1 ASX Announcement 29 January 2014 Quarterly Activities Report December 2013 Project geologists inspecting new drill core from the Natougou Gold Project. Orbis Gold Limited ACN ASX Code : OBS Head Office Level 32, AMP Place, 10 Eagle Street Brisbane QLD 4000 Ouagadougou Office Section 281, Secteur 15 Quartier Ouaga 2000 Telephone: Facsimile: Website: info@orbisgold.com Quarterly Activities Report December

2 Highlights West African Gold Natougou Project Scoping Study Positive Scoping Study results received for Natougou Gold Project significant gold production, significant free cashflows and low cash costs outlined over the life of mine across a range of mill capacities (based on a US$1,300/oz gold price): Mill Capacity Mine Life Average Gold Production Total Cash Cost Project NPV (10%) Project IRR Project Free Cashflow (after tax & capex) Payback 1.5Mtpa 8.2 yrs 154koz pa US$652/oz US$259m 43% US$476m 1.8 years 2.0Mtpa 6.2 yrs 213koz pa US$590/oz US$356m 60% US$560m 1.4 years Cautionary Statement Regarding Natougou Production Targets / Scoping Study The Company advises the Natougou Scoping Study results and production targets reflected in this presentation are preliminary in nature as conclusions are drawn partly from Indicated Mineral Resources and Inferred Mineral Resources. The Natougou Scoping Study is based on lower level technical and economic assessments, and is insufficient to support estimation of Ore Reserves or to provide assurance of an economic development case at this stage, or to provide certainty that the conclusions of the Scoping Study will be realised. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised. Natougou Project Drilling Results Subsequent to end of the quarter new near surface high grade drill intersections announced from Mineral Resource infill drilling program. New intersections indicate potential to incorporate additional high grade gold mineralisation into early stages of the mine schedule currently being assessed in detailed development studies. New high grade gold intersections included: o 18.33g/t Au (from 65.85m) in BODD091 (incl g/t Au from 65.85m) o 9.66g/t Au (from 58.40m) in BODD093 (incl g/t Au from 61.00m) o 38.69g/t Au (from 53.40m) in BODD094 (incl g/t Au from 56.00m) o 13.89g/t Au (from 54.00m) in BODD096 (incl g/t Au from 56.00m) o 11.40g/t Au (from 46.00m) in BODD098 (incl g/t Au from 48.00m) 2

3 o 8.06g/t Au (from 47.00m) in BODD099 (incl g/t Au from 49.00m) o 29.12g/t Au (from 99.37m) in BODD116 (incl g/t Au from m) o 30.74g/t Au (from 39.03m) in BODD135 (incl g/t Au from 41.00m) o 19.64g/t Au (from 62.00m) in BODD137 (incl g/t Au from 63.00m) Multi rig drilling program to continue during March 2014 quarter targeting upgrade and extension of Natougou Project Mineral Resources. Natougou Project Development Studies Natougou Project development studies commenced during the quarter (following receipt of positive Scoping Study results). Mr Andrew Skalski appointed as Manager Projects to lead the advancement of all technical studies for the Company focussed initially on the Natougou Gold Project. Recent development study activities included expansion of metallurgical test work program and commencement of environmental and social baseline survey programs. Bantou Project Expanded induced polarisation (IP) geophysical survey commenced survey to define structural gold targets within large scale gold in soil anomalies at Bantou, Tankoro and Safia Prospects. Drilling of multiple gold targets across the Bantou Project area scheduled to commence during March 2014 quarter. Nabanga Gold Project Internal Scoping Study assessing selective underground mining of Nabanga deposit continued. 3

4 Exploration West Africa Orbis Gold holds a large portfolio of highly prospective exploration permits in Burkina Faso, West Africa (Figure 1). On ground exploration recommenced in Burkina Faso during the quarter following the end of the annual wet season rains. Field activities are currently focussed on the high grade Natougou Gold Project in eastern Burkina Faso (drilling program in progress), and the Bantou Gold Project in western Burkina Faso (geophysical program in progress) (Figure 1). Figure 1 Orbis Burkina Faso location diagram. Natougou Gold Project During the quarter Orbis achieved further significant progress on the advancement of the Natougou Gold Project including: completion of a development Scoping Study confirming potential for development of a robust large scale low cost gold mine at Natougou (subject to completion of formal feasibility studies). appointment of Mr Andrew Skalski as Manager Projects to lead the completion of a formal Feasibility Study for the Natougou Project, commencement of development studies for the Natougou Gold Project, and recommencement of resource definition drilling with new near surface high grade assay results reported subsequent to the end of the quarter. An overview of the results of these activities is provided below. 4

5 Natougou Project Scoping Study During the quarter Orbis announced that it had received positive results from the development Scoping Study for the Natougou Gold deposit. The Scoping Study evaluation was managed by Lycopodium Minerals Pty Ltd, with input from a range of specialist consultants, and was completed to a +/ 50% input cost estimate. The Scoping Study assumes development of the Natougou deposit by a conventional open pit mining method comprising drill, blast, load and haul (Figure 2). Total production over the life of mine is estimated at 3.5g/t Au for 1.41 million ounces of contained gold. Figure 2 Natougou Project 3D view of notional staged open pit design from Scoping Study. The Scoping Study assessed two alternate mill throughput scenarios 1.5Mtpa and 2.0Mtpa and used a base gold price assumption of US$1,300/oz. The Scoping Study indicates potential for significant positive financial outcomes for both mill capacity scenarios evaluated and indicates potential for development of a large scale low cost gold mine (subject to completion of formal feasibility studies). Summary financial and physical KPI's derived from the Scoping Study are provided as follows: Mill Capacity Mine Life Average Gold Production Total Cash Cost Project NPV (10%) Project IRR Project Free Cashflow (after tax & capex) Payback 1.5Mtpa 8.2 yrs 154koz pa US$652/oz US$259m 43% US$476m 1.8 years 2.0Mtpa 6.2 yrs 213koz pa US$590/oz US$356m 60% US$560m 1.4 years Table 1 Natougou Summary financial KPI's (100% project basis, US$1,300/oz gold price). The Scoping Study included sensitivity analysis based on movements in the gold price within the range US$1,000/oz to US$1,600/oz (+/ US$300/oz). 5

6 The results of the sensitivity analysis (summarised in Table 2) indicate potential for a robust project with strong returns and significant free cashflows (after tax and capex) across a range of gold price scenarios. Scenario 1.5Mtpa 2.0Mtpa Gold Price US$1,000/oz US$1,300/oz $1,600/oz Cashflow (after tax) US$175m US$476m US$760m NPV 10 (after tax) US$54m US$259m US$453m IRR (after tax) 17% 43% 65% Cashflow (after tax) US$246m US$560m US$857m NPV 10 (after tax) US$125m US$356m US$574m IRR (after tax) 29% 60% 87% Table 2 Natougou Sensitivity analysis versus gold price (100% project basis). A provisional site layout for the Natougou site (as defined in the Scoping Study) is provided at Figure 3. Further details on the Natougou Scoping Study can be found in the Company's ASX release "Natougou Positive Scoping Study Results" dated 15 October Figure 3 Natougou Provisional site layout. Natougou Project Drilling Results Subsequent to the end of the quarter Orbis announced new high grade drill assay results from the Natougou Gold Project. The assays comprised initial results for an infill drilling program (being completed on a 40m x 40m drill grid) that is targeting an upgrade of a significant proportion of the Natougou deposit to an Indicated Mineral Resource status. 6

7 The assay results (for the initial 34 diamond drill holes) tested the up dip extension of the deposit in the area to the immediate south east of the current Indicated Mineral Resources (Figure 4). The drilling results confirmed near surface high grade gold mineralisation within the Natougou deposit and indicate potential for additional high grade mineralisation to be incorporated into early stages of the mine production schedule currently being assessed in detailed development studies (Figures 5 and 6). The drill holes intersections (including multiple drill holes with visible free gold) included: 18.33g/t Au (from 65.85m) in BODD091 (incl g/t Au from 65.85m) 9.66g/t Au (from 58.40m) in BODD093 visible gold observed (incl g/t Au from 61.00m) 38.69g/t Au (from 53.40m) in BODD094 visible gold observed (incl g/t Au from 56.00m) 13.89g/t Au (from 54.00m) in BODD096 visible gold observed (incl g/t Au from 56.00m) 11.40g/t Au (from 46.00m) in BODD098 visible gold observed (incl g/t Au from 48.00m) 8.06g/t Au (from 47.00m) in BODD099 (incl g/t Au from 49.00m) 29.12g/t Au (from 99.37m) in BODD116 visible gold observed (incl g/t Au from m) 30.74g/t Au (from 39.03m) in BODD135 visible gold observed (incl g/t Au from 41.00m) 19.64g/t Au (from 62.00m) in BODD137 visible gold observed (incl g/t Au from 63.00m) Further details on the drill hole results shown above (including location data) can be found in the Company's ASX releases "Natougou Near Surface High Grade Gold Intersections" dated 13 January The multi rig drilling program at Natougou will continue during the March 2014 quarter. In addition to "infill" drilling the current drilling program will also target: extensions to the Natougou deposit in particular hangingwall structures previously intersected along the south west margin of the deposit, and additional gold targets within the surrounding large scale (50km 2 ) gold in soil anomaly. 7

8 Figure 4 Natougou drill status plan showing location of new drill holes and cross section. Figure 5 Natougou cross section "A B". 8

9 Figure 6 Natougou detailed drill status plan showing location of new drill hole intersections. Natougou Project Development Studies During the quarter Orbis announced the appointment of Mr Andrew Skalski as Manager Projects to lead to the advancement of all technical studies for the Company focussed initially on the Natougou Gold Project. Andrew is a metallurgist with 29 years experience in the mining industry and has previously held senior roles at KCGM, WMC Resources and several junior mining houses. He has been successful in the management and optimisation of complex processing operations, integration of major plant expansion, project management and new business development. Andrew has particular expertise in the management and preparation of feasibility studies for the mining industry in Australia, New Zealand, Indonesia, West and East Africa. Following the receipt of positive Scoping Study results during the quarter Orbis commenced detailed technical studies on the development of the Natougou gold deposit. Development study activities during the quarter focussed on expansion of the metallurgical test work program and commencement of environmental and social baseline survey programs. The development studies will provide input into a formal Definitive Feasibility Study (DFS) for the Natougou Gold Project. Orbis anticipates that it will provide a timetable for completion of the DFS at the completion of the current infill drilling program and Mineral Resource upgrade. 9

10 Bantou Gold Project During the quarter the Company continued to advance exploration activities within the Bantou Project area in western Burkina Faso (Figure 1). The Bantou Project includes a number of highly prospective gold targets within the Dynikongolo exploration permit including the Bantou, Tankoro and Safia Gold Prospects (Figure 7). Figure 7 Bantou Project showing location of prospect areas / Orbis discoveries. 10

11 IP Geophysical Survey Program During the quarter Orbis commenced an expanded program of induced polarisation (IP) geophysical surveys across the Bantou Project area. The expanded IP surveys are seeking to define new gold mineralised structures within the Bantou, Tankoro and Safia Prospect areas (Figure 7). The IP survey technique has proven to be very effective in the definition of potential new gold mineralised structures in the Bantou area. Reconnaissance IP surveys completed by Orbis in 2013 (with subsequent drilling) led to new gold discoveries in the Bantou East and Tankoro East areas (Figure 7). Nabanga Gold Project During the quarter Orbis continued to advance an internal Scoping Study assessing the potential for future development of the high grade Nabanga gold deposit. Studies are currently focussed on the assessment of selective underground mining methods targeting higher production grades and lower annual production rates. Exploration Mount Isa Region Orbis Gold Limited holds an interest in approximately 2,700km 2 of granted exploration permits in the Mount Isa region of north west Queensland. Orbis' permits in the Mount Isa region are prospective for a range of mineral deposit styles including ironoxide copper gold (IOCG) deposits and shear hosted copper deposits. The Company s strategy for its Mount Isa region projects is to advance exploration by third party funding under joint venture type arrangements. Boomara Project No significant results were received during the quarter for the Boomara Project. Corporate Orbis Cash Reserves Cash reserves and liquid investments held by the Company totalled approximately $5.6 million at 31 December 2013 (includes $0.15 million held by Harmattan Gold Limited). Capital Structure (at 28 January 2014) Share price (OBS): $0.32 Issued shares: 219.5m Unlisted options: 4.8m Market Capitalisation: $70.2 million (at 28 January 2014) 11

12 Major Shareholders Shareholder Shares Held % DGR Global Ltd 39,000, % HSBC Custody Nominees (Australia) Limited 26,890, % Tenstar Trading Limited 20,593, % UBS Nominees Pty Ltd 8,840, % Other 124,212, % Total 219,536, % Table 3 Summary of major shareholders at 16 January For further information please contact: Mr Peter Spiers Managing Director Ph: (07) or Mr Peter Harding Smith Company Secretary Ph: (07) or info@orbisgold.com Further information on Orbis Gold can be found on our website Competent Persons Statement The information in this report that relates to Exploration Results is based on information compiled by Mr Peter Spiers, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Spiers is a full time employee of the company. Mr Spiers has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Spiers consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Drill Hole Intersections Drill hole intersection lengths reported in this announcement represent down hole lengths and do not equate to true widths. The conversion from down hole lengths to true widths will be variable from hole to hole due to variability of the dip of the targeted structures and variability in the inclination (dip) of individual drill holes. 12

For personal use only. Burkina Faso ASX:MET. The Gold Symposium. Sydney (14-15 November 2011)

For personal use only. Burkina Faso ASX:MET. The Gold Symposium. Sydney (14-15 November 2011) Burkina Faso ASX:MET The Gold Symposium Sydney (14-15 November 2011) Important Information Disclaimer This presentation may contain certain statements and projections provided by or on behalf of Mt Isa

More information

WEST AFRICAN SCOPING STUDY DELIVERS HIGH MARGIN, LOW CAPITAL COST STAGE 1 GOLD PROJECT

WEST AFRICAN SCOPING STUDY DELIVERS HIGH MARGIN, LOW CAPITAL COST STAGE 1 GOLD PROJECT Press Release 29 th July 2014 WEST AFRICAN SCOPING STUDY DELIVERS HIGH MARGIN, LOW CAPITAL COST STAGE 1 GOLD PROJECT West African Resources Limited (ASX, TSXV: WAF) is pleased to announce the results of

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 28th November 2012 MATILDA MINE DEMONSTRATES ROBUST ECONOMICS Matilda open pit design confirms o 2.45Mt milled tonnes @ 2.11 g/t au head grade o 150,000oz gold production over four years

More information

TUNKILLIA GOLD PROJECT

TUNKILLIA GOLD PROJECT TUNKILLIA GOLD PROJECT Positive Scoping Study establishes that Mungana (ASX: MUX) can become costcompetitive gold producer in South Australia Highlights Technical and economic assessment provides confidence

More information

TAMPIA GOLD PROJECT FEASIBILITY STUDY

TAMPIA GOLD PROJECT FEASIBILITY STUDY TAMPIA GOLD PROJECT FEASIBILITY STUDY DEVELOPING A NEW GOLD MINE EXPLORING A POTENTIAL NEW GOLD FIELD ASX:EXU 1 TAMPIA GOLD PROJECT Western Australian gold explorer focused on developing the shallow high

More information

For personal use only

For personal use only Developing the outstanding Fekola Project September 2014 Click to edit Master title style Click to edit Master subtitle style ASX:PIR 1 Executive Summary Papillon is an ASX-listed gold development company

More information

Press Release 31 January 2018

Press Release 31 January 2018 Press Release 31 January 2018 DECEMBER 2017 QUARTERLY REPORT (ASX: WAF) is pleased to report activities on its 100%-owned gold and copper-gold projects in Burkina Faso, West Africa, for the quarter ending

More information

A New Growth Story in Western Australian Gold

A New Growth Story in Western Australian Gold A New Growth Story in Western Australian Gold Gold production imminent following execution of mining alliance & toll milling agreements Cash flow by Q4 2016 Outstanding exploration upside in world-class

More information

West African Resources awards underground mining contract for M1 South to Byrnecut

West African Resources awards underground mining contract for M1 South to Byrnecut Press Release 28 th November 2018 West African Resources awards underground mining contract for M1 South to Byrnecut Gold developer West African Resources Limited (ASX, TSXV: WAF) is pleased to announce

More information

UNEARTHING THE FUTURE

UNEARTHING THE FUTURE UNEARTHING THE FUTURE Bank of America Merrill Lynch 34 th Annual Global Mining Metals & Steel Conference Barcelona, Spain May 16-18, 2017 FORWARD-LOOKING STATEMENTS This presentation contains forward-looking

More information

For personal use only

For personal use only ASX QUARTERLY REPORT MARCH 216 Quarterly Report March 216 Highlights 29 April 216 Maiden JORC resource of 131.1Mt @7.9% TGC at the Mahenge Project including 37.6Mt @1.2% TGC or 16.7Mt@ 11.1% TGC Largest

More information

Focused On Being A Burkina Faso Producer

Focused On Being A Burkina Faso Producer Focused On Being A Burkina Faso Producer Investor Presentation December 2012 www.goldenrim.com.au Disclaimer & Competent Person Statement This presentation has been prepared by Golden Rim Resources Limited

More information

Acacia Mining plc (formerly African Barrick Gold plc) LSE: ACA. ( Acacia or the Company ) Approval of Gokona Underground project at North Mara

Acacia Mining plc (formerly African Barrick Gold plc) LSE: ACA. ( Acacia or the Company ) Approval of Gokona Underground project at North Mara 27 November 2014 Acacia Mining plc (formerly African Barrick Gold plc) LSE:ACA ( Acacia or the Company ) Approval of Gokona Underground project at North Mara Total production of 450,000 ounces over a 5

More information

Press Release 31 July 2017

Press Release 31 July 2017 Press Release 31 July 2017 JUNE 2017 QUARTERLY REPORT West African Resources Limited (ASX: WAF) is pleased to report activities on its 100%-owned gold and copper-gold projects in Burkina Faso, West Africa,

More information

20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa

20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa 10 August 2018 ASX: MOD 20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa T3 plant throughput capacity increased to 3Mtpa, a 20% increase to the PFS Base Case Sedgman appointed as Feasibility

More information

VITAL METALS ANNUAL GENERAL MEETING

VITAL METALS ANNUAL GENERAL MEETING VITAL METALS ANNUAL GENERAL MEETING ASX:VML 25 November 2013 Building a globally significant strategic metals company Disclaimer & Competent Person Certain oral and written statements contained or incorporated

More information

For personal use only. Investor presentation Europe

For personal use only. Investor presentation Europe Investor presentation Europe July 2018 ASX: GPR For personal use only Investment highlights 1 Advanced 100Koz.pa gold development project 6 Strong cashflow delivers 2.2-year payback 7 Mining, environmental

More information

Panda Hill Niobium Project. January 2014

Panda Hill Niobium Project. January 2014 Panda Hill Niobium Project January 2014 ASX Capital Structure Issued Shares* 128,675,017 Unlisted options (May 2016 at 26.7c) 7,687,500 Listed options (January 2015 at 26.7c) 15,962,506 Total Options 23,650,006

More information

Press Release 25 October 2017

Press Release 25 October 2017 Press Release 25 October 2017 SEPTEMBER 2017 QUARTERLY REPORT (ASX: WAF) is pleased to report activities on its 100%-owned projects in Burkina Faso, West Africa, for the quarter ending 30 September 2017.

More information

High Grade Gold Intercepts Extend Akoko North. New High Grade East Lode Discovered. 12 th January ASX Announcement

High Grade Gold Intercepts Extend Akoko North. New High Grade East Lode Discovered. 12 th January ASX Announcement 12 th January 2010 ASX Announcement High Grade Gold Intercepts Extend Akoko North New High Grade East Lode Discovered Level 3, 10 Outram St West Perth WA 6005 PO BOX 437. West Perth WA 6872 Tel: +618 9322

More information

Celebrating 21 years of African gold mining. Presentation by Lee-Anne de Bruin, Chief Financial Officer Mining Indaba 2018, Cape Town

Celebrating 21 years of African gold mining. Presentation by Lee-Anne de Bruin, Chief Financial Officer Mining Indaba 2018, Cape Town Celebrating 21 years of African gold mining Presentation by Lee-Anne de Bruin, Chief Financial Officer Mining Indaba 2018, Cape Town Important Notices and Disclaimers Not an offer of securities This presentation

More information

For personal use only. Investor presentation

For personal use only. Investor presentation Investor presentation May 2018 ASX: GPR For personal use only Investment highlights 1 Advanced 100Koz.pa development project 5 AISC below A$800/oz in first two years 6 Strong cashflow delivers 2.2-year

More information

For personal use only. Drilling at Torrecillas July 2011

For personal use only. Drilling at Torrecillas July 2011 Drilling at Torrecillas July 2011 Mundo Mineracao Ltda - Overview Presentation December 2012 1 Disclaimer & Forward-Looking Statements Competent Person s Statement The information in this report that relates

More information

For personal use only

For personal use only ASX: GPR 31 January 2019 Quarterly report December 2018 The Board of Geopacific Resources Ltd (Geopacific ASX: GPR) is pleased to provide the December 2018 quarterly report. A significant milestone was

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 21 January 2015 SIGNIFICANT RESOURCE PROJECT ACQUISITION INTERNATIONAL GOLDFIELDS TO ACQUIRE PROSPECTIVE MINING & EXPLORATION PERMITS WITH POLYMETALLIC JORC RESOURCE HIGHLIGHTS International

More information

ACTIVITIES REPORT SEPTEMBER QUARTER 2017

ACTIVITIES REPORT SEPTEMBER QUARTER 2017 ACTIVITIES REPORT SEPTEMBER QUARTER 2017 HIGHLIGHTS ASX ANNOUNCMENT 30 October 2017 ASX Code: CMM ABN: 84 121 700 105 Board of Directors: Mr Heath Hellewell Executive Chairman Mr Guy LeClezio Non-Executive

More information

RIU Explorers Conference, February 2018: Trevor Dixon, Chairman

RIU Explorers Conference, February 2018: Trevor Dixon, Chairman Construction Underway : CLEAR PATHWAY TO CASHFLOW IN 2018 Low Capex Development : PROCESSING PLANT ALREADY SECURED Project Debt Funding: US$27M SPROTT DEBT FACILITY An Emerging WA Gold Producer with Outstanding

More information

For personal use only

For personal use only An Emerging West African Gold Developer www.papillonresources.com February 2013 Executive Summary Gold focus in Mali Flagship Fekola Project advancing rapidly Mineral Resource Estimate of 4.21 Moz (@ 2.38

More information

The Syama Transformation Story

The Syama Transformation Story The Syama Transformation Story Mine Gold. Create Value. Ms Lee-Anne de Bruin, Chief Financial Officer JP Morgan Australian Gold Forum September 2018 Important Notices and Disclaimers This presentation

More information

For personal use only

For personal use only NOVEMBER 2016 Investor Presentation Charging Ahead at the Authier Lithium Project ASX: SYA Sourcing the raw materials of the future Buoyant Lithium Macro DEMAND SUPPLY Renewable grid storage Transportation

More information

RAMELIUS APPROVES VIVIEN GOLD MINE

RAMELIUS APPROVES VIVIEN GOLD MINE For Immediate Release RAMELIUS APPROVES VIVIEN GOLD MINE Ramelius advised that this ASX Release has been replaced due to some formatting errors and follows. ISSUED CAPITAL Ordinary Shares: 469M DIRECTORS

More information

September 2014 Quarterly Report

September 2014 Quarterly Report 31 O c t o b e r 2 0 1 4 ANNOUNCEMENT / MEDIA RELEASE September 2014 Quarterly Report Carbon-in-leach (CIL) potential confirmed at Mankarga 5, Burkina Faso Diamond drilling beneath oxide starter pit reinforces

More information

June 2016 Quarterly Activity Report. Makabingui Gold Project Permit Update. Moura Permit Konkoutou Gold Project. Corporate

June 2016 Quarterly Activity Report. Makabingui Gold Project Permit Update. Moura Permit Konkoutou Gold Project. Corporate Bassari Resources Limited is an Australian ASXlisted company focused on discovering and developing multimillion ounce gold deposits in the Birimian Gold Belt, Senegal, West Africa. FAST FACTS ASX Code

More information

For personal use only

For personal use only Annual General Meeting Presentation 20 November 2017 Pilbara Gold Project Camels on The Sisters Tenement 1 Competent Persons Statements The information in this presentation that relates to the exploration

More information

Investing in Tin Seminar London 5 th December 2011

Investing in Tin Seminar London 5 th December 2011 Investing in Tin Seminar London 5 th December 2011 Disclaimer This presentation has been prepared by Consolidated Tin Mines Ltd (CSD) based on information from its own and third party sources and is not

More information

PRODUCING AND EXPLORING Q WEBCAST

PRODUCING AND EXPLORING Q WEBCAST PRODUCING AND EXPLORING Q3 2012 WEBCAST 1 CAUTIONARY STATEMENT This presentation contains forward looking information, within the meaning of applicable Canadian securities legislation, and forward looking

More information

For personal use only

For personal use only ASX/ Media Announcement 22 January 2015 Vital Metals Limited ASX Code: VML ACN: 112 032 596 64 Churchill Avenue, Subiaco, WA 6008 WATERSHED TUNGSTEN PROJECT: FINANCIALS SIGNIFICANTLY ENHANCED BY FALLING

More information

For personal use only

For personal use only For personal use only Indaba/121 Cape Town 5-6 February 2018 Botswana Copper Charging ahead in 2018 Disclaimer & Forward Looking Statements Competent Person s Statement Information in this presentation

More information

For personal use only

For personal use only 8 June 2018 ASX ANNOUNCEMENT PROGRAMME OF WORK APPROVAL MUNDA GOLD MINE HIGHLIGHTS POW received and planning underway to commence drilling JORC2012 resource 511,000t @ 2.82g/t Au for 46,337 ounces Au*

More information

For personal use only

For personal use only ACN 072 692 365 Report for September Quarter 26 October 2016 ASX Code: HEG, HEGOA CORPORATE A subscription agreement was signed with Bao Industry Pty Ltd (01.08.2016) for a number of placements to raise

More information

GROWTH THROUGH CASH FLOW. Q Results 3 August 2017

GROWTH THROUGH CASH FLOW. Q Results 3 August 2017 GROWTH THROUGH CASH FLOW 2017 Results 3 August 2017 2 DISCLOSURES Forward Looking Statements: There are risks associated with an investment in the shares of Centamin. Recipients of this presentation should

More information

INVESTOR PRESENTATION March 2017

INVESTOR PRESENTATION March 2017 INVESTOR PRESENTATION March 2017 1 1 Overview 100% owner of Big Springs Gold Project, north-east Nevada, USA 1 Mil ounce resource Fully permitted to commence mining operations Low capex requirement Mining

More information

For personal use only

For personal use only ASX Announcement 4 August 2015 Chief Executive Officer s Presentation at Diggers & Dealers 01 Attached is a copy of the Chief Executive Officer s presentation to be given at the Diggers and Dealers Conference

More information

For personal use only

For personal use only 31 December 2017 ASX Code: GPR GEOPACIFIC RESOURCES LIMITED ACN 003 208 393 info@geopacific.com.au www.geopacific.com.au PROJECTS PNG Woodlark Gold CAMBODIA Kou Sa Copper/ Gold FIJI: Sabeto & Vuda Gold-Copper

More information

Quarterly Activities Report

Quarterly Activities Report ASX: CYL Quarterly Activities Report Quarter ended 30 June 2012 SUMMARY High grade gold intersected in aircore drilling programme at Four Eagles Gold Project. Very high grade gold mineralisation in diamond

More information

An Australian gold miner for global investors WA Mining Club - May 2018

An Australian gold miner for global investors WA Mining Club - May 2018 An Australian gold miner for global investors WA Mining Club - May 2018 Disclaimer Competent Persons Statements The information in this announcement that relates to exploration results, data quality, geological

More information

Precious Metals Investment Symposium, November 2017: Don Harper, Managing Director

Precious Metals Investment Symposium, November 2017: Don Harper, Managing Director Feasibility Study complete : CLEAR PATHWAY TO CASHFLOW IN 2018 Low Capex Development : PROCESS PLANT ALREADY SECURED Tier 1 Location in WA : AGGRESSIVE EXPLORATION IN 2018 An Emerging WA Gold Producer

More information

Building an African Gold Mining Powerhouse

Building an African Gold Mining Powerhouse ASX: CHN Development targeted for 2011 104,000 oz per year producer Huge exploration upside Building an African Gold Mining Powerhouse Corporate Presentation July 2010 www.chalicegold.com Disclaimer &

More information

2011 Full Year Results Conference Call Presentation February 17, 2012

2011 Full Year Results Conference Call Presentation February 17, 2012 2011 Full Year Results Conference Call Presentation February 17, 2012 Cautionary Note Cautionary Notes a) Information Purposes Only The information contained in this presentation is provided by OceanaGold

More information

Alecto Minerals plc / EPIC: ALO / Market: AIM / Sector: Exploration & Development. Alecto Minerals plc ( Alecto or the Company )

Alecto Minerals plc / EPIC: ALO / Market: AIM / Sector: Exploration & Development. Alecto Minerals plc ( Alecto or the Company ) 29 September 2015 Alecto Minerals plc / EPIC: ALO / Market: AIM / Sector: Exploration & Development Alecto Minerals plc ( Alecto or the Company ) Scoping Study Demonstrates Robust Economics for a Joint

More information

Makabingui Gold Project

Makabingui Gold Project 26 April 2018 Bassari Resources Limited is an Australian ASXlisted company focused on discovering and developing multimillion ounce gold deposits in the Birimian Gold Belt, Senegal, West Africa. FAST FACTS

More information

LSE:ACA. Acacia Mining plc. Unearthing Africa s Potential

LSE:ACA. Acacia Mining plc. Unearthing Africa s Potential LSE:ACA Acacia Mining plc Unearthing Africa s Potential 03.09.2015 Important Notice This presentation includes forward-looking statements that express or imply expectations of future events or results

More information

COMPANY PRESENTATION

COMPANY PRESENTATION ASX/Media Announcement 5 February 2018 COMPANY PRESENTATION Golden Rim Resources Ltd (ASX: GMR, Golden Rim, Company) is pleased to provide its updated Company Presentation, Going for Gold in Burkina Faso.

More information

For personal use only

For personal use only Name of entity Information Form and Checklist Annexure I (Mining Entities) ABN/ARBN/ARSN Matador Mining Limited 45 612 912 393 This Annexure forms part of the Information Form and Checklist supplied by

More information

RAMELIUS TAKEOVER OFFER FOR EXPLAURUM LTD

RAMELIUS TAKEOVER OFFER FOR EXPLAURUM LTD Ramelius Resources Limited ASX:RMS RAMELIUS TAKEOVER OFFER FOR EXPLAURUM LTD 10 SEPTEMBER 2018 EXPLAURUM TAKEOVER TAKEOVER OFFER OFFER SEPTEMBER SEPTEMBER 2018 2018 1 QUALIFICATION Forward Looking Statements

More information

AGM Presentation, November 2017: Don Harper, Managing Director

AGM Presentation, November 2017: Don Harper, Managing Director Feasibility Study complete : CLEAR PATHWAY TO CASHFLOW IN 2018 Low Capex Development : PROCESS PLANT SECURED Project Debt Funding : TECHNICAL DUE DILIGENCE COMPLETE Tier 1 Location in WA : AGGRESSIVE EXPLORATION

More information

Scoping study (assuming toll milling) estimates $A24M (US$17M) operating surplus

Scoping study (assuming toll milling) estimates $A24M (US$17M) operating surplus 30 th April 2009 March December 2009 Quarterly Quarterly Report Report 2008 Highlights Akoko Project 76,000 ounce Indicated and Inferred Mineral Resource estimated for Akoko North gold deposit Pit optimisation

More information

Press Release 30 April 2018

Press Release 30 April 2018 Press Release 30 April 2018 MARCH 2018 QUARTERLY REPORT West African Resources Limited (ASX: WAF) is pleased to report activities on its 100%-owned gold and copper-gold projects in Burkina Faso, West Africa,

More information

PRODUCING AND EXPLORING 2012 ANNUAL GENERAL MEETING OF SHAREHOLDERS

PRODUCING AND EXPLORING 2012 ANNUAL GENERAL MEETING OF SHAREHOLDERS PRODUCING AND EXPLORING 2012 ANNUAL GENERAL MEETING OF SHAREHOLDERS 1 2012 ANNUAL GENERAL MEETING OF SHAREHOLDERS Alan R. Hill Richard Young Chairman & CEO President & CFO FOCUSED ON GROWTH FOCUSED ON:

More information

>gold >base metals >exploration

>gold >base metals >exploration >gold >base metals >exploration Building on Weednanna Gold Results, South Australia Wilcherry Project Joint Venture Mining 2017 Resources Convention, Brisbane, 30 August 2017 ASX Code: AGS 1 Cautionary

More information

LARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA

LARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA 3 MAY 2017 LARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA Highlights New zone of spodumene pegmatites discovered, with main body outcropping along 1300 metres in strike extent Widths up

More information

ASX ANNOUNCEMENT 18 SEPTEMBER More High Grade Results at the Zara Gold Project in Eritrea

ASX ANNOUNCEMENT 18 SEPTEMBER More High Grade Results at the Zara Gold Project in Eritrea ASX ANNOUNCEMENT 18 SEPTEMBER 2007 More High Grade Results at the Zara Gold Project in Eritrea Zara Joint Venture, Eritrea (Dragon Mining Limited - 20% interest) Koka Gold Deposit Dragon Mining Limited

More information

Mt Morgans Gold Project Feasibility Study / Expansion PFS Building Australia s next significant mid tier gold producer 21 November 2016 Rohan

Mt Morgans Gold Project Feasibility Study / Expansion PFS Building Australia s next significant mid tier gold producer 21 November 2016 Rohan Mt Morgans Gold Project Feasibility Study / Expansion PFS Building stralia s next significant mid tier gold producer 21 November 2016 Rohan Williams Executive Chairman Mount Morgans Feasibility Study Presentation

More information

MEDIA RELEASE. OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated)

MEDIA RELEASE. OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated) MEDIA RELEASE 26 June 2017 OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated) (MELBOURNE) OceanaGold Corporation (TSX/ASX: OGC) (the

More information

GOLD RESERVES INCREASED BY 155% TO 2.15 MILLION OUNCES AT SIMBERI GOLD PROJECT

GOLD RESERVES INCREASED BY 155% TO 2.15 MILLION OUNCES AT SIMBERI GOLD PROJECT ASX:ALD TSX:ALG AIM:AGLD 10 September 2010 Media Release This press release is not for dissemination in the United States and shall not be disseminated to United States news services. GOLD RESERVES INCREASED

More information

INDEPENDENCE GROUP NL

INDEPENDENCE GROUP NL INDEPENDENCE GROUP NL Growing a Great Company Annual General Meeting 25 November 2009 Chris Bonwick Managing Director FORWARD LOOKING STATEMENTS Certain oral and written statements contained or incorporated

More information

but investors are currently concerned about: Cost pressures Skills shortages US$ gold price outlook Australian dollar gold price per ounce

but investors are currently concerned about: Cost pressures Skills shortages US$ gold price outlook Australian dollar gold price per ounce 2 A$/oz 1,900 1,800 1,700 1,600 1,500 1,400 Australian dollar gold price per ounce A$ gold price Evolution reserve price assumption 1 Australian gold producers in good shape Generating record profits Reliable

More information

Sourcing the raw materials of the future. Authier Lithium Project JORC Resource Overview ASX: SYA JULY 2016

Sourcing the raw materials of the future. Authier Lithium Project JORC Resource Overview ASX: SYA JULY 2016 Sourcing the raw materials of the future ASX: SYA JULY 2016 Authier Lithium Project JORC Resource Overview Disclaimer COMPETENT PERSON STATEMENTS Authier - The information in this report that relates to

More information

SARAMA RESOURCES LTD. MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL RESULTS. For the year and quarter ended December 31, 2013.

SARAMA RESOURCES LTD. MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL RESULTS. For the year and quarter ended December 31, 2013. SARAMA RESOURCES LTD. MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL RESULTS For the year and quarter ended December 31, 2013 (April 30, 2014) (All amounts expressed in United States dollars, unless

More information

SIGNIFICANT GOLD INTERCEPTS AT PIGIBO PROSPECT

SIGNIFICANT GOLD INTERCEPTS AT PIGIBO PROSPECT 10 July 2009 Company Announcements Office Australian Stock Exchange Ltd This press release is not for dissemination in the United States and shall not be disseminated to United States news services. SIGNIFICANT

More information

6 September 2017 AFRICA DOWN UNDER AMENDED PRESENTATION

6 September 2017 AFRICA DOWN UNDER AMENDED PRESENTATION 6 September 2017 AFRICA DOWN UNDER AMENDED PRESENTATION Birimian Limited (ASX: BGS; Birimian or the Company) encloses an amended presentation for the Africa Down Under Conference in relation to a correction

More information

Emerging Producer in the. Murchison Goldfields

Emerging Producer in the. Murchison Goldfields Emerging Producer in the Kirkalocka Gold Project Update April 2012 Murchison Goldfields ASX:MUM Release of Feasibility Study Released April 2, 2012 Demonstrates the recommissioning of Kirkalocka is economic

More information

MERGER PRESENTATION JULY 2018

MERGER PRESENTATION JULY 2018 MERGER PRESENTATION JULY 2018 ASX: SPI ASX: EXG PAGE 1 1 CREATING A LEADING ASX-LISTED GOLD DEVELOPER The combined company, to be led by Managing Director Mr John Young, aims to fast-track the creation

More information

DRILLING TO RE-COMMENCE AT FOUR EAGLES GOLD PROJECT

DRILLING TO RE-COMMENCE AT FOUR EAGLES GOLD PROJECT ASX ANNOUNCEMENT 13 DECEMBER 2016 DRILLING TO RE-COMMENCE AT FOUR EAGLES GOLD PROJECT RC and Air Core drilling to re-commence at the Four Eagles Gold Project in mid-january 2017 Proposed drilling programme

More information

For personal use only

For personal use only Sandfire Resources NL ABN 55 105 154 185 Level 2, 31 Ventnor Ave, West Perth Western Australia 6005 Phone: +61 8 6430 3800 Fax: +61 8 6430 3849 Email: info@sandfire.com.au Web: www.sandfire.com.au ASX/Media

More information

For personal use only

For personal use only ABN 70 121 539 375 Interim Financial Report 31 December 2016 (ABN 70 121 539 375) CORPORATE INFORMATION Directors Mark Connelly (Non-Executive Chairman) Richard Hyde (Managing Director) Simon Storm (Non-Executive

More information

For personal use only

For personal use only ame of entity Information Form and Checklist Annexure I (Mining Entities) AB/ARB/ARS TT Mines Limited AC 107 244 039 This Annexure forms part of the Information Form and Checklist supplied by the entity

More information

UNEARTHING THE FUTURE. THE 28 TH ANNUAL GOLD FORUM The Broadmoor, Colorado Springs, Colorado September 2017

UNEARTHING THE FUTURE. THE 28 TH ANNUAL GOLD FORUM The Broadmoor, Colorado Springs, Colorado September 2017 UNEARTHING THE FUTURE THE 28 TH ANNUAL GOLD FORUM The Broadmoor, Colorado Springs, Colorado 24-27 September 2017 FORWARD-LOOKING STATEMENTS This presentation contains forward-looking statements. Forward-looking

More information

Pilbara Copper Zinc Projects

Pilbara Copper Zinc Projects Pilbara Copper Zinc Projects Right Metals Right Project Right Time Read Corporate Rising Stars Conference 30-31 May 2017 JOHN NITSCHKE, MANAGING DIRECTOR ASX: VXR 1 Disclaimers Cautionary Statement The

More information

ASX RELEASE 28 February, Half Year Ended 31 December 2006

ASX RELEASE 28 February, Half Year Ended 31 December 2006 Half Year Ended ember This document provides a review of the financial results and operations of Equigold NL for the half year ended ember. Highlights Profit before tax and hedge accounting adjustments

More information

Metminco Limited Developing Gold Production in Colombia. MAY 2017 Annual General Meeting

Metminco Limited Developing Gold Production in Colombia. MAY 2017 Annual General Meeting Metminco Limited Developing Gold Production in Colombia MAY 2017 Annual General Meeting 1 DISCLAIMER This presentation (the Presentation ) is strictly confidential to the recipient and has been prepared

More information

PRODUCING AND EXPLORING Q WEBCAST

PRODUCING AND EXPLORING Q WEBCAST PRODUCING AND EXPLORING Q2 2012 WEBCAST 1 CAUTIONARY STATEMENT This presentation contains forward looking information, within the meaning of applicable Canadian securities legislation, and forward looking

More information

Erdene Announces Positive Preliminary Economic Assessment for the Khundii Gold Project

Erdene Announces Positive Preliminary Economic Assessment for the Khundii Gold Project Erdene Announces Positive Preliminary Economic Assessment for the Khundii Gold Project Halifax, Nova Scotia December 18, 2018 - Erdene Resource Development Corp. (TSX:ERD; MSE:ERDN) ("Erdene" or "Company"),

More information

For personal use only

For personal use only ASX: GPR 30 October 2018 Quarterly report September 2018 The Board of Geopacific Resources Ltd (Geopacific ASX: GPR) is pleased to provide its quarterly report for the period ending 30 September 2018.

More information

For personal use only

For personal use only Mount Magnet South NL ABN 93 096 635 246 Quarterly Activities & Cashflow Report 30 September 2011 Summary Upgraded Mineral Resource Estimate at Kirkalocka finalised increasing Indicated category by 13%

More information

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA 13 July 2012 NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA This release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The

More information

BUREY GOLD LIMITED (ASX:BYR)

BUREY GOLD LIMITED (ASX:BYR) Investor Presentation October 2016 BUREY GOLD LIMITED (ASX:BYR) Disclaimer The material in this presentation ( Material ) is not and does not constitute an offer, invitation or recommendation to subscribe

More information

For personal use only

For personal use only QUARTERLY ACTIVITIES REPORT FOR THE 3 MONTH PERIOD ENDING 31 DECEMBER 2016 31 January 2017 HIGHLIGHTS FOR THE QUARTER Shareholders approved the acquisition of a 70% interest in the advanced and highly

More information

SARAMA RESOURCES LTD. MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL RESULTS. For the quarter and period ended September 30, 2016

SARAMA RESOURCES LTD. MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL RESULTS. For the quarter and period ended September 30, 2016 SARAMA RESOURCES LTD. MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL RESULTS For the quarter and period ended 2016 (November 25, 2016) (All amounts expressed in United States dollars, unless otherwise

More information

Agreement to Acquire Remaining Interest in the Golden Ridge Gold and Nickel Project

Agreement to Acquire Remaining Interest in the Golden Ridge Gold and Nickel Project 10 July 2012 ASX/Media Announcement ABN: 44 103 423 981 Tel: +61 8 9322 6974 Fax: +61 8 9486 9393 email: dcrook@pioresources.com.au Address: 21 Ord Street West Perth Western Australia Postal: PO Box 1787

More information

Resource and Investment NL ASX: RNI November 2013 AGM Presentation

Resource and Investment NL ASX: RNI November 2013 AGM Presentation An Emerging Western Australian Miner With a dominant copper-gold exploration portfolio Resource and Investment NL ASX: RNI November 203 AGM Presentation Corporate Snapshot Chairman: Miles Kennedy 28 years

More information

Bankable feasibility study on the Coburn project continued broadly on schedule with completion due in late March 2004.

Bankable feasibility study on the Coburn project continued broadly on schedule with completion due in late March 2004. QUARTERLY REPORT TO END OF DECEMBER 2003 GUNSON RESOURCES LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 st DECEMBER 2003 HIGHLIGHTS A significant increase in the Amy Zone resource at the Coburn heavy

More information

For personal use only

For personal use only Bligh signs development Joint Venture Agreement for the Bundarra Gold Project in WA Bligh Resources Limited ACN 130 964 162 ASX: BGH ASX Release 28 October 2015 Level 9, 53 Walker St North Sydney New South

More information

Investor Presentation

Investor Presentation ASX/Media Release 28 September 2011 Investor Presentation Australian gold exploration and development company, Westgold Resources Limited (ASX: WGR, Westgold ) lodges an updated investor presentation which

More information

TSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS

TSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS Orca Gold Inc. 2000-885 West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE Orca Gold Intercepts Broad Mineralization, Including 162m at 2.01 g/t Au

More information

BOSS FINALISES EARN IN AGREEMENT WITH GRYPHON MINERALS

BOSS FINALISES EARN IN AGREEMENT WITH GRYPHON MINERALS ASX ANNOUNCEMENT 4 July 2014 HIGHLIGHTS BOSS FINALISES EARN IN AGREEMENT WITH GRYPHON MINERALS Final documentation executed with Gryphon Minerals Limited (ASX:GRY) following completion of successful due

More information

Positive Pre-Feasibility at Borborema

Positive Pre-Feasibility at Borborema Positive Pre-Feasibility at Borborema Crusader Resources Limited has completed a positive Pre-Feasibility Study (PFS) of the Borborema Gold Project in the northeast of Brazil confirming a robustly economic

More information

For personal use only

For personal use only September 2015 Quarterly Report Fast Facts HIGHLIGHTS PFS completed, robust low cost operation defined All-in Sustaining Costs of US$234/oz projected Binding A$25M/yr pyrite offtake contract secured LOI

More information

AZUMAH MINING LEASES GRANTED

AZUMAH MINING LEASES GRANTED AZUMAH MINING LEASES GRANTED WA GOLD PROJECT, GHANA ASX & Media Release ASX Code AZM 28 th July 2014 Perth-based gold explorer and developer Azumah Resources Limited (ASX:AZM) (Azumah or the Company) is

More information

Bligh Strikes Joint Venture Agreement to develop Bundarra Gold Project in WA

Bligh Strikes Joint Venture Agreement to develop Bundarra Gold Project in WA Bligh Strikes Joint Venture Agreement to develop Bundarra Gold Project in WA Bligh Resources Limited ACN 130 964 162 Contacts: Bill Richie Yang ASX: BGH ASX Release 2 September 2015 Level 9, 53 Walker

More information