Eligibility of costs in the Horizon 2020 funded EUROfusion project
|
|
- Mervyn Lyons
- 5 years ago
- Views:
Transcription
1 Eligibility of costs in the Horizon 2020 funded EUROfusion project Garching, 3 December 2015 Subcontractors and other third party support Presented by: Michael Erdmann, EUROfusion Coordinator Unit, Max-Planck-Institute for Plasma Physics
2 H Eligibility of costs Direct Costs Indirect Costs Specific Costs Actual Costs Flat-rate Costs Unit Costs Unit Costs General Eligibility Conditions Personnel Subcontracting Overheads Mobility Other Direct Costs Specific Eligibility Conditions Travel Equipment Goods & Services
3 Eligibility of direct costs Direct Costs Actual Costs General Eligibility Conditions Personnel Subcontracting Other Direct Costs Specific Eligibility Conditions Travel Equipment Goods & Services
4 Eligibility of direct costs of subcontracting Direct Costs Actual Costs Costs that are directly linked to the action implementation and can therefore be attributed to it directly. caused in full by the action or caused in full by several actions and the attribution to a single action can, and has been, directly measured General Eligibility Conditions Subcontracting Specific Eligibility Conditions
5 Subcontracting - general eligibility conditions Actual General conditions for actual costs to be eligible Art. 6.1 Eligible actual costs must meet the following criteria: actually incurred by the beneficiary OK incurred during the action duration (exception for final report) indicated in estimated budget set out in Annex 2 incurred in connection with the action as described in Annex 1 and necessary for its implementation identifiable and verifiable, properly recorded in the beneficiary s accounts in compliance with applicable national law on taxes, labour & social security reasonable, justified, complying with principle of sound financial management
6 Subcontracting - specific eligibility conditions Beneficiaries are expected to have all resources to implement their share of the action themselves. As an exception, however, they may involve third parties. Subcontracting Specific eligibility conditions Art. 6.2 b Specific eligibility conditions for direct costs of subcontracting: costs incurred for subcontracting of action tasks described in Annex 1 OK purchased in accordance with relevant public procurement rules (unless beneficiary is a private company or private association) total estimated costs of subcontracting per beneficiary set out in Annex 2 the following obligations were extended to the subcontractor: avoiding conflict of interest (Article 35) maintaining confidentiality (Article 36) promoting the action and giving visibility to the EU funding (Article 38) liability for damages (Article 46)
7 Subcontracting - ineligible costs Subcontracting Indicative list of ineligible costs Costs based on activities implemented before the starting date of EUROfusion Costs based on activities implemented after the date of project closure Deductible VAT Indirect costs Costs that are invoiced to a third party and therefore not definitely and genuinely born by the beneficiary Costs resulting from subcontracting between beneficiaries (not allowed in the same Grant Agreement)
8 Excursus - other third party support Four additional types of third party support Art. 10, 11, 12, 14 Beneficiaries are expected to have all resources to implement their share of the action themselves. As an exception they may involve third parties. All legal entities involved in the action by providing external support without having signed the Grant Agreement are called third parties. In addition to call upon subcontractors, EUROfusion beneficiaries may: a) b) purchase goods, works or services (Article 10), call upon linked third parties (Article 14) c) use in-kind contributions provided by third parties against payment (Article 11) d) or free of charge (Article 12) to carry out work under the action and declare these costs for the action.
9 Third Party Involvement - Overview Types of third parties Implement action tasks Provides resources or services CHARACTERISTICS What is eligible? Must be indicated in Annex 1 Indirect costs Selecting the third party Articles Subcontractors YES NO PRICE YES NO Best value for money, avoid conflict of interest 13 Contractors NO YES PRICE NO YES Best value for money, avoid conflict of interest 10 Linked Third Parties YES NO COSTS YES YES Must be affiliated or have a legal link 14 In-kind Contributors NO YES COSTS YES YES Not used to circumvent the rules 11 & 12
10 Excursus - other third party support Subcontracting versus a) purchase of works and services Art. 10 Subcontracting (Article 13 GA) Works and services (Article 10 GA) implementation of action tasks no implementation of action tasks but necessary for their accomplishment action tasks must be described in tasks not described in Annex 1 Annex 1 but simplified approval procedure costs are to be declared as Direct Costs are to be declared as costs of subcontracting Other direct costs no indirect costs 25% indirect costs best value for money, if appropriate, lowest price beneficiaries remain fully responsible for the work carried out by third parties.
11 Excursus - other third party support b) Linked Third Parties (LTP) Art. 14 Affiliated entities or entities with a legal link to a beneficiary can be linked third parties. Entities with a legal link refers to an established relationship (between the third party and the beneficiary), which is: not based on a contract for the purchase goods, works or services and a legal relationship. This may be either a legal structure (e. g. JRU) or implemented through an agreement or contract (not limited to the action). The beneficiary remains responsible towards the Commission for the work carried out by the LTP. Moreover, the beneficiary is financially responsible for any undue amount paid by the Commission as reimbursement of costs of their LTP.
12 Excursus - other third party support b) Linked Third Parties (LTP) Art. 14 Additional characteristics of linked third parties: LTPs must be named in Article 14 of the GA. Their tasks and estimated costs must be identified in Annexes 1 and 2 (already at the moment of the GA signature or added later, through an amendment). Work is usually carried out independently and on the LTPs own premises. Beneficiaries must ensure that their GA obligations under Articles 18, 20, 35, 36 and 38 also apply to their LTPs. LTPs claim their own costs (all cost categories, including indirect costs at the 25% flat rate). No profit margin allowed!
13 Excursus - other third party support When no affiliation or established legal link exists, third parties can still provide external support (e. g. seconded staff, laboratory space, machines etc.) in the following forms: c) in-kind contributions provided by third parties against payment Art. 11 Use of in-kind contribution against payment Third parties contributing in-kind make available some of their resources to a beneficiary without this being their economic activity. Third parties and their contributions are set out in Annex 1. Eligible costs are the amounts that the beneficiary pays to the in-kind contributors within the limit of the third party s costs (no profit margin allowed!) Indirect costs (25 % flat-rate) of the third party are: either not taken into account if used in the premises of the beneficiary, or taken into account if used in the third parties premises
14 Excursus - other third party support When no affiliation or established legal link exists, third parties can still provide external support (e. g. seconded staff, laboratory space, machines etc.) in the following forms: and d) in-kind contributions provided by third parties free of charge Art. 12 Use of in-kind contribution free of charge Third parties contributing in-kind make available some of their resources to a beneficiary without this being their economic activity. Third parties and their contributions are set out in Annex 1. The beneficiary may declare costs of in-kind contributors provided free of charge within the limit of the third party s costs. Costs must be included in the in-kind contributor s accounts. They must be declared as receipts of the project. Indirect costs (25 % flat-rate) of the third party are: either not taken into account if used in the premises of the beneficiary, or taken into account if used in the third parties premises
Eligibility of costs in the Horizon 2020 funded EUROfusion project
Eligibility of costs in the Horizon 2020 funded EUROfusion project Garching, 3 December 2015 Other Direct Costs: Travel,, Other Goods & Services Presented by: Melanie John, EUROfusion Coordinator Unit,
More informationEligibility of costs in the Horizon 2020 funded EUROfusion project
Eligibility of costs in the Horizon 2020 funded EUROfusion project Garching, 3 December 2015 of Personnel Presented by: Melanie John, EUROfusion Coordinator Unit, Max-Planck-Institute for Plasma Physics
More informationMono-Beneficiary Model Grant Agreement
Justice Programme & Rights, Equality and Citizenship Programme Mono-Beneficiary Model Grant Agreement (JUST/REC MGA Mono) Version 2.0 10 January 2017 Disclaimer This document is aimed at assisting applicants
More informationMulti-beneficiary Model Grant Agreement
Partnership for Research and Innovation in the Mediterranean Area Programme (PRIMA) Multi-beneficiary Model Grant Agreement Version 5.0 30 January 2018 Disclaimer This document is aimed at assisting applicants
More informationFCH 2 JU Financial Workshop. Third parties. Georgiana Buznosu Legal Officer FCH 2 JU. Brussels, 21 March 2018
FCH 2 JU Financial Workshop Third parties Georgiana Buznosu Legal Officer FCH 2 JU Brussels, 21 March 2018 THIRD PARTIES Overview Notion of third parties in H2020 Individual overview: linked third parties,
More informationEuropean Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement. (EMPIR MGA - Multi)
European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement (EMPIR MGA - Multi) Version 5.0 12 March 2018 Version Publication Date 1.0 16.07.2015 Initial version
More informationProject costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs.
Financial issues Extract from the guide for BONUS applicants 1 8. How to prepare project budget? Only the real costs required for the implementation should be indicated in the planned budget for the project.
More informationCoordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities
Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities Ann Van Menxel DG CNECT H6 Brussels, 17 December 2013 Legal references Reimbursement
More informationModel Grant Agreement LUMP SUM PILOT S2R JU
HORIZON HORIZON 2020 2020 Model Grant Agreement LUMP SUM PILOT S2R JU Lump sum grant: introduction The grant agreement will set out the lump sum (EU funding) corresponding to the full accomplishment of
More informationMulti-Beneficiary Model Grant Agreement
H2020 Programme Multi-Beneficiary Model Grant Agreement Pre-Commercial Procurement (PCP) and Procurement of Innovative Solutions (PPI) (H2020 MGA PCP/PPI Multi) Version 5.0 18 October 2017 Disclaimer This
More informationCreative Europe Sub-programme Culture Financial management
Creative Europe Sub-programme Culture Financial management 10 November 2014 Sandra Delespesse & Maria-Paz Benito 1 Content Financial tasks Eligibility of costs Important documents Checks, audit and evaluation
More informationFCH JU GRANT AGREEMENT
FCH JU GRANT AGREEMENT COORDINATORS DAY Brussels, September 23 rd 2016 Georgiana Buznosu Legal framework of a H2020 project EU Financial Regulation 1. H2020 Rules for Participation Applicable Work Plan
More informationMulti-beneficiary Model Grant Agreement for Members
Clean Sky 2 Joint Undertaking (CS2) Multi-beneficiary Model Grant Agreement for Members (CS2 JU Members MGA Multi) Version 5.0 28 November 2017 Disclaimer This document is aimed at assisting applicants
More informationAudit certificate template for Horizon2020 projects funded by SERI
Audit certificate template for Horizon2020 projects funded by SERI Under Article 4.1 of the subsidy agreement concluded between SERI and the Swiss research institution (hereinafter referred to as beneficiary),
More informationMulti-Beneficiary Model Grant Agreement
European Research Council (ERC) Multi-Beneficiary Model Grant Agreement ERC Starting Grants, Consolidator Grants and Advanced Grants (H2020 ERC MGA Multi) Version 5.0 18 October 2017 Disclaimer This document
More informationMono-Beneficiary Model Grant Agreement
European Research Council (ERC) Mono-Beneficiary Model Grant Agreement ERC Proof of Concept (H2020 ERC MGA PoC Mono) Version 5.0 18 October 2017 Disclaimer This document is aimed at assisting applicants
More informationANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS
ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions Where the grant takes the form of a unit
More informationFCH 2 JU GRANT AGREEMENT
FCH 2 JU GRANT AGREEMENT Georgiana Buznosu - Legal Officer http://www.fch.europa.eu/ LEGAL FRAMEWORK OF A H2020 PROJECT EU Financial Regulation 1. H2020 Rules for Participation Applicable Work Plan 2.
More informationFCH 2 JU Financial Workshop Brussels, 30 March Direct Costs. Thanos BATSILAS, FCH 2 JU Financial Officer.
FCH 2 JU Financial Workshop Brussels, 30 March 2017 Direct Costs Thanos BATSILAS, FCH 2 JU Financial Officer http://www.fch.europa.eu/ General eligibility criteria Article 6 Actually incurred! Incurred
More informationFinancial Rules in FP7 Projects
FP7 Financial Management and Audits Financial Rules in FP7 Projects Mr. Gabor Kitley Managing Director Europa Media PSC 13 November 29, Budapest Content Basic Facts Forms of financing Eligibility rules
More informationAnnex VI. Model terms of reference for the Certificate on the Financial Statements
Annex VI Pielikums Nr.2 Model terms of reference for the Certificate on the Financial Statements 1. Audit objectives The certificate on the financial statements and underlying accounts, produced by an
More informationFAQ. Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014)
FAQ Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014) CORRIGENDUM: In the first version of the Application Guide,
More informationANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS
ANNEX III FINANCIAL AND CONTRACTUAL RULES KEY ACTION 2 SCHOOL EXCHANGE PARTNERSHIPS [KA229] I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions
More informationGuide for Applicants
EUROPEAN COMMISSION EUROSTAT Guide for Applicants Eurostat Grants Version 4.0 11 January 2018 1/55 IMPORTANT NOTICE The Guide for Applicants is a user guide that aims to explain to applicants and beneficiaries
More informationModel Grant Agreement FINANCIAL ISSUES
HORIZON HORIZON 2020 2020 Model Grant Agreement FINANCIAL ISSUES Next Steps MGA Amendment 27/02/2017: Most relevant novelties Article 6.2.A.1 Direct personnel costs: new definition for additional remuneration
More informationCall for Proposals Action 1 Promoting Cluster Excellence (62/G/ENT/CIP/13/C/N04C031) Financial Aspects
Call for Proposals Action 1 Promoting Cluster Excellence (62/G/ENT/CIP/13/C/N04C031) Action 2 Clusters and Entrepreneurship in Support of Emerging Industries (64/G/ENT/CIP/13/C/N04C02) Information Day
More informationFINANCE AND BUDGET. Research Executive Agency Marie Curie host-driven actions. ITN Coordinators Meeting Brussels, September 2012
FINANCE AND BUDGET Research Executive Agency Marie Curie host-driven actions ITN Coordinators Meeting Brussels, September 2012 Financial Management of ITN Projects 1. EU contribution - cost categories,
More informationFinancial errors in FP7 How to improve the quality of financial statements?
Financial errors in FP7 How to improve the quality of financial statements? Oslo, 26 April 2013 Doroteya PETROVA ERC Executive Agency Marcin BARAN European Commission Introduction This presentation is
More informationFRAMEWORK PARTNERSHIP AGREEMENT
NUMBER FPA2016/EIT/CLIMATE-KIC Ref.: 00198.EIT.2016.I FRAMEWORK PARTNERSHIP AGREEMENT NUMBER FPA2016/EIT/CLIMATE-KIC This Framework Partnership Agreement is between the following parties: on the one part,
More informationFinancial Guidelines for Beneficiaries EDCTP Association October 2016
Financial Guidelines for Beneficiaries EDCTP Association October 2016 This document is prepared as a supplement to the Grant Agreement (GA), where majority of the information is extracted from. In the
More informationCLEAN SKY FINANCIAL WORKSHOP 18/01/2018 QUESTIONS & ANSWERS
CLEAN SKY FINANCIAL WORKSHOP 18/01/2018 QUESTIONS & ANSWERS Q1: What happens if a member has no allocated budget for the given year in the GAM? Is there still an obligation to contribute to the administrative
More informationAdministrative, Financial and Operational Aspects of Project Management
Administrative, Financial and Operational Aspects of Project Management European Commission Directorate General Environmental Technologies Unit Presentation 1. General overview of Grant Agreement 2. Duties
More informationWebinar on Other Direct Costs in Horizon 2020
Webinar on Other Direct Costs in Horizon 2020 Welcome! We will start the webinar 12:00 CET. The presentation slides and recording will be published on http://www.ncpacademy.eu/ after the webinar. Other
More informationCOMMISSION DECISION. of
EUROPEAN COMMISSION Brussels, 26.1.2017 C(2017) 308 final COMMISSION DECISION of 26.1.2017 authorising the use of reimbursement of indirect costs on the basis of a maximum flatrate of 25% for the actions
More informationEstimated eligible actual costs
GRANT AGREEMENT NR/TITLE : REPORTING PERIOD : EXPENDITURE FINANCIAL STATEMENT COMM/MAD/2016/04 - Annex VIII From dd/mm/yyyy to dd/mm/yyyy REIMBURSEMENT OF ELIGIBLE COSTS Applicants should give full details
More informationAnnex X to the Model LIFE Grant Agreement Financial and Administrative Guidelines
Annex X to the Model LIFE Grant Agreement Financial and Administrative Guidelines (Update 20.06.2018) Main changes to Annex X compared to the previous version relate to : - inconsistencies/corrections/further
More informationThis is the flowchart for stating/reporting the budget starting from the proposal phase tup till diurng control by an auditor. The key message is
1 2 3 This is the flowchart for stating/reporting the budget starting from the proposal phase tup till diurng control by an auditor. The key message is that funding is not based on the estimated budget,
More informationLegal and financial issues in Horizon Bonn,
Legal and financial issues in Horizon 2020 Bonn, 01.02.2017 www.nks-ruf.de National Contact Point Legal & Financial Issues Located in the EU-Bureau of the BMBF in Bonn and Berlin Advice on legal and financial
More informationBrussels, 11 May FP7 Audit. DG RTD Unit M2
Brussels, 11 May 2011 FP7 Audit DG RTD Unit M2 1 Contents 1. Purpose of the audits 2. When, by whom and how selected 3. Phases of the audit 4. Common Mistakes 5. Systemic errors 6. Questions 2 Purpose
More informationHorizon 2020 SME Instrument Experts Briefing - Subcontracting Part 3
Horizon 2020 SME Instrument Experts Briefing - Subcontracting Part 3 General rules under H2020 Art.13 of the General Model Grant Agreement (GMGA): "If necessary to implement the action, the beneficiaries
More informationAudit certificates. Training Seminar Brussels 28 November 2006
Audit certificates Training Seminar Brussels 28 November 2006 Overview Introduction Audit certificate requirements What When By whom Audit certificate template Audit certificate guidance notes for contractors
More informationFinancial and Reporting Rules IRIS Project
Financial and Reporting Rules IRIS Project February 18 th, 2013 Sivan Schmidt Project number 530315-TEMPUS-1-2012-1-IL-TEMPUS-JPGR This project has been funded with support from the European Commission.
More informationCERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS
CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS MATERIALS PREPARED BY THE WORKING GROUP ON CERTIFICATE ON THE METHODOLOGY UNDER FP7: DG RESEARCH AND INNOVATION DG
More informationEuropean Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer
European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer Alexandros IATROU Deputy Head of Administration and Finance Unit, Directorate for Energy DG Research and Innovation JOPRAD
More informationLIFE Grant Agreement Financial Aspects Highlights
LIFE Grant Agreement Financial Aspects Highlights Kick-off Meetings Call 2016 Action Grants Strand buddies (EASME) Congratulations for obtaining the Grant! And Welcome to the Finance presentation SUMMARY
More informationAUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME
AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME WORKING NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP/ COORDINATION GROUP
More informationAnnex II Draft specific grant agreement
Model specific agreement: December 2016 Annex II Draft specific grant agreement SPECIFIC AGREEMENT No./.. This Specific agreement ("the Specific agreement") is concluded between the following parties:
More informationProject Management and Financial Reporting
Horizon 2020 and ERC Project Management and 11-13 April 2018 Brussels Horizon 2020 Project Management and AGENDA DAY 1 08:30 09:00 Registration 09:00 09:30 Event opening 09:30 10:30 How to Coordinate and
More informationPracticalities in the Financial Management of FP7 projects - An outlook to audits and Horizon 2020 rules
Practicalities in the Financial Management of FP7 projects - An outlook to audits and Horizon 2020 rules Gabor Kitley Chief Executive Officer Europa Media Is the FP7 Financial Audit really a nightmare?
More informationH2020-ITN-2015 Info Day. Finance. Francisca CUESTA SÁNCHEZ. Research Executive Agency Unit REA-A1
H2020-ITN-2015 Info Day Finance Francisca CUESTA SÁNCHEZ Research Executive Agency Unit REA-A1 Overview 1. EU contribution 2. Eligible & ineligible costs 3. Funding mechanism 4. Cost categories 5. Records
More informationProject Administration
Co-funded by the European Union Project Administration Maria Grazia Bonanomi, UCSC Diverse Kick-off meeting - Milan, 22-24 January 2014 Outline: - Context - Key features - Final Reporting Package - Eligible
More informationANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS
ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions Where the grant takes the form of a unit
More informationImportant Messages - Grants
GRANT IMPORTANT MESSAGES Important Messages - Grants SCOPE Important messages contain: 1) procedural rules ( procedure ) e.g. interpretation of the PRAG or internal procedures etc. 2) recommendations e.g.
More informationDG Justice & Consumers. Project Management.General Principles
DG Justice & Consumers Project Management.General Principles Project Life-Cycle Start Eligibility Monitoring End Eligibility Closing of Project A M E N D M E N T S Proposal Grant Agreement Progress report
More informationCOMMISSION DECISION. of
EUROPEAN COMMISSION Brussels, 25.11.2016 C(2016) 7553 final COMMISSION DECISION of 25.11.2016 modifying the Commission decision of 7.3.2014 authorising the reimbursement on the basis of unit costs for
More informationAUDIT CERTIFICATE WORKING NOTES 6 TH FRAMEWORK PROGRAMME
AUDIT CERTIFICATE WORKING NOTES 6 TH FRAMEWORK PROGRAMME WORKING NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP VERSION 1 APPROVED
More informationANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS
ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions Where the grant takes the form of a unit
More informationSouth East Europe (SEE) SEE Control Guidelines
South East Europe (SEE) SEE Control Guidelines Version 1.4. Final version approved by the MC 10 th June 2009 1 st amendment to be approved by MC (2.0) 1 CONTENTS 1 Purpose and content of the SEE Control
More informationModel Grant Agreement FINANCIAL ISSUES
HORIZON HORIZON 2020 2020 Model Grant Agreement FINANCIAL ISSUES Table of Contents 1. FP7 : Lessons learned 2. H2020: Model Grant Agreement 3. Cost Categories and Reporting Issues a. Personnel cost calculation
More informationModel Grant Agreement FINANCIAL ISSUES
HORIZON HORIZON 2020 2020 Model Grant Agreement FINANCIAL ISSUES Table of Contents 1. Introduction 2. H2020: Model Grant Agreement 3. Cost Categories and Reporting Issues a. Personnel cost calculation
More informationModel terms of reference for the certificate on the financial statements
Model terms of reference for the certificate on the financial statements Terms of erence for an Independent Report of Factual Findings on costs declared under a Grant Agreement financed under the Call
More informationTips on Administrative issues and Financial Reporting KOM ANYWHERE Soraya Hidalgo European Projects Office - UPC
Tips on Administrative issues and Financial Reporting Soraya Hidalgo European Projects Office - UPC Outline H2020 Main changes Grant Agreement Structure Financial reporting Elegibility criteriai Do s and
More informationMarket Replication: Eco-Innovation F I N A N C I A L G U I D E L I N E S for co-ordinators and co-beneficiaries
Market Replication: Eco-Innovation 2008-2013 F I N A N C I A L G U I D E L I N E S for co-ordinators and co-beneficiaries I ACCOUNTING DOCUMENTS 2 II COST REIMBURSEMENT 3 III WHAT ARE ELIGIBLE COSTS? 4
More informationFCH 2 JU Grant Agreement.
FCH 2 JU Grant Agreement Nicolas.brahy@fch.europa.eu Why should I care about the GA at this stage? Time to Grant reduced 5 months for evaluation 3 months for signature no time for real negotiation! no
More informationFP7 CERTIFICATION MODALITIES
KP7 bijeenkomst Nederlandse accoutants Nijenrode Business Universiteit, Breukelen 12 January 2010 FP7 CERTIFICATION MODALITIES Laurence DECHEVRE European Commission - DG Research, Unit A5 1 Overview of
More informationITN 2010 Finance and Budget
Brussels, February 2011 ITN Coordinators meeting ITN 2010 Finance and Budget Research Executive Agency Marie Curie host-driven actions Financial Management of ITN Projects 1. The EU contribution The cost
More informationCertification of Financial Statements for ICT PSP projects
DG INFORMATION SOCIETY AND MEDIA ICT Policy Support Programme Competitiveness and Innovation Framework Programme Certification of Financial Statements for ICT PSP projects Version 1.0 (03-03-2008) Certification
More informationUniversity Hospital Basel
University Hospital Basel Financial Ressort Fund Controlling Factsheet about EU s FP7 (V.1.01) Major Characteristics in Brief On the following pages you will find useful advices for the execution of FP7-Projects
More informationThe Hitchhiker s Guide to the Financial Rules and Management of Horizon 2020 Projects
The Hitchhiker s Guide to the Financial Rules and Management of Horizon 2020 Projects Gabor Kitley CEO/Europa Media 5-6 June 2018 CERN Gevena, Switzerland Chapters 1. The Basics 2. The Practicalities 3.
More informationTERMS OF REFERENCE FOR AN EXPENDITURE VERIFICATION OF A GRANT CONTRACT - EXTERNAL ACTION OF THE EUROPEAN UNION -
TERMS OF REFERENCE FOR AN EXPENDITURE VERIFICATION OF A GRANT CONTRACT - EXTERNAL ACTION OF THE EUROPEAN UNION - HOW TO USE THIS TERMS OF REFERENCE MODEL? All text highlighted in yellow in this ToR model
More informationWhy? Disclaimer: Information not legally binding
LUMP SUM PILOT Why? Why? Simplification: No financial reporting, no time sheets, no financial audit. Payment exclusively based on completion of activity. Pilot scheme to evaluate results view to FP9 Start
More informationANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS
ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions Where the grant takes the form of a unit
More informationIN2IT FINANCIAL WORKSHOP
IN2IT FINANCIAL WORKSHOP DR. VERED HOLZMANN IN2IT PROJECT MANAGER MTA, 13 MARCH 2016 Agenda Part A: Erasmus+ Office: Rationale of the Erasmus+ budget management Unit costs vs. Actual costs Control unit
More informationH2020 General Model Grant Agreement Multi (H2020 General MGA Multi)
H2020 General Model Grant Agreement Multi (H2020 General MGA Multi) Version 2.1 1 October 2015 Disclaimer This document is aimed at assisting applicants for Horizon 2020 funding. It shows the full range
More informationFCH 2 JU Financial Workshop. Other Direct Costs. Thanos BATSILAS Financial Officer FCH 2 JU. Brussels, 21 March 2018
FH 2 JU Financial Workshop Other Direct osts Thanos TSILS Financial Officer FH 2 JU russels, 21 March 2018 rticle 6.2.D Financial Statement olumn D 5 cost categories (but 3 reporting sub-columns) 2 forms
More informationAn overview of the eligibility rules in the programming period
Rules and conditions applicable to actions co-financed from Structural Funds and Cohesion Fund An overview of the eligibility rules in the programming period 2007-2013 FEBRUARY 2009 1 Table of contents
More informationMODEL FOR THE CERTIFICATE ON THE FINANCIAL STATEMENTS
Grant Agreement number: [insert number] [insert acronym] [insert call identifier of the master call] H2020 Model Grant Agreement: Multi-beneficiary General MGA: December 2013 ANNEX 5 MODEL FOR THE CERTIFICATE
More informationJUST/2015/RGEN/AG/ROLE JUST/2016/RGEN/AG/VAWA
Project Management JUST/2015/RDAP/AG/MULT JUST/2015/RGEN/AG/ROLE JUST/2016/RGEN/AG/VAWA Kick-off Meeting 14 March 2017 1 Who s who? different actors Beneficiaries (mono or multi) and other project partners
More informationRules on eligibility of expenditure
Rules on eligibility of expenditure 2014-2020 Financial management of IPA Programme 18-19 October 2016 Belgrade, Serbia @InteractEU Mattias Assmundson, Interact Programme Dimensions of eligibility discussed
More informationPresentation on Financial and Administrative activities. L.Garvia (D Appolonia)
Presentation on Financial and Administrative activities L.Garvia (D Appolonia) Tableof ofcontent New in HORIZON 2020 o Reimbursment rate; Method for calculation of indirect costs; Electronic signatures
More informationANNEX A - I. Note: it is important that each tenderer has read the Working Practice and its annexes very carefully.
ANNEX A - I Note: it is important that each tenderer has read the Working Practice and its annexes very carefully. WORKING PRACTICE 1.GENERAL INFORMATION 1.1.THE AUDIT CO-ORDINATOR 1.1.1.The Audit Co-ordinator
More informationFINANCIAL PROVISIONS
Justice Programme & Rights, Equality and Citizenship Programme FINANCIAL PROVISIONS Annex to Calls for Proposals Action Grants 2018 Version 1.0 30 January 2018 History of changes Version Date Change Page
More informationGRANT DECISION APPROVING NATIONAL PROGRAMMES AND ASSOCIATED FUNDING. Decision Number SANTE/2018/ES/SI
Ref. Ares(2018)592514-31/01/2018 EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HEALTH AND FOOD SAFETY Food Chain: Stakeholders and International Relations Director GRANT DECISION APPROVING NATIONAL PROGRAMMES
More informationLegal and Financial Issues in H2020
Legal and Financial Issues in H2020 BESTPRAC Training School September 27, 2016 Katarina Rohsmann, FFG OVERVIEW ü Minimum requirements for participation ü Funding instruments and funding rates ü Grant
More informationGuide for Applicants
The Romanian-EEA Research Programme 2012-2017 RO14 - Programme Area: Research within priority Sectors Monica Cruceru Program Coordinator UEFISCDI I. Definitions II. Eligibility of applicants and project
More informationIMI Financial Guidelines
Innovative Medicines Initiative IMI Financial Guidelines VERSION 2 of 20 June 2013 These guidelines aim at assisting all IMI consortia during the negotiation phase and all individual participants during
More informationFinancial Reporting. Tempus IV. Kyiv-Mohyla Academy Kiev 16 November Ana Ramon de la Cruz and Giulia Moro
Financial Reporting Tempus IV Kyiv-Mohyla Academy Kiev 16 November 2016 Ana Ramon de la Cruz and Giulia Moro 1 1. General principles Exchange rate Co-financing Transfer of money 2. Budget headings (purpose,
More informationProcedures for the Administration of Subcontracts
Procedures for the Administration of Subcontracts The purpose of this document is to assist Rensselaer faculty and staff in the preparation and administration of subawards and subcontracts issued under
More information2016 CALL FOR PROPOSALS FOR PROJECTS ON PREVENTION AND PREPAREDNESS IN CIVIL PROTECTION AND MARINE POLLUTION
2016 CALL FOR PROPOSALS FOR PROJECTS ON PREVENTION AND PREPAREDNESS IN CIVIL PROTECTION AND MARINE POLLUTION 1. Is Turkey eligible under the External or the internal budget? Until the EU receives information
More informationGuide to Financial Issues relating to ICT PSP Grant Agreements
DG COMMUNICATIONS NETWORKS, CONTENT AND TECHNOLOGY ICT Policy Support Programme Competitiveness and Innovation Framework Programme Guide to Financial Issues relating to ICT PSP Grant Agreements Version
More informationKA2 Strategic Partnerships Financial Management. 21st September
KA2 Strategic Partnerships Financial Management 21st September 2017 Leargas.Ireland @Leargas www.leargas.ie 1 Overview General Principles of Financial Management Eligibility of Expenses (eligible and ineligible
More informationQ&A on simplified cost options in programmes. March 2018 Application, control and audit: use of simplified cost options for staff costs
Q&A on simplified cost options in programmes Application, control and audit: use of simplified cost options for staff costs Disclaimer: Answers to questions presented in this Q&A document have been drafted
More informationFinancial Webinar. IMI 2 projects :00 CET
Financial Webinar IMI 2 projects 12.05.2017 10:00 CET Agenda How to use GoToWebinar o Gaëlle Lanckmans, IMI Finance Cost Eligibility o Gaëlle Lanckmans, IMI Finance Reporting requirements and Migration
More informationCOMMISSION DECISION. of
EUROPEAN COMMISSION Brussels, 10.12.2013 C(2013) 8196 final COMMISSION DECISION of 10.12.2013 authorising the use of reimbursement on the basis of unit costs for energy efficiency measures in buildings
More informationGENERA guidelines on reporting. Kick-off Meeting Brussels. Paula Mota Alves
GENERA guidelines on reporting Kick-off Meeting 17.09.2015 Brussels Paula Mota Alves Unit B5 Spreading Excellence, Widening Participation, Science with and for Society Outline of presentation o Horizon
More informationANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS
ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions Where the grant takes the form of a unit
More informationCOMMISSION IMPLEMENTING REGULATION (EU)
L 46/8 Official Journal of the European Union 19.2.2013 REGULATIONS COMMISSION IMPLEMENTING REGULATION (EU) No 135/2013 of 18 February 2013 amending Implementing Regulation (EU) No 926/2011 for the purposes
More informationEN ANNEX XXIII (edited by EUROfusion Coordinator Unit) Table changes for H2020 MGAs
EN ANNEX XXIII (edited by EUROfusion ) H2020 Model Grant Agreements: Table of changes: V3.0 dd.mm.2016 Table changes for H2020 MGAs In red new text added to the Articles Strikethrough text removed from
More informationor institution which in turn is a member of the International Federation of Accountants (IFAC).
Terms of Reference for an Expenditure Verification of a Grant Contract for Estonia - Latvia- Russia Cross Border Cooperation Programme within the European Neighbourhood and Partnership Instrument 2007-2013
More informationAcceptable costs in SBO and TBM projects (COST MODEL)
1. Introduction Acceptable costs in SBO and TBM projects (COST MODEL) 1.1. Purpose of the cost model This document contains important guidelines for: - the preparation of a project budget (in the project
More information