HSE Minimum Requirements for Partner Companies / Contractors. Issued: 01 July 2018

Size: px
Start display at page:

Download "HSE Minimum Requirements for Partner Companies / Contractors. Issued: 01 July 2018"

Transcription

1 HSE Minimum Requirements for Partner Companies / Contractors Issued: 01 July 2018

2 Content 1. HSE Fundamentals - Minimum Requirements Principles Scope Mandatory implementation Reducing Risk Potential, Coordination, Work Scheduling with Safety Measures Suspension of Work During Acutely Hazardous Situations Provisions of the HSE Minimum Requirements Requirements Affecting Contractor Employees Workplace Safety Requirements Affecting the Contractor Commissioning of Sub-Contractors Temporary Employees Accident and Damage Reporting Involvement in Environmental and Energy Management Instruction/Training Access Regulations Accommodations/Common Areas Safety, Orderliness and Cleanliness Withdrawal / Expulsion of Personnel from the Production or Construction Site Prohibition of intoxicating substances, Smoking Rules Organization of First Aid Contact at Production Facilities and on Construction Sites Materials and Equipment Tools and Accessories Radio Communications, Mobile Phones Personal Protective Equipment (PPE) Work Permitting and Approval Process Special Provisions of the HSE Minimum Requirements Work involving a Falling Hazard Crane Operation, Hoisting and Pulling Tasks Use of Mobile Elevated Work Platforms Scaffolding Work Electro-technical Work Hot Work, Fire and Explosion Protection Working in Containers / Confined Spaces Work with Angle Sanders Working with Hazardous Substances Asbestos Dealing with Dust or Dust-Like Substances Dealing with Substances Hazardous to Water Radiation and Hazards Associated with Non-Destructive Testing Transports Delivery Traffic Driving in Reverse Requirements for Transports with Tipping Trailers / Dump Trucks Use of Materials Handling Vehicles Exclusion from Liability... 15

3 1. HSE Fundamentals - Minimum Requirements 1.1 Principles The contracting entity s corporate principles on workplace and environmental protection place the highest priority on protecting the life and health of employees and are aimed at preventing physical and psychological injury to persons while at work. These principles seek to continuously improve job safety and health protection as well as environmental protection. The contractor will observe these principles when performing work. This relates to the safety of all employees of the contracting entity as well as employees of the contractor, including its sub-contractor chain located at the production facilities and construction sites of the contracting entity. Work performed at the customer (such as metre reading, consultations) is to be considered the same as activities performed at construction sites. In addition, environmental protection and the economical use of resources are also considered core objectives. When performing work, negative impacts on the environment and environs should be limited to the absolute minimum necessary. Each instance of non-compliance with the provisions of HSE minimum requirements will be penalized and can result in expulsion from the contracting entity s production and construction sites. These and the following rules are binding for all personnel that the contractor employs or contracts with in fulfilling its obligations to supply goods and render services, i.e., including for employees of its sub-contractors as well as their sub-contractor chain. These HSE minimum requirements do not release the contractor from its obligation to comply with the applicable statutory requirements and to ensure their implementation. 1.2 Scope The HSE minimum requirements apply to all work as well as transport services at the contracting entity s production facilities and on the contracting entity s construction sites. Supplementary to the provisions of the HSE minimum requirements, the requirements of the Construction Site Ordinance shall apply to construction sites, subject to the scope of work to be performed and the number of personnel involved. In addition, supplementary to these HSE minimum requirements, additional project/site-specific HSE requirements may also be applied upon awarding of a contract. 1.3 Mandatory implementation Compliance with the provisions stipulated in these HSE minimum requirements shall be monitored by both the contracting entity and the contractor. When performing work, the contractor agrees to comply with all statutory requirements, in particular workplace safety and health regulations. The contractor shall ensure compliance with accident prevention regulations and any rules made known to him by the contracting entity. Likewise, when utilizing equipment it shall be ensured that the proper type of equipment is used and that statutory regulations and technical rules are observed.

4 Instructions of the contracting entity shall be obeyed. Each contractor shall ensure that when work is being performed at least one German-speaking supervisor is present for each trade and shift. This person shall be identified by name to the contracting entity prior to commencing work. The contracting entity retains the right to issue specific instructions and notifications within the course of organizing larger projects as work progresses which the contractor shall ensure are announced to and observed by its employees. The same applies to the use of safety and technical forms customary for the contracting entity s production facilities and construction sites. Prior to commencing work, each contractor shall instruct his employees in the provisions of these HSE minimum requirements and applicable instructions material to his delivery of goods and services and is responsible for implementation and compliance with the same. This instruction and awareness of the relevant content shall be documented in writing by the contractor s employees. Proof of instruction shall be provided to the contracting entity s point-of-contact prior to commencing work. The instruction must be provided in a manner that is understandable to the employee and shall be conducted on a regular basis (how often instruction must be repeated will be specified on the basis of the contractor s risk assessment). Prior to commencing work, the contractor shall verify the receipt and acceptance without reservation of these HSE minimum regulations by signing the contract and shall submit all supporting documents requested by these HSE minimum requirements. In addition, the contractor agrees to comply with all workplace safety and accident prevention regulations as well as to assume responsibility for safety, orderliness, cleanliness and environmental protection in its work area. If the contractor declines to accept these HSE minimum requirements without reservation, the contracting entity retains the right to refuse to permit the contractor to commence work. Any costs incurred therefrom, e.g. standby periods / work stoppage / leasing costs for tools, cranes, etc., shall be borne by the contractor. 1.4 Reducing Risk Potential, Coordination, Work Scheduling with Safety Measures Risk Assessment Pursuant to the Workplace Safety Act (ArbSchG) as well as associated regulations, risk assessments shall be prepared for all work assignments (e.g. construction, assembly, operation, repair and demolition) and upon request submitted to the contracting entity. Following evaluation of the risks identified, a work schedule for each trade shall be defined and implemented with safety goals for the systematic reduction of potential hazards. The goal is to avoid accidents and near accidents as well as to prevent negative impacts on the environment and environs. Coordination The requirements of the German Statutory Accident Insurance Association (DGUV), Rule 1 (DGUV V1) and the Workplace Safety Act (ArbSchG) relating to coordination shall be clarified in coordination between the contracting entity and the contractor before commencing to work and, if needed, set down in writing. The designation and appointment of coordinators (one or more) for certain jobs must be in writing.

5 In selecting these persons, particular attention should be given to their professional and personal suitability as well as any knowledge of the production facility, construction site or local area that may be required. In exercising this coordination function, the respective freedom to issue instructions and coordination authority shall be guaranteed by the contractor. The work schedule with safety measures that is to be prepared by the contractor prior to commencing work shall meet the basic requirements of DGUV V1. The contractor shall enclose all relevant documents needed to evaluate the work schedule with safety measures. 1.5 Suspension of Work During Acutely Hazardous Situations Should an acutely hazardous situation arise while work is being performed, work shall be immediately suspended and the hazard promptly eliminated. Work may not recommence until all unsafe conditions have been eliminated. All costs arising from the suspension of work due to hazardous situations which the contractor is responsible for shall be borne by the contractor. 2. Provisions of the HSE Minimum Requirements 2.1 Requirements Affecting Contractor Employees Contractor employees must be professionally and personally suited for work at the production facilities and on the construction sites of the contracting entity. Responsibility for ensuring such suitability as well as for providing proof of such suitability resides with the contractor. The contractor agrees to ensure that communications with all parties involved is in the language appropriate to the project/construction site. Contractor personnel who are not yet 18 years of age may perform work only where such has been expressly agreed with the contracted entity and does not violate provisions of law. All training, directions and instructions relating to contractor duties and tasks shall be provided in a language intelligible to the employees and made available in written form. All management and supervisory personnel responsible for work to be performed within the scope of the contract as well as the contractor s security personnel shall be identified by name to the contracting entity. 2.2 Workplace Safety Requirements Affecting the Contractor Only those contractors will be retained that have been successfully pre-qualified by the contracting entity with respect to the work to be performed and the risks associated therewith. The contractor is encouraged to structure the occupational safety organisation in accordance with SCC or BS OHSAS 18001:2007 (prospectively ISO 45001).

6 The contracting entity may stipulate additional requirements relating to the project/construction site Commissioning of Sub-Contractors In awarding work to sub-contractors, the contractor shall comply with 8 ArbSchG [Workplace Safety Act] as well as 6(1) DGUV V1 Principles of Prevention". The HSE minimum requirements also apply completely to the whole sub-contractor chain. The contractor agrees to notify his subcontractors in writing of the standards set forth in these HSE minimum requirements and to monitor and implement them accordingly. The contractor must have the contracting entity approve subcontractors Temporary Employees A contractor that hires temporary staff on the basis of the Temporary Employee Act (AÜG) is fully responsible for workplace safety for these temporary employees for the term of their assignment. The contractor shall treat persons hired as temporary employees as if they were his own employees. Statutory/insurance-related reporting obligations are the responsibility of the contractor Accident and Damage Reporting All incidents (workplace accidents, near accidents, unsafe conditions and activities, property damage, environmental damage, etc.) shall be promptly reported to the contracting entity. Documentation shall be coordinated with the contracting entity s health and safety officer (SiFa). Certifications of First Aid treatments shall likewise be made available to the contracting entity. Property damage of any kind at the expense of the contracting entity that occurs in the contractor s work area or for which the contractor bears responsibility or which the contractor identifies shall be promptly reported. In accordance with the duty to minimise damage, immediate measures shall be coordinated with the contracting entity and faciliated. In order to avoid future personal injury and environmental damage, a careful analysis of occurred accidents and near accidents is required for the purpose of identifying potential improvements. The contractor therefore agrees to cooperate and assist the contracting entity with accident investigations or to provide the contracting entity with the findings of its own accident investigation. It should be emphasised that findings of accident investigations are not used to evaluate the contractor but instead serve solely to improve workplace health and safety as well as environmental protection Involvement in Environmental and Energy Management The contractor actively participates in avoiding negative environmental impacts and in increasing environmental performance and energy performance in accordance with the environmental and energy goals and policies announced by the contracting entity. The contractor shall endeavour to execute the assignment in a manner that makes efficient use of resources and energy. Avoidable energy consumption shall be prevented, e.g. by switching off unneeded consumers. Negative impacts on energy and resource use of the contracting entity shall be avoided.

7 The contractor shall report to the contracting entity observations of unanticipated environmental impacts or circumstances that result in energy loss, such as leaks or defects. Recommendations for improving energy efficiency or for avoiding environmental impacts shall be communicated in the same manner Instruction/Training Prior to commencing work, the contractor shall receive safety information relevant to the activity it is to perform. The training that the contractor is responsible for conducting shall also be monitored by the contractor for effectiveness. Monitoring effectiveness can be accomplished by the contractor on a random basis in the course of inspections and/or by posing questions Access Regulations Documents for identity control (identification by personal ID) as well as documentation required by social insurance law shall be kept on site by the contractor for all contractor employees so that it is available at all times. The contracting entity shall be allowed to inspect these records at any time. Unauthorised access to work areas and operation of switches and controls is forbidden. It shall in principle be refrained from driving vehicles on production facilities and construction sites of the contracting entity. Case-by-case exceptions under special circumstances (transportation of tools, measurement devices, materials, etc.) must be approved by the contracting entity Accommodations/Common Areas Daytime accommodations and other common areas must be made available and operated in accordance with workplace guidelines. The contractor shall provide accommodations for its employees. The contracting entity shall provide the required supply and disposal capacities, e.g. for locating daytime accommodations, washrooms, toilets and other facilities, provided needs are coordinated in a timely manner with the contractor. The contracting entity retains the right to set up the common areas itself. Food and drink may only be consumed in the break rooms/zones assigned for that purpose. It is forbidden to live or stay overnight at the contracting entity s production facilities or construction sites Safety, Orderliness and Cleanliness All contractors are required to keep their work sites, storage facilities, depots and accommodations in a clean and orderly condition. All contractors shall ensure that leftover materials, construction waste, rubbish, packaging, etc. is promptly removed from their areas, however no less than once daily. Work areas in buildings are to be kept in reasonably clean (broom-swept) condition and production facilities and construction sites of the contracting entity (which include storage areas, workspaces, access routes) are to be kept and turned over in clean condition. Non-compliance will result in cleaning being done at the expense of the party responsible. All contractors are responsible for seeing that no flammable materials are stored in their areas that could be ignited by hot work.

8 The use of cables, wires, hoses, etc. may not present an accident hazard or obstruct traffic. Escape and rescue routes and hydrants shall be kept clear. All tools and materials shall be put away and stored securely after use. All tools and equipment shall be turned off or otherwise rendered safe immediately at the end of the work day as well as during break periods. Unless otherwise agreed by contract, rules on waste logistics and disposal that apply to the specific production facility or construction site shall be applied Withdrawal / Expulsion of Personnel from the Production or Construction Site The contractor agrees to replace personnel at its own expense if the contracting entity requests it on serious grounds, which include for example: Lack of qualification and experience on the part of contractor employees Non-compliance with instructions given by the contracting entity Theft Alcohol and drug abuse Serious or repeated violation of HSE regulations. Through the withdrawal/expulsion of personnel, the contractor is not released from the obligation to perform the agreed services or to adhere to agreed deadlines Prohibition of intoxicating substances, Smoking Rules Contractor employees are prohibited from consuming alcoholic beverages, narcotics and medications that affect reaction and perception capacity. Employees who are under the influence of such substances shall be prohibited from entering production facilities and construction sites or expelled from production facilities and construction sites. A general ban on smoking shall be in effect in enclosed spaces. In coordination with the contracting entity, the contractor may use company defined smoking areas Organization of First Aid Contingent on the scope of work performed and existing risks, the contractor shall provide a sufficient number of First Aid providers and set up or maintain a sufficient number of First Aid facilities. In coordination with the contracting entity, the contractor may, if necessary, draw on the company s First Aid organisation (if available). Additional internal emergency response measures of the contractor shall be made known to the contracting entity prior to commencing work as part of the workflow plan (opportunity for joint coordination). 2.3 Contact at Production Facilities and on Construction Sites The contracting entity and contractor agree to provide prompt, full and coherent notification of work-related events. This applies in particular to hazardous situations or damage.

9 The following outlines the basic communication channels. These shall be deviated from only in the event of imminent danger or where necessary after prior consultation with the contracting entity. The contractor is obligated to identify all personnel he employs (at a minimum all those who hold key positions) by name in writing and to communicate this information to the contracting entity. The contracting entity and the contractor shall reach agreement as to the expediency of designating deputies. 2.4 Materials and Equipment Tools and Accessories Tools and accessories shall be provided by the contractor for specific tasks, unless otherwise agreed by contract. Only suitable, approved and periodically tested tools and accessories may be used. The loaning of tools and accessories as well as accessory components and consumables from the contracting entity s stocks to contractor employees is not provided for and must be handled on a case-by-case basis Radio Communications, Mobile Phones If radio communications are used, the number and type of devices as well as the frequency employed shall be reported to the contracting entity, and authorisation to use the devices shall be obtained by the contractor. The contractor shall comply with postal and telecommunications regulations. Wireless connections (for controlling machinery and lifting equipment) must be registered with the contracting entity. Before these connections can be employed at the production facilities and construction sites, proof of registration and problem-free operation (no interference with other devices and equipment) shall be provided to the contracting entity. The use of mobile phones is prohibited when performing certain types of work (e.g. transport and control operations, directing vehicles, etc.). It is prohibited to bring mobile phones or radio devices into areas subject to explosion hazards.

10 2.5 Personal Protective Equipment (PPE) The contractor shall provide his employees with sufficient protective equipment and clothing on the basis of the protective measures stipulated in the risk assessment. The contractor is required to instruct his employees in the proper use of the equipment. Persons who lack PPE that accords with the regulations applicable to the production facility or construction site (such as a safety helmet/safety shoes/safety goggles/etc.) may not access the contracting entity s production facilities and construction sites. If owing to the specific work situation additional protective gear is needed (e.g. eye or face protection, hearing protection, breathing protection, high-visibility clothing), the contractor shall see that it is provided and properly used. After being given one warning, persons who fail to comply will be expelled from the contracting entity s production facilities and construction sites. Helmets worn by contractor employees must be labelled with the company name and the name of the employee. The loaning or supplying of PPE to contractor personnel from the contracting entity s stocks is in principle not provided for and must be handled on a case-by-case basis. 2.6 Work Permitting and Approval Process The contractor is required to participate in the work permitting and approval process for production facilities and construction sites. Work may not commence without a work permit (WP). Changes to status or clearances shall be undertaken exclusively by the responsible specialist with the contracting entity or by a person authorised by the responsible specialist for this purpose. A written work permit involving special safety measures (hot work permit, driving permit, scaffolding, etc.) is generally required to perform hazardous work. The responsible party with the contracting party shall be notified of commencement, suspension and termination of work. 3. Special Provisions of the HSE Minimum Requirements Prior to performing work of evident higher risk, immediately before commencing work the contractor employee responsible for the work shall conduct and document a risk assessment. The contractor shall undertake and adhere to the safety measures identified thereby. Special safety measures that require the cooperation of the contracting entity to be implemented shall be identified by the contractor. The contractor shall notify the contracting entity in writing before commencing the activity which high-risk tasks are to be taken into account in executing the activity. 3.1 Work involving a Falling Hazard Prior to commencing work, appropriate safety measures shall be taken by the contractor based on the risk assessment so that work at height can be performed safely. In adverse weather conditions - such as thunderstorms, strong winds, frost or ice hazard - work at height may not be performed.

11 Work involving a falling hazard / Work at height: Persons working at the following heights must be secured against falling: From 0.00 m above water or other materials in which one can sink 1.00 m or higher Workplaces and routes in which the distance to edge is more than 2.0 m lie outside the hazard zone for falls. 3.2 Crane Operation, Hoisting and Pulling Tasks The regulations of the employer s liability insurance association, including implementing instructions, apply to crane operation, hoisting and pulling tasks. The following provides examples of some of the basic issues involved: Persons are not permitted to stand under suspended loads. Load-handling equipment may not be used for transporting persons It is not permissible to ride on loads being hoisted by crane. It is not permissible to use lifting tackle or load-bearing equipment that does not have a load-capacity notice and visible and valid inspection sticker. Persons in hoistable personnel lifting devices must be secured against falling by using PPE. Before using a mobile crane, the contractor must present the inspection certificate for the crane as well as proof of qualification to perform crane and backstop work (Anschlagarbeiten). Verification of structural safety for the installation site / planned load shall be verified / provided by the contractor. A permit is required to perform work with a mobile crane. For work performed in proximity to high-voltage lines, crane hoisting and rotating movements are to be set so as not to exceed safety clearances. If necessary, the contractor shall install a rotation governor. In addition, the contractor shall earth each crane using an earthing device he provides. The appropriate conductor cross-section as well as permissible earthing points shall be coordinated with the contracting entity s relevant specialist on site. The aforementioned regulations apply mutatis mutandis for hoisting and pulling tasks. 3.3 Use of Mobile Elevated Work Platforms Persons in mobile elevated work platforms shall, where technically provided for, secure themselves against falling by using PPE. Mobile elevated work platforms may only be operated by trained persons specifically commissioned to perform this work. 3.4 Scaffolding Work The contracting entity s standard form shall be used for scaffolding approval and acceptance. Any time scaffolding is not available for use -- in particular while being assembled, disassembled or modified - the scaffolding shall be labelled at all access points and stairs with No Entrance signs

12 and appropriately demarcated with barriers that prevent access to the hazard zone. When assembling and disassembling scaffolding, erectors must wear and make proper use of PPE that protects against falls. Approved industrial safety helmets with chin straps must also be worn. 3.5 Electro-technical Work Equipment and supplies brought in by the contractor must be safe and tested and comply with applicable statutory requirements. A permit is required prior to commencing work in order to perform work on electrical systems. A separate written approval process is required for live-line work. The electrician-in-charge or the contracting entity may stipulate additional requirements and has decision-making authority in all electro-technical matters. Instructions of the electrician-in-charge relating to electrical safety shall be adhered to by all employees. 3.6 Hot Work, Fire and Explosion Protection If hot work must be performed, a hot work certificate (supplement to work permit) must be obtained from the contracting entity s facility management and appropriate safety measures must be taken. When performing welding work over gratings or on open platforms, fire-resistant covers must be placed on the areas below where welding is being done. Flammable materials shall be removed or properly covered (e.g. fire-control tarp). Appropriate procedures (incl. equipment) shall be employed when working in areas subject to explosion hazards. 3.7 Working in Containers / Confined Spaces When performing work in containers or confined spaces, special attention should be given to the safety of personnel who are performing such work. Access authorization with gas analysis is required. When performing work in containers and confined spaces and when working with breathing apparatus, at least one security guard must be stationed outside the hazard zone. The particular safety features of tools and equipment used in containers and confined spaces shall be noted. 3.8 Work with Angle Sanders The contractor shall take special safety precautions when planning, monitoring and executing cutting or grinding work using electric angle sanders. In supplement to specific restrictions regarding the use of angle sanders as derived from a tradespecific risk analysis and work flow plan (see Chap. 1.4), the following general restrictions also apply: Only properly instructed personnel who meet the requirements of the applicable standard are allowed to use angle sanders with grinding and cutting disks. All angle sanders must be equipped with a handle(s) that comply with statutory

13 requirements. All angle sanders must be handled with both hands. If this is not possible, a different tool must be used. Pursuant to statutory regulations, all angle sanders must be equipped with a safety hood for the disk. Angle sanders must be equipped with a kick-back stop. Angle sanders must be equipped with a brake that automatically stops the disk any time the trigger is released. Angle sanders may not have a lock-on switch. In connection with work associated with a falling hazard and the use of PPE to protect against falls, it shall be ensured that the use of angle sanders does not present a risk of causing damage to PPE (e.g. damage to the safety line or tether). Angle sanders used for cutting must be equipped with a cutting disk suitable to this task. Angle sanders may not be used for work with hazardous materials, e.g. working with asbestos or in proximity to hazardous substances, such as flammable solutions. Negative impacts on humans and the environment posed by sander dust shall be taken into account and kept to a minimum. The use of pneumatic angle sanders shall be kept to a minimum and requires the written approval of the contracting entity. If no other options are available, the contractor employee responsible for the work and contracting entity executive management must sign a prior approval. Prescribed basic protection includes wearing safety glasses and a face shield to protect the eyes and face from flying particles, close-fitting clothing with long arms and legs and closely-fitting gloves to provide for better grip and to protect hands from metal fragments and sparks. Deviations from the above are only allowed on the basis of a trade-specific risk analysis. 3.9 Working with Hazardous Substances Prior to commencing work, the contractor shall submit to the contracting entity all EC Safety Data Sheets and planned uses of hazardous substances it requires in order to fulfil its scope of supply and services in a timely manner. The risk assessments, directives and instruction document prepared by the contractor shall be posted in proximity to the trade (Gewerk) and shown to the contracting entity upon request. The directives prepared by the contractor shall be posted in the production facilities and construction sites. The use of carcinogenic, mutagenic or reprotoxic substances is not permitted. Storage of hazardous substances brought in by the contractor shall be coordinated with the contracting entity prior to commencing an activity.

14 Dusts and Fibres (AMF): Special requirements apply to the use of artificial mineral fibres" (AMF). The contracting entity shall undertake together with the contractor to classify mineral wool products (thermal load and the year the mineral wool was installed) Asbestos The contracting entity shall be promptly notified if materials containing asbestos are discovered while work is being performed. It shall be coordinated between contracting entity and contractor as to how to proceed Dealing with Dust or Dust-Like Substances Machinery and equipment shall be selected and operated so as to generate the least amount of dust possible. Dust-generating devices, machinery and equipment must be equipped with an effective vacuum device or the release of dust must be prevented by other means. For activities that involve potential exposure to dust, the propagation of dust to unaffected work spaces shall be prevented, dust deposits shall be avoided and any deposits that have accumulated shall be removed by damp or wet methods. Cleaning work areas using dry brooming or blowers is not permitted Dealing with Substances Hazardous to Water The use and storage of substances hazardous to water shall be coordinated with the contracting entity prior to delivery. Protective measures required by the WHG [Water Management Act] of the VAwS [Regulation on Facilities Using Substances Hazardous to Water] as well as local requirements shall be met Radiation and Hazards Associated with Non-Destructive Testing Work using radiation sources shall be reported in writing to the contracting entity 48 hours in advance. Proof of compliance with the X-Ray and Radiation Act shall be provided to the contracting entity. The work shall be conducted at a time when no one is in proximity to the area where the work must be performed. For work involving a radiation hazard, the affected area, including access to pipes, canals or the like within this area, shall be demarcated by barriers and warning signage intended specifically for this purpose. No persons may be in this restricted area other than those assigned to perform this work Transports Delivery Traffic Transports shall be via the access routes normally used for such purposes. Drivers shall be instructed prior to accessing the production/construction site by vehicle. Drivers shall be given the name of a contact person, with whom they must check in and check out.

15 Special or heavy transports shall be reported to the contacting entity. Deliveries shall take place only during regular daytime work hours. Routes used within the contracting entity s production and construction sites shall be kept clear. This applies in particular to emergency routes and work areas near hydrants. Traffic regulations applicable under the StVO [Highway Act] shall apply. The contracting entity can deny access for failure to comply. Suppliers may remain on the production and construction sites solely for the express purpose of providing delivery Driving in Reverse Backing up shall be avoided where possible. If backing up is necessary for operational reasons, it must be performed in such manner so that it poses no hazard to people or things. Each vehicle operator is therefore obligated to eliminate such hazards before operating the vehicle. The driver shall, in any event, proceed at walking speed. If 360º visibility is not provided, additional safety measures must be taken, e.g.: direction. The person providing directions must remain within the driver s field-of-vision and may not perform any other activity simultaneously. Use of back-up video systems Requirements for Transports with Tipping Trailers / Dump Trucks In addition to items and , the contractor is also responsible for the following: Preparation of specific risk assessments for transports as well as loading and unloading activities prior to commencing work. Preparation of operating instructions in cooperation with the contact person / contracting entity site manager prior to commencing work. Training / instruction of drivers with reference to the aforementioned documents as well as maintenance of training documentation prior to commencing work Use of Materials Handling Vehicles The contractor shall see that materials handling vehicles used at the contracting entity s production/construction sites meet all applicable regulations and, where applicable, the Road Transport Certification Regulation [Straßenverkehrszulassungsverordnung]. Materials handling vehicles may only be operated by trained persons specifically commissioned to perform this work. 4. Exclusion from Liability The contents of these HSE Minimum Requirements provide a general overview of work-specific hazards and activities. The citations of health and safety and/or statutory regulations in this document are only provided as examples. The contractor shall independently undertake to obtain current information on its obligations under law and to ensure compliance with the same. This document makes no claim to completeness and may be supplemented by requirements specific to a particular contract.

GASCADE Gastransport GmbH HSE-GUIDELINE-CONTRACTORS. Version 5 Status: 15th May 2017

GASCADE Gastransport GmbH HSE-GUIDELINE-CONTRACTORS. Version 5 Status: 15th May 2017 GASCADE Gastransport GmbH HSE-GUIDELINE-CONTRACTORS Version 5 Status: 15th May 2017 CONTENT 1. Preamble... 2. Scope... 3. General requirements, access, intoxicants... 4. Responsibility / organisation /

More information

ACCIDENT PREVENTION POLICY Signature Page Assign, Sign, & Return this page only to DiFiore Construction

ACCIDENT PREVENTION POLICY Signature Page Assign, Sign, & Return this page only to DiFiore Construction To all Subcontractors: ACCIDENT PREVENTION POLICY Signature Page Assign, Sign, & Return this page only to DiFiore Construction Excellence in safety and loss prevention is an objective of all operations

More information

Info Sheet for Contractor Personnel

Info Sheet for Contractor Personnel Page 1 of 6 I. Introduction To assure smooth operations on our premises it is necessary to read the information in this policy prior to accepting the contract. The contractor and its employees are required

More information

Guideline for external contractors working on the premise of MANN+HUMMEL

Guideline for external contractors working on the premise of MANN+HUMMEL Guideline for external contractors working on the premise of MANN+HUMMEL 1 Purpose MHG-HS-I-0011 describes the regulations for health, safety and environment for external contractors working on the premise

More information

A1) General Safety Guidelines applicable to external employees at all Company workplaces.

A1) General Safety Guidelines applicable to external employees at all Company workplaces. SAFETY GUIDELINES AND RISK INFORMATION for External Employees Engaged in Work Activities at MND Drilling & Services a.s. Workplaces The safety guidelines and information concerning potential risks and

More information

Contractor Guidelines

Contractor Guidelines Contractor Guidelines This Guideline has been written to detail the minimum expectations with regards to contractor safety at Sodexo business units. It is the responsibility of the contractor to understand

More information

Independent Contractor policy (Fremdfirmenordnung)

Independent Contractor policy (Fremdfirmenordnung) Independent Revision: 2 Date: 05.03.2015 Page 1 / 7 CONTENT 1 Purpose and objective... 2 2 Scope of policy... 2 3 Safety guidelines... 2 3.1 Measures in case of accident or fire... 2 3.2 Release requests...

More information

WORKING WITH CONTRACTORS POLICY AND PROCEDURE

WORKING WITH CONTRACTORS POLICY AND PROCEDURE WORKING WITH CONTRACTORS POLICY AND PROCEDURE CROWN SECURITY CONTRACTORS & OSH (i) Preface Contract work is becoming increasingly common in the modern workplace management culture, and has been a feature

More information

Safety & Health Manual

Safety & Health Manual Safety & Health Manual Chapter 8 Sub-Contractor Policy 8-1 Sub-Contractor Policy engages the services of sub-contractors and values its relationships with these essential service providers. In the interest

More information

SUB CONTRACTOR INDUCTION PACK

SUB CONTRACTOR INDUCTION PACK REQUIREMENTS FOR WORKING ON ROYAL MAIL PREMISES 1. INTRODUCTION AND PURPOSE This document sets out the arrangements that Royal Mail Property & Facilities Solutions Limited and Royal Mail [hereinafter jointly

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS Page 1 of 5 RFP 18-PR-DMS-49 ANNUAL MAINTENANCE AND REPAIR OF INDUSTRIAL ELECTRICAL CONTROL EQUIPMENT

More information

Working with third parties

Working with third parties Working with third parties 1 Safety arrangements 1.1 Obligations of third-party employees Third-party employees carrying out works at AIM Recycling nv always have to take care of their own safety as well

More information

SAFETY POLICY. Office Address 5195 W. 58 th Ave. Unit F Arvada, CO

SAFETY POLICY. Office Address 5195 W. 58 th Ave. Unit F Arvada, CO SAFETY POLICY Office Address 5195 W. 58 th Ave. Unit F Arvada, CO 80002 303-223-5716 info@valiantcc.com www.valiantcc.com I. Objective Safety Policy Table of Contents II. Policy III. Applicability IV.

More information

Contractors Induction Booklet. Contractor s Name:

Contractors Induction Booklet. Contractor s Name: Contractors Induction Booklet Date Contractor s Name: Business Name: The following information relates to Work Health & Safety and has been designed and implemented by the Owner s Corporation (OC) and

More information

RULES, REGULATIONS AND GENERAL SPECIFICATIONS FOR SUB CONTRACT WORK

RULES, REGULATIONS AND GENERAL SPECIFICATIONS FOR SUB CONTRACT WORK AGS AUTOMOTIVE SYSTEMS RULES, REGULATIONS AND GENERAL SPECIFICATIONS FOR SUB CONTRACT WORK All Contractors working on the premises of A.G. Simpson Automotive Inc. or A.G. Simpson (USA), Inc., (as the case

More information

Work Health and Safety Conditions

Work Health and Safety Conditions Work Health and Safety Conditions Table of Contents PURPOSE AND SCOPE... 1 RESPONSIBILITIES... 1 DEFINITIONS, ABBREVIATIONS AND ACRONYMS... 1 GENERAL WH&S & ELECTRICAL SAFETY REQUIREMENTS... 1 Compliance...

More information

Property Inspection Guidelines

Property Inspection Guidelines Property Inspection Guidelines www.tridentinsurance.net Lines of Business: Property, General Liability, Worker s Compensation, Public Official Liability Risk Control Strategy/Key Issues: Provide a tool

More information

POWER CONSTRUCTION COMPANY CCIP PROGRAM SAFETY REQUIREMENTS

POWER CONSTRUCTION COMPANY CCIP PROGRAM SAFETY REQUIREMENTS POWER CONSTRUCTION COMPANY CCIP PROGRAM SAFETY REQUIREMENTS The following requirements apply to all subcontractors including tier subcontractors, vendors, deliveries, visitors and the like (herein known

More information

Work and Environmental Guideline of voestalpine BÖHLER Edelstahl GmbH & Co KG for External Companies

Work and Environmental Guideline of voestalpine BÖHLER Edelstahl GmbH & Co KG for External Companies page 1 of 11 Work and Environmental Guideline of voestalpine BÖHLER Edelstahl GmbH & Co KG for External Companies Ref. No. Remark/Change Created by / on Approved by /on 0 First edition Law, insurances

More information

Instructions on Safety, Environmental Protection, Fire Safety and Efficient Energy Consumption for Non-ZEISS Staff

Instructions on Safety, Environmental Protection, Fire Safety and Efficient Energy Consumption for Non-ZEISS Staff Downloads, printouts and copies of any kind are not subject to document control. Instructions on Safety, Environmental Protection, Fire Safety and Efficient Energy Consumption for Non-ZEISS Staff HAuG_8.7.4_EN

More information

SAFETY POLICY PART 1 - GENERAL POLICY

SAFETY POLICY PART 1 - GENERAL POLICY SAFETY POLICY PART 1 - GENERAL POLICY a. The Scope of This Policy This is the Safety Policy of National Game Fair Ltd (the Organiser) as required by Section 2(3) of the Health and Safety at Work Act 1974,

More information

SUBSIDIARY LEGISLATION OCCUPATIONAL HEALTH AND SAFETY (PAYMENT OF PENALTIES) REGULATIONS

SUBSIDIARY LEGISLATION OCCUPATIONAL HEALTH AND SAFETY (PAYMENT OF PENALTIES) REGULATIONS (PAYMENT OF PENALTIES) [S.L.424.33 1 SUBSIDIARY LEGISLATION 424.33 (PAYMENT OF PENALTIES) REGULATIONS LEGAL NOTICE 36 of 2012. 24th January, 2012 1. (1) The title of these regulations is the Occupational

More information

Contractor Information

Contractor Information Contractor Information Contractor Induction Program Table of Contents Introduction... 1 Contractor Occupational Safety and Health Management Systems... 2 Safety Orientation Sessions for Contractors Employees...

More information

Maxion Wheels Czech s.r.o.

Maxion Wheels Czech s.r.o. Maxion Wheels Czech s.r.o. Vratimovská 707 719 00 Ostrava-Kunčice Company ID: 24790834 Tax ID: CZ24790834 Supplement No.. to the contract. TERMS AND CONDITIONS TO ENSURE HEALTH AND SAFETY AT WORK, ENVIRONMENTAL

More information

ab0cd EBRD CONTRACTOR CODE OF CONDUCT AND HEALTH AND SAFETY POLICY C:\WINDOWS\Temp\Temporary Internet Files\Contractor Code of Conduct.

ab0cd EBRD CONTRACTOR CODE OF CONDUCT AND HEALTH AND SAFETY POLICY C:\WINDOWS\Temp\Temporary Internet Files\Contractor Code of Conduct. ab0cd EBRD CONTRACTOR CODE OF CONDUCT AND HEALTH AND SAFETY POLICY 1 TABLE of CONTENTS SECTION SUBJECT 1.0 INTRODUCTION 3 2.0 DEFINITIONS 3 3.0 STATUTORY OBLIGATIONS OF CONTRACTORS 3 4.0 OBLIGATIONS SET

More information

A Safety, Environmental and Labour rights Guide for Suppliers to British Airways

A Safety, Environmental and Labour rights Guide for Suppliers to British Airways A Safety, Environmental and Labour rights Guide for Suppliers to British Airways Introduction The relationship between British Airways and its Suppliers is crucial in achieving our Mission of providing

More information

Contractor Health and Safety Code of Practice. Updated June 4, 2018

Contractor Health and Safety Code of Practice. Updated June 4, 2018 Contractor Health and Safety Code of Practice 2018 Updated June 4, 2018 Updated June 4, 2018 TABLE OF CONTENTS A. DEFINITIONS...3 B. PURPOSE...7 C. STRATEGIC ALIGNMENT...7 D. REGULATORY CONSIDERATIONS...7

More information

KERANG DISTRICT HEALTH CONTRACTORS HANDBOOK

KERANG DISTRICT HEALTH CONTRACTORS HANDBOOK KERANG DISTRICT HEALTH CONTRACTORS HANDBOOK SEPTEMBER 2014 Document History Details Date Notes Document Prepared May 1995 Revised May 2000 Review Revised February 2004 Review Revised November 2004 Review

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION SAFETY, HEALTH, AND EMERGENCY RESPONSE

2016 CDM Smith All Rights Reserved July 2016 SECTION SAFETY, HEALTH, AND EMERGENCY RESPONSE PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 01 11 01 SAFETY, HEALTH, AND EMERGENCY RESPONSE A. Pursuant to Section 107 of the Contract Work Hours and Safety Standards Act and DOL Regulations set forth in

More information

GENERAL CONDITIONS FOR TRAINING

GENERAL CONDITIONS FOR TRAINING GENERAL CONDITIONS FOR TRAINING General conditions for training REGISTRATION Registration must take place in writing. Please send the enclosed registration form to Panasonic Industry Europe GmbH Robot

More information

OSHA 1926 Subpart A General

OSHA 1926 Subpart A General OSHA 1926 Subpart A General 1926.2 Variances (a) Variances from the standards may be granted (b) To obtain a variance, a specific request must be made to OSHA 1926.3 Inspections Right of Entry (a) Authorized

More information

This policy aims to ensure the health, safety and welfare of contractors working on UEL premises and those affected by their work.

This policy aims to ensure the health, safety and welfare of contractors working on UEL premises and those affected by their work. HR Services UEL Health and Safety Handbook Contractor Health and Safety Management Policy This policy is a sub-policy of the main University Health and Safety Policy Statement Introduction The University

More information

Electric Transmission Texas, LLC Supplemental Safety Terms and Conditions

Electric Transmission Texas, LLC Supplemental Safety Terms and Conditions Electric Transmission Texas, LLC Supplemental Safety Terms and Conditions These Supplemental Safety Terms and Conditions are intended to supplement and not replace the safety provisions in the general

More information

Power Construction Company CCIP Program Safety Requirements

Power Construction Company CCIP Program Safety Requirements Introduction The following safety requirements (herein known as safety requirements) apply to all subcontractors including tier subcontractors, employees, consultants, vendors, deliveries, visitors and

More information

Diversified Engineering & Plastics General Safety & Environmental Process for Contractors

Diversified Engineering & Plastics General Safety & Environmental Process for Contractors STATUS: Issued TITLE: Diversified Engineering & Plastics General Safety & Environmental Process for Contractors NUMBER: PUR-OP-12 EFFECTIVE: 03/12/2018 LATEST REV: 5 PAGES: 5 Purpose Scope The purpose

More information

Job Safety Analysis Preparation And Risk Assessment

Job Safety Analysis Preparation And Risk Assessment Job Safety Analysis Preparation And Risk Assessment Sample Only Reference CPL_PCR_JSA_Risk_Assessment Revision Number SAMPLE ONLY Document Owner Sample Date 2015 File Location Procedure Revision Date Major

More information

Health & Safety Policy

Health & Safety Policy Health & Safety Policy K4S Security Ltd Imperial Office 2a Heigham Road East Ham London E6 2JG Registered Company Number: 09646212 Policy Date: 12 April 2018 1/14 Contents Page 1.0 General Statement of

More information

CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]

CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category] CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category] RFP Language Contract Language 1. Contractor recognizes the importance of performing the work in a safe and responsible manner

More information

HAZARD IDENTIFICATION AND ASSESSMENT

HAZARD IDENTIFICATION AND ASSESSMENT SOP-28 Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 11 Purpose To provide guidelines for identifying, assessing and controlling workplace hazards; To ensure the potential

More information

CAMBRIDGESHIRE GUIDED BUSWAY OPERATIONS POLICY

CAMBRIDGESHIRE GUIDED BUSWAY OPERATIONS POLICY CAMBRIDGESHIRE GUIDED BUSWAY OPERATIONS POLICY Page 1 of 7 CGB OPERATIONS POLICY Contents: 1. Introduction 2. Contents 3. General Policy 4. Safety Inductions 5. Access 6. Requirements and Restrictions

More information

CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]

CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category] CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category] RFP Language Contract Language 1. Contractor recognizes the importance of performing the Work in a safe and responsible manner

More information

CODE OF PRACTICE FOR SUBCONTRACTORS

CODE OF PRACTICE FOR SUBCONTRACTORS CODE OF PRACTICE FOR SUBCONTRACTORS Introduction Competence Quality Management Considerate Constructors Scheme Site Induction Safe Systems of Work Tools and Equipment Personal Protective Equipment Environmental

More information

MAINE COMMUNITY COLLEGE SYSTEM

MAINE COMMUNITY COLLEGE SYSTEM MAINE COMMUNITY COLLEGE SYSTEM HEALTH AND SAFETY Section 800.1 SUBJECT: PURPOSE: MOTOR VEHICLE PROCEDURE To promote the safe the authorized operation of motor vehicles operated on behalf, or for the benefit,

More information

1.3 All employees are equally responsible for complying with the Ontario Occupational Health & Safety Act and its Regulations.

1.3 All employees are equally responsible for complying with the Ontario Occupational Health & Safety Act and its Regulations. Revision No: 1 Page: 1 of 14 1.0 PURPOSE 1.1 The purpose of this policy is to establish guidelines for contractors in order to provide and maintain a safe work environment for all employees. Advance planning

More information

Registered Driving for Work Policy

Registered Driving for Work Policy Registered Driving for Work Policy This policy is to be read in Conjunction with the Consortium Transport Policy References Other CLC policies relating to this policy Health and Safety Policy Transport

More information

Procurement ANNEX A Page 1 of 19. Annex A: PROVISIONS REGARDING LABOUR REGULATIONS AND THE PREVENTION OF OCCUPATIONAL HAZARDS

Procurement ANNEX A Page 1 of 19. Annex A: PROVISIONS REGARDING LABOUR REGULATIONS AND THE PREVENTION OF OCCUPATIONAL HAZARDS Procurement ANNEX A Page 1 of 19 Procurement Annex A: PROVISIONS REGARDING LABOUR REGULATIONS AND THE PREVENTION OF OCCUPATIONAL HAZARDS Common provisions regarding labour regulations Occupational health

More information

Technical standard. Health and Safety Standard: Penalty scheme applicable to contractor companies. Code: NT GN-SP.ESS.

Technical standard. Health and Safety Standard: Penalty scheme applicable to contractor companies. Code: NT GN-SP.ESS. Technical standard Health and Safety Standard: Penalty scheme applicable to contractor Code: NT.00045.GN-SP.ESS Version: 2 The following text is a translation of the original Procedure "Estándar de Seguridad

More information

LONG ISLAND UNIVERSITY STANDARD TERMS AND CONDITIONS

LONG ISLAND UNIVERSITY STANDARD TERMS AND CONDITIONS LONG ISLAND UNIVERSITY STANDARD TERMS AND CONDITIONS CONTENTS I. Scope II. Review of Contract Documents III. Responsible Business Practices IV. Schedules and Time of Completion V. Plans, Specifications,

More information

Contractor Policy and Procedures. Contractor. Policy and Procedures. Working Together. November Borders College 4/12/ Working Together

Contractor Policy and Procedures. Contractor. Policy and Procedures. Working Together. November Borders College 4/12/ Working Together Contractor Working Together Policy and Procedures November 2017 Borders College 4/12/2017 1 Working Together History of Changes Version Description of Change Authored by Date 1.1 This document combines

More information

Alcumus Health and safety assessment standards

Alcumus Health and safety assessment standards Alcumus Health and safety assessment standards Comply with your assessment duties as a client Gain greater visibility of the anticipated risks throughout your supply chain Document Code: TG-S-01 Version:

More information

Transnet Freight Rail E.4E Transnet (August 2006) A Division of Transnet Ltd. TRANSNET LIMITED (Registration no. 1990/000900/06) PRIEVIEW COPY ONLY

Transnet Freight Rail E.4E Transnet (August 2006) A Division of Transnet Ltd. TRANSNET LIMITED (Registration no. 1990/000900/06) PRIEVIEW COPY ONLY TRANSNET LIMITED (Registration no. 1990/000900/06) SAFETY ARRANGEMENTS AND PROCEDURAL COMPLIANCE WITH THE OCCUPATIONAL HEALTH AND SAFETY ACT (ACT 85 OF 1993) AND APPLICABLE REGULATIONS 1. General 1.1 The

More information

Contractor Pre-qualification Questionnaire

Contractor Pre-qualification Questionnaire Contractor Pre-qualification Questionnaire This document shall be used to determine qualifications of contractors who shall work under Anderson Engineering Co., Inc. (AECI). AECI shall use this document

More information

San Antonio Water System PROJECT CONSTRUCTION PROGRAM HEALTH AND SAFETY PROGRAM

San Antonio Water System PROJECT CONSTRUCTION PROGRAM HEALTH AND SAFETY PROGRAM PROJECT CONSTRUCTION PROGRAM HEALTH AND SAFETY PROGRAM SEPTEMBER 2007 TABLE OF CONTENTS INTRODUCTION... 2 SAFETY RESPONSIBILITIES, AUTHORITY AND ACCOUNTABILITY... 3 REGULATORY AGENCIES... 3 SAWS... 4

More information

Attachment no. 9 to PS-12

Attachment no. 9 to PS-12 Number of pages number 5 1 GENERAL PRINCIPLES OF CONDUCTING AND ORGANIZING WORK ON THE PREMISES OF - KWIDZYN CONTRACTOR IS OBLIGED TO CONFIRM ORDER ACCEPTANCE IN WRITING. Order acceptance means unequivocal

More information

PREQUALIFICATION QUESTIONNAIRE

PREQUALIFICATION QUESTIONNAIRE PREUALIFICATION UESTIONNAIRE 1.0 COMPANY DETAILS 1.1 Please complete the company details below: Company: Post Code: Tel: E-mail Contact: Title: CRN: Fax: Website: 1.2 Does this Company have a Parent Company

More information

(a) Implement and maintain this Safety and Health Program. (b) Conduct an aggressive loss prevention program.

(a) Implement and maintain this Safety and Health Program. (b) Conduct an aggressive loss prevention program. Responsibilities The Orange County Board of County Commissioners exercises overall responsibility for endorsing and supporting the provisions of this Safety and Health Program. The Orange County Administrator

More information

LEGAL SUPPLEMENT 1269

LEGAL SUPPLEMENT 1269 LEGAL SUPPLEMENT 1269 to the Government Gazette of Mauritius No. 113 of 29 November 2014 Government Notice No. 216 of 2014 THE OCCUPATIONAL SAFETY AND HEALTH ACT Regulations made by the Minister under

More information

COMPANY POLICY FOR HEALTH AND SAFETY

COMPANY POLICY FOR HEALTH AND SAFETY Breakfire Ltd, Unit 2 Woodview Business Centre, Lockwood Close, Nottingham, NG5 9JN COMPANY POLICY FOR HEALTH AND SAFETY January 2018 TABLE OF CONTENTS SECTION 1 TITLE NUMBER REVISION Policy & Administration

More information

ATTACHMENT "I" SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS)

ATTACHMENT I SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS) ATTACHMENT "I" SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS) Swinerton Builders, Inc. (SWINERTON) constantly strives to provide a safe and productive work environment.

More information

Control of Asbestos Regulations 2012 (SI 2012 No. 632)

Control of Asbestos Regulations 2012 (SI 2012 No. 632) Control of Asbestos Regulations 2012 (SI 2012 No. 632) Part 1: Preliminary Part 1 covers commencement, interpretation and application. 2: Interpretation This contains a number of definitions. Of particular

More information

Health and Safety. Version 5. Category: Corporate. Latest Review Date: December Review Frequency: Annual. Owner: Company Secretary

Health and Safety. Version 5. Category: Corporate. Latest Review Date: December Review Frequency: Annual. Owner: Company Secretary Health and Safety Version 5 Category: Corporate Latest Review Date: December 2016 Review Frequency: Annual Owner: Company Secretary Contributors: H&S Facilitator, Facilities Manager, Customer Service Manager,

More information

Work Method and OH&S Statement

Work Method and OH&S Statement Work Method and OH&S Statement for (Customer name) Work Site: (TBA) Quotation ref: (TBA) Produced by: Accredited Epoxy Applicators Pty Ltd (date) ACCREDITED EPOXY APPLICATORS PTY LTD 2007 Page 1 CONTENTS

More information

SUPPLEMENTARY EHS CONDITIONS OF CONTRACT. SUPPLEMENTARY EHS CONDITIONS OF CONTRACT FOR WORK ON SABIC SITES in Europe

SUPPLEMENTARY EHS CONDITIONS OF CONTRACT. SUPPLEMENTARY EHS CONDITIONS OF CONTRACT FOR WORK ON SABIC SITES in Europe SUPPLEMENTARY EHS CONDITIONS OF CONTRACT July 2011 SUPPLEMENTARY EHS CONDITIONS OF CONTRACT FOR WORK ON SABIC SITES in Europe CONTENTS 1 INTRODUCTION... 3 2 GENERAL WORKING ARRANGEMENTS FOR SABIC SITES...

More information

S.I.A.S. Società Incremento Automobilismo e Sport SpA

S.I.A.S. Società Incremento Automobilismo e Sport SpA S.I.A.S. Società Incremento Automobilismo e Sport SpA INFORMATION FOR EXTERNAL COMPANIES Pursuant to article 26 paragraph 1, letter b) DLgs.n.81/2008 Document Review Date Reason Annex 1 - Information 1

More information

Vehicle Accident Prevention and Safety

Vehicle Accident Prevention and Safety Vehicle Accident Prevention and Safety Policy Type: Administrative Responsible Office: Office of Insurance and Risk Management, Safety and Risk Management, Division of Administration Initial Policy Approved:

More information

HIGH RISK CONSTRUCTION WORK

HIGH RISK CONSTRUCTION WORK CONTRACTOR WHS SYSTEM STANDARD HIGH RISK CONSTRUCTION WORK EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION

More information

Security, Safety, and Environmental Guidelines for Contractor Employees EXHIBIT S-1

Security, Safety, and Environmental Guidelines for Contractor Employees EXHIBIT S-1 Security, Safety, and Environmental Guidelines for Contractor Employees EXHIBIT S-1 Security, Safety, and Environmental Policy Vision Beliefs Zero Injuries / Illnesses Nothing we do is worth someone being

More information

SASKATCHEWAN OCCUPATIONAL HEALTH AND SAFETY REGULATIONS

SASKATCHEWAN OCCUPATIONAL HEALTH AND SAFETY REGULATIONS SASKATCHEWAN OCCUPATIONAL HEALTH AND SAFETY REGULATIONS PART XXIII Asbestos Interpretation 330 In this Part: (a) asbestos means the fibrous form of crocidolite, amosite, chrysotile, anthophyllite, actinolite,

More information

BUILDING CLEARANCE CERTIFICATE

BUILDING CLEARANCE CERTIFICATE ZWARTKOP GOLF ESTATE HOMEOWNERS ASSOCIATION (ASSOCIATION INCORPORATED UNDER SECTION 21) Reg no 2004/002619/08 Po Box 14636 Tel: 012 654 7062 Lyttelton Email: 0140 irene@zwartkopgolfestate.co.za BUILDING

More information

Workplace Safety and Loss Prevention Incentive Program (Safety, Drug and Alcohol Prevention, and Return to Work Incentive Programs)

Workplace Safety and Loss Prevention Incentive Program (Safety, Drug and Alcohol Prevention, and Return to Work Incentive Programs) Part 60 Workplace Safety and Loss Prevention Incentive Program (Safety, Drug and Alcohol Prevention, and Return to Work Incentive Programs) Part 60 Workplace Safety and Loss Prevention Incentive Program

More information

EXTREME ADVENTURE LTD - BOOKING FORM

EXTREME ADVENTURE LTD - BOOKING FORM Hirer's details EXTREME ADVENTURE LTD - BOOKING FORM Hirer's Name... Activity to Hire...... Correspondence... & Invoice Address... Postcode... E mail... Tel... Event details Event Description... Start

More information

AGREEMENT ON OCCUPATIONAL HEALTH AND SAFETY IN TERMS OF SECTION 37(2) OF THE OCCUPATIONAL HEALTH AND SAFETY ACT 85 OF 1993 (AS AMENDED) between

AGREEMENT ON OCCUPATIONAL HEALTH AND SAFETY IN TERMS OF SECTION 37(2) OF THE OCCUPATIONAL HEALTH AND SAFETY ACT 85 OF 1993 (AS AMENDED) between AGREEMENT ON OCCUPATIONAL HEALTH AND SAFETY IN TERMS OF SECTION 37(2) OF THE OCCUPATIONAL HEALTH AND SAFETY ACT 85 OF 1993 (AS AMENDED) between TELKOM SA SOC LIMITED (Registration number: 1991/005476/07)

More information

SUPPLEMENTARY TERMS AND CONDITIONS FOR PURCHASE ORDERS ISSUED FOR CONSTRUCTION, INSTALLATION OR REPAIR WORK TO BE PERFORMED ON OUR PREMISES

SUPPLEMENTARY TERMS AND CONDITIONS FOR PURCHASE ORDERS ISSUED FOR CONSTRUCTION, INSTALLATION OR REPAIR WORK TO BE PERFORMED ON OUR PREMISES SUPPLEMENTARY TERMS AND CONDITIONS FOR PURCHASE ORDERS ISSUED FOR CONSTRUCTION, INSTALLATION OR REPAIR WORK TO BE PERFORMED ON OUR PREMISES Whereas, ( you ) and the TopBuild company identified on the purchase

More information

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S220 Hazard Communication Program REV /13/2012

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S220 Hazard Communication Program REV /13/2012 PAGE 1 OF 7 Hazard Communication Program Right to Know PURPOSE: It is the intention of BMT and all of its subsidiary companies to conduct its operations in such a manner that not only complies with health,

More information

Health and Safety statement of intent

Health and Safety statement of intent Health and Safety statement of intent 1. Our company strives to take strict measures to monitor and control Health & Safety as an integral part of running our business operation. 2. We will, so far as

More information

HULCHER CONTRACTOR SAFETY MANAGEMENT PROCESS

HULCHER CONTRACTOR SAFETY MANAGEMENT PROCESS Hulcher Services is initiating a mission to improve safety for its employees, contractors, subcontractors, visitors, and general public. The Hulcher Contractor Safety Management Process (HCSMP) was developed

More information

APPLICATION FOR STANDS IN THE FOOD HALL Please read attached notes. CARTMEL AGRICULTURAL SHOW WEDNESDAY 7 August 2019

APPLICATION FOR STANDS IN THE FOOD HALL Please read attached notes. CARTMEL AGRICULTURAL SHOW WEDNESDAY 7 August 2019 APPLICATION FOR STANDS IN THE FOOD HALL Please read attached notes. CARTMEL AGRICULTURAL SHOW WEDNESDAY 7 August 2019 Name of Company/Applicant: Address:...Postcode:.. Tel : E mail address:..web Site:..

More information

Principles of Prevention

Principles of Prevention 1 DGUV Regulation 1 Accident prevention regulation Principles of Prevention November 2013, English version issued Januar 2016 Imprint Published by: Deutsche Gesetzliche Unfallversicherung e.v. (German

More information

TRANSFLO MOTOR CARRIER OPERATING PROVISIONS

TRANSFLO MOTOR CARRIER OPERATING PROVISIONS Purpose The purpose of this document is to establish operating and safety requirements, policies and procedures for motor carriers conducting operations within a TRANSFLO terminal. Motor Carrier Access

More information

AIA Document A201 TM 1997

AIA Document A201 TM 1997 AIA Document A201 TM 1997 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address): A201 conversion Michigan State University East Lansing, MI THE OWNER:

More information

This document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site.

This document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site. Introduction This document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site. It was put together by members of the Food & Drink

More information

ROBERT A. BOTHMAN, INC. EXHIBIT "A" SUBCONTRACTORS SCOPE OF WORK EXHIBIT A SUBCONTRACTOR SCOPE OF WORK, dated this

ROBERT A. BOTHMAN, INC. EXHIBIT A SUBCONTRACTORS SCOPE OF WORK EXHIBIT A SUBCONTRACTOR SCOPE OF WORK, dated this ROBERT A. BOTHMAN, INC. EXHIBIT "A" SUBCONTRACTORS SCOPE OF WORK 5 - EXHIBIT A SUBCONTRACTOR SCOPE OF WORK, dated this All Work in strict accordance with Contract Documents. day of 216 (Where reference

More information

HONDA AUSTRALIA MOTORCYCLE AND POWER EQUIPMENT PTY LTD Hume Highway Campbellfield VIC OCCUPATIONAL HEALTH AND SAFETY

HONDA AUSTRALIA MOTORCYCLE AND POWER EQUIPMENT PTY LTD Hume Highway Campbellfield VIC OCCUPATIONAL HEALTH AND SAFETY AUSTRALIA MOTORCYCLE AND POWER EQUIPMENT PTY LTD 1954-1956 Hume Highway Campbellfield VIC. 3061 APRIL 2004 OCCUPATIONAL HEALTH AND SAFETY RISK ASSESSMENT REPORT - - THIS REPORT IS PREPARED BY RISKPLANT

More information

APPLICATION FOR TRADE SPACE Please read attached notes. CARTMEL AGRICULTURAL SHOW WEDNESDAY 7 AUGUST 2019

APPLICATION FOR TRADE SPACE Please read attached notes. CARTMEL AGRICULTURAL SHOW WEDNESDAY 7 AUGUST 2019 APPLICATION FOR TRADE SPACE Please read attached notes. CARTMEL AGRICULTURAL SHOW WEDNESDAY 7 AUGUST 2019 Name of Company/Applicant: Address:. Postcode: Tel :. E mail address:..web Site:.. Brief but clear

More information

MARKET OH&S PLAN 1 INTRODUCTION 2 OH&S RESPONSIBILITIES

MARKET OH&S PLAN 1 INTRODUCTION 2 OH&S RESPONSIBILITIES 1 INTRODUCTION Melbourne Market Authority (MMA) is committed to a safety culture and practices that provide for a healthy and safe working environment. The health and safety of all those who work for us

More information

CONTRACTOR SAFETY AGREEMENT

CONTRACTOR SAFETY AGREEMENT CONTRACTOR SAFETY AGREEMENT All contractors and self-employed persons working on Pembina Trails School Division property must comply with the Safety and Health Act and Regulations of Manitoba in the performance

More information

Vehicle Policy Organisation and Management. The University of Edinburgh

Vehicle Policy Organisation and Management. The University of Edinburgh The University of Edinburgh Vehicle Policy 2007 Introduction This policy aims to reduce legal, health and safety and financial liability and to control costs of managing University vehicles. The objective

More information

San Antonio Water System Standard Specifications for Construction

San Antonio Water System Standard Specifications for Construction ITEM NO. 902 Construction Safety And Health Program 902.1 DESCRIPTION: This item shall govern the preparation and implementation of the contractor s Constuction Safety and Health Program for the specified

More information

KEEPING PEOPLE SAFE: HEALTH & SAFETY POLICY. Our Health & Safety Policy for

KEEPING PEOPLE SAFE: HEALTH & SAFETY POLICY. Our Health & Safety Policy for KEEPING PEOPLE SAFE: HEALTH & SAFETY POLICY Our Health & Safety Policy for 2 KEEP PEOPLE SAFE: HEALTH & SAFETY POLICY Our Health & Safety Policy Name of Church Address Signed Signed on behalf of the Parochial

More information

AIA Document A201 TM 1997

AIA Document A201 TM 1997 AIA Document A201 TM 1997 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address): Project University of Maine at Farmington THE OWNER: (Name and address):

More information

COLIN PEACOCK LTD HEALTH AND SAFETY POLICY June 2014 PREFACE

COLIN PEACOCK LTD HEALTH AND SAFETY POLICY June 2014 PREFACE PREFACE Without active support, any attempt at organised accident prevention will be useless - or even worse than useless, since there may be an illusion that health and safety matters are under control,

More information

SG31:15. Management of Slips and Trips 1. PURPOSE

SG31:15. Management of Slips and Trips 1. PURPOSE SG31:15 Management of Slips and Trips 1. PURPOSE The purpose of this guide is to eliminate or reduce the risk of injury from slips and trips by providing advice and guidance to all persons involved in

More information

Mine Health and Safety Regulation 2007

Mine Health and Safety Regulation 2007 New South Wales Mine Health and Safety Regulation 2007 under the Mine Health and Safety Act 2004 Her Excellency the Governor, with the advice of the Executive Council, has made the following Regulation

More information

Health & Safety Policy& Procedure. Head Office: Marle House Oldham Broadway Business Park Broadgate Chadderton Oldham OL9 9XA

Health & Safety Policy& Procedure. Head Office: Marle House Oldham Broadway Business Park Broadgate Chadderton Oldham OL9 9XA Health & Safety Policy& Procedure Head Office: Marle House Oldham Broadway Business Park Broadgate Chadderton Oldham OL9 9XA HEALTH & SAFETY POLICY CONTENTS Page Date of Last Review 1 Health & Safety Policy

More information

Your health and safety guide to Licensing and Registrations

Your health and safety guide to Licensing and Registrations Your health and safety guide to Licensing and Registrations Edition 2 June 2017 Contents Introduction 1 About the issue 2 Do I need a licence? 2 Registration of plant designs 2 Your legal duties 3 The

More information

Occupational Safety & Health Policy & Guidelines for Contractors

Occupational Safety & Health Policy & Guidelines for Contractors Occupational Safety & Health Policy & Guidelines for Contractors Occupational Safety & Health Policy & Guidelines for Contractors Table of Contents Forward..1 Introduction... 1 Policy.1 City of Kalamunda

More information

Contract appendix: Health and Safety (HAS)

Contract appendix: Health and Safety (HAS) Based on the fundamental principle of perpetuating a preventive mindset and effective control of operational risks, this contract appendix establishes the legal and managerial principles for maintaining

More information

Appendix I: Safety Orientation Checklist GENERAL Department Safety Program, Crop and Soil Sciences, Washington State University

Appendix I: Safety Orientation Checklist GENERAL Department Safety Program, Crop and Soil Sciences, Washington State University Appendix I: Safety Orientation Checklist GENERAL Department Safety Program, Crop and Soil Sciences, Washington State University Employee: Supervisor: NOTE: Ensure that employees/students who use English

More information

Contractor Management Procedure

Contractor Management Procedure Contractor Management Procedure Purpose Skillset Limited ( Skillset ) has a duty under the NSW Work Health and Safety Act and Regulations 2011 (the Legislation ) to prevent and/or to minimise risk in the

More information

Guidelines on Occupational Safety and Health Management at the TEPCO Fukushima Daiichi Nuclear Power Plant

Guidelines on Occupational Safety and Health Management at the TEPCO Fukushima Daiichi Nuclear Power Plant Guidelines on Occupational Safety and Health Management at the TEPCO Fukushima Daiichi Nuclear Power Plant Enactment: Labour Standards Bureau Notification No. 0826-1, 26 August 2015 Section 1 Objectives

More information