SUSTAINABLE FELLWOOD PHASE III PROJECT SPECIFIC QUALIFICATIONS Contractor Name: Authorized Representative: Address: Phone Number: Address: Pleas

Size: px
Start display at page:

Download "SUSTAINABLE FELLWOOD PHASE III PROJECT SPECIFIC QUALIFICATIONS Contractor Name: Authorized Representative: Address: Phone Number: Address: Pleas"

Transcription

1 SUSTAINABLE FELLWOOD PHASE III PROJECT SPECIFIC QUALIFICATIONS Contractor Name: Authorized Representative: Address: Phone Number: Address: Please acknowledge each of the items below by initialing. Contractor is committed to providing a LEED AP as project manager. Contractor shall agree to work with owner/developer to achieve City of Savannah and HAS goals for 30% minority business participation in subcontracts for services and supplies. Further, contractor shall co-operate with owner/developer to achieve all HUD mandated requirements under section 3 of HUD regulations. New Rules require mandatory monthly submission of Section 3, Certified Payroll. General Contractor payment will not be processed without timely, complete and correct submissions. Contractor is or will be a certified Earthcraft Builder by the time the project starts. Contractor is a DCA approved General Contractor. OR Contractor is committed to becoming a DCA approved General Contractor by the time the project starts. Form to begin process is located at the following address: Contractor has acknowledged the following mandatory DCA fees structure: 6% overhead (max) 6% profit (max) 2% insurance & bond Contractor is committed to the following badge requirements: I-9 Verification LEED/Earthcraft Awareness o Show 15 minute LEED/Earthcraft awareness video/presentation to each individual on site. o Issue a badge attachment signifying compliance to each individual Contractor has provided the following information for their 3 most recent Multifamily Projects. Location of Project Size of Project

2 Schedule & Budget Comments Contractor has previous experience working on low income housing tax credit projects. Contractor has a written quality control program. Contractor has a written safety program. Contractor has acknowledged that they will be able to provide proof of the following insurance prior to start of construction. (See Exhibit L Insurance Requirements and Multifamily Insurance Requirements.) The strictest guidelines take precedence. Contractor acknowledges that builder s risk insurance will be required. Contractor will be expected to bond the project. (5% Bid 100% P&P) Contractor has attached Total Annual Volume Report for the last 3-5 years. Contractor is not nor has been on the HUD Suspension or Debarment list. Contractor will be contracted with Sustainable Fellwood Phase III, LP. Contractor agrees to follow guidelines of Clean Sites Initiative. (See attached.) (signature of authorized representative) (title) (date) Please return this document and all required attachments to: Annie Melone, Axiom Management LLC AMelone@AxiomManagementLLC.com direct line

3 Exhibit L INSURANCE REQUIREMENTS CHECKLIST A. Construction Phase 1. Owner's Commercial General Liability (Bodily Injury and Property Damage) Insurance of the real estate development class in amounts not less than $1,000,000 per occurrence, $2,000,000 in the aggregate, and $3,000,000 umbrella for structures with 1-3 stories or $5,000,000 umbrella for structures 4 or more stories. Maximum deductible is $10, General Contractor's Commercial General Liability and Property Damage Insurance of the construction exposure class in the same amounts set forth above. Automobile liability, and workers' compensation in the statutory amount. Maximum deductible is $10, All-Risk Builder's Risk Insurance ( All-Risk or Special form, NOT NAMED PERIL POLICY) providing replacement cost coverage in an amount equal to completed construction value, including soft cost coverage, with an agreed amount endorsement per the attached worksheet. For rehabilitation projects, the acquisition cost is to be included in the Builder's Risk policy or under a separate policy. Maximum deductible is $10,000, but may be higher on a case-by-case basis. 4. Architect's Errors and Omissions Insurance for the greater of $250,000 or 10% of the construction contract, in a form satisfactory to the Limited Partner. 5. Pollution Insurance for existing Apartment Complexes that are being substantially rehabilitated. B. Permanent Insurance (after construction) 1. Owner's Commercial General Liability (Bodily Injury and Property Damage) Insurance in amounts not less than $1,000,000 per occurrence, $2,000,000 in the aggregate, and $3,000,000 umbrella for structures with 1-3 stories or $5,000,000 umbrella for structures 4 or more stories. Maximum deductible is $10, Owner's Special Form ( All-Risk or Special form, NOT NAMED PERIL POLICY) Property Insurance on buildings and personal property in an amount not less than the full insurable replacement value of such buildings and personal property, but in no event less than the principle amount of all outstanding loans for the project. Maximum deductible is $10,000, but may be higher on a case-by-case basis. 3. Rental Interruption Insurance in amounts required by all lenders, but not less than the equivalent of twelve (12) month's gross rental income. 4. Boiler and Machinery Insurance C. Catastrophic Risk and Additional Insurance Coverage 1. Sinkhole/Mine Subsidence Insurance in an amount equal to 100% replacement cost if the project is located in an area that is prone to sinkhole/mine subsidence. 2. Windstorm Coverage if all-risk property damage insurance excludes wind-related events in an amount equal to 100% of replacement cost or actual cash value. Maximum deductible is 5% of the total insured value.

4 3. Flood Insurance in an amount equal to 100% of the full replacement cost if the project is located in a Special Flood Hazard Area. Maximum deductible is 2% of the total insured value per building. 4. Earthquake coverage Seismic reports are required for all projects located in Zones 3 or 4. If the Probable Maximum Loss (PML) is 20% or greater, earthquake insurance in an amount equal to 100% of the full replacement value is required, with a maximum deductible of 5% of the total insured value. If the PML is below 20%, insurance is not required. However, if the PML is slightly under 20%, the sponsor must provide information on what will be done to mitigate any seismic risk (i.e. construction includes HVAC clips, reinforced masonry, etc.). 5. Ordinance and Law Coverage if the apartment complex represents a non-conforming use under current building, zoning, or land use laws or ordinances D. Evidence of Insurance Insurance coverage must be evidenced by Certificates of Insurance and properly endorsed policies certified as true and correct by the insurance agent, but may not be evidenced solely by Certificates. All evidence of insurance must satisfy the following requirements: 1. [NAME OF PROJECT PARTNERSHIP] should be the named insured. 2. [FUND] should be named as an additional insured and should appear in the certificate holder box with the following address: c/o Enterprise Community Investment, Inc. 520 SW Sixth Avenue, Suite 700 Portland, OR Attention: Asset Management 3. Policies must be written with an A.M. Best rated company of "A-VI" or better. 4. All binders and policies should contain a cancellation clause stating that the policy will not be canceled without at least thirty (30) days prior written notice to the Limited Partner. 5. Certificates must document the amount of all deductibles. 6. All binders and policies must be accompanied by evidence of premium payment.

5 FREDDIE MAC INSURANCE REQUIREMENTS Property Name: Address: WELLS FARGO MULTIFAMILY CAPITAL (PLEASE PROVIDE THIS INFORMATION TO YOUR INSURANCE AGENT) Description of Improvements: Wells Fargo Multifamily Capital ( WELLS FARGO ) is currently processing a loan request on the captioned property. Before the loan can be closed, however, WELLS FARGO must receive confirmation that the proposed/actual insurance program satisfies Freddie Mac s requirements, as summarized below: General: A. Each policy must be for a term of not less than one year. B. The Named Insured must be the Borrower, as specified in the legal documents. The Property Damage policy must include a standard noncontributing mortgagee clause, loss payable clause, and the general liability policy must contain a standard additional insured provision acceptable to Freddie Mac as follows: Freddie Mac its successors and assigns c/o Wells Fargo Bank, N. A Corporate Ridge, 10 th Floor McLean, VA C. Each policy must include 30 Day advance Notification of coverage reduction or cancellation (10-day written notification for nonpayment of premium). D. A blanket or package policy (or policies) will satisfy insurance requirements, provided that: the policy provides the same or better insurance coverage as a single property insurance policy; the Property is listed and identifiable in the policy; and, the property is insured for 100 percent of the replacement cost of the improvements plus 12 months gross income. The maximum per occurrence deductible for a blanket policy must not exceed one percent of the total Replacement Cost and is not to exceed $ Property Insurance: An ACORD-28 (10/2003 edition) form (Evidence of Property Insurance) and a complete copy of the policy reflecting: A. All Risk of Physical Loss. Mold will be considered for exclusion in all cases so long as the borrower has an O&M plan for mold and moisture control and there is not an existing mold condition at the property. B. Building ordinance or law coverage must be included or maintained in a separate policy for any property that may not be rebuilt to as is condition in the event of any loss. Additionally, please contact your asset manager immediately should the property become non-conforming at any time during the life of the loan. C. Boiler and Machinery Insurance is required for a Property with a central HVAC system where steam boilers and/or other pressurized systems are in operation and are regulated by the State where the property is located. Coverage must equal or exceed the lesser of the replacement cost of the building housing the central HVAC system including the replacement cost of the HVAC system or $2M. If provided by a different carrier than the property coverage, evidence of a joint loss agreement must be provided. The maximum deductible amount is $50,000 for an individual policy; or for a blanket policy the maximum deductible must not exceed 1 percent of the total replacement cost to a maximum amount of $250,000. D. Amount of the policy must be based on an Agreed Value clause (with no co-insurance provisions) based on 100% Replacement Cost coverage of the improvements (with no deductions for depreciation)., and documentation must be provided to show how the replacement cost was determined and by whom.. D. Inflation Guard coverage is recommended. E. Loss of Rents/Business Income Coverage equal to 12 months gross rents (Estimated Amount: ) is required. F. All property insurance must be written on a per-occurrence basis. (However, boiler and machinery insurance, if required, must be written on a per-accident basis.) G. If there is a separate boiler and machinery policy, evidence of a joint loss endorsement for both the property policy and the boiler policy must be provided.

6 H. If the building contains aluminum branch wiring, the policy, attachments and/or endorsements must also contain a written acknowledgement that the Property is covered for any damage caused by aluminum wiring. G. A deductible that does not exceed $50,000 for a property with a replacement cost less than $10M; and $75,000 for a property with a replacement cost equal to or greater than $10M. For a Blanket Policy, the maximum deductible per occurrence must not exceed 1 percent of the total Replacement Cost, to a maximum deductible of $250,000. Catastrophic Risks: A. If the property policy excludes damage from wind-related events, a separate windstorm insurance policy meeting the same requirements will be required and must include everything as indicated above for property coverage. B. Flood insurance is required if any improvement that is part of the property is located in an area that has been identified by FEMA as a Special Flood Hazard Area ( SFHA ), designated as Zones A and V [Zones A and V also include the following Zones: AE, A1 30, AH, AO, AR, A99, VE, and V1 30] Primary flood insurance must always be provided through the NFIP and comply with the NFIP deductible for the type of improvement insured. If the Replacement Cost of the building(s) exceeds the limit of NFIP coverage, Freddie Mac requires additional flood insurance from an insurer that meets Freddie Mac s requirements. The deductible for private flood insurance must not exceed the maximum deductible permitted for property damage as outlined above. C. Freddie Mac may require earthquake insurance for a property in an area prone to earthquakes. Freddie Mac requires a Site Specific Seismic Report (SSSR) with a Probable Maximum Loss (PML) at the borrower s expense for a Property located in Seismic Risk Zones 3 or 4. D. Freddie Mac may require terrorism insurance based on the characteristics of the property and the transaction. Commercial General Liability: An ACORD-25 Form (Certificate of Insurance) reflecting: A. Minimum of $1,000,000 per occurrence and $2,000,000 general aggregate is required for all properties. In addition, the borrower must carry a $1M umbrella/excess policy for buildings that have 1 3 stories; $5M for 4 9 stories; and $10M for 10 stories or more. If the liability coverage is greater than $1M per occurrence and $2M aggregate, the Umbrella or Excess policy may be reduced or eliminated provided the total of both coverage complies with the following: 1 3 stories $2M per occurrence; $3M aggregate 4 9 stories $6M per occurrence; $7M aggregate 10 stories or more $11M per occurrence; $12M aggregate B. Liability insurance must be written on a per-occurrence policy form. C. The certificate of insurance must indicate that coverage is provided on a per location basis. D. The maximum combined deductible for all forms of liability insurance [including Directors and Officers (D&O) and liability for Co-ops] is $25,000. The maximum combined SIR for all forms of liability insurance is $10,000. The maximum combined deductible and SIR is $35,000 which is the sum of the maximum combined deductible ($25,000) and the maximum combined SIR ($10,000) for GL and Excess/Umbrella. For a blanket policy the maximum deductible per occurrence must not exceed one percent of the total replacement cost to a maximum deductible of $250,000. Other Policies: Other coverage, such as, Builders Risk, Sewer and Drain Insurance, Insurance for localized perils, Workers Compensation Coverage, Automobile Liability and/or a Fidelity Bond may be required based on the particular factors that impact the property. Carriers: Each insurer providing property damage and liability insurance, whether admitted or non-admitted, including Lloyd s of London, must meet the rating requirements for either AM BEST or Standard and Poors. If AM Best and Standard and Poors both rate an insurer, the insurer need meet only one of the rating requirements. For AM Best: If the mortgage amount is $5M or less, the carrier must be rated A- with a financial size category of VI; if the mortgage amount is greater than $5M up to and including $25M, the carrier must be rated A- with a financial size category of VIII; if the mortgage amount is greater than $25M, up to and including $50M the carrier must be rated A with a financial size category of IX; and if the mortgage amount is greater than $50M, the carrier must be rated A with a financial size category of X.

7 For Standard and Poors: The insurer must be rated BBB or better in Standard and Poors Insurer Solvency Review. THE INSURANCE AGENT MUST PROVIDE WELLS FARGO COPIES OF PAID RECEIPTS REFLECTING THE ANNUAL PREMIUMS FOR THESE POLICIES. IF A POLICY IS SCHEDULED TO EXPIRE WITHIN 60 DAYS OF THE ANTICIPATED LOAN CLOSING DATE, BORROWER WILL BE REQUIRED TO PROVIDE A CONFIRMATION THAT THE POLICY HAS BEEN OR WILL BE RENEWED BY A CARRIER WITH TERMS THAT SATISFY FREDDIE MAC REQUIREMENTS.

Section : General Insurance Requirements - Applies to All Policies

Section : General Insurance Requirements - Applies to All Policies Agency Guides/Fannie Mae Multifamily/Multifamily Selling and Servicing Guide/Part III: New Underwriting/Part IIIA: Base Underwriting Requirements/Chapter 3: The Property/Section 322: Property and Liability

More information

2010 INSURANCE MANUAL

2010 INSURANCE MANUAL 2010 INSURANCE MANUAL All required insurance shall be in a form, amount, content and written by companies acceptable to the Georgia Department of Community Affairs (DCA). For identification purposes, all

More information

Clarification: The bid due date has been adjusted to 3/19 at 10:00 a.m. at Oliver House (1450 Commerce Drive, Decatur, GA 30030).

Clarification: The bid due date has been adjusted to 3/19 at 10:00 a.m. at Oliver House (1450 Commerce Drive, Decatur, GA 30030). ADDENDUM PROJECT: ARCHITECT: OWNER: Oakview Walk Decatur, GA Arch Project #2015-086 DCA Project #2017-046 Martin Riley Associates - Architects, P.C. 215 Church Street, Suite 200 Decatur, Georgia 30030-3329

More information

MINIMUM INSURANCE REQUIREMENTS FOR CLOSING OF VHDA FINANCED DEVELOPMENTS

MINIMUM INSURANCE REQUIREMENTS FOR CLOSING OF VHDA FINANCED DEVELOPMENTS MINIMUM INSURANCE REQUIREMENTS FOR CLOSING OF VHDA FINANCED DEVELOPMENTS The Commitment issued by the Virginia Housing Development Authority (the Authority ) to finance housing developments contains certain

More information

Insurance Specifications: During Construction

Insurance Specifications: During Construction Insurance Specifications: During Construction ALL INSURANCE CARRIERS MUST BE A.M. BEST S RATED AT LEAST A VIII* The Certificate Holder with rights of direct notice must be National Equity Fund, Inc. Note:

More information

MINIMUM INSURANCE REQUIREMENTS FOR CLOSING OF DHCD FINANCED DEVELOPMENTS

MINIMUM INSURANCE REQUIREMENTS FOR CLOSING OF DHCD FINANCED DEVELOPMENTS MINIMUM INSURANCE REQUIREMENTS FOR CLOSING OF DHCD FINANCED DEVELOPMENTS The Commitment issued by the Department of Housing and Community Development ( DHCD ) to finance housing developments contains certain

More information

MINIMUM INSURANCE REQUIREMENTS FOR CLOSING OF VHTF FINANCED DEVELOPMENTS

MINIMUM INSURANCE REQUIREMENTS FOR CLOSING OF VHTF FINANCED DEVELOPMENTS MINIMUM INSURANCE REQUIREMENTS FOR CLOSING OF VHTF FINANCED DEVELOPMENTS The Commitment issued by the Virginia Housing Trust Fund ( VHTF ) to finance housing developments contains certain insurance requirements

More information

Florida Housing Finance Corporation (FHFC) Insurance Guide (Insurance Guide)

Florida Housing Finance Corporation (FHFC) Insurance Guide (Insurance Guide) Florida Housing Finance Corporation (FHFC) Insurance Guide (Insurance Guide) This Insurance Guide incorporates the Fannie Mae Multifamily Selling and Servicing Guide dated 2/22/16 (the Fannie Mae Guide

More information

MINIMUM INSURANCE REQUIREMENTS FOR CLOSING OF VHDA CONSTRUCTION FINANCING

MINIMUM INSURANCE REQUIREMENTS FOR CLOSING OF VHDA CONSTRUCTION FINANCING MINIMUM INSURANCE REQUIREMENTS FOR CLOSING OF VHDA CONSTRUCTION FINANCING The Commitment issued by the Virginia Housing Development Authority (the Authority ) to finance housing developments contains certain

More information

Rail Owner Controlled Insurance Program Manual

Rail Owner Controlled Insurance Program Manual Rail Owner Controlled Insurance Program Manual Addendum No. 4 to June 2013 Edition (Updated 08-21-17) Update to Section 5 Enrolled and Excluded Contractor Required Coverage for Package P Contract Section

More information

OCIP Contract Language

OCIP Contract Language Page 1 of 12 7. Insurance Requirements OCIP Contract Language 7.1 COUNTY Provided Insurance. COUNTY will provide an Owner Controlled Insurance Program ( OCIP ) for the Project. The OCIP will be administered

More information

Insurance Handbook for VHFA-financed rental housing contains the following: 1) Insurance coverages and limits that are required by VHFA;

Insurance Handbook for VHFA-financed rental housing contains the following: 1) Insurance coverages and limits that are required by VHFA; INSURANCE HANDBOOK Insurance Handbook for VHFA-financed rental housing contains the following: 1) Insurance coverages and limits that are required by VHFA; 2) Insurance coverages that are recommended by

More information

INSURANCE EXHIBIT TO CONSTRUCTION AGREEMENT Insurance Requirements Owner Controlled Insurance Program

INSURANCE EXHIBIT TO CONSTRUCTION AGREEMENT Insurance Requirements Owner Controlled Insurance Program *THIS INSURANCE EXHIBIT IS SUBJECT TO FINAL UPDATE BASED ON QUOTE NEGOTIATIONS AND DECISION BY OWNER TO IMPLEMENT THE OCIP PROGRAM FOR THIS PROJECT IT IS BEING PROVIDED FOR INFORMATION ONLY, TO PROSPECTIVE

More information

APPENDIX B WASHINGTON SUBURBAN SANITARY COMMISSION PROCUREMENT OFFICE INSURANCE AND BONDING CONTRACT NO.

APPENDIX B WASHINGTON SUBURBAN SANITARY COMMISSION PROCUREMENT OFFICE INSURANCE AND BONDING CONTRACT NO. APPENDIX B WASHINGTON SUBURBAN SANITARY COMMISSION PROCUREMENT OFFICE INSURANCE AND BONDING CONTRACT NO. 1. INSURANCE REQUIREMENTS A. INSURANCE: The Contractor shall be required to maintain insurance for

More information

SECTION SUPPLEMENTARY CONDITIONS

SECTION SUPPLEMENTARY CONDITIONS SECTION 00800 SUPPLEMENTARY CONDITIONS PART 1 GENERAL 1.01 GENERAL CONDITIONS A. The Supplementary Conditions modify, delete and/or add to the General Conditions, AIA Document A201/Cma, Construction Management

More information

Correspondent Project Approval

Correspondent Project Approval Correspondent Project Approval Insurance Training June 2017 Agenda Condo and PUD Submission Reference Guide Hazard and Wind Insurance Special Endorsements Co-insurance Flood Insurance Commercial Policies

More information

FHA Multifamily Housing Policy Handbook TABLE OF CONTENTS

FHA Multifamily Housing Policy Handbook TABLE OF CONTENTS FHA Multifamily Housing Policy Handbook TABLE OF CONTENTS UNIT ONGOING ASSET MONITORING........ Purpose... A. Insurance Protection... B. Equal Monthly Payments... C. Fire and Hazard Insurance... D. Exclusions...

More information

DOMESTIC ONLY CONRAD, CURIO, WALDORF ASTORIA HILTON WORLDWIDE 1 LUXURY FRANCHISED - REQUIREMENTS [Hilton Worldwide Holdings Inc.]

DOMESTIC ONLY CONRAD, CURIO, WALDORF ASTORIA HILTON WORLDWIDE 1 LUXURY FRANCHISED - REQUIREMENTS [Hilton Worldwide Holdings Inc.] DOMESTIC ONLY CONRAD, CURIO, WALDORF ASTORIA HILTON WORLDWIDE 1 LUXURY FRANCHISED - REQUIREMENTS [Hilton Worldwide Holdings Inc.] NAME AND ADDRESS OF AGENCY: Fax and E-Mail NAME AND ADDRESS OF INSURED:

More information

Company Participation:

Company Participation: Coverage is underwritten by ICAT Managers on behalf of the Company(ies) listed below. Coverage will be written on the ISO Causes of Loss - Special Form (CP 10 30 06 07) form. Company Participation: Policy

More information

INSURANCE CHECKLIST FRANCHISE HOTELS

INSURANCE CHECKLIST FRANCHISE HOTELS INSURANCE CHECKLIST FRANCHISE HOTELS INSURANCE REQUIRED DURING OPERATIONS HOTELS OUTSIDE U.S.A. Location Name (including Brand) & Facility ID # Full Address of Location: REQUIREMENTS PUBLIC LIABILITY Hotel

More information

OREGON STATE UNIVERSITY

OREGON STATE UNIVERSITY OREGON STATE UNIVERSITY SUPPLEMENTAL GENERAL CONDITIONS To The PUBLIC IMPROVEMENT GENERAL CONDITIONS Project Name: Magruder Hall Hospital Expansion & Renovation The following modify the November 1, 2016

More information

COMMERCIAL FACADE IMPROVEMENT PROGRAM GUIDELINES AND APPLICATION

COMMERCIAL FACADE IMPROVEMENT PROGRAM GUIDELINES AND APPLICATION CITY OF SOUTH GATE COMMUNITY DEVELOPMENT DEPARTMENT 8650 CALIFORNIA AVENUE SOUTH GATE, CALIFORNIA 90280 (323) 563-9535 COMMERCIAL FACADE IMPROVEMENT PROGRAM GUIDELINES AND APPLICATION City of South Gate

More information

UHM Insurance Requirements (Hazard, Condominium, H0-6 and Flood)

UHM Insurance Requirements (Hazard, Condominium, H0-6 and Flood) This Insurance Guide is provided by Union Home Mortgage Corp. ( UHM ), having its principal place of business at 8241 Dow Circle West, Strongsville, OH 44136. UHM publishes this via its secured website

More information

W.E. O Neil Construction Co. of Arizona c/o (Project Coordinator) 4511 E. Kerby Avenue Phoenix, AZ Fax (480)

W.E. O Neil Construction Co. of Arizona c/o (Project Coordinator) 4511 E. Kerby Avenue Phoenix, AZ Fax (480) W.E. O NEIL CONSTRUCTION CO. OF ARIZONA INSURANCE REQUIREMENTS Project Name Project Address City, State Zip Subcontractor SHALL NOT COMMENCE WORK at the site until it has obtained and provided all insurance

More information

Subcontractor Qualification Statement

Subcontractor Qualification Statement Subcontractor Qualification Statement Trade: Legal Name of Firm: Address: No. & Street City State Zip Mailing Address: If different from above address E-mail address: Telephone #: Fax #: Website: Type

More information

INSURANCE AND INDEMNIFICATION MANUAL. Supplement to Policy 560 i

INSURANCE AND INDEMNIFICATION MANUAL. Supplement to Policy 560 i INSURANCE AND INDEMNIFICATION MANUAL Supplement to Policy 560 Table of Contents.1 INTRODUCTION... 1.2 EXHIBIT I INSURANCE AND INDEMNITY REQUIREMENTS FOR CONSTRUCTION AND SERVICE CONTRACTS... 1 2.1 INDEMNIFICATION/HOLD

More information

BLUEPRINT 2010 ACORD CERTIFICATE OF INSURANCE CHANGES CONSTRUCTION PRACTICE LIKELY ISSUES CONSTRUCTION CONTRACTS

BLUEPRINT 2010 ACORD CERTIFICATE OF INSURANCE CHANGES CONSTRUCTION PRACTICE LIKELY ISSUES CONSTRUCTION CONTRACTS CONSTRUCTION PRACTICE BLUEPRINT September 2010 www.willis.com 2010 ACORD CERTIFICATE OF INSURANCE CHANGES Many of you have heard that ACORD, the licensing company for insurance forms, has amended their

More information

Bid/Contract Insurance Requirements (Insurance Manual)

Bid/Contract Insurance Requirements (Insurance Manual) The Regents of the University of California (UCIP) Bid/Contract Insurance Requirements (Insurance Manual) for the University of California, San Francisco Medical Center Mission Bay Precision Cancer Medicine

More information

Insurance Issues TABLE OF CONTENTS

Insurance Issues TABLE OF CONTENTS TABLE OF CONTENTS I. INTRODUCTION... 1 II. PARTIES TO THE POLICY... 1 III. THE RISK OF NO INSURANCE... 2 A. Certificates Of Insurance Are Not Insurance... 2 1. Not Reasonable to Rely on an ACORD Certificate

More information

CITY AND COUNTY OF SAN FRANCISCO Port of San Francisco. Contract No Pier 23 Roof Repair. ADDENDUM No. 1 Issued: December 16, 2016

CITY AND COUNTY OF SAN FRANCISCO Port of San Francisco. Contract No Pier 23 Roof Repair. ADDENDUM No. 1 Issued: December 16, 2016 CITY AND COUNTY OF SAN FRANCISCO Port of San Francisco Contract No. 2784 Pier 23 Roof Repair ADDENDUM No. 1 Issued: December 16, 2016 The following clarifications, changes, additions or deletions are incorporated

More information

DOCUMENT OF INSURANCE

DOCUMENT OF INSURANCE DOCUMENT OF INSURANCE 12/17/12 This Document is issued as a matter of information only to authorized viewers for their internal use only and confers no rights upon any viewer of this Document. This Document

More information

Bid/Contract Insurance Requirements (Insurance Manual)

Bid/Contract Insurance Requirements (Insurance Manual) The Regents of the University of California University Controlled Insurance Program (UCIP) Bid/Contract Insurance Requirements (Insurance Manual) for the [CAMPUS] [PROJECT] Construction Project Need a

More information

Office of Risk Management

Office of Risk Management Office of Risk Management Patrick M. Durbin, CHMM, Assistant Director of Risk Control Michelle N. Bost, CHMM, Environmental Program Coordinator Eric Agnew, CPCU, ARM, Risk & Insurance Analyst U. T. System

More information

Exhibit 1 to Part 3 Project-Specific Terms

Exhibit 1 to Part 3 Project-Specific Terms Exhibit 1 to Part 3 Project-Specific Terms (Date of Standard Exhibit 1 to Part 3: July 2013) This Exhibit 1 to Part 3 (2013 Lump Sum Design-Build Agreement Between Department and Design-Builder) contains

More information

responsibility of Tenant and/or Construction Contractors or Construction Subcontractors to pay.

responsibility of Tenant and/or Construction Contractors or Construction Subcontractors to pay. responsibility of Tenant and/or Construction Contractors or Construction Subcontractors to pay. (h) Primary Coverage. For claims arising out of or relating to work on the Specific Project, Tenant s insurance

More information

Real Estate Finance: Evaluating Property Insurance Under Current Lender Standards

Real Estate Finance: Evaluating Property Insurance Under Current Lender Standards Presenting a live 90-minute webinar with interactive Q&A Real Estate Finance: Evaluating Property Insurance Under Current Lender Standards Determining Replacement Cost, Business Interruption, Flood, Windstorm,

More information

SHORT FORM CREDIT APPLICATION (For Wisconsin residents only)

SHORT FORM CREDIT APPLICATION (For Wisconsin residents only) W. B. A. 130S (5/14) efipco 11257 2014 Wisconsin Bankers Association/Distributed by FIPCO SHORT FORM CREDIT APPLICATION (For Wisconsin residents only) of Application To Creditor: 1. (S). Check one of the

More information

EXHIBIT B. Insurance Requirements for Construction Contracts

EXHIBIT B. Insurance Requirements for Construction Contracts EXHIBIT B Insurance Requirements for Construction Contracts Contractor shall procure and maintain for the duration of the contract, and for 3 years thereafter, insurance against claims for injuries to

More information

PROFESSIONAL SERVICES FOR CONSTRUCTION MANAGER AT RISK (CMAR) FOR THE MOBILE DOWNTOWN TERMINAL BROOKLEY AEROPLEX MOBILE, ALABAMA

PROFESSIONAL SERVICES FOR CONSTRUCTION MANAGER AT RISK (CMAR) FOR THE MOBILE DOWNTOWN TERMINAL BROOKLEY AEROPLEX MOBILE, ALABAMA MOBILE AIRPORT AUTHORITY PROFESSIONAL SERVICES FOR CONSTRUCTION MANAGER AT RISK (CMAR) FOR THE MOBILE DOWNTOWN TERMINAL BROOKLEY AEROPLEX MOBILE, ALABAMA REQUEST FOR PROPOSAL (RFP) Date: September 24,

More information

EXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR

EXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR EXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR Section 1 Insurance Coverages Prior to Project Completion Except as set forth below, the Developer will obtain and

More information

BIGGERT-WATERS 2012 TALKING POINTS

BIGGERT-WATERS 2012 TALKING POINTS BIGGERT-WATERS 2012 TALKING POINTS No Extension of Subsidy on the Pre-FIRM Properties in SFHA s & Zone D Effective October 1, 2013, the NFIP will no longer provide any extension of premium rate subsidy

More information

SUBCONTRACTOR PREQUALIFICATION FORM

SUBCONTRACTOR PREQUALIFICATION FORM SUBCONTRACTOR PREQUALIFICATION FORM All subcontractors are required to complete this questionnaire. The contents of this questionnaire will be considered and used solely to determine your firm s qualification

More information

REQUEST FOR PROPOSALS FOR AFFORDABLE SUPPORTIVE RECOVERY HOUSING

REQUEST FOR PROPOSALS FOR AFFORDABLE SUPPORTIVE RECOVERY HOUSING REQUEST FOR PROPOSALS FOR AFFORDABLE SUPPORTIVE RECOVERY HOUSING New Hampshire Housing Finance Authority ( Authority ) is seeking applications for financing from qualified developers for projects that

More information

Exhibit 1 to Part 3 Project-Specific Terms

Exhibit 1 to Part 3 Project-Specific Terms to Part 3 Project-Specific Terms (Date of Standard to Part 3: July 2013) This to Part 3 (2013 Lump Sum Design-Build Agreement Between Department and Design-Builder) contains project-specific terms that

More information

Guide To Homeowner s Insurance Exam Study Guide

Guide To Homeowner s Insurance Exam Study Guide Guide To Homeowner s Insurance Exam Study Guide This document contains all the questions that will included in the final exam, in the order that they will be asked. When you have studied the course materials,

More information

RESOLUTION NO Adopted by the Sacramento City Council. June 11, 2013

RESOLUTION NO Adopted by the Sacramento City Council. June 11, 2013 RESOLUTION NO. 2013-0199 Adopted by the Sacramento City Council June 11, 2013 CURTIS PARK COURT APARTMENTS PROJECT: AUTHORIZING A $1,800,000 LOAN COMMITMENT (CITY HOME INVESTMENT PARTNERSHIP FUNDS); EXECUTION

More information

INSURANCE PROVISIONS AND CASUALTY LOSSES

INSURANCE PROVISIONS AND CASUALTY LOSSES Presented: 2017 Bernard O. Dow Leasing Institute Houston, Texas November 10, 2017 South Texas School of Law INSURANCE PROVISIONS AND CASUALTY LOSSES Aaron Johnston, Jr. Author contact information: Aaron

More information

SYRACUSE UNIVERSITY Contractor Insurance Requirements The Contractor shall provide, maintain and deliver during the term of this Agreement the following insurance with at least the minimum coverages and

More information

County of Greene, New York REQUEST FOR PROPOSALS (RFP) TO PROVIDE INSURANCE BROKERAGE SERVICES FOR THE COUNTY OF GREENE

County of Greene, New York REQUEST FOR PROPOSALS (RFP) TO PROVIDE INSURANCE BROKERAGE SERVICES FOR THE COUNTY OF GREENE County of Greene, New York REQUEST FOR PROPOSALS (RFP) TO PROVIDE INSURANCE BROKERAGE SERVICES FOR THE COUNTY OF GREENE SECTION 1: PURPOSE. 1.1 The County of Greene hereby requests proposals from interested

More information

SAMPLE. Insurance Exhibit. Design-Builder s Insurance Requirements

SAMPLE. Insurance Exhibit. Design-Builder s Insurance Requirements Insurance Exhibit Design-Builder s Insurance Requirements Document No. E-INS-I Second Edition, 2010 Design-Build Institute of America Washington, DC Insurance Exhibit (The Parties should consult their

More information

Exhibit D Insurance Exhibits. Document No. E-INSWD Second Edition, 2010 Design-Build Institute of America Washington, DC

Exhibit D Insurance Exhibits. Document No. E-INSWD Second Edition, 2010 Design-Build Institute of America Washington, DC Exhibit D Insurance Exhibits Document No. E-INSWD Second Edition, 2010 Design-Build Institute of America Washington, DC Insurance Exhibit Design-Builder s Insurance Requirements (The Parties should consult

More information

DOCUMENT SUPPLEMENTARY CONDITIONS

DOCUMENT SUPPLEMENTARY CONDITIONS 1.1 GENERAL CONDITIONS DOCUMENT 007300 SUPPLEMENTARY CONDITIONS A. The Supplementary Conditions modify, delete and/or add to the General Conditions, AIA Document A201/Cma, Construction Management Edition,

More information

PHILADELPHIA REDEVELOPMENT AUTHORITY INSURANCE REQUIREMENTS

PHILADELPHIA REDEVELOPMENT AUTHORITY INSURANCE REQUIREMENTS PHILADELPHIA REDEVELOPMENT AUTHORITY INSURANCE REQUIREMENTS The individual or entity seeking to enter into a contract with the Philadelphia Redevelopment Authority or who is entering into a contract with

More information

AIA Document A101 TM 2017 Exhibit A

AIA Document A101 TM 2017 Exhibit A AIA Document A101 TM 2017 Exhibit A Insurance and Bonds This Insurance and Bonds Exhibit is part of the Agreement, between the Owner and the Contractor, dated the day of «November» in the year «2017» (In

More information

FSLSO DILIGENT EFFORT/DISCLOSURE MATRIX

FSLSO DILIGENT EFFORT/DISCLOSURE MATRIX The FSLSO Diligent Effort/ Matrix was developed by the Florida Surplus Lines Service Office for the purpose of providing Commercial Property Coverage Type Description Diligent Effort () or Commercial Property

More information

Contractor s Insurance Requirements

Contractor s Insurance Requirements ATTACHMENT 5 Contractor s Insurance Requirements Upon tentative award, Bidder shall be required to procure at its sole cost and expense all required insurance. The Contractor shall procure at its sole

More information

ADDENDUM TO STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR A RESIDENTIAL OR SMALL COMMERCIAL PROJECT AIA DOCUMENT A

ADDENDUM TO STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR A RESIDENTIAL OR SMALL COMMERCIAL PROJECT AIA DOCUMENT A ADDENDUM TO STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR A RESIDENTIAL OR SMALL COMMERCIAL PROJECT AIA DOCUMENT A105-2007 The following addendum modifies or supplements the standard form

More information

Where Builders Risk Meets Personal Lines

Where Builders Risk Meets Personal Lines Where Builders Risk Meets Personal Lines Presenter Introduction Mary Stiglic, CIC, Marketing Manager More than 18 years experience with builders risk Licensed property and casualty agent Holds CIC designation

More information

ADDENDUM #1 TO THE REQUEST FOR QUALIFICATIONS

ADDENDUM #1 TO THE REQUEST FOR QUALIFICATIONS MARICOPA COUNTY SPECIAL HEALTH CARE DISTRICT MARICOPA INTEGRATED HEALTH SYSTEM TO THE REQUEST FOR QUALIFICATIONS FOR DESIGN PROFESSIONAL AMBULATORY FACILITY #1 RFQ NO. 480 90 17 002, ISSUED JUNE 1, 2017

More information

MORTGAGE PURCHASE AGREEMENT

MORTGAGE PURCHASE AGREEMENT MORTGAGE PURCHASE AGREEMENT THIS AGREEMENT is entered into this day of, 20, by and between ("Seller"), whose address is and the Industrial Commission of North Dakota, acting in its capacity as the North

More information

EXHIBIT B ADDITIONAL TERMS AND CONDITIONS ADDENDUM

EXHIBIT B ADDITIONAL TERMS AND CONDITIONS ADDENDUM EXHIBIT B ADDITIONAL TERMS AND CONDITIONS ADDENDUM A. ADVANCES AND CONSTRUCTION 1. CONDITIONS PRECEDENT TO INITIAL ADVANCE. Bank shall make the initial advance of proceeds of the Authority Loan and hereby

More information

Document A Exhibit A Insurance and Bonds

Document A Exhibit A Insurance and Bonds Document A101 2017 Exhibit A Insurance and Bonds This Insurance and Bonds Exhibit is part of the Agreement, between the Owner and the Contractor, dated the day of in the year (In words, indicate day, month

More information

Property Risk Insurance Specialist PRIS Syllabus

Property Risk Insurance Specialist PRIS Syllabus Property Risk Insurance Specialist PRIS Syllabus Day 1 Overview of Property Driven Accounts Commercial Challenges to Insuring o General Liability o Property o Crime o Inland Marine o Workers Compensation

More information

Revision Summary: AR Compass Below are the revisions to the current AR Compass that are now on the AR Compass 01 15

Revision Summary: AR Compass Below are the revisions to the current AR Compass that are now on the AR Compass 01 15 Revision Summary: AR Compass 01 15 Below are the revisions to the current AR Compass 11 10 that are now on the AR Compass 01 15 Pg # s 1 Coverage Territory (I.C.): extended to include Canada. Comment:

More information

TRELLIS COMMUNITY DEVELOPMENT REQUEST FOR PROPOSAL COLTER 20 UNIT SINGLE FAMILY ATTACHED PROJECT

TRELLIS COMMUNITY DEVELOPMENT REQUEST FOR PROPOSAL COLTER 20 UNIT SINGLE FAMILY ATTACHED PROJECT TRELLIS COMMUNITY DEVELOPMENT REQUEST FOR PROPOSAL TRELLIS @ COLTER 20 UNIT SINGLE FAMILY ATTACHED PROJECT A. INSTRUCTIONS Through this Request for Proposal, TRELLIS COMMUNITY DEVELOPMENT is seeking the

More information

Summary Description of Rail OCIP Coverage

Summary Description of Rail OCIP Coverage Rail OCIP Overview Package P for the Dulles Corridor Metrorail Phase 2 construction project will be insured under an Owner Controlled Insurance Program (Rail OCIP). The Rail OCIP insures contractors and

More information

EXHIBIT F. Portland Public Schools Owner Controlled Insurance Program (OCIP) Portland Public Schools OCIP. Participant Guidebook/Manual.

EXHIBIT F. Portland Public Schools Owner Controlled Insurance Program (OCIP) Portland Public Schools OCIP. Participant Guidebook/Manual. Portland Public Schools Owner Controlled Insurance Program (OCIP) Participant Guidebook/Manual Program Name: Portland Public Schools OCIP Project Locations: Various project locations in School District

More information

DOMINION BUILDERS, LLC requires that allsubcontractors interested in working with us, complete this pre-qualification form.

DOMINION BUILDERS, LLC requires that allsubcontractors interested in working with us, complete this pre-qualification form. DOMINION BUILDERS, LLC requires that allsubcontractors interested in working with us, complete this pre-qualification form. Complete the form below and email or fax (both the form and all attachments)

More information

Florida Annual Conference of The United Methodist Church 2017 Insurance Summary Coverage Period: 12/31/ /31/2017

Florida Annual Conference of The United Methodist Church 2017 Insurance Summary Coverage Period: 12/31/ /31/2017 Florida Annual Conference of The United Methodist Church 2017 Insurance Summary Coverage Period: 12/31/2016 12/31/2017 Below is a brief listing of the insurance programs, coverages, limits and deductibles

More information

REAL ESTATE INVESTORS (REI) APPLICATION QUESTIONNAIRE

REAL ESTATE INVESTORS (REI) APPLICATION QUESTIONNAIRE Section One Insured Info First named insured: Address: Phone: Email: Website: List all additional named insureds: (Please attach a list if not enough room on this form) 1. 2. Number of Properties: 3. Estimated

More information

COMMERCIAL PACKAGE POLICY COVERAGES WITH CONTRACTOR SHIELDSM

COMMERCIAL PACKAGE POLICY COVERAGES WITH CONTRACTOR SHIELDSM contractor shield sm COMMERCIAL PACKAGE POLICY COVERAGES WITH IMPACT CONTRACTOR SHIELDSM For decades, Federated insurance products have been designed specifically for contractors to manage the risks and

More information

REQUEST FOR PROPOSAL (RFP) for PROFESSIONAL CONSULTING SERVICES. to perform an

REQUEST FOR PROPOSAL (RFP) for PROFESSIONAL CONSULTING SERVICES. to perform an REQUEST FOR PROPOSAL (RFP) for PROFESSIONAL CONSULTING SERVICES to perform an ANALYSIS OF IMPEDIMENTS TO FAIR HOUSING CHOICE 24 C.F.R. 570.601 (a) (2) 24 C.F.R. 91.225 (a) June 27, 2011 ALL PROPOSALS ARE

More information

SAMPLE. Insurance Exhibit. Design-Build Subcontractor s Insurance Requirements

SAMPLE. Insurance Exhibit. Design-Build Subcontractor s Insurance Requirements Insurance Exhibit Design-Build Subcontractor s Insurance Requirements Document No. E-INS-IV Second Edition, 2010 Design-Build Institute of America Washington, DC Insurance Exhibit Design-Build Subcontractor

More information

Housing Authority of the City and County of San Francisco

Housing Authority of the City and County of San Francisco Housing Authority of the City and County of San Francisco REQUEST FOR QUOTE 1815 Egbert Avenue San Francisco, CA 94124 September 24, 2018 REQUEST FOR QUOTE A. Introduction The Housing Authority of the

More information

TRENTON AGRI PRODUCTS LLC INSURANCE & INDEMNIFICATION TERMS & CONDITIONS

TRENTON AGRI PRODUCTS LLC INSURANCE & INDEMNIFICATION TERMS & CONDITIONS TRENTON AGRI PRODUCTS LLC INSURANCE & INDEMNIFICATION TERMS & CONDITIONS These Insurance & Indemnification Terms & Conditions ( Terms ) are hereby incorporated in and made a part of each and every written

More information

COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT PERMANENT ENCROACHMENT PERMIT

COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT PERMANENT ENCROACHMENT PERMIT COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT PERMANENT ENCROACHMENT PERMIT 1. Applicant shall provide one (1) set of approved CVWD Drawings. 2. Applicant shall submit a completed Permanent

More information

CITY OF ROMULUS CHAPTER 39: PURCHASING

CITY OF ROMULUS CHAPTER 39: PURCHASING CITY OF ROMULUS CHAPTER 39: PURCHASING CITY OF ROMULUS ORDINANCE NO. AN ORDINANCE TO AMEND PORTIONS OF CHAPTER 39 AND TO ADD ADDITIONAL SECTIONS TO CHAPTER 39 OF THE PURCHASING ORDINANCE OF THE CITY OF

More information

PROFESSIONAL SERVICES and NON-CONSTRUCTION CONRACTS

PROFESSIONAL SERVICES and NON-CONSTRUCTION CONRACTS CASTAIC LAKE WATER AGENCY STANDARD CONTRACT RISK TRANSFER PROVISIONS, GENERAL CONDITIONS, REQUIRED INSURANCE and CALIFORNIA LABOR CODE REQUIREMENTS for PROFESSIONAL SERVICES and NON-CONSTRUCTION CONRACTS

More information

Letter of Instructions

Letter of Instructions Letter of Instructions Trade Contractor Prequalification Statement Please complete the following and return at your earliest convenience by email to prequal@chanen.com. 1. Trade Contractor Prequalification

More information

Subcontractor Insurance Requirements Certificate Holder VCI Construction, LLC 1921 W. Eleventh Street, Upland CA 91786

Subcontractor Insurance Requirements Certificate Holder VCI Construction, LLC 1921 W. Eleventh Street, Upland CA 91786 Subcontractor Insurance Requirements Certificate Holder VCI Construction, LLC 1921 W. Eleventh Street, Upland CA 91786 Provide this document to your insurance agent along with all samples of endorsements

More information

COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT TEMPORARY ENCROACHMENT PERMIT

COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT TEMPORARY ENCROACHMENT PERMIT COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT TEMPORARY ENCROACHMENT PERMIT 1. Applicant shall submit a completed Temporary Encroachment Permit application and obtain an executed Temporary

More information

LAYTON RISK MANAGEMENT CONTRACTOR CONTROLLED INSURANCE PROGRAM MANUAL FOR THE PROJECT NAME. Layton Construction and Gallagher Construction Services

LAYTON RISK MANAGEMENT CONTRACTOR CONTROLLED INSURANCE PROGRAM MANUAL FOR THE PROJECT NAME. Layton Construction and Gallagher Construction Services LAYTON RISK MANAGEMENT CONTRACTOR CONTROLLED INSURANCE PROGRAM MANUAL FOR THE PROJECT NAME Presented By: Layton Construction and Gallagher Construction Services Table of Contents Insurance Coverages...

More information

Re: Joint Notice of Proposed Rulemaking on Loans in Areas Having Special Flood Hazards -- Private Flood Insurance

Re: Joint Notice of Proposed Rulemaking on Loans in Areas Having Special Flood Hazards -- Private Flood Insurance Office of the Comptroller of the Currency Legislative and Regulatory Activities Division 400 7 th Street SW., Suite 3E-218, Mail Stop 9W-11 Washington, DC 20219 Docket ID OCC 2016 0005; RIN 1557 AD67 Board

More information

ADDENDUM A. Subcontractor Insurance Requirements

ADDENDUM A. Subcontractor Insurance Requirements ADDENDUM A Subcontractor Insurance Requirements Certificates and endorsements must be received and approved prior to the start of any work. No payments will be released until all insurance documents are

More information

Texas All-Lines Adjuster Pre-Class Assignment Insurance Terms and Concepts

Texas All-Lines Adjuster Pre-Class Assignment Insurance Terms and Concepts Texas All-Lines Adjuster Pre-Class Assignment Assignment: Please review and have a thorough working knowledge of the definitions for each of the terms and concepts listed below. Be prepared to discuss

More information

REQUIRED AT PROPOSAL STAGE:

REQUIRED AT PROPOSAL STAGE: DATE: February 13, 2019 SUBJECT: ADDENDUM #1-2401 E. PACIFIC COAST HIGHWAY WILMINGTON, CA 90744 The Port of Los Angeles 2401 E. Pacific Coast Highway Wilmington, CA 90744 Request for Lease Proposals Exhibit

More information

All-in-One Custom Construction

All-in-One Custom Construction Wholesale Lending All-in-One Custom Construction This is a true one-time-close loan program designed to finance the construction or major remodel of a primary residence or second home. This loan includes

More information

GUIDELINES FOR PURCHASING INSURANCE ELCA LEADERS

GUIDELINES FOR PURCHASING INSURANCE ELCA LEADERS GUIDELINES FOR PURCHASING INSURANCE For ELCA LEADERS Developed By Willis is pleased to provide the following information to help ELCA congregations and synods in evaluating different insurance programs

More information

RESOLUTION NO Adopted by the Sacramento City Council August 9, 2011

RESOLUTION NO Adopted by the Sacramento City Council August 9, 2011 RESOLUTION NO. 2011-464 Adopted by the Sacramento City Council August 9, 2011 KELSEY VILLAGE: APPROVAL OF A LOAN COMMITMENT UP TO $2,100,000 (COMPRISED OF CITY HOME INVESTMENT PARTNERSHIP PROGRAM FUNDS

More information

ROCHESTER SCHOOLS MODERNIZATION PROJECT PHASE 2b School Without Walls Commencement Academy INSURANCE REQUIREMENTS

ROCHESTER SCHOOLS MODERNIZATION PROJECT PHASE 2b School Without Walls Commencement Academy INSURANCE REQUIREMENTS INSURANCE REQUIREMENTS 00 73 16-1 SECTION 00 73 16 - INSURANCE REQUIREMENTS Contractor shall obtain at its own cost and expense all the insurance described below (the Required Insurance ) that will protect

More information

CERTIFICATE OF PROPERTY INSURANCE DATE (MM/DD/YYYY) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY

More information

May 5, Write Your Own (WYO) Principal Coordinators and the National Flood Insurance Program (NFIP) Servicing Agent

May 5, Write Your Own (WYO) Principal Coordinators and the National Flood Insurance Program (NFIP) Servicing Agent U.S. Department of Homeland Security 500 C Street, SW Washington, DC 20472 W-13026 May 5, 2013 MEMORANDUM FOR: Write Your Own (WYO) Principal Coordinators and the National Flood Insurance Program (NFIP)

More information

AIA Document A101 TM 2017 Exhibit A

AIA Document A101 TM 2017 Exhibit A AIA Document A101 TM 2017 Exhibit A Insurance and Bonds This Insurance and Bonds Exhibit is part of the Agreement, between the Owner and the Contractor, dated the day of in the year (In words, indicate

More information

AIA Document A101 TM 2007

AIA Document A101 TM 2007 AIA Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year (In words, indicate day, month

More information

Massport-LOGAN MODERNIZATION/CAPITAL PROGRAMS

Massport-LOGAN MODERNIZATION/CAPITAL PROGRAMS Introduction The Massachusetts Port Authority (Massport) has elected to provide and administer an Owner Controlled Insurance Program (OCIP) for the Logan Airport Construction Projects. This manual will

More information

National Correspondent Division Lender Guide

National Correspondent Division Lender Guide GLOSSARY As used in the Agreement and this Guide, the terms herein shall have the following meanings, unless the context requires otherwise: Accepted Servicing Practice(s): With respect to any Loan, as

More information

MCGOUGH STANDARD INSURANCE REQUIREMENTS

MCGOUGH STANDARD INSURANCE REQUIREMENTS MCGOUGH STANDARD INSURANCE REQUIREMENTS B1. Insurance. Prior to commencing any Subcontract Work hereunder, the Subcontractor shall procure, maintain and pay for insurance of the type and with the minimum

More information

Introduction to General Insurance Exam

Introduction to General Insurance Exam Exam February 2018 Important Exam Information: Exam Registration Candidates may register online or with an application. Order Study Notes There is no study note package for this examination. Introductory

More information

Selected Insurance Issues in Commercial Real Estate Transactions Understanding the Nuances

Selected Insurance Issues in Commercial Real Estate Transactions Understanding the Nuances Selected Insurance Issues in Commercial Real Estate Transactions Understanding the Nuances Richard A. Fineman, Esquire and Andrew H. Wagner, MBA What is Insurance? Insurance is the transfer of risk via

More information

Regional School District No. 8 REQUEST FOR PROPOSALS FOR AUDITING SERVICES LEGAL NOTICE. REQUEST FOR PROPOSALS - Regional School District No.

Regional School District No. 8 REQUEST FOR PROPOSALS FOR AUDITING SERVICES LEGAL NOTICE. REQUEST FOR PROPOSALS - Regional School District No. Regional School District No. 8 REQUEST FOR PROPOSALS FOR AUDITING SERVICES LEGAL NOTICE REQUEST FOR PROPOSALS - Regional School District No. 8 REQUEST FOR PROPOSALS FOR AUDITING SERVICES Regional School

More information