Administrative and financial aspects: recommendations for the preparation of proposals

Size: px
Start display at page:

Download "Administrative and financial aspects: recommendations for the preparation of proposals"

Transcription

1 Environment (including climate change) Theme 2012 Calls 17 June 2011 Administrative and financial aspects: recommendations for the preparation of proposals Vincent Favrel Deputy Head of Unit Unit I.6 Administration and Finance Directorate I Environment European Commission - Research DG Vincent.Favrel@ec.europa.eu 12 July

2 Administrative and financial aspects: recommendations for the preparation of the proposals Outline: Building the consortium Calculating the budget More information? 2

3 Building the consortium Validation of participants Highly recommended: To clarify the legal status of all consortium members (e.g. public/private, profit/not-profit, SME, international organisations, etc) that is determining the upper-limit for the EU contribution and, in some cases, the eligibility of the proposals (e.g SME participation) To this aim, please make sure that all participants: Are registered in the Unique Registration Facility or URF in order to get a Participant Identification Code (PIC) see Have submitted the documents for their validation in order to be validated preferably before submitting the proposal. All self-declared SME should pre-check their status against the EU definition (see tool provided on-line at: and submit the required documents 3

4 Building the consortium Project coordinator (2/2) Coordinators should not be selected exclusively based on their scientific excellence! Issues to be addressed at the proposal preparation stage: Has the coordinator the operational and financial capacity required for his role (see Article II.2.3)? Verification of the Financial Viability required if the coordinator is a not public organisation (see pre-check tool available on Cordis for pre-check: Split of Financial/Administrative & Scientific roles is possible. However: Financial/Administrative Coordinator always deemed to be the Coordinator for contractual purposes. Coordination tasks cannot be outsourced (only limited support administrative tasks can). 4

5 Building the consortium Contribution from third parties (1/3) Please make sure that all possible internal and external contributions are identified during the proposal preparation phase. General principle: Beneficiaries (i.e consortium members) should have the operational capacity to carry out the work themselves. BUT: Under certain conditions, legal entities that are not part of the consortium may also contribute to the projects and the costs incurred by these third parties not signing the GA may be eligible. Three types of third parties can be identified depending on their contribution to the project In all cases: A beneficiary cannot be the third party to another beneficiary Third party s contribution (tasks + budget) should be discribed in the proposal The beneficiary retains sole responsibility for the work 5

6 Building the consortium Contribution from third parties (2/3) Key questions in order to identify the type of third parties: Is the third party carrying out part of the work under its own supervision OR is it simply making resources (staff, infrastructures?) available to a beneficiary? If the third party makes resources available to a beneficiary: Are the resources under the full supervision, management and control of the beneficiary? Does the beneficiary reimburse the third party (= eligible costs) or is it free of charge (possibly a receipt for the project)? Costs reported by the beneficiary itself (not the third party) Examples: Foundations, spin-off companies, etc., created in order to manage the administrative tasks of the beneficiary The case of resources (professors/equipment) working for, or used by a university but whose salaries/costs are paid by the Government: beneficiary is free to use these resources at will 6

7 Key questions in order to identify the type of third parties (ctd.): If the third party is carrying out part of the work: Does its contribution concern a limited part of the work or the provision of (technical) support to a beneficiary? OR Building the consortium Contribution from third parties (3/3) Is it a service provided at market price, for profit with no specific interest in the research? Third party = subcontractor Only the tasks and indicative budget (not the name of the subcontractor) have to be identified in the proposal! Does its contribution concern research tasks with scientific added value? Is there a formal relationship between the beneficiary and the third party prior and not limited to the project? Are the costs of the third party charged without profit? Third party + beneficiary = members of a Joint Research Unit (UMR), a grouping or affiliates Grant Agreement must include the Special Clause 10 and the third party will claim its own costs. 7

8 Form of grant: reimbursement of direct and indirect eligible costs (see definition in GA Art. II.14) Eligible costs must be actual and may include: Costs of personnel working on the project (to be documented by time sheets) Subcontracting costs Calculating the budget: General principles (1/2) Other costs: travel and subsistence; durable equipment; consumables and supplies, etc. Indirect costs calculated according to the Indirect Costs Method validated for each legal entity (actual costs, simplified method, standard and special transitional flat rate) 8

9 EU contribution Calculating the budget: General principles (1/2) Legal entities established in Member States, Associated Countries, ICPC and international European Interests organisations are eligible for EU funding Maximum reimbursement rate (50%, 75% or 100%) depending on: - the legal status of the organisation (e.g. public vs private) Reporting: - the funding scheme (e.g. collaborative project vs coordination and support action) - the type of activity (e.g. research vs management) Costs to be reported at the end of each period (Form C) Certificates on Financial Statements (CFS) to be provided when (and only when) the EU contribution requested exceeds

10 Certification on the Financial Statements (CFS) General principles: Mandatory for a beneficiary when its cumulative requested EU contribution for the project exceeds 375,000; Otherwise, no CFS requested, not even at the end of the project. If above the threshold, 2 exceptions: for project of 2 years or less, CFS submitted only at the end; if a certification on the methodology is provided, no intermediate CFS required but only at the end. CFS costs to be budgeted as management costs (e.g. subcontracting) BUT they will be eligible only when it is contractually required (EU contribution > ) 10

11 Allocation of resources and related costs to activity types (1/2) Types of activities: RTD Research and technological development activities DEM Demonstration activities COORD/SUP Coordination and support activities MGT Management activities including: Overall legal, ethical, financial & legal coordination; Certificates on Financial Statements (ONLY if contractually required!); Audits & Technical Review costs; Implementation of competitive calls for the selection of additional beneficiaries Maintenance of the Consortium Agreement; OTH Other activities including: Dissemination, networking, intellectual property rights (patent), studies, promotion of the exploitation of results Training and career development of researchers actions 11

12 Allocation of resources and related costs to activity types (2/2) Points to bear in mind when preparing the proposal: Tasks and efforts to be allocated to the correct activity type One activity type per Work Package as a general rule In addition to research (coordination/support) Work Packages, you should generally have one Work Package for management + one Work Package for dissemination (incl. communication and training activities) Costs and EU contribution budgeted must be consistent with the task allocation in the proposal 12

13 Exceptions - Average personnel costs and flat rates Costs claimed may not be actual in the following cases: Average personnel costs if it is based on a methodology considered as beneficiary s usual cost accounting practice and applied consistently to all participations in FP activities (see new eligibility criteria in the Decision on 3 measures to simplify the management of EU FP7 grants); Natural persons (self-employed, one-man company, etc.) and SMEowners who do not receive a salary registered as such in the accounts Use of a flat rate based on the ones published in the annual People Work Programme (Marie Curie Fellowships) and a standard number of productive hours equal to per year; Flat rates may be used to claim daily subsistence costs and accommodation related to travel as part of the implementation of a project it applies to any travel of this participant in the specific project or only for external experts/advisors needed for the project; For more information: 13

14 Exceptions Indirect Costs in Coordination and Support Actions (1/2) Specific rules for Coordination and Support Actions: The transitional flat rate of 60% does not apply to Coordination and Support Action (CSA) but only to funding schemes with RTD and demonstration activities The 20% standard flat rate applies and is calculated automatically in NEF for the participants using the transitional flat rate of 60% 100% EU funding of direct eligible costs BUT indirect costs will be reimbursed up to maximum 7% of the direct eligible costs, excluding subcontracting and the costs of resources made available by third parties which are not used on the premises of the beneficiary. 14

15 Exception - Third Countries and International Organisations Legal entities established in International Cooperation Partner Countries (ICPC) are entitled to EU funding. Participants from third countries other than ICPC (i.e. high-income countries) + International Organisations (different from International European interest organisations) may: Participate if participation conditions already fulfilled; Receive funding only if: provided for in the SP or WP (not applicable for FP7 ENV Calls 2011) the EU financial contribution in respect of this participant is essential for carrying out the project it should be duly justified and approved by Commission services provision for funding is provided for in a bilateral agreement between Community and the third country. 15

16 Exceptions Lump sums (1/2) Optional alternative funding form for International Cooperation Partner Countries participants The lump sum covers all the costs of an ICPC participant, including not only the costs for personnel and travel, but also those of equipment, consumables and indirect costs. Lump sum calculated based on: Lump sum amount per researcher per year based on the economy of the ICPC (3 income groups) The number of person-years requested for the project by the legal entity (efforts for research activities only!) As for any other participants, the reimbursement rate is based on the funding scheme and the legal status 16

17 Exceptions Lump sums (2/2) Points to bear in mind when preparing the DoW and the GPF: Make sure that the lump sum is calculated according to the rules and consistent with the contribution (in Person- Months) of the participant to the project activities: Interest of ICPC participants to use the lump sum option should be checked at an early stage 17

18 Reporting periods Reporting periods 18-month period to be used as a general rule to reduce the administrative burden 18 months is a maximum duration for a reporting period If project duration not multiple of 18 months: Preference should be given to shorter periods at the end of the project (e.g instead of ) More balanced periods can also be envisaged for a better monitoring of the project (e.g instead of 18+6) 18

19 Reporting Periodic reports to be submitted by coordinator 60 days after end of period: overview of progress of the work, including a publishable summary report, use of the resources and Financial Statement (Form C) Final reports to be submitted by coordinator 60 days after end of project: publishable summary report, conclusions and socioeconomic impact, covering wider societal implications and a plan on use and dissemination of foreground. Commission has 105 days to evaluate and execute the corresponding payment: No tacit approval of reports Automatic payment of interests 19

20 Payment modalities One pre-financing (45 days after entry into force of the GA) for the whole duration of the project): Indicative amounts: For projects with more than two periods: 160% of estimated average EU funding per reporting period (=max EC contribution/n of periods); For projects with 1-2 periods: 60-80% of the total EC contribution. 5% of maximum EC contribution (Art. 5.1 GA) is transferred from the prefinancing to Guarantee Fund; Coordinator is deemed to have received full prefinancing; Signed Form A needed by the Coordinator before transfer of pre-financing can be made. Interim payments based on financial statements (EC contribution= amounts justified & accepted * funding rate); Retention (10%); Final payment (with recovery of the 10% retention and the 5% contribution to the Guarantee Funds if possible). 20

21 More information? Documents to read carefully (all beneficiaries!) Model Grand Agreement (incl. the General Conditions and Special Clauses) Reference documents Rules for participation and dissemination of results Guide to Financial Issues Rules to ensure consistent verification of participants Guide to Intellectual Property Rules Guidance notes on project reporting Guidance notes on audit certification Find a document FP7 Helpdesk 21

Administrative, Financial and Operational Aspects of Project Management

Administrative, Financial and Operational Aspects of Project Management Administrative, Financial and Operational Aspects of Project Management European Commission Directorate General Environmental Technologies Unit Presentation 1. General overview of Grant Agreement 2. Duties

More information

Belarus, 28 February 2008

Belarus, 28 February 2008 National Documentation Center (EKT/NHRF) FP7 Rules of Participation Funding schemes Financial issues Evaluation Criteria Implementation Submission Maria Samara, Administrative project officer Maria Koutrokoi,,

More information

Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities

Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities Ann Van Menxel DG CNECT H6 Brussels, 17 December 2013 Legal references Reimbursement

More information

Financial Rules in FP7 Projects

Financial Rules in FP7 Projects FP7 Financial Management and Audits Financial Rules in FP7 Projects Mr. Gabor Kitley Managing Director Europa Media PSC 13 November 29, Budapest Content Basic Facts Forms of financing Eligibility rules

More information

Katerina Tzitzinou, FP7 Legal & Financial NCP A practical guide for understanding EC funding and rules of participation

Katerina Tzitzinou, FP7 Legal & Financial NCP A practical guide for understanding EC funding and rules of participation Katerina Tzitzinou, FP7 Legal & Financial NCP katerina@help-forward.gr A practical guide for understanding EC funding and rules of participation 1st training, Sochi, 20-21 January 2010 Presentation Content

More information

Guide to Financial Issues relating to FP7 Indirect Actions

Guide to Financial Issues relating to FP7 Indirect Actions Guide to Financial Issues relating to FP7 Indirect Actions Version 18/03/2013 Disclaimer This guide is aimed at assisting beneficiaries. It is provided for information purposes only and its contents are

More information

Project costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs.

Project costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs. Financial issues Extract from the guide for BONUS applicants 1 8. How to prepare project budget? Only the real costs required for the implementation should be indicated in the planned budget for the project.

More information

Short-term measures under FP7 (the so-called quick gains) (COM Decision C/2011/174)

Short-term measures under FP7 (the so-called quick gains) (COM Decision C/2011/174) Simplifying the implementation of FP7 COM Decision C/2011/174 European Commission- DG INFSO Unit S4 - Legal aspects Short-term measures under FP7 (the so-called quick gains) (COM Decision C/2011/174) Revision

More information

Financial errors in FP7 How to improve the quality of financial statements?

Financial errors in FP7 How to improve the quality of financial statements? Financial errors in FP7 How to improve the quality of financial statements? Oslo, 26 April 2013 Doroteya PETROVA ERC Executive Agency Marcin BARAN European Commission Introduction This presentation is

More information

Reporting and Monitoring, Participant Portal and SESAM

Reporting and Monitoring, Participant Portal and SESAM Reporting and Monitoring, Participant Portal and SESAM Research Executive Agency Marie Curie Host-Driven actions Mika Levonen ITN Coordinators briefing meeting Brussels, November 2013 Overview Project

More information

Budget. Sapienza Università di Roma 11/12 Giugno 2012

Budget. Sapienza Università di Roma 11/12 Giugno 2012 Budget Chiara Pocaterra Punto di Contatto Nazionale Tema 2 "Prodotti Alimentari, Agricoltura e Pesca e Biotecnologie" 7PQ Tema 5 "Energia" 7PQ Programma Euratom Sapienza Università di Roma 11/12 Giugno

More information

CERTIFICATES ISSUED BY EXTERNAL AUDITORS FREQUENTLY ASKED QUESTIONS

CERTIFICATES ISSUED BY EXTERNAL AUDITORS FREQUENTLY ASKED QUESTIONS CERTIFICATES ISSUED BY EXTERNAL AUDITORS FREQUENTLY ASKED QUESTIONS VERSION MAY 2011 Disclaimer This document is aimed at assisting beneficiaries and auditors. It is provided for information purposes only

More information

European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer

European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer Alexandros IATROU Deputy Head of Administration and Finance Unit, Directorate for Energy DG Research and Innovation JOPRAD

More information

Call title: FP7-SCIENCE-IN-SOCIETY

Call title: FP7-SCIENCE-IN-SOCIETY Call title: FP7-SCIENCE-IN-SOCIETY-2010-1 Call identifier: FP7-SCIENCE-IN-SOCIETY-2010-1 Date of publication: Thursday 30 July 2009 Deadline 1 : Thursday 21 January 2010 at 17.00.00, Brussels local time.

More information

FCH 2 JU Grant Agreement.

FCH 2 JU Grant Agreement. FCH 2 JU Grant Agreement Nicolas.brahy@fch.europa.eu Why should I care about the GA at this stage? Time to Grant reduced 5 months for evaluation 3 months for signature no time for real negotiation! no

More information

CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS

CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS MATERIALS PREPARED BY THE WORKING GROUP ON CERTIFICATE ON THE METHODOLOGY UNDER FP7: DG RESEARCH AND INNOVATION DG

More information

FP6 Contract and Financial Reporting. The Basics for EC Consortia. Linda Polik Research Services

FP6 Contract and Financial Reporting. The Basics for EC Consortia. Linda Polik Research Services FP6 Contract and Financial Reporting The Basics for EC Consortia Linda Polik Research Services linda.polik@admin.ox.ac.uk Overview of Presentation 1) Contractual Issues 2) Financial Issues 3) Reporting

More information

FINAL. FP7 AUDIT MANUAL (Restricted Use)

FINAL. FP7 AUDIT MANUAL (Restricted Use) FINAL FP7 AUDIT MANUAL (Restricted Use) PREPARED BY THE AUDIT MANUAL WORKING GROUP: DG RESEARCH AND INNOVATION (RTD) DG CONNECT (CNECT) DG MOBILITY AND TRANSPORT (MOVE) DG ENERGY (ENER) DG ENTERPRISE AND

More information

Marina ZANCHI DG Research Directorate N International scientific cooperation

Marina ZANCHI DG Research Directorate N International scientific cooperation Marina ZANCHI DG Research Directorate N International scientific cooperation E-mail: marina.zanchi@cec.eu.int 1 Kick-off meeting Sofia 27 May 2005 Contract Reporting and Deliverables Financial Statements

More information

Financial rules in FP7

Financial rules in FP7 Financial rules in FP7 Some basics - normal accounting and management principles - no special solutions for FP7 - necessary, economic - within contract period Direct costs = actual costs (accounting) (*)

More information

Presentation on Financial and Administrative activities. L.Garvia (D Appolonia)

Presentation on Financial and Administrative activities. L.Garvia (D Appolonia) Presentation on Financial and Administrative activities L.Garvia (D Appolonia) Tableof ofcontent New in HORIZON 2020 o Reimbursment rate; Method for calculation of indirect costs; Electronic signatures

More information

Guide to Financial Issues relating to Indirect Actions of the Sixth Framework Programmes

Guide to Financial Issues relating to Indirect Actions of the Sixth Framework Programmes Guide to Financial Issues relating to Indirect Actions of the Sixth Framework Programmes VERSION APRIL 2004 EXECUTIVE SUMMARY 1 - First Principles The Financial Regulation (FR) of the Communities 1, and

More information

ITN 2010 Finance and Budget

ITN 2010 Finance and Budget Brussels, February 2011 ITN Coordinators meeting ITN 2010 Finance and Budget Research Executive Agency Marie Curie host-driven actions Financial Management of ITN Projects 1. The EU contribution The cost

More information

H2020-ITN-2015 Info Day. Finance. Francisca CUESTA SÁNCHEZ. Research Executive Agency Unit REA-A1

H2020-ITN-2015 Info Day. Finance. Francisca CUESTA SÁNCHEZ. Research Executive Agency Unit REA-A1 H2020-ITN-2015 Info Day Finance Francisca CUESTA SÁNCHEZ Research Executive Agency Unit REA-A1 Overview 1. EU contribution 2. Eligible & ineligible costs 3. Funding mechanism 4. Cost categories 5. Records

More information

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME WORKING NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP/ COORDINATION GROUP

More information

GENERA guidelines on reporting. Kick-off Meeting Brussels. Paula Mota Alves

GENERA guidelines on reporting. Kick-off Meeting Brussels. Paula Mota Alves GENERA guidelines on reporting Kick-off Meeting 17.09.2015 Brussels Paula Mota Alves Unit B5 Spreading Excellence, Widening Participation, Science with and for Society Outline of presentation o Horizon

More information

Research for the benefit of SMEs The new approach. Amaury NEVE European Commission DG Research - Unit T4: SMEs

Research for the benefit of SMEs The new approach. Amaury NEVE European Commission DG Research - Unit T4: SMEs Research for the benefit of SMEs The new approach Amaury NEVE European Commission DG Research - Unit T4: SMEs Research for the benefit of SMEs Objectives Strengthen the innovation capacities of SMEs to

More information

Model Grant Agreement LUMP SUM PILOT S2R JU

Model Grant Agreement LUMP SUM PILOT S2R JU HORIZON HORIZON 2020 2020 Model Grant Agreement LUMP SUM PILOT S2R JU Lump sum grant: introduction The grant agreement will set out the lump sum (EU funding) corresponding to the full accomplishment of

More information

AUDIT CERTIFICATE WORKING NOTES 6 TH FRAMEWORK PROGRAMME

AUDIT CERTIFICATE WORKING NOTES 6 TH FRAMEWORK PROGRAMME AUDIT CERTIFICATE WORKING NOTES 6 TH FRAMEWORK PROGRAMME WORKING NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP VERSION 1 APPROVED

More information

FCH JU GRANT AGREEMENT

FCH JU GRANT AGREEMENT FCH JU GRANT AGREEMENT COORDINATORS DAY Brussels, September 23 rd 2016 Georgiana Buznosu Legal framework of a H2020 project EU Financial Regulation 1. H2020 Rules for Participation Applicable Work Plan

More information

Guide to Financial Issues relating to ICT PSP Grant Agreements

Guide to Financial Issues relating to ICT PSP Grant Agreements DG COMMUNICATIONS NETWORKS, CONTENT AND TECHNOLOGY ICT Policy Support Programme Competitiveness and Innovation Framework Programme Guide to Financial Issues relating to ICT PSP Grant Agreements Version

More information

Why? Disclaimer: Information not legally binding

Why? Disclaimer: Information not legally binding LUMP SUM PILOT Why? Why? Simplification: No financial reporting, no time sheets, no financial audit. Payment exclusively based on completion of activity. Pilot scheme to evaluate results view to FP9 Start

More information

Financial Webinar. IMI 2 projects :00 CET

Financial Webinar. IMI 2 projects :00 CET Financial Webinar IMI 2 projects 12.05.2017 10:00 CET Agenda How to use GoToWebinar o Gaëlle Lanckmans, IMI Finance Cost Eligibility o Gaëlle Lanckmans, IMI Finance Reporting requirements and Migration

More information

Legal and Financial Issues in H2020

Legal and Financial Issues in H2020 Legal and Financial Issues in H2020 BESTPRAC Training School September 27, 2016 Katarina Rohsmann, FFG OVERVIEW ü Minimum requirements for participation ü Funding instruments and funding rates ü Grant

More information

Horizon The EU Framework Programme for Johannes Klumpers DG RTD. Research and Innovation. Research and Innovation

Horizon The EU Framework Programme for Johannes Klumpers DG RTD. Research and Innovation. Research and Innovation Horizon 2020 The EU Framework Programme for Research and Johannes Klumpers DG RTD 2014-2020 Research and What is Horizon 2020 Commission proposal for a 80 billion euro research and innovation funding programme

More information

CSJU-Procedure 2.5. Guidelines for Members and Partners on Subcontracting

CSJU-Procedure 2.5. Guidelines for Members and Partners on Subcontracting CSJU-Procedure 2.5 Guidelines for Members and Partners on Subcontracting 03 October 2013 Revision History Table Version n Issue Date V. 01 19 November 2009 V. 02 03 October 2013 Clean Sky JU 2013 Please

More information

MODEL BONUS GRANT AGREEMENT

MODEL BONUS GRANT AGREEMENT 12 November 2012 MODEL BONUS GRANT AGREEMENT PROJECT: FULL NAME AND ACRONYM CONTRACTING PARTIES: The BONUS-Baltic Organisations Network for Funding Science EEIG (hereinafter referred to as "the BONUS EEIG")

More information

Financial Reporting What s new?

Financial Reporting What s new? Financial Reporting What s new? EARMA Luleå Financial reporting in H2020-what s new? 21 June 2016 Poul Petersen Senior Executive Officer Research & Innovation, EU Office Universitetsparken 1 2100 Copenhagen

More information

MARIE CURIE INITIAL TRAINING NETWORK

MARIE CURIE INITIAL TRAINING NETWORK ANNEX III SPECIFIC PROVISIONS MARIE CURIE INITIAL TRAINING NETWORK [MULTI BENEFICIARY] III. 1 Definitions In addition to the definitions in Article II.1, the following definitions apply to this grant agreement:

More information

Legal and financial issues in Horizon Bonn,

Legal and financial issues in Horizon Bonn, Legal and financial issues in Horizon 2020 Bonn, 01.02.2017 www.nks-ruf.de National Contact Point Legal & Financial Issues Located in the EU-Bureau of the BMBF in Bonn and Berlin Advice on legal and financial

More information

Horizon 2020 SME Instrument Experts Briefing - Subcontracting Part 3

Horizon 2020 SME Instrument Experts Briefing - Subcontracting Part 3 Horizon 2020 SME Instrument Experts Briefing - Subcontracting Part 3 General rules under H2020 Art.13 of the General Model Grant Agreement (GMGA): "If necessary to implement the action, the beneficiaries

More information

Call for Proposals Action 1 Promoting Cluster Excellence (62/G/ENT/CIP/13/C/N04C031) Financial Aspects

Call for Proposals Action 1 Promoting Cluster Excellence (62/G/ENT/CIP/13/C/N04C031) Financial Aspects Call for Proposals Action 1 Promoting Cluster Excellence (62/G/ENT/CIP/13/C/N04C031) Action 2 Clusters and Entrepreneurship in Support of Emerging Industries (64/G/ENT/CIP/13/C/N04C02) Information Day

More information

FP7 CERTIFICATION MODALITIES

FP7 CERTIFICATION MODALITIES KP7 bijeenkomst Nederlandse accoutants Nijenrode Business Universiteit, Breukelen 12 January 2010 FP7 CERTIFICATION MODALITIES Laurence DECHEVRE European Commission - DG Research, Unit A5 1 Overview of

More information

P Periodic project report Please remove this front page when using the template

P Periodic project report Please remove this front page when using the template P Periodic project report Please remove this front page when using the template IMI1 programme Template for periodic project report Recommendations for project coordinators When preparing a periodic report,

More information

FINANCE AND BUDGET. Research Executive Agency Marie Curie host-driven actions. ITN Coordinators Meeting Brussels, September 2012

FINANCE AND BUDGET. Research Executive Agency Marie Curie host-driven actions. ITN Coordinators Meeting Brussels, September 2012 FINANCE AND BUDGET Research Executive Agency Marie Curie host-driven actions ITN Coordinators Meeting Brussels, September 2012 Financial Management of ITN Projects 1. EU contribution - cost categories,

More information

Call title: FP7-SSH Collaborative projects (large scale integrating research projects)

Call title: FP7-SSH Collaborative projects (large scale integrating research projects) Call fiche: SSH-2011-1- s research projects) Call title: FP7-SSH-2011- s research projects) Call identifier: FP7-SSH-2011-1 Date of publication: 20 July 2010: Deadline 1 : 2 February 2011 at 17.00.00 Brussels

More information

European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement. (EMPIR MGA - Multi)

European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement. (EMPIR MGA - Multi) European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement (EMPIR MGA - Multi) Version 5.0 12 March 2018 Version Publication Date 1.0 16.07.2015 Initial version

More information

IMI Financial Guidelines

IMI Financial Guidelines IMI Financial Guidelines VERSION 1.0 of 17 January 2012 These guidelines aim at assisting all IMI consortia during the negotiation phase and all individual participants during the implementation of IMI

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 25.11.2016 C(2016) 7553 final COMMISSION DECISION of 25.11.2016 modifying the Commission decision of 7.3.2014 authorising the reimbursement on the basis of unit costs for

More information

Brussels, 11 May FP7 Audit. DG RTD Unit M2

Brussels, 11 May FP7 Audit. DG RTD Unit M2 Brussels, 11 May 2011 FP7 Audit DG RTD Unit M2 1 Contents 1. Purpose of the audits 2. When, by whom and how selected 3. Phases of the audit 4. Common Mistakes 5. Systemic errors 6. Questions 2 Purpose

More information

Multi-beneficiary Model Grant Agreement

Multi-beneficiary Model Grant Agreement Partnership for Research and Innovation in the Mediterranean Area Programme (PRIMA) Multi-beneficiary Model Grant Agreement Version 5.0 30 January 2018 Disclaimer This document is aimed at assisting applicants

More information

How to Manage and Administer Integrated Projects and Networks of Excellence

How to Manage and Administer Integrated Projects and Networks of Excellence How to Manage and Administer Integrated Projects and Networks of Excellence EARMA Annual Conference Budapest 14th June 2002 ** Based on Information published by EC to June 2002** PRESENTER Sean McCarthy

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 10.12.2013 C(2013) 8197 final COMMISSION DECISION of 10.12.2013 authorising the use of reimbursement on the basis of unit costs for the personnel costs of the owners of small

More information

The Marie Curie Actions FP7 Financial Guidelines

The Marie Curie Actions FP7 Financial Guidelines The Marie Curie Actions FP7 Financial Guidelines SPECIFIC PROVISIONS RELATED TO MARIE CURIE ACTIONS FINANCED UNDER THE FP7 "PEOPLE" PROGRAMME Part 3: Projects funded in the PEOPLE Work Programmes calls

More information

Communication campaign

Communication campaign Communication campaign Financial reporting: Formalities & General Aspects, Common Mistakes & E-reporting Basics Nora Ovcharova FCH JU Financial Officer The FORCE Form C The tool used to report/declare

More information

FCH 2 JU GRANT AGREEMENT

FCH 2 JU GRANT AGREEMENT FCH 2 JU GRANT AGREEMENT Georgiana Buznosu - Legal Officer http://www.fch.europa.eu/ LEGAL FRAMEWORK OF A H2020 PROJECT EU Financial Regulation 1. H2020 Rules for Participation Applicable Work Plan 2.

More information

ARTICLE EUROPEAN COMMISION PROPOSAL AMENDMENT RATIONALE

ARTICLE EUROPEAN COMMISION PROPOSAL AMENDMENT RATIONALE REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL establishing Horizon Europe the Framework Programme for Research and Innovation, laying down its rules for participation and dissemination ARTICLE

More information

POLICY AREA: RESEARCH AND INNOVATION

POLICY AREA: RESEARCH AND INNOVATION 11. Research and Innovation TYPE OF ACTION / MEASURE Reducing number of Programmes Single sector framework POLICY AREA: RESEARCH AND INNOVATION SECTORAL COMMISSION PROPOSALS 14 - All existing Union research

More information

PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL

PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL Establishing the European Geological Surveys Research Area to deliver a Geological Service for Europe PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL Joint Call on applied geoscience

More information

RESEARCH TRAINING NETWORKS

RESEARCH TRAINING NETWORKS EUROPEAN COMMISSION RESEARCH DIRECTORATE-GENERAL Directorate F : Human potential and mobility RESEARCH TRAINING NETWORKS HUMAN POTENTIAL AND MOBILITY OF RESEARCHERS PROGRAMME RESEARCH TRAINING NETWORKS

More information

FP7 Financial Rules, Project Reporting and Tools

FP7 Financial Rules, Project Reporting and Tools FP7 Financial Rules, Project Reporting and Tools Dita Mocova EGEE-II / EGEE-III Transition Meeting CERN, Geneva 6-7 May 2008 www.eu-egee.org EGEE-III INFSO-RI-222667 Introduction 1. FP7 Financial rules

More information

Tips on Administrative issues and Financial Reporting KOM ANYWHERE Soraya Hidalgo European Projects Office - UPC

Tips on Administrative issues and Financial Reporting KOM ANYWHERE Soraya Hidalgo European Projects Office - UPC Tips on Administrative issues and Financial Reporting Soraya Hidalgo European Projects Office - UPC Outline H2020 Main changes Grant Agreement Structure Financial reporting Elegibility criteriai Do s and

More information

ERA-NET Plus. Practical implementation. Jörg NIEHOFF DG Research & Innovation European Research Area Unit B4 - Joint Programming

ERA-NET Plus. Practical implementation. Jörg NIEHOFF DG Research & Innovation European Research Area Unit B4 - Joint Programming ERA-NET Plus Practical implementation Jörg NIEHOFF DG Research & Innovation European Research Area Unit B4 - Joint Programming Coordination of national programmes in FP7 ERA-NET Like in FP6: Coordination

More information

Multi-beneficiary Model Grant Agreement for Members

Multi-beneficiary Model Grant Agreement for Members Clean Sky 2 Joint Undertaking (CS2) Multi-beneficiary Model Grant Agreement for Members (CS2 JU Members MGA Multi) Version 5.0 28 November 2017 Disclaimer This document is aimed at assisting applicants

More information

National Documentation Center (EKT/NHRF) Introduction to FP7

National Documentation Center (EKT/NHRF) Introduction to FP7 National Documentation Center (EKT/NHRF) Introduction to FP7 Maria Samara, Hellenic Alternate NCP for SSH Maria Koutrokoi,, Hellenic NCP for ICT, Research Infrastructures and Ideas Programme of FP7 Technical

More information

Project management - WP2

Project management - WP2 ASSEMBLE Plus Kick-Off Meeting Project management - WP2 DGRTT European Affairs Office A. Stécy JOMBERT ASSEMBLE Plus Project Manager Alice.jombert@upmc.fr +33(0)144 27 51 43 19/10/2017 Project Overview

More information

FP7 Simplification Workshop

FP7 Simplification Workshop FP7 Simplification Workshop WG 1 Community financial contribution Report General Remarks Generally, WG participants supported the extended use of lump-sum and flat-rate financing as a major mode to simplify

More information

Multi-Beneficiary Model Grant Agreement

Multi-Beneficiary Model Grant Agreement H2020 Programme Multi-Beneficiary Model Grant Agreement Pre-Commercial Procurement (PCP) and Procurement of Innovative Solutions (PPI) (H2020 MGA PCP/PPI Multi) Version 5.0 18 October 2017 Disclaimer This

More information

Practicalities in the Financial Management of FP7 projects - An outlook to audits and Horizon 2020 rules

Practicalities in the Financial Management of FP7 projects - An outlook to audits and Horizon 2020 rules Practicalities in the Financial Management of FP7 projects - An outlook to audits and Horizon 2020 rules Gabor Kitley Chief Executive Officer Europa Media Is the FP7 Financial Audit really a nightmare?

More information

MARIE CURIE INTRA-EUROPEAN FELLOWSHIP FOR CAREER DEVELOPMENT

MARIE CURIE INTRA-EUROPEAN FELLOWSHIP FOR CAREER DEVELOPMENT ANNEX III SPECIFIC PROVISIONS MARIE CURIE INTRA-EUROPEAN FELLOWSHIP FOR CAREER DEVELOPMENT III. 1 Definitions In addition to the definitions in Article II.1, the following definitions apply to this grant

More information

MODEL CONTRACT. Marie Curie individual fellowships

MODEL CONTRACT. Marie Curie individual fellowships MODEL CONTRACT Marie Curie individual fellowships CONTRACT NO The [European Community] [European Atomic Energy Community] ( the Community ), represented by the Commission of the European Communities (

More information

ERC Grant Management Workshop - 14 December 2011, Brussels Questions & Answers

ERC Grant Management Workshop - 14 December 2011, Brussels Questions & Answers ERC Grant Management Workshop - 14 December 2011, Brussels Questions & Answers N Questions Answers Topics 1 Could you clarify the implication of the names indicated in the proposal (PI, authorised rep.,

More information

Model Grant Agreement FINANCIAL ISSUES

Model Grant Agreement FINANCIAL ISSUES HORIZON HORIZON 2020 2020 Model Grant Agreement FINANCIAL ISSUES Table of Contents 1. FP7 : Lessons learned 2. H2020: Model Grant Agreement 3. Cost Categories and Reporting Issues a. Personnel cost calculation

More information

Multi-Beneficiary Model Grant Agreement

Multi-Beneficiary Model Grant Agreement European Research Council (ERC) Multi-Beneficiary Model Grant Agreement ERC Starting Grants, Consolidator Grants and Advanced Grants (H2020 ERC MGA Multi) Version 5.0 18 October 2017 Disclaimer This document

More information

Model Grant Agreement FINANCIAL ISSUES

Model Grant Agreement FINANCIAL ISSUES HORIZON HORIZON 2020 2020 Model Grant Agreement FINANCIAL ISSUES Table of Contents 1. Introduction 2. H2020: Model Grant Agreement 3. Cost Categories and Reporting Issues a. Personnel cost calculation

More information

Webinar on Introduction to Lump Sum funding in Horizon Martin Baumgartner (FFG Austria) Morten Gylling (DAFSHE Denmark)

Webinar on Introduction to Lump Sum funding in Horizon Martin Baumgartner (FFG Austria) Morten Gylling (DAFSHE Denmark) Webinar on Introduction to Lump Sum funding in Horizon 2020 Martin Baumgartner (FFG Austria) Morten Gylling (DAFSHE Denmark) Who are we? A key objective of the NCP Academy project is to provide harmonised

More information

H2020 proposal preparation RI-Links2UA Horizon 2020 Info Day 8 June, 2018

H2020 proposal preparation RI-Links2UA Horizon 2020 Info Day 8 June, 2018 H2020 proposal preparation RI-Links2UA Horizon 2020 Info Day 8 June, 2018 Acknowledgement Slides, prepared by Gorazd Weiss are used in this presentation Today s topics 1. INTRODUCTION FROM IDEA TO IMPLEMENTATION

More information

Mono-Beneficiary Model Grant Agreement

Mono-Beneficiary Model Grant Agreement European Research Council (ERC) Mono-Beneficiary Model Grant Agreement ERC Proof of Concept (H2020 ERC MGA PoC Mono) Version 5.0 18 October 2017 Disclaimer This document is aimed at assisting applicants

More information

FAQ. Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014)

FAQ. Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014) FAQ Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014) CORRIGENDUM: In the first version of the Application Guide,

More information

LIFE Grant Agreement Financial Aspects Highlights

LIFE Grant Agreement Financial Aspects Highlights LIFE Grant Agreement Financial Aspects Highlights Kick-off Meetings Call 2016 Action Grants Strand buddies (EASME) Congratulations for obtaining the Grant! And Welcome to the Finance presentation SUMMARY

More information

Financial management of H2020 projects

Financial management of H2020 projects Financial management of H2020 projects BESTPRAC Training School: "Finance for Beginners" Per Inge Andresen Senior adviser NTNU Norwegian University of Science and Technology NTNU Norwegian University of

More information

COMMISSION IMPLEMENTING DECISION. of

COMMISSION IMPLEMENTING DECISION. of EUROPEAN COMMISSION Brussels, 17.9.2012 C(2012) 6299 final COMMISSION IMPLEMENTING DECISION of 17.9.2012 on adopting the annual work programme for 2013 for the specific programme on the "Prevention, Preparedness

More information

FP7 Specific Programme. «People» Policies and Marie Curie Actions. Dr. Barbara Rhode

FP7 Specific Programme. «People» Policies and Marie Curie Actions. Dr. Barbara Rhode FP7 Specific Programme «People» Policies and Marie Curie Actions Dr. Barbara Rhode Adviser to the Director of Directorate T Directorate General Research 1 Structure of the presentation Introduction: Policy

More information

Financial Guidelines for Beneficiaries EDCTP Association October 2016

Financial Guidelines for Beneficiaries EDCTP Association October 2016 Financial Guidelines for Beneficiaries EDCTP Association October 2016 This document is prepared as a supplement to the Grant Agreement (GA), where majority of the information is extracted from. In the

More information

KA2 Strategic Partnerships Financial Management. 21st September

KA2 Strategic Partnerships Financial Management. 21st September KA2 Strategic Partnerships Financial Management 21st September 2017 Leargas.Ireland @Leargas www.leargas.ie 1 Overview General Principles of Financial Management Eligibility of Expenses (eligible and ineligible

More information

Guide for Applicants

Guide for Applicants The Romanian-EEA Research Programme 2012-2017 RO14 - Programme Area: Research within priority Sectors Monica Cruceru Program Coordinator UEFISCDI I. Definitions II. Eligibility of applicants and project

More information

Model Grant Agreement FINANCIAL ISSUES

Model Grant Agreement FINANCIAL ISSUES HORIZON HORIZON 2020 2020 Model Grant Agreement FINANCIAL ISSUES Table of Contents 1. FP7 : Lessons learned 2. H2020: Model Grant Agreement 3. Cost Categories and Reporting Issues a. Types of Staff Contracts

More information

Annex II Draft specific grant agreement

Annex II Draft specific grant agreement Model specific agreement: December 2016 Annex II Draft specific grant agreement SPECIFIC AGREEMENT No./.. This Specific agreement ("the Specific agreement") is concluded between the following parties:

More information

European Commission THE FIFTH FRAMEWORK PROGRAMME. This document can be downloaded from URL:

European Commission THE FIFTH FRAMEWORK PROGRAMME. This document can be downloaded from URL: European Commission THE FIFTH FRAMEWORK PROGRAMME The Fifth Framework Programme focuses on Community activities in the field of research, technological development and demonstration (RTD) for the period

More information

Mono-Beneficiary Model Grant Agreement

Mono-Beneficiary Model Grant Agreement Justice Programme & Rights, Equality and Citizenship Programme Mono-Beneficiary Model Grant Agreement (JUST/REC MGA Mono) Version 2.0 10 January 2017 Disclaimer This document is aimed at assisting applicants

More information

Eligibility of costs in the Horizon 2020 funded EUROfusion project

Eligibility of costs in the Horizon 2020 funded EUROfusion project Eligibility of costs in the Horizon 2020 funded EUROfusion project Garching, 3 December 2015 Subcontractors and other third party support Presented by: Michael Erdmann, EUROfusion Coordinator Unit, Max-Planck-Institute

More information

Call for Proposals Practicalities: contractual and financial issues and application

Call for Proposals Practicalities: contractual and financial issues and application Call for Proposals 2007 Practicalities: contractual and financial issues and application National Information Day Ministry of Health Republic of Bulgaria Sofia, 28 March 2007 Who can submit? - Participating

More information

Guide for Applicants

Guide for Applicants EUROPEAN COMMISSION EUROSTAT Guide for Applicants Eurostat Grants Version 4.0 11 January 2018 1/55 IMPORTANT NOTICE The Guide for Applicants is a user guide that aims to explain to applicants and beneficiaries

More information

PROVISIONS FOR IMPLEMENTING SPECIFIC SUPPORT ACTIONS

PROVISIONS FOR IMPLEMENTING SPECIFIC SUPPORT ACTIONS PROVISIONS FOR IMPLEMENTIN SPECIFIC SUPPORT ACTIONS Background document This is a practical guide on the provisions for implementing specific support actions in the Sixth Framework Programme. This document,

More information

Research Infrastructures and Horizon 2020

Research Infrastructures and Horizon 2020 Mariano Menna DG Research & DERri Final Meeting, Milano, Italy, 10 th -11 th October 2013 Research Infrastructures and Horizon 2020 The EU Framework Programme for Research and 2014-2020 Research and Europe

More information

P2P and support to Joint Programming under Horizon Dr Jörg Niehoff Head of Sector Joint Programming DG Research & Innovation

P2P and support to Joint Programming under Horizon Dr Jörg Niehoff Head of Sector Joint Programming DG Research & Innovation P2P and support to Joint Programming under Horizon 2020 Dr Jörg Niehoff Head of Sector Joint Programming DG Research & Innovation Public-public partnerships in Horizon 2020 (Art.26) 1. Horizon 2020 shall

More information

H2020 Participant Guarantee Fund 12 TH NCP MEETING - LEGAL & FINANCIAL MATTERS 17 OCTOBER 2018

H2020 Participant Guarantee Fund 12 TH NCP MEETING - LEGAL & FINANCIAL MATTERS 17 OCTOBER 2018 H2020 Participant Guarantee Fund 12 TH NCP MEETING - LEGAL & FINANCIAL MATTERS 17 OCTOBER 2018 DG RTD Designated service of the Commission for the management of the Guarantee Fund Verónica MUÑOZ Agenda

More information

IMI Financial Guidelines

IMI Financial Guidelines Innovative Medicines Initiative IMI Financial Guidelines VERSION 2 of 20 June 2013 These guidelines aim at assisting all IMI consortia during the negotiation phase and all individual participants during

More information

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No. 2018 Erasmus+ Grant agreement multi-beneficiary Special conditions Agreement number: [complete] Standard grant agreement (multi beneficiaries) GRANT AGREEMENT for a: Project with multiple beneficiaries

More information

Proposal Template (Technical Annex) ECSEL Innovation Actions (IA) ECSEL Research and Innovation Actions (RIA) Calls 2017

Proposal Template (Technical Annex) ECSEL Innovation Actions (IA) ECSEL Research and Innovation Actions (RIA) Calls 2017 Proposal Template (Technical Annex) ECSEL Innovation Actions (IA) ECSEL Research and Innovation Actions (RIA) Calls 2017 Please, follow the structure and text formatting of this template when preparing

More information