Guidelines to Exploration and Mining Investment

Size: px
Start display at page:

Download "Guidelines to Exploration and Mining Investment"

Transcription

1 A Raw Materials Group event in cooperation with the School of Professional Development Guidelines to Exploration and Mining Investment August 2012 For Professionals Involved in the Development of Mining and Natural Resource Projects

2 Introduction While the key asset for the minerals sector is the un-mined mineralisation associated with the deposit, the value to the company can only be released if exploration is able to identify extensions of the mineralisation and mining and processing can be undertaken efficiently and at minimum cost. This involves consideration of grade control procedures and the approach to metal reconciliation from bock estimates of in situ grades through mining dilution, determination of head grades, the proportion of production tied up in stockpiles and then plant recovery. It follows from that that any interrelationships with capital investment decisions aimed at improving grade control and reducing operating costs would always be important. This is particularly the case in the Scandinavian countries which have benefited less from increases in dollar metal prices over the last year against escalating local currency-based Capex and Opcosts. This has encouraged the implementation of mechanised mining techniques but does require close co-operation between a parent company and the operating division in undertaking technical and financial appraisal of new investment options. Securing finance (whether equity or debt) requires all the relevant technical, operational, permitting and financial components to be presented in an integrated and transparent manner. For projects to be able to secure equity funding they normally require the inclusion of a resource that can be placed into one of the internationally recognised systems of classification. To take a resource into the reserve category requires the development of a prefeasibility or full technical feasibility study. This would expect to add significant value to a project which might otherwise comprises mainly exploration potential as it permits the generation of a discounted cash flow financial model. Where the NPV and IRR generated can be shown, through sensitivity analysis, to be robust this not only enhances the valuation of the project for the equity market, it can also be used to secure project finance. Course Structure The aim of the course is to provide a guide to understanding the main factors involved in securing the financial support for mining projects through equity, debt, or entering into a joint venture. This involves addressing the underlying technical principles, applying these to mineral projects and demonstrating how these influence the financial modelling. Particular attention will be given to the treatment of key independent variables, such as grade and metal price, dependent variables, such as grade-tonnage relationships, and the way these influence the rate of mining, associated operating and capital costs, and the optimisation of the NPV of a project. The structure of joint ventures and the role of tax models in enhancing the features of a mineral project will be outlined. During the workshop sessions use of the IC-MinEval software provided by IC-FinEval. The course was launched in Stockholm in November 2004 and was re-delivered annually since then. Each delivery was fully subscribed and was well received by delegates.

3 Who Should Attend? This course will be of particular interest to all professionals who are involved in the funding of minerals projects from exploration through to development and making investment decisions in operating mines. The course will also be of interest to those based with for financial institutions as mining analysts, fund and asset managers, or securities and corporate finance investment bankers. IC-MinEval Use will be made in the workshop sessions of the IC-MinEval software provided by IC- FinEval, Excel -based spreadsheet programmes automating all stages required to produce models for a wide range of mineral projects. IC-MinEval produces a Balance Sheet, and Profit and Loss account from the cash flows, with tax provisions linked to the Profit and Loss Account. The cost of debt is calculated, as is the weighted average cost of capital and the cost of equity. Output modules include the base case discount cash flows, as well as key financial ratios and performance indicators such as NPV, IRR payback and maximum cash exposure. Sensitivity analysis can be undertaken on key variables. The functionality of IC-MinEval will be delivered over the internet through the Software as a Service (SAAS) system with InfoMine ( Delegates will be expected to have their own laptop computers available and will be provided with wireless access to the College's internet. They will need to have administrative rights for their laptops, as there will be the need to install ActiveX to access the system. Delegates will be given access to SaaS a few days before the start of the course. (Delegates with AppleMac and Firefox internet browsers may need some support.) Delegates all have access to the functionality of IC-MinEval through SaaS for a further four weeks after the course. Access beyond that will be available on subscriptions. Pre-course E- learning To enable registered delegates to derive maximum benefit from the live sessions, an internet url, user name and password will be supplied prior to the course providing access to a Virtual Learning Environment (VLE) designed for the programme. All the course material covered in the live sessions will be available here prior to the start of the course, together with important course information, including joining instructions. It will also enable participants to post details about themselves and be involved in post course follow-up. For a limited period, participants will be able to access an EduMine e-learning module through the VLE. This gives an introduction to modelling project finance and covers the critical issues associated with the debt financing of mining projects.

4 Provisional Schedule Day 1 08:30-09:00 09:00-09:30 09:30-11:00 14:00-15:30 15:30-15:45 15:45-17:00 Registration Welcome and Profile of Participants 1.1 Value Creation in Mineral Projects - The Life Cycle of mineral projects. Drivers. Stages of planning and execution. Relationship between risk and valuation. Exploration and mining leases. Permitting and environmental impact. 1.2 Feasibility Studies - Role of a prefeasibility study. Scope of a full technical feasibility study. Role in raising equity. Role in securing debt finance. Engineering, Procurement, Construction and Management contracts. 1.3 Formulation of a Joint Venture agreement - Consideration of vend-in conditions and link to valuation. Defining deliverables and the role of the feasibility study. Clawback agreements. 1.4 Resource Estimation - Drilling technology, sampling and principles of uncertainty and concepts of geological continuity. Grade and volume estimation. Cut-off grades, establishing resources and reserves. Day 2 09:00-10:00 10:00-11:00 14:00-15:30 15:30-15:45 15:45-16:00 16:00-17: Mine Planning - Mine block models. Relationships between costs and scale of mining. Mining dilution and mining recovery. Sampling on the scale of mining. Proven and probably reserve categories in operating mines. Metal reconciliation from in situ reserve estimation to metal produced. 2.2 Discounted Cash Flow Analysis - Time value of money. Incremental cash flow model. Discount rates. Optimisation of the scale of mining. NPV, IRR, payback, maximum cash exposure. - DCF exercise based on annuity tables. Review of spreadsheet- based solution. 2.3 Workshop Session: Botswana Gold Using IC-MinEval 2.4 Case History of a Gold Operation - Setting up base case. Optimisation of NPV. Determination of cut-off grade. Sensitivity analysis. 2.5 Analysis of Risk and Uncertainty in Financial Models - Monte Carlo simulation. 2.6 Base Metal Project Workshop 1 - IC-MinEval-based DCF evaluation of nickel metal operations. Setting up the model. Determination of key performance variables. - Analysis of relationship between cashflow, maximum cash exposure debt and equity ratios (gearing). Project acquisition cost estimates.

5 Day 3 09:00-11:00 14:00-15:30 15:30-15:45 15:45-17:00 Day Base Metal Project Workshop 2 - Project Finance - Capital Asset Pricing Model. Relationship between cost of debt, taxation, Balance Sheet, Profit and Loss account and cash flow. Calculating the cost of debt and equity. Determining the weighted average cost of capital and optimum level of gearing. Debt performance indicators (debt service coverage and ratios such as loan life, project life, reserve tail, interest cover, principal cover and residual cover). 3.2 Underground Operation - Engineering concepts behind block caving mining method. Technical risks of the side-wall failure in the open pit on dilution in subsequent block caving operations. Implications for the reserve tail and project finance. Multipartner scenario analysis determining relative return for different stakeholders as a function of investment contribution. 3.3 Scenario Analysis Industrial Minerals - Workshop session. Iron ore. Chemistry of primary minerals. Price based on dry metric tonne units as a function of iron content. Product specifications and penalties. Beneficiation and yields as a function of iron content. Infrastructure Power, transport of ore (rail and slurry pumping) and port facilities 3.4 Scenario Analysis - Energy - Workshop session. Coal Geology and classification. Evaluation. Coking Coal. Role of volumetrics in setting up a financial model. 09:00-10:00 10:00-11:00 14:00-15:00 15:00-16: Surface coal operations - Justification of an investment in equipment. Set up IC- CoalEval open pit scenario. Funding based on debt and equity. Sensitivity analysis. Coffee 4.2 Underground Coal Operation - Long wall mining. Set up IC-CoalEval underground mine base case. DCF evaluation exercise demonstrating relationship between efficiency and profitability. Introduction to EduMine course. 4.3 Diamonds - Geological settings and pricing. Alluvial deposit case history. Evaluation of projects. Instability of DCF models. Primary kimberlitic projects. 4.4 Mineral exploration and reporting codes. 4.5 A Financial Perspective: What do banks want to know? What is limited recourse finance? A brief overview of who the lenders are, their thinking and what you as a borrower should think of. Alternative to banks?

6 Course Director and Presenter Professor Dennis Buchanan Emeritus Professor of Mining Geology & Senior Research Fellow, Imperial College London Professor Buchanan works jointly between the Department of Earth Science and Engineering and the Business School at Imperial College London and will act as the Course Director. Professor Buchanan's current research interest lies in addressing the underlying technical principles applying to mineral projects and demonstrating how these influence financial modelling. He is founder and Chairman of the Imperial College startup company, IC-FinEval Ltd, which provides financial evaluation, risk assessment and decision making software. He has 30 years experience teaching mining geology, mineral exploration and mineral project appraisal and is responsible for the MSc in Metals and Energy Finance. This is a new joint degree between the Department of Earth Science and Engineering and the Business School at Imperial College. Professor Buchanan has worked as a Mining Geologist in both gold and platinum mines in South Africa and had wide experience as a consultant to industry, as an expert witness and in designing and delivering short courses for industry.

7 General Information Important information to all delegates prior to attending the course: Delegates will be expected to have their own PC laptop computers with Windows 95/NT 4.0 (or newer version) and Excel 97 (or better) already installed. If you are using MAC please notify Mr. Kiram Sundblad. In both cases you should have administrative rights to install software. Delegates will be given access to the IC MinEval SAAS-software a few days prior to the course and this will be administrated by Infomine in Vancouver. Blackboard access will be administrated by the Imperial College London, by Miss Stephanie O'Mahony, cpd@imperial.ac.uk and she will send the delegates their usernames and passwords. All delegates are expected to log on to both Blackboard and the SAASsoftware when they receive their login details, to make sure that everything works properly prior to the course. Course location: Stockholm, City Conference Centre, Norra Latin, Drottninggatan 71. Fee: Registration SEK. Please register before 15th June All prices are excluding Swedish VAT if applicable. This includes all course materials, coffee & lunch. Other meals and hotel accommodation are not included. Limited number of participants, first come first served. Registration: Please contact: Kiram Sundblad, Raw Materials Group kiram.sundblad@rmg.se Phone: The organisers reserve the right to cancel this course at their discretion. Cancellations received later than four weeks before course beginning will not be refundable.

Guidelines to Exploration and Mining Investment

Guidelines to Exploration and Mining Investment GUIDELINES TO EXPLORATION AND MINING INVESTMENT Guidelines to Exploration and Mining Investment 8 11 April 2014 in Stockholm Course Director: Prof Dennis Buchanan For Professionals Involved in the Development

More information

3 DAY COURSE/WORKSHOP STRATEGIC OPEN PIT MINE PROJECT EVALUATION

3 DAY COURSE/WORKSHOP STRATEGIC OPEN PIT MINE PROJECT EVALUATION 3 DAY COURSE/WORKSHOP STRATEGIC OPEN PIT MINE PROJECT EVALUATION MiningMath Associates and the Laboratory of Mineral Research and Mine Planning of UFMG have partnered with Rompev Pty Ltd to bring to you

More information

Version 1.2. IC-MinEval. Software for the Financial Evaluation of Mineral Deposits. IC-FinEval Ltd

Version 1.2. IC-MinEval. Software for the Financial Evaluation of Mineral Deposits. IC-FinEval Ltd Version 1.2 IC-MinEval Software for the Financial Evaluation of Mineral Deposits IC-FinEval Ltd Legal Information Copyright IC-MinEval is a trademark of IC-FinEval Ltd. Trademarks and copyright All products

More information

WODGINA ORE RESERVE COMMENTARY

WODGINA ORE RESERVE COMMENTARY ASX ANNOUNCEMENT 4 May 2018 WODGINA ORE RESERVE COMMENTARY Mineral Resources Limited (ASX:MIN; MRL) refers to its announcement on 1 May 2018 titled Wodgina Mineral Resource and Ore Reserve Update and its

More information

Budgeting and Costing Control Workshop

Budgeting and Costing Control Workshop CORPORATE FINANCIAL PLANNING, Budgeting and Costing Control Workshop H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: All business decision-making

More information

Half-Yearly Report 2014

Half-Yearly Report 2014 Half-Yearly Report Half-Yearly Report Conroy Gold and Natural Resources plc Chairman s Statement Dear Shareholder I have great pleasure in presenting your Company s Half-Yearly Report for the six months.

More information

BURNSTONE PROJECT Feasibility study and LoM plan

BURNSTONE PROJECT Feasibility study and LoM plan BURNSTONE PROJECT Feasibility study and LoM plan Richard Stewart Executive Vice President: Business Development 28 July 2016 Disclaimer The information in this presentation may include forward-looking

More information

For personal use only

For personal use only Name of entity Information Form and Checklist Annexure I (Mining Entities) ABN/ARBN/ARSN Matador Mining Limited 45 612 912 393 This Annexure forms part of the Information Form and Checklist supplied by

More information

PROSPECT ANNOUNCES SIGNIFICANT VALUE UPGRADE OF ARCADIA LITHIUM PROJECT FOLLOWING UPDATED PRE-FEASIBILITY STUDY

PROSPECT ANNOUNCES SIGNIFICANT VALUE UPGRADE OF ARCADIA LITHIUM PROJECT FOLLOWING UPDATED PRE-FEASIBILITY STUDY PROSPECT ANNOUNCES SIGNIFICANT VALUE UPGRADE OF ARCADIA LITHIUM PROJECT FOLLOWING UPDATED PRE-FEASIBILITY STUDY POSITIVE IMPROVEMENTS IN KEY PROJECT PARAMETERS FURTHER ENHANCES THE ECONOMICS OF THE PROJECT

More information

Basic Financial Modelling in Excel

Basic Financial Modelling in Excel Basic Financial Modelling in Excel A Two Day Programme This course is presented in London on: 14-15 May 2018 This course can also be presented in-house for your company or via live on-line webinar The

More information

Financial Analyst Training Programme 10 Days

Financial Analyst Training Programme 10 Days Financial Analyst Training Programme 10 Days Delegate Profile: This course is targeted at delegates who are new to banking and finance and provides a comprehensive overview of financial reporting, financial

More information

JAMBREIRO IRON ORE PROJECT SET TO DELIVER STRONG CASH FLOWS AND RETURNS: PRE-FEASIBILITY STUDY

JAMBREIRO IRON ORE PROJECT SET TO DELIVER STRONG CASH FLOWS AND RETURNS: PRE-FEASIBILITY STUDY 14 November 2011 JAMBREIRO IRON ORE PROJECT SET TO DELIVER STRONG CASH FLOWS AND RETURNS: PRE-FEASIBILITY STUDY Board approves Commencement of Bankable Feasibility Study Jambreiro Pre-Feasibility Study

More information

Avnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project

Avnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project Avnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project ST. PETER PORT, GUERNSEY, October 15, 2014 Avnel Gold Mining Limited ( Avnel Gold or the Company

More information

Basic Financial Modelling in Excel

Basic Financial Modelling in Excel Basic Financial Modelling in Excel A Two Day Programme This course is presented in London on: DATES TBD This course can also be presented in-house for your company or via live on-line webinar The Banking

More information

Low capital development cost and high grades maximise free cash flow

Low capital development cost and high grades maximise free cash flow Harmony Gold Mining Company Limited Registration number 1950/038232/06 Incorporated in the Republic of South Africa ISIN: ZAE000015228 JSE share code: HAR ( Harmony or the Company ) Harmony s Golpu Project

More information

For personal use only

For personal use only ASX Announcement 29 January 2014 Quarterly Activities Report December 2013 Project geologists inspecting new drill core from the Natougou Gold Project. Orbis Gold Limited ACN 120 212 017 ASX Code : OBS

More information

For personal use only

For personal use only ame of entity Information Form and Checklist Annexure I (Mining Entities) AB/ARB/ARS TT Mines Limited AC 107 244 039 This Annexure forms part of the Information Form and Checklist supplied by the entity

More information

Spanish Mountain Gold Announces Results of New PEA for the First Zone

Spanish Mountain Gold Announces Results of New PEA for the First Zone 1120-1095 West Pender Street Vancouver, British Columbia, V6E 2M6 Tel: 604.601.3651 April 10, 2017 Spanish Mountain Gold Announces Results of New PEA for the First Zone VANCOUVER, B.C. Spanish Mountain

More information

GOLD PROJECTS Update. Richard Stewart Executive Vice President: Business Development. 28 July 2016

GOLD PROJECTS Update. Richard Stewart Executive Vice President: Business Development. 28 July 2016 GOLD PROJECTS Update Richard Stewart Executive Vice President: Business Development 28 July 2016 Disclaimer The information in this presentation may include forward-looking statements, which are based

More information

Acacia Mining plc (formerly African Barrick Gold plc) LSE: ACA. ( Acacia or the Company ) Approval of Gokona Underground project at North Mara

Acacia Mining plc (formerly African Barrick Gold plc) LSE: ACA. ( Acacia or the Company ) Approval of Gokona Underground project at North Mara 27 November 2014 Acacia Mining plc (formerly African Barrick Gold plc) LSE:ACA ( Acacia or the Company ) Approval of Gokona Underground project at North Mara Total production of 450,000 ounces over a 5

More information

International approaches to mining projects: Due Diligence, Scoping, Pre-Feasibility, Feasibility Studies

International approaches to mining projects: Due Diligence, Scoping, Pre-Feasibility, Feasibility Studies International approaches to mining projects: Due Diligence, Scoping, Pre-Feasibility, Feasibility Studies Sergei Sabanov, PhD, CEng MIMMM Date:10 December 2013 Location: Almaty, Kazakhstan SRK Consulting

More information

For personal use only

For personal use only 26 March 2013 Company Announcements Office ASX Limited Exchange Centre 20 Bridge Street Sydney NSW 2000 BARNES HILL OPTIMISED FEASIBILITY STUDY COMPLETED HIGHLIGHTS Summary Optimised feasibility study

More information

TAMPIA GOLD PROJECT FEASIBILITY STUDY

TAMPIA GOLD PROJECT FEASIBILITY STUDY TAMPIA GOLD PROJECT FEASIBILITY STUDY DEVELOPING A NEW GOLD MINE EXPLORING A POTENTIAL NEW GOLD FIELD ASX:EXU 1 TAMPIA GOLD PROJECT Western Australian gold explorer focused on developing the shallow high

More information

Turquoise Hill files 2016 Oyu Tolgoi Technical Report

Turquoise Hill files 2016 Oyu Tolgoi Technical Report October 21, 2016 Press release Turquoise Hill files 2016 Oyu Tolgoi Technical Report VANCOUVER, CANADA Turquoise Hill Resources today filed an updated compliant independently-prepared technical report

More information

Definitive Feasibility Study Released 16:23 28-Feb-2017

Definitive Feasibility Study Released 16:23 28-Feb-2017 Regulatory Story Xtract Resources plc - XTR Definitive Feasibility Study Released 16:23 28-Feb-2017 RNS Number : 1114Y Xtract Resources plc 28 February 2017 For immediate release 28 February 2017 Xtract

More information

SCOTGOLD RESOURCES LIMITED

SCOTGOLD RESOURCES LIMITED SCOTGOLD RESOURCES LIMITED Proactive Investor Forum Presentation London 12 January 2017 Disclaimer This presentation is provided for the sole purpose of providing preliminary technical, financial and other

More information

SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS

SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS FOR IMMEDIATE RELEASE December 8th, 2009 TSX: SUE SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS Toronto, Ontario, Canada, December 8 th, 2009 Sulliden Gold Corporation ( Sulliden or the Company )

More information

The above activities have produced consistently good results that have confirmed the value of the Mahenge Liandu project.

The above activities have produced consistently good results that have confirmed the value of the Mahenge Liandu project. Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company 20 September 2018 Armadale Capital Plc ( Armadale the Company or the Group ) Interim Results Armadale, the AIM quoted investment

More information

An Overview of Financial Model Components

An Overview of Financial Model Components An Overview of Financial Model Components Norm Kaneshiro Business Operations UK Seabed Resources 05 May 2017 2016 UK Seabed Resources Ltd. 1 Economic Model Cost fidelity will evolve upon completion of

More information

PRESS RELEASE FOR IMMEDIATE RELEASE May 13, 2016

PRESS RELEASE FOR IMMEDIATE RELEASE May 13, 2016 CZN-TSX CZICF-OTCQB PRESS RELEASE FOR IMMEDIATE RELEASE May 13, 2016 CANADIAN ZINC FILES TECHNICAL REPORT ON 2016 PREFEASIBILITY STUDY UPDATE FOR THE PRAIRIE CREEK MINE Vancouver, British Columbia, May

More information

AVESORO REPORTS A 29% INCREASE IN MINERAL RESERVES AT THE YOUGA GOLD MINE

AVESORO REPORTS A 29% INCREASE IN MINERAL RESERVES AT THE YOUGA GOLD MINE 19 June 2018 Avesoro Resources Inc. TSX: ASO AIM: ASO AVESORO REPORTS A 29% INCREASE IN MINERAL RESERVES AT THE YOUGA GOLD MINE Avesoro Resources Inc. ( Avesoro or the Company ), the TSX and AIM listed

More information

For personal use only

For personal use only February 20 th, 2017 ASX Release Strategic Exploration Alliance with South32 South32 to fund exploration activities (including drilling) over at least five AusQuest projects as part of a global Strategic

More information

Quarterly Report for March 2018

Quarterly Report for March 2018 Quarterly Report for March 2018 Highlights ASX ANNOUNCEMENT 30 April 2018 Australian Securities Exchange Code: RND Board of Directors: Mr Otakar Demis Chairman and Joint Company Secretary Mr Anton Billis

More information

Understanding Finance to Influence Strategic Decisions Finance for Successful Strategy. London. Kuala Lumpur. 31 Jul - 04 Aug 2017

Understanding Finance to Influence Strategic Decisions Finance for Successful Strategy. London. Kuala Lumpur. 31 Jul - 04 Aug 2017 Kuala Lumpur 31 Jul - 04 Aug 2017 London 09-13 Oct 2017 Introduction Objectives It is essential to fully understand how finance influences strategic decision-making because it provides the foundation for

More information

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2018

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2018 31 July 2018 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2018 HIGHLIGHTS Revision to the Sese JV Environmental and Social Impact Assessment to 500MW and associated increase in coal mining

More information

QUARTERLY REPORT OCTOBER TO DECEMBER 2014

QUARTERLY REPORT OCTOBER TO DECEMBER 2014 QUARTERLY REPORT OCTOBER TO DECEMBER 2014 Highlights Outlook for March Quarter 2015 TUNGSTEN & MOLYBDENUM Molyhil NT Revised feasibility study completed demonstrating robust economics Continue off-take

More information

Developing an Advanced Lithium Project in Quebec, Canada

Developing an Advanced Lithium Project in Quebec, Canada Developing an Advanced Lithium Project in Quebec, Canada November 2017 ASX: SYA International Lithium & Graphite Conference, Hong Kong Disclaimer Forward Looking Statements This presentation may contain

More information

Technical Presentation The Star-Orion South Diamond Project. June 18, 2013

Technical Presentation The Star-Orion South Diamond Project. June 18, 2013 Technical Presentation The Star-Orion South Diamond Project June 18, 2013 Safe Harbour Statement This presentation contains forward-looking statements as defined by certain securities laws, including the

More information

Emerging Producer in the. Murchison Goldfields

Emerging Producer in the. Murchison Goldfields Emerging Producer in the Kirkalocka Gold Project Update April 2012 Murchison Goldfields ASX:MUM Release of Feasibility Study Released April 2, 2012 Demonstrates the recommissioning of Kirkalocka is economic

More information

GOLD RESERVE ANNOUNCES IMPROVED BRISAS PROJECT ECONOMICS AND UPDATES BRISAS PROJECT REPORT

GOLD RESERVE ANNOUNCES IMPROVED BRISAS PROJECT ECONOMICS AND UPDATES BRISAS PROJECT REPORT GOLD RESERVE ANNOUNCES IMPROVED BRISAS PROJECT ECONOMICS AND UPDATES BRISAS PROJECT 43-101 REPORT NR-06-15 SPOKANE, WASHINGTON November 13, 2006 Gold Reserve Inc. (TSX: GRZ AMEX:GRZ) announced the completion

More information

PEREGRINE DIAMONDS SUCCESSFULLY COMPLETES 2017 WORK PROGRAM AT CHIDLIAK AND PROVIDES BOTSWANA PROJECT UPDATE

PEREGRINE DIAMONDS SUCCESSFULLY COMPLETES 2017 WORK PROGRAM AT CHIDLIAK AND PROVIDES BOTSWANA PROJECT UPDATE Toronto Stock Exchange September 21, 2017 Trading Symbol: PGD For Immediate Release PEREGRINE DIAMONDS SUCCESSFULLY COMPLETES 2017 WORK PROGRAM AT CHIDLIAK AND PROVIDES BOTSWANA PROJECT UPDATE VANCOUVER,

More information

SOTKAMO SILVER AB Company Announcement July 28 th 2017

SOTKAMO SILVER AB Company Announcement July 28 th 2017 SOTKAMO SILVER AB Company Announcement July 28 th 2017 (NGM: SOSI; NASDAQ: SOSI1) Stockholm 8.45 am SOTKAMO SILVER: TECHNICAL REPORT OF SILVER MINE AND FEASIBILITY STUDY COMPLETED. THE DECISION TO MOVE

More information

SOLAR POWER PROJECT ECONOMICS

SOLAR POWER PROJECT ECONOMICS SOLAR POWER PROJECT ECONOMICS Instructor: Peter Cockcroft 9 11 October 2017 Bandung OVERVIEW Given the various fiscal incentives and quality of electricity offtakers today, the economic evaluation of solar

More information

LUCARA ON SCHEDULE TO COMPLETE PLANT OPTIMIZATION AND TO PROCESS SOUTH LOBE ORE

LUCARA ON SCHEDULE TO COMPLETE PLANT OPTIMIZATION AND TO PROCESS SOUTH LOBE ORE NEWS RELEASE FIRST QUARTER RESULTS: LUCARA ON SCHEDULE TO COMPLETE PLANT OPTIMIZATION AND TO PROCESS SOUTH LOBE ORE MAY 12, 2015 (LUC TSX, LUC BSE, LUC Nasdaq Stockholm) Lucara Diamond Corp. ( Lucara or

More information

For personal use only

For personal use only ACN 072 692 365 Report for September Quarter 26 October 2016 ASX Code: HEG, HEGOA CORPORATE A subscription agreement was signed with Bao Industry Pty Ltd (01.08.2016) for a number of placements to raise

More information

Minera IRL Reports Positive Ollachea Project Optimization Results

Minera IRL Reports Positive Ollachea Project Optimization Results Minera IRL Reports Positive Ollachea Project Optimization Results Lima, 4 June 2014: Minera IRL Limited ( Minera IRL or the Company ), (TSX:IRL) (AIM:MIRL) (BVL:MIRL), the Latin America gold mining company,

More information

NEWS RELEASE. Resources at Galat Sufar South ( GSS ), in-pit and outside current design, continue to increase

NEWS RELEASE. Resources at Galat Sufar South ( GSS ), in-pit and outside current design, continue to increase Orca Gold Inc. 2000-885 West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE Orca Gold Drills 123 m at 1.96 g/t Au and 12.0 m at 8.36 g/t Au and Proves

More information

Project Finance Modelling

Project Finance Modelling Project Finance Modelling A 3 Day Programme This course is presented in London on: 28 February 2 March 2018, 10-12 September 2018 The Banking and Corporate Finance Training Specialist Course Objectives

More information

Reserves and Resources Disclosure Rules for Mining and Oil & Gas Companies:

Reserves and Resources Disclosure Rules for Mining and Oil & Gas Companies: Reserves and Resources Disclosure Rules for Mining and Oil & Gas Companies: Draft ASX Listing Rules and Guidance Notes for Enhanced Disclosure Consultation Paper September 2012 Contents 1. Executive summary

More information

Alecto Minerals plc / EPIC: ALO / Market: AIM / Sector: Exploration & Development. Alecto Minerals plc ( Alecto or the Company )

Alecto Minerals plc / EPIC: ALO / Market: AIM / Sector: Exploration & Development. Alecto Minerals plc ( Alecto or the Company ) 29 September 2015 Alecto Minerals plc / EPIC: ALO / Market: AIM / Sector: Exploration & Development Alecto Minerals plc ( Alecto or the Company ) Scoping Study Demonstrates Robust Economics for a Joint

More information

A Z E R B A I J A N G O L D, C O P P E R A N D S I L V E R P R O D U C E R

A Z E R B A I J A N G O L D, C O P P E R A N D S I L V E R P R O D U C E R A Z E R B A I J A N G O L D, C O P P E R A N D S I L V E R P R O D U C E R A C A S H G E N E R A T I V E M I N I N G B U S I N E S S P R O A C T I V E I N V E S T O R S E V E N I N G F E B R U A R Y 2

More information

Panda Hill Niobium Project. January 2014

Panda Hill Niobium Project. January 2014 Panda Hill Niobium Project January 2014 ASX Capital Structure Issued Shares* 128,675,017 Unlisted options (May 2016 at 26.7c) 7,687,500 Listed options (January 2015 at 26.7c) 15,962,506 Total Options 23,650,006

More information

NOT FOR DISTRIBUTION TO US NEWSWIRE SERVICES OR DISSEMINATION IN THE UNITED STATES

NOT FOR DISTRIBUTION TO US NEWSWIRE SERVICES OR DISSEMINATION IN THE UNITED STATES NEWS RELEASE 09-01 NEW MILLENNIUM CAPITAL CORP. ANNOUNCES UPDATE OF KÉMAG MINERAL RESOURCE ESTIMATE BASED ON THE SPRING DRILLING PROGRAM, AND POSITIVE RESULTS OF KÉMAG PRE-FEASIBILITY STUDY, NOT FOR DISTRIBUTION

More information

Arafura Resources Limited

Arafura Resources Limited Arafura Resources Limited Australian Uranium & Rare Earths Conference 2013 16-17 July 2013, Fremantle Disclaimer Important Notice This presentation contains certain statements which may constitute forward-looking

More information

Peregrine Diamonds announces a positive Preliminary Economic Assessment for the Chidliak Phase One Diamond Development Project

Peregrine Diamonds announces a positive Preliminary Economic Assessment for the Chidliak Phase One Diamond Development Project Toronto Stock Exchange July 7, 2016 Trading Symbol: PGD Peregrine Diamonds announces a positive Preliminary Economic Assessment for the Chidliak Phase One Diamond Development Project Phase One development

More information

SCAF Workshop Integrated Cost and Schedule Risk Analysis. Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol

SCAF Workshop Integrated Cost and Schedule Risk Analysis. Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol The following presentation was given at: SCAF Workshop Integrated Cost and Schedule Risk Analysis Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol Released for distribution by the Author www.scaf.org.uk/library

More information

THE UPDATE ON THE ABCOURT-BARVUE FEASIBILITY STUDY IS POSITIVE A MAJOR REDUCTION IN THE INITIAL CAPITAL COST IS EXPECTED

THE UPDATE ON THE ABCOURT-BARVUE FEASIBILITY STUDY IS POSITIVE A MAJOR REDUCTION IN THE INITIAL CAPITAL COST IS EXPECTED FOR IMMEDIATE RELEASE TSX Venture ABI.V February 8, 2019 THE UPDATE ON THE ABCOURT-BARVUE FEASIBILITY STUDY IS POSITIVE A MAJOR REDUCTION IN THE INITIAL CAPITAL COST IS EXPECTED Rouyn-Noranda, Québec,

More information

22 October 2018 LSE: PDL. Petra Diamonds Limited ("Petra" or the "Company" or the Group ) Trading Update Q1 FY 2019 Production and Sales Report

22 October 2018 LSE: PDL. Petra Diamonds Limited (Petra or the Company or the Group ) Trading Update Q1 FY 2019 Production and Sales Report 22 October 2018 LSE: PDL Petra Diamonds Limited ("Petra" or the "Company" or the Group ) Trading Update Q1 FY 2019 Production and Report Petra Diamonds Limited announces the following Trading Update (unaudited)

More information

23 April 2018 LSE: PDL. Petra Diamonds Limited ( Petra, the Company or the Group ) Trading Update Q3 FY 2018 Production and Sales Report

23 April 2018 LSE: PDL. Petra Diamonds Limited ( Petra, the Company or the Group ) Trading Update Q3 FY 2018 Production and Sales Report 23 April LSE: PDL Petra Diamonds Limited ( Petra, the Company or the Group ) Trading Update Production and Report Petra Diamonds Limited announces the following trading update (unaudited) for the period

More information

NEWS RELEASE. Preliminary Economic Assessment of Block 14 Strong Economics at US$1,200/oz

NEWS RELEASE. Preliminary Economic Assessment of Block 14 Strong Economics at US$1,200/oz Orca Gold Inc., 2000-885 West Georgia St., Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE Preliminary Economic Assessment of Block 14 Strong Economics at US$1,200/oz

More information

Company Announcements Office. Subject: Australia Papua New Guinea Business Forum Golpu Project Update

Company Announcements Office. Subject: Australia Papua New Guinea Business Forum Golpu Project Update LEVEL 9 600 ST KILDA ROAD MELBOURNE VICTORIA 3004 AUSTRALIA PO BOX 6213 ST KILDA ROAD CENTRAL MELBOURNE 8008 To: From: Company Announcements Office Francesca Lee Date: 19 May 2015 Subject: Australia Papua

More information

How can mining companies maximise shareholder return creating value for all stakeholders

How can mining companies maximise shareholder return creating value for all stakeholders How can mining companies maximise shareholder return creating value for all stakeholders Mines and Money December 214 Gold price 22 to 214 longest rally in history US$/oz 2 18 16 14 12 1 8 6 4 2 1 Gold

More information

Dominion Diamond Files Updated Technical Report for the Diavik Diamond Mine

Dominion Diamond Files Updated Technical Report for the Diavik Diamond Mine Dominion Diamond Files Updated Technical Report for the Diavik Diamond Mine YELLOWKNIFE, NT (March 31, 2017) Dominion Diamond Corporation (TSX: DDC, NYSE: DDC) (the Company or Dominion ) today filed an

More information

Big news at Venturex goes unnoticed By Trevor Hoey. Published at Oct 22, 2018, in Speculate

Big news at Venturex goes unnoticed By Trevor Hoey. Published at Oct 22, 2018, in Speculate Big news at Venturex goes unnoticed By Trevor Hoey. Published at Oct 22, 2018, in Speculate Venturex Resources (ASX:VXR) recent definitive feasibility study (DFS) release has dispensed of many uncertainties

More information

Key factors in determining investment in mining

Key factors in determining investment in mining Key factors in determining investment in mining To consider financing of a mining project, investors must analyze The current state of fundamentals in the mining industry (i.e., supply, demand and price

More information

NOLANS RARE EARTHS A MAJOR PROJECT FOR THE TERRITORY

NOLANS RARE EARTHS A MAJOR PROJECT FOR THE TERRITORY NOLANS RARE EARTHS A MAJOR PROJECT FOR THE TERRITORY October 2014 Gavin Lockyer Managing Director DISCLAIMER Important Notice This presentation contains certain statements which may constitute forward-looking

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 28th November 2012 MATILDA MINE DEMONSTRATES ROBUST ECONOMICS Matilda open pit design confirms o 2.45Mt milled tonnes @ 2.11 g/t au head grade o 150,000oz gold production over four years

More information

QUARTERLY REPORT. For the period ended 30 June Carpentaria Resources is answering the world s call for high grade iron ore.

QUARTERLY REPORT. For the period ended 30 June Carpentaria Resources is answering the world s call for high grade iron ore. QUARTERLY REPORT For the period ended 30 June 2018 + Carpentaria Resources is answering the world s call for high grade iron ore. + The Company has a majority interest in the Hawsons Iron Project, source

More information

NEWS RELEASE Orca Gold Intersects 13m at 10.19g/t Au and 93.7m at 1.72g/t Au at its Block 14 Gold Project in Sudan

NEWS RELEASE Orca Gold Intersects 13m at 10.19g/t Au and 93.7m at 1.72g/t Au at its Block 14 Gold Project in Sudan Orca Gold Inc. 2000-885 West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE Orca Gold Intersects 13m at 10.19g/t Au and 93.7m at 1.72g/t Au at its Block

More information

ATLANTIC ANNOUNCES STRATEGIC INVESTMENT IN VELOCITY MINERALS LTD.

ATLANTIC ANNOUNCES STRATEGIC INVESTMENT IN VELOCITY MINERALS LTD. ATLANTIC ANNOUNCES STRATEGIC INVESTMENT IN VELOCITY MINERALS LTD. January 17, 2019 Canadian dollars unless otherwise noted Vancouver, British Columbia Atlantic Gold Corporation (TSX-V: AGB) ("Atlantic"

More information

Q P R E S T E A P E A R E S U L T S

Q P R E S T E A P E A R E S U L T S Q 4 2 0 1 4 P R E S T E A P E A R E S U L T S 1 1. 1 4 DISCLAIMER AND OTHER MATTERS SAFE HARBOR: Some statements contained in this presentation are forwardlooking statements within the meaning of the Private

More information

23 October 2017 LSE: PDL. Petra Diamonds Limited ("Petra" or "the Company" or the Group ) Trading Update Q1 FY 2018 Production and Sales Report

23 October 2017 LSE: PDL. Petra Diamonds Limited (Petra or the Company or the Group ) Trading Update Q1 FY 2018 Production and Sales Report This announcement contains inside information 23 October 2017 LSE: PDL Petra Diamonds Limited ("Petra" or "the Company" or the Group ) Trading Update Q1 FY 2018 Production and Report Petra Diamonds Limited

More information

HUMMINGBIRD RESOURCES

HUMMINGBIRD RESOURCES This research is intended for UK institutional investors only and market professionals. It is not intended for retail customers and any retail customer should seek professional, independent advice before

More information

Authier Lithium Project Advances to the Definitive Feasibility Stage

Authier Lithium Project Advances to the Definitive Feasibility Stage December 2017 ASX: SYA Authier Lithium Project Advances to the Definitive Feasibility Stage Disclaimer Forward Looking Statements This presentation may contain certain forward looking statements. Such

More information

BMR Group PLC ("BMR" or the "Company") Interim results for the six months ended 31 December 2016

BMR Group PLC (BMR or the Company) Interim results for the six months ended 31 December 2016 RNS Number : 0984B BMR Group PLC 31 March 2017 BMR Group PLC ("BMR" or the "Company") Interim results for the six months ended 31 December 2016 Chairman's statement I am pleased to present below the unaudited

More information

Mining On Top: Africa London Summit

Mining On Top: Africa London Summit www.miningontop.com/africa DELEGATE BROCHURE In partnership with Mining On Top: Africa London Summit Sharing the profits of the commodity boom One Great George Street, Westminster, London 25-26th June

More information

INVITATION TO TENDER: CONSULTANCY SERVICES TO DEVELOP A FINANCIAL MODEL FOR THE LESOTHO-BOTSWANA WATER TRANSFER SCHEME (LBWTS)

INVITATION TO TENDER: CONSULTANCY SERVICES TO DEVELOP A FINANCIAL MODEL FOR THE LESOTHO-BOTSWANA WATER TRANSFER SCHEME (LBWTS) INVITATION TO TENDER: CONSULTANCY SERVICES TO DEVELOP A FINANCIAL MODEL FOR THE LESOTHO-BOTSWANA WATER TRANSFER SCHEME (LBWTS) I am pleased to inform you that your organisation is invited to take part

More information

URSA Major Minerals Incorporated Press Release UMJ TSX March 2, 2012 URSA Major Minerals and Prophecy Platinum sign business combination agreement

URSA Major Minerals Incorporated Press Release UMJ TSX March 2, 2012 URSA Major Minerals and Prophecy Platinum sign business combination agreement URSA Major Minerals Incorporated Press Release UMJ TSX March 2, 2012 URSA Major Minerals and Prophecy Platinum sign business combination agreement Ursa Major Minerals Incorporated ("Ursa") (TSX: UMJ) and

More information

The concept of project value tracking and its application in project planning at Anglo Platinum

The concept of project value tracking and its application in project planning at Anglo Platinum text:text 9/26/08 2:58 PM Page 327 PEARSON-TAYLOR, J. and SMITH, G.L. The concept of project value tracking and its application in project planning at Anglo Platinum. Third International Platinum Conference

More information

For personal use only

For personal use only ` Dated: 14 April 2015 PHOENIX SUSPENDS SMALL MINING PROJECTS TO FOCUS ON NORTON JV AND HEAP LEACH ASX: PXG KEY POINTS Completion of mining at Kintore West in April 2015 Final milling campaign at Greenfields

More information

NEWCREST PROFITABLE GROWTH

NEWCREST PROFITABLE GROWTH NEWCREST PROFITABLE GROWTH Gerard Bond Finance Director and Chief Financial Officer Disclaimer Forward Looking Statements This presentation includes forward looking statements. Forward looking statements

More information

ASX ANNOUNCEMENT/MEDIA RELEASE

ASX ANNOUNCEMENT/MEDIA RELEASE ASX Code: MNB 27 October 2016 PERTH OFFICE Suite 1, 245 Churchill Avenue Subiaco WA 6008 T: +61 8 6270 4610 E: info@minbos.com W: www.minbos.com ABN: 93 141 175 493 ASX ANNOUNCEMENT/MEDIA RELEASE QUARTERLY

More information

For personal use only

For personal use only ASX Code: THR 23 August 2018 THOR MINING PLC Registered Numbers: United Kingdom 05276 414 Australia 121 117 673 Registered Office: 58 Galway Avenue MARLESTON, SA, 5035 Australia Ph: +61 8 7324 1935 Fx:

More information

Media Announcement (For Immediate Release)

Media Announcement (For Immediate Release) LionGold Corp Ltd (Incorporated in Bermuda) 59 Mohamed Sultan Road Sultan Link 02-08 Singapore 238999 Tel: (65) 6690 6860 Fax: (65) 6690 6844 info@liongoldcorp.om www.liongoldcorp.com Media Announcement

More information

ASX Release: 31 July 2017 Quarterly Activities Report - for the period ended 30 June 2017

ASX Release: 31 July 2017 Quarterly Activities Report - for the period ended 30 June 2017 ASX Release: 31 July 2017 Quarterly Activities Report - for the period ended 30 June 2017 ASX Code: WRM Issued Securities Shares: 870.7 million Options: 183.4 million Cash on hand (30 June 2017) $3.2M

More information

Mini MBA: Accounting & Finance. An Intensive 2-Week Training Course

Mini MBA: Accounting & Finance. An Intensive 2-Week Training Course An ISO 9001:2015 & ISO 29990:2010 Certified Company 15-JUL-18 An Intensive 2-Week Training Course Mini MBA: Accounting & Finance 24 Sep - 05 Oct 2018, Rome 19-30 Nov 2018, London 29 Jul - 09 Aug 2019,

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: General 13 April 2016 English only Economic Commission for Europe Conference of European Statisticians Group of Experts on National Accounts Fifteenth

More information

For personal use only. Investor presentation

For personal use only. Investor presentation Investor presentation May 2018 ASX: GPR For personal use only Investment highlights 1 Advanced 100Koz.pa development project 5 AISC below A$800/oz in first two years 6 Strong cashflow delivers 2.2-year

More information

ELEMENTOS. Building a profitable, robust & sustainable Tin mining company. (ASX:ELT) July Renewable energy needs Tin.

ELEMENTOS. Building a profitable, robust & sustainable Tin mining company. (ASX:ELT) July Renewable energy needs Tin. ELEMENTOS (ASX:ELT) July 2017 Building a profitable, robust & sustainable Tin mining company Renewable energy needs Tin. Why Tin? Global demand driven by sustainabilty & renewable energy trends batteries

More information

20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa

20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa 10 August 2018 ASX: MOD 20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa T3 plant throughput capacity increased to 3Mtpa, a 20% increase to the PFS Base Case Sedgman appointed as Feasibility

More information

PEA for Tilemsi Phosphate Indicates US$ 649m NPV at 10% Discount Rate

PEA for Tilemsi Phosphate Indicates US$ 649m NPV at 10% Discount Rate December 18, 2012 PEA for Tilemsi Phosphate Indicates US$ 649m NPV at 10% Discount Rate VANCOUVER, BRITISH COLUMBIA (December 18, 2012) Great Quest Metals Ltd. ("Great Quest" or the Company ) (TSX-V: GQ,

More information

For personal use only

For personal use only 20 June 2017 SIANA GOLD PROJECT AND COMPANY UPDATE Key Points Siana Gold Project, Philippines Key milestones achieved with underground development prior to suspension of underground activities: o Combined

More information

NOTES TO THE FINANCIAL STATEMENTS

NOTES TO THE FINANCIAL STATEMENTS FINANCIAL STATEMENTS NOTES TO THE FINANCIAL STATEMENTS 1. ACCOUNTING POLICIES Basis of preparation The financial statements have been prepared in accordance with International Financial Reporting Standards

More information

For further information: Investor Relations (416)

For further information: Investor Relations (416) For further information: Investor Relations (416) 947-1212 (All amounts expressed in U.S. dollars unless otherwise noted) AGNICO EAGLE COMPLETES UPDATED NI 43-101 TECHNICAL REPORT ON THE MELIADINE GOLD

More information

THE 10-DAY FINANCIAL MANAGEMENT WORKSHOP FOR THE OIL & GAS INDUSTRY: Budgeting, Cost Control and Financial Accounting

THE 10-DAY FINANCIAL MANAGEMENT WORKSHOP FOR THE OIL & GAS INDUSTRY: Budgeting, Cost Control and Financial Accounting ISO 9001:2015 Certified ISO 29990:2010 Certified ISO 29990 13-NOV-18 THE 10-DAY FINANCIAL MANAGEMENT WORKSHOP FOR THE OIL & GAS INDUSTRY: Budgeting, Cost Control and Financial Accounting 09-20 Sep 2019,

More information

Why Mines Fail. Presented by: Richard J. Lambert, MBA, P.E., P.Eng. Seeking Better Mining Outcomes in the Next Cycle.

Why Mines Fail. Presented by: Richard J. Lambert, MBA, P.E., P.Eng. Seeking Better Mining Outcomes in the Next Cycle. Why Mines Fail Seeking Better Mining Outcomes in the Next Cycle Presented by: Richard J. Lambert, MBA, P.E., P.Eng. March 6, 2017 About RPA Advice to the mining industry for 30 years The specialty firm

More information

COLONIAL COAL INTERNATIONAL CORP. Suite Howe Street, Vancouver, British Columbia, Canada, V6C 2T5 Telephone: (604)

COLONIAL COAL INTERNATIONAL CORP. Suite Howe Street, Vancouver, British Columbia, Canada, V6C 2T5 Telephone: (604) COLONIAL COAL INTERNATIONAL CORP. Suite 200-595 Howe Street, Vancouver, British Columbia, Canada, V6C 2T5 Telephone: (604) 568-4962 NEWS RELEASE COLONIAL COAL ANNOUNCES COMBINED RESULTS OF RECENT PRELIMINARY

More information

Understanding the capital efficiency and risk effects of a streaming deal

Understanding the capital efficiency and risk effects of a streaming deal Understanding the capital efficiency and risk effects of a streaming deal Michael Samis, Associate Partner michael.samis@ca.ey.com EY Valuation and Business Modelling Complex Securities Group October 26,

More information

PM013: Project Management Detailed Engineering for Capital Projects

PM013: Project Management Detailed Engineering for Capital Projects PM013: Project Management Detailed Engineering for Capital Projects PM013 Rev.001 CMCT COURSE OUTLINE Page 1 of 6 Training Description: Large capital-intensive projects require substantial and often risky

More information

An Australian gold miner for global investors WA Mining Club - May 2018

An Australian gold miner for global investors WA Mining Club - May 2018 An Australian gold miner for global investors WA Mining Club - May 2018 Disclaimer Competent Persons Statements The information in this announcement that relates to exploration results, data quality, geological

More information