1 AIA Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status, address and other information) Archuleta County PO Box San Juan Street Pagosa Springs, CO and the Contractor: (Name, legal status, address and other information) for the following Project: (Name, location and detailed description) Archuleta County Building Roof Reconstruction 449 San Juan Street Pagosa Springs, CO ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document A , General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. The Architect: (Name, legal status, address and other information) Reynolds + Associates Architecture & Engineers 1140 Main Ave., Ste B Durango, CO The Owner and Contractor agree as follows. ELECTRONIC COPYING of any portion of this AIA Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document. AIA Document A Copyright 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:00:51 on 06/18/2013 under Order No _1 which expires on 05/11/2014, and is not for resale. User Notes: ( ) 1

2 TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement if it differs from the date of this Agreement or, if applicable, state that the date will be fixed in a notice to proceed.) «The date of commencement shall be fixed in a Notice to Proceed. That date is expected, but not guaranteed, to be October 14, 2013» If, prior to the commencement of the Work, the Owner requires time to file mortgages and other security interests, the Owner s time requirement shall be as follows: 3.2 The Contract Time shall be measured from the date of commencement. ARTICLE 4 CONTRACT SUM 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor s performance of the Contract. The Contract Sum shall be ($ ), subject to additions and deductions as provided in the Contract Documents. AIA Document A Copyright 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:00:51 on 06/18/2013 under Order No _1 which expires on 05/11/2014, and is not for resale. User Notes: ( ) 2

3 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If the bidding or proposal documents permit the Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires.) 4.3 Unit prices, if any: (Identify and state the unit price; state quantity limitations, if any, to which the unit price will be applicable.) Item Units and Limitations Price Per Unit ($0.00) 4.4 Allowances included in the Contract Sum, if any: (Identify allowance and state exclusions, if any, from the allowance price.) Item Price ARTICLE 5 PAYMENTS 5.1 PROGRESS PAYMENTS Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. Applications for Payment submitted by the Contractor shall conform to any current invoicing requirements or standards imposed by the Department of Local Affairs (DOLA), of the State of Colorado, as part of their grant to this project. If DOLA communicates any new or different invoicing standards during the project period, the Contractor will comply with those standards The period covered by each Application for Payment shall be one calendar month ending on the last day of the month Provided that an Application for Payment is received by the Architect not later than the «7th» day of a month, the Owner shall make payment of the certified amount to the Contractor not later than the «7th» day of the «following» month. If an Application for Payment is received by the Architect after the application date fixed above, payment shall be made by the Owner not later than «thirty» ( «30» ) days after the Architect receives the Application for Payment. (Federal, state or local laws may require payment within a certain period of time.) Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor s Applications for Payment Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows:.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of «ten» percent ( «10» %). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute shall be included as provided in Section of AIA Document A , General Conditions of the Contract for Construction; AIA Document A Copyright 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:00:51 on 06/18/2013 under Order No _1 which expires on 05/11/2014, and is not for resale. User Notes: ( ) 3

4 .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of «ten» percent ( «10» %);.3 Subtract the aggregate of previous payments made by the Owner; and.4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of AIA Document A The progress payment amount determined in accordance with Section shall be further modified under the following circumstances:.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to the full amount of the Contract Sum, less such amounts as the Architect shall determine for incomplete Work, retainage applicable to such work and unsettled claims; and (Section of AIA Document A requires release of applicable retainage upon Substantial Completion of Work with consent of surety, if any.).2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section of AIA Document A Except with the Owner s prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site Archuleta County is a public entity. Nothing in this document waives the Colorado Governmental Immunity Act. All funding obligation beyond the current fiscal year are subject to the funds being budgeted and appropriated. 5.2 FINAL PAYMENT Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when.1 the Contractor has fully performed the Contract except for the Contractor s responsibility to correct Work as provided in Section of AIA Document A , and to satisfy other requirements, if any, which extend beyond final payment; and.2 a final Certificate for Payment has been issued by the Architect The Owner s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect s final Certificate for Payment. ARTICLE 6 DISPUTE RESOLUTION- omitted ARTICLE 7 TERMINATION OR SUSPENSION 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A The Work may be suspended by the Owner as provided in Article 14 of AIA Document A ARTICLE 8 MISCELLANEOUS PROVISIONS 8.1 Where reference is made in this Agreement to a provision of AIA Document A or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 8.2 The Owner s representative: (Name, address and other information) «Mitzi Bowman, Building & Grounds Manager 449 San Juan Street PO Box 1507 Pagosa Springs, CO AIA Document A Copyright 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:00:51 on 06/18/2013 under Order No _1 which expires on 05/11/2014, and is not for resale. User Notes: ( ) 4

5 Phone: The Contractor s representative: (Name, address and other information) 8.4 Neither the Owner s nor the Contractor s representative shall be changed without ten days written notice to the other party. ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below The Agreement is this executed AIA Document A , Standard Form of Agreement Between Owner and Contractor The General Conditions are AIA Document A , General Conditions of the Contract for Construction The Supplementary and other Conditions of the Contract: Document Title Date Pages Spec Section Supplementary Conditions - AIA The Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) «See Specification Table of Contents Section » Section Title Date Pages The Drawings: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Number Title Date G-101 A-101 A-102 A-103 S-101 S-102 Index, General Notes Roof Plan Roof Details Typical Details Structural Framing Plan Structural Details The Addenda, if any: Number Date Pages Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article Additional documents, if any, forming part of the Contract Documents: AIA Document A Copyright 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:00:51 on 06/18/2013 under Order No _1 which expires on 05/11/2014, and is not for resale. User Notes: ( ) 5

6 .1 AIA Document E , Digital Data Protocol Exhibit, if completed by the parties, or the following:.2 Other documents, if any, listed below: (List here any additional documents that are intended to form part of the Contract Documents. AIA Document A provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor s bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) «Invitation to Bid, Instructions to Bidders, Contractor s Bid» ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A (State bonding requirements, if any, and limits of liability for insurance required in Article 11 of AIA Document A ) Type of insurance or bond Bid Bond Performance Bond Labor & Material Payment Bond General Liability Automobile Liability Malpractice/Professional Liability Insurance Limit of liability or bond amount 5% of Bid Amount 100% Contract Price 100% Contract Price Commercial General Liability Insurance written on ISO occurrence from CG /93 or equivalent, covering premises operations, fire damage, independent contractors, products and completed operations, blanket contractual liability, personal injury, and advertising liability with minimum limits as follows (a) $1,000,000 each occurrence; (b) $1,0000,000 general aggregate; (c) $1,000,000 products and completed operations aggregate; and (d) $50,000 any one fire. Automobile Liability Insurance covering any auto (including owned, hired or non-owned autos) with a minimum limit of $1,000,000 each accident combined single limit. Contractor and Sub-Contractors shall maintain in full force and effect a Professional Liability Insurance Policy in the minimum amount of $1,000,000 per occurrence and $3,000,000 in the aggregate, written on an occurrence form, that provides coverage for its work undertaken pursuant to this project. If a policy written on an occurrence form is not commercially available, the claims-made policy shall remain in effect for the duration of this project and for at least two years beyond the completion and acceptance of the work, or, alternatively, a two year extended reporting period must be purchased. The Contractor or Sub-Contractor shall be responsible for all claims, damages, losses or expenses, including attorney s fees, arising out of or resulting from such party s performance of professional services for this project. AIA Document A Copyright 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:00:51 on 06/18/2013 under Order No _1 which expires on 05/11/2014, and is not for resale. User Notes: ( ) 6

7 Worker s Compensation Builder s Risk Insurance Worker s Compensation Insurance shall be maintained as required by State statute, and Employer s Liability Insurance covering all of the Contractor s and Sub-Contractor s employees acting within the course and scope of their employment on this project. Contractor and/or Sub-Contractors shall purchase and maintain property insurance written on a builder s risk allrisk or equivalent policy form in the amount of the initial construction/rehabilitation costs, plus value of subsequent modifications and cost of materials supplied or installed by others, comprising total value for the entire Project at the site on a replacement cost basis without optional deductibles. Such property insurance shall be maintained, unless otherwise agreed in writing by all persons and entities who are beneficiaries of such insurance, until final payment has been made or until no person or entity other than the property owner has an insurable interest in the property. a) The insurance shall include interest of the Owner, Contractor and Sub-Contractor in the project as named insureds. b) All associated deductibles shall be the responsibility of the Contractor and Sub-Contractor. Such policy may have a deductible clause but not to exceed $10,000. c) Property insurance shall be an all risk or equivalent policy form and shall include, without limitation, insurance against the perils of fire (with extended coverage) and physical loss or damage including, without duplication of coverage, theft, vandalism, malicious mischief, collapse, earthquake, flood, windstorm, falsework, testing and startup, temporary buildings and debris removal including demolition occasioned by enforcement of any applicable legal requirements, and shall cover reasonable compensation for the Owner, Contractor s and Sub-Contractors services and expenses required as a result of such insured loss. d) Builders Risk coverage shall include partial use by Owner. e) The amount of such insurance shall be increased to include the cost of any additional work to be done on the project, or materials or equipment to be incorporated in the project, under other independent contracts let or to be let. In such event, Contractor and Sub-Contractor shall be reimbursed for this cost as his or her share of the insurance in the same ratio as the ratio of the insurance represented by such independent contracts let or to be let to the total insurance carried. Pollution Liability Insurance If Contractor or Sub-Contractor is providing directly or indirectly work with pollution/environmental hazards, they must provide or cause those conducting the work to provide Pollution Liability Insurance coverage. Pollution Liability policy must include contractual liability coverage. The policy AIA Document A Copyright 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:00:51 on 06/18/2013 under Order No _1 which expires on 05/11/2014, and is not for resale. User Notes: ( ) 7

8 limits shall be in the amount of $1,000,000 with a maximum deductible to $25,000 to be paid by the Contractor and/or Sub-Contractor. Miscellaneous Insurance Provisions Certificates Certificates of Insurance and/or insurance policies required under this agreement shall be subject to the following stipulations and additional requirements: i) Deductible: Any and all deductibles or self-insured retentions contained in any Insurance policy shall be assumed by and at the sole risk of the Contractor or Sub-Contractor. ii) In Force: If any of the said policies shall fail at any time to meet the requirements of this agreement as to form or substance, or if a company issuing any such policy shall be or at any time cease to be approved by the Division of Insurance of the State of Colorado, or be to cease to be in compliance with any stricter requirements of this agreement, the Contractor or Sub-Contractor shall promptly obtain a new policy. iii) Insurer: All requisite insurance shall be obtained from financially responsible insurance companies, authorized to do business in the State of Colorado and acceptable to the Owner. iv) Additional Insured: The Owner and the State of Colorado shall be named as additional insured on the Commercial General Liability and Automobile Liability Insurance policies. v) Primacy of Coverage: Coverage required of the Contractor and Sub-Contractor shall be primary over any insurance or self-insurance program carried by the Owner or the State of Colorado vi) Cancellation: The above insurance policies shall include provisions preventing cancellation or nonrenewal without at least 45 days prior notice of the Owner. vii) Subrogation Waiver: All insurance policies in any way related to this project and secured and maintained by the Contractor or Sub-Contractor as required herein shall include clauses stating that each carrier shall waive all rights of recovery, under subrogation or otherwise, against the Owner or the State of Colorado, it s agencies, institutions, organizations, officers, agents, employees and volunteers. Contractor and/or Sub-Contractors shall provide certificates showing insurance coverage required hereunder to the Owner within 4 (four) days of the Notice of Award. The Owner may choose to accept the insurance certificates after the specified 4 (four) days, but in no case will the Notice to Proceed be issued until acceptable insurance certificates have been provided. No later than 15 (fifteen) days prior to the expiration date of any such coverage, the Contractor and/or Sub-Contractor shall deliver to the Owner certificates of insurance evidencing renewals thereof. In addition, upon request by the State of Colorado, at any other time during the AIA Document A Copyright 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:00:51 on 06/18/2013 under Order No _1 which expires on 05/11/2014, and is not for resale. User Notes: ( ) 8

9 term of this project the Contractor and/or Sub-Contractor shall, within ten (10) days of such request, supply to the State of Colorado evidence satisfactory to the State of compliance with the insurance related provisions of this agreement. All other insurance requirements per General Conditions. This Agreement entered into as of the day and year first written above. OWNER (Signature) CONTRACTOR (Signature) (Printed name and title) (Printed name and title) AIA Document A Copyright 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:00:51 on 06/18/2013 under Order No _1 which expires on 05/11/2014, and is not for resale. User Notes: ( ) 9

10 AIA Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) Archuleta County Building Roof Reconstruction 449 San Juan Street Pagosa Springs, CO THE OWNER: (Name, legal status and address) Archuleta County PO Box San Juan Street Pagosa Springs, CO THE ARCHITECT: (Name, legal status and address) Reynolds + Associates Architecture & Engineers 1140 Main Ave., Ste B Durango, CO TABLE OF ARTICLES ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. 1 GENERAL PROVISIONS 2 OWNER 3 CONTRACTOR 4 ARCHITECT 5 SUBCONTRACTORS 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 7 CHANGES IN THE WORK 8 TIME 9 PAYMENTS AND COMPLETION 10 PROTECTION OF PERSONS AND PROPERTY 11 INSURANCE AND BONDS 12 UNCOVERING AND CORRECTION OF WORK 13 MISCELLANEOUS PROVISIONS 14 TERMINATION OR SUSPENSION OF THE CONTRACT 15 CLAIMS AND DISPUTES ELECTRONIC COPYING of any portion of this AIA Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document. 1

11 INDEX (Topics and numbers in bold are section headings.) Acceptance of Nonconforming Work 9.6.6, 9.9.3, 12.3 Acceptance of Work 9.6.6, 9.8.2, 9.9.3, , , 12.3 Access to Work 3.16, 6.2.1, 12.1 Accident Prevention 10 Acts and Omissions 3.2, 3.3.2, , 3.18, 4.2.3, 8.3.1, 9.5.1, , , , 13.7, 14.1, 15.2 Addenda 1.1.1, Additional Costs, Claims for 3.7.4, 3.7.5, 6.1.1, , 10.3, Additional Inspections and Testing 9.4.2, 9.8.3, , 13.5 Additional Insured Additional Time, Claims for 3.2.4, 3.7.4, 3.7.5, , 8.3.2, Administration of the Contract 3.1.3, 4.2, 9.4, 9.5 Advertisement or Invitation to Bid Aesthetic Effect Allowances 3.8, All-risk Insurance , Applications for Payment 4.2.5, 7.3.9, 9.2, 9.3, 9.4, 9.5.1, 9.6.3, 9.7, 9.10, Approvals 2.1.1, 2.2.2, 2.4, 3.1.3, , , , , 4.2.7, 9.3.2, Arbitration 8.3.1, , , , 15.4 ARCHITECT 4 Architect, Definition of Architect, Extent of Authority 2.4.1, , 4.1, 4.2, 5.2, 6.3, 7.1.2, 7.3.7, 7.4, 9.2, 9.3.1, 9.4, 9.5, 9.6.3, 9.8, , , 12.1, , , , , , , Architect, Limitations of Authority and Responsibility 2.1.1, , , , 4.1.2, 4.2.1, 4.2.2, 4.2.3, 4.2.6, 4.2.7, , , , 5.2.1, 7.4, 9.4.2, 9.5.3, 9.6.4, , 15.2 Architect s Additional Services and Expenses 2.4.1, , , , , Architect s Administration of the Contract 3.1.3, 4.2, 3.7.4, 15.2, 9.4.1, 9.5 Architect s Approvals 2.4.1, 3.1.3, 3.5, , Architect s Authority to Reject Work 3.5, 4.2.6, , Architect s Copyright 1.1.7, 1.5 Architect s Decisions 3.7.4, 4.2.6, 4.2.7, , , , , 6.3, 7.3.7, 7.3.9, 8.1.3, 8.3.1, 9.2, 9.4.1, 9.5, 9.8.4, 9.9.1, , 15.2, 15.3 Architect s Inspections 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.8.3, 9.9.2, , 13.5 Architect s Instructions 3.2.4, 3.3.1, 4.2.6, 4.2.7, Architect s Interpretations , Architect s Project Representative Architect s Relationship with Contractor 1.1.2, 1.5, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5, 3.7.4, 3.7.5, 3.9.2, 3.9.3, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.2, 4.1.3, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, , 10.3, , 12, , 13.5, 15.2 Architect s Relationship with Subcontractors 1.1.2, 4.2.3, 4.2.4, 4.2.6, 9.6.3, 9.6.4, Architect s Representations 9.4.2, 9.5.1, Architect s Site Visits 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, , 13.5 Asbestos Attorneys Fees , , Award of Separate Contracts 6.1.1, Award of Subcontracts and Other Contracts for Portions of the Work 5.2 Basic Definitions 1.1 Bidding Requirements 1.1.1, 5.2.1, Binding Dispute Resolution 9.7, , , , , , , , Boiler and Machinery Insurance Bonds, Lien , , Bonds, Performance, and Payment , 9.6.7, , ,

12 Building Permit Capitalization 1.3 Certificate of Substantial Completion 9.8.3, 9.8.4, Certificates for Payment 4.2.1, 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7, , , , , Certificates of Inspection, Testing or Approval Certificates of Insurance , Change Orders 1.1.1, 2.4.1, 3.4.2, 3.7.4, , , , 4.2.8, 5.2.3, 7.1.2, 7.1.3, 7.2, 7.3.2, 7.3.6, 7.3.9, , 8.3.1, , , , , , , , Change Orders, Definition of CHANGES IN THE WORK 2.2.1, 3.11, 4.2.8, 7, 7.2.1, 7.3.1, 7.4, 8.3.1, , Claims, Definition of CLAIMS AND DISPUTES 3.2.4, 6.1.1, 6.3, 7.3.9, 9.3.3, , , 15, 15.4 Claims and Timely Assertion of Claims Claims for Additional Cost 3.2.4, 3.7.4, 6.1.1, 7.3.9, , Claims for Additional Time 3.2.4, , 8.3.2, , Concealed or Unknown Conditions, Claims for Claims for Damages 3.2.4, 3.18, 6.1.1, 8.3.3, 9.5.1, 9.6.7, , , , , , , Claims Subject to Arbitration , Cleaning Up 3.15, 6.3 Commencement of the Work, Conditions Relating to 2.2.1, 3.2.2, 3.4.1, 3.7.1, , , 5.2.1, 5.2.3, 6.2.2, 8.1.2, 8.2.2, 8.3.1, 11.1, , , , Commencement of the Work, Definition of Communications Facilitating Contract Administration 3.9.1, Completion, Conditions Relating to 3.4.1, 3.11, 3.15, 4.2.2, 4.2.9, 8.2, 9.4.2, 9.8, 9.9.1, 9.10, 12.2, 13.7, COMPLETION, PAYMENTS AND 9 Completion, Substantial 4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, , 12.2, 13.7 Compliance with Laws 1.6.1, 3.2.3, 3.6, 3.7, , 3.13, 4.1.1, 9.6.4, , 11.1, 11.3, 13.1, 13.4, , , 13.6, , , , , Concealed or Unknown Conditions 3.7.4, 4.2.8, 8.3.1, 10.3 Conditions of the Contract 1.1.1, 6.1.1, Consent, Written 3.4.2, 3.7.4, , , 4.1.2, 9.3.2, 9.8.5, 9.9.1, , , , 13.2, , Consolidation or Joinder CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 1.1.4, 6 Construction Change Directive, Definition of Construction Change Directives 1.1.1, 3.4.2, , 4.2.8, 7.1.1, 7.1.2, 7.1.3, 7.3, Construction Schedules, Contractor s 3.10, , , 6.1.3, Contingent Assignment of Subcontracts 5.4, Continuing Contract Performance Contract, Definition of CONTRACT, TERMINATION OR SUSPENSION OF THE , , 14 Contract Administration 3.1.3, 4, 9.4, 9.5 Contract Award and Execution, Conditions Relating to 3.7.1, 3.10, 5.2, 6.1, , , Contract Documents, Copies Furnished and Use of 1.5.2, 2.2.5, 5.3 Contract Documents, Definition of Contract Sum 3.7.4, 3.8, 5.2.3, 7.2, 7.3, 7.4, 9.1, 9.4.2, , 9.6.7, 9.7, , , , , , Contract Sum, Definition of 9.1 Contract Time 3.7.4, 3.7.5, , 5.2.3, , 7.3.1, 7.3.5, 7.4, 8.1.1, 8.2.1, 8.3.1, 9.5.1, 9.7, , , , , Contract Time, Definition of

13 CONTRACTOR 3 Contractor, Definition of 3.1, Contractor s Construction Schedules 3.10, , , 6.1.3, Contractor s Employees 3.3.2, 3.4.3, 3.8.1, 3.9, , 4.2.3, 4.2.6, 10.2, 10.3, , , 14.1, Contractor s Liability Insurance 11.1 Contractor s Relationship with Separate Contractors and Owner s Forces , , 4.2.4, 6, , , Contractor s Relationship with Subcontractors 1.2.2, 3.3.2, , , 5, 9.6.2, 9.6.7, , , , Contractor s Relationship with the Architect 1.1.2, 1.5, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5, 3.7.4, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.3, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, , 10.3, , 12, 13.5, , Contractor s Representations 3.2.1, 3.2.2, 3.5, , 6.2.2, 8.2.1, 9.3.3, Contractor s Responsibility for Those Performing the Work 3.3.2, 3.18, 5.3.1, 6.1.3, 6.2, 9.5.1, Contractor s Review of Contract Documents 3.2 Contractor s Right to Stop the Work 9.7 Contractor s Right to Terminate the Contract 14.1, Contractor s Submittals 3.10, 3.11, , 4.2.7, 5.2.1, 5.2.3, 9.2, 9.3, 9.8.2, 9.8.3, 9.9.1, , , , Contractor s Superintendent 3.9, Contractor s Supervision and Construction Procedures 1.2.2, 3.3, 3.4, , 4.2.2, 4.2.7, 6.1.3, 6.2.4, 7.1.3, 7.3.5, 7.3.7, 8.2, 10, 12, 14, Contractual Liability Insurance , 11.2 Coordination and Correlation 1.2, 3.2.1, 3.3.1, 3.10, , 6.1.3, Copies Furnished of Drawings and Specifications 1.5, 2.2.5, 3.11 Copyrights 1.5, 3.17 Correction of Work 2.3, 2.4, 3.7.3, 9.4.2, 9.8.2, 9.8.3, 9.9.1, , 12.2 Correlation and Intent of the Contract Documents 1.2 Cost, Definition of Costs 2.4.1, 3.2.4, 3.7.3, 3.8.2, , 5.4.2, 6.1.1, 6.2.3, , 7.3.7, 7.3.8, 7.3.9, , , , 11.3, , , , 13.5, 14 Cutting and Patching 3.14, Damage to Construction of Owner or Separate Contractors , 6.2.4, , , 10.4, , 11.3, Damage to the Work , 9.9.1, , , , , Damages, Claims for 3.2.4, 3.18, 6.1.1, 8.3.3, 9.5.1, 9.6.7, , , , , , , Damages for Delay 6.1.1, 8.3.3, , 9.7, Date of Commencement of the Work, Definition of Date of Substantial Completion, Definition of Day, Definition of Decisions of the Architect 3.7.4, 4.2.6, 4.2.7, , , , 15.2, 6.3, 7.3.7, 7.3.9, 8.1.3, 8.3.1, 9.2, 9.4, 9.5.1, 9.8.4, 9.9.1, , , , 15.1, 15.2 Decisions to Withhold Certification 9.4.1, 9.5, 9.7, Defective or Nonconforming Work, Acceptance, Rejection and Correction of 2.3.1, 2.4.1, 3.5, 4.2.6, 6.2.5, 9.5.1, 9.5.2, 9.6.6, 9.8.2, 9.9.3, , Definitions 1.1, 2.1.1, 3.1.1, 3.5, , , , 4.1.1, , 5.1, 6.1.2, 7.2.1, 7.3.1, 8.1, 9.1, Delays and Extensions of Time 3.2, 3.7.4, 5.2.3, 7.2.1, 7.3.1, 7.4, 8.3, 9.5.1, 9.7, , , , , Disputes 6.3, 7.3.9, 15.1, 15.2 Documents and Samples at the Site 3.11 Drawings, Definition of Drawings and Specifications, Use and Ownership of 3.11 Effective Date of Insurance 8.2.2, Emergencies 10.4, , Employees, Contractor s 3.3.2, 3.4.3, 3.8.1, 3.9, , 4.2.3, 4.2.6, 10.2, , , , 14.1,

14 Equipment, Labor, Materials or 1.1.3, 1.1.6, 3.4, 3.5, 3.8.2, 3.8.3, 3.12, , , 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7, 9.3.2, 9.3.3, , , , , , Execution and Progress of the Work 1.1.3, 1.2.1, 1.2.2, 2.2.3, 2.2.5, 3.1, 3.3.1, 3.4.1, 3.5, 3.7.1, , 3.12, 3.14, 4.2, 6.2.2, 7.1.3, 7.3.5, 8.2, 9.5.1, 9.9.1, 10.2, 10.3, 12.2, 14.2, , Extensions of Time 3.2.4, 3.7.4, 5.2.3, 7.2.1, 7.3, 7.4, 9.5.1, 9.7, , , 14.3, , Failure of Payment , 9.7, , 13.6, , Faulty Work (See Defective or Nonconforming Work) Final Completion and Final Payment 4.2.1, 4.2.9, 9.8.2, 9.10, , , , , , , Financial Arrangements, Owner s 2.2.1, , Fire and Extended Coverage Insurance GENERAL PROVISIONS 1 Governing Law 13.1 Guarantees (See Warranty) Hazardous Materials , 10.3 Identification of Subcontractors and Suppliers Indemnification 3.17, 3.18, , , , , , Information and Services Required of the Owner 2.1.2, 2.2, 3.2.2, , , 6.1.3, 6.1.4, 6.2.5, 9.6.1, 9.6.4, 9.9.2, , , 11.2, 11.4, , , , , Initial Decision 15.2 Initial Decision Maker, Definition of Initial Decision Maker, Decisions , , , , , , Initial Decision Maker, Extent of Authority , , , , , , , Injury or Damage to Person or Property , Inspections 3.1.3, 3.3.3, 3.7.1, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3, 9.9.2, , , 13.5 Instructions to Bidders Instructions to the Contractor 3.2.4, 3.3.1, 3.8.1, 5.2.1, 7, 8.2.2, 12, Instruments of Service, Definition of Insurance , 6.1.1, 7.3.7, 9.3.2, 9.8.4, 9.9.1, , 11 Insurance, Boiler and Machinery Insurance, Contractor s Liability 11.1 Insurance, Effective Date of 8.2.2, Insurance, Loss of Use Insurance, Owner s Liability 11.2 Insurance, Property , 11.3 Insurance, Stored Materials INSURANCE AND BONDS 11 Insurance Companies, Consent to Partial Occupancy Intent of the Contract Documents 1.2.1, 4.2.7, , , 7.4 Interest 13.6 Interpretation 1.2.3, 1.4, 4.1.1, 5.1, 6.1.2, Interpretations, Written , , Judgment on Final Award Labor and Materials, Equipment 1.1.3, 1.1.6, 3.4, 3.5, 3.8.2, 3.8.3, 3.12, 3.13, , 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7, 9.3.2, 9.3.3, , , , , , Labor Disputes Laws and Regulations 1.5, 3.2.3, 3.6, 3.7, , , 4.1.1, 9.6.4, 9.9.1, , , 11.3, , 13.4, , , , 14, , 15.4 Liens 2.1.2, 9.3.3, , , Limitations, Statutes of , 13.7, Limitations of Liability 2.3.1, 3.2.2, 3.5, , 3.17, , 4.2.6, 4.2.7, , 6.2.2, 9.4.2, 9.6.4, 9.6.7, , , , 11.2, , , Limitations of Time 2.1.2, 2.2, 2.4, 3.2.2, 3.10, 3.11, , , 4.2.7, 5.2, 5.3.1, 5.4.1, 6.2.4, 7.3, 7.4, 8.2, 9.2, 9.3.1, 9.3.3, 9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, 9.10, , , , , 12.2, 13.5, 13.7, 14, 15 Loss of Use Insurance

15 Material Suppliers 1.5, , 4.2.4, 4.2.6, 5.2.1, 9.3, 9.4.2, 9.6, Materials, Hazardous , 10.3 Materials, Labor, Equipment and 1.1.3, 1.1.6, 1.5.1, 3.4.1, 3.5, 3.8.2, 3.8.3, 3.12, , , 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7, 9.3.2, 9.3.3, , , , , , Means, Methods, Techniques, Sequences and Procedures of Construction 3.3.1, , 4.2.2, 4.2.7, Mechanic s Lien 2.1.2, Mediation 8.3.1, , , , , , 15.3, Minor Changes in the Work 1.1.1, , 4.2.8, 7.1, 7.4 MISCELLANEOUS PROVISIONS 13 Modifications, Definition of Modifications to the Contract 1.1.1, 1.1.2, 3.11, 4.1.2, 4.2.1, 5.2.3, 7, 8.3.1, 9.7, , Mutual Responsibility 6.2 Nonconforming Work, Acceptance of 9.6.6, 9.9.3, 12.3 Nonconforming Work, Rejection and Correction of 2.3.1, 2.4.1, 3.5, 4.2.6, 6.2.4, 9.5.1, 9.8.2, 9.9.3, , Notice 2.2.1, 2.3.1, 2.4.1, 3.2.4, 3.3.1, 3.7.2, , 5.2.1, 9.7, 9.10, , , , 13.3, , , 14.1, 14.2, , Notice, Written 2.3.1, 2.4.1, 3.3.1, 3.9.2, , , 5.2.1, 9.7, 9.10, , 10.3, , , , 13.3, 14, , Notice of Claims 3.7.4, , , 15.4 Notice of Testing and Inspections , Observations, Contractor s 3.2, Occupancy 2.2.2, 9.6.6, 9.8, Orders, Written 1.1.1, 2.3, 3.9.2, 7, 8.2.2, , 12.1, , , OWNER 2 Owner, Definition of Owner, Information and Services Required of the 2.1.2, 2.2, 3.2.2, , 6.1.3, 6.1.4, 6.2.5, 9.3.2, 9.6.1, 9.6.4, 9.9.2, , , 11.2, 11.3, , , , , Owner s Authority 1.5, 2.1.1, 2.3.1, 2.4.1, 3.4.2, 3.8.1, , , 4.1.2, 4.1.3, 4.2.4, 4.2.9, 5.2.1, 5.2.4, 5.4.1, 6.1, 6.3, 7.2.1, 7.3.1, 8.2.2, 8.3.1, 9.3.1, 9.3.2, 9.5.1, 9.6.4, 9.9.1, , , , , , , , , 14.3, 14.4, Owner s Financial Capability 2.2.1, , Owner s Liability Insurance 11.2 Owner s Relationship with Subcontractors 1.1.2, 5.2, 5.3, 5.4, 9.6.4, , Owner s Right to Carry Out the Work 2.4, Owner s Right to Clean Up 6.3 Owner s Right to Perform Construction and to Award Separate Contracts 6.1 Owner s Right to Stop the Work 2.3 Owner s Right to Suspend the Work 14.3 Owner s Right to Terminate the Contract 14.2 Ownership and Use of Drawings, Specifications and Other Instruments of Service 1.1.1, 1.1.6, 1.1.7, 1.5, 2.2.5, 3.2.2, , 3.17, , Partial Occupancy or Use 9.6.6, 9.9, Patching, Cutting and 3.14, Patents 3.17 Payment, Applications for 4.2.5, 7.3.9, 9.2, 9.3, 9.4, 9.5, 9.6.3, 9.7, 9.8.5, , , , Payment, Certificates for 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7, , , 13.7, , Payment, Failure of , 9.7, , 13.6, , Payment, Final 4.2.1, 4.2.9, 9.8.2, 9.10, , , , , 13.7, , Payment Bond, Performance Bond and , 9.6.7, , 11.4 Payments, Progress 9.3, 9.6, 9.8.5, , 13.6, , PAYMENTS AND COMPLETION 9 6

16 Payments to Subcontractors 5.4.2, , 9.6.2, 9.6.3, 9.6.4, 9.6.7, PCB Performance Bond and Payment Bond , 9.6.7, , 11.4 Permits, Fees, Notices and Compliance with Laws 2.2.2, 3.7, 3.13, , PERSONS AND PROPERTY, PROTECTION OF 10 Polychlorinated Biphenyl Product Data, Definition of Product Data and Samples, Shop Drawings 3.11, 3.12, Progress and Completion 4.2.2, 8.2, 9.8, 9.9.1, , Progress Payments 9.3, 9.6, 9.8.5, , 13.6, , Project, Definition of Project Representatives Property Insurance , 11.3 PROTECTION OF PERSONS AND PROPERTY 10 Regulations and Laws 1.5, 3.2.3, 3.6, 3.7, , 3.13, 4.1.1, 9.6.4, 9.9.1, , 11.1, 11.4, 13.1, 13.4, , , 13.6, 14, , 15.4 Rejection of Work 3.5, 4.2.6, Releases and Waivers of Liens Representations 3.2.1, 3.5, , 6.2.2, 8.2.1, 9.3.3, 9.4.2, 9.5.1, 9.8.2, Representatives 2.1.1, 3.1.1, 3.9, 4.1.1, 4.2.1, 4.2.2, , 5.1.1, 5.1.2, Responsibility for Those Performing the Work 3.3.2, 3.18, 4.2.3, 5.3.1, 6.1.3, 6.2, 6.3, 9.5.1, 10 Retainage 9.3.1, 9.6.2, 9.8.5, 9.9.1, , Review of Contract Documents and Field Conditions by Contractor 3.2, , Review of Contractor s Submittals by Owner and Architect , , 3.11, 3.12, 4.2, 5.2, 6.1.3, 9.2, Review of Shop Drawings, Product Data and Samples by Contractor 3.12 Rights and Remedies 1.1.2, 2.3, 2.4, 3.5, 3.7.4, , 4.2.6, 5.3, 5.4, 6.1, 6.3, 7.3.1, 8.3, 9.5.1, 9.7, , 10.3, , , 13.4, 14, 15.4 Royalties, Patents and Copyrights 3.17 Rules and Notices for Arbitration Safety of Persons and Property 10.2, 10.4 Safety Precautions and Programs 3.3.1, 4.2.2, 4.2.7, 5.3.1, 10.1, 10.2, 10.4 Samples, Definition of Samples, Shop Drawings, Product Data and 3.11, 3.12, Samples at the Site, Documents and 3.11 Schedule of Values 9.2, Schedules, Construction 3.10, , , 6.1.3, Separate Contracts and Contractors 1.1.4, , , 4.2.4, 4.2.7, 6, 8.3.1, Shop Drawings, Definition of Shop Drawings, Product Data and Samples 3.11, 3.12, Site, Use of 3.13, 6.1.1, Site Inspections 3.2.2, 3.3.3, 3.7.1, 3.7.4, 4.2, 9.4.2, , 13.5 Site Visits, Architect s 3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, , 13.5 Special Inspections and Testing 4.2.6, , 13.5 Specifications, Definition of Specifications 1.1.1, 1.1.6, 1.2.2, 1.5, 3.11, , 3.17, Statute of Limitations 13.7, Stopping the Work 2.3, 9.7, 10.3, 14.1 Stored Materials 6.2.1, 9.3.2, , Subcontractor, Definition of SUBCONTRACTORS 5 Subcontractors, Work by 1.2.2, 3.3.2, , 4.2.3, 5.2.3, 5.3, 5.4, , Subcontractual Relations 5.3, 5.4, , 9.6, 9.10, , 14.1,

17 Submittals 3.10, 3.11, 3.12, 4.2.7, 5.2.1, 5.2.3, 7.3.7, 9.2, 9.3, 9.8, 9.9.1, , , Submittal Schedule , , Subrogation, Waivers of 6.1.1, Substantial Completion 4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, , 12.2, 13.7 Substantial Completion, Definition of Substitution of Subcontractors 5.2.3, Substitution of Architect Substitutions of Materials 3.4.2, 3.5, Sub-subcontractor, Definition of Subsurface Conditions Successors and Assigns 13.2 Superintendent 3.9, Supervision and Construction Procedures 1.2.2, 3.3, 3.4, , 4.2.2, 4.2.7, 6.1.3, 6.2.4, 7.1.3, 7.3.7, 8.2, 8.3.1, 9.4.2, 10, 12, 14, Surety , 9.8.5, , , , Surety, Consent of , Surveys Suspension by the Owner for Convenience 14.3 Suspension of the Work 5.4.2, 14.3 Suspension or Termination of the Contract , 14 Taxes 3.6, , Termination by the Contractor 14.1, Termination by the Owner for Cause , 14.2, Termination by the Owner for Convenience 14.4 Termination of the Architect Termination of the Contractor TERMINATION OR SUSPENSION OF THE CONTRACT 14 Tests and Inspections 3.1.3, 3.3.3, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3, 9.9.2, , , , , 13.5 TIME 8 Time, Delays and Extensions of 3.2.4, 3.7.4, 5.2.3, 7.2.1, 7.3.1, 7.4, 8.3, 9.5.1, 9.7, , , , , Time Limits 2.1.2, 2.2, 2.4, 3.2.2, 3.10, 3.11, , , 4.2, 5.2, 5.3, 5.4, 6.2.4, 7.3, 7.4, 8.2, 9.2, 9.3.1, 9.3.3, 9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, 9.10, , 12.2, 13.5, 13.7, 14, , 15.4 Time Limits on Claims 3.7.4, , 13.7, Title to Work 9.3.2, Transmission of Data in Digital Form 1.6 UNCOVERING AND CORRECTION OF WORK 12 Uncovering of Work 12.1 Unforeseen Conditions, Concealed or Unknown 3.7.4, 8.3.1, 10.3 Unit Prices , Use of Documents 1.1.1, 1.5, 2.2.5, , 5.3 Use of Site 3.13, 6.1.1, Values, Schedule of 9.2, Waiver of Claims by the Architect Waiver of Claims by the Contractor , , Waiver of Claims by the Owner 9.9.3, , , , , , Waiver of Consequential Damages , Waiver of Liens , Waivers of Subrogation 6.1.1, Warranty 3.5, 4.2.9, 9.3.3, 9.8.4, 9.9.1, , , 13.7 Weather Delays Work, Definition of Written Consent 1.5.2, 3.4.2, 3.7.4, , , 4.1.2, 9.3.2, 9.8.5, 9.9.1, , , , 13.2, , Written Interpretations ,

18 Written Notice 2.3, 2.4, 3.3.1, 3.9, , , 5.2.1, 8.2.2, 9.7, 9.10, , 10.3, , , , 13.3, 14, Written Orders 1.1.1, 2.3, 3.9, 7, 8.2.2, 12.1, 12.2, , ,

19 ARTICLE 1 GENERAL PROVISIONS 1.1 BASIC DEFINITIONS THE CONTRACT DOCUMENTS The Contract Documents are enumerated in the Agreement between the Owner and Contractor (hereinafter the Agreement) and consist of the Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of the Contract, other documents listed in the Agreement and Modifications issued after execution of the Contract. A Modification is (1) a written amendment to the Contract signed by both parties, (2) a Change Order, (3) a Construction Change Directive or (4) a written order for a minor change in the Work issued by the Architect THE CONTRACT The Contract Documents form the Contract for Construction. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. The Contract may be amended or modified only by a Modification. The Contract Documents shall not be construed to create a contractual relationship of any kind (1) between the Contractor and the Architect or the Architect s consultants, (2) between the Owner and a Subcontractor or a Sub-subcontractor, (3) between the Owner and the Architect or the Architect s consultants or (4) between any persons or entities other than the Owner and the Contractor. The Architect shall, however, be entitled to performance and enforcement of obligations under the Contract intended to facilitate performance of the Architect s duties THE WORK The term Work means the construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by the Contractor to fulfill the Contractor s obligations. The Work may constitute the whole or a part of the Project THE PROJECT The Project is the total construction of which the Work performed under the Contract Documents may be the whole or a part and which may include construction by the Owner and by separate contractors THE DRAWINGS The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams THE SPECIFICATIONS The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, systems, standards and workmanship for the Work, and performance of related services INSTRUMENTS OF SERVICE Instruments of Service are representations, in any medium of expression now known or later developed, of the tangible and intangible creative work performed by the Architect and the Architect s consultants under their respective professional services agreements. Instruments of Service may include, without limitation, studies, surveys, models, sketches, drawings, specifications, and other similar materials. 1.2 CORRELATION AND INTENT OF THE CONTRACT DOCUMENTS The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required only to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indicated results Organization of the Specifications into divisions, sections and articles, and arrangement of Drawings shall not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade Unless otherwise stated in the Contract Documents, words that have well-known technical or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings. 10

IFB F B-WING RENOVATIONS IFB F C OFFICES BUILD OUT. Addendum 3

IFB F B-WING RENOVATIONS IFB F C OFFICES BUILD OUT. Addendum 3 JUNE 23, 2016 ATTENTION ALL PROPONENTS: IFB F2015017 B-WING RENOVATIONS IFB F2015007 9C OFFICES BUILD OUT Addendum 3 The purpose of this Amendment is to advise all offertories of the following: 1. In Project

More information

Document A201 TM 2007 SP

Document A201 TM 2007 SP AIA Document A201 TM 2007 SP General Conditions of the Contract for Construction, for use on a Sustainable Project for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status

More information

Document A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition

Document A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition Document A232 2009 SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition for the following PROJECT: (Name, and location or address)

More information

AIA Document A201 TM 1997

AIA Document A201 TM 1997 AIA Document A201 TM 1997 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address): Project University of Maine at Farmington THE OWNER: (Name and address):

More information

Document A201 TM. General Conditions of the Contract for Construction. (Name and location or address)

Document A201 TM. General Conditions of the Contract for Construction. (Name and location or address) Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status and address) Case Western Reserve University

More information

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE Page 1 of 37 for the following PROJECT: (Name and location or address) EXAMPLE THE OWNER: (Name and address) Example, THE ARCHITECT: (Name and address) TABLE OF ARTICLES 1 GENERAL PROVISIONS 2 OWNER 3

More information

Document A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition

Document A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition Document A232 2009 General Conditions of the Contract for Construction, Construction Manager as Adviser Edition for the following PROJECT: (Name, and location or address) THE CONSTRUCTION MANAGER: (Name,

More information

AIA Document A201 TM 2007

AIA Document A201 TM 2007 AIA Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name and address) THE ARCHITECT: (Name and address) TABLE

More information

AIA Document A201 TM 1997

AIA Document A201 TM 1997 AIA Document A201 TM 1997 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address): A201 conversion Michigan State University East Lansing, MI THE OWNER:

More information

AIA Document A201 TM 2007

AIA Document A201 TM 2007 AIA Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) Pre-Construction and Construction Management at Risk Services Lafayette

More information

Document A201 TM. General Conditions of the Contract for Construction

Document A201 TM. General Conditions of the Contract for Construction Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: Proposed Renovations to a Portion of the Township Municipal Building 175 West Valley Forge Road King

More information

Document A201 TM. General Conditions of the Contract for Construction

Document A201 TM. General Conditions of the Contract for Construction Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status and address) THE ARCHITECT: (Name, legal

More information

ADVERTISEMENT FOR BIDS CSD NO. 158 BID # B CONSOLIDATED SCHOOL DISTRICT # ELEMENTARY SCHOOLS CARPET INSTALLATION

ADVERTISEMENT FOR BIDS CSD NO. 158 BID # B CONSOLIDATED SCHOOL DISTRICT # ELEMENTARY SCHOOLS CARPET INSTALLATION ADVERTISEMENT FOR BIDS CSD NO. 158 BID #2011-29B CONSOLIDATED SCHOOL DISTRICT #158 2011 ELEMENTARY SCHOOLS CARPET INSTALLATION Consolidated School District #158 will receive single prime sealed bids for

More information

Document A201 TM. General Conditions of the Contract for Construction

Document A201 TM. General Conditions of the Contract for Construction Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: for: (Name and location or address) Work for The University of Tennessee Section 00 72 13 2017 THE OWNER:

More information

AIA Document A201 TM 2007

AIA Document A201 TM 2007 AIA Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name and address) THE ARCHITECT: (Name and address) TABLE

More information

Document A South Carolina Division of Procurement Services, Office of the State Engineer Version of

Document A South Carolina Division of Procurement Services, Office of the State Engineer Version of South Carolina Division of Procurement Services, Office of the State Engineer Version of Document A201 2007 General Conditions of the Contract for Construction This version of AIA Document A201 2007 is

More information

Document A201 TM. General Conditions of the Contract for Construction

Document A201 TM. General Conditions of the Contract for Construction Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name and address) Austin Community College District 9101

More information

AIA Document A101 TM 2007

AIA Document A101 TM 2007 AIA Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AS MODIFIED BY OWNER AGREEMENT made as of the day of in the year (In words,

More information

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year (In words, indicate day, month and

More information

Document A201/CMa. General Conditions of the Contract for Construction where the Construction Manager is NOT a Constructor

Document A201/CMa. General Conditions of the Contract for Construction where the Construction Manager is NOT a Constructor TM Document A201CMa General Conditions of the Contract for Construction where the Construction Manager is NOT a Constructor 1992 for the following PROJECT: (Name and location or address): Interior Finish

More information

ARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES

ARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES ARTICLE 1 THE SUBCONTRACT DOCUMENTS 1.1 The Subcontract Documents consist of (1) this Agreement; (2) the prime Contract, consisting of the Agreement between the Owner and Contractor and the other Contract

More information

General Conditions of the Contract for Construction

General Conditions of the Contract for Construction ATTACHMENT F CENTRAL NEW MEXICO COMMUNITY COLLEGE General Conditions of the Contract for Construction TABLE OF ARTICLES 1. GENERAL PROVISIONS 2. OWNER 3. CONTRACTOR 4. ADMINISTRATION OF THE CONTRACT 5.

More information

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of. (Date of issuance of Owner s Purchase Order) BETWEEN the

More information

AIA Document C196 TM 2008

AIA Document C196 TM 2008 AIA Document C196 TM 2008 Standard Form of Agreement Between Single Purpose Entity and Owner for Integrated Project Delivery AGREEMENT made as of the day of in the year (In words, indicate day, month and

More information

TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS

TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS AIA Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year «2017» (In words, indicate day,

More information

AIA Document A101 TM 2007

AIA Document A101 TM 2007 AIA Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year (In words, indicate day, month

More information

Document A Exhibit A Insurance and Bonds

Document A Exhibit A Insurance and Bonds Document A101 2017 Exhibit A Insurance and Bonds This Insurance and Bonds Exhibit is part of the Agreement, between the Owner and the Contractor, dated the day of in the year (In words, indicate day, month

More information

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project Document A105 2007 Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN

More information

Standard Form of Agreement Between Contractor and Subcontractor

Standard Form of Agreement Between Contractor and Subcontractor Document A401 2007 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the in the year (In words, indicate day, month and year.) day of BETWEEN the Contractor: (Name, legal

More information

Document A Standard Abbreviated Form of Agreement Between Owner and Contractor

Document A Standard Abbreviated Form of Agreement Between Owner and Contractor Document A104 2017 Standard Abbreviated Form of Agreement Between Owner and Contractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal

More information

General Conditions of the Contract for Construction

General Conditions of the Contract for Construction ALBUQUERQUE PUBLIC SCHOOLS of the Contract for Construction 2008 Edition rev. 1 TABLE OF ARTICLES 1. GENERAL PROVISIONS 2. OWNER 3. CONTRACTOR 4. ADMINISTRATION OF THE CONTRACT 5. SUBCONTRACTS 6. CONSTRUCTION

More information

ICSC CENTERBUILD CONFERENCE DECEMBER 2-5, 1998 ARIZONA BILTMORE PHOENIX, ARIZONA

ICSC CENTERBUILD CONFERENCE DECEMBER 2-5, 1998 ARIZONA BILTMORE PHOENIX, ARIZONA ICSC CENTERBUILD CONFERENCE DECEMBER 2-5, 1998 ARIZONA BILTMORE PHOENIX, ARIZONA A COMPARATIVE ANALYSIS OF THE 1997 CHANGES TO THE AIA GENERAL CONDITIONS TO THE CONTRACT FOR CONSTRUCTION (A201) STUART

More information

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year (In words, indicate day, month and

More information

AIA Document A103 TM 2007

AIA Document A103 TM 2007 AIA Document A103 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is the Cost of the Work plus a fee without a Guaranteed Maximum Price AGREEMENT made as of the

More information

Document A401 TM. Standard Form of Agreement Between Contractor and Subcontractor

Document A401 TM. Standard Form of Agreement Between Contractor and Subcontractor Document A401 TM 2017 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Contractor: (Name,

More information

Standard Form of Agreement Between Design-Builder and Contractor. The Design-Builder has entered into a Design-Build Contract with the Owner dated:

Standard Form of Agreement Between Design-Builder and Contractor. The Design-Builder has entered into a Design-Build Contract with the Owner dated: Document A142 2014 Standard Form of Agreement Between Design-Builder and Contractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Design-Builder: (Name,

More information

Document A107. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope

Document A107. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope TM Document A107 2007 Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope AGREEMENT made as of the in the year (In words, indicate day, month and year.) day of BETWEEN

More information

Document A Standard Form of Agreement Between Contractor and Subcontractor

Document A Standard Form of Agreement Between Contractor and Subcontractor Document A401 2017 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Contractor: (Name, legal

More information

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year (In words, indicate day, month and

More information

Document A401 TM. Standard Form of Agreement Between Contractor and Subcontractor

Document A401 TM. Standard Form of Agreement Between Contractor and Subcontractor Document A401 TM 2007 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Contractor: (Name,

More information

AIA Document A101 TM 1997

AIA Document A101 TM 1997 AIA Document A101 TM 1997 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM AGREEMENT made as of the day of in the year of (In words, indicate day,

More information

Standard Form of Agreement Between Contractor and Subcontractor

Standard Form of Agreement Between Contractor and Subcontractor Standard Form of Agreement Between Contractor and Subcontractor GENERAL TERMS AND CONDITIONS ARTICLE 1 THE SUBCONTRACT DOCUMENTS 1.1 The Subcontract Documents consist of (1) these General Terms and Conditions,

More information

ADDENDUM TO STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR A RESIDENTIAL OR SMALL COMMERCIAL PROJECT AIA DOCUMENT A

ADDENDUM TO STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR A RESIDENTIAL OR SMALL COMMERCIAL PROJECT AIA DOCUMENT A ADDENDUM TO STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR A RESIDENTIAL OR SMALL COMMERCIAL PROJECT AIA DOCUMENT A105-2007 The following addendum modifies or supplements the standard form

More information

C R D A Capital Region Development Authority

C R D A Capital Region Development Authority C R D A Capital Region Development Authority 100 Columbus Boulevard Suite 500 Hartford, CT 06103-2819 Tel (860) 527-0100 Fax (860) 527-0133 www.crdact.net September 26, 2018 Addendum #3 Regional Market

More information

AIA A201 General Conditions of the Contract for Construction

AIA A201 General Conditions of the Contract for Construction AIA A201 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) Capital Improvement Plan Primary School THE OWNER: (Name and address) Hallsville R-IV

More information

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES AGREEMENT made by and between, hereinafter called the Owner, and SITESCOMMERCIAL, LLC 185 WIND CHIME COURT, SUITE

More information

Document A104 TM. Standard Abbreviated Form of Agreement Between Owner and Contractor

Document A104 TM. Standard Abbreviated Form of Agreement Between Owner and Contractor Document A104 TM 2017 Standard Abbreviated Form of Agreement Between Owner and Contractor AGREEMENT made as of the Twenty Eighth day of June in the year Two Thousand Eighteen (In words, indicate day, month

More information

Document A101. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM

Document A101. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM TM Document A101 1997 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM AGREEMENT made as of the day of March in the year of 2007 (In words, indicate

More information

Document A141 TM Exhibit B. Insurance and Bonds. for the following PROJECT: (Name and location or address)

Document A141 TM Exhibit B. Insurance and Bonds. for the following PROJECT: (Name and location or address) Insurance and Bonds Document A141 TM 2014 Exhibit B for the following PROJECT: (Name and location or address) Native Village of Eyak Community Health Center Repair Project P.O. Box 1388 Cordova, AK 99574

More information

AIA Document A107 TM 1997

AIA Document A107 TM 1997 AIA Document A107 TM 1997 Abbreviated Standard Form of Agreement Between Owner and Contractor for Construction Projects of Limited Scope where the basis of payment is a STIPULATED SUM AGREEMENT made as

More information

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum Document A0 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the 3th day of June in the year 206 (In words, indicate day,

More information

Document A Exhibit A

Document A Exhibit A Design-Build Amendment Document A141 2014 Exhibit A This Amendment is incorporated into the accompanying AIA Document A141 2014, Standard Form of Agreement Between Owner and Design-Builder dated the day

More information

MASTER SUBCONTRACT AGREEMENT

MASTER SUBCONTRACT AGREEMENT Back s Construction, Inc. 1602 Front Street, Suite 100 San Diego, CA 92101 Phone: 619-713-2566 Fax: 619-713-0992 MASTER SUBCONTRACT AGREEMENT This subcontract made and entered into this Monday, January

More information

SUPPLEMENTARY AND SPECIAL TERMS AND CONDITIONS FOR MINOR PROJECTS

SUPPLEMENTARY AND SPECIAL TERMS AND CONDITIONS FOR MINOR PROJECTS SUPPLEMENTARY AND SPECIAL TERMS AND CONDITIONS FOR MINOR PROJECTS HCPS STANDARDS DOC. No.: 01015 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 04-04-14 - Revised paragraph 13.10.1 to increase

More information

GENERAL CONDITIONS. of the CONTRACT FOR CONSTRUCTION. for the ARCHDIOCESE OF CHICAGO. for SOLE SOURCE CONTRACTS. (2004 Archdiocese Edition)

GENERAL CONDITIONS. of the CONTRACT FOR CONSTRUCTION. for the ARCHDIOCESE OF CHICAGO. for SOLE SOURCE CONTRACTS. (2004 Archdiocese Edition) Document #: 861154 GENERAL CONDITIONS of the CONTRACT FOR CONSTRUCTION for the ARCHDIOCESE OF CHICAGO for SOLE SOURCE CONTRACTS (2004 Archdiocese Edition) 86 Document #: 861161 TABLE OF CONTENTS ARTICLE

More information

SECTION AGREEMENT BETWEEN OWNER AND CONTRACTOR

SECTION AGREEMENT BETWEEN OWNER AND CONTRACTOR Montgomery County Public Schools Facilities Guide DIVISION 0 - CONDITIONS OF THE CONTRACT SECTION 00500 - AGREEMENT BETWEEN OWNER AND CONTRACTOR The provisions of the following Agreement Between Owner

More information

AIA Document A101 TM 2007

AIA Document A101 TM 2007 AIA Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year (In words, indicate day, month

More information

AIA CONTRACT DOCUMENTS

AIA CONTRACT DOCUMENTS AIA CONTRACT DOCUMENTS A101, A102 and A201 Sanjay Kurian Becker & Poliakoff, P.A. Forms of Documents AIA A101-2007 (Lump sum) AIA A102-2007 (Guaranteed Maximum Price) AIA A201-2007 (General Conditions)

More information

AIA Document A101 TM 2007

AIA Document A101 TM 2007 AIA Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year «Two Thousand Fourteen» (In

More information

GENERAL CONDITIONS of the CONTRACT FOR CONSTRUCTION for the ARCHDIOCESE OF CHICAGO (2004 Archdiocese Edition)

GENERAL CONDITIONS of the CONTRACT FOR CONSTRUCTION for the ARCHDIOCESE OF CHICAGO (2004 Archdiocese Edition) GENERAL CONDITIONS of the CONTRACT FOR CONSTRUCTION for the ARCHDIOCESE OF CHICAGO (2004 Archdiocese Edition) TABLE OF CONTENTS ARTICLE 1...1 General Provision...1 1.1 Definitions...1 1.2 Execution, Correlation

More information

SUPPLEMENTARY CONDITIONS

SUPPLEMENTARY CONDITIONS SUPPLEMENTARY CONDITIONS Instructions for Use The A.I.A. A201-1997, General Conditions of the Contract for Construction, with Additions and Deletions by Michigan State University, along with the Supplementary

More information

Document A401. Standard Form of Agreement Between Contractor and Subcontractor

Document A401. Standard Form of Agreement Between Contractor and Subcontractor TM Document A401 1997 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year) BETWEEN the Contractor: (Name,

More information

3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents.

3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents. the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Contractor. 2.2.2

More information

AIA Document A133 TM 2009

AIA Document A133 TM 2009 AIA Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

More information

! " # $ " % made as of the 24 day of May in the year 2006 (In words, indicate day, month and year) the Owner: (Name, address and other information)

!  # $  % made as of the 24 day of May in the year 2006 (In words, indicate day, month and year) the Owner: (Name, address and other information) ! " # $ " % made as of the 24 day of May in the year 2006 (In words, indicate day, month and year) the Owner: (Name, address and other information) Wynne Public Schools P.O. Box 69 Wynne, AR 72396 Telephone

More information

Subcontract Agreement

Subcontract Agreement S THIS AGREEMENT made as of the day of, 2012 BETWEEN the Contractor: TCL Partners 5212 123 rd Place SE Everett, WA 98208 and the For the Following Project: The Architect for the Project: The Contractor

More information

STANDARD SUBCONTRACT AGREEMENT FOR BUILDING CONSTRUCTION

STANDARD SUBCONTRACT AGREEMENT FOR BUILDING CONSTRUCTION STANDARD SUBCONTRACT AGREEMENT FOR BUILDING CONSTRUCTION THIS AGREEMENT made at Columbus, Ohio on by and between Lincoln Construction, Inc., hereinafter referred to as the Contractor, and, hereinafter

More information

AIA Document A107 TM 2007

AIA Document A107 TM 2007 AIA Document A107 TM 2007 Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope NOTE: THIS IS A DRAFT DOCUMENT ONLY AND REMAINS SUBJECT TO FURTHER REVISION BY NAVY FEDERAL

More information

AIA Document A105 TM 2017

AIA Document A105 TM 2017 AIA Document A105 TM 2017 Standard Short Form of Agreement Between Owner and Contractor AGREEMENT made as of the» day of in the year 2018» (In words, indicate day, month and year.) BETWEEN the Owner: (Name,

More information

AIA Document B141 TM 1997 Part

AIA Document B141 TM 1997 Part 1 AIA Document B141 TM 1997 Part Standard Form of Agreement Between Owner and Architect with Standard Form of Architect's Services TABLE OF ARTICLES 1.1 INITIAL INFORMATION 1.2 RESPONSIBILITIES OF THE

More information

RICE UNIVERSITY SHORT FORM CONTRACT

RICE UNIVERSITY SHORT FORM CONTRACT RICE UNIVERSITY SHORT FORM CONTRACT This Rice University Short Form Contract (this Contract ) is entered into by and between WILLIAM MARSH RICE UNIVERSITY, a Texas non-profit corporation (the University

More information

AIA Document A102 TM 2007

AIA Document A102 TM 2007 AIA Document A102 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price AGREEMENT made as of the

More information

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager At-Risk

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager At-Risk CMAA Document CMAR-1 Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager At-Risk 2004 EDITION This document is to be used in connection with CMAA Standard Form of Contract

More information

AIA Document A133 TM 2009

AIA Document A133 TM 2009 AIA Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

More information

CONSTRUCTION CONTRACT EXAMPLE

CONSTRUCTION CONTRACT EXAMPLE P a g e 1 CONSTRUCTION CONTRACT EXAMPLE THIS AGREEMENT, made and entered into this date, by and between, hereinafter called CONTRACTOR, and NPC QUALITY BURGER, INC., hereinafter called OWNER. IT IS HEREBY

More information

Apollo Engineering, LLC S. West Bayshore Rd. Suite 10 Traverse City, MI (231) Office

Apollo Engineering, LLC S. West Bayshore Rd. Suite 10 Traverse City, MI (231) Office REQUEST FOR PROPOSAL BOILER REPLACEMENT INSTALLATION AT Lincoln Elementary School 810 E. 5th Avenue Sault Ste. Marie, Michigan 49783 Washington Elementary 1200 Ryan Avenue Sault Ste. Marie, MI 49783 Soo

More information

ANNEX A Standard Special Conditions For The Salvation Army

ANNEX A Standard Special Conditions For The Salvation Army ANNEX A Standard Special Conditions For The Salvation Army TO BE ATTACHED TO AIA B101-2007 EDITION ABBREVIATED STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT 1. Contract Documents. This Annex supplements,

More information

ConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR

ConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR ConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR Job No. [ ] Subcontract No. [ ] This Agreement is made this [ ] day of [ ], [ ], by and between CONSTRUCTOR, L&L Builders

More information

AIA Document A102 TM 2007

AIA Document A102 TM 2007 AIA Document A102 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price AGREEMENT made as of the

More information

W I T N E S S E T H:

W I T N E S S E T H: GENERAL CONTRACTORS SUBCONTRACT AGREEMENT THIS CONTRACT, made and entered into the day of, 20, by and between, a Tennessee, having its principal place of business at, hereinafter referred to as "Contractor"

More information

FIRM FIXED PRICE TERMS AND CONDITIONS AES-1 Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE

FIRM FIXED PRICE TERMS AND CONDITIONS AES-1 Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE 1. DEFINITIONS 1 2. COMPOSITION OF THE ARCHITECT-ENGINEER 1 3. INDEPENDENT CONTRACTOR 1 4. RESPONSIBILITY OF THE ARCHETECT-ENGINEER

More information

Document A107 TM. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope

Document A107 TM. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope Document A107 TM 2007 Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN

More information

STATE OF VERMONT STANDARD FORM. GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017)

STATE OF VERMONT STANDARD FORM. GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017) STATE OF VERMONT STANDARD FORM GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017) The following general conditions are for use with DESIGN BUILD construction contracts with the State of Vermont,

More information

SHORT FORM STANDARD SUBCONTRACT. This Agreement is made this day of, 20, between

SHORT FORM STANDARD SUBCONTRACT. This Agreement is made this day of, 20, between SHORT FORM STANDARD SUBCONTRACT This Agreement is made this day of, 20, between (Contractor) and (Subcontractor). The work described in Section I below shall be performed in accordance with the prime contract

More information

Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project

Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project Document B108 2009 Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project AGREEMENT made as of the in the year (In words, indicate day, month and year.)

More information

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager as Owner s Agent

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager as Owner s Agent CMAA Document A-1 Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager as Owner s Agent 2013 EDITION This document is to be used in connection with the Standard Form of

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

Standard Form of Agreement Between Owner and Architect without a Predefined

Standard Form of Agreement Between Owner and Architect without a Predefined Document B102 2007 Standard Form of Agreement Between Owner and Architect without a Predefined Scope of Architect s Services AGREEMENT made as of the in the year (In words, indicate day, month and year.)

More information

For further information on the AIA s approach to drafting contract documents, see AIA Document M120, Document Drafting Principles.

For further information on the AIA s approach to drafting contract documents, see AIA Document M120, Document Drafting Principles. INSTRUCTIONS Abbreviated Standard Form of Agreement Between Owner and Contractor for Construction Projects of Limited Scope where the basis of payment is a STIPULATED SUM GENERAL INFORMATION PURPOSE. AIA

More information

Attachment I GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION

Attachment I GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION GENERAL CONDITIONS Attachment I GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION These General Conditions, the Supplementary Conditions and Special or other Conditions made part of this specifications

More information

OGC-S Owner-Contractor Construction Agreement

OGC-S Owner-Contractor Construction Agreement Owner-Contractor Construction Agreement This agreement is entered into as of ( Effective Date ) between Lone Star College (the "College"), a public junior college pursuant to Section 130.004 of the Texas

More information

RENOVATION CONTRACT. Borrower Name(s): Phone #: Phone #:

RENOVATION CONTRACT. Borrower Name(s): Phone #: Phone #: RENOVATION CONTRACT Case Number: Date: Borrower Name(s): Phone #: Phone #: THIS RENOVATION CONTRACT ( Contract ) dated as of, by and between ( Owner ) and ( Contractor ). Owner and Contractor, in consideration

More information

WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT

WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT This Equipment Purchase Agreement ( Agreement ) is entered into this day of, 20, by and between the Western Riverside Council of Governments,

More information

SUBCONTRACT (SHORT FORM)

SUBCONTRACT (SHORT FORM) SUBCONTRACTOR: PHONE SUBCONTRACT (SHORT FORM) PROJECT: LOCATION: This agreement is made and effective, by and between SUN CONSTRUCTION & FACILITY SERVICES, INC. (Contractor) and (Subcontractor) which are

More information

FIXTURE TERMS & CONDITIONS Materials & Goods

FIXTURE TERMS & CONDITIONS Materials & Goods FIXTURE TERMS & CONDITIONS Materials & Goods 1. BINDING EFFECT; ACCEPTANCE. This purchase order and all subsequent purchase orders delivered by Supplier to The Pep Boys Manny, Moe & Jack, and its affiliates,

More information

stipulated price contract

stipulated price contract 2 2 stipulated price contract 2 0 0 8 Apply a CCDC 2 copyright seal here. The application of the seal demonstrates the intention of the party proposing the use of this document that it be an accurate and

More information

In September 2018, NCARB updated the ARE 5.0 Handbook to include 2017 AIA Contract Documents updates for the following documents:

In September 2018, NCARB updated the ARE 5.0 Handbook to include 2017 AIA Contract Documents updates for the following documents: In September 2018, NCARB updated the ARE 5.0 Handbook to include 2017 AIA Contract Documents updates for the following documents: A101-2017: Standard Form of Agreement Between Owner and Contractor where

More information

BETWEEN name. address. AND name (hereinafter called the Subcontractor ) address

BETWEEN name. address. AND name (hereinafter called the Subcontractor ) address AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR CONTRACTOR S COPY SUBCONTRACT NO. Alberta Standard Construction Subcontract THIS AGREEMENT made this day of, A.D. 20 BETWEEN name (hereinafter called the

More information

Construction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures.

Construction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures. Construction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures. Contractor Address Address City, Zip Work Phone Number: Cell Phone Number:

More information

GENERAL CONDITIONS TABLE OF CONTENTS

GENERAL CONDITIONS TABLE OF CONTENTS GENERAL CONDITIONS TABLE OF CONTENTS ARTICLE 1 GENERAL PROVISIONS 1.1 BASIC DEFINITIONS 1.2 OWNERSHIP AND USE OF CONTRACT DOCUMENTS 1.3 INTERPRETATION ARTICLE 2 UNIVERSITY 2.1 INFORMATION AND SERVICES

More information