1 Risk Assessment Policy (Trust, Summer, Senior and Prep School & EYFS) Introduction St Bede s School Trust (hereafter referred to as Bede s) clearly recognises that a failure to take reasonable safety precautions in relation to identified hazards would represent a serious risk to staff, visitors, general public and contractors and, in particular, pupils, and expose the Trust to the possibility of prosecution. The aim of this Policy is to set out the systematic approach for suitable and sufficient risk management throughout Bede s. This policy has particular regard for ensuring the welfare of pupils at the school is safeguarded and promoted at all times and appropriate action is taken to reduce risks and potential risks that are identified. The purpose of risk assessment is to identify hazards and evaluate any associated risks. This includes such areas as: Safeguarding (including Prevent) Pupil Welfare (including attendance, bullying, supervision of pupils, medical needs, and SEN/D) Health and Safety (including premises, equipment and public rights of way) Security (including premises and grounds assessments ASRA S) Fire Safety (including Fire Risk Assessments, and Arson Attempt) Critical incidents (including identification of significant areas of risk, potential and likelihood) School Trips (including supervision levels and meeting pupil s medical needs) Lessons and Activities (including emotional and physical risks) Boarding (including overseas pupils and pupils with EAL) Pupils with onerous demands (including Legat School of Dance and Elite Athletes programme) Staff Recruitment (including DBS Disclosures and suitability to work in a school) Risk assessments do not have to be complicated. The level of detail contained in them should be relevant to the level of the risks involved with the activity. In many cases a risk assessment will lead to clarification and the documenting of protocols and procedures that are often already in place, following best practice and relevant industry standards where applicable. Risk assessments can also assist in the identification of requirements for levels of instruction, information, training and supervision that may be required for the activity. (See Appendix 1 Risk Assessment and Control Process Map) In addition, some topic specific risk assessments are required by legislation for example those concerning fire safety, pupil supervision, school trips, manual handling, display screen assessments, substances hazardous to health, provision and use of work equipment, asbestos, and security assessments. This list is in no way exhaustive. Page 1 of 11

2 Where relevant these risk assessments will be completed using industry standard assessment templates or guidelines. All other Bede s risk assessments should be completed using the Trust wide standard risk assessment template. (See Appendices 2, 3 and 4) (See separate Bede s General Health & Safety Policy and relevant topic specific policies for further information and guidance on specific risk assessments) 1. Responsibilities a) Employees are responsible for: Assisting with and participating in the process of risk assessment and adhering to any risk control measures of which they are made aware. b) A risk assessment author is responsible for: Identifying and implementing control measures and effectively communicating the significant risks and relative control measures to employees and others as appropriate. c) Heads of Departments / departmental managers are responsible for: Ensuring that risk assessments are completed for their departments / areas of control. They may do so by delegating the task to others. Allocating resources in response to risk assessments completed within departments and determining a course of action should it be identified that a risk cannot be suitably controlled so far as is reasonably practicable. Setting up frameworks for decision making and corporate strategies which incorporate risk assessment principles. This will ensure that decisions made take into account relevant risk factors. Ensuring that those who are tasked with completing risk assessments are suitably trained to do so. Ensuring that a suitable mechanism exists to communicate the safe systems of work identified as part of the risk assessment procedures. Typically these are likely to be in the form of Standard Operating Procedures (SOP) or Bede s own guidelines such as those set out in Bede s policies, procedures, handbooks and codes of conduct. Make suitable representation to the relevant Health & Safety Committee or SMT Committee if risk assessments identify an outstanding need which cannot be resourced within existing departmental resources. c) The Risk Review Audit Committee are responsible for: Monitoring and reviewing the activity of risk assessment taking place within the organisation. Page 2 of 11

3 2. Scope For the purpose of this policy the following definitions apply: a) Hazard: Something with the potential to cause harm b) Hazardous Outcome: A description of how someone could be hurt or damage could occur as a result of interacting with the hazard c) Risk Rating: The overall judgement of the level of risk which may arise from the hazard, based upon the likelihood of the event occurring and the potential severity of the consequence d) Control Measures: Method used to reduce or control risks arising from identified hazards e) Residual Risk: The level of risk remaining once control measures have been applied to reduce risks so far as is reasonably practicable. 3. Legal aspects of Risk Assessment There are clear duties for risk assessment under acts such as the Health & Safety at Work Act 1974 and The Management of Health & Safety at Work Regulations1999. The following requirements are laid down in those regulations and can be applied to other areas of risk assessment; The risk assessment shall be suitable and sufficient and cover both employees and non-employees affected by the employers undertaking (e.g. contractors, members of the public, pupils, etc) The term suitable and sufficient is important as it defines the limits to the risk assessment process. A suitable and sufficient risk assessment should: Identify the significant risks and ignore the trivial ones; Identify and prioritise the measures required to comply with any relevant statutory provisions; Remain appropriate to the nature of the work and valid over a reasonable period of time; Identify the risk arising from or in connection with the work. The detail should be proportionate to the risk. The significant findings that should be recorded include a detailed statement of the hazards and risks; the preventative, protective or control measures in place; and any further measures to reduce the risks present. Page 3 of 11

4 4. Risk Assessment Bede s has a responsibility to ensure that the risks posed to staff, pupils, property, contractors and the public are reduced, so far as reasonably practicable. Risk assessment is a subjective but logical process which can be broken down into 5 steps: Step 1 Identify the hazard Step 2 Decide who or what might be harmed and how Step 3 Evaluate the risks and decide on precautions Step 4 Record significant findings and implement them Step 5 Review the assessment and update if necessary When conducting a risk assessment, line managers should adopt a team approach to risk assessment whenever possible and involve staff members who have practical experience (as they often have the best awareness and understanding of the hazards involved with the activity and how the activity is actually carried out.) 5. Types of Risk Assessment All significant risks shall be assessed. Although the principles of assessment remain the same their application can differ. There are 3 recognised methods of assessment; a) Formal A written method of evaluating the risk of harm (as described above). b) Generic An evaluation of risk that can be applied to common tasks. In unusual circumstances, when an unforeseen risk presents itself (a previous Formal or Generic risk assessment not having been compiled and / or in use) an employee may be required to use a dynamic risk assessment. c) Dynamic A mental assessment of risk for use when any delay would increase the risk from harm. 6. Training Bede s as a responsible employer will provide appropriate risk assessment training for staff as necessary, as identified by their line manager. Those who have a responsibility for the completion of risk assessments will initially be provided with basic (online and / or internally coached) risk assessment training. This foundation training covers the processes and key stages of risk assessment including the rationale behind the risk assessment; application of suitable and sufficient control measures to mitigate risk; communication of the risk assessment; record keeping and incident management. The Trust Health & Safety (Fire Safety) Coordinator will assist staff as necessary to enable them to complete their assessment. Page 4 of 11

5 Specialised risk assessment training will be provided to staff as required ensuring appropriate expertise, monitoring and supervision. 7. Communication Relevant information identified in the risk assessment regarding the hazards, their associated risks to the Trust and the appropriate control measures must be effectively communicated, and be readily accessible to, employees and others as appropriate. 8. Monitoring Managers or appropriate persons shall monitor the effectiveness of control measures and ensure that physical control measures are used, installed correctly and suitably maintained where applicable. Likewise checks should be made to ensure that agreed control measures and safe systems of work are being followed correctly. 9. Record Keeping Risk Assessments and associated documents must be kept for a minimum period of three years from the date which they are superseded as they may be required in the event of a litigation claim for compensation (note that claims for compensation can, generally be made up to 3 years from the date of the incident occurring). It should be noted that risk assessments which relate to the use of substances may need to be kept for 40 years, in order to trace exposure to substances which are known to have ill health effects e.g. asbestos. 10. Review of Policy This policy will be reviewed biannually or at an earlier date if changes are required due to changes in our risk assessment process or legislation and/or guidance. Doc Ref: RAP- 04 Owned by: Authorised by: Director of Estates Governing Body Policy Ratified: November 2017 Review Date: November 2019 Circulation: All Staff Parents on request Page 5 of 11

6 Date Review Comments Reviewed By Transfer of Ownership of Policy from Director of Estates to Trust Health & Safety (Fire Safety) Coordinator. Trust H&S Co-ordinator Appendix 3 & 4 added for staff guidance. This policy is a requirement of the Independent School s Inspectorate (ISI page 39) and is submitted to Bede s Governing Body for ratification Policy reviewed No changes Trust H&S Co-ordinator necessary Additional bullet points and reference to Trust H&S Co-ordinator areas of potential risk included to Introduction and Statement of Intent with due regards to ISI Part 3 Paragraph 16 (207) Risk Assessment Minor changes to 1. Responsibilities Trust H&S Co-ordinator Page 6 of 11

7 Appendix 1 Risk Assessment and Control Process Map List the activities undertaken in the area of responsibility. Establish a program (based on risk) to undertake the risk assessments. Undertake the risk assessments. Risk Assessment and Control Process Identify the hazards, who may be harmed and how. Monitor and review as appropriate. Retain records. Identify existing control measures and assess the risk. Risk Adequately Controlled? YES Record the findings and communicate information. NO Identify additional control measures required. Develop and implement action plan. Page 7 of 11

8 Generic Risk Assessment Template Significant Hazards Persons / Property at Risk Risk Residual Risk Control Measures Risk L S DR L S DR LIKELIHOOD (L) = Frequent (5) Probable (4) Occasional (3) Improbable (2) Remote (1) SEVERITY (S) = High (5) Significant (4) Moderate (3) Low (2) Minimal (1) Degree of Risk (DR) = likelihood x severity Person completing Assessment: Signature: Position: Date: Date of Revision Page 8 of 11

9 Appendix 3 Risk Assessment & Risk Matrix Risk Assessment Looking at an activity or situation, identifying hazards, evaluating risk levels and implementing measures to eliminate or reduce the risk, so far as is reasonably practicable Focus on significant risks and ignore trivial risks A hazard is something with the potential to cause harm A risk is the likelihood of harm being caused combined with potential severity Risk assessment considers: how likely harm is to be caused the degree of harm the number and type of people who may be affected Risk Control Measures Remove or eliminate hazard Substitute a hazardous material or process with a non-hazardous or less hazardous one Separate or isolate people from the hazard Use safe systems of work Wear personal protection as a last resort Ensure everyone involved is trained, instructed and supervised accordingly Risk Matrix LIKELIHOOD (L) = Frequent (5) Probable (4) Occasional (3) Improbable (2) Remote (1) SEVERITY (S) = High (5) Significant (4) Moderate (3) Low (2) Minimal (1) Degree of Risk (DR) = likelihood x severity 1 25 (See Matrix below) Page 9 of 11

10 Appendix 3 Risk Rating Degree of Risk Risk Treatment (1-2) Minimal Acceptable risk. No further action or additional controls are required. Risks at this level should be monitored and reassessed at appropriate intervals (3-6) Low A risk at this level may be acceptable. If not acceptable, existing controls should be monitored or adjusted. No further action or additional controls are required. (7-10) Moderate Not normally acceptable. Efforts should be made to reduce the risk, provided this is not disproportionate. Establish more precisely the likelihood of harm as a basis for determining the need for improved control measures. (11-19) Significant Very unlikely to be acceptable. Significant resources may have to be allocated to reduce the risk. Where the risk involves work in progress urgent action should be taken. (20 25) High Unacceptable. Immediate action must be taken to manage the risk. Control measures should be put into place which have the effect of reducing the impact of an event or the likelihood of an event occurring. A number of control measures may be required. Page 10 of 11

11 Appendix 4 RETENTION OF ASSESSMENTS Risk assessments must be retained for a minimum of 3 years. START TASK Hazard Identification Hazards must have the potential to cause harm. Trivial safety consequences or improbable circumstances should not be subject to further risk assessment. Undertake task. Task to be reassessed if influencing factors Significant hazards present Dynamic Risk Assessment A mental assessment of risk for use when any delay would increase the risk from harm. Dynamic assessment can also be used as the initial step in formal risk assessment. It can also be used when the likelihood of a significant consequence of the risk associated with the hazards is unlikely or very unlikely. The number of people who may be affected by a hazard is a relevant consideration during risk estimation. Formal Risk Assessment When assessing a risk all influencing factors must be considered. Follow the guidance in this policy to complete your assessment. Generic Risk Assessment Some common tasks may have been assessed by line managers that are highly relevant to similar locations. If the line manager considers that the influencing factors of a previously conducted assessment are the same as in his/hers location and that the controls would adequately control the risk, then the assessment may be used, saving time and effort. Record Assessment REVIEW OF ASSESSMENT Risk assessments are to be reviewed annually following an accident / incident or when it is believed the control measures are no longer Accident / Incident Investigation In the event of an accident / incident a copy of the risk assessment shall be kept with the accident Is the level of risk acceptable Inform those exposed to hazard of the risk assessment findings and ensure control measures are adopted Consider additional control measures and re-assess Undertake Page task 11 implementing of 11 monitoring and supervising control measures Additional controls Seek guidance from the Trust Health & Safety Co-ordinator if necessary

Risk Assessment Policy. (Whole School including EYFS)

Risk Assessment Policy. (Whole School including EYFS) Responsible for Initiating Review of Policy SLT Committee to Review SLT Last Review Date April 2018 Review Period Annually Approved by (Committee and Date) SLT April 2018 Approved by Board of Governors

More information

Risk assessment Policy and Procedures

Risk assessment Policy and Procedures Risk assessment Policy and Procedures 1. Introduction The purpose of risk assessment is to identify hazards and evaluate any associated risks to health and safety arising from Youth Works activities, enabling

More information

St George s School Windsor Castle Risk Assessment and Risk Management Policy

St George s School Windsor Castle Risk Assessment and Risk Management Policy St George s School Windsor Castle Risk Assessment and Risk Management Policy The Governors and management of St George s School Windsor Castle are committed to promoting the safety and welfare of all members

More information

Risk Assessment Procedure

Risk Assessment Procedure 1. Introduction Risk Assessment Procedure 1.1 The Management of Health and Safety at Work Regulations 1999 set out general duties which apply to employers and are aimed at improving health and safety management.

More information

RISK ASSESSMENT POLICY 2018

RISK ASSESSMENT POLICY 2018 RISK ASSESSMENT POLICY 2018 INTRODUCTION A risk assessment is an important tool in protecting employees, parents, children and visitors by analysing hazards and identifying risk reduction measures. The

More information

HAZARD MANAGEMENT POLICY Page 1 of 7 Reviewed: October 2018

HAZARD MANAGEMENT POLICY Page 1 of 7 Reviewed: October 2018 Page 1 of 7 Policy Applies to: The Board of Directors, staff employed by Mercy Hospital, Credentialed Specialists, Allied Health Professionals, contractors, students, volunteers and visitors. Related Standards:

More information

Policy. Safety risk assessment. 1 Why use risk assessment?

Policy. Safety risk assessment. 1 Why use risk assessment? Safety risk assessment V E R S I O N 1. 1 M A R C H 2 0 0 5 1 Why use risk assessment? 1.1 The principle reason for conducting risk assessments is to comply with our legal duty. The Management of Health

More information

Risk Assessment Policy

Risk Assessment Policy Risk Assessment Policy Updated: April 2018 Date of next Review: April 2019 Policy Lead: Bursar Checked by: Middle Leadership Team 1. INTRODUCTION Beachborough School will have hazards which if not controlled

More information

RISK ASSESSMENT POLICY and GUIDANCE (INCLUDING EYFS)

RISK ASSESSMENT POLICY and GUIDANCE (INCLUDING EYFS) RISK ASSESSMENT POLICY and GUIDANCE (INCLUDING EYFS) Author: Andy Southgate Date: October 2015 Reviewed: April 2017 Next Review Due: Summer Term 2018 RISK ASSESSMENT POLICY and GUIDANCE BACKGROUND This

More information

Policy and Procedures on Risk Management

Policy and Procedures on Risk Management Policy and Procedures on Risk Management 4 th January 2008 Policy... 1 Procedures... 1 Appointment of assessors and training... 2 Risk Assessment... 2 Health and Safety Action Plans... 4 Background information

More information

Health and Safety Risk Assessment Policy

Health and Safety Risk Assessment Policy Health and Safety Risk Assessment Policy Date updated: March 2018 Lead person(s): Review date: March 2021 Health and Safety Manager Head of Education Policy Title: Health and Safety Risk Assessment Page

More information

BROCKWOOD PARK SCHOOL & INWOODS SMALL SCHOOL

BROCKWOOD PARK SCHOOL & INWOODS SMALL SCHOOL BROCKWOOD PARK SCHOOL & INWOODS SMALL SCHOOL RISK ASSESSMENT POLICY Last Review Date August 2018 Policy endorsed by Policy is maintained by ISI reference The Trustees, Principal & Inwoods Head Teacher

More information

St George s School Windsor Castle Risk Assessment and Risk Management Policy

St George s School Windsor Castle Risk Assessment and Risk Management Policy St George s School Windsor Castle Risk Assessment and Risk Management Policy 1.1 Scope This guidance is applicable to all those with responsibility for developing / implementing risk management strategy

More information

Health and Safety Procedure: Risk Assessment. 1. Introduction

Health and Safety Procedure: Risk Assessment. 1. Introduction Health and Safety Procedure: Risk Assessment 1. Introduction 1.1. The purpose of this Procedure is to set out the London School of Economics (hereafter the School or LSE) arrangements for undertaking risk

More information

The King's Academy Risk Assessment Policy and Procedure 2010

The King's Academy Risk Assessment Policy and Procedure 2010 The King's Academy Risk Assessment Policy and Procedure 2010 Page 1 of 12 Background and Purpose This policy forms part of and should be read in conjunction with the Health and Safety Policy it is designed

More information

RISK MANAGEMENT FRAMEWORK

RISK MANAGEMENT FRAMEWORK Risk Management Framework RISK MANAGEMENT FRAMEWORK Purpose This Risk Management Framework introduces St. Michael s College s approach to risk management. It includes a definition of risk, a summary of

More information

RISK ASSESSMENT POLICY

RISK ASSESSMENT POLICY RISK ASSESSMENT POLICY Scope of the Policy The academy s Governors are committed to promoting the safety and welfare of all members of its community. Governors priority lies in ensuring that all operations

More information

Woodcote House School. Risk Management and Risk Assessment Policy

Woodcote House School. Risk Management and Risk Assessment Policy Woodcote House School Risk Management and Risk Assessment Policy 1.1 Scope This guidance is applicable to all those with responsibility for developing / implementing risk management strategy and undertaking

More information

Stowe School Risk Assessment Policy

Stowe School Risk Assessment Policy Stowe School Risk Assessment Policy Created April 2011 Updated Feb 2012 Version 2 Updated January 2013 Version 3 Annual Reviewed January 2014 version 4.0 Annual Reviewed January 2015 version 5.0 Annual

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy Executive or Director lead Policy author/lead Feedback on implementation to Dean Wilson Charlie Stephenson. Health, Safety Risk Advisor Charlie Stephenson. Health, Safety Risk

More information

Hazard Identification, Risk Assessment and Control Procedure

Hazard Identification, Risk Assessment and Control Procedure Hazard Identification, Risk Assessment and Control Procedure 1. Purpose To ensure that there is a formal process for hazard identification, risk assessment and control to effectively manage workplace and

More information

This policy is written in support of the Trustees Policy Statement for Health, Safety and Environment, endorsed by the full committee.

This policy is written in support of the Trustees Policy Statement for Health, Safety and Environment, endorsed by the full committee. Spalding District Title: Purpose: Policy Statement: Risk Assessment Policy This policy is written in support of the Trustees Policy Statement for Health, Safety and Environment, endorsed by the full committee.

More information

Contractor Policy and Procedures. Contractor. Policy and Procedures. Working Together. November Borders College 4/12/ Working Together

Contractor Policy and Procedures. Contractor. Policy and Procedures. Working Together. November Borders College 4/12/ Working Together Contractor Working Together Policy and Procedures November 2017 Borders College 4/12/2017 1 Working Together History of Changes Version Description of Change Authored by Date 1.1 This document combines

More information

APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD COMPETITION

APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD COMPETITION APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD COMPETITION Revised August 2017-1 - P a g e CONTENTS PAGE 2017 Updated Code of Practice 3 UKA Health & Safety Policy 4 Definitions 5 Hazard

More information

Risk Assessment Policy

Risk Assessment Policy Risk Assessment Policy To be accepted if agreed December 2016 Review Date December 2018 Overview This policy is designed to assist the school in fulfilling their legal duties in assessing risks. Risk management

More information

Information on Risk Assessments and Guidance on the Completion of KeeleSU General Risk Assessment Form

Information on Risk Assessments and Guidance on the Completion of KeeleSU General Risk Assessment Form SECTION 2 Keele University Students Union HEALTH & SAFETY MANUAL Information on Risk Assessments and Guidance on the Completion of KeeleSU General Risk Assessment Form General Statement KeeleSU accepts

More information

Risk Management Strategy January NHS Education for Scotland RISK MANAGEMENT STRATEGY

Risk Management Strategy January NHS Education for Scotland RISK MANAGEMENT STRATEGY NHS Education for Scotland RISK MANAGEMENT STRATEGY January 2016 1 Contents 1. NES STATEMENT ON RISK MANAGEMENT 2 RISK MANAGEMENT STRATEGY 3 RISK MANAGEMENT STRUCTURES 4 RISK MANAGEMENT PROCESSES 5 RISK

More information

RISK ASSESSMENTS (GENERAL) POLICY AND GUIDANCE

RISK ASSESSMENTS (GENERAL) POLICY AND GUIDANCE RISK ASSESSMENTS (GENERAL) POLICY AND GUIDANCE Revised June 2016: Version 1.2 Name of Policy: Purpose of the Policy: Policy Applies to: Approved by: Responsible for its Updating: Final Approval by: Risk

More information

Health and Safety. Version 5. Category: Corporate. Latest Review Date: December Review Frequency: Annual. Owner: Company Secretary

Health and Safety. Version 5. Category: Corporate. Latest Review Date: December Review Frequency: Annual. Owner: Company Secretary Health and Safety Version 5 Category: Corporate Latest Review Date: December 2016 Review Frequency: Annual Owner: Company Secretary Contributors: H&S Facilitator, Facilities Manager, Customer Service Manager,

More information

Risk Assessment Policy

Risk Assessment Policy West Heath School Ashgrove Road Sevenoaks TN13 1SR www.westheathschool.com Risk Assessment Policy This policy has been written for All staff and students at West Heath School Copies of this policy may

More information

Documentation Control. Hazard Identification, Risk Assessment and Management Procedure. (This document is linked GG/CM/007- Risk Management Policy)

Documentation Control. Hazard Identification, Risk Assessment and Management Procedure. (This document is linked GG/CM/007- Risk Management Policy) Documentation Control Reference: Date approved: 24 November 2016 Approving Body: (This document is linked GG/CM/007- Risk Management Policy) Trust Board (Medical Director) Implementation Date: 24 November

More information

Policy Document Control Page

Policy Document Control Page Policy Document Control Page Title Title: Risk Assessment Policy Version: V8 Reference Number: CO21 Supersedes Supersedes: V7 Description of Amendment(s): Removal of Risk and Clinical Governance Committee

More information

PROHSP6 Control health and safety risks

PROHSP6 Control health and safety risks Overview This standard is for people with a role which involves: 1 managing the control of health and safety risks effectively, co-ordinating outcomes, prioritising risks and reviewing effectiveness; 2

More information

School Business Manager

School Business Manager Plicy Title: Risk Assessment Plicy Authr: Schl Business Manager Audience: Staff Reviewed by: Gvernrs Review frequency: Annual Reviewed when: Octber 2016 Risk Assessment Plicy Intrductin Nrthease Manr Schl

More information

Risk Management Policy

Risk Management Policy Risk Management Policy Date First Published June 2016 Version 3 Date Last Approved 20 th June 2018 Review Cycle 1 Year Review Date June 2019 Learning together; to be the best we can be 1. Introduction

More information

Auckland Transport HS03-01 Risk and Hazard Management

Auckland Transport HS03-01 Risk and Hazard Management Auckland Transport HS03-01 Risk and Hazard Management (Procedure uncontrolled when printing) Relating to Standard: HS03 Risk and Hazard Management Standard December 2016 Health and Safety-Procedure-HS03-01

More information

Risk Assessment Policy

Risk Assessment Policy Risk Assessment Policy Introduction All independent schools are legally required to have risk assessments in place that cover a great many school activities, including all the many educational visits,

More information

Risk Management Policy

Risk Management Policy Risk Management Policy Date Published 6 th July 2016 Version 1 Approved Date 6 th July 2016 Review Cycle Annually Review Date June 2017 Learning together; to be the best we can be 1. Introduction 1.1.

More information

London Christian Learning Centre. Risk Assessment

London Christian Learning Centre. Risk Assessment London Christian Learning Centre Risk Assessment RISK ASSESSMENT POLICY INTRODUCTION At London Christian Learning Centre we recognise the importance of the process of risk assessment to enable us to safeguard

More information

Risk Management Strategy

Risk Management Strategy Risk Management Strategy 2016 2019 Version: 6 Policy Lead/Author & Deputy Director of Quality position: Ward / Department: Nursing Directorate Replacing Document: Version 5 Approving Committee Quality

More information

Risk Assessment ADVICE NOTE 13 FEBRUARY Look in the accident book as a guide to risks that individuals have already been exposed to.

Risk Assessment ADVICE NOTE 13 FEBRUARY Look in the accident book as a guide to risks that individuals have already been exposed to. ADVICE NOTE 13 Risk Assessment FEBRUARY 2010 This Advice Note has been produced by NICVA to provide clear, concise information and a straightforward guide to risk assessment. This advice note will help

More information

Risk Management Policy and Strategy

Risk Management Policy and Strategy Risk Management Policy and Strategy Version: 2.1 Bodies consulted: Approved by: Directors and Managers responsible for risk Board of Directors Date Approved: 28 March 2017 Lead Manager: Lead Director:

More information

WORK INTEGRATED LEARNING (WIL) PROGRAM STUDENT PLACEMENT AGREEMENT. This agreement is made on the day of 20..

WORK INTEGRATED LEARNING (WIL) PROGRAM STUDENT PLACEMENT AGREEMENT. This agreement is made on the day of 20.. WORK INTEGRATED LEARNING (WIL) PROGRAM STUDENT PLACEMENT AGREEMENT This agreement is made on the day of 20.. BETWEEN Monash University, through its Faculty of Business and Economics ( the Faculty ) of

More information

Common Safety Methods CSM

Common Safety Methods CSM Common Safety Methods CSM A common safety method on risk evaluation and assessment Directive 2004/49/EC, Article 6(3)(a) Presented by: matti.katajala@safetyadvisor.fi / www.safetyadvisor.fi Motivation

More information

Hazard Prevention Program. Regulation 19

Hazard Prevention Program. Regulation 19 Hazard Prevention Program Regulation 19 Topics Purpose of the regulation Key terminology What is a Hazard Prevention Program? Overview of the regulation Steps for Complying with the Regulation Conclusion

More information

28 July May October 2016

28 July May October 2016 Policy Name Risk Management Policy & Procedure Related Policies and Legislation AISWA Guidelines Risk Management Policy Category Planning & Management Relevant Audience Date of Issue / Last Revision All

More information

NATIONAL RISK MANAGEMENT SYSTEM

NATIONAL RISK MANAGEMENT SYSTEM Scouts Australia NATIONAL RISK MANAGEMENT SYSTEM 2003 First Published 2003 Reviewed August 2006 in consideration of AS/NZS 4360-2004 and Organisational Performance Since First Published. Amendment by Chair

More information

HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY HEALTH AND SAFETY POLICY Please be aware that this printed version of the Policy may NOT be the latest version. Staff are reminded that they should always refer to the Intranet for the latest version.

More information

Health and Safety Policy Statement

Health and Safety Policy Statement Health and Safety Policy Statement Under the Health and Safety at Work etc Act 1974 (HSW Act) employers must, so far as is reasonably practicable, provide: Safe equipment Safe substances Necessary information,

More information

European Railway Agency Recommendation on the 1 st set of Common Safety Methods (ERA-REC SAF)

European Railway Agency Recommendation on the 1 st set of Common Safety Methods (ERA-REC SAF) European Railway Agency Recommendation on the 1 st set of Common Safety Methods (ERA-REC-02-2007-SAF) The Director, Having regard to the Directive 2004/49/EC 1 of the European Parliament, Having regard

More information

How to complete a Risk Assessment (RA)

How to complete a Risk Assessment (RA) How to complete a Risk Assessment (RA) All Exhibitors/Contractors are reminded of their duty in law to undertake written RAs on behalf of their employees and to develop safe working practices arising from

More information

Health and Safety Management System Overview

Health and Safety Management System Overview Health and Safety Management System Overview 24 January 2018 DOCUMENT CONTROL Document Identifier HS007 (previously HS1001) Version 1 Date of Issue 24/01/2018 Version History Version Date Nature of Amendment

More information

Risk Policy Statement & Risk Assessment

Risk Policy Statement & Risk Assessment Phoenix Community Care Ltd Policy & Procedure Risk Policy Statement & Risk Assessment Version Written Updated Scheduled Review Date Author Approving Body 1 2008 2008 2009 Anne Spriggs 2008 Date Approved

More information

NHS North Somerset Clinical Commissioning Group Risk Management Strategy and Framework

NHS North Somerset Clinical Commissioning Group Risk Management Strategy and Framework NHS North Somerset Clinical Commissioning Group Risk Management Strategy and Framework An Integrated Risk Management Framework Clinical Risk Management Financial Risk Management Corporate Risk Management

More information

STRATEGY DOCUMENT. Risk Management Strategy

STRATEGY DOCUMENT. Risk Management Strategy STRATEGY DOCUMENT Risk Management Strategy Document Number: 1COV-STG-007 Sponsor: Chief Executive Date Created: 01/11/2005 Version: 5.0 Status: Final Date Approved: xxx Next Review Date: xxx Approved By:

More information

YACHTING AUSTRALIA. Club Risk Management Template. A Practical Resource for Clubs and Centres

YACHTING AUSTRALIA. Club Risk Management Template. A Practical Resource for Clubs and Centres YACHTING AUSTRALIA Club Risk Management Template A Practical Resource for Clubs and Centres Club Risk Management Template Safety is Yachting Australia s first priority. In line with upholding this priority,

More information

Version: th November 2010 RISK MANAGEMENT POLICY

Version: th November 2010 RISK MANAGEMENT POLICY Version: 1.2-25th November 2010 RISK MANAGEMENT POLICY Document History Document Location To be completed. Revision History Date of this revision: 17/09/2010 Date of next revision: N/A Revision Number

More information

Risk Registers. Providing evidence, if required, that the Trust is compliant with the Management of Health and Safety Regulations 1999;

Risk Registers. Providing evidence, if required, that the Trust is compliant with the Management of Health and Safety Regulations 1999; Risk Registers Appendix 1 What is a Risk Register? A Risk Register is a log of risks of all kinds that threaten the delivery of objectives and the delivery of services. It should be a live document which

More information

Note: This policy incorporates key elements of the former Risk Taking and Assessment Policy (SO-0080).

Note: This policy incorporates key elements of the former Risk Taking and Assessment Policy (SO-0080). Risk Assessment Policy Document Title Reference Number Risk Assessment Policy Version Number V2.3 Date of Issue 01/09/06 Latest Revision 17/03/16 Distribution Owner Policy Lead Department All Employees

More information

Risk Management Policy and Procedures.

Risk Management Policy and Procedures. Risk Management Policy and Procedures. Rev Date Purpose of Issue/Description of Change Date 1. June 2006 Initial Issue 2. November 2009 Revised and updated 6 th November 2009 3. September 2010 Revised

More information

RISK ASSESSMENT. Hospitality and Accomodation Services. November 2011

RISK ASSESSMENT. Hospitality and Accomodation Services. November 2011 RISK ASSESSMENT Hospitality and Accomodation Services November 2011 Course Content Introduction to health and safety How heath and safety is managed at the University Risk assessment in theory Risk assessment

More information

UNIVERSITY OF ABERDEEN RISK MANAGEMENT FRAMEWORK

UNIVERSITY OF ABERDEEN RISK MANAGEMENT FRAMEWORK UNIVERSITY OF ABERDEEN RISK MANAGEMENT FRAMEWORK 1 TABLE OF CONTENTS FIGURES AND TABLES... 3 1. INTRODUCTION... 4 2. KEY TERMS AND DEFINITIONS... 5 2.1 Risk... 5 2.2 Risk Management... 5 2.3 Risk Management

More information

OHS RISK MANAGEMENT GUIDELINES

OHS RISK MANAGEMENT GUIDELINES OHS RISK MANAGEMENT GUIDELINES Contents 1 Introduction...2 2 Related UOW Documents...2 3 References and Applicable Legislation...2 4 Definitions...2 5 Responsibilities...3 5.1 Employees...3 5.2 Supervisors...3

More information

Step 5 INSTRUCTIONS FOR USING RISK ASSESSMENT TEMPLATE. Step 6. Step 1. Step 2. Step 3. Step 4. Complete Section 3 Emergency Response Plan

Step 5 INSTRUCTIONS FOR USING RISK ASSESSMENT TEMPLATE. Step 6. Step 1. Step 2. Step 3. Step 4. Complete Section 3 Emergency Response Plan INSTRUCTIONS FOR USING RISK ASSESSMENT TEMPLATE When completing a risk management assessment focus your thoughts on three critical areas: 1. People 2. Environment 3. Equipment Step 5 Complete Section 3

More information

HSE MANUAL. PO Box 14659, Zayed bin Sultan Street, Al Ain, U.A.E.., Tel: , Fax

HSE MANUAL. PO Box 14659, Zayed bin Sultan Street, Al Ain, U.A.E.., Tel: , Fax HSE MANUAL PO Box 14659, Zayed bin Sultan Street, Al Ain, U.A.E.., Tel: 03-7640177, Fax 03-7640188 HSE 1 Health and Safety Policy Statement 1.0 The policy is to ensure, as far as is reasonably practicable,

More information

Risk Management Strategy, Policy and Procedure

Risk Management Strategy, Policy and Procedure Title: Purpose: Risk Management Strategy, Policy and Procedure The overarching purpose of the risk management strategy is to describe the framework and processes within Cornwall Partnership NHS Foundation

More information

PEOP-048 OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM FOR ENZED FRANCHISES

PEOP-048 OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM FOR ENZED FRANCHISES OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM FOR ENZED FRANCHISES 01 November This Occupational Health & Safety Management System (OHSMS) is a guide only to managing occupational health and safety

More information

Contractor Management Procedure

Contractor Management Procedure Contractor Management Procedure Purpose Skillset Limited ( Skillset ) has a duty under the NSW Work Health and Safety Act and Regulations 2011 (the Legislation ) to prevent and/or to minimise risk in the

More information

Contractor Policy. Contractor. Policy. Working Together. August Borders College 29/8/ Working Together

Contractor Policy. Contractor. Policy. Working Together. August Borders College 29/8/ Working Together Contractor Working Together Policy August 2014 Borders College 29/8/2014 1 Working Together History of Changes Version Description of Change Authored by Date 1.1 K Drum Borders College 29/8/2014 2 Working

More information

PANAMA MARITIME AUTHORITY

PANAMA MARITIME AUTHORITY PANAMA MARITIME AUTHORITY MERCHANT MARINE CIRCULAR MMC-213 PanCanal Building Albrook, Panama City Republic of Panama Tel: (507) 501-5000 segumar@segumar.com To: Ship-owners/Operators, Company Security

More information

This policy aims to ensure the health, safety and welfare of contractors working on UEL premises and those affected by their work.

This policy aims to ensure the health, safety and welfare of contractors working on UEL premises and those affected by their work. HR Services UEL Health and Safety Handbook Contractor Health and Safety Management Policy This policy is a sub-policy of the main University Health and Safety Policy Statement Introduction The University

More information

Job Safety Analysis Preparation And Risk Assessment

Job Safety Analysis Preparation And Risk Assessment Job Safety Analysis Preparation And Risk Assessment Sample Only Reference CPL_PCR_JSA_Risk_Assessment Revision Number SAMPLE ONLY Document Owner Sample Date 2015 File Location Procedure Revision Date Major

More information

An Introductory Presentation for ECU Staff

An Introductory Presentation for ECU Staff Risk Management at ECU An Introductory Presentation for ECU Staff Phillip Draber Manager, Risk and Assurance Outcomes By the end of this session you should: Be able to complete and document risk management

More information

An Update On Association Policies, Health Checks & Guidelines To A Safer Hockey Association. Lauren Woods Member Engagement & Operations

An Update On Association Policies, Health Checks & Guidelines To A Safer Hockey Association. Lauren Woods Member Engagement & Operations An Update On Association Policies, Health Checks & Guidelines To A Safer Hockey Association Lauren Woods Member Engagement & Operations Association Health Checks Issues arising from the health check: 3/27

More information

Kidsafe NSW Risk Management Plan. August 2014

Kidsafe NSW Risk Management Plan. August 2014 Kidsafe NSW Risk Management Plan August 2014 Document Control Document Approval Name & Position Signature Date Document Version Control Version Status Date Prepared By Comments Document Reviewers Name

More information

Health & Safety Policy

Health & Safety Policy Health & Safety Policy K4S Security Ltd Imperial Office 2a Heigham Road East Ham London E6 2JG Registered Company Number: 09646212 Policy Date: 12 April 2018 1/14 Contents Page 1.0 General Statement of

More information

Risk Management Framework

Risk Management Framework Risk Management Framework Risk Management Framework 1. The University views Risk Management as integral to the successful execution of its Strategy. In order to achieve the aims set out in our strategy,

More information

PROJECT RISK ASSESSMENT FORM

PROJECT RISK ASSESSMENT FORM SCHOOL OF CIVIL & ENVIRONMENTAL ENGINEERING WORKPLACE SAFETY COMMITTEE PROJECT RISK ASSESSMENT FORM Student/staff/researcher Supervisor/s Date Project title PROJECT DATA LEGAL OBLIGATION The OHS Regulation

More information

Integrated Risk Management Framework Sept Page 1 of 17

Integrated Risk Management Framework Sept Page 1 of 17 Integrated Risk Management Framework 2017-2018 Sept 2017 Page 1 of 17 Reference: Title: Author/Nominated Lead: Approval Date: Approving Committee: Review Date: Target Audience: Circulation List: Cross

More information

Having regard to the Treaty establishing the European Atomic Energy Community, and in particular Articles 31 and 32 thereof,

Having regard to the Treaty establishing the European Atomic Energy Community, and in particular Articles 31 and 32 thereof, L 219/42 COUNCIL DIRECTIVE 2014/87/EURATOM of 8 July 2014 amending Directive 2009/71/Euratom establishing a Community framework for the nuclear safety of nuclear installations THE COUNCIL OF THE EUROPEAN

More information

CONTROLLED DOCUMENT. Version Number: 4.1. On: January 2018 Review Date: June 2016 Distribution: Essential Reading for: Information for: 1 of 15

CONTROLLED DOCUMENT. Version Number: 4.1. On: January 2018 Review Date: June 2016 Distribution: Essential Reading for: Information for: 1 of 15 Risk Management Strategy and Policy CONTROLLED DOCUMENT CATEGORY: CLASSIFICATION: PURPOSE: Controlled Number: Document Strategy/Policy Governance To set out the principles and framework for the management

More information

Archery Victoria is mindful of the risks associated with conducting archery activities and events at club level.

Archery Victoria is mindful of the risks associated with conducting archery activities and events at club level. 0521. Risk Management Policy Archery Victoria Title: Policy and Procedures Manual Subject: Risk Management Policy Author: Chief Executive Officer - Trevor Filmer Date: 1-Jul-11 Replaces: 1-Jul-11 Number:

More information

MARKET OH&S PLAN 1 INTRODUCTION 2 OH&S RESPONSIBILITIES

MARKET OH&S PLAN 1 INTRODUCTION 2 OH&S RESPONSIBILITIES 1 INTRODUCTION Melbourne Market Authority (MMA) is committed to a safety culture and practices that provide for a healthy and safe working environment. The health and safety of all those who work for us

More information

General Risk Management Framework

General Risk Management Framework North Gold Coast Seahawks Basketball Inc General Risk Management Framework Introduction This guide provides an outline for a North Gold Coast Seahawks Basketball Risk Management Framework. Note: This draft

More information

Scouting Ireland Risk Management Framework

Scouting Ireland Risk Management Framework No. SID 124A/15 Gasóga na héireann/scouting Ireland Issued Amended 20 th June 2015 Deleted Source: National Management Committee Scouting Ireland Risk Management Framework Revision Date Description # 20/06/2015

More information

RISK REGISTER POLICY AND PROCEDURE

RISK REGISTER POLICY AND PROCEDURE RISK REGISTER POLICY AND PROCEDURE Lead Manager: Head of Clinical Governance Responsible Director: Board Medical Director Approved by: Date Approved: Date for Review: Feb 2012 Replaces Version: 1.0 Page

More information

The Scope and Nature of Occupational Health and Safety

The Scope and Nature of Occupational Health and Safety Element 1: Foundations in Health and Safety The Scope and Nature of Occupational Health and Safety The study of health and safety involves the study of many different subjects including the sciences (chemistry,

More information

Risk Management. At the Cambridge Science Festival. Occupational Health & Safety Service

Risk Management. At the Cambridge Science Festival. Occupational Health & Safety Service Risk Management At the Cambridge Science Festival Occupational Health & Safety Service TIGER IMAGING Reasons for undertaking risk management Duty of care to provide a safe workplace for event staff, volunteers

More information

Risk Management. Policy and Procedures

Risk Management. Policy and Procedures Risk Management Policy and Procedures POLICY SCHEDULE Policy title Policy owner Policy lead contact Approving body Date of approval/review Related Guidelines and Procedures Review interval Risk Management

More information

WHS Risk Assessment and Control Form

WHS Risk Assessment and Control Form WHS Risk Assessment and Control Form Step 1: Who has conducted the Risk Assessment Risk Assessment completed by (name): Staff / Student Number: Signature: Date: Step 4: Documentation and initial approval

More information

Risk Management Policy

Risk Management Policy Risk Management Policy Version: 3 Board Endorsement: 11 January 2014 Last Review Date: 3 January 2014 Next Review Date: July 2014 Risk Management Policy 1 Table of Contents 1 Introduction... 3 2 Overview...

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 4 June /14 Interinstitutional File: 2013/0340 (NLE) ATO 45

COUNCIL OF THE EUROPEAN UNION. Brussels, 4 June /14 Interinstitutional File: 2013/0340 (NLE) ATO 45 COUNCIL OF THE EUROPEAN UNION Brussels, 4 June 2014 10410/14 Interinstitutional File: 2013/0340 (NLE) ATO 45 NOTE from: General Secretariat of the Council to: Delegations No. Cion prop.: 15030/13 ATO 119

More information

Basic Risk Management Guidelines for Motor Sports Clubs

Basic Risk Management Guidelines for Motor Sports Clubs Basic Risk Management Guidelines for Motor Sports Clubs Prepared by Risk Group Pty Ltd for Motor Sports NT Risk Group Pty Ltd ACN 090 929 418 Unit 5, 48 Nelson Street, St Kilda Victoria 3182 Australia

More information

WORK HEALTH AND SAFETY REFRESHER

WORK HEALTH AND SAFETY REFRESHER WORK HEALTH AND SAFETY REFRESHER LEARNING OUTCOMES Advice regarding legislative duties, rights and obligations WHSMS implementation and maintenance Identifying hazards; assessing risks; and developing,

More information

Risk Management Strategy. February 2016 February 2019 Risk management, risk Assurance Plan SOP

Risk Management Strategy. February 2016 February 2019 Risk management, risk Assurance Plan SOP Corporate Risk Register: Standard Operating Procedure Document Control Summary Status: Version: Author/Title: Owner/Title: Approved by: Ratified: Related Trust Strategy and/or Strategic Aims Implementation

More information

Appendix 4 :Contractors Health and Safety Questionnaire (Form CCHSQ1) 1. DETAILS OF CONTRACTOR / SUB-CONTRACTOR Name of Company:

Appendix 4 :Contractors Health and Safety Questionnaire (Form CCHSQ1) 1. DETAILS OF CONTRACTOR / SUB-CONTRACTOR Name of Company: Appendix 4 :Contractors Health and Safety Questionnaire (Form CCHSQ1) 1. DETAILS OF CONTRACTOR / SUB-CONTRACTOR Name of Company: Address: Telephone Number: Contact for Further Information: Email Address:

More information

VOLUNTEERS & INSURANCE

VOLUNTEERS & INSURANCE VOLUNTEERS & INSURANCE I N F O R M A T I O N S H E E T Volunteers involved in your organisation may expose themselves to risks from time to time. Organisations or volunteers can be found legally liable

More information

AUSTRALIAN CLAY TARGET ASSOCIATION INC.

AUSTRALIAN CLAY TARGET ASSOCIATION INC. AUSTRALIAN CLAY TARGET ASSOCIATION INC. ABN: 14 590 029 414 Registered No. A12282 PO Box 466, WAGGA WAGGA NSW 2650, Australia T: 02 6938 2121. F: 02 6931 0125 Email: info@claytarget.com.au Website: www.claytarget.com.au

More information

Fundraising Event Notification Form

Fundraising Event Notification Form Fundraising Event Notification Form How to obtain Public Liability Insurance cover Public Liability Insurance cover Conditions and Exceptions Thank you for organising a fundraising event in aid of The

More information

PROJECT NAME. Risk Management Log

PROJECT NAME. Risk Management Log Risk Management Log Document Number:JobNo/001 Revision:0 Revision date:dd/mm/yyyy Document Owner: Levitt Bernstein QMS/SF/3-07-04/08.06.11 PAGE 1 OF 9 Purpose: The Risk Management Log is a record of each

More information