1 ASX/ Media Announcement 22 January 2015 Vital Metals Limited ASX Code: VML ACN: Churchill Avenue, Subiaco, WA 6008 WATERSHED TUNGSTEN PROJECT: FINANCIALS SIGNIFICANTLY ENHANCED BY FALLING CURRENCY AND COSTS Lower dollar and falling input costs drive improved financial returns Tel: Fax: vital@vitalmetals.com.au Capital Structure 304 million shares 80 million unlisted options Board & Management David Macoboy Chairman Mark Strizek CEO and Managing Director Peter Cordin Non-Executive Director Andrew Simpson Non-Executive Director Ian Hobson Company Secretary For further information: Investors: Mark Strizek Managing Director Vital Metals (08) Media: Nicholas Read Read Corporate (08) Key Points Significant depreciation in the Australian Dollar against the US Dollar combined with lower Australian costs adds to the competiveness of the Watershed Tungsten Project. The already attractive financial parameters of the Watershed Tungsten Project have significantly improved over the Definitive Feasibility Study assumptions made in July Vital Metals Limited (ASX: VML) is pleased to report significant improvements to the key financial metrics for its flagship Watershed Tungsten Project in North Queensland as a result of changes to key currency and operating cost inputs. A recent review of the cost inputs used in the 2014 Definitive Feasibility Study (DFS) 1 and financial model has been completed. Recent changes to exchange rates, diesel costs and labour availability have largely moved outside of the range considered for the DFS. Vendors were approached for the review and in most cases provided updates to previous estimates. In the case of diesel, which is a significant component of the mining cost, the quoted price is at a significant discount to the pricing assumed for the DFS. Vital believes it is reasonable to assume that many of these changes are here for the medium term or greater. In the case of oil and diesel, it appears that significant supply from resurgent US oil production and improved energy efficiency leading to a levelling of demand will lead to a fairly sustained period of lower diesel prices. The changes have combined to further enhance the operating cost of the Watershed Tungsten Project, which will be selling tungsten concentrate priced in US Dollars. Watershed stands ready for development with all significant environmental approvals and mining leases in place, and the 2014 DFS having outlined a substantial mine life of 10 years production of tungsten concentrate. 1 ASX Announcement 17 September
2 The recently completed DFS review has included: Revising the exchange rate to US$0.80 and US$0.75 as opposed to US$0.90; Applying a 15% reduction to operating costs over previous assumptions; Maintaining estimated capital expenditure at the same level as the previously reported figures (scheduled for review). At an exchange rate of US$0.80 and US$0.75, the estimated capital would be US$138M and US$129M respectively. Project returns for a range of prices and an exchange rate of US$0.80 and a 100% equity case are shown in Table 1 below. The combination of a lower exchange rate and lower operating costs mean that the project will now generate similar returns at a price of US$375/mtu compared to the previously reported case 2, which used a price of US$450/mtu and an exchange rate of US$0.90. Life-of-mine cash costs are extremely competitive at US$156/mtu. Table 1: Project Returns 100% Equity Case. Project Returns US$325/mtu US$350/mtu US$375/mtu US$400/mtu US$450/mtu 8% $63M $31M $111M $65M $160M $100M $207M $132M $300M $200M IRR 16.0% 12.3% 21.5% 16.6% 26.8% 20.6% 31.7% 24.5% 40.8% 31.6% Payback Years Free Cashflow $184M $130M $259M $182M $335M $235M $410M $288M $561M $394M Cash Costs US$/ mtu 156 Total Costs US$/ mtu 212 An additional scenario that uses an exchange rate of US$0.75 is shown in Table 2 below. A product price of just over US$350/mtu would generate similar returns to the previously reported case 2. Life-of-mine cash costs fall further to US$146/mtu. Table 2: Project Returns 100% Equity Case. Project Returns US$325/mtu US$350/mtu US$375/mtu US$400/mtu US$450/mtu 8% $99M $57M $151M $93M $202M $129M $254 $165M $357M $237M IRR 20.2% 15.5% 25.8% 19.9% 31.1% 24.0% 36.1% 27.9% 45.5% 35.3% Payback Years Free Cashflow $241M $169M $321M $225M $401M $281M $482M $338M $643M $451M Cash Costs US$/ mtu 146 Total Costs US$/ mtu 199 Operating cost savings are best demonstrated by the recent reduction in diesel prices. Despite a falling exchange rate, diesel prices have now fallen to levels last seen in 2009: 2 ASX Announcement 17 September
3 Vital s Managing Director Mark Strizek said the outlook for tungsten prices remained positive, with the lower oil price expected to boost economic growth. Tungsten demand is closely related to GDP growth, so we would expect to see demand continue to expand, he said. Meanwhile, on the supply side there is very little new production coming on stream only the Hemerdon Project towards the end of the year. The Chinese government appears keen to control domestic output so it doesn t seem likely that Chinese production will grow in We are continuing to advance Watershed rapidly towards development. Our partner JOGMEC is continuing to hold discussions with a number of Japanese companies regarding the transfer of their 30 per cent project interest. This new partner will be responsible for providing 30 per cent of the finance, plus a minimum 30 per cent of the off-take. This company has the potential to assist Vital with securing project debt finance for Watershed. The combined effect of changes to exchange rate and operating cost base means that Watershed is now an even more compelling proposition, Mr Strizek added. The Project is well placed for immediate development and the DFS has shown that it will generate very attractive returns for its shareholders and Joint Venture partners alike. ENDS For further details, refer to the Company s website, Contact: Mark Strizek MD Vital Metals Ltd Phone: vital@vitalmetals.com.au Media Inquiries: Nicholas Read Read Corporate Telephone: info@readcorporate.com.au Forward looking statements Certain written statements contained or incorporated by reference in this announcement, including information as to the future financial or operating performance of the Company and its projects, constitute forward-looking statements. All statements, other than statements of historical fact, are 3
4 forward-looking statements. The words believe, expect, anticipate, contemplate, target, plan, intend, continue, budget, estimate, may, will, schedule and similar expressions identify forward-looking statements. Forward-looking statements include, among other things, statements regarding targets, estimates and assumptions in respect of tungsten, gold or other metal production and prices, operating costs and results, capital expenditures, mineral reserves and mineral resources and anticipated grades and recovery rates. Forward-looking statements are necessarily based upon a number of estimates and assumptions related to future business, economic, market, political, social and other conditions that, while considered reasonable by the Company, are inherently subject to significant uncertainties and contingencies. Many known and unknown factors could cause actual events or results to differ materially from estimated or anticipated events or results reflected in such forward-looking statements. Such factors include, but are not limited to: competition; mineral prices; ability to meet additional funding requirements; exploration, development and operating risks; uninsurable risks; uncertainties inherent in ore reserve and resource estimates; dependence on third party smelting facilities; factors associated with foreign operations and related regulatory risks; environmental regulation and liability; currency risks; effects of inflation on results of operations; factors relating to title to properties; native title and aboriginal heritage issues; dependence on key personnel; and share price volatility and also include unanticipated and unusual events, many of which are beyond the Company's ability to control or predict. For further information, please see the Company's most recent annual financial statement, a copy of which can be obtained from the Company on request or at the Company's website: The Company disclaims any intent or obligation to update any forwardlooking statements, whether as a result of new information, future events or results or otherwise. All forward-looking statements made in this presentation are qualified by the foregoing cautionary statements. Investors are cautioned that forward-looking statements are not guarantees of future performance and, accordingly, not to put undue reliance on such statements. Cautionary Statement The Definitive Feasibility Study (DFS) referred to in this announcement is based on a Proved and Probable Ore Reserve derived from a Measured and Indicated Mineral Resource, plus a small proportion of mining inventory, which comprises material that is currently classified as Inferred Mineral Resource. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised. The Company advises that the Proved and Probable Ore Reserve provides 93% of the total tonnage and 93% of the total WO3 metal underpinning the forecast production target and financial projections, and that the additional life of mine plan material comprises less than 7% of the total tonnage and WO3 metal. Furthermore, in the first five years of production, 95% of the material planned to be processed is based on Proved and Probable Ore Reserves. As such, the dependence of the outcomes of the DFS and the guidance provided in this announcement on the lower confidence Inferred Mineral Resource material contained in the life of mine plan is minimal. The Company has concluded that it has a reasonable basis for providing the forward looking statements included in this announcement. 4
5 Competent Person s Statement The information that refers to Mineral Resources in this announcement was prepared and first disclosed under the JORC Code It has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since last reported. The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Mark Strizek, a Competent Person who is a Member or The Australasian Institute of Mining and Metallurgy. Mr Strizek is a full time employee of the Company. Mr Strizek has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Strizek consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears. The information in this report that relates to Mineral Resources for the Watershed Deposit is based on information evaluated by Mr Simon Tear who is a Member of The Australasian Institute of Mining and Metallurgy (MAusIMM) and who has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Tear is a Director of H&S Consultants Pty Ltd and he consents to the inclusion of the estimates in the report of the Mineral Resource in the form and context in which they appear. This Ore Reserves statement has been compiled in accordance with the guidelines defined in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012 Edition). The Ore Reserves have been compiled by Mr Steve Craig of Orelogy Group Pty Ltd, who is a Fellow of Australasian Institute of Mining and Metallurgy. Mr Craig has had sufficient experience in Ore Reserve estimation relevant to the style of mineralisation and type of deposit under consideration to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Mineral Resources and Ore Reserves. Mr Craig consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears. 5
6 ABOUT VITAL METALS Vital Metals Ltd (ASX: VML) is a developer and explorer, focused on progressing two highly prospective mineral projects: the advanced Watershed Tungsten Project in far north Queensland, Australia and the Doulnia Gold Project in southern Burkina Faso, West Africa. Watershed Tungsten Project Queensland The Watershed scheelite (calcium tungstate) Project, in far North Queensland, 150 kilometres northwest of Cairns, is the Company s flagship venture. Vital has entered into a formal Earn-In Agreement with JOGMEC (Japan Oil, Gas and Metals National Corporation) where JOGMEC has earnt 30% of the Project for $5.4M (valuing the Project at the time of the farm-in at $18M). The funds have been used to finance a Definitive Feasibility Study (DFS). Doulnia Gold Project Burkina Faso The Doulnia Gold Project (100% Vital) is located in southern Burkina Faso, West Africa. The Project is made up of three contiguous tenements; The Doulnia and Kampala exploration tenements which were recently secured following a deal with Ampella Mining Ltd and the Zeko exploration tenement. The Project is located in highly prospective Birimian Greenstone terrain with over 400 sq. km of contiguous tenements lying on the trend of the Markoye Fault Corridor and the Bole shear zone and hosting the Kollo Gold Project and Boungou South Gold Prospect. About JOGMEC Japan Oil, Gas and Metals National Corporation (JOGMEC) were established in JOGMEC is Government owned and integrates the functions of the former Japan National Oil Corporation, which was in charge of securing a stable supply of oil and natural gas and the former Metal Mining Agency of Japan, which was in charge of ensuring a stable supply of nonferrous metal and mineral resources and implementing mine pollution control measures. It has an annual budget of around 1,564 billion yen ($18B) and provides financial assistance, technology development and technical support to Japanese companies and their foreign subsidiaries. Figure 1: Vital Metals Project Locations 6
7 Figure 2: Vital Metals Watershed Project Locations 7
VITAL METALS ANNUAL GENERAL MEETING
VITAL METALS ANNUAL GENERAL MEETING ASX:VML 25 November 2013 Building a globally significant strategic metals company Disclaimer & Competent Person Certain oral and written statements contained or incorporated
More informationSeptember Quarterly Report
September Quarterly Report Kasbah Resources Limited ASX : KAS 1 DISCLAIMER Certain oral and written statements contained or incorporated by reference in this presentation, including information as to the
More informationFor personal use only
Quarterly Report For the three months ending September 211 Vital Metals Limited ASX Code: ACN: 112 32 596 VML Suite 44c Cottesloe Central, 46 Stirling Hwy, Peppermint Grove, WA 611 PO Box 188, Cottesloe
More informationTTC Completes Acquisition. of 20% Project Interest in Achmmach Tin Project ASX : KAS. Kasbah Resources Limited
ASX : KAS TTC Completes Acquisition of 20% Project Interest in Achmmach Tin Project Kasbah Resources Limited 1 DISCLAIMER Certain oral and written statements contained or incorporated by reference in this
More informationFor personal use only
ASX ANNOUNCEMENT 17 October 2018 ASX Market Announcements ASX Limited 20 Bridge Street Sydney NSW 2000 US$35M COMMITTED OFFER OF DEBT FUNDING SECURED FOR THE ADIDI-KANGA GOLD PROJECT Key Highlights: The
More informationFor personal use only
ASX Announcement 29 January 2014 Quarterly Activities Report December 2013 Project geologists inspecting new drill core from the Natougou Gold Project. Orbis Gold Limited ACN 120 212 017 ASX Code : OBS
More informationWest African Resources awards underground mining contract for M1 South to Byrnecut
Press Release 28 th November 2018 West African Resources awards underground mining contract for M1 South to Byrnecut Gold developer West African Resources Limited (ASX, TSXV: WAF) is pleased to announce
More informationFor personal use only
Bligh signs development Joint Venture Agreement for the Bundarra Gold Project in WA Bligh Resources Limited ACN 130 964 162 ASX: BGH ASX Release 28 October 2015 Level 9, 53 Walker St North Sydney New South
More informationFor personal use only
QUARTERLY REPORT OCTOBER TO DECEMBER 2017 Highlights Outlook for March Quarter 2018 TUNGSTEN & MULTI COMMODITIES Molyhil, NT Australia Continued strength in tungsten and molybdenum pricing price fuels
More informationQuarterly Activities Report Quarter Ended 30 June 2017
ASX Announcement & Media Release 27 July 2017 DIRECTORS Simon O Loughlin Non-Executive Chairman Simon Taylor Non-Executive Director Stephen Kelly Executive Director and Company Secretary ASX Code: CHZ
More informationINDEPENDENCE GROUP NL
INDEPENDENCE GROUP NL Growing a Great Company Annual General Meeting 25 November 2009 Chris Bonwick Managing Director FORWARD LOOKING STATEMENTS Certain oral and written statements contained or incorporated
More informationSpecialty Metals Exploration and Development - May 2009
Specialty Metals Exploration and Development - May 2009 Hemerdon Ball open pit 2008 Wolf Minerals May 2009 Presentation structure Hemerdon Ball tungsten mine Project Financial Summary Company structure
More informationINVESTOR PRESENTATION. August 2018
INVESTOR PRESENTATION Contents Tungsten The Metal Project Portfolio Mineral Resources Tungsten Market Data Clearly Defined Strategy Mt Mulgine Tungsten Project Building Strategic Alliances Corporate Overview
More informationFor personal use only. Burkina Faso ASX:MET. The Gold Symposium. Sydney (14-15 November 2011)
Burkina Faso ASX:MET The Gold Symposium Sydney (14-15 November 2011) Important Information Disclaimer This presentation may contain certain statements and projections provided by or on behalf of Mt Isa
More informationAZUMAH MINING LEASES GRANTED
AZUMAH MINING LEASES GRANTED WA GOLD PROJECT, GHANA ASX & Media Release ASX Code AZM 28 th July 2014 Perth-based gold explorer and developer Azumah Resources Limited (ASX:AZM) (Azumah or the Company) is
More informationJune 2016 Quarterly Activity Report. Makabingui Gold Project Permit Update. Moura Permit Konkoutou Gold Project. Corporate
Bassari Resources Limited is an Australian ASXlisted company focused on discovering and developing multimillion ounce gold deposits in the Birimian Gold Belt, Senegal, West Africa. FAST FACTS ASX Code
More informationFor personal use only
QUARTERLY ACTIVITIES REPORT FOR THE 3 MONTH PERIOD ENDING 31 DECEMBER 2016 31 January 2017 HIGHLIGHTS FOR THE QUARTER Shareholders approved the acquisition of a 70% interest in the advanced and highly
More informationFor personal use only. AGM Presentation. November 2016
AGM Presentation November 2016 Disclaimer This presentation includes certain statements that may be deemed forward-looking statements. All statements, other than statements of historical fact, that refer
More informationPress Release 25 October 2017
Press Release 25 October 2017 SEPTEMBER 2017 QUARTERLY REPORT (ASX: WAF) is pleased to report activities on its 100%-owned projects in Burkina Faso, West Africa, for the quarter ending 30 September 2017.
More informationNOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA
13 July 2012 NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA This release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The
More informationA New Growth Story in Western Australian Gold
A New Growth Story in Western Australian Gold Gold production imminent following execution of mining alliance & toll milling agreements Cash flow by Q4 2016 Outstanding exploration upside in world-class
More informationVital Metals (VML) Development Ready. Recommendation: Maintain Speculative BUY. Company Update Key Points
Vital Metals (VML) Development Ready March 2016 Grant Craighead Research Manager gcraighead@breakawayinvestmentgroup.com Mark Gordon Senior Research Analyst mgordon@breakawayresearch.com www.breakawayresearch.com
More informationFor personal use only
ASX QUARTERLY REPORT MARCH 216 Quarterly Report March 216 Highlights 29 April 216 Maiden JORC resource of 131.1Mt @7.9% TGC at the Mahenge Project including 37.6Mt @1.2% TGC or 16.7Mt@ 11.1% TGC Largest
More informationFor personal use only
` Dated: 14 April 2015 PHOENIX SUSPENDS SMALL MINING PROJECTS TO FOCUS ON NORTON JV AND HEAP LEACH ASX: PXG KEY POINTS Completion of mining at Kintore West in April 2015 Final milling campaign at Greenfields
More informationFor personal use only
ABN 32 112 032 596 Annual Financial Report for the year ended 30 June 2018 Corporate Information ABN 32 112 032 596 Directors Mark Strizek (Managing Director) Francis Harper (Non-Executive Chairman) Peter
More informationINDEPENDENCE GROUP NL
INDEPENDENCE GROUP NL Continuing to Deliver Shareholder Wealth by Mining & Exploration Success. Diggers & Dealers August 2009 Chris Bonwick Managing Director FORWARD LOOKING STATEMENTS Certain oral and
More informationFor personal use only. The Achmmach Tin Project A Development Ready Tin Opportunity
The Achmmach Tin Project A Development Ready Tin Opportunity Austmine Presentation Perth, 5 November 2015 DISCLAIMER Certain oral and written statements contained or incorporated by reference in this presentation,
More informationQuarterly Activities Report Quarter Ended 30 September 2017
ASX Announcement & Media Release 31 October 2017 DIRECTORS Simon O Loughlin Non-Executive Chairman Simon Taylor Non-Executive Director Quarterly Activities Report Quarter Ended 30 September 2017 Highlights
More informationQUARTERLY REPORT OCTOBER TO DECEMBER 2014
QUARTERLY REPORT OCTOBER TO DECEMBER 2014 Highlights Outlook for March Quarter 2015 TUNGSTEN & MOLYBDENUM Molyhil NT Revised feasibility study completed demonstrating robust economics Continue off-take
More informationQUARTERLY REPORT APRIL TO JUNE 2014
QUARTERLY REPORT APRIL TO JUNE 2014 Highlights Outlook for September Quarter 2014 TUNGSTEN & MOLYBDENUM Molyhil NT. Revised ore reserve extends mine life to 6 years Metallurgical testwork confirm ore sorting
More informationMakabingui Gold Project
26 April 2018 Bassari Resources Limited is an Australian ASXlisted company focused on discovering and developing multimillion ounce gold deposits in the Birimian Gold Belt, Senegal, West Africa. FAST FACTS
More informationFor personal use only
Name of entity Information Form and Checklist Annexure I (Mining Entities) ABN/ARBN/ARSN Matador Mining Limited 45 612 912 393 This Annexure forms part of the Information Form and Checklist supplied by
More informationCOBRE MONTANA INVESTOR PRESENTATION
COBRE MONTANA INVESTOR PRESENTATION DISRUPTIVE TECHNOLOGY TO REVOLUTIONIZE LITHIUM PRODUCTION 1 Disclaimer This presentation is for information purposes only. Neither this presentation nor the information
More informationOutlook for Australian cathode production
Outlook for Australian cathode production Adrian Griffin Managing Director ASX: LIT 1 Lithium Mine to Market Roskill, Perth 2019 Disclaimer This presentation is for information purposes only. Neither this
More informationAgreement to Acquire Remaining Interest in the Golden Ridge Gold and Nickel Project
10 July 2012 ASX/Media Announcement ABN: 44 103 423 981 Tel: +61 8 9322 6974 Fax: +61 8 9486 9393 email: dcrook@pioresources.com.au Address: 21 Ord Street West Perth Western Australia Postal: PO Box 1787
More informationAchmmach Tin Project. Definitive Feasibility Study ASX : KAS. Kasbah Resources Limited
ASX : KAS Achmmach Tin Project Definitive Feasibility Study Kasbah Resources Limited 1 DISCLAIMER Certain oral and written statements contained or incorporated by reference in this presentation, including
More informationPress Release 31 January 2018
Press Release 31 January 2018 DECEMBER 2017 QUARTERLY REPORT (ASX: WAF) is pleased to report activities on its 100%-owned gold and copper-gold projects in Burkina Faso, West Africa, for the quarter ending
More informationBOSS FINALISES EARN IN AGREEMENT WITH GRYPHON MINERALS
ASX ANNOUNCEMENT 4 July 2014 HIGHLIGHTS BOSS FINALISES EARN IN AGREEMENT WITH GRYPHON MINERALS Final documentation executed with Gryphon Minerals Limited (ASX:GRY) following completion of successful due
More informationLARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA
3 MAY 2017 LARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA Highlights New zone of spodumene pegmatites discovered, with main body outcropping along 1300 metres in strike extent Widths up
More informationASX ANNOUNCEMENT. 22 February 2019
22 February 2019 ASX ANNOUNCEMENT LITHIUM AUSTRALIA PRESENTS AT ROSKILL CONFERENCE HIGHLIGHTS Lithium Australia presents at Roskill s Lithium Mine to Market forum in Perth, Western Australia Leading lithium
More informationBligh Strikes Joint Venture Agreement to develop Bundarra Gold Project in WA
Bligh Strikes Joint Venture Agreement to develop Bundarra Gold Project in WA Bligh Resources Limited ACN 130 964 162 Contacts: Bill Richie Yang ASX: BGH ASX Release 2 September 2015 Level 9, 53 Walker
More informationINVESTOR PRESENTATION
MEDUSA MINING LIMITED ABN: 60 099 377 849 Suite 10. 100 Mill Point Road South Perth WA 6151 PO Box 122 South Perth WA 6951 Telephone: 618-94741330 Facsimile: 618-94741342 Email: admin@medusamining.com.au
More informationKilmain Project Collaborative opportunities in Queensland for exploration, resource development and investment with JOGMEC Presentation Colin
Kilmain Project Collaborative opportunities in Queensland for exploration, resource development and investment with JOGMEC Presentation Colin Randall, Managing Director Allegiance Coal Limited 26 February
More informationSalamanca. The only major new uranium mine being developed in the world today
Salamanca The only major new uranium mine being developed in the world today Low cost producer capable of generating strong cashflow at the bottom of the uranium price cycle July 2016 A AIM/ASX: BKY ABN:
More informationFor personal use only
Southern Hemisphere Mining Limited ABN: 17 140 494 784 283 Rokeby Road SUBIACO, WA Australia, 6008 Postal Address: PO Box 52 WEST PERTH, WA Australia, 6872 Phone: +61 (0) 8 6141 3500 Fax: +61 (0) 8 6141
More informationConstructing the Salamanca uranium mine in Western Spain. 121, Cape Town, February 2017
Constructing the Salamanca uranium mine in Western Spain 121, Cape Town, February 2017 Source: Company reports, World Nuclear Association GLOBAL TOP 10 PRODUCER 4.4Mlbs pa Rare combination of low CAPEX
More informationAchmmach Tin Project, Morocco DFS complete, Funding Underway. IMARC, 31 October 2018 Russell Clark, CEO
Achmmach Tin Project, Morocco DFS complete, Funding Underway IMARC, 31 October 2018 Russell Clark, CEO DISCLAIMER Summary of information This presentation has been prepared by and is the sole responsibility
More informationRNI INCREASES GROSVENOR GOLD ORE RESERVES TO 523,000oz
ASX Announcement 29 November 2013 RNI INCREASES GROSVENOR GOLD ORE RESERVES TO 523,000oz Resource and Investment NL (ASX: RNI) is pleased to announce an update of Mineral Ore Reserves at the Grosvenor
More informationFor personal use only
Quarterly Report June 2017 26 July 2017 ABOUT ALTONA SRIG Transaction Terminated Altona Mining Limited (ASX: AOH) is a cashed up ASX listed company with a record of shareholder returns. It is focussed
More informationPathway to Production
For personal use only Charging forward with Lithium Pathway to Production 8th Lithium Supply & Markets Conference 24 26 May 2016 Las Vegas Disclaimer This presentation has been prepared by Altura Mining
More informationMEDUSA MINING LIMITED
MEDUSA MINING LIMITED Gold producer focused on organic growth in the Philippines INVESTOR PRESENTATION OCTOBER 2017 Delivering the Strategic Plan 1 Important Notice This presentation contains only a brief
More informationAchmmach Tin Project, Morocco DFS complete, Funding Underway. Melbourne Mining Club, 17 July 2018 Russell Clark, CEO
Achmmach Tin Project, Morocco DFS complete, Funding Underway Melbourne Mining Club, 17 July 2018 Russell Clark, CEO DISCLAIMER Summary of information This presentation has been prepared by and is the sole
More informationFor personal use only
ABN 32 112 032 596 INTERIM FINANCIAL REPORT FOR THE HALF-YEAR ENDED This interim financial report does not include all the notes of the type normally included in an annual financial report. Accordingly,
More informationA$37M INSTITUTIONAL PLACEMENT TO ACCELERATE EXPLORATION PROGRAMS AT WESTRALIA AND CAMERON WELL AND EXTINGUISH JUPITER LIFE OF MINE ROYALTY OBLIGATION
Not for release to US wire services or distribution in the United States 11 JULY 2018 A$37M INSTITUTIONAL PLACEMENT TO ACCELERATE EXPLORATION PROGRAMS AT WESTRALIA AND CAMERON WELL AND EXTINGUISH JUPITER
More informationRusina Mining NL ABN Interim financial report for the half-year ended 31 December 2008
ABN 51 009 242 451 Interim financial report for the half-year ended 31 December 2008 Corporate Directory Directors Mr Gordon Getley Mr Robert Gregory Mr Philip Fillis Mr Antony Butler Chairman/Non Executive
More informationCONSOLIDATED ZINC LIMITED ACN INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2017
INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER CORPORATE DIRECTORY Registered and Corporate Office Level 1, Suite 1 35-37 Havelock Street West Perth WA 6005 Telephone: (+61 8) 9322 3406 Facsimile:
More informationMAHENGE BEST IN CLASS GRAPHITE PROJECT. 121 Mining Investment Cape Town
MAHENGE BEST IN CLASS GRAPHITE PROJECT 121 Mining Investment Cape Town February 2019 1 Disclaimer The release, publication or distribution of this presentation in certain jurisdictions may be restricted
More informationBuilding a Future Based on the Past
Building a Future Based on the Past Australian Graphite Conference April 2017 DISCLAIMER This presentation is for information purposes only. Neither this presentation nor the information contained in it
More informationFor personal use only
24 August 2018 Placement and Fully Underwritten Entitlement Offer to raise approximately $75 million Highlights Placement for approximately $5.8 million successfully completed Launch of underwritten entitlement
More informationMD&A. All dollar amounts contained in this MD&A are expressed in United States dollars, unless otherwise stated.
MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE SIX MONTHS ENDED 31 DECEMBER Mineral Deposits Limited ( MDL or the Company ) is an Australian-based mining company with a current focus in Senegal, West Africa
More informationFor personal use only
ame of entity Information Form and Checklist Annexure I (Mining Entities) AB/ARB/ARS TT Mines Limited AC 107 244 039 This Annexure forms part of the Information Form and Checklist supplied by the entity
More informationFor personal use only
ASX: GPR 31 January 2019 Quarterly report December 2018 The Board of Geopacific Resources Ltd (Geopacific ASX: GPR) is pleased to provide the December 2018 quarterly report. A significant milestone was
More informationALLIANCE RESOURCES L I M I T E D
ALLIANCE RESOURCES L I M I T E D THE FOUR MILE URANIUM PROJECT Australia s next uranium mine Australian Uranium Conference Fremantle, Western Australia Patrick Mutz Managing Director 22-23 July 2009 Corporate
More informationFor personal use only
ASX Announcement 30 October 2017 Quarterly Activities Report for Period Ended 30 September 2017 Drilling in full swing with two rigs at Kildare Zinc Project having early success extending McGregor Prospect;
More information20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa
10 August 2018 ASX: MOD 20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa T3 plant throughput capacity increased to 3Mtpa, a 20% increase to the PFS Base Case Sedgman appointed as Feasibility
More informationFor personal use only
ASX ANNOUNCEMENT 11 January 2019 ASX Market Announcements ASX Limited 20 Bridge Street Sydney NSW 2000 Vector Completes Acquisition of World-Class Adidi-Kanga Gold Project Acquisition of a 60% interest
More informationResource and Investment NL ASX: RNI Paydirt s Gold Conference Presentation 3 April 2014
An Emerging Western Australian Miner With a dominant copper-gold exploration portfolio Resource and Investment NL ASX: RNI Paydirt s Gold Conference Presentation 3 April 2014 1 Competent Person s Statement
More informationDragon Energy Limited
Dragon Energy Limited Corporate Presentation September 2012 Disclaimer This document has been prepared by Dragon Energy Ltd ( DLE ) (ABN 38 119 992 175) and provided as a basic overview on the Company.
More informationFor personal use only
MARCH 2012 QUARTERLY REPORT PERTH, Western Australia, April 30, 2012: Coalspur Mines Limited ( Coalspur or Company ) (ASX: CPL, TSX: CPT) is pleased to present its quarterly report for the three months
More informationFor personal use only
ASX ANNOUNCEMENT 21 January 2015 SIGNIFICANT RESOURCE PROJECT ACQUISITION INTERNATIONAL GOLDFIELDS TO ACQUIRE PROSPECTIVE MINING & EXPLORATION PERMITS WITH POLYMETALLIC JORC RESOURCE HIGHLIGHTS International
More informationDisclaimer. Forward Looking Statements
1 Disclaimer This presentation has been prepared by Birimian Limited ABN 11 113 931 105 (Company or BGS) for general information purposes only. The presentation is not and should not be considered as an
More informationEmerging Producer in the. Murchison Goldfields
Emerging Producer in the Kirkalocka Gold Project Update April 2012 Murchison Goldfields ASX:MUM Release of Feasibility Study Released April 2, 2012 Demonstrates the recommissioning of Kirkalocka is economic
More informationQuarterly Activities Report & Appendix 5B
31 JULY 2018 Quarterly Activities Report & Quarter Ending June 30, 2018 Lustrum Minerals Limited (ASX: LRM) (Lustrum) (Company) is pleased to provide a summary of its activities for the three (3) months
More informationCelebrating 21 years of African gold mining. Presentation by Lee-Anne de Bruin, Chief Financial Officer Mining Indaba 2018, Cape Town
Celebrating 21 years of African gold mining Presentation by Lee-Anne de Bruin, Chief Financial Officer Mining Indaba 2018, Cape Town Important Notices and Disclaimers Not an offer of securities This presentation
More informationFor personal use only
For personal use only Investor Presentation MARCH 2016 1 Disclaimer The purpose of this presentation is to provide general information about Aphrodite Gold Limited (Company) and it is presented for informational
More informationFor personal use only
T +61 2 8823 3179 E info@cokal.com.au Level 5, 56 Pitt Street, Sydney NSW 2000 ABN 55 082 541 437 (ASX: CKA) www.cokal.com.au ASX ANNOUNCEMENT / MEDIA RELEASE 11 October 2017 Robust Production Achieved
More informationArafura Resources Limited
Arafura Resources Limited Australian Uranium & Rare Earths Conference 2013 16-17 July 2013, Fremantle Disclaimer Important Notice This presentation contains certain statements which may constitute forward-looking
More informationFor personal use only
Highlights Completion of Due Diligence on European Cobalt Projects ASX Announcement Thursday, 30 March 2017 Fast Facts Shares on Issue: 47.3M 1 Market Cap: $6.5M 1 Cash in Bank: $4.5M 1,2 Subject to shareholder
More informationOverview. ASX Release Monday 10 December ASX Code: SAU
ASX Release Monday 10 December 2018 ASX Code: SAU Shares on Issue: 55.8m Share Price: $0.17 Market Capitalisation: $9.5m Assets WA, Australia Cannon Gold Mine (100%) Glandore Gold Project (75%*) Cowarna
More informationSourcing the raw materials of the future. Authier Lithium Project JORC Resource Overview ASX: SYA JULY 2016
Sourcing the raw materials of the future ASX: SYA JULY 2016 Authier Lithium Project JORC Resource Overview Disclaimer COMPETENT PERSON STATEMENTS Authier - The information in this report that relates to
More informationASX ANNOUNCEMENT 18 SEPTEMBER More High Grade Results at the Zara Gold Project in Eritrea
ASX ANNOUNCEMENT 18 SEPTEMBER 2007 More High Grade Results at the Zara Gold Project in Eritrea Zara Joint Venture, Eritrea (Dragon Mining Limited - 20% interest) Koka Gold Deposit Dragon Mining Limited
More informationFor personal use only
ASX RELEASE 7 September 2015 INVESTMENT HIGHLIGHTS Developing a large scale coking coal basin Two exceptionally well located coking coal deposits Combined Resources of 536.3 Mt Amaam North: Project F:
More informationFor personal use only
PALADIN ENERGY LTD ACN 061 681 098 Ref: 399272 27 August 2015 ASX Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 By Electronic Lodgement Dear Sir/Madam June 2015 Full
More informationFor personal use only
Big Assets + Leverage = Big Opportunity Presentation to Investor Express August 2012 Disclaimer and Important Information Forward Looking Statements This document may include forward looking statements.
More informationFor personal use only
Level 1, Suite 5, The Business Centre 55 Salvado Road, Subiaco WA 6008 Telephone: +61 8 9380 6062 Facsimile: +61 8 9380 6766 W www.manasresources.com E ross@manasresources.com ASX RELEASE AND MEDIA RELEASE
More informationOTCQX:CROCF. February. completed % U 3 O 8 Cut Off Grade. contained. repetitions. significant the aim of. Gold retains
65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD ANNOUNCES INITIAL URANIUM RESOURCE ESTIMATE AT THUNDERBALL COMPLETED BY JV PARTNER THUNDELARRA February 8, 2011
More informationQUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2011
26 OCTOBER 2011 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2011 St George Mining Limited (ASX: SGQ) ( St George Mining ), a gold and nickel focused exploration company, presents its
More informationMERGER PRESENTATION JULY 2018
MERGER PRESENTATION JULY 2018 ASX: SPI ASX: EXG PAGE 1 1 CREATING A LEADING ASX-LISTED GOLD DEVELOPER The combined company, to be led by Managing Director Mr John Young, aims to fast-track the creation
More informationCompany Announcements Office. Subject: Australia Papua New Guinea Business Forum Golpu Project Update
LEVEL 9 600 ST KILDA ROAD MELBOURNE VICTORIA 3004 AUSTRALIA PO BOX 6213 ST KILDA ROAD CENTRAL MELBOURNE 8008 To: From: Company Announcements Office Francesca Lee Date: 19 May 2015 Subject: Australia Papua
More informationSOUTHERNGOLD. Compelling Value in a Unique Gold Explorer. ASX Ticker: SAU
SOUTHERNGOLD Compelling Value in a Unique Gold Explorer ASX Ticker: SAU Disclaimer Forward-looking statements The information in this presentation is published to inform you about Southern Gold Limited
More informationFor personal use only
February 20 th, 2017 ASX Release Strategic Exploration Alliance with South32 South32 to fund exploration activities (including drilling) over at least five AusQuest projects as part of a global Strategic
More informationVULCAN RESOURCES AND UNIVERSAL RESOURCES MERGER TO CREATE SIGNIFICANT COPPER-FOCUSSED GLOBAL DEVELOPMENT COMPANY
Level 2, 91 Havelock Street, West Perth Western Australia 6005 Phone: +61 (0)8 9486 8400 ABN 60 100 072 624 Facsimile: +61 (0)8 9486 8700 Ground Floor, 1 Altona Street, West Perth WA 6005 www.universalresources.com.au
More informationFor personal use only
Sandfire Resources NL ABN 55 105 154 185 Level 2, 31 Ventnor Ave, West Perth Western Australia 6005 Phone: +61 8 6430 3800 Fax: +61 8 6430 3849 Email: info@sandfire.com.au Web: www.sandfire.com.au ASX/Media
More informationASX Code: THR THOR MINING PLC LETTER TO SHAREHOLDERS. 19 June 2018
19 June 2018 THOR MINING PLC Registered Numbers: United Kingdom 05276 414 Australia 121 117 673 Registered Office: 58 Galway Avenue MARLESTON, SA, 5035 Australia Ph: +61 8 7324 1935 Fx: +61 8 8351 5169
More informationPaulsens Project resource soars 41% to 318,000oz as 2012 surplus cashflow forecast hits $35m
ASX ANNOUNCEMENT 21 FBRUARY 2012 Australian Securities Exchange Code: NST Board of Directors Mr Chris Rowe Non-Executive Chairman Mr Bill Beament Managing Director Mr Michael Fotios Non-Executive Director
More informationPALADIN ENERGY LTD ACN
PALADIN ENERGY LTD ACN 061 681 098 Ref: 409025 10 May 2016 ASX Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 By Electronic Lodgement Dear Sir/Madam March Quarter
More informationFor personal use only
Canyon Resources An Overview CANYON RESOURCES AN OVERVIEW DEVELOPING A WORLD-CLASS BAUXITE ASSET NOVEMBER 2018 D I S C L A I M E R Disclaimer This presentation is for information purposes only. Neither
More informationSOUTH AUSTRALIA EXPLORATION AND MINING CONFERENCE STEVEN MCCLARE IIIII GENERAL MANAGER 28 NOVEMBER 2013
SOUTH AUSTRALIA EXPLORATION AND MINING CONFERENCE STEVEN MCCLARE IIIII GENERAL MANAGER 28 NOVEMBER 2013 ASSETS, BOARD AND MANAGEMENT TEAM Production and cash flow in Australia Kanmantoo Copper Mine (100%
More informationRIU Explorers Conference, February 2018: Trevor Dixon, Chairman
Construction Underway : CLEAR PATHWAY TO CASHFLOW IN 2018 Low Capex Development : PROCESSING PLANT ALREADY SECURED Project Debt Funding: US$27M SPROTT DEBT FACILITY An Emerging WA Gold Producer with Outstanding
More informationFor personal use only
ASX ANNOUNCEMENT 26 February 2018 ASX Market Announcements ASX Limited 20 Bridge Street Sydney NSW 2000 Kibali South and Nizi Gold Projects Due Diligence Completed - Formal Decision to Proceed with Joint