1 BLACK COUNTRY TECHNICAL ASSISTANCE ERDF CAPACITY BUILDING PROGRAMME 2014 The Black Country Technical Assistance Team presents a series of capacity building workshops to support existing and newly funded Black Country ERDF Projects to increase their understanding of complex ERDF regulations and to manage their projects in a robust and efficient manner.
2 Contents Black Country Technical Assistance Team 1 ERDF Public Procurement & State Aid 2 ERDF Financial Management 5 ERDF Monitoring & Audit 8 ERDF Project Closure & Exit 10 Contact Information & How to Book 12
3 BLACK COUNTRY TECHNICAL ASSISTANCE TEAM BLACK COUNTRY TECHNICAL ASSISTANCE The Black Country ERDF Technical Assistance Team s role is to support the development of ERDF activity across Dudley, Sandwell, Walsall and Wolverhampton. Working closely with the Black Country LEP, the four Black Country Local Authorities and other public and private partners, the team: supports applicants with development of ERDF eligible projects; supports existing projects to achieve their expected outcomes and expenditure and remain compliant throughout their delivery; enhances delivery of ERDF Communications; captures best practice and presents achievements on the Package and all Black Country projects; provides a focal point for the communication and promotion of future opportunities offered by the forthcoming EU Programme. ERDF CAPACITY BUILDING PROGRAMME 2014 The Black Country Technical Assistance Team have organised a number of FREE ERDF capacity building workshops to support existing and newly funded Black Country ERDF Projects to grow their understanding of complex ERDF regulations and to manage their projects in a robust and efficient manner. The workshops, which will delivered by Kalliopi Associates, are suitable for Black Country ERDF project staff, funding, finance and procurement officers and accountable bodies and guarantors. Kalliopi Associates has extensive experience in the field of EU Funding particularly the Structural Funds Programmes and has worked closely with West Midlands and Black Country partners over the years. Each interactive session is expected to attract 20 attendees with a mix of ERDF knowledge and experience. On completion participants will receive a programme certificate and copies of course material. Project is part financed by the European Union- European Regional Development Fund. 1
4 ERDF PUBLIC PROCUREMENT & STATE AID Managing State Aid and Public Procurement in ERDF Funded Projects The European Union is founded on the principle of fair and transparent transfer of goods and services within and between the Member States. Underpinning these principles are the Competition Laws; an element of which is how public sector investment is managed. Projects funded through the European Regional Development Fund fall within this remit. If investment is found to contravene the conditions laid down in the Laws, the penalties can be significant. So as to support project applicants in the planning and ongoing management of ERDF projects, 2 halfday sessions relating to (1) State Aid and (2) Public Procurement have been designed. Both sessions will be facilitator led with opportunity for case study discussion based on practical worked examples. The State Aid session will cover: The background to the State Aid Regulations and the limitations they place on the investment of public funding How to establish whether State Aid is present when planning an investment What measures are available to manage investment Block Exemptions, Regional Aid, de Minimis Calculating, recording and reporting State Aid in delivery. The Public Procurement session will cover: The legalities of EU Public Procurement and Public Procurement procedures How to manage Public Procurement in project delivery Procuring and contracting for goods and services options and practices. ERDF Public Procurement in Practice Workshop (half day session): 28 th August 2014 (9:30am 13:00pm), ASAN The Workspace, All Saints Road, Wolverhampton WV2 1EL. Or 30 th September 2014 (9:30am-13:00pm), The Brambles, 2 Priory Road, Dudley, DY1 1HH. Managing State Aid Workshop (half day session): 28 th August 2014 (13:30pm 16:00pm), ASAN The Workspace, All Saints Road, Wolverhampton WV2 1EL. Or 30 th September 2014 (13:30pm-16:00pm), The Brambles, 2 Priory Road, Dudley, DY1 1HH. 2
5 ERDF PUBLIC PROCUREMENT & STATE AID 9.30 am Registration ERDF Public Procurement in Practice P R O G R A M M E HALF DAY SESSION 9.45 am Welcome and Introductions Course objectives confirmed am Break Public Procurement and Purchasing - The Regulatory Framework Background to public procurement policy and its management within public authorities EU Procurement, thresholds and regulatory management The Procurement Route Planner estimating purchasing values Internal procedures and implications for project delivery Group discussion and review of ERDF audit requirements am Managing the procurement process Contracts, Frameworks and Lots, Purchase Orders Preparing output-based specifications for services Selection and Award criteria Managing the procurement process Case study review of procurement cycle from business case to purchase pm Plenary Any questions pm Close 3
6 ERDF PUBLIC PROCUREMENT & STATE AID 1.15 pm Registration Managing State Aid in ERDF Projects P R O G R A M M E HALF DAY SESSION 1.30 pm Welcome and Introductions Course objectives confirmed 2.30 pm Break The Regulatory Framework basis of compliance State Aid and the Treaty on the Functioning of the EU - Article 107 (1) Restrictions and Exceptions Article 107 (2) (3) and other provisions The State Aid tests is Aid compatible? Calculating, recording and reporting State Aid investment Linkages to ERDF & other State Investment Programmes Facilitator-led input, group discussion and recognising State Aid quiz 2.45 pm Managing State Aid in Projects Options available: The General Block Exemption Regulation o Regional Aid and Assisted Area Status De Minimis UK Exemptions reviewed 3.45 pm ` Plenary Any questions 4.00 pm Close Group discussion and opportunity for mapping Project activities with State Aid conditions 4
7 ERDF FINANCIAL MANAGEMENT Managing ERDF Finance This one day session is designed to provide a comprehensive overview of ERDF finances and the eligibility factors affecting delivery. The content concentrates on the practical, financial aspects of project delivery and covers issues of apportionment, overheads, match funding and private sector leverage/revenue. The workshop will also provide an insight into the inspection and audit requirements embodied in the EU Commission s Regulations and how projects can best avoid errors and irregularities through risk management. The session will - Review regulatory conditions relating to ERDF expenditure and DCLG requirements Discuss the management of project budgets profiles, match funding, apportionment methodologies Understand the expectations the Regulations place on project deliverers in terms of accountability and audit trails Discuss the risks associated with management of ERDF projects. ERDF Financial Management Workshop (half day session- INVITATION ONLY as part of the Black Country ERDF Operational Meeting): 27 th August 2014 (9:30am 13:00pm), Linden House (Newbridge Room), 211 Tettenhall Road, Wolverhampton WV6 0DD. ERDF Financial Management Workshop (one day session - open): 4 th September 2014 (9:30am -16:00pm), Dudley and Kingswinford Rugby Club, Swindon Road, Wall Heath, Kingswinford, West Midlands, DY6 0AW. 5
8 ERDF FINANCIAL MANAGEMENT Black Country ERDF Operational Team Meeting 9.30 am Registration ERDF Financial Management (Invitation Only) P R O G R A M M E HALF DAY SESSION 9.45 am Welcome and EUSIF Update - Zoey West, Black Country Technical Assistance Team 10.00am Welcome and course objectives confirmed - Anne Eastwood, Kalliopi Associates am Break Managing Finances Commission and Managing Authority (DCLG) rules governing expenditure Eligible and ineligible expenditure Direct, indirect and shared project costs Match funding evidencing actual match and in kind Purchasing, procurement and defrayed expenditure time sensitive issues am Inspections, Audits and EU Finances Key areas of financial inspection and audit reviewed Claims management system Financial management systems and procedures The process for verifying and validating data for claims Implications for project applicants Group work reviewing financial management systems for ERDF projects pm Plenary Any questions pm Close 6
9 ERDF FINANCIAL MANAGEMENT ERDF Financial Management P R O G R A M M E 9.30 am Registration 9.45 am Welcome and Introductions. Course objectives confirmed. Managing Finances Commission and Managing Authority (DCLG) rules governing expenditure Eligible and ineligible expenditure Private sector leverage and revenue generation (Article 55) Sources of evidence and audit trails Online and transaction listings am Break am Managing and budgeting ERDF expenditure The project budget profiles explained Direct, indirect and shared project costs Match funding evidencing actual match and in kind Purchasing, procurement and defrayed expenditure time sensitive issues The process for verifying and validating data for claims pm Lunch 1.15 pm Putting it into Practice Managing the project budget Sharing costs staff salaries and depreciation Indirect costs and overheads Maintaining profiles, managing variances and re-profiling 2.30 pm Break 2.50 pm Inspections, Audits and EU Finances -Key areas of financial inspection and audit reviewed Claims management system Financial management systems and procedures Implications for project applicants 3.45 pm Plenary Any questions? 4.00 pm Close 7
10 ERDF MONITORING & AUDIT Monitoring and Auditing of ERDF Projects The European Regulations governing ERDF place demanding expectations on project deliverers in terms of maintaining compliance whilst meeting performance targets. Without effective quality management systems linked with sound technical knowledge, deliverers run the risk of non-compliance and clawback of grant. This one day session is designed to provide an insight into the expectations placed on deliverers and provide practical examples of best practice for current and future project management. The session will cover - The core roles and responsibilities of programme implementation functions and separation of duties How to develop a resourced programme or project specific monitoring system linked to risk management The key compliance areas expected by EU Commission relating to Community and National Regulations (EC Reg 1828/2006 Article 13 and Article 16) Best practice in using on-site verification visits (PEV and PAV) to reduce risk in programme and project delivery. ERDF Monitoring and Audit Workshop (one day session): 16 th September 2014 (9:30am-16:00pm), Newhampton Arts Centre, Dunkley Street, Wolverhampton WV1 4AN. Or ERDF Monitoring and Audit Workshop (one day session): 8 th October 2014 (9:30am- 16:00pm), Holiday Inn Express Oldbury, Birchley Island, Oldbury, West Midlands, B69 2BD. 8
11 ERDF MONITORING & AUDIT Monitoring and Auditing of ERDF Projects P R O G R A M M E 9.30 am Registration 9.45 am Welcome and Introductions - Course objectives confirmed EU Commission requirements - Overview Regulation requirements 1083/2006 & 1828/2006 (Article 13 and Article 16) Errors and Irregularities Commission Regulations revisited Compliance areas to observe: o Added value, public match, procurement, state aid, cross cutting themes, publicity Roles and responsibilities of the Project Inspection and Verification Teams (PIV), Audit Teams, Commission and EU plus project applicant reviewed am Break am Scope and content of the Inspection and Verification Visit review of the PIV template Project management controls Financial management controls Purchasing systems and procurement Performance monitoring systems reporting of outputs and results Managing Commission and National regulations pm Lunch 1.15 pm Source documentation and record keeping What is sufficient, what is reliable? Identifying key documentation o to support claim expenditure o to support project outputs and results o to support added value and cross cutting themes Establishing sound project controls and risk management systems Developing the monitoring system 2.45 pm Break 3.00 pm Managing a sound delivery environment 3.45 pm Plenary Any Questions 4.00 pm Close 9
12 ERDF PROJECT CLOSURE & EXIT Project Closure and Exit Strategies Closing and archiving a project is a separate workstream in its own right with the technicalities of document retention in order to avoid clawback and repayments in the future. Of equal importance is the achievement of the project's exit strategy and sustainability factors. All need addressing through project planning and delivery. This one day session provides the information and guidance to ensure the processes are correctly embedded. The session aims To encourage projects to develop managed exit strategies and investment sustainability To plan for project closure as a component of project management To review the process of document retention and archiving to meet ERDF requirements To consider the maintenance aspects of project closure follow up actions, people, assets, lessons learnt. ERDF Project Closure and Exit Strategy Workshop (one day session): Or, 24 th September (9:30am 16:00pm), Walsall Deaf Centre 59a Lichfield Street, Walsall, WS4 2BX. ERDF Project Closure and Exit Strategy Workshop(one day session): 14 th October 2014 (9:30am 16:00pm), Newhampton Arts Centre, Dunkley Street, Wolverhampton WV1 4AN. 10
13 ERDF PROJECT CLOSURE & EXIT STRATEGY Project Closure and Exit Strategies P R O G R A M M E 9.30 am Registration 9.45 am Welcome and Introductions - Course objectives confirmed Managing the closure of a project Closure s role in project management o Realising benefits, preparing for handover and closure Roles and responsibilities project applicant and partners o Immediate and post-project actions o Issues for handover, succession and exit EU specifics covering ERDF projects am Break am Managing the future DCLG guidance Retention and retrieval of records o Authoritative records explained Retention and management of project assets Audit and inspection requirements Archiving records essential documentation pm Lunch 1.15 pm Sustainability defining and managing exit strategies Issues for project design, planning and delivery Identifying project benefits, values and lessons learnt Forming partnerships and linkages for future actions Managing life after the end of the project 2.45 pm Break 3.00 pm Managing the closure and exit process Exit Strategies, sustainability and project closure Expectations of stakeholders Project options available pm Plenary Any questions 4.00 pm Close 11
14 BLACK COUNTRY TECHNICAL ASSISTANCE CONTACT INFORMATION: ZOEY WEST EXTERNAL FUNDING TEAM LEADER NICK ALAMANOS BLACK COUNTRY ERDF PROGRAMME MANAGER KAYE DAVIES PROJECT DEVELOPMENT OFFICER Tel: Mobile: Tel: Mobile: Tel: Mobile: Address: Walsall MBC Civic Centre Darwall Street Walsall, WS1 1TP HOW TO REGISTER: To book your place on one or more of the capacity building workshops please and include details of any special requirements. You will receive a preworkshop questionnaire which you will need to complete and return immediately in order to confirm your booking. Please note that although these workshops are free of charge, failure to attend on the day of the session may result in a small charge. The team produces regular updates to partners in the Black Country on new developments, events and capacity building opportunities. If you would like to receive these updates in the future please send an request to davieskaye@walsall.gov.uk or call
European Funding Joy Holland West Midlands European Service
European Funding 2014-2020 Joy Holland West Midlands European Service Europe 2020 Targets Employment 75% of the 20-64 year-olds to be employed R&D / Innovation 3% of the EU's GDP invested in RDI Climate
More informationVersion 4: 29 th June 2017
PROGRAMME RULES INTERREG VA CROSS-BORDER PROGRAMME FOR TERRITORIAL CO-OPERATION 2014-2020 NORTHERN IRELAND, BORDER REGION OF IRELAND AND WESTERN SCOTLAND & PEACE IV EU PROGRAMME FOR PEACE AND RECONCILIATION
More informationThe National ERDF Handbook. For the English Convergence and Competitiveness Programmes (ERDF-GN-1-001)
The National ERDF Handbook For the English Convergence and Competitiveness Programmes 2007 2013 (ERDF-GN-1-001) Version 1: 1st April 2012 Contents 1 Purpose and Scope 4 2 Overview 5 3 The Application Process
More informationAudit & Compliance Guidance
Audit & Compliance Guidance Green Infrastructure Fund Guidance for Applicants September 2018 Disclaimer Applicants should be aware that as the Green Infrastructure Fund is a new programme, the guidance
More informationCornwall & Isles of Scilly Investment Fund
1 Cornwall & Isles of Scilly Investment Fund Q&A Respondents are invited to direct questions in advance of submitting a response to sally-ann.rogerson@british-business-bank.co.uk. Questions (posted anonymously)
More informationUnemployment Briefing Number 1: Issued September 2013
Unemployment Briefing Number 1: Issued September 2013 Introduction & Background Welcome to the initial refreshed edition of Wolverhampton s Unemployment Briefing, last published in 2009. This month s briefing
More informationRevised 1 Guidance Note on Financial Engineering Instruments under Article 44 of Council Regulation (EC) No 1083/2006
REVISED VERSION 08/02/2012 COCOF_10-0014-05-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY Revised 1 Guidance Note on Financial Engineering Instruments under Article 44 of Council Regulation
More informationOverview of the Northern Ireland Ireland - Scotland VA Programme. Electric Vehicles Call Workshop
Overview of the Northern Ireland Ireland - Scotland VA Programme Electric Vehicles Call Workshop Welcome MARK FEENEY, MA DIRECTOR Introduction and Outline of Workshop Programme Priorities Policy Context
More informationSouth East Europe (SEE) SEE Control Guidelines
South East Europe (SEE) SEE Control Guidelines Version 1.4. Final version approved by the MC 10 th June 2009 1 st amendment to be approved by MC (2.0) 1 CONTENTS 1 Purpose and content of the SEE Control
More informationThis document is meant purely as a documentation tool and the institutions do not assume any liability for its contents
2006R1828 EN 01.12.2011 003.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B C1 COMMISSION REGULATION (EC) No 1828/2006 of
More informationEUROPEAN COMMISSION. EGESIF_ final 22/02/2016
EGESIF_14-0015-02 final 22/02/2016 EUROPEAN COMMISSION GUIDELINES FOR DETERMINING FINANCIAL CORRECTIONS TO BE MADE TO EXPENDITURE CO-FINANCED BY THE EU UNDER THE STRUCTURAL FUNDS AND THE EUROPEAN FISHERIES
More informationOfficial Journal of the European Union
13.5.2014 L 138/5 COMMISSION DELEGATED REGULATION (EU) No 480/2014 of 3 March 2014 supplementing Regulation (EU) No 1303/2013 of the European Parliament and of the Council laying down common provisions
More informationWest Midlands Pension Fund. Customer Engagement Strategy 2018
West Midlands Pension Fund Customer Engagement Strategy 2018 June 2018 Customer Engagement Strategy 2018 Background The West Midlands Pension Fund ( The Fund ) is one of the UK s largest pension funds
More informationHaving regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,
L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)
More informationGuidance on management verifications Cooperation Programme Interreg V-A Greece - Italy
Guidance on management verifications Cooperation Programme Interreg V-A Greece - Italy 2014-2020 Greece-Italy v.10 1 Table of contents Introduction 1. General 1.1 Regulatory requirements 1.2 General principles
More informationHow to close the project
Training on Project & Financial Management and Communication; Vienna, 11-12 September 2013 How to close the project JTS CENTRAL EUROPE Agenda of the workshop Time span from 10h30 13h00 Welcome Presentation
More informationFollow up and reporting procedures. Lead partners seminar 5th targeted call Lydwine Lafontaine
Follow up and reporting procedures Lead partners seminar 5th targeted call Lydwine Lafontaine Table of contents Background information Subsidy contract Lead partner principles 1. Progress of the project:
More informationCornwall & Isles of Scilly Investment Fund
Cornwall & Isles of Scilly Investment Fund Pre-Market Engagement Seminar For Prospective Fund Managers 27 th July 2017 Cornwall & Isles of Scilly Investment Fund Introduction Sandra Rothwell, CEO Cornwall
More informationFirst level control report including checklist
First level control report including checklist Project title Project acronym Project number Report Number 1. Project and progress report Name 2. Project Partner Name Organisation Job title Division/Unit/Department
More informationState of play of Financial Instruments in the ERDF programmes. David Read DCLG (Managing Authority), England
State of play of Financial Instruments in the ERDF 2014-2020 programmes David Read DCLG (Managing Authority), England Background Whilst the UK has significant experience of setting up and implementing
More informationPartnership Agreement between the Lead Partner and the other project partners
Partnership Agreement between the Lead Partner and the other project partners Foreword This Partnership Agreement is signed on the basis of the following documents that form the legal framework applicable
More informationAssets, Regeneration and Growth Committee 1 st June 2015
Assets, Regeneration and Growth Committee 1 st June 2015 Title Community Asset Strategy Report of Chief Operating Officer Wards All Status Public Enclosures Appendix 1: Draft Community Asset Strategy Officer
More informationSCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS
SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS Incorporating amendments by Scottish Futures Trust (Proposals for Decision Points 2 5 Only) Executive summary... 1 Section 1: Introduction
More informationFIRST LEVEL CONTROL: PRINCIPLES AND PRACTICE
CENTRAL EUROPE PROGRAMME 2007-2013 Project financial management and controls Vienna, 7 th April 2011 FIRST LEVEL CONTROL: PRINCIPLES AND PRACTICE 1. Validation of expenditure: the FLC 2. General principles
More informationProject Monitoring and Reporting Workshop for Interreg programmes
Project Monitoring and Reporting Workshop for Interreg programmes Who, why, how? 21-22 April 2016 Sofia, Bulgaria Interact is co-financed by the European Regional Development Fund (ERDF) Responsibilities
More informationJESSICA. UDF Handbook
JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS UDF Handbook HORIZONTAL STUDY Final Report July 2012 DISCLAIMER: This document has been produced with the financial assistance of
More informationFactsheet N 15. Anti-fraud strategy
Factsheet N 15 Version N 1 of 25 th November 2016 Table of contents I. THE INTERREG 2 SEAS ANTI-FRAUD STRATEGY... 3 A. The Programme policy on anti-fraud... 3 B. A targeted fraud risk mapping... 3 C. ARACHNE...
More informationGuidance on Simplified Cost Options (SCOs):
EGESIF_14-0017 29/08/2014 EUROPEAN COMMISSION European Structural and Investment (ESI) Funds Guidance on Simplified Cost Options (SCOs): Flat rate financing, Standard scales of unit costs, Lump sums (under
More informationActualtests.PRINCE2Foundation.120questions
Actualtests.PRINCE2Foundation.120questions Number: PRINCE2 Passing Score: 800 Time Limit: 120 min File Version: 4.8 http://www.gratisexam.com/ PRINCE2 Foundation PRINCE2 Foundation written Exam 1. Dump
More informationAnnex VI. Model terms of reference for the Certificate on the Financial Statements
Annex VI Pielikums Nr.2 Model terms of reference for the Certificate on the Financial Statements 1. Audit objectives The certificate on the financial statements and underlying accounts, produced by an
More informationPRINCE2-PRINCE2-Foundation.150q
PRINCE2-PRINCE2-Foundation.150q Number: PRINCE2-Foundation Passing Score: 800 Time Limit: 120 min File Version: 6.0 Exam PRINCE2-Foundation Version: 6.0 Exam A QUESTION 1 What process ensures focus on
More informationThe control system for Cohesion Policy
EN The control system for Cohesion Policy How it works in the 2007 13 budget period Canarias Guyane Guadeloupe Martinique Réunion Açores Madeira giis REGIOg Structural Funds 2007-2013: Contents Foreword
More informationGenerating successful projects, developing and managing the project pipeline Trainer: Robin Smail Independent Consultant & Visiting Expert EIPA
Generating successful projects, developing and managing the project pipeline Trainer: Robin Smail Independent Consultant & Visiting Expert EIPA Successful projects: Operations that contribute to specific
More informationAppointment of a First Level Controller - Statement of Requirements (SOR)
Territorial Co-operation Programmes 2014-2020 Appointment of a First Level Controller - Statement of Requirements (SOR) Introduction Beneficiaries participating in Territorial Co-operation Programmes are
More informationManagement verifications in Interreg
Management verifications in Interreg The workshop is co-financed by the Interreg V-A Greece Cyprus and the Interreg V- B Balkan Med Programs Outlines Following the needs assessment led throughout the Southern
More informationEvaluation and Monitoring of EU Structural and Cohesion Funds Programmes, Introduction. What is this course about?
Evaluation and Monitoring of EU Structural and Cohesion Funds Programmes, 2014-2020 Introduction What is this course about? This seminar will deal with the evaluation, monitoring and reporting requirements
More informationHorizon 2020 FINANCE ACADEMY October 2018 Budapest
Horizon 2020 FINANCE ACADEMY 16-19 October 2018 Budapest DAY 1: FUNDAMENTALS OF FINANCES IN H2020 09:00 09:30 Registration and Welcome 09:30 10:00 Event opening: Introduction to the course and the participants
More informationUse of Right to Buy Receipts
Report to the Cabinet 26 September 2016 Wards: Citywide Use of Right to Buy Receipts Report of the City Neighbourhoods and Housing Manager This is a Key Decision This is a key decision. The matter is in
More informationMinutes of a Meeting of the Black Country Local Enterprise Partnership
Minutes of a Meeting of the Black Country Local Enterprise Partnership 20 th March 2017 at 3.00p.m. at NMC, 47 Birmingham Road, West Bromwich Present: Stewart Towe Chair; Simon Eastwood Carrillion plc;
More informationMaking Tax Digital for VAT. Main issues for consideration
Making Tax Digital for VAT Main issues for consideration Businesses whose taxable turnover exceeds the VAT registration threshold will need to keep their records digitally, using MTD functional compatible
More informationLead Partner Seminar. JS/MA Riga
Lead Partner Seminar JS/MA 9.12.2015 Riga Welcome to the Lead Partner Seminar Objective of the day: Give the Lead Partner the needed tools to best implement the project To know where to come with questions
More informationERDF SUBSIDY CONTRACT NO...
The Government Office for Development and European Cohesion Policy, Kotnikova 5, SI 1000 Ljubljana, Slovenia, acting as the Managing Authority of the Cooperation Programme Interreg V-A Slovenia-Hungary
More informationAnnex 3 First level control report including checklist
European Union European Regional Development Fund Sharing solutions for better regional policies Anne 3 First level control report including checklist The first level control report and checklist constitute
More informationAnnex 1. Action Fiche for Solomon Islands
Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation
More informationJESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT
JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT 17 April 2009 This document has been produced with the financial
More informationBraindumps.PRINCE2-Foundation.150.QA
Braindumps.PRINCE2-Foundation.150.QA Number: PRINCE2-Foundation Passing Score: 800 Time Limit: 120 min File Version: 29.1 http://www.gratisexam.com/ I was a little apprehensive at first about an online
More informationRegulation on the implementation of the European Economic Area (EEA) Financial Mechanism
the European Economic Area (EEA) Financial Mechanism 2014-2021 Adopted by the EEA Financial Mechanism Committee pursuant to Article 10.5 of Protocol 38c to the EEA Agreement on 8 September 2016 and confirmed
More informationSimplified Cost Options:
Simplified Cost Options: DG EMPL audit approach Jeroen Jutte Head of Unit Relations with Control Authorities, Legal Procedures, Audit Direct Management and EGF Audit implications Need to consider audit
More informationValue Added Tax (VAT) seminar. Manama, 6 February 2018
Value Added Tax (VAT) seminar Manama, 6 February 2018 Contents Introduction 04 Agenda 05 Key information 07 Registration form 08 Introduction Value-added tax and excise duties in Bahrain: are you ready?
More informationINVITATION TO TENDER
INVITATION TO TENDER To undertake an ex-ante assessment of the case for 2014-20 ERDF investment by Cheshire and Warrington and Stoke-on-Trent and Staffordshire LEPs into a new Urban Development Fund established
More informationPM017: Managing Cost Reduction
PM017: Managing Cost Reduction PM017 Rev.002 CMCT COURSE OUTLINE Page 1 of 5 Training Description: Businesses that don t control their costs don t stay in business. How well are you doing? Is everyone
More informationGrowth Accelerator Guidance
Growth Accelerator Guidance Revision: December 2016 Contents 1.0 Introduction... 3 2.0 The Growth Accelerator Approach... 3 3.0 The Business Case... 5 4.0 The Process... 7 5.0 Case Study: Edinburgh St
More information6 March, Bonn, Germany. UNFCCC secretariat Marshall Room, Haus Carstanjen Martin Luther King Strasse 8 UNFCCC Secretariat.
1 1 st Mini workshop on the preparation of the first Biennial Assessment and overview of financial flows 6 March, Bonn, Germany UNFCCC secretariat Marshall Room, Haus Carstanjen Martin Luther King Strasse
More informationB.29[17d] Medium-term planning in government departments: Four-year plans
B.29[17d] Medium-term planning in government departments: Four-year plans Photo acknowledgement: mychillybin.co.nz Phil Armitage B.29[17d] Medium-term planning in government departments: Four-year plans
More informationGuidance document on. management verifications to be carried out by Member States on operations co-financed by
Final version of 05/06/2008 COCOF 08/0020/04-EN Guidance document on management verifications to be carried out by Member States on operations co-financed by the Structural Funds and the Cohesion Fund
More informationTable of contents. Introduction Regulatory requirements... 3
COCOF 08/0020/02-EN DRAFT Guidance document on management verifications to be carried out by Member States on projects co-financed by the Structural Funds and the Cohesion Fund for the 2007 2013 programming
More informationAnnex 8. Project Assurance Recommendations
Annex 8 Project Assurance Recommendations Contents 1. Project Review Report 2. Recommendations and actions Taken 3. Project Board Roles and Responsibilities This page is intentionally blank BRT North -
More informationT HE EUROPEAN COURT OF AUDITORS D EFINITION & T REATMENT OF DAS ERRORS
T HE EUROPEAN COURT OF AUDITORS D EFINITION & T REATMENT OF DAS ERRORS E N G L II S H Introduction 4 Error definition & classification concerning the different DAS Sources 5 General situation 5 Weaknesses
More informationBudget Management and Public Financial Accountability: Training Workshop and Study Tour to South Africa
Date: 18 22 June, 2007 Venue: Pretoria, South Africa Budget Management and Public Financial Accountability: Training Workshop and Study Tour to South Africa CABRI and World Bank Institute Introduction
More informationTerms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms
Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms 2014-2021 Table of Contents 1. Introduction... 3 1.1 Objectives
More informationSPONSORSHIP INVITATION
18TH ANNUAL TAX PLANNING STRATEGIES U.S. AND EUROPE HOTEL OKURA AMSTERDAM USA Branch SPONSORSHIP INVITATION CONFERENCE INFORMATION ABOUT THE CONFERENCE The annual U.S. and Europe Tax Planning Strategies
More informationAs part of the BEIS Local Energy programme, BEIS has allocated 2.7m in this financial year to support the capacity of LEPs and local authorities to:
Department for Business, Energy & Industrial Strategy 1 Victoria Street, London SW1A 2AW T: +44 (0)300 068 8377 E: Samantha.kennedy@beis.gov.uk www.gov.uk/beis Dear Sir/Madam Local Energy capacity support
More informationGUIDANCE DOCUMENT ON THE FUNCTIONS OF THE CERTIFYING AUTHORITY. for the programming period
Final version of 25/07/2008 COCOF 08/0014/02-EN GUIDANCE DOCUMENT ON THE FUNCTIONS OF THE CERTIFYING AUTHORITY for the 2007 2013 programming period Table of contents 1. Introduction... 3 2. Main functions
More informationFirst Level Control and Verifications of ESI Funds
First Level Control and Verifications of ESI Funds 2014 2020 l Interactive Workshop 15 16 November 2018 Nice, France EXPERTS This two day intensive workshop focuses on: Maeve Hamilton Head of EU Managing
More informationProject Implementation. Project Implementation Seminar Monika Balode, Project Coordinator September 2018 Tallinn & Stockholm
Project Implementation Project Implementation Seminar Monika Balode, Project Coordinator September 2018 Tallinn & Stockholm Contents Result orientation Cooperation Lead partner principle Guidance documents
More informationInnovation Window. Technology Transfer Fund(s) / Accelerator Fund(s). The financial instrument(s) must be established as a closed-end fund.
Innovation Window The Innovation Window of the Greek ESIF FoF follows and is complementary to the creation of the newly established Hellenic Foundation for Research and Innovation (ELIDEK) by the General
More informationCommittee on Budgetary Control
European Parliament 2014-2019 Committee on Budgetary Control 2017/2154(DEC) 30.1.2018 DRAFT REPORT on discharge in respect of the implementation of the budget of the European Medicines Agency for the financial
More informationCommunity Partnerships Program Eligible Costing Rules and Financial Management Guidelines
Community Partnerships Program Eligible Costing Rules and Financial Management Guidelines Top tips when preparing your budget... 2 What are eligible costs?... 3 I. Personnel, Payroll and other Compensation...
More informationCE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE
CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE ANNEX 1 1. IDTIFICATION Title/Number Support Services to the National Authorising Officer CRIS NO: FED/2009/021-496 Total cost Total: 315,800 (EC Contribution:
More informationEuropean Structural application: and Investment Funds
Quick appraisal of major project European Structural application: and Investment Funds Guidance for Member States on Article 38(4) CPR - Implementation options for financial instruments by or under the
More informationLIST OF FINAL GUIDANCE NOTES APPROVED BY COCOF FROM 2006 TO 2011
EUROPEAN COMMISSION DIRECTORATE-GERAL REGIONAL POLICY Policy coordination The Director LIST OF FINAL GUIDANCE NOTES APPROVED BY COCOF OM 2006 TO 2011 No. COCOF ref. No. Title ( in ) Linguistic 1 COCOF
More informationCOMMISSION DELEGATED REGULATION (EU)
L 148/54 20.5.2014 COMMISSION DELEGATED REGULATION (EU) No 532/2014 of 13 March 2014 supplementing Regulation (EU) No 223/2014 of the European Parliament and of the Council on the Fund for European Aid
More informationMini MBA: Accounting & Finance. An Intensive 2-Week Training Course
An ISO 9001:2015 & ISO 29990:2010 Certified Company 15-JUL-18 An Intensive 2-Week Training Course Mini MBA: Accounting & Finance 24 Sep - 05 Oct 2018, Rome 19-30 Nov 2018, London 29 Jul - 09 Aug 2019,
More informationEVALUATION IN THE FIELD OF STATE AID WORKSHOP Brussels, 23 April 2013
EVALUATION IN THE FIELD OF STATE AID WORKSHOP ANNE BUCHER European Commission DG Economic and Financial Affairs Director for Structual Reforms and Competitiveness Art.30 of the Financial Regulation In
More informationSolvency II workshop Governance, Risk Management and Use
< Picture to go here > Solvency II workshop Governance, Risk Management and Use 9 & 10 September Lloyd s 1 Agenda Introduction Model Change Themes from submissions Feedback from recent reviews Evidence
More informationFinancial Reporting First Level Control
Financial Reporting First Level Control Xander Storms Frank Everaarts It s not that hard! Report twice a year about content, progress and costs The Lead Beneficiary collects and integrates the data Those
More informationCOMMISSION DELEGATED REGULATION (EU) No /.. of
EUROPEAN COMMISSION Brussels, 26.10.2015 C(2015) 7245 final COMMISSION DELEGATED REGULATION (EU) No /.. of 26.10.2015 supplementing Regulation (EU) No 575/2013 of the European Parliament and of the Council
More informationThis Webcast Will Begin Shortly
This Webcast Will Begin Shortly If you have any technical problems with the Webcast or the streaming audio, please contact us via email at: webcast@acc.com Thank You! IT Law for Non-IT Lawyers ACC Webinar
More informationCLOSURE GUIDELINES SEMINAR. Section 4 Submission of closure documents
CLOSURE GUIDELINES SEMINAR Section 4 Submission of closure documents 4.1.2 CLOSURE DOCUMENTS for IPA CBC 1. Final statement of expenditure (as integral part of the final payment application) issued by
More informationPRINCE2 Practitioner Online
What you will learn At the end of this course the delegate will be prepared for the PRINCE2 practitioner exam. The purpose of the Practitioner qualification is to confirm whether the candidate has achieved
More informationENSURING EFFECTIVE GOVERNANCE AND FINANCIAL REPORTING
70 Audit Committee Report ENSURING EFFECTIVE GOVERNANCE AND FINANCIAL REPORTING The Board and the Audit Committee are committed to the continuous strengthening of the Group s systems of risk management,
More informationProject costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs.
Financial issues Extract from the guide for BONUS applicants 1 8. How to prepare project budget? Only the real costs required for the implementation should be indicated in the planned budget for the project.
More informationIndex. Executive Summary 1. Introduction 3. Audit Findings 11 MANDATE 1 AUDIT PLAN 1 GENERAL OBSERVATION AND MAIN CONCLUSIONS 1 RECOMMENDATIONS 2
Report to the Contact Commiittee of the heads of the Supreme Audit Institutions of the Member States of the European Union and the European Court of Auditors On the Parallel Audit on the Costs of controlls
More informationWOLVERHAMPTON CLINICAL COMMISSIONING GROUP GOVERNING BODY
WOLVERHAMPTON CLINICAL COMMISSIONING GROUP GOVERNING BODY Minutes of the Extraordinary Governing Body Meeting held on Tuesday 10 January 2017 Commencing at 1.00 pm at Wolverhampton Science Park, Stephenson
More informationINTERREG 2 Seas Mers Zeeën First Level Control Manual
INTERREG 2 Seas Mers Zeeën 2014-2020 First Level Control Manual Version of 29/11/2018 Table of Content 1. INTRODUCTION... 5 1.1. PURPOSE AND OBJECTIVE OF THIS MANUAL... 5 1.2. TERMINOLOGY... 5 2. LEGAL
More informationECO/ Green Deal consultation event. 19 March 2014
ECO/ Green Deal consultation event 19 March 2014 Agenda Not for profit Independent Mission led Established 10 years 1000 Registration and coffee 1030 Welcome, Merlin Hyman, chief executive, Regen SW 1040
More informationDepartment of Enterprise, Trade & Employment
Department of Enterprise, Trade & Employment Circular No. ESF/PA/1-2001 31 July 2001 FINANCIAL MANAGEMENT AND CONTROL PROCEDURES FOR THE EUROPEAN SOCIAL FUND (ESF) 2000-2006 1. Background The purpose of
More informationFact Sheet 14 - Partnership Agreement
- Partnership Agreement Valid from Valid to Main changes Version 2 27.04.15 A previous version was available on the programme website but all projects must use this version. Core message: It is a regulatory
More informationIncentive Guidelines Micro Guarantee
Incentive Guidelines Issue Date: 1st January 2017 Version: 1 http://support.maltaenterprise.com It is recommended that potential applicants contact Business First prior to submitting their application.
More informationIssue Date: 1 st April 2014 Version: 4.4 Update: 1 st October 2015 http://support.maltaenterprise.com Malta Enterprise may support interested applicants to understand the objectives of the incentive; explain
More informationEnterprise Zone Memorandum of Understanding
Enterprise Zone Memorandum of Understanding THIS AGREEMENT is dated [ ] 2016 PARTIES 1. THE SECRETARY OF STATE FOR COMMUNITIES AND LOCAL GOVERNMENT whose principal address is 2 Marsham Street, London,
More informationUpdate: 1st January
Issue Date: 1 st April 2014 Version: 6 Update: 1st January 2017 http://support.maltaenterprise.com Malta Enterprise provides support to interested applicants to understand the objectives of the incentive,
More informationEU SIF Briefing Session:
EU SIF 2014 2020 Briefing Session: BRIEF INTRODUCTION TO THE FUNDS GOVERNANCE BUSINESS PROCESS STRATEGY EVERYTHING ELSE (Q+A) EU SIF 2014 2020 Briefing: Three European Union Structural and Investment Funds
More informationIBFD Course Programme BEPS Country Implementation
IBFD Course Programme BEPS Country Implementation Summary On 5 October 2015, the OECD published the final reports of its 15-point base erosion and profit shifting (BEPS) project. A bit more than a year
More informationProducer Organisation Scheme
EMFF Operational Programme 2014-2020 Producer Organisation Scheme 2014-15 EUROPEAN UNION This measure is part-financed by the European Maritime and Fisheries Fund Ireland s EU Structural and Investment
More informationMONTENEGRO. Enhanced control and management of fisheries INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)
INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Enhanced control and management of fisheries Action summary The objective of the Action is to align the electronic data collection
More informationFact Sheet 13 Roles and responsibilities in project partnerships
Roles and responsibilities in project partnerships Valid from Valid to Main changes Version 3 03.05.17 -Minor wording change recommending the use of the same FLC for local partnerships. -Clarified the
More informationEC Guidance. Management verifications and audit
EC Guidance Management verifications and audit Rafael López Sánchez, Deputy Head of Unit C.1 Directorate C Audit Directorate-General Regional and Urban Policy #ficompass Management verifications and audit
More informationFinancial instruments for SME support in practice Case study demonstrating the use of equity instruments Charles HAMILTON, Invest Northern Ireland
Financial instruments for SME support in practice Case study demonstrating the use of equity instruments Charles HAMILTON, Invest Northern Ireland Presentation Content Section 1 - Strategic Context Section
More informationPRINCE2 Foundation Online
What you will learn PRINCE2 Foundation online is a learning solution created to meet the demands of our customers. The Foundation elements are taught via our comprehensive e-learning material. This style
More information