART I GUIDING PRINCIPLES... 2

POLICY ON CONTRACT REVIEW, SIGNING AND REQUIRED APPROVALS TABLE OF CONTENTS PART I GUIDING PRINCIPLES... 2 Effective Date: June 7, 2013 Supersedes /Amends: November 17, 2011 Originating Office: Board of Governors Policy Number: BD-1 TABLE OF CONTENTS PART I GUIDING PRINCIPLES... 2 PART II - MANAGEMENT OF CONTRACTS...

More information

FICHE NO 25 APPLICABILITY OF FLAT RATES FOR FINANCING INDIRECT COSTS IN OTHER UNION POLICIES VERSION 1 22/10/2013. Version

FICHE NO 25 APPLICABILITY OF FLAT RATES FOR FINANCING INDIRECT COSTS IN OTHER UNION POLICIES VERSION 1 22/10/2013. Version FICHE NO 25 APPLICABILITY OF FLAT RATES FOR FINANCING INDIRECT COSTS IN OTHER UNION POLICIES VERSION 1 22/10/2013 Regulation Common Provisions Regulation (CPR) Article 58 of CPR: Article Flat rate financing

More information

BRITISH HORSERACING GRANT SCHEME STATE AID GUIDANCE

BRITISH HORSERACING GRANT SCHEME STATE AID GUIDANCE BRITISH HORSERACING GRANT SCHEME STATE AID GUIDANCE BRITISH HORSERACING GRANT SCHEME STATE AID GUIDANCE Part 1 - Introduction 1. EU State aid law is relevant to any distribution of funds from the Tote

More information

ITN 2010 Finance and Budget

ITN 2010 Finance and Budget Brussels, February 2011 ITN Coordinators meeting ITN 2010 Finance and Budget Research Executive Agency Marie Curie host-driven actions Financial Management of ITN Projects 1. The EU contribution The cost

More information

Consolidated Financial Statements

Consolidated Financial Statements Consolidated Financial Statements For the Year Ended March 31, 2016 TABLE OF CONTENTS Financial Statement Discussion and Analysis 1 Statement of Management Responsibility 8 Independent Auditor's Report

More information

Martina Kadunc Better Regulation DG Research & Innovation

Martina Kadunc Better Regulation DG Research & Innovation Martina Kadunc Better Regulation DG Research & Innovation STRUCTURE OF THE PRESENTATION Towards FP9 Policy making process Horizon 2020 Interim Evaluation Key findings Foresight Economic case for R&I Lamy

More information

Report on the annual accounts of the Single European Sky Air Traffic Management Research Joint Undertaking for the financial year 2017

Report on the annual accounts of the Single European Sky Air Traffic Management Research Joint Undertaking for the financial year 2017 Report on the annual accounts of the Single European Sky Air Traffic Management Research Joint Undertaking for the financial year 2017 Together with the Joint Undertaking s reply 12, rue Alcide De Gasperi

More information

Budget Reform Update. Paul Ellinger, Associate Chancellor & Vice Provost Budget and Resource Planning

Budget Reform Update. Paul Ellinger, Associate Chancellor & Vice Provost Budget and Resource Planning Budget Reform Update Paul Ellinger, Associate Chancellor & Vice Provost Budget and Resource Planning February 2018 Outline Brief budget model overview Communication plan Principles Major components Timeline

More information

Last update: Document reference: IMI2/INT/

Last update: Document reference: IMI2/INT/ Last update: 07.04.2017 Document reference: IMI2/INT/2017-00830 1 Contents 1 Legal and financial framework... 3 2 IMI partners and actitivities... 4 3 Factsheet - IMI at a glance... 5 4 Budgetary principles...

More information

WORKSHOP ON THE HORIZON 2020 MODEL GRANT AGREEMENT

WORKSHOP ON THE HORIZON 2020 MODEL GRANT AGREEMENT WORKSHOP ON THE HORIZON 2020 MODEL GRANT AGREEMENT Brussels April 2013 Research and Innovation Workshops and consultations with NCPs' and stakeholders on the Horizon 2020 A first NCPs workshop on 15 November

More information

Standardisation of Health and Social Services

Standardisation of Health and Social Services Standardisation of Health and Social Services Position of the European Social Insurance Platform (ESIP) FINAL 14 July 2016 - 2 - About the European Social Insurance Platform (ESIP) The European Social

More information

Official Journal of the European Union

Official Journal of the European Union 18.8.2016 C 299/7 COUNCIL RECOMMDATION of 12 July 2016 on the 2016 National Reform Programme of Spain and delivering a Council opinion on the 2016 Stability Programme of Spain (2016/C 299/02) THE COUNCIL

More information

EUROPEAN COMMISSION. The Commission has based its Decision on the following considerations:

EUROPEAN COMMISSION. The Commission has based its Decision on the following considerations: EUROPEAN COMMISSION Brussels, 28.2.2018 C(2018) 1387 final Subject: State aid / Hungary SA.46515 (2016/N) Amendment to the community agricultural marketing support scheme Sir, The European Commission ("the

More information

Disclosure Methodological Note For Aventis Pharma Ltd trading as Sanofi

Disclosure Methodological Note For Aventis Pharma Ltd trading as Sanofi Disclosure 2015 Methodological Note For Aventis Pharma Ltd trading as Sanofi INTRODUCTION The EFPIA Disclosure Code requires all EFPIA member companies to disclose transfers of value (TOV) such as support

More information

Ex-post audit Horizon 2020 Zagreb, 25 April Mr Ekke Van Vliet Common Audit Service (CAS)

Ex-post audit Horizon 2020 Zagreb, 25 April Mr Ekke Van Vliet Common Audit Service (CAS) HORIZON HORIZON 2020 2020 Ex-post audit Horizon 2020 Zagreb, 25 April 2018 Mr Ekke Van Vliet Common Audit Service (CAS) I AUDIT CYCLE 2 1.1. Why audits? I, the undersigned Director-General, in my capacity

More information

AUDIT CERTIFICATE WORKING NOTES 6 TH FRAMEWORK PROGRAMME

AUDIT CERTIFICATE WORKING NOTES 6 TH FRAMEWORK PROGRAMME AUDIT CERTIFICATE WORKING NOTES 6 TH FRAMEWORK PROGRAMME WORKING NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP VERSION 1 APPROVED

More information

Guidelines on regional state aid for

Guidelines on regional state aid for Guidelines on regional state aid for 2014-2020 Bojana VRCEK DG COMP- Regional state aid 2 July 2015 Structure of presentation 1. Regional State aid & Cohesion 2. Regional aid: Where? 3. Regional aid: What

More information

This is the flowchart for stating/reporting the budget starting from the proposal phase tup till diurng control by an auditor. The key message is

This is the flowchart for stating/reporting the budget starting from the proposal phase tup till diurng control by an auditor. The key message is 1 2 3 This is the flowchart for stating/reporting the budget starting from the proposal phase tup till diurng control by an auditor. The key message is that funding is not based on the estimated budget,

More information

Guide for Applicants

Guide for Applicants The Romanian-EEA Research Programme 2012-2017 RO14 - Programme Area: Research within priority Sectors Monica Cruceru Program Coordinator UEFISCDI I. Definitions II. Eligibility of applicants and project

More information

Managing compliance of ESI Funds with State aid rules

Managing compliance of ESI Funds with State aid rules Managing compliance of ESI Funds with State aid rules Carole Mancel-Blanchard European Commission DG Regional Policy Roxana Laiu European Commission ESI & SA Basic principles - 1 Principle 1 SA compliance

More information

Encl.: Report on the annual accounts of the Clean Sky Joint Undertaking for the financial year 2015 together with the Joint Undertaking's reply.

Encl.: Report on the annual accounts of the Clean Sky Joint Undertaking for the financial year 2015 together with the Joint Undertaking's reply. Council of the European Union Brussels, 17 November 2016 (OR. en) 14055/16 FIN 760 COVER NOTE From: date of receipt: 17 November 2016 To: Subject: Mr Klaus-Heiner LEHNE, President of the European Court

More information

Last update: Document reference: IMI2/INT/

Last update: Document reference: IMI2/INT/ Last update: 30.03.2016 Document reference: IMI2/INT/2016-00894 1 Contents 1 Report on budgetary and financial management financial year 2015... 3 1.1. Overview of IMI2 JU activities in 2015... 3 1.2.

More information

English is not an official language of Switzerland. This translation is provided for information purposes only and has no legal force.

English is not an official language of Switzerland. This translation is provided for information purposes only and has no legal force. www.snsf.ch Wildhainweg, P.O. Box, CH-00 Berne Committee of the Foundation Council English is not an official language of Switzerland. This translation is provided for information purposes only and has

More information

Belarus, 28 February 2008

Belarus, 28 February 2008 National Documentation Center (EKT/NHRF) FP7 Rules of Participation Funding schemes Financial issues Evaluation Criteria Implementation Submission Maria Samara, Administrative project officer Maria Koutrokoi,,

More information

POLICY AREA: RESEARCH AND INNOVATION

POLICY AREA: RESEARCH AND INNOVATION 11. Research and Innovation TYPE OF ACTION / MEASURE Reducing number of Programmes Single sector framework POLICY AREA: RESEARCH AND INNOVATION SECTORAL COMMISSION PROPOSALS 14 - All existing Union research

More information

REPORT. on the annual accounts of the European Asylum Support Office for the financial year 2016, together with the Office s reply (2017/C 417/12)

REPORT. on the annual accounts of the European Asylum Support Office for the financial year 2016, together with the Office s reply (2017/C 417/12) 6.12.2017 EN Official Journal of the European Union C 417/79 REPORT on the annual accounts of the European Asylum Support Office for the financial year 2016, together with the Office s reply (2017/C 417/12)

More information

Rules. Unofficial translation. - for aid from the EUDP to projects within research, development and demonstration.

Rules. Unofficial translation. - for aid from the EUDP to projects within research, development and demonstration. Energy Technology Development and Demonstration Programme Rules - for aid from the EUDP to projects within research, development and demonstration. Table of contents 1 INTRODUCTION... 5 2 BENEFICIARIES

More information

Comments on the European Commission s Horizon 2020 Proposals

Comments on the European Commission s Horizon 2020 Proposals Rev. I: 21 st February 2012 Comments on the European Commission s Horizon 2020 Proposals EARTO is in general favourable towards the European Commission s proposals for the future Horizon 2020 (H2020) research

More information

Sanofi-Aventis Bulgaria EOOD Methodological Note

Sanofi-Aventis Bulgaria EOOD Methodological Note Sanofi-Aventis Bulgaria EOOD Methodological Note INTRODUCTION Collaboration between healthcare professionals and Pharmaceutical Companies has long been a positive driver for advancements in patient care

More information

Reporting of Transfers of Value to HCPs and HCOs Methodological Note for Reporting of 2017 Data in 2018

Reporting of Transfers of Value to HCPs and HCOs Methodological Note for Reporting of 2017 Data in 2018 AstraZeneca Eesti OÜ Reg. kood 11733875 Järvevana tee 9 11314 Tallinn Estonia Reporting of Transfers of Value to HCPs and HCOs Methodological Note for Reporting of 2017 Data in 2018 Contents 1. Introduction...

More information

Reporting of Transfers of Value to HCPs and HCOs Methodological Note for Reporting of 2017 Data in 2018

Reporting of Transfers of Value to HCPs and HCOs Methodological Note for Reporting of 2017 Data in 2018 Reporting of Transfers of Value to HCPs and HCOs Methodological Note for Reporting of 2017 Data in 2018 ASTRAZENECA LUXEMBOURG SA N 2002 2220 862 AM BRILL 7B LU-3961 EHLANGE LUXEMBOURG Contents 1. Introduction...

More information

Report on the annual accounts of the Bio-based Industries Joint Undertaking for the financial year Together with the Joint Undertaking s reply

Report on the annual accounts of the Bio-based Industries Joint Undertaking for the financial year Together with the Joint Undertaking s reply Report on the annual accounts of the Bio-based Industries Joint Undertaking for the financial year 2017 Together with the Joint Undertaking s reply 12, rue Alcide De Gasperi - L - 1615 Luxembourg T (+352)

More information

Reporting of Transfers of Value to HCPs and HCOs Methodological Note for Reporting of 2017 Data in 2018

Reporting of Transfers of Value to HCPs and HCOs Methodological Note for Reporting of 2017 Data in 2018 Reporting of Transfers of Value to HCPs and HCOs Methodological Note for Reporting of 2017 Data in 2018 AstraZeneca Bulgaria EOOD Registration number 201340239 36 Dragan Tsankov, Bulgaria, Sofia1057 Contents

More information

UK Higher Education Sector Position on the Horizon 2020 Framework for Research and Innovation. UK Higher Education International Unit Universities UK

UK Higher Education Sector Position on the Horizon 2020 Framework for Research and Innovation. UK Higher Education International Unit Universities UK UK Higher Education Sector Position on the Horizon 2020 Framework for Research and Innovation UK Higher Education International Unit Universities UK March 2012 UK higher education sector position on the

More information

EU framework programme processes

EU framework programme processes Briefing January 2018 Adoption, implementation, evaluation SUMMARY Over the past 35 years, the European Union ( EU) institutions have adopted eight framework programmes for research. The lifecycles of

More information