1 Wirral Local Flood Risk Management Strategy Part 1

2 Contents Part 1 1. Introduction 2. National Context for Flood Risk Management 3. Local Context for Flood Risk Management 4. Local Objectives for Strategy 5. Risk Management Authorities 6. Lead Local Flood Authority (LLFA) Structure, Governance and Local Partnerships 7. Local Flood and Coastal Erosion Risk 7.1 Current Local Flood and Coastal Erosion Risk 7.2 Current Local Flood and Coastal Erosion Risk Management 7.3 Current Management of Local Flooding Issues 7.4 Future Local Flood and Coastal Erosion Risk Local Flood Risk Management Guiding Principles Spatial Planning (including consents and SuDS) New work Maintenance Asset register Resilience, Response and Recovery 8 Investigations 9 Communications 10 Funding 11 Skills (needs, gaps and succession planning) 12 SEA 13 Programme & Proposed Future Flood Risk Investigations 14 Local Flood Risk Management Action Plan 15 Definitions Part 2 Appendices

3 Part Introduction 1.1 The Wirral The Wirral Peninsula is set between the River Dee and the River Mersey, extending into Liverpool Bay and the Irish Sea and overlooking both the Welsh Hills and the Liverpool skyline. It has a rich cultural and maritime heritage with a legacy of picturesque country villages, medieval hamlets and buildings, a wide variety of private and municipal golf courses, including the world famous Links course, Royal Liverpool Golf Club and a number of operating ports and 25 miles of unspoilt coastline with three of the five recommended good beaches in the North West. It has a well-connected transport system, with both rail and motorway links to the main national networks. It is also home to several protected coastland parks, preserving some of the finest coastal scenery in Britain. There is also an unusual array of wildlife, from migratory birds to colonies of grey seals. 1.2 Wirral Council Wirral Council as a Unitary Authority is the Lead Local Flood Authority (LLFA) for the Wirral borough area and undertakes the flood and coastal erosion risk management functions as described in sections 4 & 5 of Part 1 of the Flood and Water Management Act 2010 (FWMA). It is also the Highway and Planning Authority; the Land Drainage body, in accordance with the Land Drainage Act 1991 and the Coastal Defence operating authority, although both are operated under permissive powers and as such Wirral Council is not obliged to carry out any flood and coastal defence works at present. Wirral has developed a policy statement on Local Flood Risk Management, which is detailed in Appendix 1 of Part 2 of this document. 2.0 National Context for Flood Risk Management The FWMA placed a requirement for the Environment Agency (EA) to develop a National Strategy for Flood and Coastal Erosion Risk Management in England. This strategy, which was subsequently approved by the Secretary of State and Parliament, provides a framework for the work of all LLFA s. The National Strategy sets out the long-term objectives for managing flood and coastal erosion risks and the measures to achieve them. It sets the context for and informs on the production of local flood risk management strategies by the LLFA. These local strategies in turn provide the framework for the delivery of local improvements needed to help communities to manage local flood risk. They also aim to encourage more effective risk management by enabling people, communities, business and the public sector to work together.

4 3.0 Local Context for Flood Risk Management 3.1 General Following the 2007 summer floods, Sir Michael Pitt published his review of the response by the responsible parties, setting out 92 recommendations to be addressed. Government accepted these recommendations and announced its intention to introduce a Floods & Water Bill in order to respond to them. This resulted in The Flood & Water Management Act (2010). It created clearer roles and responsibilities and instilled a more risk based approach. There was a new lead function for local authorities in managing flood risk, following on from their role as the LLFA created following The Flood Risk Regulations (2009) that transposed the EU Floods Directive into UK law. The Act included a number of measures and responsibilities for the LLFA, which included the production of a Local Flood Risk Management Strategy (LFRMS) under Section 9. Effect of national and local strategies: England - (1) A lead local flood authority for an area in England must develop, maintain, apply and monitor a strategy for local flood risk management in its area (a local flood risk management strategy ). Details of Legislative and other Flood Risk Context are set out in Appendix 2 of Part 2 of this document 4.0 Local Objectives for Strategy Wirral Council as the LLFA will work with its partners, other flood risk management authorities, individuals, communities and organisations to reduce the threat of flooding and coastal erosion. It will achieve this through the aims and objectives as set out in this strategy. 4.1 Aims and Objectives of the Local Strategy The aim of the local strategy is to ensure that the overall context of the National Strategy is met through Wirral s management of local flood and coastal erosion risk. The Council will, through its flood and coastal erosion activities, manage the local risk to people and their property through the objectives set out below. Understand the local risks of flooding and coastal erosion, working together with partners, other risk management authorities, organisations and the community to identify the causes and put in place long-term plans to manage these risks and make sure that other plans take account of them; Ensure that the guiding principles for sustainable development are applied and inappropriate development is avoided in existing and future areas at risk of flood and coastal erosion while elsewhere, carefully managing other land to avoid increasing the risks; Where financially viable, build, maintain and improve local flood and coastal erosion management infrastructure and systems to mitigate or reduce the likelihood of harm to people and damage to the economy; environment (natural, historic, built and social) and society as a whole. Increase public awareness of the effects of climate change and the implications for an increase in flood risk, engage with people specifically at risk of flooding, to encourage them to

5 take action to manage and/or mitigate the risks that they face and to make their property more resilient;. Support and assist those bodies responsible for improving the detection, forecasting and issue of warnings of flooding. Plan for and co-ordinate a rapid response to flood emergencies and promote faster recovery from flooding. 5.0 Risk Management Authorities Details of the Risk Management Authorities within the Wirral Area are detailed in Appendix 3 of Part 2 of this Document 6.0 LLFA Structure, Governance and Local Partnerships 6.1 The Wirral Flood Management Partnership In 2008, in response to the Pitt review and recommendations, Wirral s Streetscene & Transportation Overview & Scrutiny approved the establishment of a cross-party Elected Members Steering Group, which met regularly with the cross-departmental Officers Flood Group which was also established in 2008 following a local flooding incident. The present Wirral Flood Group is a combination of these two groups, plus representatives from the EA, UU, WW, Wirral NHS and the Emergency Services. The partnership relationship has been strengthened by re-branding as the Wirral Flood Management Partnership Group, together with the introduction of agreed Terms of Reference that all partners have signed up to. This group reported annually to the Overview & Scrutiny Committee and more recently to its replacement, the Policy & Performance Committee on flood risk management undertaken during the previous year and sets out its actions/targets for the next In addition, an operational sub-group, made up of Council Officers and representatives from the EA, UU and WW, has been established to deal with the day-to-day flooding and flood risk issues, it meets bi-monthly or as required and reports to the Flood Management Partnership Group 6 monthly meetings. The Governance and Partnership Arrangements structure is detailed below in Figure 2

6 Chief Executive Officer Regeneration & Environment Policy & Performance Committee Cabinet Member Environment & Sustainability (Portfolio Holder) Strategic Director Regeneration & Environment Strategic Director of Transformation & Resources Conservative Party Lead Elected Member Environment Agency Strategic Emergency Services Assistant Chief Executive / Head of Universal & Infrastructure Services Head of Environment & Regulation Head of Regeneration Lib Dem Party Lead Elected Member Sewerage - Strategic UU WW Environment Agency Operational Health, Safety & Resilience Operations Manager (Chairman Flood Management Partnership) Senior Manager Highways Highway Asset Manager Building Control Manager Forward Planning Manager Planning- Develop. Control Manager Labour Party Lead Elected Member Head of Legal & Member Services Sewerage - Operational UU WW Climate Change Officer Communications Emergency Planning Lead FCERM Lead Officer & Chairman Operational Flood Group Highway Assets, Coastal & Drainage Team Leader Planning - Forward Planning Lead Planning - Development Control Lead Legal & Member Services Lead Figure 2. Governance and Partnership Arrangements (Members of Flood Management Partnership and Operational Flood Group in shaded boxes)

7 6.2 Other Partnerships for Consultation The Council has existing arrangements for community consultation via its Local Strategic Partnership, Local Constituency Committee s, Wirral Youth Engagement, and Wirral Voluntary and Community Services Network. The Local Strategic Partnership Assembly is a non-statutory, non-executive body bringing together representatives of the public, private, voluntary and community sectors. Consultation with the Local Strategic Partnership reaches senior Council managers, key local public service providers and designated local champions for subjects such as housing, health and social care, access and mobility, and crime and disorder. The Council also currently operates four Local Constituency Committee s, which is one of the key ways that Wirral Council engages with local people; and gives them an opportunity to shape services in their area and give feedback in connection with Council Plans, Policies and Strategies. Wirral Youth Engagement through The Executive Youth Board and Youth Forums are a more recent addition to the Council s consultation network, working alongside the Local Constituency Committees to address a traditionally hard-to-reach group. They allow young people to raise their concerns and shape local services. Consultation through the Wirral Voluntary and Community Services Network (WVCSN), which operates outside the Council and, work with local community groups and voluntary organisations which provide services locally. They have the potential to reach over 400 member organisations across Wirral. However, WVCSN representatives also form a significant part of the Local Strategic Partnership. 7.0 Local Flood and Coastal Erosion Risk 7.1 Current Local Flood and Coastal Erosion Risk Local flood and coastal erosion risk means flood risk from:- the sea; groundwater; rivers and ordinary watercourses which includes a lake or pond or other area of water which flows into an ordinary watercourse; and surface runoff. Wirral is potentially vulnerable to flooding from several sources: Coastal/Tidal Fluvial from rivers / watercourses Groundwater Pluvial or surface water Sewer Man made structures Climate change

8 Coastal / Tidal flooding can be caused by river or sea defences being overtopped, usually caused by a combination of low pressure and high tide. However, where defences are not overtopped or exceeded, tidal flooding can also be caused by spray overtopping. Fluvial flooding from rivers and watercourses occurs as a result of flows in a river /watercourse exceeding their capacity. This type of flooding may result from overtopping and / or breaching of flood defences following heavy rainfall and / or melting snow, which causes abnormally high water levels. It can also be caused by debris build up which can ultimately block them or any screens located on them. Groundwater flooding results when the natural water table within the underlying strata rises to ground level. This can result from reductions in water abstraction, or following extended periods of sustained rainfall. The areas most at risk can be low-lying areas or where the ground water table is at a naturally shallow level. Pluvial or surface water flooding is usually, but not exclusively, as a result of intense rainfall that exceeds the capacity of the installed drainage system, this often leads to flooding of the public highway. Typically this type of flooding is very localised and has short lead-times, making it difficult to predict. It can occur where no watercourse exists. The problem and severity of pluvial flooding can be exacerbated by: topography, drainage system capacity and surfaces with low permeability. Sewer flooding both foul and surface water, can occur as a result of heavy rainfall overloading sewers or failure of a sewer due to collapse or debris build up. Man-made structure flooding can result from the failure of canals, reservoirs, and other man-made structures along with problems caused by the failure of pumping stations, water mains and industrial activity Historical Significant Local Flood Risk In order to identify if there had been any historical local significant flood risk, it was necessary to define what was to be considered as a locally significant flooding incident. Wirral MBC, along with other Councils on Merseyside, agreed this as flooding that affected 20 people (or approximately 8 houses) or 1 critical service, within a 1 km square area. Although flooding was found to have occurred at a number of locations across the borough, only two recent incidents met the locally significant flooding criteria. However, records from a number of sources suggest that surface water flooding has occurred following a number of previous either high intensity storm events or extended periods of heavy rain and until recently had only affected a small number of properties internally. The majority of the recorded flooding in the past was mainly external to the property, or restricted to the highway, open space and farmland Future Significant Local Flood Risk The Government, drawing on information from existing surface water flood risk maps, identified locations across the UK, where local flood risk is significant and where these locations are clustered together they have been identified as Indicative Flood Risk Areas. The above criteria did not identify any indicative flood risk areas within the Wirral.

9 However, although no indicative flood risk areas were identified, it was established that a number of locations existed that could be at risk from future flooding that would affect possibly properties following a 1in 200 year rainfall event across the Wirral, although there is only a 0.5% chance of it occurring in any one year Climate Change Recent changes in climate, particularly in the North West have included: - average mean temperatures rising by about 2.65 C over the last century the 1990s being globally the warmest decade in the last century with 1998 being the hottest year on record seasonal rainfall has varied by as much as 15% from the average in the last 30 years decreases in summer rainfall during the last century of up to 20% increases in high intensity winter rainfall having been experienced since the 1960s increases in flooding of some major rivers in the region in the last few decades sea levels around Liverpool having risen by about 6cm in the last 50 years and 10cm over the last 100 years. Predicted changes which may affect the climate of the UK include:- Warming in the North West, which will increase mean winter temperatures between 1 and 3 C and in summer between 2.6 and 4.1 C by the 2050 s. While by the 2080 s summer mean temperatures across the North West may have risen between 2 and 5.9 C. More warming in summer and autumn than in winter and spring. Winters will become wetter than at present by up to 26%, whilst summers will most likely become drier. This contrast between winter and summer climate will increase with time. Winters will become wetter and summers drier. Sea level rises of up to 30cm by the 2050 s and 80cm by the 2090 s (these are specifically based on latest climate change guidance from EA in 2011). The predicted changes are generally based on the Governments own UK Climate Impacts and the most recent predictions from the UK Climate Projections 2009 (UKCP09), which has produced a series of potential climate change scenarios based on differing global emission rates from low to high. There are a large number of uncertainties associated with predicting the outcome of these scenarios, which create limitations on the accuracy of the predictions. The Wirral Climate Change Group is a local forum supported by Wirral Council s Sustainability Unit, which co-ordinates action on climate change in Wirral. The group is working on the development of a replacement climate change strategy for Wirral There are clearly a large number of potential consequences of climate change with differing degrees of likelihood associated with them. Wirral will ensure that it is as prepared as possible, within the resource constraints placed on it, to respond to the challenges posed by extreme weather events, inline with Government guidance.

10 7.2 Current Local Flood and Coastal Erosion Risk Management Coastal Erosion and Tidal Flood Risk Coastal erosion is a natural process caused by wind and wave action wearing away the land, such as the foreshore or cliffs. Where tidal currents, wind and waves, cause the land to be worn away and removes sediment which is not replenished, then erosion occurs. Erosion of foreshores can happen slowly over time; however, lowering beach levels can increase the risk of failure of coastal defence structures, while erosion at the base or toe of a cliff can cause instabilities, which become immediately apparent. Coastal erosion and tidal flood risk is managed through the Council s responsibilities for coastal defence. A strategic approach is adopted for Flood and Coastal Erosion Risk Management (FCERM) at Wirral. The strategic hierarchy comprises Shoreline Management Plans (SMPs), followed by Strategy Plans and finally detailed scheme appraisal. Each of these stages becomes progressively more detailed and site specific, leading ultimately, provided sufficient funds are identified, to the implementation of a management scheme that is considered appropriate for a specific length of coastline. The current North West England and North Wales Shoreline Management Plan (SMP2), was adopted by Wirral Council in September 2010 and defines a preferred shoreline management policy for each Policy Unit defined along the Wirral Frontage Whilst the SMP identifies what policy should be adopted for future coastal defence management, the emerging Wirral Coastal Strategy identifies how the policies would most appropriately be implemented, based on a more detailed understanding of coastal processes applying, flood and coastal erosion risks faced by coastal communities, environmental impacts and the economic justification for different future coastal management scenarios. Wirral Council is an active member of the North West and North Wales Coastal Group, leading on the sub-cell 11a SMP production in Membership together with collaborative working between members of the Coastal Groups reinforces the strategic approach taken towards FCERM. Wirral Council is the major owner of the 42km of sea and river frontage between its boundaries on the Dee and Mersey Estuaries, whilst most of this frontage is artificially defended to reduce flood and coastal erosion risk no major works have been undertaken on the Wirral since 2001, with the exception of the reconstruction of the West Kirby Marine Lake Outer Wall in There has however been on-going revenue expenditure on the maintenance of existing coastal defence assets. A programme of regular inspection and monitoring is also in place and the output from these activities has informed and been fully considered during the production of the Wirral Coastal Strategy.

11 Main Rivers The Environment Agency maintains 97km of main rivers and any associated flood defences within the Wirral catchment. These are:- Dibbinsdale Brook Dibbinsdale Brook Tributary Clatter Brook Storeton Brook Prenton Brook River Fender Newton Brook (Mersey) Greasby Brook Carr Drain Perimeter Drain Arrowe Brook The Birket Birket Old Courses The Environment Agency has a prioritised programme of regular maintenance on all its main rivers, which includes inspections, litter and debris removal, desilting, strimming, flailing and weed treatment. However, they have identified that with the changing financial climate it is likely that this may need to be reviewed annually, with the likelihood that maintenance reductions will be necessary. Where these main rivers pass into culverts under the public highway Wirral Council, as the Highway Authority, has inspection and maintenance responsibilities Ordinary Watercourses In addition to these Main Rivers there is a network of ordinary watercourses for which Wirral Council is the relevant operating authority and it has been agreed with the Environment Agency that there are 5.04km of critical ordinary watercourses of which 3.89km are culverted and although these are nonmain river they are critical due to their potential to put large numbers of people and property at risk of flooding. As the LLFA for the Wirral area, the Council is now also responsible for consenting and enforcement of certain works to these ordinary watercourses. No planned maintenance of watercourses is undertaken at present, although in urban areas where flood risk may be more critical, problems are more easily recognised and acted on. Even where Wirral has riparian owner responsibilities, no extensive planned maintenance is undertaken. Additionally, in the past, due to the resource implications, no investigation of flooding problems that related purely to ordinary watercourses had been carried out. This has resulted in there being very little knowledge or understanding of the land drainage flooding issues. Outside the urban areas, these watercourses are generally not deemed critical and flood risk could be minimised by the proper exercise of maintenance by the owners. However, again where they pass into culverts under the public highway Wirral Council, as the Highway Authority, has maintenance responsibilities. Where these culverts are large enough to be considered as a highway bridging

12 structure (usually a span greater than 1.5m), then they are visually inspected bi-annually, while every 5 years a more detailed structural assessment is undertaken. It is likely that some of these highway culverts are protected by debris screens but no detailed records of the location and condition are held at present Groundwater The Environment Agency Areas Susceptible to Ground Water Flooding Map (AStGWF) suggests that the coastal fringes to the east and northeast together with the northwest of the Wirral could be susceptible to groundwater flooding. However, the production of these maps was based on limited geological information and does not take account of groundwater rebound following reductions in water abstraction. In addition, the maps show 1km grid squares where geological and hydrogeological conditions show that groundwater might emerge but it is likely that only isolated locations within the overall susceptible area are actually likely to suffer the consequence of groundwater flooding. Figure 4 below taken from Wirral s Preliminary Flood Risk Assessment shows the Environment Agency AStGWF Map for the Wirral. Figure 4 Environment Agency AStGWF Map for the Wirral No records were identified of known groundwater flooding within the Wirral thus it is not possible to conclude if any past groundwater flooding had had any significant effect on existing recorded surface water flooding. However, it is possible that the future requirement to deal with surface water by the

13 adoption of SuDS could possibly lead to groundwater and land drainage flooding becoming more widespread. Groundwater does affect the operation of the three Mersey tunnels (2 road and 1 rail) and continuous pumping is undertaken at present by the operator Pluvial or Surface Water At present the Council s limited resources are directed primarily at dealing with flood risk related to the public highway through the annual pre-emptive cleansing of gullies and associated assets, minor repairs and improvements and the investigation of flooding incidents particularly where a relationship with the public highway is suspected. Where new highway drainage systems are provided they are designed not to flood in a 1in 100 year rainfall event + a 20% increase in capacity for climate change Sewer The majority of the public sewerage system in the Wirral is owned and maintained by United Utilities, however the southwest corner of the Borough, around Heswall, is the responsibility of Dwyr Cymru (Welsh Water). Much of the highway drainage system within the Wirral discharges into these public sewers and during high intensity storm events or extended periods of heavy rain the public sewerage system often becomes overloaded resulting in both surface water and foul flooding of the highway and property. A register of reported sewage flooding incidents is held by both United Utilities and Welsh Water; and are utilised to identify locations where sewer capacity improvements are necessary and would provide economical local benefits. Both produce 5-yearly investment plans identifying those locations that will benefit from improvements over that period. In addition they undertake both planned and reactive maintenance on their sewerage assets to reduce flood risk. However, any new sewers or upsizing that is undertaken are designed to ensure no flooding in a 1in 30year rainfall event while taking account of climate change and urban creep Man-made Structures The failure of man-made structures can lead to flooding which can have no relationship with rainfall events. The failure of canals, reservoirs, pumping stations, water mains and the infrastructure at industrial sites can lead to flooding. The responsibility to maintain these where they occur in the Wirral rests with a number of public and private organisations. As they are identified the flood risk will be assessed and the flood risk management authority with responsibility will be notified Climate Change Wirral has been attempting to mitigate climate change through behavioural changes and by reducing its carbon emissions thus reducing its carbon footprint, for example through initiatives such as energy management to reduce consumption, recycling and green transport initiatives. There has also been work on adapting to climate change where possible through for example, changes in how the

14 Planning Department deals with inappropriate developments in flood risk areas or by protecting existing assets. Opportunities to reduce surface water discharging from new development is also utilised where possible. 7.3 Current Management of Local Flooding Issues General Although a recurring problem throughout the Borough, flooding in Wirral had until recently, tended to take place mostly on an isolated incident basis. However, a number of extreme rainfall and coastal storm surge events have occurred, as detailed below. In August 2011, a 1 in 461 year rainfall event affecting the Heswall and Wallasey/New Brighton areas with over 30 properties affected by internal flooding. August 13th 2012, a 1 in 30 year rainfall event affected the whole Borough and 46 properties suffered some form of internal flooding. August 15th 2012, a 1 in 12 year event affected the whole Borough and some 26 properties were affected by internal flooding. August 29th 2012, a 1 in 20 year rainfall event, led to 10 properties across the Borough suffering some form of internal flooding. September 24/25th 2012, a 1 in 25 year rainfall event led to widespread flooding and road closures although only 1 property reported internal flooding. December 5th 2013, a low-pressure induced surge caused already high tide levels to increase by over 1.2m. Wave action raised water levels even higher and the westerly winds of force 8, gusting to force 10 led to defences being overtopped at West Kirby, Hoylake and Meols. 4 Commercial and 8 residential properties were flooded and although some minimal damage was caused to coastal defences there was significant damage to other council assets, private property and private defences. In addition, at New Brighton flooding caused by overtopping, vertically reflected waves and wind blown wave spray across the flood containment defences led to 19 businesses and 4 domestic properties being flooded. Localised flooding can also occur as a consequence of a lack of maintenance, capacity issues or that no drainage exists at all. Flooding from public sewers is a continuing problem affecting most areas but to varying degrees and both UU and WW, although tackling the problem, prioritise the flooding such that internal flooding of property is the highest priority for funding while highway and external property flooding is considered a lower priority. However it is likely that through resolving internal property flooding by increasing the public sewer capacity, benefits to the system as a whole accrue. In the early 2000 s the Council carried out an assessment of the flood risk from ordinary watercourses based on historical flooding information coupled with the Environment Agency s indicative flood plain maps. It was satisfied at the time of the assessment that there were minimal risks to human health, the social and economic welfare of individuals and communities, infrastructure, and the environment (including cultural heritage), created by the flood risk from these ordinary watercourses. However, following the recent flooding incidents this has been reviewed and will continue to be reviewed on a regular basis as detailed knowledge on the drainage network is collated. The localised ordinary watercourse flooding locations are listed below and now include Rigby Drive and Lloyd Drive, Greasby, which have been added to this list following the review.

15 Clatterbridge Hospital Croft Drive east, Caldy Column Road, Caldy Brimstage Road, Brimstage Brimstage Road, Brackenwood Target Road, Heswall Arrowe Park Road, Upton Arrowe Brook Road/Arrowe Brook Lane, Greasby The Great Culvert (this is owned and maintained by others) Rigby Drive/Lloyd Drive, Greasby Council Officers regularly meet with operational representatives of the EA, UU and WW to discuss flooding issues and identify how, by co-ordinating maintenance and improvement works, flooding and flood risk can be resolved or at least reduced. These partnerships will be developed and extended, to include the sharing/exchange of information, which will be essential for the development and implementation of both the national and local flood risk management strategies. A list of historical flood locations has been developed and this is reviewed regularly and updated. Locations that have received remedial works are archived but stay on the list for record purposes. At present there is no specific funding to deal with flooding issues Flood Warning The EA has for many years produced mapping identifying areas at risk of flooding from rivers or the sea. These Indicative Flood Plain Maps have formed the basis of Flood Warning Areas, used by the EA to warn residents of possible flooding events. The method of warning for Wirral s two Flood Warning Areas (FWAs) (Tides in Merseyside and Cheshire, and Wirral Flood Watch Catchment) was indirect via general reports on local media. The Indicative Flood Plain Maps are also used with regard to planning policy and development control. The present Planning Policy Guidance: Development and Flood Risk (PPG25) has identified constraints for development based on 1% risk of flooding for river and 0.5% risk of flooding for tidal in any one year. PPG25 also contains guidance for development in areas at 0.1% risk of either type of flooding. The areas at risk are defined from the EA s Indicative Flood Plain mapping In 2004 the EA identified Wirral as an area where it could provide a direct flood warning service to properties at risk of tidal and / or fluvial flooding. The FWAs introduced by the EA did not include any of the areas at risk of flooding from the Critical Ordinary Watercourses identified in the Council s Policy Statement on Flood and Coastal Defence. There has been a 34% take up of the flood warning within the Wirral and of the properties receiving direct flood warnings, 17% are in flood warning areas with no history of flooding. Following the coastal flooding in December 2013 the Environment Agency introduced a targeted Flood Warning Area for New Brighton specifically around Marine Point, it undertook to improve take up of the existing Flood Warning Area at West Kirby and rebranded its Flood Alerts for the Dee Estuary and north Wirral to make the locations more familiar to Wirral residents. The new Flood Alerts were both subsets of existing larger alerts but it was hoped that by making them specific it would then make the alert more timely and accurate targeting only the specific area at risk. These new areas are:-

16 Irish Sea from Hilbre Island to Heswall - Areas at risk include land from Hilbre Island and along the coast from West Kirby to Heswall. Irish Sea from Hoylake to New Brighton - Areas at risk include land at the head of the Wirral from Hoylake to New Brighton and including parts of Leasowe and Wallasey. The EA warn by the most appropriate direct method, eg. phone, text or media broadcasts to properties in the following areas:- EA FWD Code FWD Name Properties 013FWCTDEE Irish Sea Hilbre Island to Heswall FWFME4 Arrowe Brook at Upton FSTTME3 Mersey Estuary at Woodside FWCTME1 Irish Sea from Hoylake to New Brighton FWFME7 River Birkett at Leasowe FWFME6 River Birket at Meols FWTTME8 Irish Sea and Mersey Estuary from the Head of the Wirral to Runcorn Figure 5 Wirral Flood Warning Area Statistics Policy Statement on Flood and Coastal Defence Wirral s Flood and Coastal Defence Policy Statement is detailed in Appendix 1 of Part 2 of this document and identifies that the Governments policy aim is to reduce the risk to people and the developed and natural environment from flooding and coastal erosion by encouraging the provision of technically, environmentally and economically sound and sustainable defence measures. Its objectives in meeting this aim are:-. 1 To encourage the provision of adequate and cost affective flood warning systems 2 To encourage the provision of adequate, economically, technically and environmentally sound and sustainable flood and coastal defence measures 3 To discourage inappropriate development in areas at risk from flooding and coastal erosion Catchment Flood Management Plans Wirral is spread across two Catchment Flood Management Plan (CFMP) areas, the Mersey Estuary, and the Dee Estuary. The Mersey area has 12 actions associated with the local authority, 6 are high priority and 6 medium and Wirral is the lead partner on 6 of these actions, while the Dee Estuary CFMP has none relating to the Wirral. The Mersey Estuary South catchment covers the rivers that drain into the River Mersey from the Wirral peninsula. Two of the three main watercourses drain the Wirral catchment through the River Birket and Dibbinsdale Brook. The third watercourse is Rivacre Brook, which is the southernmost of the three main watercourses and flows into the Mersey near Ellesmere Port, and is not part of the

17 Wirral catchment. There are no watercourses draining into the Dee Estuary from the Wirral, which have associated flood risk. Approximately two-thirds of the surface water flows generated within the Wirral discharges into the River Birket and its tributaries. This Main River flows into a large diameter culvert known locally as The Great Culvert. These flows are intercepted by an automatic, mechanically raked screen with a bypass overflow should the screen blind or suffer a mechanical failure, which has lead to property flooding in the past. Downstream of this screen is a pumping station, operated by United Utilities that intercepts these raked flows up to the stations maximum pumping capacity of 6m3/s, which are discharged into the West Float Dock. Flows in excess of this pass forward into the downstream section of the Great Culvert which is designated as a public sewer and receives combined flows from the public sewerage system. The Great Culvert eventually discharges into the United Utilities WwTW at Shore Road, Birkenhead. Flows in excess of the treatment capacity of the works are pumped directly into the River Mersey via a storm pumping station with a capacity of 9.14m3/s. The River Birket catchment was the subject of a flood risk study by the Environment Agency in 2006 and the results of this have been shared with Wirral. In addition a recent EA funded catchment investigation has identified and mapped the surface water/land drainage catchments outfalling into it. Further south, Dibbinsdale Brook drains the central area of the Wirral Peninsula, and its main tributary is Clatter Brook. The catchment is mainly rural in the upper reaches, and heavily urbanised in the lower reaches downstream from the confluence with Clatter Brook. The aim of the CFMPs is to create a better environment through flood risk management. In undertaking the actions there will be a need to consider the environmental responsibilities that apply across all of the work, for example complying with legislation. Any activities undertaken to comply with the actions will, therefore, need to meet the requirements of, for example, the Water Framework Directive. In setting this plan and implementing actions, Wirral will ensure that it is maximising the opportunities to meet its environmental responsibilities while reducing the flood risk. The Mersey Estuary CFMP considers that the current flood risk management is adequate at present while it may be necessary in the future to improve and extend this by changes to the level of defences, flood forecasting and flood warning. In addition it recommends that there is no increase or if possible a reduction in run-off from development and that an integrated urban drainage strategy is developed with the EA and UU. These actions will be considered as an integral part of this flood risk management strategy. The Dee Estuary CFMP provides an overview of the proposed flood risk management at the catchment scale for the next years although the Wirral catchment is not considered to be under any major risk. The preferred policies for the Mersey Estuary Wirral Catchment would be: Policy 5 : Areas of moderate to high flood risk, where we can generally take further action to reduce flood risk, we will.

18 This policy will tend to be applied to those areas where the case for further action to reduce flood risk is most compelling, for example, where there are many people at high risk, or where changes in the environment have already increased risk. Taking further action to reduce risk will require additional appraisal to assess whether there are socially and environmentally sustainable, technically viable and economically justified options. The table below taken from the Mersey Estuary CFMP shows the flood risk within the Wirral. Catchme nt Mersey Estuary South Communi ty Wallasey, Bromboro ugh, Ellesmere Port Irby, Hoylake Number of Properti es at risk (10% a.p.) Number of Properties at risk (1% a.p.) Relative Hazard (1% a.p.) Damage to Residential Properties ( M) 10 % 1% 0.1 % Damage to Commercial Properties ( M) 10 % Agricultural Damages ( k) 1% 0.1% 10% 1% 0.1% Medium Figure 6. Mersey Estuary CFMP Wirral Flood Risk In addition, in order to achieve a sustainable approach to flood risk management and to ensure that any improvements are not affected now or in the future, by, for example, inappropriate development. It will be necessary to support and promote the following actions throughout all sub-catchments: Application of appropriate planning requirements and building regulations for proposed developments under the National Planning Policy Framework (NPPF) and Part H of the Building Regulations; Risk based approach to maintenance of drainage infrastructure; Increase the flood awareness and education for existing property owners/occupiers, including the promotion of self help schemes such as flood pact (an Environment Agency initiative). Encourage take-up of environmental stewardship schemes to improve land use management and flood risk. The Actions from the CFMPs are detailed in Appendix 5 and a diagrammatic representation of the Wirral plan is shown in Appendix 6 of Part 2 of this document. It is clear from the initial assessment of responsibility from the Lead Department that some actions will be led by Environment & Regulation (Drainage) together with the involvement and support of Regeneration (Planning), who act as lead for some actions. However, the involvement of the Regeneration at all stages of the development and implementation will be critical. The timescales for the implementation of actions has been set externally but Wirral will need to have made progress in connection with them, despite a long timescale for completion.

19 7.3.5 Land Drainage Issues As recommended by the Pitt review, Wirral will need to consider undertaking a more pre-emptive view of the maintenance of the surface water system, in particular the clearing of strategic critical watercourses although at present the exact locations and conditions of these are largely unknown. A number of debris screens are believed to be located on some of the culverts beneath the public highway but at present no regular cleaning is undertaken. The location of other critical culverts is being investigated as the need to identify the flooding consequences to property and the travelling public from any blockages or failures needs to be known. The mapping of the land drainage/surface water catchments of the River Birket and part of the Dibbinsdale Brook has already been completed. This has enabled the connection of urban surface water catchments with their river outfalls to be established. It would appear that even where Wirral has riparian responsibilities to maintain watercourses, this has rarely been happening. This responsibility for maintenance is likely to occur at playing fields, allotments, school premises and leased farmland. The future maintenance of all watercourses on a regular basis by either the council or riparian owners, where these can be identified, will result in additional storage capacity. However, it should be noted that the effect on the whole system of regular maintenance needs to be considered as flooding problems downstream may occur due to surface water draining more quickly. Wirral at present has permissive powers under the Land Drainage Act 1991 but not a duty to carry out works on ordinary watercourses. This can include improvements, general maintenance and cleaning work; in addition the permissive powers enable the Council to take action against those who are legally responsible to carry out such work but do not do so and in default carry out that work and recharge the property. These are known as Riparian Owners and are described in more detail below. The Council has never formally taken up these permissive powers as the process can be very expensive and may involve a great deal of investigation. There is no specific budget for such work and therefore any such problems have never been identified and recorded in any detail. However, new responsibilities for local authorities within the Flood and Water Management Act will result in more of these needing to be investigated although resolution will still be problematic. The term Riparian Owner describes anyone who owns a property where a watercourse bounds or crosses it. Under common law they possess rights and responsibilities appertaining to that stretch of watercourse, which may be an open watercourse, a culvert or pipe. Often property owners are unaware of this responsibility particularly where the watercourse is underground. In addition, where a watercourse is situated on a boundary between properties, it is normally presumed that a Riparian Owner owns the land up to the centre-line of the watercourse, unless records exist to prove otherwise, so both property owners would have riparian responsibilities. A Riparian Owner is responsible for: - accepting water from the section of watercourse owned by their upstream neighbour and transferring this, together with drainage from their own property, to their neighbour downstream,

20 carrying out, at his or her own expense, any necessary maintenance of the watercourse to the satisfaction of the relevant Land Drainage Authority, which in the case of the non-main rivers within the Wirral area is the Council. As previously identified, the Council itself has riparian responsibilities to maintain watercourses where it is the landowner and these are the responsibility of the Department that has ownership. In addition, LLFA s have led on ordinary watercourse consenting and enforcement, since April 2012, following commencement of paragraphs of Schedule 2 of the Flood and Water Management Act 2010, which changed ordinary watercourse management by section 23 of the Land Drainage Act 1991 (LDA1991). These regulatory powers, which have transferred from the Environment Agency to LLFA s, enables the control of certain activities that might have an adverse flooding impact. These include the erection of milldams, weirs or other similar obstruction, culverting an ordinary watercourse, or alterations to an existing culvert in a manner that would be likely to affect the flow of an ordinary watercourse, without the consent in writing of the LLFA Community Involvement Involving and informing the local community concerning flood risk within Wirral is identified as a high priority now and in the future and the necessary resources will need to be identified to support this aim. The Wirral Flood Partnership has produced an information leaflet that gives residents appropriate advice on what to do in the event of a flood, which will be made available, resources permitting, at Wirral Council One-Stop-Shops and Libraries. In addition, undertaking consultation with the various housing providers in Wirral would enable the flood risk messages to reach a wider audience, increase the understanding of the local flood risk and secure the prioritisation and response that these communities would wish to see in connection with what are often localised problems that directly affect them. The involvement of local communities in the funding of flood mitigation/prevention works will be necessary in the future due to the limited amount of funding available nationally and locally. In addition, it will not be economically, socially or environmentally feasible to permanently resolve all flooding issues in the Wirral. As part of this Plan it is proposed to develop an investment strategy for how the Council can work with other organisations and communities to raise further funds and prioritise areas for further investigation and/or investment 7.4 Future Local Flood and Coastal Erosion Risk Local Flood Risk Management Guiding Principles For local flood and coastal erosion management to be viable and sustainable it will be necessary to make difficult decisions on where risk management activities can and cannot be carried out. These decisions, and the processes by which they are taken, will be guided by a number of high-level principles. 1 Community focus and partnership working 2 A catchment and coastal cell based approach 3 Sustainability 4 Proportionate, risk-based approaches

21 5 Multiple benefits 6 Beneficiaries should be encouraged to invest in risk management Community Focus and Partnership working. Wirral will work with other flood risk management authorities in partnership with communities to understand the community perspective of flooding and coastal erosion, helping communities understand and actively prepare for the risks, and encourage them to have direct involvement in decision-making and risk management actions. The aim is to ensure that decision-making and ownership of risk management measures are as local as possible but within a catchment or coastal cell that ensures a fair allocation of funds and avoids the transfer of risk elsewhere without prior agreement. Wirral will co-ordinate its consultations and the input of local bodies and communities through its four local Neighbourhood Forum s and public scrutiny and overview proceedings. It will work closely with the Regional Flood and Coastal Committee (RFCCs) to consider how both the costs and benefits of investment resulting from local flood risk management strategies should be spread between geographical areas, communities and sectors. Involving those communities identified as being at risk can help inform local decisions on what is needed and who should be asked to contribute towards the costs of investment, so that costs and benefits are shared fairly. Partnership working will also ensure that risk is managed in a co-ordinated way beyond authority boundaries, for example across catchments or along the coast, with lead local flood authorities working together collectively. By working in partnership with communities, Wirral will achieve a clearer understanding of the issues, and be able to bring together those best placed to develop and provide solutions. The key aims will include the identification of synergies and efficiencies and ways of maximising these, the development of better links with other related work, and the promotion of better sharing of information and expertise A Catchment and Coastal Cell based Approach In understanding and managing flood and coastal risks locally, Wirral will ensure that it considers the impact on other parts of the catchment or coast, to avoid passing risk on to others within the catchment or along the coast without prior agreement. This catchment or coastal cell approach will be a key aspect to managing risks at source and achieving wider benefits through better integrated water management and increase the opportunity for developing new sources of funding as well as pooling resources and expertise. The existing catchment flood management plans (CFMPs) and shoreline management plans (SMPs) will support this approach Sustainability Wirral will support local communities by managing flood and coastal erosion risks in ways that take account of all impacts and the whole-life costs of any investment. The risk management solutions will be forward-looking, taking account of potential risks that may arise in the future and being adaptable to climate change. They will, where possible, also work with natural processes and aim to enhance the environment. By adopting a more sustainable approach to the management of flood and coastal erosion risks, Wirral aims to greatly improve the environmental condition of rivers, wetlands, coastal areas, and the social and economic circumstances around and within the local settlements.

Solway Local Plan District 1 Flood risk management in Scotland 1.1 What is a Flood Risk Management Strategy? Flood Risk Management Strategies have bee

Solway Local Plan District 1 Flood risk management in Scotland 1.1 What is a Flood Risk Management Strategy? Flood Risk Management Strategies have bee Flood Risk Management Strategy Solway Local Plan District Section 1: Flood Risk Management in Scotland 1.1 What is a Flood Risk Management Strategy?... 1 1.2 How to read this Strategy... 1 1.3 Managing

More information

Joint Lincolnshire Flood Risk and Drainage Management Strategy: Draft v.6.0:consultation Draft, : Annexes A-F

Joint Lincolnshire Flood Risk and Drainage Management Strategy: Draft v.6.0:consultation Draft, : Annexes A-F Lincolnshire Flood Risk and Drainage Management Partnership Framework Lincolnshire Joint Flood Risk and Drainage Management Strategy Draft v.6.0 Consultation Draft 23 rd May 2012 Annexes A-F Joint Lincolnshire

More information

Protocol for the maintenance of flood and coastal risk management assets (England only) Version 4, 27/01/2014 UNCLASSIFIED

Protocol for the maintenance of flood and coastal risk management assets (England only) Version 4, 27/01/2014 UNCLASSIFIED Protocol for the maintenance of flood and coastal risk management assets (England only) Version 4, 27/01/2014 UNCLASSIFIED We are the Environment Agency. We protect and improve the environment and make

More information

Understanding the risks, empowering communities, building resilience: the national flood and coastal erosion risk management strategy for England

Understanding the risks, empowering communities, building resilience: the national flood and coastal erosion risk management strategy for England 14669 NFS Cor Slip / Sig: 1 / Plate A Understanding the risks, empowering communities, building resilience: the national flood and coastal erosion risk management strategy for England Session: 2010-2012

More information

Kirkwall (Potentially Vulnerable Area 03/05) Local Plan District Local authority Main catchment Orkney Orkney Islands Council Orkney coastal Backgroun

Kirkwall (Potentially Vulnerable Area 03/05) Local Plan District Local authority Main catchment Orkney Orkney Islands Council Orkney coastal Backgroun Kirkwall (Potentially Vulnerable Area 03/05) Local Plan District Orkney Local authority Orkney Islands Council Main catchment Orkney coastal Summary of flooding impacts 490 residential properties 460 non-residential

More information

Local Government Group. Preliminary Framework to assist the development of the Local Strategy for Flood Risk Management.

Local Government Group. Preliminary Framework to assist the development of the Local Strategy for Flood Risk Management. Preliminary Framework to assist the development of the Local Strategy for Flood Risk Management A Living Document February 2011 Preliminary Framework for Local Flood Risk Management Strategy Page 1 Table

More information

Flood Risk Management Planning in Scotland: Arrangements for February 2012

Flood Risk Management Planning in Scotland: Arrangements for February 2012 Flood Risk Management Planning in Scotland: Arrangements for 2012 2016 February 2012 Flood Risk Management (Scotland) Act 2009 1 Contents Forewords 1. Introduction to this document... 5 2. Sustainable

More information

Flood Risk Management Strategy. Shetland

Flood Risk Management Strategy. Shetland Flood Risk Management Strategy Shetland Publication date: 14 December 2015 Terms and conditions Ownership: All intellectual property rights for Flood Risk Management Strategies are owned by SEPA or its

More information

Flood Investigation Report

Flood Investigation Report Flood Investigation Report Bar Hill 1.1 Background As the Lead Local Flood Authority (LLFA) for Cambridgeshire, it is Cambridgeshire County Council s duty to investigate flood incidents as detailed within

More information

Shropshire Local Flood Risk Management Strategy. Summary for Consultation. July 2014

Shropshire Local Flood Risk Management Strategy. Summary for Consultation. July 2014 Shropshire Local Flood Risk Management Strategy Summary for Consultation July 2014 SHROPSHIRE LOCAL FLOOD RISK MANAGEMENT STRATEGY 1 Introduction This Strategy is about managing flooding in Shropshire.

More information

LOCAL FLOOD RISK MANAGEMENT STRATEGY FOR HERTFORDSHIRE. STRATEGY (Vision) Part 1 of 4

LOCAL FLOOD RISK MANAGEMENT STRATEGY FOR HERTFORDSHIRE. STRATEGY (Vision) Part 1 of 4 LOCAL FLOOD RISK MANAGEMENT STRATEGY FOR HERTFORDSHIRE STRATEGY (Vision) Part 1 of 4 Geoperspectives 2011 Contents Executive Summary... 1 E1. Background... 1 E2. Relevance... 1 E3. Strategy Content...

More information

Local Flood Risk Management Strategy for Central Bedfordshire

Local Flood Risk Management Strategy for Central Bedfordshire Central Bedfordshire Council www.centralbedfordshire.gov.uk Local Flood Risk Management Strategy for Central Bedfordshire Final February 2014 1 Foreword Following flooding in 2007, the government commissioned

More information

Review of preliminary flood risk assessments (Flood Risk Regulations 2009): guidance for lead local flood authorities in England

Review of preliminary flood risk assessments (Flood Risk Regulations 2009): guidance for lead local flood authorities in England Review of preliminary flood risk assessments (Flood Risk Regulations 2009): guidance for lead local flood authorities in England 25 January 2017 We are the Environment Agency. We protect and improve the

More information

Strategic Flood Risk Assessment. SFRA Report

Strategic Flood Risk Assessment. SFRA Report Strategic Flood Risk Assessment SFRA Report on Strandhill Mini-Plan Variation No.1 of the Sligo County Development Plan 2011-2017 Prepared by Contents 1. The context for the Flood Risk Assessment 1 2.

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions The West of Wales Shoreline Management Plan (SMP) provides a high level strategy for managing flood and erosion risk for the coastline and is a non statutory policy document

More information

ARUN DISTRICT COUNCIL POLICY STATEMENT ON FLOOD AND COASTAL DEFENCE. 12 January 2004

ARUN DISTRICT COUNCIL POLICY STATEMENT ON FLOOD AND COASTAL DEFENCE. 12 January 2004 ARUN DISTRICT COUNCIL POLICY STATEMENT ON FLOOD AND COASTAL DEFENCE 12 January 2004 1.0 INTRODUCTION This is an update to the existing policy statement which was prepared by Arun District Council to provide

More information

RIVER LUGG INTERNAL DRAINAGE BOARD. Statement on Water Level and Flood Risk Management

RIVER LUGG INTERNAL DRAINAGE BOARD. Statement on Water Level and Flood Risk Management RIVER LUGG INTERNAL DRAINAGE BOARD Statement on Water Level and Flood Risk Management 1. Introduction Purpose 1.1. This policy statement has been prepared by the River Lugg Internal Drainage Board (the

More information

Strategic Flood Risk Assessment for SDCC Development Plan

Strategic Flood Risk Assessment for SDCC Development Plan Strategic Flood Risk Assessment for SDCC Development Plan Detailed Report on Flood Risk in the Baldonnell Area 8 th May 2015 rpsgroup.com/ireland Strategic Flood Risk Assessment for SDCC Development Plan

More information

Flood Investigation Report

Flood Investigation Report Flood Investigation Report Oakington 1.1 Background As the Lead Local Flood Authority (LLFA) for Cambridgeshire, it is Cambridgeshire County Council s (CCC) duty to investigate flood incidents as detailed

More information

Fort William (Potentially Vulnerable Area 01/25) Local authority Main catchment The Highland Council Appin coastal Background This Potentially Vulnera

Fort William (Potentially Vulnerable Area 01/25) Local authority Main catchment The Highland Council Appin coastal Background This Potentially Vulnera Fort William (Potentially Vulnerable Area 01/25) Local authority The Highland Council Main catchment Appin coastal Summary of flooding impacts 100 residential properties 80 non-residential properties 520,000

More information

Local Flood Risk Management Strategy

Local Flood Risk Management Strategy of London Local Flood Risk Management Strategy 2014-2020 September 2014 of London Local Flood Risk Management Strategy 2014-2020 Sept 2014 1 Contents 1 Introduction... 4 2 Flood Risk Management Strategy

More information

Local Flood Risk Management Strategy

Local Flood Risk Management Strategy Local Flood Risk Management Strategy 2017 2019 Contents Section Pages Executive Summary 3 1.0 Introduction 4 2.0 Aims 5 3.0 Flood Risk in Poole 6 4.0 Drainage 10 5.0 Surface Water Management Plans 12 6.0

More information

Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Local authority Main catchment Clyde and Loch Lomond Glasgow City Council

Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Local authority Main catchment Clyde and Loch Lomond Glasgow City Council Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Clyde and Loch Lomond Local authority Glasgow City Council Main catchment River Clyde Summary of flooding impacts At risk of

More information

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment Strategic Flood Risk Assessment Draft Claremorris Local Area Plan 2012 2018 Prepared by Forward Planning Section Mayo County Council 1 Table of Contents Section 1: Overview of the Guidelines... 4 1.1 Introduction...

More information

Preliminary Flood Risk Assessment (PFRA) Final guidance

Preliminary Flood Risk Assessment (PFRA) Final guidance 07/12/2010 Preliminary Flood Risk Assessment (PFRA) Final guidance Report GEHO1210BTGH-E-E i 07/12/2010 We are The Environment Agency. It's our job to look after your environment and make it a better place

More information

Planning and Flood Risk

Planning and Flood Risk Planning and Flood Risk Patricia Calleary BE MEngSc MSc CEng MIEI After the Beast from the East Patricia Calleary Flood Risk and Planning Flooding in Ireland» Floods are a natural and inevitable part of

More information

FLOODING INFORMATION SHEET YOUR QUESTIONS ANSWERED

FLOODING INFORMATION SHEET YOUR QUESTIONS ANSWERED The information in this document has been written in partnership by the Association of British Insurers and the Environment Agency 1. Flood risk and insurance Q1. How can I find out the flood risk affecting

More information

Caol and Inverlochy (Potentially Vulnerable Area 01/24) Local Plan District Highland and Argyll Local authority The Highland Council Main catchment Fo

Caol and Inverlochy (Potentially Vulnerable Area 01/24) Local Plan District Highland and Argyll Local authority The Highland Council Main catchment Fo Caol and Inverlochy (Potentially Vulnerable Area 01/24) Local authority The Highland Council Main catchment Fort William coastal Summary of flooding impacts 170 residential properties 40 non-residential

More information

Consider the risks to your own business as well as to your operations

Consider the risks to your own business as well as to your operations Hayley Bowman Flood and Coastal Risk Management Mapping, Modelling and Data 07919 544 551 Hayley.bowman@environment-agency.gov.uk DataInfo@environment-agency.gov.uk EA covers England only. Wales covered

More information

Clyde south - Port Glasgow to Inchinnan (Potentially Vulnerable Area 11/09) Local Plan District Clyde and Loch Lomond Local authority Inverclyde Counc

Clyde south - Port Glasgow to Inchinnan (Potentially Vulnerable Area 11/09) Local Plan District Clyde and Loch Lomond Local authority Inverclyde Counc Clyde south - Port Glasgow to Inchinnan (Potentially Vulnerable Area 11/09) Local Plan District Clyde and Loch Lomond Local authority Inverclyde Council, Renfrewshire Council Main catchment Firth of Clyde

More information

STRATEGIC FLOOD RISK ASSESSMENT

STRATEGIC FLOOD RISK ASSESSMENT STRATEGIC FLOOD RISK ASSESSMENT FOR PROPOSED VARIATION NO. 1 (CORE STRATEGY) TO THE LONGFORD TOWN DEVELOPMENT PLAN 2009-2015 for: Longford Local Authorities Great Water Street, Longford, Co. Longford by:

More information

Guildford Borough Level 1 Strategic Flood Risk Assessment Summary Report. January 2016

Guildford Borough Level 1 Strategic Flood Risk Assessment Summary Report. January 2016 Guildford Borough Level 1 Strategic Flood Risk Assessment Summary Report January 2016 What is this document? This document provides a summary of Guildford Borough Strategic Flood Risk Assessment (SFRA,

More information

Turriff (Potentially Vulnerable Area 06/07) Local Plan District Local authority Main catchment North East Aberdeenshire Council River Deveron Backgrou

Turriff (Potentially Vulnerable Area 06/07) Local Plan District Local authority Main catchment North East Aberdeenshire Council River Deveron Backgrou Turriff (Potentially Vulnerable Area 06/07) Local Plan District North East Local authority Aberdeenshire Council Main catchment River Deveron Summary of flooding impacts At risk of flooding

More information

Nairn Central (Potentially Vulnerable Area 01/18) Local authority Main catchment The Highland Council Moray coastal Background This Potentially Vulner

Nairn Central (Potentially Vulnerable Area 01/18) Local authority Main catchment The Highland Council Moray coastal Background This Potentially Vulner Nairn Central (Potentially Vulnerable Area 01/18) Local authority The Highland Council Main catchment Moray coastal Summary of flooding impacts At risk of flooding 350 residential 30 non-residential 340,000

More information

Lowestoft. Summary 2016 FLOOD RISK MANAGEMENT. Mike Page

Lowestoft. Summary 2016 FLOOD RISK MANAGEMENT. Mike Page Mike Page Lowestoft FLOOD RISK MANAGEMENT Strategy Summary 2016 Introduction This Strategy Summary Document is a brief overview of the Strategy for managing the risk of flooding to Lowestoft from the sea,

More information

Isle of Arran (Potentially Vulnerable Area 12/08) Local Plan District Local authority Main catchment Brodick to Kilmory Ayrshire North Ayrshire Counci

Isle of Arran (Potentially Vulnerable Area 12/08) Local Plan District Local authority Main catchment Brodick to Kilmory Ayrshire North Ayrshire Counci Isle of Arran (Potentially Vulnerable Area 12/08) Local Plan District Ayrshire Local authority North Ayrshire Council Main catchment Brodick to Kilmory Arran coastal Summary of flooding impacts At risk

More information

CHAPTER 10 FLOOD RISK

CHAPTER 10 FLOOD RISK CHAPTER 10 FLOOD RISK 10.1 Introduction and Key Issues 10.1.1 This chapter describes the likely effects that the construction and operation of the Upgrade will have on flood risk. The potential effects

More information

Alyth (Potentially Vulnerable Area 08/04) Local Plan District Local authority Main catchment Tay Perth and Kinross Council Alyth Burn (River Tay) Back

Alyth (Potentially Vulnerable Area 08/04) Local Plan District Local authority Main catchment Tay Perth and Kinross Council Alyth Burn (River Tay) Back Alyth (Potentially Vulnerable Area 08/04) Local Plan District Tay Local authority Perth and Kinross Council Main catchment Alyth Burn (River Tay) Summary of flooding impacts 50 residential properties 20

More information

THE RIVER STOUR (KENT) INTERNAL DRAINAGE BOARD. Policy Statement on Water Level and Flood Risk Management

THE RIVER STOUR (KENT) INTERNAL DRAINAGE BOARD. Policy Statement on Water Level and Flood Risk Management THE RIVER STOUR (KENT) INTERNAL DRAINAGE BOARD Policy Statement on Water Level and Flood Risk Management 1. Introduction Purpose 1.1. This policy statement has been prepared by the River Stour (Kent) Internal

More information

Role of the Flood & Water Management Committee & LCC as Lead Local Flood Authority

Role of the Flood & Water Management Committee & LCC as Lead Local Flood Authority Role of the Flood & Water Management Committee & LCC as Lead Local Flood Authority Page 1 Agenda Item 5 Page 2 21F of Local Government Act 2000 - Overview and scrutiny committees: flood risk management

More information

Arbroath (Potentially Vulnerable Area 07/07) Local Plan District Local authority Main catchment Tay Estuary and Montrose Basin Angus Council Brothock

Arbroath (Potentially Vulnerable Area 07/07) Local Plan District Local authority Main catchment Tay Estuary and Montrose Basin Angus Council Brothock Arbroath (Potentially Vulnerable Area 07/07) Local Plan District Tay Estuary and Montrose Basin Local authority Angus Council Main catchment Brothock Water Summary of flooding impacts 250 residential properties

More information

LOCAL FLOOD RISK STRATEGY EMYR WILLIAMS PEMBROKESHIRE COUNTY COUNCIL

LOCAL FLOOD RISK STRATEGY EMYR WILLIAMS PEMBROKESHIRE COUNTY COUNCIL LOCAL FLOOD RISK STRATEGY EMYR WILLIAMS PEMBROKESHIRE COUNTY COUNCIL Flood Risk Management We can only manage flood risk. It is not possible to prevent all flooding even if we had the money. There will

More information

Ellon (Potentially Vulnerable Area 06/12) Local Plan District North East Local authority Aberdeenshire Council Main catchment River Ythan, Buchan coas

Ellon (Potentially Vulnerable Area 06/12) Local Plan District North East Local authority Aberdeenshire Council Main catchment River Ythan, Buchan coas Ellon (Potentially Vulnerable Area 06/12) Local Plan District North East Local authority Aberdeenshire Council Main catchment River Ythan, Buchan coastal Summary of flooding impacts 110 residential 40

More information

Creetown (Potentially Vulnerable Area 14/17) Local Plan District Local authority Main catchment Dumfries and Galloway Solway Moneypool Burn Council Ba

Creetown (Potentially Vulnerable Area 14/17) Local Plan District Local authority Main catchment Dumfries and Galloway Solway Moneypool Burn Council Ba Creetown (Potentially Vulnerable Area 14/17) Local Plan District Solway Local authority Dumfries and Galloway Council Main catchment Moneypool Burn Summary of flooding impacts 90 residential properties

More information

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment Strategic Flood Risk Assessment Ireland West Airport Knock Local Area Plan 2012 2018 Prepared by Forward Planning Section Mayo County Council 0 1 Table of Contents Section 1: Overview of the Guidelines...

More information

eastsussex.gov.uk East Sussex Local Flood Risk Management Strategy

eastsussex.gov.uk East Sussex Local Flood Risk Management Strategy eastsussex.gov.uk East Sussex Local Flood Risk Management Strategy 2013 2016 Foreword I am sure that you will agree that flooding has been at the forefront of all our minds over the past year. The country

More information

Inverurie and Kintore (Potentially Vulnerable Area 06/13) Local Plan District Local authority Main catchment North East Aberdeenshire Council River Do

Inverurie and Kintore (Potentially Vulnerable Area 06/13) Local Plan District Local authority Main catchment North East Aberdeenshire Council River Do Inverurie and Kintore (Potentially Vulnerable Area 06/13) Local Plan District North East Local authority Aberdeenshire Council Main catchment River Don Summary of flooding impacts 230 residential properties

More information

Local Flood Risk Management Strategy Bedford Borough Council

Local Flood Risk Management Strategy Bedford Borough Council In fulfilment of the Flood & Water Management Act 2010 NOVEMBER 2015 Local Authority Officer Melanie Crump Senior Flood Risk Officer John Molyneux Head of Regulatory Services Department Regulatory Services,

More information

LINCOLNSHIRE COUNTY COUNCIL A DRAINAGE AUTHORITY and what it will mean for Lincolnshire MARK WELSH & DAVID HICKMAN THE LEGISLATION:

LINCOLNSHIRE COUNTY COUNCIL A DRAINAGE AUTHORITY and what it will mean for Lincolnshire MARK WELSH & DAVID HICKMAN THE LEGISLATION: LINCOLNSHIRE COUNTY COUNCIL A DRAINAGE AUTHORITY and what it will mean for MARK WELSH & DAVID HICKMAN ADA Local Authority Seminar Thursday 17 March 2010 Great Northern Hotel, Peterborough THE LEGISLATION:

More information

Clyde catchment - Motherwell to Lesmahagow (Potentially Vulnerable Area 11/17/2) Local Plan District Clyde and Loch Lomond Local authority North Lanar

Clyde catchment - Motherwell to Lesmahagow (Potentially Vulnerable Area 11/17/2) Local Plan District Clyde and Loch Lomond Local authority North Lanar Clyde catchment - Motherwell to Lesmahagow (Potentially Vulnerable Area 11/17/2) Local Plan District Clyde and Loch Lomond Local authority North Lanarkshire Council, South Lanarkshire Council Main catchment

More information

Wigan Local Flood Risk Management Strategy

Wigan Local Flood Risk Management Strategy Wigan Local Flood Risk Management Strategy Revision Schedule Wigan Council Wigan Flood Risk Management Strategy Revisions Rev Date Details ails Prepared Reviewed Approved 1 24/04/14 2 05/06/14 3 11/06/14

More information

LOW. Overall Flood risk. Flood considerations. Specimen Address, Specimen Town. Rivers and the Sea Low page 4. Historic Flood.

LOW. Overall Flood risk. Flood considerations. Specimen Address, Specimen Town. Rivers and the Sea Low page 4. Historic Flood. Specimen Address, Specimen Town Overall Flood risk LOW Crown copyright and database rights 2018. Ordnance Survey licence 100035207 Groundsure Floodview complies with relevant Law Society practice notes

More information

London Borough of Sutton Local Flood Risk Management Strategy Action Draft for Consultation

London Borough of Sutton Local Flood Risk Management Strategy Action Draft for Consultation London Borough of Sutton Local Flood Risk Strategy Action Draft for Consultation This Action Plan supports the London Borough of Sutton Local Flood Risk Strategy (v1.0) July 2014. The reader should refer

More information

Bolton s Flood Risk Management Strategy

Bolton s Flood Risk Management Strategy Bolton s Flood Risk Management Strategy www.bolton.gov.uk Ringley Old Bridge over the River Irwell; built 1677. It replaced a previous bridge lost in a flood in 1673. Revision History Revision Ref Amendments

More information

FOR TO THE GAELTACHT LOCAL AREA PLAN MARCH 2013

FOR TO THE GAELTACHT LOCAL AREA PLAN MARCH 2013 APPENDIX II TO THE SEA ENVIRONMENTAL REPORT STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT FOR PROPOSED AMENDMENT TO THE GAELTACHT LOCAL AREA PLAN 2008-2014 for: Galway County Council County Buildings Prospect

More information

Chelmsford City Council. Level 1 and Level 2 Strategic Flood Risk Assessment. Final Report

Chelmsford City Council. Level 1 and Level 2 Strategic Flood Risk Assessment. Final Report Chelmsford City Council Level 1 and Level 2 Strategic Flood Risk Assessment Final Report October 2017 This page has been left intentionally blank 2015s3715 Chelmsford SFRA L1 and L2 Final Report v1.0.docx

More information

Oban (Potentially Vulnerable Area 01/31) Local authority Main catchment Argyll and Bute Council Knapdale coastal Background This Potentially Vulnerabl

Oban (Potentially Vulnerable Area 01/31) Local authority Main catchment Argyll and Bute Council Knapdale coastal Background This Potentially Vulnerabl Oban (Potentially Vulnerable Area 01/31) Local authority Argyll and Bute Council Main catchment Knapdale coastal Summary of flooding impacts 320 residential properties 310 non-residential properties 1.8

More information

CYNGOR SIR POWYS COUNTY COUNCIL. CABINET EXECUTIVE 18 th September Flood Risk Management Plan (FRMP)

CYNGOR SIR POWYS COUNTY COUNCIL. CABINET EXECUTIVE 18 th September Flood Risk Management Plan (FRMP) CYNGOR SIR POWYS COUNTY COUNCIL. CABINET EXECUTIVE 18 th September 2018 REPORT AUTHOR: SUBJECT: County Councillor Phyl Davies Portfolio Holder for Highways, Recycling and Assets Flood Risk Management Plan

More information

Elgin (Potentially Vulnerable Area 05/05) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Moray Council River

Elgin (Potentially Vulnerable Area 05/05) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Moray Council River Elgin (Potentially Vulnerable Area 05/05) Findhorn, Nairn and Speyside Local authority The Moray Council Main catchment River Lossie Summary of flooding impacts Summary of flooding impacts At risk of flooding

More information

Flood Risk Management in England

Flood Risk Management in England REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1521 SESSION 2010 2012 28 OCTOBER 2011 Department for Environment, Food and Rural Affairs and Environment Agency Flood Risk Management in England Flood

More information

Flood Risk Assessment for Planning

Flood Risk Assessment for Planning Flood Risk Assessment for Planning Report on: Sample Property, Sample Town, Sample Postcode Report prepared for: Report Reference: Report Date: Sample AEL-XXXX-FRA-XXXX 28 th October 2016 Client Reference:

More information

River Lugg Internal Drainage Board. Policy Statement on Flood Protection and Water Level Management

River Lugg Internal Drainage Board. Policy Statement on Flood Protection and Water Level Management River Lugg Internal Drainage Board Policy Statement on Flood Protection and Water Level Management 1 INTRODUCTION Purpose 1.1 This policy statement has been prepared by the River Lugg Internal Drainage

More information

Glossary. Annual Average Damages (AAD) Benefit cost ratio (BCR)

Glossary. Annual Average Damages (AAD) Benefit cost ratio (BCR) Glossary Term Accretion Actions Annual Average Damages (AAD) Appraisal Appraisal baseline Awareness raising Bathing waters Benefit cost ratio (BCR) Blue infrastructure Accumulation of sediment. Activities

More information

Flood Risk Management New legislation New Duties!

Flood Risk Management New legislation New Duties! Flood Risk Management New legislation New Duties! Andy Cameron Lancashire County Council Senior Engineer Strategic Flood Risk Iwan Lawton Environment Agency Technical Specialist Development & Flood Risk

More information

Document Control Sheet

Document Control Sheet Strategic Flood Risk Assessment of the Maynooth Local Area Plan 2013-2019 Proposed Amendment No. 1 Document Control Sheet Client: Project Title: Document Title: Document No: Kildare County Council Strategic

More information

Bradford District. Local Flood Risk Management Strategy

Bradford District. Local Flood Risk Management Strategy Bradford District Local Flood Risk Management Strategy 1 Executive Summary Adverse weather is a national concern and the risk of flooding in England is predicted to increase as a result of climate change

More information

Newcastle City Council. Flood Risk Management Plan

Newcastle City Council. Flood Risk Management Plan Newcastle City Council Flood Risk Management Plan Foreword Flooding is one of the impacts of climate change and in recent times it has had a significant effect on the quality of life of our residents and

More information

Derwent Catchment Flood Management Plan. Summary Report December managing flood risk

Derwent Catchment Flood Management Plan. Summary Report December managing flood risk Derwent Catchment Flood Management Plan Summary Report December 2010 managing flood risk We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and

More information

Background to the PFRA European Overview - UC9810.5b

Background to the PFRA European Overview - UC9810.5b Background to the PFRA European Overview - UC9810.5b The individual Member State Reports reflect the situation as reported by the Member States to the European Commission in 2012 The situation in the MSs

More information

Strategic Environmental Assessment

Strategic Environmental Assessment Strategic Environmental Assessment Cambridgeshire Local Strategy for Flood Risk Management 2012-2015 Non-Technical Summary - Hyder Consulting (UK) Limited 2212959 Manning House 22 Carlisle Place London

More information

FLOOD SOLUTIONS Residence

FLOOD SOLUTIONS Residence FLOOD SOLUTIONS Residence Report prepared on 22 Knighton Road, Liverpool, L4 9RD Report reference AEL028FLR022381 National grid reference 337815, 394462 Report prepared for Specimen Client Client reference

More information

Lowestoft Flood Risk Management Project

Lowestoft Flood Risk Management Project Volume 1, Issue 1 Winter 2017 Lowestoft Flood Risk Management Project I N S I D E T H I S I S S U E : Welcome 1 Background to the project 2 What are we considering 2 and how has the project progressed?

More information

Report to Cabinet. 24 February Local Strategy for Flood Risk Management in the Black Country (Key Decision Ref. No. HE040)

Report to Cabinet. 24 February Local Strategy for Flood Risk Management in the Black Country (Key Decision Ref. No. HE040) Agenda Item 8 Report to Cabinet 24 February 2016 Subject: Presenting Cabinet Member: Local Strategy for Flood Risk Management in the Black Country (Key Decision Ref. No. HE040) Highways and Environment

More information

What can be done to minimise future economic and social harm caused by flooding and improve resilience. Flood Warning and Informing

What can be done to minimise future economic and social harm caused by flooding and improve resilience. Flood Warning and Informing What can be done to minimise future economic and social harm caused by flooding and improve resilience Flood Warning and Informing Marc Becker SEPA Flood Risk Manager (Hydrology) 16 th September 2016 The

More information

Climate risk management plan. Towards a resilient business

Climate risk management plan. Towards a resilient business Type your organisation name here Climate risk management plan Towards a resilient business 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 Click the numbers to select your cover images 1 2 3 4 5 Document control sheet Document

More information

A GUIDE TO BEST PRACTICE IN FLOOD RISK MANAGEMENT IN AUSTRALIA

A GUIDE TO BEST PRACTICE IN FLOOD RISK MANAGEMENT IN AUSTRALIA A GUIDE TO BEST PRACTICE IN FLOOD RISK MANAGEMENT IN AUSTRALIA McLuckie D. For the National Flood Risk Advisory Group duncan.mcluckie@environment.nsw.gov.au Introduction Flooding is a natural phenomenon

More information

BLESSINGTON LOCAL AREA PLAN FLOOD RISK ASSESSMENT

BLESSINGTON LOCAL AREA PLAN FLOOD RISK ASSESSMENT BLESSINGTON LOCAL AREA PLAN 2013-2019 FLOOD RISK ASSESSMENT Table of Contents Page Number 1.0 INTRODUCTION 1 1.1 Definition of Flooding 2 1.2 Policy Framework 2 1.3 Flood Risk Identification 3 1.4 Mapping

More information

Managing flood risk in Camden The Camden flood risk management strategy Public consultation draft

Managing flood risk in Camden The Camden flood risk management strategy Public consultation draft Managing flood risk in Camden The Camden flood risk management strategy Public consultation draft Contents 1. Foreword 3 2. Executive summary 4 3. Glossary 6 4. Introduction 8 4.1 Strategy objectives 8

More information

Barnsley MBC. Barnsley. Local Flood Risk Management Strategy. (Appendices) Date September Barnsley MBC - Local Flood Risk Management Strategy

Barnsley MBC. Barnsley. Local Flood Risk Management Strategy. (Appendices) Date September Barnsley MBC - Local Flood Risk Management Strategy Barnsley (Appendices) Date September 2017 Version FINAL DRAFT - Revision Schedule Revision Date Prepared Details Prepared by Date Issued 01 September 2017 Draft Report (for Internal Distribution) Wayne

More information

Hillfoots Villages (Potentially Vulnerable Area 09/04) Local Plan District Forth Local authority Clackmannanshire Council, Stirling Council Main catch

Hillfoots Villages (Potentially Vulnerable Area 09/04) Local Plan District Forth Local authority Clackmannanshire Council, Stirling Council Main catch Hillfoots Villages (Potentially Vulnerable Area 09/04) Local Plan District Forth Local authority Clackmannanshire Council, Stirling Council Main catchment River Devon Summary of flooding impacts Summary

More information

Dornoch (Potentially Vulnerable Area 01/07) Local Plan District Highland and Argyll Local authority The Highland Council Main catchment Dornoch coasta

Dornoch (Potentially Vulnerable Area 01/07) Local Plan District Highland and Argyll Local authority The Highland Council Main catchment Dornoch coasta Dornoch (Potentially Vulnerable Area 01/07) Local authority The Highland Council Main catchment Dornoch coastal Summary of flooding impacts

More information

Luncarty, Stanley, Bankfoot, Dunkeld and Birnam (Potentially Vulnerable Area 08/08) Local Plan District Local authority Main catchment Tay Perth and K

Luncarty, Stanley, Bankfoot, Dunkeld and Birnam (Potentially Vulnerable Area 08/08) Local Plan District Local authority Main catchment Tay Perth and K Luncarty, Stanley, Bankfoot, Dunkeld and Birnam (Potentially Vulnerable Area 08/08) Local Plan District Tay Local authority Perth and Kinross Council Main catchment River Tay Summary of flooding impacts

More information

Barry Island and Docks (2)

Barry Island and Docks (2) Barry Island and Docks (2) Draft Recommendations: Long Term Plan It has been assumed that the structures associated with Barry Docks will be maintained and upgraded in the long term, but this is subject

More information

Volusia County Floodplain Management Plan 2012

Volusia County Floodplain Management Plan 2012 Volusia County Floodplain Management Plan 2012 Introduction The National Flood Insurance Program (NFIP) provides federally supported flood insurance in communities that regulate development in floodplains.

More information

STATUTORY INSTRUMENTS. S.I. No. 122 of EUROPEAN COMMUNITIES (ASSESSMENT AND MANAGEMENT OF FLOOD RISKS) REGULATIONS 2010.

STATUTORY INSTRUMENTS. S.I. No. 122 of EUROPEAN COMMUNITIES (ASSESSMENT AND MANAGEMENT OF FLOOD RISKS) REGULATIONS 2010. STATUTORY INSTRUMENTS. S.I. No. 122 of 2010. EUROPEAN COMMUNITIES (ASSESSMENT AND MANAGEMENT OF FLOOD RISKS) REGULATIONS 2010. (Prn. A10/0432) 2 [122] S.I. No. 122 of 2010. EUROPEAN COMMUNITIES (ASSESSMENT

More information

Flood Response - Tenants Guide

Flood Response - Tenants Guide Flood Response - Tenants Guide Forethought Climate change, combined with other factors such as urbanisation, is increasing the likelihood and severity of flooding events in the UK. By the 2050s, an extra

More information

Development and Flood Risk - the Environment Agency s approach to PPS25. scrutinised before planning decisions are made

Development and Flood Risk - the Environment Agency s approach to PPS25. scrutinised before planning decisions are made Development and Flood Risk - the Environment Agency s approach to PPS25 Steve Cook Flood Risk Policy Advisor Stephen.cook@environment-agency.gov.uk Our role in PPS25 h Providing advice and information

More information

Comhairle Baile Cheanntair~ Nás na Ríogh

Comhairle Baile Cheanntair~ Nás na Ríogh Comhairle Baile Cheanntair~ Nás na Ríogh DRAFT STRATEGIC FLOOD RISK ASSESSMENT NAAS TOWN DEVELOPMENT PLAN 2011 ~ 2017 Kildare County Council Water Services Department Aras Chill Dara Devoy Park Naas County

More information

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial

More information

Flood Risk Assessment Cobh Town Plan Cobh Town Development Plan Volume 2: Strategic Flood Risk Assessment

Flood Risk Assessment Cobh Town Plan Cobh Town Development Plan Volume 2: Strategic Flood Risk Assessment Flood Risk Assessment Cobh Town Plan 2013 Cobh Town Development Plan 2013 Volume 2: Strategic Flood Risk Assessment Cobh Town Plan 2013 Flood Risk Assessment Document Verification Page 1 of 1 Job Title:

More information

Flood Risk Management: Modelling blockage and breach scenarios February 2015

Flood Risk Management: Modelling blockage and breach scenarios February 2015 Flood Risk Management: Modelling blockage and breach scenarios February 2015 OGN100 Document Owner: Mark Pugh Page 1 of 6 Version History: Document Date Summary of Changes Version Published 1.0 DEC-2014

More information

Contents Amendment Record

Contents Amendment Record Contents Amendment Record This report has been issued and amended as follows: Issue Revision Description Date Approved by 1 1 0 1 Draft for CSG review Consultation Draft 30 April 2010 30 July 2010 M Phillips

More information

Isle of Wight Local Flood Risk Management Strategy

Isle of Wight Local Flood Risk Management Strategy Isle of Wight Local Flood Risk Management Strategy Final Report July 2016 Isle of Wight Council Isle of Wight Council, Seaclose Offices, Fairlee Road, Newport, Isle of Wight, PO30 2QS Tel. 01983 821000.

More information

Resilience to Flooding of Grid and Primary Substations

Resilience to Flooding of Grid and Primary Substations PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Technical Report 138 Resilience to Flooding of Grid and Primary Substations www.energynetworks.org PUBLISHING AND COPYRIGHT

More information

Flood Risk Management (Scotland) Act 2009: DRAFT Local Flood Risk Management Plan Ayrshire Local Plan District

Flood Risk Management (Scotland) Act 2009: DRAFT Local Flood Risk Management Plan Ayrshire Local Plan District Appendix 1 Flood Risk Management (Scotland) Act 2009: DRAFT Local Flood Risk Management Plan Ayrshire Local Plan District Published by: North Ayrshire Council No 12 Local FRM Plan March 2016 Delivering

More information

Castle Douglas (Potentially Vulnerable Area 14/11) Local Plan District Local authority Main catchment Dumfries and Galloway Solway River Dee (Solway)

Castle Douglas (Potentially Vulnerable Area 14/11) Local Plan District Local authority Main catchment Dumfries and Galloway Solway River Dee (Solway) Castle Douglas (Potentially Vulnerable Area 14/11) Local Plan District Solway Local authority Dumfries and Galloway Council Main catchment River Dee (Solway) Summary of flooding impacts 180 residential

More information

Forres (Potentially Vulnerable Area 05/06) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Moray Council Moray

Forres (Potentially Vulnerable Area 05/06) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Moray Council Moray Forres (Potentially Vulnerable Area 05/06) Findhorn, Nairn and Speyside Local authority The Moray Council Main catchment Moray coastal Summary of flooding impacts Summary of flooding impacts At risk of

More information

2018 Long Term Plan Financial forecasting assumptions

2018 Long Term Plan Financial forecasting assumptions 2018 Long Term Plan Financial forecasting assumptions Forecasting assumption Risk Likelihood of occurrence Projected price change factors Forecast financial information That actual price changes vary Medium

More information

Devon Local Flood Risk Management Strategy Update

Devon Local Flood Risk Management Strategy Update Devon Local Flood Risk Management Strategy Update April 2017 Newsletter Devon s Local Flood Risk Management Strategy was published in June 2014 and is supported by an annual Action Plan which prioritises

More information

Porthcawl to Sker Point (7)

Porthcawl to Sker Point (7) Porthcawl to Sker Point (7) Draft Recommendations: Long Term Plan The long term plan for the developed frontage of Porthcawl (which extends between the northern boundary of Merthyr-mawr Warren and the

More information