1 Standard Summary Project Fiche for the Transition Facility 1. Basic Information 1.1 CRIS Number: 2004/ Title Building Capacity to introduce the Polluter Pays Principle through Economic Instruments to Implement the EU Environmental Acquis 1.3 Sector Environment 1.4 Location Malta 2. Objectives 2.1 Overall Objective To achieve compliance with the EU Environmental Acquis. 2.2 Project Purpose To build the necessary capacity in the Maltese government to devise and implement a package of environmental economic instruments applying the Polluter Pays Principle in practice. 2.3 Justification The 2003 EU Commission Comprehensive Monitoring Report on Malta states the administrative capacities in the area of Environment are in place, but further work is needed within the Malta Environment and Planning Authority to ensure a proper implementation of the acquis. The Report also makes specific reference to this proposal under its Comments on Progress section. While the Twinning Project MT2002/IB/EN-01 Capacity Building in the Environment Sector forms part of the 2002 pre-accession programme in the field of environment, the introduction of economic instruments has not been encompassed to a sufficient extent. It is considered that the successful introduction of environmental economic instruments would be essential in enabling Malta to comply with the Acquis. The Treaty establishing the European Community (Article 174(2)) provides that Community environmental policy should be based upon certain basic principles among which is the polluter pays principle. In Article 3 of the 6 th Environment Action Programme of the European Community, strategic approaches to meet environmental objectives include the promotion of polluter pays principle, through the use of market based instruments, including the use of emissions trading, environmental taxes, charges and subsidies, to internalise the negative as well as the positive impacts on the environment. 1

2 3. Description 3.1 Background and Justification The present situation To date, in Malta, the use of economic instruments for environmental management has been limited to initiatives not forming part of a comprehensive strategy. Over the years, these have included: tiered water tariffs, higher duty on leaded petrol to encourage the use of unleaded petrol, road license surcharges for entry into Valletta and for heavy vehicles, interest rebates for solar water heaters, performance bonds for development applications, subsidies to encourage conversion of existing property as opposed to new build, deposit refund schemes on glass bottles and shopping crates, grants for historic building restoration, reduced registration taxes for electrically-powered vehicles, reduced import duties for environmentally friendly products, and VAT rebates to encourage rehabilitation of dilapidated buildings. In several areas however, charges do not even cover production and administration costs (e.g. household waste disposal, waste water disposal), and are certainly not reflective of environmental costs. It can safely be said that government in Malta is still mainly involved in command and control type measures and that plenty of potential exists for the introduction of various economic instruments. Although there has been assistance through preaccession funds for the implementation of various EU directives, there has not been any assistance to address the need to introduce the Polluter Pays Principle holistically and across the fields of the Acquis. Situation foreseen on the date of accession Whilst the budget has introduced some additional economic measures for the environment, the absence of a strategy and unifying framework remains an issue of concern. Moreover, it is foreseen that this issue will not be sufficiently addressed through pre-accession assistance by the date of Malta s accession. What remains to be done beyond the accession date The introduction of economic environmental instruments after Malta s accession will be an opportunity to strengthen the implementation of the Polluter Pays principle, thereby facilitating the achievement of environmental objectives delineated in the Acquis. The introduction of such instruments will result in pricing mechanisms that would better reflect the value of environmental goods and services (thereby improving allocative efficiency), as well as generate revenue that could be utilised for environmental improvement. A considerable effort and specialised expertise must be directed towards strengthening institutional capacity and coordination between economic and environmental ministries, as well as towards increasing public awareness, understanding and acceptance of the need for such measures. 2

3 3.2 Linked Activities This project is linked to the pre-accession Twinning arrangement (MT2002/IB/EN-01) Establishing Institutional Capacity in the Environment Sector and will build upon the training and administrative systems put in place as a result of the pre accession assistance. In particular, it is linked to the Service Contract 2, which provides for the development of an Integrated Communications Strategy (ICS) in the environment field. The consultants for the ICS will assess the legal requirements vis-à-vis communications; liase with all the players involved; provide an analysis of the current situation in the field of information, education, awareness and participation in environmental matters; draft a three year integrated strategy and formulate an implementation plan, as well as provide the relevant training and assistance to key beneficiaries. The strategy will subsequently be implemented by all the agencies involved in the environmental field, with MEPA being the main player. Public information activities proposed under this project will coincide with and benefit from the implementation of the ICS. This project is also linked to the implementation of all EU Directives concerned with the enforcement of the Polluter Pays principle through a series of economic measures (for instance, EU Directive 94/62/EC on Packaging and Packaging Waste, Directive 2000/50/EC on End of Life Vehicles, as well as a number of other directives provide for the establishment of economic incentives and obligations implementing the principle of producer s responsibility to meet the established targets). The project is also linked to the Twinning proposal submitted by the WasteServ Malta Ltd. titled Technical Assistance for the development of implementation systems for the producer responsibility directives, which focuses on the implementation of the Polluter Pays principle in the area of waste. The project will also benefit from the findings of another project Inventory of economic instruments used in environmental policy in selected EEA countries currently being carried out by the European Environment Agency (EEA), to update the joint EEA OECD database on the use of economic instruments applied in environmental policy. The aim of the database is to facilitate the exchange of experience and best practices across borders, so as to promote an improved use of these instruments in the countries. There are also potential synergies with projects under another area of the Acquis, namely Economic and Fiscal Affairs, for which the Ministry of Finance and Economic Affairs is responsible. As from 2002 there has been a commitment to introduce a number of environmental economic measures. The new batch has been introduced in the government budget for It is therefore considered necessary that this project builds upon the developments in this regard. 3

4 3.3 Results It is expected that this project will result in: A. A three-year plan for the introduction of a package of environmental economic instruments also identifying the institutional, legislative and public communication measures necessary for its successful implementation. The plan shall be prepared by the middle of November B. A pilot 3-month public information campaign to accompany the launch of the first package of environmental economic instruments. The campaign will consist of the design and production of information materials and their distribution to key target groups according to the communications plan. The pilot campaign will be carried out between November 2005 and February C1. A series of training workshops between November 2005 and December 2005, each targeting key experts from the MEPA, the Ministry for Rural Affairs and the Environment, the Ministry of Finance, as well as from the other government agencies listed under section 4 (Institutional Framework). C2. A national conference addressing the experts, industry & commerce representatives, NGOs, government departments & corporations, as well as other key stakeholders. The conference will be held in December 2005 for around 60 participants. D. A performance monitoring report, summarising the findings of the study of environmental, economic and social effects of the newly introduced instruments and outlining recommendations for their finetuning and improvement. The report and the recommendations will be finalised by October 2005, in time for the government budget for Activities The project will be implemented in two phases through one service contract. The phases will consist of the following: Phase 1. Provision of expert advice, coordination and training (October 2005 December 2005) A. Specialised consultancy is required to formulate the package of instruments and the three-year plan for their introduction. The package will establish a unified framework for the implementation of the Polluter Pays principle, containing measures to fulfil obligations and environmental objectives set out by 4

5 the EU environmental Acquis. This framework will also provide a tool for integrating the instruments already in place under a single umbrella. The package, containing a detailed description of the proposed measures shall be accompanied by the implementation plan that would incorporate the strategy outlining the legislative and institutional measures necessary for the successful implementation of the package. For this purpose, the services of two experts shall be required. Expert 1, having over 15 years of experience in the field of environmental economic instruments and an in-depth knowledge of the Community environmental legislation shall be required to spend a total of 60 days in Malta in one visit. Expert 2, having over 15 years experience and specialising in the economies of Small Island states (preferably the Maltese Islands) shall be required to spend a total of 30 calendar days in Malta in one visit. Expert 1 and Expert 2, working in close collaboration with the key officials from the Ministry for Rural Affairs and the Environment, MEPA and the Ministry of Finance and Economic Affairs shall assess the present situation regarding the instruments, identifying areas of deficiency in need of priority addressing. In assessing the situation, the experts will pay close attention to the linked activities (described under section 3.2) and collate the necessary data from existing reports and commissioned surveys. The preliminary groundwork as regards assessing the situation will be carried out by MEPA prior to the arrival of the consultants in mid-october As steering committee consisting of the representatives of the Ministries mentioned under Institutional Framework shall also be set up to ensure coordination. Once the assessment report has been prepared, the consultants will then proceed to develop the package of instruments, with due considerations being paid to social, economic and environmental impact, as well as prepare the introduction plan identifying the institutional and legislative measures necessary to implement it. B. At the final stages of the package development, Expert 3 would join the team and prepare a short to-medium term public communications plan to accompany the introduction of the package. Expert 3 will have over 15 years of experience in environmental communications, preferably specialising in the design of public information campaigns for the introduction of environmental instruments. He/she shall be required to spend a total of 14 days in Malta in one visit. The plan would contain an overall communications strategy (consistent with the linked activities described under section 3.2) and the detailed programme for the pilot 3-months information campaign to accompany the launch of the package developed by Experts 1 and 2. 5

6 C. After having prepared the strategy and the programme, Expert 3 would coordinate the onset of the pilot campaign, making the necessary arrangements in close liaison with the communications officials from the Ministry of Finance and Economic Affairs, the Ministry for Rural Affairs and the Environment and MEPA. The Commission will fund the pilot information campaign, which would initiate the process of public involvement and provide authorities with experience necessary for the subsequent implementation of the long-term communications strategy. The campaign would ensure the long-term sustainability of economic instruments that will be introduced as a result of this project and is therefore an integral part of the project itself. This component of the Phase 1 is a logical continuation of the first activity, whereby Expert 1, after having developed a proposal for the package of instruments and carried out other tasks therein specified, will provide the necessary training to the key government experts so as to enable them to subsequently devise, implement, monitor and review environmental economic instruments for Malta. This component will consist of the following: 1. Three (3) two-day workshops organised for the MEPA, the Ministry of Rural Affairs and the Environment, the Ministry of Finance, as well as other key government agencies identified in section 4 below. 2. A one-day national conference involving all the target groups, including representatives of industry & commerce, civil society and NGOs. Phase 2. Monitoring and Evaluation D. Once the package of instruments has begun to be implemented, the project entails a performance monitoring of the various economic instruments. The monitoring exercise will involve a study of environmental, economic and social effects of the instruments, which will subsequently guide the recommendations for fine-tuning and improvement. For this purpose, Expert 1, specialising in economic instruments, shall spend in Malta a total of 30 calendar days in one visit. Throughout both phases, MEPA undertakes to provide in kind office facilities for the experts, secretarial and administrative assistance for the duration of their stay, as well as any professional assistance relevant to the objectives of this project upon their request. Local transport for visiting experts, as well as venues and logistics for meetings shall be also provided by the beneficiary. 3.4 Lessons learned The experience earned from the limited use of economic instruments in Malta suggests that unless their future introduction forms part of a comprehensive strategy agreed by all the relevant parties, their potential will not be fully utilised. To date, there has been no significant attempt to analyse the performance of 6

7 environmental economic instruments and suggest a coherent strategy, thus there are no lessons learnt from the experience of similar projects. However on a broader level, various reports prepared by twinning experts as part of the project Establishing Institutional Capacity in the Environment Sector-MT2002/IB/EN (see Linked Activities) pinpoint to a potential common shortcoming of institution building and technical assistance exercises in the Maltese environment sector, a problem which is rooted in the chronic lack of adequate human resources to fulfil the necessary staffing requirements and further aggravated by the slow and complex recruitment process. However in the case of this project, which in the short to medium term does not envisage, nor rely upon the recruitment of any additional staff, it is highly unlikely that such potential deficiency could in any way impede the timely delivery of the project s results. 4. Institutional Framework This project necessitates the collaboration of MEPA, as the lead agency responsible for the implementation of the EU Environmental Acquis within the Ministry for Rural Affairs and the Environment, with the Ministry of Finance (MFIN). The EU & Multilateral Unit (EUMA) within MEPA will coordinate the project in collaboration with the MFIN and will provide input to the identification of priority areas in environmental sector to be addressed through the project. MFIN, as the Ministry with the remit to design and implement the national economic and fiscal policy will be primarily concerned with the economic and fiscal aspects of the project. The Department of Operations and the Office of the Permanent Secretary within the MFIN will be the focal points for this project. A number of other Ministries and national agencies will also provide input in the project directly by providing the necessary data during the monitoring phase and indirectly (outside the scope of this project) by actually administering the economic instruments. The following bodies with the remit in environmental protection are identified for this purpose: The Ministry for Resources and Infrastructure (MRES) The Malta Maritime Authority The Malta Resources Authority (MRA) The Malta Transport Authority The Superintendent of Cultural Heritage It is envisaged that this project would help to maximize the effectiveness of some of these institutions, without causing any substantial change to the existing institutional framework. The project is constrained by the fact that the abovementioned agencies fall under the responsibilities of different Ministries, therefore necessitating coordination at Cabinet level. Therefore a steering committee will be set up with the representatives of all the Ministries involved. Another constraint is the fact that the actual endorsement of the government budget and the introduction of fiscal instruments, as well as the adoption of any legislation is the prerogative of the National Parliament, thus falling outside the scope and control of this project. 7

8 5. Detailed Budget (EUROS) Technical Assistance Service Contract Transition Facility Support Institution Building Investment Support Total TF (=IS+IB) National Cofinancing IFI TOTAL Total 0 200, , ,000 The amounts for co-financing indicated in the table correspond to cash co-financing. In addition, in-kind contributions from the Maltese administration for a good implementation of the /technical assistance may be developed in the terms of reference. The co-financing expenses will be monitored by the beneficiary and the NAO. For the earmarked co-finance, a clear and verifiable set of costs will be provided. The beneficiary will define which budget lines are the source for co-finance. The beneficiary together with the NAO commits to sound financial management and financial control 6. Implementation Arrangements 6.1 Implementing Agency: Malta Environment and Planning Authority (within the Ministry for Rural Affairs and the Environment) St. Francis Ravelin Floriana CMR01 Malta Tel.: Fax: Project Leader: Dr. Godwin Cassar, MEPA Director General Tel: Fax: Project Manager (MEPA): Ms. Marie Briguglio, EU & Multilateral Affairs Unit Manager Tel: Fax: marie.briguglio@mepa.org.mt 8

9 Project Manager (MFIN) Mr. Tonio Briguglio Ministry of Finance Maison Demandols Tel: Fax: tonio.briguglio@gov.mt Contracting Authority: Department of Contracts Notre Dame Ravelin Floriana CMR 02 Malta Contract Person: Mr. Dennis Attard Assistant Director Tel: Fax: dennis.attard@gov.mt 6.2 Twinning N/A 6.3 Non-standard aspects N/A 6.4 Contracts This project will be implemented through one technical assistance service contract for the total amount of 200,000 Euro. 7. Implementation Schedule Contract Technical Assistance Service Contract Start tendering Start project Completion date date activities date March 2005 October 2005 October Sustainability The contributions of this project are in line with the long term strategic objectives of the government of Malta, in the fields of environment, economy, human resource development and citizenship. The human and financial resources to be provided by MEPA for this project are envisaged in the organisation s business plan. The Ministry of Finance has also provided for the human resources required for the implementation of this project. The project will be jointly managed by the EU & Multilateral Affairs Unit (EUMA) from MEPA and the Department of Operations at the MFIN. 9

10 9. Conditionality and sequencing This project is linked to but not dependent on other projects, as described in section 3.2. The progressing of this project will pay close attention to the developments in these related areas. In terms of conditionality, the project itself can proceed independently, although its results will have a bearing on the achievement of the objectives of the Acquis, and possibly on other sectoral projects. It must be noted that the full implementation of the second phase of the project, mainly the monitoring stage, will depend on the actual adoption of the proposed economic instruments by the National Parliament in the Government budget for The preliminary groundwork as regards assessing the situation will be carried out by MEPA prior to the arrival of consultants in October

11 The table below summarises the key milestones of the project: Mar- Phase Component 05 Oct- 05 Nov- 05 Milestone Start tendering 0 0 X Start of project activities 0 0 X Assessment report 1 A X Package of economic instruments 1 A X Introduction plan - Legislative & Institutional 1 A X Communications plan 1 B X Pilot public information campaign 1 B X X X 3 training workshops 1 C X National Conference 1 C X Monitoring of the instruments performance 2 D X Report of recommendations 2 D X Below is the schedule of expert visits: Phase PHASE 1 PHASE 2 Month Oct-05 Nov-05 Dec-05 Sep-06 Oct-06 Week Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Expert 1 X X X X X X X X X X X X Expert 2 X X X X Expert 3 X X Dec- 05 Jan- 06 Feb- 06 Mar- 06 Apr- 06 May- 06 Jun- 06 Jul- 06 Aug- 06 Sep- 06 Oct

12 ANNEXES TO PROJECT FICHE PAF log frame template LOGFRAME PLANNING MATRIX FOR PROJECT Building Capacity to introduce the Polluter Pays Principle through Economic Instruments to Implement the EU Environmental Acquis ANNEX I Programme name and number Transition Facility Contracting period expires: 15/12/2006 Disbursement period expires: 15/12/2007 Total budget: 200,000 TF Budget: 200,000 Overall objective Objectively verifiable indicators Sources of Verification Assumptions To achieve compliance with the EU Environmental Acquis. Malta s timely and successful achievement of targets set by the EU environmental Acquis Government of Malta reports on progress in the environment sector MEPA annual reports for 2005 and 2006 Government State of the Environment report (2005) Successful implementation of this project and other capacitybuilding projects in the field of environment Cooperation of key players 12

13 Project Purpose Objectively verifiable indicators Sources of Verification Assumptions To build the necessary capacity in the Maltese government to devise and implement a package of environmental economic instruments applying into practice the Polluter Pays Principle. By January 2006 a pool of up to 60 experts from the key government agencies is trained in the design, implementation and monitoring of environmental economic instruments The first package of instruments is introduced with the government budget for 2006 Between November 2005 and February 2006, a pilot public information campaign is implemented Description of the package of instruments and plan for their introduction Communications plan Proceedings of workshops and conference Proceedings of meetings Government budget for 2006 Annual report of MEPA for 2005 Adoption of the package by the National Parliament 13

14 Results Objectively verifiable indicators Sources of Verification Assumptions A. A three-year plan for the introduction of a package of environmental economic instruments also identifying the institutional, legislative and public communication measures necessary for its successful implementation. The full report and the detailed plan is drafted by the middle of November 2005 in agreement with the MFEA and MEPA. The report document Cooperation of key players B. A pilot 3-months public information campaign to accompany the launch of the first package of environmental economic instruments. The campaign will consist of the design and production of information materials and their distribution to key target groups according to the communications plan. The pilot campaign will be carried out between November 2005 and February The pilot public information campaign plan is drafted The design, production and distribution of public information materials is commissioned in accordance with the plan The communications plan document Designs, artwork, samples of materials, publications, etc Financial proofs of communications services procured during campaign Press clippings Campaign designed and implemented in accordance with the framework provided by the ICS (see section on linked activities) C1, A series of 3 two-day training workshops in December 2005, each targeting around 20 key experts from the MEPA, the Ministry for Rural Affairs and the Environment, the Ministry of Finance and Workshops are held in December 2005 Workshops attendance and participation Workshops proceedings Experts are available to attend workshops 14

15 Results Objectively verifiable indicators Sources of Verification Assumptions Economic Affairs, as well as from the other government agencies listed under section 4 (Institutional Framework). C2. A one-day national conference addressing the experts, industry & commerce representatives, NGOs, government departments & corporations, as well as other key stakeholders. Conference is held in December 2005 Conference attendance and participation Conference proceedings Media coverage D. A performance monitoring report, summarising the findings of the study of environmental, economic and social effects of the newly introduced instruments and outlining recommendations for their fine-tuning and improvement. The report and the recommendations will be finalised by October 2006, in time for the government budget for Monitoring is carried out and the recommendations are given by the middle of October 2006 Monitoring, evaluation and recommendations report Availability of the required data 15

16 Activities Means Assumptions Preconditions A. Formulation of the package of instruments and the three-year plan for their introduction. The package will establish a unified framework for the implementation of the Polluter Pays principle, containing measures to fulfill obligations and environmental objectives set out by the EU environmental Acquis as well as integrate the instruments already in place under the single umbrella. B. Preparation of the short to medium term public communications plan to accompany the introduction of instruments, as well as the design and coordination of the pilot 3-months public information campaign to be funded through this project. Consultancy and coordinating input of two visiting experts Specialised consultancy and coordinating input from one visiting expert in environmental communications Funding of 52,000 Euro for the pilot campaign Consultancy will begin in mid-october 2005 The package and the plan will be drafted in close liaison with MEPA and MFEA. The work on the communications plan will commence when the package of instruments and the implementation plan are in the final stages of preparation Preliminary groundwork in collating data has been carried out by MEPA prior to the commencement of the consultants work The communications plan is to be consistent with the overall framework established by the ICS (see section on linked activities) 16

17 Activities Means Assumptions Preconditions C. Organisation of 3 two-day training workshops for local experts and a national conference addressing the main target groups Training workshops and the conference will be organised and carried out by the visiting expert in environmental economic instruments who had provided consultancy to devise the package Local experts are available to attend the workshops Cooperation of the key players D. Carrying out the performance monitoring exercise to evaluate the social, economic and environmental impacts of the instruments introduced, as well as to provide recommendations for finetuning and improving of the package to be incorporated in the government budget for 2007 Data collation, analysis and specialised consultancy by the visiting expert in environmental economic instruments Availability and reliability of the data required The package had been already introduced in the national budget for

18 SUMMARY DETAILED TIME IMPLEMENTATION CHART FOR THE PROJECT Annex 2 Title: Building Capacity to introduce the Polluter Pays Principle through Economic Instruments to Implement the EU Environmental Acquis CONTRACT J F M A M J J A S O N D J F M A M J J A S O Technical Assistance Service Contract D D C C C C C C C I I I I I I I I I I I I X D = Design C = Contracting I = Implementation X = Closure 18

19 CUMULATIVE CONTRACTING AND DISBURSEMENT SCHEDULE OF EU FUNDING Annex 3 Title: Building Capacity to introduce the Polluter Pays Principle through Economic Instruments to Implement the EU Environmental Acquis All figures in Euro Technical Assistance Service Contract Q1 Q2 Q Q4 Q1 Q2 Q3 Q TOTAL CONTRACTED Total 200, ,000 DISBURSED Total 159, , ,000 19

20

21 DETAILED BUDGET BREAKDOWN Annex 4 Title: Building Capacity to introduce the Polluter Pays Principle through Economic Instruments to Implement the EU Environmental Acquis Technical Assistance Service Qty (days / Rate Contract Total (Euro) items / flights) (Euro) Phase 1 Fee Expert Fee Expert Fee Expert Flights E Flights E Flights E Lodging E Lodging E Lodging E Data collation 5000 Training materials 2500 Pilot information campaign National conference 1300 Total Phase Phase 2 Fee E Flights E Lodging E Data collation Total Phase Total Service Contract During the course of this project, MEPA undertakes to provide in kind office facilities and secretarial & administrative assistance to the visiting consultants, as well as any professional assistance relevant to the objectives of this project upon a specific request of the experts. Local transport for visiting experts, as well as venues and logistics for meetings shall be also provided by the beneficiary. 21

Standard Summary Project Fiche for the Transition Facility

Standard Summary Project Fiche for the Transition Facility 01. Basic Information Standard Summary Project Fiche for the Transition Facility 01.1. CRIS Number: 2004/16762.04.02. 01.2. Title 01.3. Sector Twinning light: MT04-IB-SO-02 Capacity strengthening of the

More information

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary Project fiche 1.1: Strengthening the capacity of the institutions to manage and implement the Operational Programmes 1. Basic information 1.1 CRIS Number: 2008/20-311 1.2 Title: Strengthening the capacity

More information

Standard Summary Project Fiche for the Transition Facility

Standard Summary Project Fiche for the Transition Facility Standard Summary Project Fiche for the Transition Facility 1 Basic Information 1.1 CRIS Number: 2006/01/-176.05.01 1.2 Title: Unallocated IB envelope 1.3 Sector: Other IB actions 1.4 Location: Hungary*

More information

1.2 Title: Project Preparation and Support Facility (PPF)

1.2 Title: Project Preparation and Support Facility (PPF) FINAL VERSION 1. Basic information 1.1 CRIS Number: 2009/021-665 1.2 Title: Project Preparation and Support Facility (PPF) 1.3 ELARG Statistical code: 4.40 1.4 Location: Skopje Implementing arrangements:

More information

STANDARD PROJECT FICHE

STANDARD PROJECT FICHE STANDARD PROJECT FICHE 1. Basic Information 1.1 CRIS Number : 2004-016-919.04 1.2 Title: Preparation for Extended Decentralized Implementation System (EDIS) in the management of pre-accession funds in

More information

04.02 EAGGF EAGGF - p.1

04.02 EAGGF EAGGF - p.1 04.02 EAGGF 1. Basic information 1.1. CRIS Number : 2002/000-605-04.02 Twinning number: PL02-AG-05 1.2. Title: EAGGF 1.3. Sector: Agriculture 1.4. Location: Poland 2. Objectives: 2.1. Overall objective:

More information

STANDARD SUMMARY PROJECT FICHE - TRANSITION FACILITY

STANDARD SUMMARY PROJECT FICHE - TRANSITION FACILITY STANDARD SUMMARY PROJECT FICHE - TRANSITION FACILITY 1. Basic Information 1.1 CRIS Number: CZ 2004/006-237/04.04 1.2 Title: Evaluation of EU-funded measures (Phase I Transition Facility) 1.3 Sector: Internal

More information

STANDARD SUMMARY PROJECT FICHE TRANSITION FACILITY

STANDARD SUMMARY PROJECT FICHE TRANSITION FACILITY STANDARD SUMMARY PROJECT FICHE TRANSITION FACILITY 1. Basic information: 1.1. CRIS Number: CZ 2004/006-237/02.01 1.2.Title: Strengthening of the Railway Infrastructure Administration (RIA) Functions 1.3

More information

Standard Summary Project Fiche IPA Decentralised National Programmes Project Number TR

Standard Summary Project Fiche IPA Decentralised National Programmes Project Number TR Standard Summary Project Fiche IPA Decentralised National Programmes Project Number TR 1. BASIC INFORMATION 1.1 CRIS Number : TR 2009/0740.01 1.2 Title : Support Activities to Strengthen the European Integration

More information

STANDARD SUMMARY PROJECT FICHE PROJECT PREPARATION FACILITY FOR THE PHARE CBC PROGRAMME BULGARIA-GREECE

STANDARD SUMMARY PROJECT FICHE PROJECT PREPARATION FACILITY FOR THE PHARE CBC PROGRAMME BULGARIA-GREECE STANDARD SUMMARY PROJECT FICHE PROJECT PREPARATION FACILITY FOR THE PHARE CBC PROGRAMME BULGARIA-GREECE 1. Basic Information 1.1 CRIS Number 2002/000-624-06 1.2 Title: Project Preparation Facility for

More information

01.05 Tax administration/1

01.05 Tax administration/1 01.05 Tax Administration 1. Basic Information 1.1 Desiree Number: PL0003.05 1.2 Title: Tax Administration 1.3 Sector: Finance - Twinning code: PL2000/IB/FI04 1.4 Location: Poland 2. Objectives 2.1 Wider

More information

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV 1. Basic information 1.1 CRIS Number: 2009 / 021-650 1.2 Title: Preparation for IPA components

More information

05.01 Strengthen environmental impact assessment

05.01 Strengthen environmental impact assessment 05.01 Strengthen environmental impact assessment 1. Basic Information 1.1.Desiree Number:PL0007.01 1.2 Title: Strengthen environmental impact assessment 1.3 Sector : Environment Twinning code: PL2000/IB/EN01

More information

PROJECT FICHE. 2.2 Project purpose: To provide sustainable access to longer-term financing to SMEs at market conditions in Cyprus.

PROJECT FICHE. 2.2 Project purpose: To provide sustainable access to longer-term financing to SMEs at market conditions in Cyprus. Updated 20.11.2002 2003 PROJECT FICHE 1. BASIC INFORMATION 1.1 CRIS Number: 2003/004-643. Project 3 1.1. Title: SME Finance Facility in Cyprus 1.3 Sector: Small and Medium-sized Enterprises 1.4 Location:

More information

Standard Summary Project Fiche Project No. TR Twinning No. TR/2004/IB/EC/06

Standard Summary Project Fiche Project No. TR Twinning No. TR/2004/IB/EC/06 Standard Summary Project Fiche Project No. TR 0402.03 Twinning No. TR/2004/IB/EC/06 1. Basic Information 1.1 Title: Strengthening the Ministries of Health, Environment and Forests, and Agriculture and

More information

Standard Summary Project Fiche Project Number

Standard Summary Project Fiche Project Number Standard Summary Project Fiche Project Number 2003.004-341.07.02 1. Basic Information Objective 7 - Private sector, Restructuring, Privatisation, SM 1.1 CRIS Number: 2003.004-341.07.02 1.2 Title: Support

More information

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18 Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18 1. Basic information 1.1. CRIS Number: 2010/022-154 1.2. Title: Technical Assistance and Project Preparation Facility (TA&PPF)

More information

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level.

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level. ` Standard Summary Project Fiche Project number: TR 0305.01 Twinning number: TR03-SPP-01 1. Basic Information 1.1 Title: SUPPORT TO THE STATE PLANNING ORGANIZATION GENERAL DIRECTORATE FOR REGIONAL DEVELOPMENT

More information

2010 IPA Horizontal Programme on Nuclear Safety and Radiation Protection PF1 Albania - Final Project Fiche No. 1

2010 IPA Horizontal Programme on Nuclear Safety and Radiation Protection PF1 Albania - Final Project Fiche No. 1 Project Fiche No. 1 Further steps to approximate the Albanian legislation and regulations in accordance with the EU acquis in the field of radiation protection, nuclear safety and security 1. Basic information

More information

Standard Project Fiche. 1.2 Title: Further Institutional Strengthening of the Court of Accounts

Standard Project Fiche. 1.2 Title: Further Institutional Strengthening of the Court of Accounts Standard Project Fiche 1. Basic Information 1.1 Desiree Number: RO-2002/000-586.03.03 1.2 Title: Further Institutional Strengthening of the Court of Accounts 1.3 Sector: Finance 1.4 Twinning component:

More information

SUMMARY PROJECT FICHE

SUMMARY PROJECT FICHE SUMMARY PROJECT FICHE 1. Title: Reinforcement of institutional and administrative capacity of the financial sector 2. Project nº: ES 9904 3. Location: Ministry of Finance, Securities Inspectorate, (Bank

More information

ANNEX. DAC code Sector Economic and Development Planning

ANNEX. DAC code Sector Economic and Development Planning ANNEX 1. IDTIFICATION Title Total cost Aid method management mode Technical Cooperation Facility 1.5M (2.4% of NIP) Project approach partially decentralised management DAC code 15010 Sector Economic and

More information

Standard Summary Project Fiche. Project number: TR Twinning number: TR02-JH-05

Standard Summary Project Fiche. Project number: TR Twinning number: TR02-JH-05 Standard Summary Project Fiche 1. Basic Information Project number: TR 0204.04 Twinning number: TR02-JH-05 1.1 Desiree Number 2.1 Title Strengthening the Fight against Money Laundering 3.1 Sector AD 4.1

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 CRIS Number 2006/018-176.04.01 Twinning light HU/2006/IB/FI/01 TWL 1.2 Title: Improvement of the efficiency of risk-based selection of taxpayers

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FCHE 1. Basic nformation 1.1 CRS Number: Twinning Light Envelope Comp. 1 2003004-979-08-04 LV2003BTL 1.2 Title: nstitution Building Facility 1.3 Sector: Various 1.4 Location: Latvia

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Désirée Number: CZ2003/004-338.02.03 1.2 Title: Capital Markets - Central Depository of Securities 1.3 Sector: Internal Market and Economic Criteria

More information

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 9

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 9 Standard Summary Project Fiche IPA centralised programmes Project Fiche: 9 1. Basic information 1.1 CRIS Number: 2009/021-170 1.2 Title: Strengthening the management and control systems for EU financial

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

Contacts: Anastasija Trajkovska, Head of Sector, telephone: (0)

Contacts: Anastasija Trajkovska, Head of Sector,   telephone: (0) Project fiche 2.1: Support to the Agency for Supervision of Fully Funded Pension Insurance (MAPAS) 1. Basic information 1.1 CRIS Number: 2008/20-311 1.2 Title: Support to the Agency for Supervision of

More information

Standard Summary Project Fiche

Standard Summary Project Fiche Standard Summary Project Fiche 1. Basic Information 1.1 CRIS Number: BG2003/004-937.09.04 1.2 Title: Further Development of the Independent Public External Audit Institution 1.3 Sector: Customs and Finance

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

Integrated Planning, Monitoring and Reporting

Integrated Planning, Monitoring and Reporting 1. Purpose This procedure describes the integrated planning, monitoring and ing cycle of the European Chemicals Agency, including the preparation of the Single Programming Document (SPD). This procedure

More information

STANDARD SUMMARY PROJECT FICHE - TRANSITION FACILITY

STANDARD SUMMARY PROJECT FICHE - TRANSITION FACILITY STANDARD SUMMARY PROJECT FICHE - TRANSITION FACILITY 1. Basic Information 1.1 CRIS Number: CZ 2004/006-237/04.02 1.2 Title: Financial Stability Issues in the Czech National Bank 1.3 Sector: Internal Market

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1. CRIS Number 2003/004-979-05-01 Twinning Number: LV/2003/IB/EN-01 1.2. Title: Administration of oil stock reserve system 1.3. Sector: Energy 1.4.

More information

Local Government Budget Management System. 1.1 CRIS Number: 2006/ Twinning No: PL/06/IB/FI/02

Local Government Budget Management System. 1.1 CRIS Number: 2006/ Twinning No: PL/06/IB/FI/02 Local Government Budget Management System 1 Key Information 1.1 CRIS Number: 2006/018-180.01-04 Twinning No: PL/06/IB/FI/02 1.2. Title: Local Government Budget Management System 1.3. Sector: Public Finance

More information

BOSNIA AND HERZEGOVINA

BOSNIA AND HERZEGOVINA INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 BOSNIA AND HERZEGOVINA European Integration Facility Action Summary The Action is designed to provide support to institutions in Bosnia and Herzegovina

More information

STANDARD SUMMARY PROJECT FICHE Project Fiche Number: CZ

STANDARD SUMMARY PROJECT FICHE Project Fiche Number: CZ 1.1 1. Basic information 1.2 Project Number - CZ01.11.03 1.3 Project Title Joint Small Project Fund 1.4 Sector ED, EN, IN, RE, SO 1.5 Project Location Cross-border region: Czech Republic Austria Districts:

More information

GUYANA FORESTRY COMMISSION

GUYANA FORESTRY COMMISSION GUYANA FORESTRY COMMISSION Roadmap for Guyana EU FLEGT VPA Process (European Union Forest law Enforcement Governance and Trade, Voluntary Partnership Agreement) January, 2013 Developed with Assistance

More information

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary Project Fiche 1.2: Supporting the process of fiscal decentralization through strengthening the capacities for sound financial management and internal financial control on local and central level 1. Basic

More information

SUMMARY PROJECT FICHE

SUMMARY PROJECT FICHE SUMMARY PROJECT FICHE 1. BASIC INFORMATION 1.1 Title: Development of the VAT Service through a Reform and Modernization programme to apply and enforce the Acquis. 1.2. Code : CY0001.02.02 1.3. Sector:

More information

Standard Summary Project Fiche IPA decentralised National programmes. Project number: TR

Standard Summary Project Fiche IPA decentralised National programmes. Project number: TR Standard Summary Project Fiche IPA decentralised National programmes Project number: TR 07 02 22 1. Basic information 1.1 CRIS Number: 1.2 Title: Capacity Building of Social Security Institution 1.3 Sector:

More information

2002 SUMMARY PROJECT FICHE

2002 SUMMARY PROJECT FICHE 2002 SUMMARY PROJECT FICHE 1. BASIC INFORMATION 1.1. Desiree Number: 1.2 Title: Communication Strategy for Cyprus 2002 1.3 Sector: Bi-communal projects 1.4 Location: Cyprus / Nicosia / Delegation 2. OBJECTIVES

More information

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting. EN EN EN ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA 1. IDENTIFICATION Beneficiary Bosnia and Herzegovina CRIS number 2010 / 022-674 Year 2010 Cost EUR 6 000 000 Implementing Authority

More information

PHARE 2004 STANDARD PROJECT FICHE

PHARE 2004 STANDARD PROJECT FICHE PHARE 2004 STANDARD PROJECT FICHE 1. Basic Information 1.1 CRIS Number: Phare 2004/016-772.03.07 1.2 Title: Design and implementation of the INTRASTAT system 1.3 Sector: 1.4 Location: Romania, INS 1.5

More information

Project Fiche IPA National programmes IPA 2012/Component I

Project Fiche IPA National programmes IPA 2012/Component I Project Fiche IPA National programmes IPA 2012/Component I 1 IDENTIFICATION Project Title Strengthening the capacity of the Central Financing and Contracting Unit (CFCU) for efficient implementation of

More information

Annex 16 Template of Project Fiche for IPA programmes / component I - decentralised management

Annex 16 Template of Project Fiche for IPA programmes / component I - decentralised management Annex 16 Template of Project Fiche for IPA programmes / component I - decentralised management 1 Standard Summary Project Fiche IPA decentralised National programmes (maximum 12/15 pages without the annexes)

More information

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument Action Fiche for EU- Brazil Sector Dialogues Support Facility 1. IDENTIFICATION Title

More information

Standard Summary Project Fiche IPA decentralised National programmes

Standard Summary Project Fiche IPA decentralised National programmes Standard Summary Project Fiche IPA decentralised National programmes 1. Basic information 1.1 CRIS Number : TR2010/0329.01 (under 2010/022-565) 1.2 Title : Modernisation of the Turkish Customs Administration

More information

STANDARD TWINNING PROJECT FICHE

STANDARD TWINNING PROJECT FICHE STANDARD TWINNING PROJECT FICHE 1. Basic Information 1.1 Publication reference Number: EuropeAid/ 136-263/IH/ACT/AL 1.2 Programme: IPA National programmes/component I (2013) 1.3 Twinning Number: AL 13

More information

Standard Summary Project Fiche. The project meets the following Accession Partnership priorities:

Standard Summary Project Fiche. The project meets the following Accession Partnership priorities: Standard Summary Project Fiche 1. Basic Information: 1.1 CRIS Number: BG2003/004-937.10.04 1.2 Title: Setting up a coherent system for the Structural Funds and the Cohesion Fund in Bulgaria for the Managing

More information

COMMISSION DECISION. C(2007)6376 on 18/12/2007

COMMISSION DECISION. C(2007)6376 on 18/12/2007 COMMISSION DECISION C(2007)6376 on 18/12/2007 adopting a horizontal programme on the Energy Efficiency Finance Facility for Albania, Bosnia and Herzegovina, Croatia, Montenegro, Serbia including Kosovo

More information

WORKSHOP MANUAL FINAL Strengthening the uptake of EU funds for Natura 2000 (ENV.B.3/SER/2012/002)

WORKSHOP MANUAL FINAL Strengthening the uptake of EU funds for Natura 2000 (ENV.B.3/SER/2012/002) WORKSHOP MANUAL FINAL 30.04.2013 Strengthening the uptake of EU funds for Natura 2000 (ENV.B.3/SER/2012/002) CONTENT INTRODUCTION 34 WORKSHOP PREPARATION 67 WORKSHOP CONTENT 89 WORKSHOP ASSESSMENT 1112

More information

IPA National Programme 2010 for Albania Project Fiche 09 "Support to the Food Safety Infrastructure "

IPA National Programme 2010 for Albania Project Fiche 09 Support to the Food Safety Infrastructure IPA National Programme 2010 for Albania Project Fiche 09 "Support to the Food Safety Infrastructure " 1. Basic information 1.1 CRIS Number: 2010/022-530 1.2 Title: Support to the food safety infrastructure

More information

2002 SUMMARY PROJECT FICHE

2002 SUMMARY PROJECT FICHE 2002 SUMMARY PROJECT FICHE 1. BASIC INFORMATION 1.1. Title: Small Project Fund 1.2. Sector: Bi-communal 1 projects 1.3. Location: Cyprus 2. OBJECTIVES 2.1. Overall Objective The objective of this bi-communal

More information

Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support

Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme 2003 2006 2005 Project Fiche for Programme Support 1. Basic Information 1.1 CRIS Number: BG 2005/017-455.01;04 1.2 1.2 Title:

More information

FINAL VERSION. 1. Basic information. 1.1 CRIS Number: 2009/

FINAL VERSION. 1. Basic information. 1.1 CRIS Number: 2009/ FINAL VERSION 1. Basic information 1.1 CRIS Number: 2009/021-665 1.2 Title: Strengthening the capacity of the Ministry of Finance for macroeconomic analysis and policy formulation in order to improve policy

More information

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode ANNEX 1. IDTIFICATION Title Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode DAC-code 15010 Project approach Partially decentralised management.

More information

Energy Regulatory Commission and Insurance Supervisory Agency (to be established) 1.2 Title: Support to regulatory and supervisory bodies

Energy Regulatory Commission and Insurance Supervisory Agency (to be established) 1.2 Title: Support to regulatory and supervisory bodies Project fiche 3.1 Energy Regulatory Commission and Insurance Supervisory Agency (to be established) 1. Basic information 1.1 CRIS Number: 2007/19297 1.2 Title: Support to regulatory and supervisory bodies

More information

Final PF2 Project Fiche IPA centralised programmes Part II of the Horizontal Programme on Nuclear Safety and Radiation Protection

Final PF2 Project Fiche IPA centralised programmes Part II of the Horizontal Programme on Nuclear Safety and Radiation Protection Final PF2 Project Fiche IPA centralised programmes Part II of the Horizontal Programme on Nuclear Safety and Radiation Protection 1. Basic information 1.1 CRIS Number: 2007/019-301 1.2 Title: Assessment

More information

DAC-code Sector Public Sector Policy and Administrative Management

DAC-code Sector Public Sector Policy and Administrative Management ANNEX 1 ANNUAL ACTION PROGRAMME 2012 FOR UKRAINE PART 1 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementatio n Framework Programme in support of EU-Ukraine Agreements CRIS: ENPI/2012/23714

More information

PHARE 2003 STANDARD SUMMARY PROJECT FICHE

PHARE 2003 STANDARD SUMMARY PROJECT FICHE PHARE 2003/005-551.06.03 version of 16.06.2003 PHARE 2003 STANDARD SUMMARY PROJECT FICHE 1. Basic information 1.1 CRIS Number: PHARE 2003/005-551.06.03 1.2 Title: Support for improving the participation

More information

Cross-border Cooperation Action Programme Montenegro - Albania for the years

Cross-border Cooperation Action Programme Montenegro - Albania for the years ANNEX 1 Cross-border Cooperation Action Programme Montenegro - Albania for the years 2015-2017 1 IDENTIFICATION Beneficiaries CRIS/ABAC Commitment references Union Contribution Budget line Montenegro,

More information

COUNCIL DECISION 2011/411/CFSP

COUNCIL DECISION 2011/411/CFSP L 183/16 Official Journal of the European Union 13.7.2011 DECISIONS COUNCIL DECISION 2011/411/CFSP of 12 July 2011 defining the statute, seat and operational rules of the European Defence Agency and repealing

More information

Parliament of the Republic of Macedonia. Law on Balanced Regional Development

Parliament of the Republic of Macedonia. Law on Balanced Regional Development Parliament of the Republic of Macedonia Law on Balanced Regional Development Skopje, May 2007 0 LAW ON BALANCED REGIONAL DEVELOPMENT I. GENERAL PROVISIONS Content of the Law Article 1 (1) This Law regulates

More information

PROJECT CYCLE MANAGEMENT & LOGICAL FRAMEWORK MATRIX TRAINING CYPRIOT CIVIL SOCIETY IN ACTION V INNOVATION AND CHANGES IN EDUCATION VI

PROJECT CYCLE MANAGEMENT & LOGICAL FRAMEWORK MATRIX TRAINING CYPRIOT CIVIL SOCIETY IN ACTION V INNOVATION AND CHANGES IN EDUCATION VI PROJECT CYCLE MANAGEMENT & LOGICAL FRAMEWORK MATRIX TRAINING CYPRIOT CIVIL SOCIETY IN ACTION V INNOVATION AND CHANGES IN EDUCATION VI Objectives of the training Understand the definition of project and

More information

AUDIT AUTHORITY ANNUAL AUDIT REPORT EUROPEAN ECONOMIC AREA FINANCIAL MECHANISM, NORWEGIAN FINANCIAL MECHANISM 2013 / Riga

AUDIT AUTHORITY ANNUAL AUDIT REPORT EUROPEAN ECONOMIC AREA FINANCIAL MECHANISM, NORWEGIAN FINANCIAL MECHANISM 2013 / Riga AUDIT AUTHORITY ANNUAL AUDIT REPORT EUROPEAN ECONOMIC AREA FINANCIAL MECHANISM, NORWEGIAN FINANCIAL MECHANISM 203 / 204 Riga Contents ABBREVIATIONS... 4 SUMMARY... 5. INTRODUCTION... 6.. INDICATION OF

More information

STANDARD TWINNING PROJECT FICHE

STANDARD TWINNING PROJECT FICHE STANDARD TWINNING PROJECT FICHE 1. Basic Information 1.1 Publication reference number: EuropeAid/ 137-889/IH/ACT/BA 1.2 Programme: IPA 2014 1.3 Twinning Number: BA 14 IB FI 01 R 1.4 Title: Improving capacity

More information

III. modus operandi of Tier 2

III. modus operandi of Tier 2 III. modus operandi of Tier 2 Objective, country and project eligibility 70 Budget and timing 71 Project preparation: formulation of proposals 71 Project appraisal 72 Project approval 73 Agreements and

More information

STANDARD SUMMARY PROJECT FICHE. 1.2 Title: Upgrade of the Latvian Statistical System in accordance with EU requirements

STANDARD SUMMARY PROJECT FICHE. 1.2 Title: Upgrade of the Latvian Statistical System in accordance with EU requirements 1 01.11.23 STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Desiree Number: LE00.11.02 Twinning Component Number: LE.00/IB/FI-02 1.2 Title: Upgrade of the Latvian Statistical System in accordance

More information

MANAGING FOR RESULTS: An Implementation Plan for the City of Portland

MANAGING FOR RESULTS: An Implementation Plan for the City of Portland MANAGING FOR RESULTS: An Implementation Plan for the City of Portland Office of Management and Finance City Auditor s Office Bureau of Planning City of Portland, Oregon June, 2003 Managing for Results

More information

Office of the Auditor General of Norway. Handbook for the Office of the Auditor General s Development Cooperation

Office of the Auditor General of Norway. Handbook for the Office of the Auditor General s Development Cooperation Office of the Auditor General of Norway Handbook for the Office of the Auditor General s Development Cooperation i Photo: The Office of the Auditor General of Norway Illustration: Lobo Media AS March 2009

More information

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof, L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)

More information

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) 2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External

More information

Standard Summary Project Fiche

Standard Summary Project Fiche Standard Summary Project Fiche 1. Basic Information 1.1 CRIS Number: 2003/005-026.07.01 Twinning EE03-IB-AG-02 1.2 Title: Development of an IT System for administration of EAGGF Guarantee section Rural

More information

ANNEX. Support to the reform of criminal justice system in Georgia - CRIS N ENPI/2008/19630

ANNEX. Support to the reform of criminal justice system in Georgia - CRIS N ENPI/2008/19630 ANNEX ACTION FICHE GEORGIA PI AAP 2008 1. IDTIFICATION Title Total cost 16 M Aid method / management mode Support to the reform of criminal justice system in Georgia - CRIS N PI/2008/19630 Sector Policy

More information

Republic of Kazakhstan. Director Climate Change Department. Ministry of Energy

Republic of Kazakhstan. Director Climate Change Department. Ministry of Energy PMR Project Implementation Status Report (ISR) The PMR Project Implementation Status Report should be prepared by the Implementing Country or Technical Partner, with the support of the Delivery Partner

More information

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management ANNEX Action Document for 11 th EDF EU-TL Co-operation Support Facility (CSF) 1. IDENTIFICATION Title/Number Total cost 11 th EDF EU-TL Co-operation Support Facility (CSF) CRIS number: 2014/37442 Total

More information

Screening report Montenegro

Screening report Montenegro Screening report Montenegro Chapter 22 Regional policy and coordination of Structural Instruments Date of screening meetings: Explanatory meeting: 14-15 November 2012 Bilateral meeting: 18 December 2012

More information

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities IDP REVIEW PROCESS PLAN DEPARTMENT OF THE OFFICE OF THE MUNICIPAL MANAGER JULY 2009-JUNE2010 TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS Roles and responsibilities 2.1 Council

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

DG Employment, Social Affairs and Inclusion

DG Employment, Social Affairs and Inclusion DG Employment, Social Affairs and Inclusion Annual work programme for operational technical assistance to implement the activities of the support group for Cyprus at the initiative of the Commission in

More information

Rehabilitation and Partial Reconstruction of Road II-19 Razlog Bansko Gotse Delchev Sadovo

Rehabilitation and Partial Reconstruction of Road II-19 Razlog Bansko Gotse Delchev Sadovo STANDARD SUMMARY PROJECT FICHE Rehabilitation and Partial Reconstruction of Road II-19 Razlog Bansko Gotse Delchev Sadovo 1. Basic Information CRIS Number: 2002/000-624-01 Title: Rehabilitation and Partial

More information

SUMMARY PROJECT FICHE. 1. BASIC INFORMATION 1.1 Title: Measures to develop the operational capacity of the Department of Customs & Excise.

SUMMARY PROJECT FICHE. 1. BASIC INFORMATION 1.1 Title: Measures to develop the operational capacity of the Department of Customs & Excise. SUMMARY PROJECT FICHE 1. BASIC INFORMATION 1.1 Title: Measures to develop the operational capacity of the Department of Customs & Excise. 1.2. Code: CY0001.02.01 1.3 Sector: Indirect Taxation Excise Customs

More information

COMMISSION DECISION. C(2007)5980 of 10/12/2007

COMMISSION DECISION. C(2007)5980 of 10/12/2007 EN EN EN COMMISSION DECISION C(2007)5980 of 10/12/2007 adopting the Cross border programme between Serbia and Montenegro under the IPA- Cross border Co operation component, for the year 2007 THE COMMISSION

More information

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming READINESS AND PREPARATORY SUPPORT PROPOSAL PAGE 1 OF 10 Country

More information

«FICHE CONTRADICTOIRE»

«FICHE CONTRADICTOIRE» «FICHE CONTRADICTOIRE» Evaluation of the Commission s External Cooperation with Angola (Country level evaluation) (*For details on the recommendations please refer to the main report) Recommendations STRATEGIC

More information

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE ANNEX 1 1. IDTIFICATION Title/Number Support Services to the National Authorising Officer CRIS NO: FED/2009/021-496 Total cost Total: 315,800 (EC Contribution:

More information

Implementing arrangements: 1.5 Implementing Agency:

Implementing arrangements: 1.5 Implementing Agency: Standard Summary Project Fiche IPA decentralised National programmes (Maximum 12/15 pages without the annexes) 1. Basic information 1.1 CRIS Number: TR2010/0136.01 1.2 Title: Improved Strategic Management

More information

Standard Summary Project Fiche. Project PL : Improved Tax Administration

Standard Summary Project Fiche. Project PL : Improved Tax Administration Standard Summary Project Fiche Project PL9904.03: Improved Tax Administration Sub-programme 2: Strengthen institutional and administrative capacity Location: Poland, Ministry of Finance, Tax Chambers,

More information

Handbook. CEWARN Rapid Response Fund (RRF)

Handbook. CEWARN Rapid Response Fund (RRF) CEWARN Rapid Response Fund (RRF) Handbook Version: authorised by the CEWARN Steering Committee on: 1.0 16 th of January, 2009 This handbook is maintained by Mr. Abdirashid Warsame, Response Coordinator,

More information

VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP

VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP EUROPEAN COMMISSION EUROPEAN EXTERNAL ACTION SERVICE VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP ***LAST UPDATE 24 SEPTEMBER 2010*** Table of Contents PART I An Overview of the Eastern

More information

Project Fiche IPA centralised programmes Regional Programme on Disaster Risk Reduction in South-East Europe

Project Fiche IPA centralised programmes Regional Programme on Disaster Risk Reduction in South-East Europe Project Fiche IPA centralised programmes Regional Programme on Disaster Risk Reduction in South-East Europe 1. Basic information 1.1 CRIS Number: 2008/019-813 and 2008/020-047 1.2 Title: Disaster Risk

More information

THE WORLD BANK TERMS OF REFERENCE Impact of carbon pricing instruments on national economy and contribution to NDC

THE WORLD BANK TERMS OF REFERENCE Impact of carbon pricing instruments on national economy and contribution to NDC THE WORLD BANK TERMS OF REFERENCE Impact of carbon pricing instruments on national economy and contribution to NDC A. Project Background and Objectives Partnership for Market Readiness The Partnership

More information

COMMISSION IMPLEMENTING DECISION. of adopting a Country Action Programme on Bosnia and Herzegovina for the year 2015

COMMISSION IMPLEMENTING DECISION. of adopting a Country Action Programme on Bosnia and Herzegovina for the year 2015 EUROPEAN COMMISSION Brussels, 7.12.2015 C(2015) 8777 final COMMISSION IMPLEMENTING DECISION of 7.12.2015 adopting a Country Action Programme on Bosnia and Herzegovina for the year 2015 EN EN COMMISSION

More information

Standard Summary Project Fiche IPA decentralised National programmes (maximum 12/15 pages without the annexes)

Standard Summary Project Fiche IPA decentralised National programmes (maximum 12/15 pages without the annexes) Standard Summary Project Fiche IPA decentralised National programmes (maximum 12/15 pages without the annexes) 1. Basic information 1.1 CRIS Number: TR2010/0327.02 1.2 Title: Implementation of by-law on

More information

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 02.05.2005 COM(2005) 178 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL GENERAL REPORT ON PRE-ACCESSION ASSISTANCE (PHARE ISPA

More information

COMMISSION IMPLEMENTING DECISION. of adopting a

COMMISSION IMPLEMENTING DECISION. of adopting a EUROPEAN COMMISSION Brussels, 10.12.2014 C(2014) 9352 final COMMISSION IMPLEMENTING DECISION of 10.12.2014 adopting a Cross-border cooperation Programme Montenegro- Albania for the years 2014-2020 and

More information

This action is funded by the European Union

This action is funded by the European Union This action is funded by the European Union ANNEX 10 of the Commission implementing Decision on the Annual Action Programme 2015 of the DCI Pan-African Programme Action Document for "Support Measures Annual

More information

Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean

Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean 2014 2020 CCI 2014TC16M4TN003 22/06/2015 Version 1.0 Balkan-Mediterranean is co-financed by European Union and

More information

01.02 National Bank of Poland/1

01.02 National Bank of Poland/1 01.02 National Bank of Poland 1. Basic information 1.1 Désirée Number: PL0003.02 1.2 Title : National Bank of Poland 1.3 Sector: Finance Twinning code: PL2000/IB/FI01 1.4 Location: Poland 2. Objectives

More information