Document of The World Bank

Size: px
Start display at page:

Download "Document of The World Bank"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL Infrastructure Operations Division West Central Africa Department Africa Region USE ONLY PROJECT COMPLETION REPORT FEDERAL REPUBLIC OF NIGERIA TRANSPORT PARASTATALS PROJECT (LOAN 2734-UNI) June 28, 1996 Report No This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

2 CURRENCY EQUIVALENTS Currency Unit = Naira (N) US$1.00 = 1.00 (appraisal) US$1.00 = 4.0 (1987) US$1.00 = 4.5 (1988) US$ 1.00 = 7.4 (1989) USS.00 = 8.0 (1990) US$ (1991) US$1.00 = 17.3 (1992) US$1.00 = 21.8 (1993) USS1.00 = (1994) FISCAL YEAR January I - December 31 SYSTEM OF WEIGHTS AND MEASURES: METRIC 1 kilometer (kim) 0.6 mile (mi) I square kilometer (km 2 ) = 0.39 square mile (mi 2 ) 1 m 3 = 1,000 liters (1) = 6.37 barrels = gallons ABBREVIATIONS AND ACRONYMS CWTC - Central Water Transportation Company FGN - Federal Goverrnment of Nigeria FMTA - Federal Ministry of Transport and Aviation (from early, 1988) (previously Federal Ministry of Transport) FMWH - Federal Ministry of Works and Housing ICB - International Competitive Bidding LASG - Lagos State Government LIB - Limited International Bidding MIS - Management Information System NAA - Nigerian Airports Authority NAL - Nigeria Airways Limited NCHC - National Cargo Handling Company NFC - National Freight Corporation NITT - National Institute of Transport Technology NNSL - Nigerian National Shipping Line NPA - Nigerian Ports Authority NRC - Nigerian Railway Corporation NTCD - National Transport Coordinating Department (later TCID) PCU - Project Coordinating Unit PMU - Project Management Unit TA - Technical Assistance TCID - Transportation Coordination and Inspectorate Department (earlier NTCD) TCPC - Technical Committee for Privatization and Commercialization TPP - Transport Parastatal Project

3 The World Bank Washington, D.C U.S.A. FOR OFFICIAL USE ONLY OMce of the Director-General Operations Evaluation June28, 1996 MEMORANDUM TO THE EXECUTIVE DIRECTORS AND THE PRESIDENT SUBJECT: Project Completion Report on Nigeria Transport Parastatals Project (Loan 2734-UNI) Attached is the Project Completion Report (PCR) on the Nigeria Transport Parastatals project (Loan 2734-UNI, approved in FY86), prepared by the Africa Regional Office. The loan for US$20.9 million was approved on June 26, 1986, and closed on June 30, 1994, two years behind schedule. US$2.76 million was canceled. The Borrower did not contribute Part II of the report. The project objectives were: (a) to lay the foundations for the reform of transport parastatals by improving accountability, specifying financial and operational objectives, improving staffing plans and examining future roles of several enterprises; and (b) to improve the efficiency with which the two largest parastatals-the Nigerian Ports Authority (NPA) and the Nigerian Railway Corporation (NRC}-utilize their facilities. The project consisted primarily of technical assistance (one third of total costs) and procurement of spare parts and equipment (two thirds). Specific components were: (a) technical assistance and training for NPA and NRC in several areas: financial controls, accounting and information systems, setting of financial targets, revenue/cost studies, marketing and tariff setting, manpower planning, workshop operations, and effective use of computers; (b) provision of computers, workshop equipment and spare parts to support technical assistance and training to NPA and NRC; (c) technical assistance to the Federal Ministry of Transport and Aviation (FMTA) to carry out policy studies; and (d) management training for senior officials of FMTA, NRC, and NPA. The project's most important objectives were not achieved. Some studies (e.g., National Transport Policy, Railroad Revitalization) provided useful background information and immediate action plans for the reform; however, they had little effect on the parastatals' management or FMTA policy because their recommendations were not implemented. Other important studies (e.g., Valuation of NRC's Assets, Transport Policy) were never completed. Equipment and spare parts were procured, especially for NRC, and helped slow down the deterioration in service. However, because of delays and the lack of counterpart funds, the rehabilitated equipment failed to support sustained improvements in efficiency of NRC's and NPA's services. During implementation, several new studies on Maritime Development, Vehicle Administration and Lagos Mass Transit were added with the Bank's agreement; but these also failed to be completed or followed up. No economic rate of return was estimated at appraisal for the project. This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

4 The project's outcome is rated as unsatisfactory, sustainability as unlikely, and institutional development as negligible. The Bank performance is rated as unsatisfactory as supervision effectiveness was hampered by high staff turnover and a lack of specialized skills (e. g., for aviation and trucking). These ratings are in line with the substance of the PCR. The project may be audited together with other Nigeria transport projects.

5 FOR OFFICIAL USE ONLY Table of Contents Pae N2. PREFACE EVALUATION SUMMARY PART I: PROJECT REVIEW FROM THE BANK'S PERSPECTIVE... 1 A. Project Identity... 1 B. Background... 1 C. Project Objectives and Description... 4 D. Project Design and Organization... 5 E. Project Implementation... 6 F. Project Results... 7 G. Project Sustainability H. Bank Performance I. Borrower Performance J. Project Relationship K. Consulting Services L. Project Documentation and Data PART II: BORROWER'S ASSESSMENT PART HI: STATISTICAL INFORMATION Table 1: Related Bank Loans Table 2: Project Timetable Table 3: Studies Table 4: Procurement of Spare Parts Table 5: Project Costs Table 6: Project Financing Table 7: Cumulative Loan Disbursements Table 8: Allocation of Loan Proceeds Table 9: Use of Bank Resources Table 10: Status of Covenants Annex A: NRC Working Ratios I This documnent has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed wiihout World Bank authorization. l

6

7 PROJECT COMPLETION REPORT FEDERAL REPUBLIC OF NIGERIA TRANSPORT PARASTATALS PROJECT (LOAN 2734-UNI) PREFACE This Project Completion Report (PCR) describes and evaluates the identification, preparation, appraisal and implementation of the Transport Parastatals Project in Nigeria, for which Loan 2734-UNI in the amount of US$20.9 million was signed on October 31, The loan became effective on April 23, It was originally scheduled to be closed on June 30, 1992, but was extended four times to allow more time for completion of project-financed components. The loan was closed on June 30, The last disbursement under the loan was on November 30, 1994; only 87 percent of the loan was disbursed, with a balance of US$2,758,796, which was canceled. The Preface, Evaluation Summary, Parts I and III of the PCR were prepared by the Infrastructure Division of the West Central Africa Department (AF4IN). The Bank's contribution to the report was prepared on the basis of, inter alia, the President's Report, Loan Agreement, Subsidiary Loan Agreements, Project Agreements, supervision reports, quarterly progress reports, correspondence between the Bank and Nigerian authorities, internal Bank memoranda and consultations with Bank staff who served as project officers on the project. Parts I and III of the PCR were sent to the Borrower for comment. The Borrower was then requested to prepare Part II and to return it to the Bank within three months. However, the Borrowers' Part II has not yet been received. The Task Manager for this PCR is Mr. Elie Saleeby. Messrs. James Wright and Olivier Lafourcade are the managing Division Chief and Department Director, respectively, for the operation.

8

9 PROJECT COMPLETION REPORT FEDERAL REPUBLIC OF NIGERIA TRANSPORT PARASTATALS PROJECT (LOAN 2734-UNI) EVALUATION SUMMARY Background and Objectives 1. In the early 1980s, the Nigeria transportation system was characterized by numerous transport parastatals, the largest of which were the Nigeria Railway Corporation (NRC) and the Nigerian Port Authority (NPA). About 1982, railway and port traffic turned sharply downward after an extended period of general prosperity and rapid traffic growth. Financial results of both NRC and NPA deteriorated alarmingly after The Transport Parastatals Project was identified in November 1982 and the project was under preparation for about two and a half years. 2. A 1984 Bank review indicated that the Nigerian parastatal transport companies were experiencing a number of basic problems. Particular attention focused on institutional weakness and operating inefficiencies. Serious questions were raised also about the economic role of some of these parastatals and the possibilities for privatization of some of them. Several financial problems suggested a need for major efforts to increase cost recovery from users of transport services. Consideration of these problems and needs by the Ministry of Transport and Aviation, NRC and NPA resulted in preparation of terms of reference for studies that should be undertaken and a review of needs for locomotive spare parts and cargo handling spare parts. The Bank assisted in this preparation activity. The project was appraised in May 1985 and was approved by the Bank's Board in June The loan became effective in January The major objectives of the project were to: (i) lay the foundation for reform of transport parastatals by improving accountability, specifying financial and operational objectives, preparing staff rationalization plans and examining the future roles of several enterprises, and (ii) improve the efficiency with which the two largest parastatals, NPA and NRC, utilize their facilities. Implementation Experience 4. An important part of the NRC component of the project was the procurement of spare parts for locomotive repairs. While implementation of spare parts procurement began well, it was soon delayed as a result of difficulties in obtaining NRC and Federal Ministry of Transport and Aviation (FMTA) approval of tender evaluations. The principal studies undertaken were the railway revitalization study and the valuation of assets study; the scheduled Management Information System (MIS) and traffic costing

10 ii completed. Factors accounting for implementation shortcomings were: (i) delayed approval of tender evaluations; (ii) delayed issuance of letters of credit; (iii) insufficient counterpart funds; (iv) long delivery times by some suppliers; (v) production stoppages in NRC due to poor financial state of the corporation; (vi) extremely poor condition of many locomotives; and (vii) bureaucratic delays. 5. Implementation of the NPA component had a reasonably good start, particularly the accounting and manpower studies. The MIS study, however, was not implemented. While the first phase of the equipment rehabilitation program was carried out on time, subsequent activities became stalled because of failure of consultants to provide adequate tender evaluations. High turnover in the NPA project managers was an adverse factor for effective implementation. 6. The FMTA component was lagging in mid at which time the ministry had accomplished little more than establishing a training program abroad. Several studies were initiated concerning future roles of transport parastatals, multimodal operations, domestic aviation policy and other subjects. Three of the studies were not completed. The initial project coordinator for the entire project performed satisfactorily but his successor did not function very effectively. The project coordinator and three project managers were seriously handicapped by insufficient support services. Eventually, the failure of NPA, NRC and the FMTA to provide adequate project support indicated a lack of Borrower's commitment to this project. Results 7. The objectives of the project were only partly achieved. Studies laid some of the foundation for the reform of transport parastatals. Little was accomplished toward improving the efficiency of the NRC and NPA. 8. Spare parts for locomotives were procured to facilitate the repair of selected locomotives. Of the 75 units planned for repair, only 37 were actually repaired. Even this limited number of locomotives did not perform satisfactorily after their repair. 9. The mechanical workshop in Apapa Port was renovated and re-equipped. Rehabilitation of cargo handling equipment was about 50 percent completed in mid The NRC actuarial and asset valuation studies were completed satisfactorily and provided useful recommendations for NRC. The revitalization study provided a basis for basic policy and institutional reforms. 11. For NPA, the MIS study was the most useful study output. A manpower study helped rationalize the authority's manpower.

11 iii 12. The various FMTA studies, particularly the study of future roles and policy options for transport parastatals, improved the information base for planning, policy formulation and decision making. Project Sustainability 13. Locomotive spare parts financed under the project were intended to improve equipment repairs and increase availability of locomotives; however, availability of such units declined. Thus, no continuing benefits of this component are foreseen. Although project-financed spare parts for NPA equipment were expected to have beneficial effects on the availability of cargo handling equipment, such benefits were in fact minimal and, therefore, little positive results are to be sustained. Various studies provided considerable useful information and some of the recommendations; to the extent they are implemented, will probably have long-term favorable impacts on the transport sector. However, all in all, project sustainability has not been met. Lessons Learned 14. Three lessons are suggested by the experience with this project: First, a broad scope project, such as the Transport Parastatals Project, requires supervision missions carefully balanced between persons with specialized skills and persons of broad experience. Ideally, most of the supervision missions for such a project would be staffed by a number of specialists to deal with diverse technical matters but this means the,nissions would be costly and would impose a heavy drain on the Bank's scarce technical specialists. A compromise is to staff a number of these missions with persons of broad experience, supplemented at times by consultants specialists. 15. The second lesson is that Project Coordinating Units (PCUs) are not suited to ensure internalization and follow-up of complex reorganization studies, particularly in parastatals. 16. The third lesson is that adequate management tools and organizational changes should be established ahead of project effectiveness to generate measurable improvements of operating performance.

12

13 PROJECT COMPLETION REPORT FEDERAL REPUBLIC OF NIGERIA TRANSPORT PARASTATALS PROJECT (LOAN 2734-UNI) PART L PROJECT REVIEW FROM THE BANK'S PERSPECTIVE A. PROJECT IDENTITY Project Name: Loan Number: Loan Amount: RVP Unit: Country: Sector: Subsector: Transport Parastatals Project 2734-UNI US$20.9 million Africa Region Federal Republic of Nigeria Transport All B. BACKGROUND 1. Nigeria, the largest country in Africa, had a population in 1993 of about 89 million, and the population was increasing at a high rate of 2.9 percent annually. The country has an extensive transportation system including a large road network, a railway system, pipelines, ocean and river ports, airports, ocean shipping lines, river transport companies, trucking companies and bus operations. Transport parastatals play important roles in this system. 2. During the seventies, the Nigerian oil industry experienced a sharp increase in both demand for its oil and the prices of oil products. The boom conditions led to a strong growth in overall transport demand. Road, port and air traffic increased during this period 15 to 20 percent annually. Rail traffic, however, declined in this period, except in the years , when the Nigeria Railway Corporation (NRC) was under expatriate management and enjoyed considerable financial and policy support from the Federal Government of Nigeria (FGN). As a result of the favorable circumstances in these few exceptional years, railway traffic doubled, suggesting that there was a significant latent demand for railway services. 3. The strong overall traffic demand in the seventies and early eighties led the Federal Government of Nigeria to invest substantial funds in transport facilities during the period. About naira 7 billion (US$9 billion) was expended on roads, largely federally owned roads; some 10,000 km of these roads were constructed and 3,000 km rehabilitated. Port capacity was more than doubled in these years and 14 major airports were constructed or improved. The major rail infrastructure project was the transformation of the existing single line narrow gauge network into a dual standard gauge network.

14 -2-4. A Transport Sector Strategy Paper, prepared by the Bank in 1984, reviewed this program of physical expansion and improvement and concluded that, while much of the program had been favorable, the downturn in the economy in the mid-eighties reduced the need for further facility expansion. The paper also noted that the expansion did not have a concurrent program of enhancing the financial and institutional capacity of the responsible organizations. Accordingly, the Bank recommended that attention be concentrated on improving maintenance and rehabilitation of the existing transport infrastructure, increasing the efficiency of the transport systems and augmenting cost recovery from transport users. The need for increased cost recovery was emphasized, given the high level of subsidies identified in the sector. The Bank report also noted an urgent requirement for improved transport sector planning, with particular attention to the need for a road inventory and reconsideration of the roles of both NRC and Nigerian Airways. Additional policy issues included: (i) the appropriate balance of road expenditures between levels of government; (ii) the optimum means of meeting future port requirements in the Lagos area; (iii) the future roles of major ports; (iv) the future needs for new airports, and (v) the economic role of river transport. 5. The Federal Government owned parastatals in all transport modes and all of them operated at a loss. The two largest transport parastatals were the Nigerian Railway Corporation (NRC) and the Nigerian Port Authority (NPA). Other important parastatals were in the road transport and sea transport subsectors (National Cargo Handling Company), aviation (Nigerian Airport Authority and Nigeria Airways Limited), and inland waterways (Central Water Transportation Company). The Federal Ministry of Transport and Aviation (FMTA) was responsible for sector policy coordination and overview of all transport modes except roads which were the responsibility of the Federal Ministry of Works and Housing (FMWH). Most of the parastatal organizations reflected poor financial results, excessive staffing, institutional weakness and operating inefficiencies. 6. At the time of appraisal, the NRC was in serious financial difficulty. Despite the substantial growth of the Nigerian economy over the 20-year period , the operating and financial performance of NRC had declined consistently, except for a brief period between 1979 and 1981, when NRC was managed by RITES of India under a management contract. While road traffic had increased approximately five-fold after the mid-sixties, rail traffic had declined by almost one-third. This poor traffic performance was reflected in NRC's declining financial results; the working ratio (working expenses divided by revenues) had deteriorated from around 90 percent in the mid-sixties to 230 percent in 1983 and 240 percent in Several factors had contributed to NRC's poor performance. Commodity exports, which accounted for almost 40 percent of rail traffic in the sixties, virtually ceased during the seventies. In addition, the competitive position of road transport had been greatly strengthened by substantial investment in roads and vehicles. The principal explanation for rail's loss of traffic was its poor operating performance which was primarily attributable to poor management, inadequate foreign exchange for spare parts, a shortage of qualified technical staff, and a surplus of unskilled labor. The number of mainline locomotives available for service declined from 170 in late 1981 to

15 -3- only 85 in mid-1985 due to inadequate running maintenance and failure to carry out periodic overhauls. 8. In addition to reducing its labor force, NRC needed to focus its resources on the markets where it had comparative advantage over road transport. NRC also needed to improve its revenue collecting system and cost controls. However, its ability to do this in 1985 was seriously hampered by lack of financial information; annual accounts were two years behind and basic accounting records were incomplete. There was an economic role for the NRC, and it could become economically and financially viable through a combination of increased traffic, higher tariffs, and considerable rationalization of the cost structure. The project was intended to promote these changes. 9. NPA was also experiencing many problems. Its financial condition had seriously deteriorated after Annual and monthly accounts were not current, although NPA had made progress over the preceding 12 months in redressing the backlog. The Port Authority suffered many of the same institutional problems facing the NRC, although to a lesser degree. 10. As a result of NPA's construction program between 1975 and 1980, port capacity had more than doubled and was adequate in 1985, especially with the downturn in traffic following While the fall in port traffic in 1983 and 1984 aggravated financial problems, NPA's results were deteriorating before that time, due primarily to the fact that three new ports were brought into service and the vastly increased costs of dredging, workshops, personnel, administration and supervision. About a year before appraisal, NPA took action to improve the situation by reducing its staff by 6,000 or 20 percent; despite this step, the staffing level remained excessive. Two other actions were taken by NPA about this time: it closed Sapele Port to commercial operations and obtained government approval of a 15 percent tariff increase. 11. NPA requested assistance through the project to: (i) improve its workshop and stores operation; (ii) assess manpower and training requirements; and (iii) introduce a new management information system. These measures, together with actions already taken, were expected to enable NPA to attain, within 3 years, an operating ratio similar to those achieved in 1980 and 1981, targets considered reasonable for the medium term. 12. There were uncertainties as to the appropriate roles of both the railway and the parastatal involved in inland waterways transport. In 1986, the government indicated to the Bank its intention to undertake policy reforms concerning these parastatals. Substantial reductions were to be made in budgetary transfers to them, parastatals would be required to generate more internal revenue and some organizations would be privatized or liquidated. The specific steps necessary to achieve these aims and a timetable for their implementation were to be worked out through the proposed Transport Parastatals Project. 13. The discussions with various transport related organizations included, inter alia, specific consideration of (i) urgently required spare parts; (ii) need for improved management information systems; (iii) need for management training; (iv) potential for improvement in workshop and cargo operations at NPA; and (v) possible transport policy studies. A formal request for the Transport

16 4- Paastatals Project was submnitted by FGN to the Bank in early The project was appraised by Bank staff in May 1985 (for a list of previous Bank financed projects in the sector see Table 1). Project Objectives C. PROJECT OBJECTIVES AND DESCRIPTION 14. The major objectives of the projects were to: (a) lay the foundations for reform of transport parastatals by improving accountability, specifying financial and operational objectives, preparing staff rationalization plans and examining the future roles of several enterprises; and (b) improve the efficiency with which the two largest parastatals, NPA and NRC, utilize their facilities. Project Description 15. The project comprised three main undertakings as follows: (a) Technical assistance and training for NPA and NRC. This activity was to be carried out in several specific subject areas, namely, to: (i) improve internal financial controls, accounting and management information systems; (ii) define financial targets including a basis for compensation for any non-commercial obligations; (iii) carry out revenue/cost studies to identify cost-cutting, marketing and tariff setting strategies; (iv) assist in manpower planning and development, including the preparation of staff rationalization and training programs; (v) assist in improving workshops and operations; and (vi) promote more effective use of computer facilities. (b) provision of computers, workshop equipment and training equipment as well as spare parts, in support of the above-mentioned technical assistance and training. (c) Technical assistance and consulting services to FMTA to carry out policy studies on subjects including the following: (i) the future options for other transport parastatals, including possible restructuring, privatization or liquidation; (ii) the respective roles of Nigerian Airways and private operators in domestic aviation; (iii) the feasibility of intermodal transport, including managementraining for senior officials of FMTA and its parastatals, especially NRC and NPA.

17 -5- D. PROJECT DESIGN AND ORGANIZATION 16. The project design emphasized assistance to the NRC and NPA but with some attention to the needs of FMTA. A particularly large share of the funding (40 percent of the allocated amount of the loan) was directed to the procurement of spare parts for NRC's locomotives to increase locomotive availability critical to operating efficiency. Likewise, spare parts for NPA's cargo handling equipment were a significant project element and also were intended to enhance the efficiency of port operations. 17. In addition to spare parts for NRC and NPA, provision was made in the project for procurement for both organizations of computers and training equipment, workshop equipment and tools. Also, the project included management training in NRC, NPA and FMTA. 18. Studies for NRC under the project included: (i) improvement of locomotive workshops and stores management; (ii) design and implementation of new internal control, accounting and management information systems; (iii) revenue/cost studies; (iv) manpower studies; and (v) project planning and programming. Additional technical assistance was provided to train trainers to implement recommendations from NRC manpower studies. 19. Studies for NPA included the following: (i) improvement of the Lagos workshop including the identification of needs for spare parts; (ii) manpower planning and development; (iii) MIS for financial and operational purposes; and (iv) rationalization of data processing activities, etc. including implementation. 20. The project was designed to improve the operating efficiency and financial results of the NRC and NPA in both the short and long term. In order to monitor the performance of these organizations, the project included specific output targets for both NRC and NPA. Among these, those set for locomotive performance were considered particularly important. 21. The project included a Project Coordinating Unit (PCU) to have overall responsibility for the management of the project. The PCU was based in the FMTA and was to report directly to the Chief Executive of FMTA. The day-to-day management of the project was the responsibility of Project Management Units (PMUs) in each of the major organizations (FMTAS, NRC and NPA). Each PMU was headed by a Project Coordinator who coordinated project components within his organization. 22. A number of conditions of loan signing and effectiveness were established by the Bank. One of these was government approval of tariff increases for NRC and NPA, which was accomplished. Another was that locomotives for rehabilitation were to be selected, spare parts needs identified and specifications for bidding prepared. This was not achieved, as a spare parts list was not ready until May 1987 and bid documents were prepared later. Some other conditions were met prior to effectiveness and some were not. Negotiations were completed in December

18 ; the loan was approved on June 26, 1986, signed October 31, 1986 and became effective January 23, 1987 (see Table 2). E. PROJECT IMPLEMENTATION 23. Nigerian Railway Corporation. By mid-1987, implementation of this component was progressing well but it was still at an early stage. As work proceeded, it became clear that NRC's equipment was in a state of dilapidation and, as a result, the railway's capacity was severely crippled. In November, the Bank sent a high level mission to Nigeria and it agreed with NRC and FMTA that an Emergency Rescue Plan was urgently required for NRC. Terms of reference were prepared by February 1988 for a Revitalization Study to include a diagnosis with an immediate action plan, manpower plan, investment plan, corporate and business plan, and a perfornance agreement. Consultants were selected for the study which was completed in mid A subsequent project was to implement its recommendations. A costing study was initiated but was not completed. 24. The locomotive rehabilitation component of the project had a smooth start but soon lost ground due to delays in approval of tender evaluations by NRC and FMTA. Delays also arose in the issuance of letters of credit by NRC's bankers. Locomotive rehabilitation in particular was proceeding slowly because of procurement delays and the use of improper procedures. Counterpart funds were inadequate for vitally needed supplies and, as a consequence, some new locomotives were purchased at high prices. By mid-1990, progress on the NRC component was rated unsatisfactory. 25. NRC apparently underestimated the magnitude of the technical and managerial tasks involved in locomotive rehabilitation. Several factors accounted for the shortcomings in implementation. These included: (i) limitations in available counterpart funds; (ii) long delivery times required by some suppliers; (iii) production stoppages in NRC due to poor financial state of the Corporation; (iv) extremely poor condition of many of the locomotives; (v) insufficient shop space, and (v) bureaucratic delays. 26. The performance of the PMU in NRC was not satisfactory, partly because of the manager's limited experience. Also, he was handicapped by insufficient support services. There was, however, reasonable continuity in the staffing of the position. 27. Nigerian Port Authority. Implementation had a reasonably good start and, by mid-1989, progress was fair on the accounting system and manpower studies. While Phase I of the equipment rehabilitation program was carried out on time, Phase II, comprising tender and bid evaluation, became stalled because of unsatisfactory performance of consultants and shortcomings of the PMU. As of mid-1990, project implementation was rated unsatisfactory, the principal problem being an inadequate tender evaluation prepared by consultants.

19 The performance of the PMU in NPA was also unsatisfactory. One of the main problems was the frequent change in the Project Manager, causing delays in decision-making. Also, there was a lack of understanding on the part of the PMU concerning the objectives of the project. 29. There were a number of causes of delays in the implementation of the NPA component. In addition to the lack of understanding of the objectives of the project and the high turnover of project managers, few staff seemed to have an adequate knowledge of Bank procedures and requirements. External factors included bureaucratic interference from high level officials in the Ministry, uncertainty concerning reorganization of NPA and the failure of some consultants to perform satisfactorily. 30. Federal Ministry of Transport and Aviation. By mid-1987 only a program for training abroad had been established. Several studies were launched in early 1989: (i) future roles and policy options for transport parastatals; (ii) freight and multimodal operations; (iii) a national transport survey; and (iv) domestic aviation policy. Progress on these studies was being made in mid Early in 1990, FMTA authorized a new study to develop a strategy and plan for the Nigeria Institute of Transport Technology. Studies were also authorized for the Maritime Academy, the National Motor Vehicle Administration, Lagos Mass Transit and a transport systems management study. In 1993, a study was authorized for the inland waterway subsector, but it began too late to be completed within the project period. Three studies planned earlier were not undertaken; these were the national transport survey and projections; development and policy analysis; and management information system studies, which could not be started before closing of the loan. 31. In response to a request from FMTA, the Bank agreed to the use of project funds for a short-term consultant to assist FMTA in producing a draft national transport policy. The consultant produced, on schedule, a draft which was adopted by Government in Among the problems that impacted the project negatively were frequent changes in executives of the Ministry. Also, the depressed state of the economy adversely affected the execution of the project. Finally, the high level of inflation led to considerable agitation for wage and salary increases which caused disruption in project implementation. Achievement of Objectives F. PROJECT RESULTS 33. Little was accomplished toward improving the efficiency of the two largest parastatals, the NRC and NPA. The project objectives were only partly achieved. On the other hand, the studies laid some of the foundation for the reform of transport parastatals. Useful studies dealt with the roles of certain parastatals and various policy issues.

20 -8- Equipment Rehabilitation 34. The locomotive rehabilitation program of NRC was directed at rehabilitating 75 locomotives in the fleet, 30 in the first tranche and 45 in the second. Under the project, only 32 were rehabilitated in the first tranche and 5 in the second tranche, a total of 37. In May 1994, only 16 of the 37 rehabilitated locomotives were running. Four of the 37 were out of service because of accidents, while 3 were in need of compressor/exhauster repairs, and 9 were held in running sheds for repairs. Eight of the original 75 locomotives targeted for rehabilitation could not be rehabilitated. The average number of available locomotives steadily declined from 66 in 1987 to 25 in The NPA equipment repair program was divided into phases: (i) repair; (ii) rehabilitation of mechanical workshop at Apapa port; and (iii) rehabilitation of cargo handling equipment. Phase I was completed on schedule in August 1987 but the other phases were seriously delayed. The mechanical workshop of Apapa port was renovated and re-equipped as planned. Rehabilitation of cargo handling equipment was about 50 percent completed. (The remainder was scheduled for completion by the end of October 1994.) A small amount of computer and training equipment was procured for both NPA and NRC. Results of Studies 36. Table 3 presents the objectives, main outputs and impact of the studies undertaken for NRC. The studies were mainly designed to review railway operations and management as a basis for defining the railway's future role and investment needs. The actuarial study and the valuation of assets provided useful results; they served to highlight problem assets. The revitalization and costing studies (the latter only partially completed) provided the basis for basic policy and institutional reforms and a proper costing of NRC's services. Implementation of recommendations in the studies was weak because of management inadequacies and a tendency to rely too heavily on the Technical Committee for Privatization and Commercialization (TCPC) which was responsible for the restructuring framework. 37. Only three studies were carried out under the NPA component of the project. Their objectives, output and impact are also presented in Table 3. The MIS study was the main accomplishment. As a result of the study, NPA was provided with a commercially-oriented accounting system and a computerized payroll system; the final phase of the study, creation of an authority-wide MIS, was not completed. A manpower planning and development study helped rationalize the authority's manpower. 38. The major objectives, outputs and impacts under the FMTA component are summarized in Table 3. While the quality of these studies varied, they improved the information base for planning, policy formulation and decision-making. The study of future roles and policy options for transport parastatals was particularly useful in preparing a National Transport Policy produced in early Delays in executing three of the studies, however, prevented their having a major influence on the reform activities of the TCPC. The Lagos Mass Transit study provided a clear framework for manpower training and development needs for Nigeria's transport sector. While

21 -9- the results of some studies were positive, FMTA did not implement many recommendations and thus missed opportunities to strengthen its institutional capacity. 39. Conspicuous failures in the FMTA study program were the exercises designed to: (i) improve policy analysis capabilities of the ministry; (ii) provide the ministry with an information system for monitoring the sector; and (iii) create a transport data bank. The first two studies were not executed and the latter was terminated early. The FMTA training program was fully implemented but it was a qualified success because of a failure to monitor the subsequent performance of trainees and the alleged award of training assignments based on favoritism. Performance Targets and Achievements 40. Performance targets were established at the outset of the project. None of these targets were achieved during the project period, except locomotive kilometers per day. Locomotive availability, a particularly important factor, declined from 54 percent in 1986 to 19 percent in The railway's working ratio target was 180, but the actual ratio increased from 212 in 1986 to 238 in Targets for NPA equipment availability were established, but it was not possible to assess the actual performance in this regard. Project Costs 42. The total project cost, as indicated in Table 5, was approximately US$24.10 million as compared with the appraisal estimate of US$30.26 million. NRC expended naira 18,004,180 in counterpart funds, or 58 percent of its commitment of naira 30,946,574. Since the NRC commitment was equivalent to US$5.8 million, the NRC counterpart funding was about US$3.36 million. NPA met its commitment of US$2.70 million. FMTA counterpart funding covered only the costs of the PCU and its PMU, somewhat less than the US$0.9 million commitment. The total counterpart funding was US$6.76 million. Adding this counterpart funding to the Bank's loan disbursement of US$18.14 million brings the total project cost to US$24-10 million. 43. The actual cost of the NRC component of US$16.13 million was 10 percent lower than the appraisal estimate, while the cost of the NPA component was 44 percent less than the appraisal estimate. In the case of the FMTA component, however, the actual cost exceeded the appraisal estimate by 24 percent. Overall, the total project cost was 18 percent below the appraisal estimate and this is explained largely by the shortfall in NRC's contribution of counterpart funds. Project Financing 44. The original plan for project financing along with the actual project financing are presented in Table 6. As indicated in that table, the Bank's US$18.1 million contribution to the project financing was 75 percent of the actual project cost while in the appraisal estimate the

22 -10- Bank's participation was planned as 69 percent. NRC failed to contribute its planned share of the financing but the NPA and FMTA more or less met their financial commitments to the project. Disbursements 45. Loan disbursements, as indicated in Table 7, began in FY Although the loan was to be fully disbursed by June 30, 1992, according to the appraisal plan, actual disbursements on that date were only 48 percent of the US$20.9 million Bank loan. A year later, 73 percent of the loan had been disbursed. After all loan disbursements were completed, the cumulative amount was US$18.1 million or about 87 percent of the loan amount. Special accounts were established to facilitate disbursements from the loan. The main reason for delays in disbursements was that substantial delays occurred in carrying out various elements of the project as detailed above in the discussion on project implementation. Allocation of Proceeds 46. Proceeds of the Bank loan, as originally planned and as finally allocated are shown in Table 8. In the Loan Agreement, US$12.14 million was the specified allocation for NRC; actually, a slightly larger amount of US$12.77 million was allocated to NRC. Originally, NPA was allocated US$6.89 million but in the end only US$2.59 million was actually allocated to the authority. In the case of FMTA, the original US$1.87 million changed to an actual US$2.78 million. Thus, only NPA suffered a sizable shortfall in the allocation of funds. Eventually, the provision of spare parts consumed more than 72 percent of the Bank disbursements, a much higher percentage than the 55 percent originally expected. Environmental Impact 47. The nature of the project was such that its impact on the environment was minimal. G. PROJECT SUSTAINABILITY 48. Locomotive spare parts financed under the project were intended to improve equipment repairs and increase the availability of locomotives; measures of availability, however, actually declined, as indicated above. Thus, no continuing benefits of this component are foreseen. Although project-financed spare parts for NPA equipment were expected to have beneficial effects on the availability of cargo handling equipment, these benefits likewise probably were not realized and therefore little positive results are likely to be sustained. The studies financed under the project provided useful information to policy makers and planers; some of the study recommendations, to the extent implemented, will probably have long-term favorable impacts on the transport sector. However, overall, the project results have to be considered unsustainable.

23 -1 1- H. BANK PERFORMANCE 49. Bank missions for both preparation and supervision of the project are shown in Table 10. Following project identification in November 1982, the Bank sent four preparation missions to Nigeria during the period 1982 through A preappraisal mission visited Nigeria early in 1985, followed by the appraisal mission later that year. In addition, post-appraisal and postnegotiation missions were sent to the country. It therefore appears that an unusual amount of effort was put forth by the Bank to prepare and appraise the project. 50. The first supervision mission arrived in Nigeria in November 1986 and the final one in February During the intervening period of just over 6 years, a total of 19 supervision missions reviewed implementation. Thus, the Bank sent about 3 such missions a year which is somewhat above the average for Bank projects. 51. Over two-thirds of the 19 missions comprised only one staff member and a third of them included two or three staff. Since the project involved several modes of transport and the Bank could not often send specialists for all modes, the project was difficult to supervise adequately. Railway engineers participated in only six missions and port engineers were involved in only five missions. Some of the studies involved aviation and trucking subsectors and none of the supervision missions involved specialists in these fields. 52. Another problem was that there was a high turnover of Bank staff assigned to the project. No Bank staff member remained with the project throughout its life, and staff changes were frequent. At least four Division Chiefs were responsible for the project at different times over the project period. The lack of continuity in staff made it difficult to supervise this rather complex multimodal project. 53. Two lessons are suggested by this experience. First, a broad scoped project, such as the Transport Parastatal Project, requires supervision missions carefully balanced between persons with specialized skills and persons of broad experience. Ideally, most of the supervision missions for such a project would be staffed by a number of specialists to deal with diverse technical matters, but this means the missions would be costly. 54. A second lesson is that the Bank should make every effort to minimize changes in the staff it assigns to a particular project. The continuity of staff the Bank assigns to a project has a large impact on effectiveness of project execution. Achieving this goal is particularly difficult over a long period of time. I. BORROWER PERFORMANCE 55. The PCU required a strong organization with full support from FMTA and required appropriate staff and facilities. Unfortunately, it never received the required support to enable it to carry out its assigned functions. Moreover, the PMUs in NRC and NRC also did not receive adequate support from their respective organizations. A shortage of counterpart funds in NRC

24 -12- was another serious problem. These shortcomings account in large part for the lack of achievement of the project. The failure to provide adequate project support indicated a lack of full Borrower commitment to the project. 56. Performance of the Borrower with regard to covenants in the Loan Agreement show mixed results, as indicated in Table 11. NRC covenants fall into three categories: (i) counterpart funding requirements; (ii) performance targets; and (iii) requirements relating to a subsidiary loan agreement, auditing and the maintenance of financial records. Counterpart funding never reached the levels required. None of performance targets, neither operating nor financial targets, were achieved, except locomotive kilometers per day. With regard to other covenants, the subsidiary loan agreement was executed, a special account was opened and proper financial records were maintained and audited. 57. Compliance with covenants relating to the NPA component was also mixed. Covenants relating to subsidiary loan agreements, record keeping, opening of special accounts, and auditing were generally complied with. NPA met its counterpart funding obligations. Performance under other covenants, however, was less than satisfactory; the identification of equipment repair needs was completed almost a year behind schedule and actual equipment repairs were accomplished with a four year delay. Targets for cargo handling equipment availability were not achieved. Also, working ratio targets were not reached; in fact, the working ratio became worse between 1986 and 1990 and, although it improved thereafter, never reached the target level. 58. Two lessons may be drawn from the implementation experience. First, the combination in a single operation of a significant TA program with a component designed to provide spare parts required unusual skills mix and capabilities in the PMUs of NPA and NRC. The establishment of separate coordination units within parastatals that are expected to be accountable, both for the internalization of complex reorganization studies and also for the procurement of standard items, is indeed questionable. A second lesson is that it is unrealistic to expect that major management weaknesses would be eliminated in the course of a single project, when the adequate management tools are not set in place ahead of effectiveness. J. PROJECT RELATIONSHIP 59. Relations between the Bank and the agencies involved in the execution of the project were generally satisfactory. Communications facilities between Nigeria and the Bank in Washington were often poor during the period of project implementation, and the Bank's field office played a vital role in expediting communications between Bank headquarters, the PCU and other executing agencies. 60. Bank staff were flexible in their dealings with the Borrower and agreed to changes in the project as warranted by unanticipated events. The amounts of funds allocated to different project categories in the Loan Agreement were revised from time to time, as indicated in Table 9. Also,

25 -13- the closing date was extended on three separate occasions, the first extension to June 1993, the second to December 31, 1993, and the third to June K. CONSULTING SERVICES 61. The performance of consultants involved in the project was mixed. In carrying out the NPA's equipment rehabilitation program, consultants performed poorly with long delays in completion of work on Phases 2 and 3, in part at least, because of the deportation of some of their personnel. On studies also, the performance of consultants varied considerably, as indicated in Table 3. L. PROJECT DOCUMENTATION AND DATA 62. The legal documents were sufficiently clear and specific for effective implementation of the project. The President's Report provided a useful framework for the Bank and the Borrower during implementation. Supervision reports, quarterly progress reports of the Borrower and other data in project files were adequate for the purposes of preparing this PCR.

26 -14- PART II: BORROWER'S ASSESSMENT (THE BORROWER WAS GIVEN THE REQUIRED TIME OF THREE MONTHS TO PREPARE ITS ASSESSMENT OF THE PROJECT. HOWEVER, THE BORROWER DID NOT SUBMIT THE ASSESSMENT.)

27 -15- PART mii: STATISTICAL INFORMATION

28 -16- Table 1: Related Bank Loans Loan No. and Title Purpose Year of Status Approval Loan 193-UNI Railway Project Rehabilitation 1958 Completed Loan 694-UNI Transport Rehabilitation Wagons, spares, track 1970 Completed Project material and equipment Loan 326-UNI Apapa Port Port development 1963 Completed Loan 922-UNI Apapa Port Container berths, 1973 Completed equipment, technical assistance Source: President' Report: Transport Parastatals Project Table 2: Proiect Timetable Item Planned Revised Actual Invitation by government 4/84 Identification 6/84 Appraisal 9/83 5/85 Negotiation 12/85 Board Approval 6/26/86 Loan Signature 10/31/86 Loan Effectiveness 1/23/87 1/23/87 Loan Closing 6/30/92 12/31/92 6/30/94 12/31/93 Last Disbursement T 11/30/94 Sources: President's Report; IBRD "Statement of Loans" for various years.

29 -17- Table 3: Studies A. NRC Activity Objective Main Output Major Achievements Remarks 1. Revitalization Aimed at identifying Technical and First detailed look at Completed in Study problems of NRC and Management audit of NRC since Canac October 1988 and their remedies. Led to NRC, Manpower Study of FMTA policy formulation of Planning and Provided basis for position given to Diagnostic, Corporate Development Plan, NRC/govt. WB in Dec Plan, Action Plan, Investment Plan appreciation of the Intervention of Manpower Plan, ( ), Corporate deep-seated problems TCPC in early 1989 Investment Plan (10 yrs) and Business Plan (5 of NRC and the need led to policy and Draft Performance yrs), Draft for major policy and conflict with Agreement. Review of Performance institutional reforms. WB/FMTA which conditions of service Agreement and Provided the basis for frustrated latter's done also Immediate Action WB acceptance of attempts at Plan. provision of assistance implementation of to NRC in support of study the reforms and recommendations TCPC's subsequent reform activities. 2. Management To develop Corporate- NONE NONE Although awarded, Information System wide MIS based on not implemented (MIS) Study recommendations due to nonemanating the implementation of Revitalization Study Revitalization Study recommendations. 3. Traffic Costing To establish a traffic Traffic costing fully Provided framework Not fully Study coating and business defined and for NRC to get a implemented evaluation system and computerized. Draft detailed and because of lack of Unit (TCBEU) within MIS produced. comprehensive view management NRC. TCBEU framework of its business commitment (data designed include job transaction and to fully validate the description, etc. and mechanism for system not able to recruitment advert. informed business be collected due to Shell of unit created decisions and lack of funds and with seconded internal monitoring of market external recruitment staff. trends. not done). 4. Valuation of To value the landed Draft valuation and Provided an in Final Report not Assets assets of NRC and also legal reports for indication of the submitted plants, equipment, etc. landed Assets and potential worth of especially the plant to allow for NRC's Interim Reports for the NRC landed assets and machinery restructuring (financial valuation of the and highlighted its valuation due to corporate). plants, machinery, etc. inadequate non-payment of fees management to date to consultant and inadequacy of it to valuers by NRC. the rewards. 5. Actuarial Study To establish the state of First valuation Led to realization of of Pension Fund the Fund and make exercise of the Fund need to strengthen the recommendations on its in recent times. management of the future. Established the Fund (which was actuarial state of the done) and the need to Fund and outlined find ways of making it options for the Fund to solvent (which was meet its liabilities and not done). suggested how fund may be strengthened.

30 -18- B. NPA Activity Objective Main Output Major Achievements Remarks 1. MIS Study - To define Final Reports and A new accounting Described in project Phases I and 11- commercially- Accounting Manuals system was evolved document as MIS for New Accounting oriented accounting and implemented but the authority, but in System and system and its computerization fact TOR narrowed Implementation implement, has been limited to it to simply evolving including only the payroll new accounting computerization system and implementing it. An MIS strategy evolved for definition and implementation under project never implemented. 2. MIS Study - Expansion of MIS Strategy Report Led to realization by Never implemented, Phase Im - Definition accounts system into NPA of the perhaps because of of Corp. wide MIS full MIS for all limitations of their the TCPC reform system departments information and proposals which had management implication for the decision-making form of MIS to be basis and agreement evolved. of for redressing the situation. 3. Manpower To establish Final Reports Used by NPA and Indicated a need for Planning and optimum staffing TCPC to undertake detailed study of Development Study levels, conditions of major staff NPA operational service, review rationalization in practiced towards organizational 1990/91 their improvement structure, etc. and, perhaps, more staff reductions. Not followed-up.

31 -19- C. FMTA Activity (Contr. Objective Main Output Major Achievements Remarks Value) FMTA Policy To define the role of Diagnostic and Provided same Usefulness reduced Studies. Etc. transport parastatals, Final Report background input into by delay in execution, 1. TRAPARS - government's policy evolvement of first which prevented its Future Role and position, the entities' National Transport use by TCPC in its Policy Options for resource needs and Policy for Nigeria work on reform of Transport Parastatals performance targets transport parastatals. ($210,308 +N660,265 = $294,957 equivalent) 2. FREMOPS - To assess the demand Diagnostic and Provided data and Gave clear idea of Freight and for freight and Final Report policy cost and non-optimal Multimodal multimodal traffic and recommendations muse of multi-modal Operations Study. the institutional, legal used as input to transport. In (f, 107,176 and investment National Transport particular, highlighted +N173,556 = framework for Policy high cost to the $223,791 improving present economy of equivalent) situation and future bureaucratic customs prospects. procedures. Useful study that has been. underutilized. 3. Domestic To review the state of Diagnostic and Included a National Most of its policy Aviation Policy domestic aviation and Final Reports Airspace Traffic recommendations (S57,643 + recommend ways of System which overtaken by actions N163,152 = $78,559 improving the operation provided for military of FMOA which was equivalent) of the sub-sector. and civilian needs. created in 1988 from _ FM T A. 4. Management To design MIS for the Firm of consultants Information System monitoring of the appointed never (MIS) - Phase I performance of the commenced work due sector and of the to none finalization of activities of the contract. Ministry. Included pilot _ implementation. 5. Development of To improve the policy. Not executed. Policy Analysis Division - Phase I formulation and implementation capacity of FMTA by reinforcing the capabilities of Policy Analysis Division of TCID. Included training program. 6. NTSP - National Primarily to design the Interim Report None Terminated due to Transport Survey specifications of a slow progress by and Projections transport statistics data consultant and their (Review and bank - scope, data subsequent request Extensions) - Phase I gathering and for increases in (S156,420 + processing and reimbursable costs N498,762 = computer needs, etc. which was rejected. S227,151 Did not include equivalent) purchase of computer which was to be in Phase 11 of the study.

32 -20- Activity (Contr. Objective Main Output Major Achievements Remarks Value) 7. Lagos Mass To determine the Diagnostic and Provided basis for Main Transit and contents of a proposed data collection identification and recommendations Transport Systems Mass Transit Project for and Final ongoing preparation adopted by a Management Study funding by WB. Reports, (by WB/LASG) of workshop on the ($960,000) Included system Working Lagos Urban recommendations of specification and Papers and Transport Project to the study. Findings preliminary engineering Drawings be executed by and design of infrastructures LASG. Recommendations of (roads, railways, etc.) the study summarized in a Sunimary Report produced for the workshop. 8. NFIT To formulate a Strategic Final Report Provided a framework Although adopted in Developnment Plan Development Plan for for reorienting the principle, its and Strategy NITT to guide its priorities for NlTT's implementation ($54,900) development over a five incremental stalled by NMTl's year period, with agreed development, the inability to obtain recommendations to be financial and other external funding. sued as a basis for resource implications. seeking external funding. 9. Training External and local Evaluation Training Inadequate Programs Phases I & training of senior and Report for opportunities monitoring of inpact II ($216,603 + middle management Phase I provided to almost all on post-training $313,264 = staff of FMTA, and its senior staff of FMTA performiance of $529,867) parastatals, especially and a large number of beneficiaries. NRC & NPA senior staff of its Selection of parastatals, mainly on beneficiaries also not management aspects optimal. Parastatals of transport planning could have benefited and management more. 10. National Motor To evolve a unified Draftl Report to Not possible to assess Vehicle vehicle licensing, FMTA since report yet to be Administration registration, etc. system accepted. System - Phase I for the country ($250,000) 11. Maritime Same as for NITf above Draft Report - ditto - Academy, Oron: Development Plan and Strategy ($53,334) 12. National To produce a Draft Draft Policy Provided a holistic Implementation has Transport Policy National Policy Document understanding of not been effectively ($14,915) Document transport sector trends carried out. by sector managers at state and national levels when discussed by National Council of T ransport in Adopted by Federal Executive Council in May 1993.

33 -21- Activity (Contr. Objective Main Output Major Achievements Remarks Value) 13. Revitalization To monitor the work of Comments on Helped to facilitate Study: Monitoring the international study political acceptability of Study Consultants consultants undertaking consultants' of the study's findings (N917,004 the main study. outputs and S124,248 recommendations, equivalent) which at the time, were seen as controversial. 14. Inland To assess the potential Final Report Highlighted the need Waterways for nland Waterways in for institutional Development Study - Nigeria reforms in the more Phase I ($180,000) effective management of the use of Nigeria's I inland waterways. I Source: Supervision Reports

34 -22- Table 4: Procurement of SDare Parts A. NRC Tranche I - Spare Parts 1. Lot/Item SLC 486/Loco SLC 486/Loco SLC/486/3 SLC 486/2 SLC 486/Loco Supplied Spares Spares Loco Spares Loco Spares Spares 2. Contractor Gen. Motors GE Electric GE (Canada) Kessler (USA) Holdtrade (USA) (USA) GmbH (Germany 3. Contract Value $232, $1,658,788 $ $766, $399, Date of Bid 11/9/87 11/9/87 11/9/87 11/9/87 11/9/87 2Opening 5. Date of 23/11/87 23/11/87 23/11/87 23/11/87 23/11/87 compilation of Bid Evaluation 6. Date of Award 27/7/88 27/7/88 27/7/88 27/7/88 27/7/88 7. Date of 17/11/88 17/11/88 17/11/88 17/11/88 17/11/88 _ Agreement 8. Date of Sept /1/89 (reqd. Sept Sept Sept Confirmation of Form M only) Order/LC due Adv. Pmt. 9. Expected shipment date 10. Actual date of 7/9/90 Aug Oct Feb Oct shipment 11. Date arrived port 20/9/90 Sept Nov Oct Date cleared or Dec Sept Dec Jun Jan delivered to NRC 13. Remarks: Time Elapsed to: Award/Approval (a) Agreement 8 months 8 months 8 months 8 months 8 months (b) Confimnation 5 months 5 months 5 months 5 months 5 months (c) Shipment 23 months 2 months 23 months 23 months 23 months (d) Clearance 5 days 7 months I month I month I month (e) 3 months no loss in time I month I month 3 months Total elapsed time (4 to ) months

35 -23- Emergency/Supplementary Orders I. Lot/Item SLC SLC SLC SLC SLC M3556(W) Supplied Undersize Emergency Repair of 18 Remanufacture Loco - Elec bearings for spares for No. Traction of 7 Diesel Starting Overhead 1801 class 1801 class Motors Engines Batteries Crane Spame 2. Contractor GE (USA) GE (USA) ABB Service, GM (USA) Rocket (S. Crown Spain Korea) Agents/I Morris of UK 3. Contract Value $54,750 $45, $592,713 $1,171,835 $156,480 S188, Date of Bid 13/12/89 13/12/89 7/3/90 7/3/90 7/3/90 21n188 Opening 5. Date of 13/12/89 13/12/ /90 29/3/90 12/4/90 Evaluation 6. Date of Award 13/2/90 13/2/90 15n/91 Re-negotiated 12/4/90 18t7/89 4/3/91 7. Date of 23/3/90 23/3/90 17/9/91 4/6/92 27/5/91 Agreement 8. Date of 3/5/90 3/5/90 15/3/93 9/2/93 25/11/91 June 1990 Confirnation of Order 9. Expected July 1990 July /5/92 Shipment Date 10. Actual Date 31/1/91 31/1/91 18/3/93 29/4/93 26/4/92 28/3/91 Shipped 11. Dated Arrived 11/3/91 11/3/91 13/4/93 25/5/93 30/5/92 17/4/91 Port 12. Date Cleared 23/8/91 23/8/91 19/5/93 7/10/93 18/12/92 25/9/91 or Delivered to l NRC 13. Remarks: Time Elapsed to: (a) Award 2 months 2 months 15 months 24 months 11 months 12 months (b) Agreement I month I month 2 months 2 months 2 months (c) Confirmation 2 months 2 months 7 months 8 months 6 months (d) Shipment 8 months 8 months I month 2 months 5 months (e) Clearance 5 months 5 months 4 months 5 months 7 months 5 months Total elapsed time ( to 12) months

36 -24- Tranche II - Spare Parts 1. Lot/Item SLC 594/1-GM SLC 594/3- SLC 594/2- SLC 594/4 - SLC SLC SLC Loco Spares 1801 Loco 1701 and Air Brake 594/6-594/7 594/5 Spares 1801 Spares Spares Loco Wheels Kessler Batteries & Aides Spares 2. Contractor GM (USA) GE (USA) GE HoldtraW Rocket Satusung Gesticorp (Canada) AMECO (Korea) (Korea) (Swiss) (USA) 3. Contract Value $1,072, $859, $1,155,166 $470,883.0 S370,012 S344,156 $46, Date of Bid 20/7/90 20/7/90 20/7/90 20t7/90 20/790 20/M90 20/7/90 - Opening 5. Date of 10/9/90 10/9/90 10/9/90 10/9/90 10/9/90 10/9/90 10/9/90 Evaluation _ 6. Date of Award 17/4/91 17/4/91 17/4/91 17/4/91 17/4/91 16/4/91 19/4/91 Amended Amended 21/8/91 on 27/6/91 7. Date of 26/91 6/8/91 27/8/91 27/5/91 24/6/91 24/6/91 Agreement 8. Date of Feb Feb /1/92 25/11/91 22/11/91 Confirmation L I I 9. Expected Aug Aug Jul Apr. May Shipment Date X! Actual Date 22/4/92 1/10/.92 12/6/92 10/5/92 15/6/92 Shipped 5/9/ Date Arrived 1/9/93 and 14/5/92 27/10/92 17/7/92, 25/5/92 13/10/92 22/6/92 Port 15/10/93 and 10/8/92, by air 14/12/92 23/9/ Date Cleared in batches from 23/10/92 15/12/92-25/9/92, 22/9/92 3/2/93 25/9/92 or Delivered to 23/12/93 to 15/1/93 21/9/92, NRC 17/5/94 6/8/ Remarks: Time Elapsed to: Award (a) Agreement 7 months 7 months 7 months 7 months 7 months 7 months 7 months (b) Confirmation 3 months 4 months 4 months I month 2 months 2 months (c) Shipment 7 months 6 months 5 months 6 months 5 months (d) Clearance 2 months 2 months 4 months 5 months 6 months (e) 3-7 months 5 months 2 months 2-3 months 4 months 4 months 3 months Total elapsed time ( to 12) months

37 Spare Parts Purchased from NRC Resources. ( ) Catbay ToWa1 Repair Parts USS241,051 92, ,424 73,090 1,026, , , ,450 3,219,371 N271, , , ,335 8,173,681 8,062,178 5,508,097 9,452,827 32,C6U4703 Runnrng Spam USS2S5,798 S6, ,313 21,292 47,563 14,233 74, N303, , , , ,651 I N/A 1,326,196 3,684,784 Coringunbles N/A NIA N/A N/A N/A N/A N/A N/A N/A Total USS527, , , ,3S2 1,134, ,26 364, ,100 3,944,085 N574, , ,121,267 8,551,332 2,247,432 5,508,097 to,s39,023 36,369,487 Note: 1. Exchange rate was as at the tune of contract. 2. Figures are invoiced values. Clearance and other charges not included. 3. Most of the consumable items were purchased directly by users through cash releases and imprests and hence the costs could not be isolated from other materials expenses. Source: Extracted from NRC Store's Register

38 -26- B. NPA Project Element Contractor Contract Value * Payment to- Remarks date* _ A. Technical Assistanc 1. Equipment and workshops Hamburg Post Completed. Spare parts rehabilitation ConsultingiTechnology identification phases executed Systems timely but preparation of bid - Phase I Nigeria $241,000 plus N440,000 fully paid documents and bid evaluation -Phase 11 -ditto- S147,000* fully paid unduly delayed by consultant's non- - Phase m -ditto- S107,200* fully paid perfonnance and non-compliance with bidding conditions in bid 2. New Accounting System Coopers and Lybrand $47,348 plus N441,851 fully paid evaluation. and Implementation include. Computerization 3. Manpower Planning and Fountainhead and Development Study Coopers and Lybrand S202,863 plus N594,147 fully paid B. Sp=r Parts I. Demas Cranes Flohr and Co. $392, fully paid Fully supplied. Repairs ongoing IPESL DM346, fully paid but near completion 2. Jones Cranes Rannel 199, fully paid Spare parts fully supplied Damen 106, fully paid Spare parts fully supplied 3. Hyster Container Hyster $362, fully paid Mostly supplied. Handlers New Ventures Nig. Ltd. S 38, fully paid Repairs started but stalked by Various by int'l shipping $1,799, fully paid insufficiency of spares supplied. 4. Caterpillar Forklifts MAFI Transport System Additional needs being compiled IPESL S324, fully paid Spare parts fully supplied. Repair works ongoing 5. MAFI Trailers All World Trading Co. S147, fully paid -ditto- $228, fully paid -ditto- C. Workshop Eauioment 1. Tools and equipment VASAR Services S1,226, Fully paid Supplied and installed. 2. Hydraulic equipment All World Trading Co. S163, ditto- Supplied *Status as of May 1994 Source: Supervision Reports

39 -27- Table 5: Proiect Costs (USS million) Appraisal Actual* NRC Local Foreign Total Local Foreign Total NRC Tech Assistance Spare Parts Equipment Sub Total NPA Tech. Assistance Spare Parts Equipment Sub Total FMTA Tech. Assistance Total Project Cost * Data available are not sufficiently detailed to permit a breakdown of costs by sub-component. Note: Contingencies in appraisal cost table of President's Report have been added to the basic cost estimates for the project components. Sources: President's Report and Disbursement Officer'

40 -28- Table 6: Proiect Financing (US$ million) Source of Funds Appraisal Estimate Actual Nigerian Railway Corporation Nigerian Port Authority Federal Ministry of Transport and Aviation IBRD Total Source: President's Report and Disbursement Officers' Report on disbursements.

41 -29- Table 7: Cumulative Loan Disbursements (US$ million) Fiscal Year and Quarter Appraisal Estimate Actual Actual as percent of Estimate FY1987 Sep 1986 Dec 1986 Mar 1987 Jun FY1988 Sep Dec Mar Jun FY1989 Sep Dec Mar Jun FY 1990 Sep Dec Mar Jun FY1991 Sep Dec Mar Jun FY1992 Sep Dec Mar Jun FY1993 Sep Dec Mar Jun FY1994 Sep Dec Mar Jun FY1995 Sep Dec Mar 1995 Jun 1995 Source: Appraisal estimates from President's Report dated 6/5/86. Actual disbursements from IBRD "Statement of Loans" for various years.

42 -30- Table 8: Allocation of Loan Proceeds (US$ million) Category Original Revised Actual Allocation Allocation Disbursements NRC Technical Assistance Spare Parts Comp. & Trg Equip Unallocated Sub Total NPA Technical Assistance Spare Parts Comp, WS, & Trg Equip Unallocated Sub Total FMTA Technical Assistance Unallocated Sub Total Total Sources: President's Report and Disbursement Officer's Report on disbursements.

43 -31- Table 9: Use of Bank Resources A. Missions Stage of Project MonthNYear No. of Days in Specialization Performance Dates of Cycle Persons Field Represented " Rating Status R Identification 11/ EC,PE,FA,C 01/28/831,3 Preparation 1 11/ ED 12/20/82 Preparation 2 06/ C n/a Preparation 3 06/ EC,RE,PE 07/19/84 Preparation 4 11/ EC,FA 12/06/84 Pre-Appraisal 02/ EC 03/29/85 Appraisal 05/ EC,ME,PE,RE,FA 07/18/85 Post Appraisal 09/ FA,PE,RE 10/25/85 Post-negotiations 1 5 FA N/A Supervision 1 11/ EC,FA,PE 1,1,1,1 01/08/87 Supervision 2 03/ FA 04/20/87 Supervision 3 05/ PE 1,1,1,1 06/12/87 Supervision 4 07/ EC 08/31/87 Supervision 5 07/ RE 1,1,2,2 09/04/87 Supervision 6 11/ RE,PE 1,2,2,2 12/09/87 Supervision7 02/ FA 1,3,2,2 04/11/88 Supervision 8 06/ FA Supervision 9 10/ FA,EC,RE 1,3,2,2 12/08/88 Supervision 10 06/ FA 2,2,2,2,1 07/24/89 Supervision 11 11/89 I 12 RE I 2/21/89 Supervision 12 02/ PE 04/03/90 Supervision 13 05/ FA,RE 2,2,2,2,1 08/08/90 Supervision 14 11/90 3 FA,RE,PE 2,2,2,2,2 12/20/90 Supervision 15 03/ ER,RE 2,2,2,2,2 04/15/91 Supervision 16 10/ EC 11/27/91 Supervision 17 02/ PE 04/01/92 Supervision 18 10/ EC = Supmision 19 02/ FA According to TOR dated February 13, 1992 and September 27, 1992, brief supervision visits were scheduled for March and October, respectively, but there are no reports on file. Source: Correspondence Files. 1. PE = Ports Engineer, EC = Economist; FA = financial Analyst; DC = Division Chief; RE = Railways Engineer, C = Consultant; ME = Mechanical Engineer, ED = Education 2. Project Brief 3. Issues Paper/Decision Mernorandum dated July 19, TOR Item 5.

44 -32- Table 10: Status of Covenants A. NRC S/N COVENANT COMPLIANCE REMARKS a) Execution of a Subsidiary Loan Complied with The effectiveness of the Loan Agreement depended on Agreement between NRC and this agreement. it was signed in April Government (Section 3.02 (a) of the Loan Agreernent) b) Fulfillment of the terms of the Partially complied with. The conditions were not fully met by Government. Subsidiary Loan Agreement such NRC was only partially assisted financially when it as Section 11, which compelled found it difficult to provide local funds for the project. the FGN to assist NRC in In 1990, about N42 mn was required but only N10 mn providing counterpart funding was provided. In 1992, N12 mn was required to finalize where the Corp. was not the valuation of assets, only N2.6 mn was released. No financially capable of doing so. funds were released for clearance of spare parts from the port. As a result, the assets valuation could not be finalized; valuable spare parts were adversely delayed. 2. NRC to open a Special Account Complied with The Dollar Special Account was operated to the (Dollar) and a Revolving Fund satisfaction of the World Bank and it was retired in Account (Naira). Section 2.01 October 1993 when the Agreement was to terminate on (b) and (e) of the Project 31/12/93, as required., there was never insufficient Agreement funds for reasons stated in l(b) above. 3. List of spare parts for Complied with in June The Canac and Transurb experts chosen for the rehabilitation program to be 1987 compilation could not be on site until April They submitted to the Bank no later completed inspection of the Locos in June Delay than 31/3/87 (amended from was probably due to long negotiation with and 31/12/86), Section 2.01 (e). mobilization by donor agencies as NRC, for financial reasons preferred to benefit from CIDA and Belgium aid offers for the exercise. 4. NRC to procure spare parts out of Complied with Satisfactory evidence of compliance submitted by NRC its own resources to the value of was accepted by the Bank during their supervision $1.75 mn for Tranche I not later mission of June 7-16, 1990 and confirmed in the Aidethan 26 months from loan Memoire of that mission. effectiveness (Section 3.02(b) of PA. 5. Loco perfonnance and Not achieved Targets were not achieved because the rehabilitation maintenance targets to be program suffered delays as a result of long delay in achieved under Part C of the receipt of spare parts, insufficient funds even from the project. Schedule 3 of the Project loan (materials had to be reduced to the available Agreement money) and complete lack of running spares due to poor local funding. Failure rates of locomotives increased because of unreliability of cannibalized parts on which R/Shed maintenance depended. These factors contributed to the observed inadequate management of the locomotive maintenance function and lowered quality of maintenance undertaken. 6. Except as the Bank shall Not achieved Operating ratio, that is, working expenses to operating otherwise agree, NRC to attain revenue had remained well above 240 percent. Despite operating ratio of 180 percent by various actions taken by NRC management to reduce 31/12/87. Section 3.04(a) of operating expenditures such as heavy staff reductions in Project Agreement and 1993, upward adjustments in rates and fares in 1990, 1992 and 1993, the total expenditure continued to outstrip the total revenue. May not be unconnected with NRC's inability to fully achieve traffic levels due to lack of sufficient locomotives (and their inadequate use and fleet management) and rolling stock, unhealthy

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT A. Sector Road Map Road Improvement and Institutional Development Project (RRP PHI 41076) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems and Opportunities 1. Roads provide

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

People s Republic of Bangladesh: Updating the Road Master Plan

People s Republic of Bangladesh: Updating the Road Master Plan South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) Technical Assistance Report Project Number: 40540-016 Transaction Technical Assistance (TRTA)

More information

Mongolia: Social Security Sector Development Program

Mongolia: Social Security Sector Development Program Validation Report Reference Number: PVR196 Project Number: 33335 Loan Numbers: 1836 and 1837(SF) November 2012 Mongolia: Social Security Sector Development Program Independent Evaluation Department ABBREVIATIONS

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6976 DRC-Multimodal Transp Additional Financing. AFRICA Sector.

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6976 DRC-Multimodal Transp Additional Financing. AFRICA Sector. Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6976 DRC-Multimodal Transp Additional Financing Region AFRICA Sector Railways (80%); Ports, waterways and shipping (5%); Aviation

More information

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Validation Report Reference Number: PCV: PHI 2011-15 Project Number: 35379 Loan Number: 2012 July 2011 Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Independent

More information

Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION REPORT FEDERAL REPUBLIC OF NIGERIA

Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION REPORT FEDERAL REPUBLIC OF NIGERIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Human Development 3 Africa Region Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION

More information

Cambodia: Rural Credit and Savings Project

Cambodia: Rural Credit and Savings Project Project Validation Report Reference Number: CAM 2008-06 Project Number: 30327 Loan Number: 1741 July 2008 Cambodia: Rural Credit and Savings Project Operations Evaluation Department ABBREVIATIONS ADB Asian

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Viet Nam: Microfinance Development Program (Subprograms 1 and 2)

Viet Nam: Microfinance Development Program (Subprograms 1 and 2) Validation Report Reference Number: PVR-478 Project Numbers: 42235-013 and 42235-023 Loan Numbers: 2877 and 3213 December 2016 Viet Nam: Microfinance Development Program (Subprograms 1 and 2) Independent

More information

US$M): Sector Board : FPD Cofinancing (US$M US$M): (US$M US$M):

US$M): Sector Board : FPD Cofinancing (US$M US$M): (US$M US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR13644 1. Project Data: Date Posted : 07/14/2011 Public Disclosure Authorized Public Disclosure Authorized Public

More information

FIlE COPY Report INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A

FIlE COPY Report INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FIlE COPY Report RESTRICTED No. p-479 This report was prepared for use within the Bank

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:ETM 34402 TECHNICAL ASSISTANCE (Financed from the Japan Special Fund) TO EAST TIMOR FOR TRANSPORT SECTOR IMPROVEMENT October 2001 ABBREVIATIONS ADB Asian Development Bank ETTA

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Second Additional Financing to Road Rehabilitation & Maintenance Project Region AFRICA Sector Roads and highways (100%) Project ID P120723

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.02 Page 1 of 2 PROJECT ADMINISTRATION MISSIONS A. Introduction 1. ADB missions dispatched for loan and technical assistance (TA) project administration are classified

More information

STATE-OWNED ENTERPRISE ANALYSIS (Republic of the Marshall Islands: Public Sector Program)

STATE-OWNED ENTERPRISE ANALYSIS (Republic of the Marshall Islands: Public Sector Program) Public Sector Program (RRP RMI 43321-01) A. Introduction STATE-OWNED ENTERPRISE ANALYSIS (Republic of the : Public Sector Program) 1. The Republic of the (RMI) operates an extensive state-owned enterprises

More information

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project Validation Report Reference Number: PVR-360 Project Number: 40198 Loan Number: 2374 December 2014* Viet Nam: Ho Chi Minh CityLong ThanhDauGiay Expressway Technical Assistance Project Independent Evaluation

More information

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities Chhattisgarh State Road Sector Project (RRP IND 44427) Sector Road Map SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR 1. Sector Performance, Problems, and Opportunities 1. The state of Chhattisgarh

More information

Document of The World Bank

Document of The World Bank Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No. 11483 Public Disclosure Authorized Public Disclosure Authorized PROJECT COMPLETION REPORT FEDERAL REPUBLIC OF NIGERIA

More information

ASIAN DEVELOPMENT BANK TAR: MLD 30026

ASIAN DEVELOPMENT BANK TAR: MLD 30026 ASIAN DEVELOPMENT BANK TAR: MLD 30026 TECHNICAL ASSISTANCE (Financed from the Japan Special Fund) TO THE REPUBLIC OF MALDIVES FOR PRIVATE SECTOR PARTICIPATION IN THE MALDIVES' PORTS November 1998 CURRENCY

More information

IFC S EXPERIENCE IN THE TRANSPORT SECTOR

IFC S EXPERIENCE IN THE TRANSPORT SECTOR APPENDIX D: IFC S EXPERIENCE IN THE TRANSPORT SECTOR The International Finance Corporation s (IFC s) IEG reviewed IFC s investments in the transport sector between 1990 and 2005. IEG found several things:

More information

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Water and Urban I1 Africa Region Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK TAR:PHI 29226 ASIAN DEVELOPMENT BANK Li TECHNICAL ASSISTANCE TO THE REPUBLIC OF ThE PHILIPPINES FOR PREPARATION OF A NATIONAL TRANSPORT STRATEGY November 1995 CURRENCY EQUIVALENTS (as of 15 October 1995)

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section H5/BP Page 1 of 4 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ADDITIONAL FINANCING 1. The

More information

b.were the project objectives/key associated outcome targets revised during implementation? No

b.were the project objectives/key associated outcome targets revised during implementation? No Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14721 1. Project Data: Date Posted: 06/24/2015 Public Disclosure Authorized Public Disclosure Authorized Public

More information

THE ROAD TO ECONOMIC GROWTH

THE ROAD TO ECONOMIC GROWTH THE ROAD TO ECONOMIC GROWTH Introduction 1. As in many countries, the road sector accounts for the major share of domestic freight and inter-urban passenger land travel in Indonesia, playing a crucial

More information

Document of The World Bank FOR OFFICIAL USE ONLY GOVERNMENT OF NIGERIA. POWER SYSTEM MAINTENANCE AND REHABILITATION PROJECT (Loan 3116-UNI)

Document of The World Bank FOR OFFICIAL USE ONLY GOVERNMENT OF NIGERIA. POWER SYSTEM MAINTENANCE AND REHABILITATION PROJECT (Loan 3116-UNI) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION REPORT GOVERNMENT

More information

Document of The World Bank RECOMMENDATION OF THE PRESIDENT OF THE TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN TO THE NATIONAL BANK OF POLAND FOR AN

Document of The World Bank RECOMMENDATION OF THE PRESIDENT OF THE TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN TO THE NATIONAL BANK OF POLAND FOR AN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFCIAL USE ONLY L.N 31(,1- PoL MEMORANDUM RECOMMENDATION

More information

September Preparing a Government Debt Management Reform Plan

September Preparing a Government Debt Management Reform Plan September 2012 Preparing a Government Debt Management Reform Plan Introduction Preparing a Government Debt Management Reform Plan The World Bank supports the strengthening of government debt management

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.07A Page 1 of 4 PROJECT COMPLETION REPORT FOR SOVEREIGN OPERATIONS 1 A. Objective and Scope 1. The main objective of a project completion report (PCR) 1 is to

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized Public Disclosure Authorized OFFICIAL CREDIT NUMBEV. 1179 COB DOCUMENTS Development Credit Agreement (River Transport Project) Public Disclosure Authorized between THE PEOPLE'S

More information

Report No. P-13 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMEN' R E S T R I C T E D

Report No. P-13 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMEN' R E S T R I C T E D Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized R E S T R I C T E D This report was prepared for use within the Bank. In making it available

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Roads and highways (70%);Railways

More information

Document of The World Bank FOR OFFICIAL USE ONLY OF THE PRESIDENT OF THE TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN FEDERAL REPUBLIC OF NIGERIA

Document of The World Bank FOR OFFICIAL USE ONLY OF THE PRESIDENT OF THE TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN FEDERAL REPUBLIC OF NIGERIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY REPORT AND RECOMMENDATION OF THE PRESIDENT

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN])

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) CAREC Corridors 1 and 6 Connector Road (Aktobe Makat) Reconstruction Project (RRP KAZ 48424) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) 1. Sector Performance, Problems, and Opportunities

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

A'/2 7TJC INTERNATIONAL DEVELOPMENT ASSOCIATION TO THE ON A PROPOSED DEVELOPMENT CREDIT FOR AN IRRIGATION REHABILITATION PROJECT

A'/2 7TJC INTERNATIONAL DEVELOPMENT ASSOCIATION TO THE ON A PROPOSED DEVELOPMENT CREDIT FOR AN IRRIGATION REHABILITATION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized -7v 2_. RESTRICTED Report No. p-629 This report was prepared for use within the Bank

More information

Agenda July 19, 2013 at 10:45 12:00 a.m.

Agenda July 19, 2013 at 10:45 12:00 a.m. Agenda July 19, 2013 at 10:45 12:00 a.m. Opening Remarks by H.E. Siniša Hajdaš-Dončić, Minister of Maritime Affairs, Transport and Infrastructure Opening Remarks by Mr. Hongjoo Hahm, Croatia Country Manager,

More information

THE PRIME MINISTER ------- No. 71/2010/QD-TTg SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness --------- Hanoi, November 09, 2010 DECISION PROMULGATING THE REGULATION ON PILOT INVESTMENT

More information

Financing Agreement OFFICIAL DOCUMENTS 1. (Amending and Restating the Development Credit Agreement) Public Disclosure Authorized

Financing Agreement OFFICIAL DOCUMENTS 1. (Amending and Restating the Development Credit Agreement) Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS 1 Public Disclosure Authorized CREDIT NUMBERS 4086-UNI and 5129-NG Financing Agreement (Amending and Restating the Development Credit Agreement) Public Disclosure

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Investment in the transport sector in Viet

More information

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Initial Project Information Document () Report No: AB484 Project Name INDONESIA - Domestic

More information

FLE CO Y Report No. E P -7

FLE CO Y Report No. E P -7 Public Disclosure Authorized RESTRICTED FLE CO Y Report No. E P -7 This report was prepared for use within the Bank and its affiliated organizations. They do not accept responsibility for its accuracy

More information

Indonesia: Capacity Building in Urban Infrastructure Management Project

Indonesia: Capacity Building in Urban Infrastructure Management Project Validation Report Reference Number: PCV: INO 2008-68 Project Number: 27289 Loan Number: 1572-INO May 2009 Indonesia: Capacity Building in Urban Infrastructure Management Project Independent Evaluation

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3909 YF Public Disclosure Authorized Development Credit Agreement (Transport Rehabilitation Project) Public Disclosure Authorized between SERBIA

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development

More information

Public Disclosure Authorized. Project Name Mali - Third Structural Adjustment Credit (SAC III) Public Disclosure Authorized

Public Disclosure Authorized. Project Name Mali - Third Structural Adjustment Credit (SAC III) Public Disclosure Authorized Public Disclosure Authorized Report No. PID10817 Project Name Mali - Third Structural Adjustment Credit (SAC III) Region Sector Project ID Africa Multi-sectoral MLPE72785 Borrower Republic of Mali Public

More information

DESK REVIEW UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN

DESK REVIEW UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN UNITED NATIONS DEVELOPMENT PROGRAMME DESK REVIEW OF UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN Report No. 1310 Issue Date: 9 October 2014 Table of

More information

Philippines: Mindanao Basic Urban Services Sector Project

Philippines: Mindanao Basic Urban Services Sector Project Validation Report Reference Number: PCV: PHI 2011-25 Project Number: 30551 Loan Number: 1843 September 2011 Philippines: Mindanao Basic Urban Services Sector Project Independent Evaluation Department ABBREVIATIONS

More information

Karnit Flug: Macroeconomic policy and the performance of the Israeli economy

Karnit Flug: Macroeconomic policy and the performance of the Israeli economy Karnit Flug: Macroeconomic policy and the performance of the Israeli economy Remarks by Dr Karnit Flug, Governor of the Bank of Israel, to the conference of the Israel Economic Association, Tel Aviv, 18

More information

Indonesia: Metropolitan Medan Urban Development Project

Indonesia: Metropolitan Medan Urban Development Project Validation Report Reference Number: PCV:INO 2009-09 Project Number: 27358 Loan Number: 1587 May 2009 Indonesia: Metropolitan Medan Urban Development Project Independent Evaluation Department 2 ABBREVIATIONS

More information

Validation Report Banking Sector Reform Program (Lao People s Democratic Republic) (Loan 1946-LAO)

Validation Report Banking Sector Reform Program (Lao People s Democratic Republic) (Loan 1946-LAO) Board of Directors IN.247-11 14 October 2011 Validation Report Banking Sector Reform Program (Lao People s Democratic Republic) (Loan 1946-LAO) The attached Report is circulated at the request of the Director

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT

SECTOR ASSESSMENT (SUMMARY): TRANSPORT SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Myanmar is the largest country in the Greater Mekong Subregion (GMS) with a total land area

More information

REPORT on the annual accounts of the European Railway Agency for the financial year 2008, together with the Agency s replies (2009/C 304/17)

REPORT on the annual accounts of the European Railway Agency for the financial year 2008, together with the Agency s replies (2009/C 304/17) 15.12.2009 Official Journal of the European Union C 304/89 REPORT on the annual accounts of the European Railway Agency for the financial year 2008, together with the Agency s replies (2009/C 304/17) CONTENTS

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 30244 Public Disclosure Authorized PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) ON A LOAN/GEF GRANT Public Disclosure

More information

FOR OFFICIAL USE ONLY -

FOR OFFICIAL USE ONLY - Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY - STAFF APPRAISAL REPORT KENYA SECOND

More information

COLOMBIA Barranquilla Airport SUMMARY OVERVIEW SUMMARY LESSONS LEARNED BARRANQUILLA AIRPORT. Location Barranquilla, Colombia

COLOMBIA Barranquilla Airport SUMMARY OVERVIEW SUMMARY LESSONS LEARNED BARRANQUILLA AIRPORT. Location Barranquilla, Colombia COLOMBIA Barranquilla Airport OVERVIEW Location Barranquilla, Colombia Sector Transport Airports Procuring Authority ANI (Agencia Nacional de Infraestructura) Project Company Grupo Aeroportuario del Caribe

More information

Assessment of the FY Natural Gas Fuel Fleet Vehicle Rebate Program

Assessment of the FY Natural Gas Fuel Fleet Vehicle Rebate Program Assessment of the FY 2014-2015 Natural Gas Fuel Fleet Vehicle Rebate Program Highlights of the FY 2014-2015 Natural Gas Vehicle Rebate Program A total of $5.2 million in rebates were disbursed statewide

More information

Solomon Islands: Transport Sector Development Project

Solomon Islands: Transport Sector Development Project Validation Report September 2018 Solomon Islands: Transport Sector Development Project Reference Number: PVR-582 Project Number: 41171-022 Grant Number: 0243 ABBREVIATIONS ADB Asian Development Bank ADF

More information

Actual Project Name : Transitional Support Credit Country: Bangladesh US$M): Project Costs (US$M Sector Board : EP Cofinancing (US$M

Actual Project Name : Transitional Support Credit Country: Bangladesh US$M): Project Costs (US$M Sector Board : EP Cofinancing (US$M IEG ICR Review Independent Evaluation Group Report Number : ICRR13360 1. Project Data: Date Posted : 03/30/2010 PROJ ID : P110167 Appraisal Actual Project Name : Transitional Support Project Costs (US$M

More information

Loans, Credits, and Grants Assumption and Amendment Agreement

Loans, Credits, and Grants Assumption and Amendment Agreement Public Disclosure Authorized Public Disclosure Authorized CONFORMED COPY IBRD LOAN NUMBER 70890 MOT IBRD LOAN NUMBER 70900 MOT IBRD LOAN NUMBER 70910 MOT IDA CREDIT NUMBER 36510 YF IDA CREDIT NUMBER 3651A

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower(s) Report No. PID5794 Lebanon-Municipal Infrastructure Project (@+) Middle East and North Africa Region Other Urban Development LBPE50544 Lebanese Republic

More information

Cambodia: Telecommunication I

Cambodia: Telecommunication I Cambodia: Telecommunication I Ex-post evaluation OECD sector 22020 / Telekommunication BMZ project ID 1995 65 805 Project-executing agency Consultant Ministry of Post and Telecommunication (MPTC) Weidleplan

More information

REPORT 2016/030 INTERNAL AUDIT DIVISION. Audit of project management at the United Nations Institute for Training and Research

REPORT 2016/030 INTERNAL AUDIT DIVISION. Audit of project management at the United Nations Institute for Training and Research INTERNAL AUDIT DIVISION REPORT 2016/030 Audit of project management at the United Nations Institute for Training and Research Overall results relating to effective management of projects were initially

More information

Loan Agreement. (Real Property Registration and Cadastre Project) between REPUBLIC OF CROATIA. and

Loan Agreement. (Real Property Registration and Cadastre Project) between REPUBLIC OF CROATIA. and CONFORMED COPY LOAN NUMBER 4674 HR Loan Agreement (Real Property Registration and Cadastre Project) between REPUBLIC OF CROATIA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated September

More information

Mongolia: Regional Road Development Project

Mongolia: Regional Road Development Project Validation Report Reference Number: PVR-481 Project Numbers: 35377-013 and 35377-023 Loan/Grant Numbers: 2087, 2621, and 0199 December 2016 Mongolia: Regional Road Development Project Independent Evaluation

More information

Tuvalu: Outer Island Maritime Infrastructure Project

Tuvalu: Outer Island Maritime Infrastructure Project Project Design Advance Project Number: 48484-003 November 2015 Tuvalu: Outer Island Maritime Infrastructure Project This document is being disclosed to the public in accordance with ADB s Public Communications

More information

Pakistan: Road Sector Development Program

Pakistan: Road Sector Development Program Validation Report Reference Number: PCV: PAK 2010-69 Project Number: 32058 Loan Number: 1891 December 2010 Pakistan: Road Sector Development Program Independent Evaluation Department ABBREVIATIONS ADB

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID7125 Project Name Argentina-Special Structural Adjustment... Loan (SSAL)

More information

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4199 UG Public Disclosure Authorized Financing Agreement (Uganda Public Service Performance Enhancement Project) between Public Disclosure Authorized

More information

Updated Project Information Document (PID) Report No: AB793. UGANDA - THIRD PHASE OF THE ROAD DEVELOPMENT PROGRAM Region.

Updated Project Information Document (PID) Report No: AB793. UGANDA - THIRD PHASE OF THE ROAD DEVELOPMENT PROGRAM Region. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Updated Project Information Document () Report No: AB793 Project Name UGANDA - THIRD

More information

Country Practice Area(Lead) Additional Financing Finance, Competitiveness and

Country Practice Area(Lead) Additional Financing Finance, Competitiveness and Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020839 Public Disclosure Authorized Public Disclosure Authorized Project ID P108080 Project Name XK

More information

TRANS-EUROPEAN NETWORKS GUIDELINES

TRANS-EUROPEAN NETWORKS GUIDELINES TRANS-EUROPEAN NETWORKS GUIDELINES The Treaty on the Functioning of the European Union (TFEU) retains the trans-european networks (TENs) in the areas of transport, energy and telecommunications, first

More information

2.0 Medium Term Expenditure Framework

2.0 Medium Term Expenditure Framework 1.0 Introduction 1.1 In June 2001, the Government of Mauritius announced its economic strategy and policy orientation for the next five years in its Economic Agenda for the New Millennium. A comprehensive

More information

DOCUMENTS CO-FINANCING FRAMEWORK AGREEMENT. between ASIAN INFRASTRUCTURE INVESTMENT BANK. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

DOCUMENTS CO-FINANCING FRAMEWORK AGREEMENT. between ASIAN INFRASTRUCTURE INVESTMENT BANK. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT IOFFICIA DOCUMENTS CO-FINANCING FRAMEWORK AGREEMENT between ASIAN INFRASTRUCTURE INVESTMENT BANK and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT and INTERNATIONAL DEVELOPMENT ASSOCIATION April

More information

Afghanistan: Regional Airports Rehabilitation Project (Phase 1)

Afghanistan: Regional Airports Rehabilitation Project (Phase 1) Validation Report Reference Number: PVR 225 Project Number: 37136 Loan Number: 2105 December 2012 Afghanistan: Regional Airports Rehabilitation Project (Phase 1) Independent Evaluation Department ABBREVIATIONS

More information

FRAMEWORK FINANCING AGREEMENT

FRAMEWORK FINANCING AGREEMENT FRAMEWORK FINANCING AGREEMENT FRAMEWORK FINANCING AGREEMENT (Second Power Transmission Enhancement Investment Program) Parties This Framework Financing Agreement ( FFA ) dated 15 July 2016 is between

More information

AUDIT UNDP COUNTRY OFFICE AFGHANISTAN FINANCIAL MANAGEMENT. Report No Issue Date: 10 December 2013

AUDIT UNDP COUNTRY OFFICE AFGHANISTAN FINANCIAL MANAGEMENT. Report No Issue Date: 10 December 2013 UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP COUNTRY OFFICE IN AFGHANISTAN FINANCIAL MANAGEMENT Report No. 1233 Issue Date: 10 December 2013 Table of Contents Executive Summary i I. Introduction

More information

Region Sector. Updated Project Information Document (PID) Report No: AB542

Region Sector. Updated Project Information Document (PID) Report No: AB542 Project Name Region Sector Theme Project Borrower(s) Implementing Agency(ies) Environment Category B (Partial Assessment) Date Prepared April 29, 2004 Auth Appr/Negs Date February 3, 2004 Bank Approval

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities Improving Public Expenditure Quality Program, SP1 (RRP VIE 50051-001) SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 Sector Road Map 1. Sector Performance,

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Project Name Region Sector Project ID Borrower Report No. PIC4620 Senegal-Urban Transport Reform and... Capacity Building Project Africa Urban Transport SNPA44383 Republic

More information

Validation Report Rural Finance Project (Mongolia) (Loan 1848-MON)

Validation Report Rural Finance Project (Mongolia) (Loan 1848-MON) Board of Directors IN.365-10 21 December 2010 Validation Report Rural Finance Project (Mongolia) (Loan 1848-MON) The attached Report is circulated at the request of the Director General, Independent Evaluation

More information

T o o l k i t f o r P u b l i c - P r i v a t e P a r t n e r s h i p s i n r o a d s & H i g h w a y s. Advantages of PPP

T o o l k i t f o r P u b l i c - P r i v a t e P a r t n e r s h i p s i n r o a d s & H i g h w a y s. Advantages of PPP Advantages of PPP A key advantage of having the private sector provide public services is that it allows public administrators to concentrate on planning, policy and regulation. The private sector, in

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2518 Operation Name

More information

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN Terms of Reference for Consultants 1. BACKGROUND INFORMATION Government of Vanuatu has requested TA support in the formulation and preparation of a national infrastructure

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020001 Public Disclosure Authorized Project ID P100580 Country Ukraine Project Name ROADS & SAFETY IMPROVEMENT

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

Mid Term Review of Project Support for enhancing capacity in advising, examining and overseeing macroeconomic policies

Mid Term Review of Project Support for enhancing capacity in advising, examining and overseeing macroeconomic policies Mid Term Review of Project 00059714 Support for enhancing capacity in advising, examining and overseeing macroeconomic policies Final Evaluation Report Date of Report: 8 August 2013 Authors of Report:

More information

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined)

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PUBLIC DISTRIBUTION PROJECT INFORMATION DOCUMENT (PID) Project Name Iraq: Emergency School

More information

Pakistan: Decentralization Support Program

Pakistan: Decentralization Support Program Validation Report Reference Number: PCV: PAK 2011-53 Program Number: 34328 Loan Numbers: 1935/1936/1937/1938 December 2011 Pakistan: Decentralization Support Program Independent Evaluation Department ABBREVIATIONS

More information

Road and Transport Management Project Phase II SAU/10/51658

Road and Transport Management Project Phase II SAU/10/51658 UNITED NATIONS DEVELOPMENT PROGRAMME United Nations Department of Social and Economic Affaires (UNDESA) Project of the Government of the Kingdom of Saudi Arabia Ministry of Transport (MOT) Road and Transport

More information

The World Bank Kenya Infrastructure Finance/PPP project (P121019)

The World Bank Kenya Infrastructure Finance/PPP project (P121019) Public Disclosure Authorized AFRICA Kenya Financial Systems Practice Global Practice IBRD/IDA Adaptable Program Loan FY 2013 Seq No: 4 ARCHIVED on 22-Dec-2014 ISR17114 Implementing Agencies: Public Private

More information

FINANCIAL MANAGEMENT ASSESSMENT

FINANCIAL MANAGEMENT ASSESSMENT Greater Malé Environmental Improvement and Waste Management Project (RRP MLD 51077) EXECUTIVE SUMMARY FINANCIAL MANAGEMENT ASSESSMENT 1. The financial management assessment (FMA) was conducted for the

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Project Name. Railway Infrastructure Rehabilitation Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Project Name. Railway Infrastructure Rehabilitation Project Region PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 65032 Project Name Railway Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Railways (100%) Project ID P120192

More information

ASIAN DEVELOPMENT BANK TAR:UZB 36498

ASIAN DEVELOPMENT BANK TAR:UZB 36498 ASIAN DEVELOPMENT BANK TAR:UZB 36498 TECHNICAL ASSISTANCE TO THE REPUBLIC OF UZBEKISTAN FOR DEVELOPMENT OF THE CAPITAL MARKET July 2003 CURRENCY EQUIVALENTS (as of 30 June 2003) Currency Unit sum SUM1.00

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL UNEP/OzL.Pro/ExCom/66/46 15 March 2012 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE

More information

Project Costs (US$M):

Project Costs (US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 10/05/2015 Report Number: ICRR14849 Public Disclosure Authorized Public Disclosure Authorized Public

More information