1 Danish Ministry of Foreign Affairs Danida Road Sector Programme Support Phase 2, INSTITUTIONAL SUPPORT Reformulated Component Description Document ZAMBIA This report contains restricted information and is for official use only. Ref. No.104.Zam June 2009

2 Table of Contents Executive Summary Cover Page Abbreviations and Acronyms 1 Introduction Description of the component Revised Component Strategy Development and Immediate Objectives Outputs and Activities Inputs Cross-Cutting Issues Budget Management and organisation Management of the Component Planning, Budgeting and Contract Procurement Financial management and procurement Budgeting Flow of Funds Accounting Financial Monitoring and Reporting Procurement Auditing Procedures Monitoring, reporting, reviews and evaluation Organisation of Monitoring System Targets and Indicators Joint Sector Reviews Cross Cutting Issues Timing of Key Monitoring Instruments Assessment of key assumptions and risks Assumptions Risks Component Implementation Plan ANNEX 1: Terms of Reference for the Technical Advisor to Road Development Agency and Local Road Authorities... 1 ANNEX 2: Overview of indicators by output.... 5

3 Executive Summary The Institutional Support Component is one out of three components of the Danish financed Road Sector Programme Support phase 2 (RSPS 2). The overall programme will contribute to, and form part of, Zambia s 10-year Road Sector Investment Programme phase II (ROADSIP II). The objectives of ROADSIP II, relevant to the RSPS 2 Institutional Support Component, include the development of the management capacity of the sector agencies, improved management of district-level access, better management of environmental and social issues and improved road safety. The reformulation of the Main Roads and District Roads Components does reflect on the activities of the Institutional Component since they are interlinked: environmental studies, road safety campaigns and impact studies are examples. However, other developments have required changes in the institutional support incl.: a slow decentralisation process, combined with a shortage of maintenance funding at the local level, and a lack of analytical instruments to assess road investments. The Institutional Support Component includes the following three subcomponents: Subcomponent A Institutional Support to the Road Development Agency (RDA) aims at: (i) strengthening the management capacity of RDA in general, (ii) assist the further integration of the management of environmental and social issues; and (iii) development of national guidelines for the establishment and operation of local road authorities (LRAs) and the management of accessibility at the district and community levels (including a Technical Advisor); The Technical Advisor will focus on capacity building, particularly with regard to decentralisation and development of guidelines and procedures for LRA. This will be the basis for providing targeted budget support to LRAs. Subcomponent B Support to the Road Transport Safety Agency (RTSA), will support the development of a national accident information system; the development of national road safety education campaigns for schools and roadside communities and road safety audits. Subcomponent C - Social Accounting Matrix (SAM) and Transport Indicators, will support the establishment of a Social Accounting Matrix for the Transport Sector and an indicator framework. The financial crisis has made a continued focus on reducing transport costs essential for maintaining or increasing Zambia s competitiveness and sustainable development of road infrastructure assets is a major contributing factor to economic growth and poverty reduction. The SAM and indicators should provide the analytical framework for analysing the role of transport for Zambia's economy. i

4 The subcomponents will be managed by the following agencies: RDA, RTSA and ZIPAR, each agency taking responsibility for the procurement of supplies and service providers in accordance with Government of Zambia standard procedures but with the requirement of no objection from the Danish Embassy at specified critical stages. The component financing is aligned with the Zambian Government systems. The National Road Fund Agency (NRFA) will have overall responsibility for the financial management of the component, including producing regular financial statements. The RDA, RTSA and ZIPAR will prepare subcomponent plans, budgets and reports on progress for the Programme Coordination Committee (CC). The CC will approve the annual work plans and budgets. The component budget will be included in the Zambian Government s national budget and the CC will organise an independent annual audit of the component. The total Danida budget for the component is DKK 27 million. ii

5 Cover Page Country: Zambia Sector : Roads Title: Road Sector Programme Support (RSPS) Phase 2 National Agencies: Road Development Agency; Road Transport and Safety Agency; National Road Fund Agency, Zambia Institute for Policy Analysis and Research Duration: 5 years Starting Date: 1st July 2007 Completion Date: 30th June 2012 Overall Budget Frame: DKK 27 million (including DKK 9 million for Technical Advisors) Details of Component: This component will support the national transport policy and sector strategy (ROADSIP II) in strengthening the management capacity in the road sector. The component comprises the following subcomponents: Subcomponent A - Institutional Support to the Road Development Agency (RDA) - for strengthening the management of RDA and, in particular, assist with the integration of environmental and social management issues into road projects; the development of national guidelines for establishment and functioning of LRAs and the management of accessibility at the district and community levels, and Subcomponent B - Support to the Road Transport and Safety Agency (RTSA) for the development of a national accident information system, the development of national road safety education campaigns for schools and road side communities and for undertaking road safety audits. Subcomponent C- Social Accounting Matrix (SAM) and Transport Indicators - for supporting the establishment of a Social Accounting Matrix for the transport sector and an indicator framework. iii

6 Abbreviations and Acronyms CC Danida DHID DKK EIA EMU ESMU EU FNDP GRZ KfW Km LDP LRA MCT MLGH MOFNP NRFA NTP PDD PRE RAMP RDA RSPS RTSA ROADSIP TA TOR USD ZIPAR ZPPA ZMK Coordination Committee RSPS2 Danish International Development Assistance Department of Housing & Infrastructure Development Danish Kroner Environmental Impact Assessment Environmental Management Unit Environmental and Social Management Unit European Union Fifth National Development Plan Government of the Republic of Zambia Kreditanstalt fur Wiederaufbau Kilometre Local Development Programme Local Road Authority Ministry of Communication and Transport Ministry of Local Government and Housing Ministry of Finance and National Planning National Road Fund Agency National Transport Policy Planning and Design Division Provincial Roads Engineer Rural Accessibility and Mobility Programme Road Development Agency Road Sector Programme Support Road Transport and Safety Agency Road Sector Investment Programme Technical assistance Terms of Reference United States Dollar Zambia Institute for Policy Analysis and Research Zambia Public Procurement Authority Zambia Kwacha Zambia Kwacha (ZMK) DKK 1.00 = ZMK 993 USD 1.00 = DKK USD 1.00 = ZMK 5,260 (Rates of exchange 26 th June 2009 Financial Times, UK) Fiscal Year: January - 31 December iv

7 1 INTRODUCTION Denmark has provided Danish support to the rehabilitation of roads in Zambia since From December 2002, this has been part of a comprehensive road sector programme of support (RSPS). During RSPS Phase I, the focus for the institutional support component was on the provision of technical assistance (TA) to build capacity at the District Council level and for support to the Environmental and Social Management Unit (ESMU). Based on the positive experience of phase 1, the Government of the Republic of Zambia (GRZ) requested continued Danish support in a phase 2. A concept paper for RSPS 2 was developed in January 2006 with continued support to ESMU; TA support for the development of national strategies and guidelines for district roads; road safety and financial support. In addition, the provision of assistance to RDA for the development of national guidelines for Local Road Authorities (LRAs) and the management of district and community level access were included. The comments from the appraisal and the results of an institutional assessment were incorporated into final draft documents produced in February These provided the basis for the submission to the Danida Board in May 2007 and after approval by the Danida Board, a government agreement was drawn up to permit phase 2 to commence on 1st November Late 2008, it became apparent that the Main Roads and District Roads Components could not be implemented as planned and that a reformulation was required. A Reformulation Consultant visited Zambia in January 2009 and made a proposal for changes, which was appraised by the Joint Sector Review of RSPS2 in March In that process, it was decided to adjust the Institutional Component to the new situation. 2 DESCRIPTION OF THE COMPONENT RSPS 2 is defined within the overall framework of the Fifth National Development Plan (FNDP) and the national Road Sector Investment Programme, Phase 2 (ROADSIP II). The component will continue to contribute to achievement of the objectives of ROADSIP II, which recognize the need to strengthen management capacity in the road sector; to improve the management of environmental and other cross cutting issues and to provide a safer road transport system. One of the key objectives of the government is to facilitate economic growth and poverty reduction through diversification, particularly in the agricultural sector. A 1

8 precondition for attaining this objective and the development of the Zambian economy in general is good sector management. 2.1 Revised Component Strategy The reformulation of the Main Roads and District Roads Components does reflect on the activities of the Institutional Component since they are interlinked: environmental studies, road safety campaigns and impact studies are examples. However, other developments have required changes in the institutional support: slow decentralisation process combined with a shortage of maintenance funding at the local level and a lack of analytical instruments to assess road investments. These developments and their implications for RSPS 2 are described below. The decentralisation of responsibilities for district and rural roads towards the Local Road Authorities (LRA) has been slow and the RSPS 2 activities linked with decentralisation has faced difficulties. Furthermore, the funding gap of the Road Fund does not permit allocation of sufficient funds towards rural district roads. Sector Budget Support (SBS) for that purpose has therefore been given priority in the Programme Document. It will be targeted towards LRAs responsible for District and Rural Roads maintenance, on the condition that they have the capacity to carry out routine maintenance. The focus of the institutional support will, therefore, be directed towards developing guidelines and procedures for LRAs and their work and towards reinforcing their capacity. Due to the global economic crisis, the price of copper has fallen dramatically and the ZMK has depreciated significantly against the USD. This is reducing GRZ general revenues substantially, including revenues arising from the fuel levy, the main source of road maintenance funding. This situation calls for reconsideration of the prioritisation of road sector interventions and new instruments to assess investments are required. Focus on the strategic role of transport as a catalyst for development has therefore been essential and an additional subcomponent has been included with the aim to develop an economic analytical framework for analysing the role of transport for Zambia's economy. The Component aims in general at the institutional strengthening of the sector agencies. The overall component strategy is to provide support to institutional strengthening in areas considered a priority by the GRZ, complementing other development assistance in the sector. Therefore, some flexibility is built into the outputs and activities of the component. As a consequence of the change in focus of the assistance, the Technical Advisor has been moved to Lusaka (see Annex 1 for TOR). The TA will focus on capacity building, particularly with regard to decentralisation and development of guidelines and procedures for LRA. This will be the basis for providing targeted budget support to LRAs as described in the RSPS 2 Programme Document. Local 2

9 TA for the provinces may be provided if a specific need for capacity building is identified. EU has funded technical assistance to RDA from 2005 and will continue to do so under EDF-10. The need for a second Danida financed full-time technical assistance posts at RDA Headquarters to support general work was originally identified but with the continuation of EU assistance, it is no longer judged necessary and is stopped. 2.2 Development and Immediate Objectives This component supports the objectives of the Fifth National Development Plan (FNDP), the National Transport Policy (NTP) and the national road sector programme (ROADSIP II), all of which recognize the need to strengthen management capacity in the road sector; to improve the management of environmental and other cross cutting issues and to provide a safer road transport system. The development objective of this component is: Support the establishment of effective institutions that enable the transport sector to promote national socio-economic development through the provision of a well-maintained, safe and sustainable network delivering net environmental and social benefits. The immediate objectives of this component are: Subcomponent A: Management of road sector improved, including development of general road management capacity, environmental management and national guidelines for LRAs. Subcomponent B: Road safety improved and a more road safety conscious community built through carrying out priority actions in RTSAs corporate plan. Subcomponent C: Improved effectiveness of implementation of policies and development programmes for the transport sector, including related infrastructure and services 2.3 Outputs and Activities Subcomponent A: Institutional Support to Road Development Agency The outputs, activities and indicators of this subcomponent are: Output A.1: Strengthening of RDA s Management Capacity The Technical Advisor will provide on the job training and assistance to the RDA Division for Planning and Implementation of road network improvements with 3

10 particular focus on the RSPS2 roads. The draft Terms of Reference for a Technical Advisor (for the duration of the programme) is attached in Annex 1 and provides more details of the planned output and activities. Output A.2: Internal capacity of RDA and LRA to manage environmental and social issues strengthened. Staff from RDA s headquarters & provincial offices and the LRAs with a role and responsibility in the implementation of the environmental and social management procedures, will be trained and equipped with the knowledge and skills required to undertake these responsibilities. Prior to the development and implementation of the capacity building programme, the procedures developed by the ESMU, that will form the basis for RDA s environmental and social management system, will be reviewed and approved by RDA senior management. These procedures will be informed by the various manuals and guidelines that have been developed by ESMU over the years, including but not limited to: the HIV/AIDS awareness manuals; the guidelines for environmental monitoring of road works; occupational health and safety manuals and the gender equality training manuals. The key activities associated with the delivery of the training will be the procurement of consultants to assist the environmental manager with the development, preparation and delivery of the training programmes. The environmental manager will evaluate all training programmes and maintain a record of the individuals trained, their position, their responsibility for environmental and social management and the content of training received. Output A.3: Capacity of environmental and social consultants advising the sector strengthened. Environmental and social impact consultants will be invited to submit proposals for inclusion on a short-list of preferred service providers. The short-listed consultants will be required to undertake additional professional training for the provision of environmental and socio-economic impact assessments, monitoring and evaluation services for the road sector. The key activities associated with this output will be the procurement of consulting services for the development, preparation and satisfactory delivery of the training programme. 4

11 Output A.4: Capacity of consulting engineers and contractors to manage and address environmental and social issues during design and construction strengthened. The mitigation of the direct environmental and social impacts associated with road improvement and maintenance activities will be enhanced by training the consulting engineers and contractors involved in the design, construction and supervision of works under RSPS 2. The training for local contractors working on the district road improvements will be integrated in the capacity building activities for local contractors under subcomponent C of the support to district component. It is anticipated that 4 5 contractors undertaking road improvement works, and 5 10 small-scale contractors for maintenance works, will be trained per district. The training programme for the consulting engineers will be delivered as a standalone programme. It will be delivered in advance of any design or supervision activities being undertaken for works under RSPS 2. The key activities associated with this output will be the procurement of consultants to assist the environmental manager with the development, preparation and delivery of training interventions. Output A.5: Environmental effects and socio-economic impact monitoring methodology, procedures and database, developed under RSPS 1 and with EU poverty and social analysis TA, piloted and revised. The key activities associated with this output fall into two groups. The first group of activities relates to the effects and impact monitoring along pilot roads. The main activities will include: (i) Collection of monitoring data for three pilot roads; and (ii) Evaluation of the monitoring system. The experiences of the pilot activity will be used to evaluate the informative value of the data obtained; and the ESMU methodology, procedures and database. ESMU s approach to environmental effects and socio-economic impact monitoring will be revised, based on the findings of this evaluation. The second group of activities is related to the monitoring and evaluation of the environmental effects and socio-economic impacts of the improvements to selected main roads supported by RSPS2 and associated accessibility improvements in the districts. The monitoring and evaluation will apply the revised methodology and procedures developed under the above first group of activities. Monitoring will also take into account the employment generated; adherence to Zambian labour laws; the work environment and terms of employment in connection with the road construction. The collection of monitoring data and the impact evaluation will be undertaken by the ESMU. 5

12 Output A.6: Strategies, Guidelines and Procedures for the establishment and functioning of LRAs and the management of district and community level accessibility developed. This will include the following areas: Support to Department of Housing and Infrastructure Development (DHID) and RDA in relation to the development of national strategies and guidelines for the management of district roads by LRAs, in particular for prioritisation and planning of road works, management and supervision of contractors and consultants as well as financial management of the roads budget. This will be done in collaboration with the Rural Accessibility and Mobility Programme (RAMP) Coordinator within the Ministry of Local Government and Housing, who is responsible for coordinating community access infrastructure projects and programmes Support to DHID and RDA for developing the capacity of the LRAs to plan and manage the improvement and maintenance of their road networks in collaboration with a similar EU-financed initiative in Central and North Western provinces and a KfW financed programme in Southern Province. Support the establishment of national guidelines and strategies for community access improvements and maintenance based on lessons learned from the RSPS 1 and other programmes. Assist in setting up improved financial management systems for road works in the districts and establish the procedures for control and operation of these accounts. Monitor the operation of this system and produce guidelines to incorporate it into an accounting procedures handbook. Supporting LRAs in setting up and maintaining a computerised database of the road network for planning and management purposes. The long-term advisor will support the DHID, RDA and LRAs in drawing together the various experiences and lessons learned from: The establishment of the LRAs under the EU programme of assistance and during this programme; Capacity building activities to improve the sustainable management of the core road network; and The numerous programmes working with community level access, including the pilot activities under RSPS 1 and 2. A process approach will be used to develop the guidelines in close consultation with DHID, RDA, the LRAs and key stakeholders such as district councils, road user committees and local communities that were involved in the activities. The Technical Advisor will play an important role in this. It is likely that separate guidelines will be prepared for the establishment and operation of LRAs, which 6

13 are mainly concerned with the core road network and for community access, which include roads, paths and tracks that are not part of the core network Subcomponent B - Support to RTSA The outputs, associated activities and indicators of this subcomponent will be: Output B.1: National accident information system developed and piloted in selected local administrative centres RTSA is currently in the process of inviting consultants to submit expressions of interests to develop the national accident information system. Therefore, the first activity under this output will be the development of Terms of Reference for the assignment and the continuation of the procurement of a consultant to undertake the assignment. The system will be developed in close consultation with stakeholders (i.e. staff and agencies that will be providing data for the system, operating the system or applying the reports generated) in order to develop ownership. When the accident information system has been developed, it will be piloted at the head office and in selected local administrative centres. Subsequently, a programme and budget to roll out the system nationally, and to build capacity related to its management and use, will be developed. The local administrative centres selected for the pilot will be improved and equipped accordingly. For each administrative centre, an assessment of the physical works and equipment required will be made and contracts tendered for the works and supply of equipment. Output B.2: A national road safety education campaign for schools and roadside communities developed and piloted in communities along the Lusaka - Mongu road and the main roads supported under RSPS2. Creating road safety and conscious road users & communities will contribute considerably to reducing the number of road accidents on Zambian roads, especially since many road accidents are the result of road user behaviour. Activities will include the development of national road safety education campaigns for schools, and for roadside community education, as identified in the RTSA corporate plan. Consulting services will be procured to develop the road safety education programmes; identify appropriate channels for disseminating information and capacity development needs (e.g. teacher and NGO training); identify appropriate communication media and design information and communication materials. A consultant will work alongside RTSA publicity section staff and provide on the job training and development to the staff. 7

14 The programmes developed will be piloted along the Lusaka Mongu road corridors and subsequently evaluated. Consequent revisions will be made and a programme and budget developed to roll out the education campaigns. First on RSPS2 Main Roads, then nationally, to build the capacity of the resources required in order to implement the campaigns. Output B.3: Road safety audits undertaken to ensure compliance with road safety requirements Road safety audits will contribute to ensuring greater compliance by road design engineers, contractors, maintenance programmes and road safety enforcement agents with the implementation of road accident prevention measures. Annual road safety audits programmes will be developed by the road safety engineer and submitted for approval. The road safety engineer will be responsible for conducting these audits and be equipped with a vehicle for this purpose. For the RSPS2 main roads, road safety audits will specifically be undertaken on the road design and during construction activities. The findings of these particular audits will be presented to RDA Subcomponent C - Support to Transport Sector Monitoring A Subcomponent Description was developed in May 2009; it details the background, output, activities and budget. The outputs, associated activities and indicators of this subcomponent will be: Output C.1: A comprehensive database of road sector related data and indicators, covering road network management, rural accessibility and impact on poverty and attainment of MDGs. Activities will include identification of the data required and their sources; the establishment of a database with assistance of a national IT consultant and training of MCT staff in database management. The data will be obtained from existing sources. This activity will be coordinated with support from the EU aimed at elaborating indicators in the road sector. Output C.2: Establishment of a functional Performance Assessment Model. The model will assess the current state of the road network and their effects on Vehicle Operating Costs. They will be used to project the future state of the 8

15 network under various funding regimes. Training and introduction to the model of key technical and management staff is foreseen. Output C.3: The development of a Zambian Social Accounting Matrix (SAM) for the transport sector. The SAM is an accounting matrix representing the transactions and transfer of income between economic sectors and agents. It may be used to assess the employment impact of investments in roads, airports etc as well as the poverty impact. The SAM is based on basic input-output data for the Zambian economy, thus it relates directly to the national economy Other Support Besides the support through the three subcomponents, funds for procurement of international consultancies, especially for a Technical and Financial Audit of the Road Sector, has been included. The EU financed the audit for 2007 and an agreement has been made that Danida should finance the one for Inputs The Government of Zambia, through RDA, RTSA, ZIPAR and the National Road Fund Agency (NRFA), will provide overall management and control and all running/operational costs associated with this component. This includes the costs of monitoring the performance of consultants engaged, the production of evaluation reports for training programmes and running costs associated with vehicles and equipment procured under the programme. The inputs to be provided by Danida are: Funds for technical advisors and short-term assistance, consultancies and studies; Funds for specific training, including workshop logistics and materials; Funds for effects monitoring along RSPS2 main roads and selected routes in the districts that were improved under RSPS 2; Funds for the equipment of the accident information system and for upgrading local administrative centres piloting the system; Funds for information and communication materials for the pilot of the road safety education programmes for schools and communities; and Funds for road safety audits. Funds for a Technical and Financial Audit of the Road Sector to be made available for the NRFA. It should be noted that, in general, the costs associated with the EIA studies and project briefs for individual projects, and with the environmental and social 9

16 monitoring activities during construction, are not funded under this component. These costs will be included in the project costs. 2.5 Cross-Cutting Issues The ESMU is undergoing a process of change, not only with its complete integration into the PDD of RDA, but also in terms of its scope of work. Having previously focused on environmental issues alone, it is now tasked with the responsibility of managing a broader range of crosscutting issues including HIV/AIDS, gender, occupational health and safety and socio-economic impacts. Since strategies and management practices are developed to manage these various risks and opportunities, staff within RDA and the LRAs tasked with the responsibility of their implementation will need to be made aware of them HIV/AIDS An HIV/AIDS policy for the Transport Sector was published in August 2004 and the ESMU has developed guidelines, manuals and training materials under RSPS 1 for the management of HIV/AIDS in the road sector. The delivery of HIV/AIDS awareness for contractors and communities has been managed through the contract, contractors being responsible for appointing service providers to deliver awareness workshops. However, there has been concern about the quality of the delivery of the awareness training by the organisations appointed by contractors. For this reason, the management of the delivery of HIV/AIDS awareness has been taken away from contractors and RDA now directly finances, procures and manages the provision of HIV/AIDS awareness programmes. During the capacity building activities of the institutional support to the RDA subcomponent, the strategy, procedures and guidelines developed for managing the HIV/AIDS risk in the sector will be included. Additional support will also be available from the ROADSIP HIV/AIDS coordinator in the Ministry of Communications and Transport Gender Although there is no specific gender policy in the transport sector, the ESMU has developed training manuals to address the issue of gender equality in the sector. This training will be integrated into the capacity building activities of subcomponent A. Additional support will also be sought from the new Ministry of Women s Affairs. 10

17 3 BUDGET A summary of the Phase 2 budget for Danida contributions to the institutional support at national level component appears below in Table 3.1, broken down by year. The total budget is DKK 27 million of which subcomponent A) accounts for 12 million, B) for 3 million and C) for 10 million. Table 3.1 Institutional Support Component Phase 2 in DKK million Phase II : Sub-Component Items Expenditures Budget Phase II Total A - Institutional Support to RDA 1,94 2,53 2,70 2,70 1,97 0,16 12,00 Strengthen RDA management capacity A.1 Support to RDA 0,44 0,80 0,80 0,80 0,16 3,00 A.2 TA Contract 1,94 2,09 1,40 1,40 1,17 8,00 A.3 Local TA 0,50 0,50 1,00 B - Support to RTSA 1,00 1,00 1,00 3,00 C.-Support to Sector Monitoring 2,00 3,00 3,00 2,00 10,00 Technical and Financial Audit 1,00 1,00 2,00 Total Budget (DKK million) 1,94 2,53 6,70 7,70 5,97 2,16 27,00 4 MANAGEMENT AND ORGANISATION 4.1 Management of the Component RDA is the main partner for RSPS 2, the ultimate responsibility resting with the Chief Executive/Director. However, with the inclusion of support to road safety, RTSA will take responsibility for the implementation of subcomponent B. ZIPAR, together with the Central Statistics Office and the Ministry of Communication and Transport, will take responsibility for subcomponent C. RDA, RTSA and ZIPAR will report to the CC directly Subcomponent A - Institutional Support to RDA The Planning and Design Division within RDA will manage this subcomponent. The Manager will provide the overall direction and the Environmental Manager will assume day-to-day responsibility for the implementation of the environmental and social management capacity building activities. The scope of work of the Technical Advisor comprises support to the Department of Planning & Design at RDA.HQ; the Department of Housing & Infrastructure Development (DHID) under MLGH; the RDA Regional offices in Mongu (Western Province), Mansa (Luapula Province) and the LRAs in the participating district councils. The Technical Advisor will counterpart with the Planning and Design Unit at 11

18 RDAHQ- the DHID within the MLGH and with the Regional Engineers at the participating RDA regional centres. Progress and performance reporting on the subcomponent will go through the Assistant Director Planning and Design who will report to the Coordination Committee (CC), through the Director. The full-time Technical Advisor will not have line management responsibilities. The Advisor will report to the Chief Executive of RDA, or an officer designated by him; to the Chief of DHID and to the Regional Engineers of Mongu and Mansa, or officers designated by them Subcomponent B - Support to RTSA The Road Safety Division within RTSA will manage this subcomponent with ultimate responsibility resting with the Director. Consulting companies will be employed under the direction of the Road Safety Division following standard government procurement procedures. Their terms of reference and contracts will define the scope of their responsibilities. Progress and performance monitoring on this subcomponent will go through the Deputy Director, Road Safety Division who will report to the CC through the Director, RTSA (see also section 6.1) Subcomponent C-Support to Transport Sector Monitoring In order to ensure appropriate links to key GRZ policy makers and to benefit from existing expertise, the subcomponent will be anchored in the newly established policy think-tank: the Zambia Institute for Policy Analysis and Research (ZIPAR). The Central Statistics Office (CSO) will play a key role in developing the SAM, including the extension with the transport module, while the road maintenance information would be anchored in the Ministry of Communication and Transport (MCT). ZIPAR would be the anchor for developing the SAM, including the transport sector module and linked to models developed in the Ministry of Finance and National Planning (MoFNP). 4.2 Planning, Budgeting and Contract Procurement The RDA, through its Planning and Design Division, will be responsible for the overall planning of subcomponent A. RTSA, through its Road Safety Division, will take the responsibility for subcomponent B. ZIPAR will take responsibility for subcomponent C. Contracts will be procured following standard government procedures. Under the Zambia National Tender Board Act, the Zambia Public Procurement Authority (ZPPA) must approve all tenders above specified ceilings. 12

19 A written no objection from the Danish Embassy will have to be obtained for all shortlists for studies and contracts before issuing requests for proposals. A written no objection from the Danish Embassy will have to be obtained after completing the evaluation of tenders but before awarding the contracts. 5 FINANCIAL MANAGEMENT AND PROCUREMENT In general, the procedures for financial management and procurement will be as described in the Programme Document. These are summarised here, with particular reference to this component. 5.1 Budgeting RDA, RTSA and ZIPAR, based on the actual and forecast progress of their respective subcomponent activities, will prepare annual subcomponent work plans with budgets, following the normal government planning and budgeting cycle. These will be discussed with NRFA, who will prepare a consolidated RSPS 2 budget submission for approval by the RSPS2 Coordination Committee (CC) and by the Royal Danish Embassy before forwarding it to the Ministry of Finance and National Planning (MOFNP). 5.2 Flow of Funds Funds will be disbursed from the Danish Embassy to the NRFA via the MOFNP on a quarterly basis, or at such other interval as mutually agreed. The NRFA will be responsible for paying suppliers and service providers directly for the subcomponent activities according to the approved work plans. Subject to agreement with the NRFA and the Danish Embassy, the RDA, RTSA and ZIPAR will operate an imprest account for expenditures on the subcomponents and will be responsible for reporting on all expenditures to NRFA. RDA, RTSA and ZIPAR will prepare quarterly cash flow forecasts for forwarding to NRFA. These will be consolidated by NRFA with other component forecasts before forwarding to the Danish Embassy. The primary responsibility for cash flow management will be with NRFA. Requests for disbursements will originate from RDA, RTSA and ZIPAR who will forward these to NRFA. Quarterly, or at other agreed intervals, NRFA will request the disbursement of funds from the Danish Embassy via MOFNP. These procedures are described in the Programme Document. 13

20 5.3 Accounting RDA, RTSA, ZIPAR and NRFA will maintain accounting records for all RSPS 2 expenditure following procedures laid down in the GRZ Financial Regulations. NRFA will forward quarterly financial statements of account to the Danish Embassy. 5.4 Financial Monitoring and Reporting RDA, RSTA and ZIPAR will be responsible for financial monitoring and reporting of their respective subcomponent activities. All reports will be submitted on a quarterly basis to NRFA and the CC. NRFA will be responsible for the overall financial management of RSPS 2 including consolidating financial reports and cash forecasts from all components for the CC. 5.5 Procurement All procurement will be the responsibility of the Zambian authorities and will follow GRZ regulations. However, all procurement of contracts for works and studies will be subject to no objection from the Danish Embassy, following the procedure described in section 4.2 above. 5.6 Auditing Procedures All RSPS 2 expenditures will be subject to the normal GRZ internal auditing procedures. In addition, independent annual audits of the RSPS 2 accounts will be organised by NRFA under the direction of the CC. Spot checks of the financial records of particular components, subcomponents or individual activities may be requested by the CC or the Danish Embassy at any time. The NRFA will be responsible for collecting and making available the relevant records for this. 14

21 6 MONITORING, REPORTING, REVIEWS AND EVALUATION 6.1 Organisation of Monitoring System The core of this component will be the procurement of consulting services in addition to some procurement of equipment and payment for workshop venues and materials. The monitoring of the consultants will be undertaken by RDA, RTSA and ZIPAR through those delegated with the responsibility for managing particular subcomponent outputs. Evaluation reports of consultant performance and of the training programmes will be produced. In addition, RDA, RTSA and ZIPAR will prepare brief quarterly progress reports on the progress of their respective subcomponents for submission to the Coordination Committee. These will include: Overall progress against plans Progress with preparations for future activities Financial progress on individual contracts with consultants Overview of financial progress compared to component budget with future projected expenditure Major problems encountered List of study reports, etc. produced in the quarter NRFA will include details of the progress of the component in the Annual ROADSIP II Progress Report based on inputs from RDA, RTSA and ZIPAR. 6.2 Targets and Indicators The targets for this component are related to those of the FNDP, NTP, ROADSIP II, and the RTSA corporate plan, as articulated in their goals and objectives. For subcomponent A - institutional support to RDA, the linkage to national sector targets and indicators is not very clear since, despite clearly articulated objectives for improving management capacity in a number of areas, no national sector targets and indicators have been set for outcomes and impacts. Due to this lack of a clear link between objective and indicators, separate indicators are shown in Annex 2. For subcomponent B, support to RTSA, the targets and indicators (see Annex 2) are linked directly with the national targets and indicators set out in the road safety 15

22 action plan. Progress towards these targets will be monitored and compiled from internal monitoring data and reports used by RTSA. For subcomponent C, Social Accounting Matrix and Transport Indicators the aim is to improve the overall monitoring of the transport sector by establishing a database and by developing models for analysis. The targets are the outputs will be reflected in regular reporting. 6.3 Joint Sector Reviews In addition to the items mentioned in Section 8 of the programme document on sector reviews, the following items will be particularly relevant for this component: Review RDA s management with particular reference to the RSPS 2 components; Review the effectiveness of support to RTSA; Review the effectiveness of ZIPAR; Review developments in broader environmental planning; and Complementarity with other TA and capacity building activities in the sector. 6.4 Cross-cutting Issues The monitoring of crosscutting issues will fall within the overall monitoring of the component, in particular the monitoring of the content and quality of the capacity building activities, and the extent to which crosscutting issues are addressed. For example, under subcomponent A, the activities associated with capacity building of RDA staff, LRA staff, consultants and contractors in the management of crosscutting issues will subsequently be reflected in the quarterly reports. 6.5 Timing of Key Monitoring Instruments RDA, RTSA and ZIPAR, who will record the output and performance of the consulting inputs in quarterly reports, will monitor the outputs of the subcomponents. 7 ASSESSMENT OF KEY ASSUMPTIONS AND RISKS 7.1 Assumptions A major assumption underpinning this component s aim of integrating environmental and social management into the road sector planning, design and operations functions is the existence of adequate external incentives to do so. It is assumed that the Zambian Government continues to recognise the importance of 16

23 crosscutting issues and has performance management measures that provide the motivation for the road sector to manage the environmental and social risks and opportunities associated with its activities. Danida is one out of several donors supporting capacity creation within the road sector and the support of the different partners is to some extent inter-linked. It is an important assumption of RSPS 2 that partner programmes proceed more or less as scheduled and that there is steady progress towards more joint support in the sector. This is a reasonable assumption based on the high degree of donor coordination already established in the sector and the progress made in developing the Joint Assistance Strategy for Zambia 7.2 Risks Institutional changes in the roads sector could affect the institutional strengthening aspects of the RSPS 2. This includes the radical restructuring of the management of local road networks by the setting up of Local Road Authorities. There are numerous potential risks in this restructuring, including the possible lack of availability of technical staff at district level. However, the process-oriented approach of RSPS 2 should facilitate the adjustment of the programme to the pace of introduction of the new structures. Furthermore, the channelling of sector budget support to the LRAs combined with institutional capacity creation can be expected to impact positively on the functioning of the LRAs. The programme is dependent on the effectiveness of the authorities, charged with the management of natural resources and land use control, to manage the potentially long-term negative socio-economic consequences of the possible degradation of the natural resource base from improved accessibility. To mitigate such risk, ESMU will carry out strategic environmental assessments as needed (see output A5) and engage with authorities and other stakeholders in the programme area to raise awareness of the risk of indirect impacts and motivate actions to minimize them. The turnover of staff of the organisation easily undermines the sustainability of any capacity building programme. This concern is noted in the FNDP, which suggests that any improvement in capacity development and retention will be curtailed unless there are changes within the public sector as a whole. With the institutional reforms in the road sector, it is anticipated that some of these changes will contribute to the development of organisational cultures conducive for building institutional knowledge and memory. The use of predominately locally procured consultancy and contracting services, and the planned capacity building for these, will also contribute to the development of a local knowledge base available to the sector in the future. 17

24 8 COMPONENT IMPLEMENTATION PLAN Figure 8.1 below show the implementation plans for activities of the subcomponents. The activities plan is indicative; RDA, RTSA and ZIPAR will develop detailed annual programmes for the subcomponents. A special Subcomponent Description, which includes a detailed implementation plan, has been prepared for Subcomponent C. 18

25 Institutional Support, RSPS 2 June 2009 Component Activities Plan A Institutional Support to RDA A.1 RDA environmental management staff training RDA senior mgt approve procedures manual * Responsibilities allocated within RDA and LRA * Prepare TOR for procurement of consulting services (if required) * Procure consulting services and engage consultants * Prepare and deliver training * Evaluate training programmes A.2 Environmental and Social Consultant training Develop consultant selection criteria and process * Consultants to be trained selected * Prepare TOR for procurement of consulting services (if required) * Procure consulting services * Prepare and deliver consultant training programme * Evaluate training programmes * A.3 Consulting Engineer and Contractor training Procure consulting services * Prepare materials for inclusion in training programmes * Conduct consulting engineers and contractors training Evaluate training programmes A.4 Effects and Impact Monitoring Pilot Roads Baseline studies for pilot roads completed (under Phase 1) Physical works completed on pilot roads * * * Prepare TOR for procurement of consulting services (if required) Procure consulting services and engage consultants Begin monitoring on pilot roads Selected Main Roads Baseline for the Mongu Senanga collected under ESIA's Physical works completed Mongu - Senanga Begin monitoring in areas where works are completed 19

26 Institutional Support, RSPS 2 June 2009 Component Activities Plan National guidelines development A.5 LRA and accessibility management guidelines Prepare TOR for procurement of consulting services B Support to RTSA Procure and engage consultants B.1 Accident information system development Develop national accident information system * Procure equipment for HO and pilot admin centres * Install system at HO and pilot administrative centres * Train staff and pilot system Make revisions to the system in preparation for national roll out B.4 Road safety education campaigns Develop materials for national road safety education campaigns B.3 Road safety audits Carry out assignment Conduct education campaigns Conduct road safety audits Recommendations for Mongu - Sesheke road implemented C Support to Transport Sector Monitoring C1 Indicator data base C2 Performance Assessment Model C3 Social Accounting matrix Note: 2012 is partial year. *) Completed 20

27 Institutional Support, RSPS 2 June 2009 ANNEX 1: TERMS OF REFERENCE FOR THE TECHNICAL ADVISOR TO ROAD DEVELOPMENT AGENCY AND LOCAL ROAD AUTHORITIES 1 BACKGROUND The road sector is one of the priority sectors in the current Danida country strategy for Zambia. Danida has been involved in the sector through the repair and rehabilitation of major roads using project assistance since The first phase of a comprehensive Road Sector Programme Support (RSPS 1), which commenced in December 2002, included three components covering (i) rehabilitation of the main Lusaka to Mongu road, (ii) rehabilitation of high priority local roads along this main road, and (iii) institutional development. Phase I ended in October The proposed RSPS Phase 2 (RSPS 2) will contribute to, and form part of, Zambia s 10-year Road Sector Investment Programme Phase II (ROADSIP II). The main objective of ROADSIP II is to bring a core network of about 40,000 kilometres into maintainable condition by RATIONALE FOR TECHNICAL ASSISTANCE As a result of the Joint Annual Review of RSPS 2, March 2009, the two Technical Advisor posts under RSPS2 were combined. The Technical Advisor will be based at RDA-HQ in Lusaka, responsible for provision of support to the RDA-HQ; the Ministry of Local Government & Housing; RDA Regional Offices and LRAs in those provinces and districts receiving support under the Programme. A further, and important, outcome of the 2009 Joint Annual Review was the expansion of support under RSPS 2 to Luapula Province and a strong recommendation for the use of Sector Budget Support (SBS) provision towards LRA activities. These Terms of Reference (ToR) are for the Technical Advisor, based at RDA-HQ in Lusaka, responsible for provision of support to RDA and the MLGH. Depending on a needs assessment, local or international, long- or short-term Consultants under the Programme, will assist the Technical Advisor. 3 OBJECTIVE The overall objective of the Consultant s assignment is to provide advice and technical assistance to the RDA, MLGH and LRAs in achieving the objectives, outputs and activities as stipulated in the Reformulated Road Sector Programme Support Phase 2. These outputs are fully described in the component descriptions. The aim of the technical assistance is primarily to assist in developing the planning, management and monitoring capacities of the RDA and MLGH in order to increase the capacity for effective management of the road network at national, provincial and district levels. 1

ROAD SECTOR PROGRAMME SUPPORT PHASE 2 (RSPS 2)

ROAD SECTOR PROGRAMME SUPPORT PHASE 2 (RSPS 2) Danish Ministry of Foreign Affairs Danida Reformulated Sector Programme Support Document For the Second Phase 2007-2012 ROAD SECTOR PROGRAMME SUPPORT PHASE 2 (RSPS 2) ZAMBIA This report contains restricted

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

Summary of Terminal Evaluation

Summary of Terminal Evaluation Summary of Terminal Evaluation I. Outline of the Project Country: Republic of Zambia Issue/Sector: Water Resource and Disaster management Rural water supply Division in charge: Global Environment Department

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE ANNEX 1 1. IDTIFICATION Title/Number Support Services to the National Authorising Officer CRIS NO: FED/2009/021-496 Total cost Total: 315,800 (EC Contribution:

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION COMMISSION OF THE EUROPEAN COMMUNITIES Draft Brussels, xxx C(2008) yyy final COMMISSION DECISION of on the Annual Action Programme 2008 in favour of Zambia to be financed from the 10th European Development

More information

ANNEX. DAC code Sector Economic and Development Planning

ANNEX. DAC code Sector Economic and Development Planning ANNEX 1. IDTIFICATION Title Total cost Aid method management mode Technical Cooperation Facility 1.5M (2.4% of NIP) Project approach partially decentralised management DAC code 15010 Sector Economic and

More information

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode ANNEX 1. IDTIFICATION Title Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode DAC-code 15010 Project approach Partially decentralised management.

More information

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument Action Fiche for EU- Brazil Sector Dialogues Support Facility 1. IDENTIFICATION Title

More information

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management ANNEX Action Document for 11 th EDF EU-TL Co-operation Support Facility (CSF) 1. IDENTIFICATION Title/Number Total cost 11 th EDF EU-TL Co-operation Support Facility (CSF) CRIS number: 2014/37442 Total

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Action Fiche for Syrian Arab Republic. 1. IDENTIFICATION Support to the EU-Syria Association Agreement Programme (SAAP I)

Action Fiche for Syrian Arab Republic. 1. IDENTIFICATION Support to the EU-Syria Association Agreement Programme (SAAP I) Action Fiche for Syrian Arab Republic 1. IDTIFICATION Title/Number Support to the EU-Syria Association Agreement Programme (SAAP I) Total cost EU contribution: EUR 5 000 000 Beneficiary contribution: tbc

More information

Empowerment of non state actors in Botswana

Empowerment of non state actors in Botswana Annex: Empowerment of non state actors in Botswana 1. IDENTIFICATION Title/Number Empowerment of non state actors in Botswana BW/FED/022-316 Total cost EUR 10 000 000 European Union contribution : EUR

More information

Summary of Project/Program. Summary - Project/Program Approval Request. Private: Public: X Mixed: Grant: USD31 Million 1. Loan: USD5 Million Project:

Summary of Project/Program. Summary - Project/Program Approval Request. Private: Public: X Mixed: Grant: USD31 Million 1. Loan: USD5 Million Project: Summary of Project/Program PILOT PROGRAM FOR CLIMATE RESILIENCE Summary - Project/Program Approval Request 1. Country/Region: Zambia 2. CIF Project ID#: XPCRZM041A 3. Project/Program Title: Zambia Strengthening

More information

not, ii) actions to be undertaken

not, ii) actions to be undertaken Recommendations, Final report Recommendation 1: Political commitment a) The European Commission should formally remind accession countries of the obligations of future member states to comply with the

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Second Additional Financing to Road Rehabilitation & Maintenance Project Region AFRICA Sector Roads and highways (100%) Project ID P120723

More information

Evaluation of the European Union s Co-operation with Kenya Country level evaluation

Evaluation of the European Union s Co-operation with Kenya Country level evaluation "FICHE CONTRADICTOIRE" Evaluation of the European Union s Co-operation with Kenya Country level evaluation Recommendations Responses of Services: Follow-up (one year later) GENERAL RECOMMENDATIONS 1 Give

More information

GUIDELINES FOR COUNTRY PROGRAMMES

GUIDELINES FOR COUNTRY PROGRAMMES GUIDELINES FOR COUNTRY PROGRAMMES 1 GUIDELINES FOR COUNTRY PROGRAMMES Ministry of Foreign Affairs of Denmark July 2013 (web 1.0) Contents BOX 1: Key Concepts in Country Programmes.... vi CHAPTER 1: INTRODUCTION...

More information

Zambia s poverty-reduction strategy paper (PRSP) has been generally accepted

Zambia s poverty-reduction strategy paper (PRSP) has been generally accepted 15 ZAMBIA The survey sought to measure objective evidence of progress against 13 key indicators on harmonisation and alignment (see Foreword). A four-point scaling system was used for all of the Yes/No

More information

Handbook. CEWARN Rapid Response Fund (RRF)

Handbook. CEWARN Rapid Response Fund (RRF) CEWARN Rapid Response Fund (RRF) Handbook Version: authorised by the CEWARN Steering Committee on: 1.0 16 th of January, 2009 This handbook is maintained by Mr. Abdirashid Warsame, Response Coordinator,

More information

VOLUME VIII: PROCEDURES MANUAL FOR PLANNING AND RESEARCH UNIT

VOLUME VIII: PROCEDURES MANUAL FOR PLANNING AND RESEARCH UNIT REPUBLIC OF RWANDA RWANDA EDUCATION BOARD (REB) REB HEADQUARTERS BUILDING VOLUME VIII: PROCEDURES MANUAL FOR PLANNING AND RESEARCH UNIT This procedures manual for Planning and Research Unit is Volume VIII

More information

04.02 EAGGF EAGGF - p.1

04.02 EAGGF EAGGF - p.1 04.02 EAGGF 1. Basic information 1.1. CRIS Number : 2002/000-605-04.02 Twinning number: PL02-AG-05 1.2. Title: EAGGF 1.3. Sector: Agriculture 1.4. Location: Poland 2. Objectives: 2.1. Overall objective:

More information

Action Fiche for Libya

Action Fiche for Libya Action Fiche for Libya 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation Public administration capacity-building facility (ENPI/2011/276-708) EU contribution: EUR 4.5 million

More information

Acronyms List. AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC

Acronyms List. AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC Acronyms List AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC Acquired immunodeficiency syndrome Country Coordinating Mechanism,

More information

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures EN ANNEX V Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures 1. Title/basic act/ CRIS number 2. Zone benefiting from the action/location CRIS number: 2018/41357

More information

Terms of Reference. External monitoring mission for the Project Mid-Term Review

Terms of Reference. External monitoring mission for the Project Mid-Term Review I- BACKGROUND Project: Supporting Citizens Access to Justice Terms of Reference External monitoring mission for the Project Mid-Term Review a) Standard UNDP M&E requirements The UNDP M&E (monitoring and

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 40280 September 2007 Islamic Republic of Afghanistan: Technical Assistance for Support for Economic Policy Management (Cofinanced by the Government of Australia

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

Ex Post-Evaluation Brief Laos: Rural road building Bokeo / Rural road infrastructure Northern Laos I+II

Ex Post-Evaluation Brief Laos: Rural road building Bokeo / Rural road infrastructure Northern Laos I+II Ex Post-Evaluation Brief Laos: Rural road building Bokeo / Rural road infrastructure Northern Laos I+II Rural road building Province of Bokeo (RRB) 1) BMZ-Nr.: 00 65 05* Programme/Client Rural infrastructure

More information

Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues

Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues 1 CONTRACT OBJECTIVES & EXPECTED RESULTS 2 1.1 Background to the Project 2 1.2 Background to the Assignment 3 1.3

More information

Annex 1: The One UN Programme in Ethiopia

Annex 1: The One UN Programme in Ethiopia Annex 1: The One UN Programme in Ethiopia Introduction. 1. This One Programme document sets out how the UN in Ethiopia will use a One UN Fund to support coordinated efforts in the second half of the current

More information

Overview of the Northern Ireland Ireland - Scotland VA Programme. Electric Vehicles Call Workshop

Overview of the Northern Ireland Ireland - Scotland VA Programme. Electric Vehicles Call Workshop Overview of the Northern Ireland Ireland - Scotland VA Programme Electric Vehicles Call Workshop Welcome MARK FEENEY, MA DIRECTOR Introduction and Outline of Workshop Programme Priorities Policy Context

More information

President s report. Proposed loan to the Republic of Mali for the. Rural Microfinance Programme

President s report. Proposed loan to the Republic of Mali for the. Rural Microfinance Programme Document: EB 2009/96/R.15/Rev.1 Agenda: 10(a)(v) Date: 30 April 2009 Distribution: Public Original: English E President s report Proposed loan to the Republic of Mali for the Rural Microfinance Programme

More information

Duration of Assignment: Apprx. 150 working days from January to September 2015

Duration of Assignment: Apprx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Governance and Institutional Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA

More information

Annex 1. IDENTIFICATION

Annex 1. IDENTIFICATION 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation Annex DAC-code 15112 Sector Ghana Decentralisation Support Programme - GDSP- Component I CRIS ref. GH/FED/022-108 EUR 5 000

More information

«FICHE CONTRADICTOIRE»

«FICHE CONTRADICTOIRE» «FICHE CONTRADICTOIRE» Evaluation of the Commission s External Cooperation with Angola (Country level evaluation) (*For details on the recommendations please refer to the main report) Recommendations STRATEGIC

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda.

Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda. Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda 21 July, 2017 Introduction: The Ministry of Water and Environment (MWE) is implementing

More information

ANNEX Action Fiche for Technical Cooperation Facility II for Palau

ANNEX Action Fiche for Technical Cooperation Facility II for Palau ANNEX Action Fiche for Technical Cooperation Facility II for Palau 1. IDENTIFICATION Title Technical Cooperation Facility CRIS no. FED/2013/024-369 Total cost 180,000 (6.2% of NIP A envelope) EDF contribution

More information

MULTI-COUNTRY. Support to Western Balkans Infrastructure Investment Projects for 2014 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

MULTI-COUNTRY. Support to Western Balkans Infrastructure Investment Projects for 2014 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MULTI-COUNTRY Support to Western Balkans Infrastructure Investment Projects for 2014 Action Summary This Action will allow financing Technical

More information

Terms of Reference for consultancy to carry out Project Base line study in the Malawi, Mozambique, Tanzania, Zambia and SADC region

Terms of Reference for consultancy to carry out Project Base line study in the Malawi, Mozambique, Tanzania, Zambia and SADC region Terms of Reference for consultancy to carry out Project Base line study in the Malawi, Mozambique, Tanzania, Zambia and SADC region STRENGTHENING THE SOCIAL ACCOUNTABILITY AND OVERSIGHT CAPACITY OF PARLIAMENTARY

More information

GUIDE TO BUDGET PREPARATION FOR PROGRAMMES IN THE CIVIL SOCIETY FUND (CSF)

GUIDE TO BUDGET PREPARATION FOR PROGRAMMES IN THE CIVIL SOCIETY FUND (CSF) GUIDE TO BUDGET PREPARATION FOR PROGRAMMES IN THE CIVIL SOCIETY FUND (CSF) JUNE 2018 VERSION 1.2 CONTENT 1. VALIDITY OF THE GUIDE... 2 2. GENERALLY ABOUT BUDGETS FOR A PROGRAMME... 2 3. CONCEPT NOTE BUDGET

More information

Duration of Assignment: Approx. 150 working days from January to September 2015

Duration of Assignment: Approx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Gender Poverty Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA Funding Reports

More information

BSPS Phasing-Out Support Business Sector Programme Support ( )

BSPS Phasing-Out Support Business Sector Programme Support ( ) Ministry of Foreign Affairs Danida Government of Vietnam Programme Support Document BSPS Phasing-Out Support Business Sector Programme Support (2011 2013) Ref. No. 104.Vietnam.809.200 November 2010 COVER

More information

STANDARD PROJECT FICHE

STANDARD PROJECT FICHE STANDARD PROJECT FICHE 1. Basic Information 1.1 CRIS Number : 2004-016-919.04 1.2 Title: Preparation for Extended Decentralized Implementation System (EDIS) in the management of pre-accession funds in

More information

Annex. 11 th EDF Support to the Office of the NAO CRIS No. TZ/FED/ Total estimated cost: EUR

Annex. 11 th EDF Support to the Office of the NAO CRIS No. TZ/FED/ Total estimated cost: EUR Annex of the Commission Decision on the individual measure in favour of Tanzania to be financed from the 11 th European Development Fund Action Document for 11 th EDF Support to the Office of the NAO 1

More information

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS Incorporating amendments by Scottish Futures Trust (Proposals for Decision Points 2 5 Only) Executive summary... 1 Section 1: Introduction

More information

Draft COMMISSION DECISION

Draft COMMISSION DECISION Draft COMMISSION DECISION of on the 2008 Annual Action Programme of Accompanying Measures for Sugar Protocol Countries in favour of Trinidad and Tobago to be financed under Article 21.060300 of the general

More information

2.2. Lessons learnt 2.3. Complementary actions 2.4. Donor coordination

2.2. Lessons learnt 2.3. Complementary actions 2.4. Donor coordination 2.2. Lessons learnt EDF projects have been implemented in Sierra Leone for three decades for the rehabilitation of both main and rural roads, providing valuable experience to the SLRA as well as the Commission

More information

EAP Task Force. EAP Task

EAP Task Force. EAP Task EAP Task Force EAP Task Force EAPP Task JOINT MEETING OF THE EAP TASK FORCE S GROUP OF SENIOR OFFICIALS ON THE REFORMS OF THE WATER SUPPLY AND SANITATION SECTOR IN EASTERN EUROPE, CAUCASUS AND CENTRAL

More information

Terms of Reference for a Social Protection Risks and Needs Analysis in the Building and Construction Industry Value Chain

Terms of Reference for a Social Protection Risks and Needs Analysis in the Building and Construction Industry Value Chain Terms of Reference for a Social Protection Risks and Needs Analysis in the Building and Construction Industry Value Chain 1. Background a. The UN Green Jobs Joint Program and its Social Protection Component

More information

Evaluation of Budget Support Operations in Morocco. Summary. July Development and Cooperation EuropeAid

Evaluation of Budget Support Operations in Morocco. Summary. July Development and Cooperation EuropeAid Evaluation of Budget Support Operations in Morocco Summary July 2014 Development and Cooperation EuropeAid A Consortium of ADE and COWI Lead Company: ADE s.a. Contact Person: Edwin Clerckx Edwin.Clerck@ade.eu

More information

DOCUMENT OF THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT STRATEGY FOR ALBANIA

DOCUMENT OF THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT STRATEGY FOR ALBANIA DOCUMENT OF THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT STRATEGY FOR ALBANIA REPORT ON THE INVITATION TO THE PUBLIC TO COMMENT 1. Overview of the public consultation process The objective of this

More information

This action is funded by the European Union

This action is funded by the European Union This action is funded by the European Union ANNEX 10 of the Commission implementing Decision on the Annual Action Programme 2015 of the DCI Pan-African Programme Action Document for "Support Measures Annual

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen JOB PROFILE 17/08/2013 Job Description and Requirements Programme Manager State-building and Governance Job no. 127004 in the EU Delegation to the Republic of Yemen Job Type: Contract Agent Function Group

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING PAPER. European Consensus on Humanitarian Aid Action Plan

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING PAPER. European Consensus on Humanitarian Aid Action Plan COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 29.5.2008 SEC(2008)1991 COMMISSION STAFF WORKING PAPER European Consensus on Humanitarian Aid Action Plan EN EN 1. INTRODUCTION: IMPLEMENTING THE EUROPEAN

More information

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED 2014-2020 1. IDENTIFICATION (max. 200 characters) The purpose of this section is to identify only the programme concerned. It

More information

Action Fiche Trinidad and Tobago

Action Fiche Trinidad and Tobago Action Fiche Trinidad and Tobago 1. Identification Title/Number Accompanying Measures for Sugar Protocol Countries, Trinidad and Tobago 2011-2013 CRIS Number: 023-150 Total cost EU Contribution: EUR 31

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

ONE WASH NATIONAL PROGRAMME (OWNP)

ONE WASH NATIONAL PROGRAMME (OWNP) ONE WASH NATIONAL PROGRAMME (OWNP) ONE Plan ONE Budget ONE Report planning with linked strategic and annual WASH plans at each level budgeting re ecting all WASH-related investments and expenditures financial

More information

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary Project fiche 1.1: Strengthening the capacity of the institutions to manage and implement the Operational Programmes 1. Basic information 1.1 CRIS Number: 2008/20-311 1.2 Title: Strengthening the capacity

More information

Cross-border Cooperation Action Programme Montenegro - Albania for the years

Cross-border Cooperation Action Programme Montenegro - Albania for the years ANNEX 1 Cross-border Cooperation Action Programme Montenegro - Albania for the years 2015-2017 1 IDENTIFICATION Beneficiaries CRIS/ABAC Commitment references Union Contribution Budget line Montenegro,

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1710 Leader

More information

Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation CRIS n ENPI/2008/

Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation CRIS n ENPI/2008/ EN 1 EN ACTION FICHE FOR ARMENIA - ENPI AAP 2008 1. IDENTIFICATION Title Total cost Aid method / Management mode Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation

More information

Office of the Auditor General of Norway. Handbook for the Office of the Auditor General s Development Cooperation

Office of the Auditor General of Norway. Handbook for the Office of the Auditor General s Development Cooperation Office of the Auditor General of Norway Handbook for the Office of the Auditor General s Development Cooperation i Photo: The Office of the Auditor General of Norway Illustration: Lobo Media AS March 2009

More information

UN BHUTAN COUNTRY FUND

UN BHUTAN COUNTRY FUND UN BHUTAN COUNTRY FUND Terms of Reference Introduction: 1. The UN system in Bhutan is implementing the One Programme 2014-2018. The One Programme is the result of a highly consultative and participatory

More information

MADAGASCAR PORTFOLIO REVIEW REPORT

MADAGASCAR PORTFOLIO REVIEW REPORT AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT FUND MADAGASCAR PORTFOLIO REVIEW REPORT SOUTH REGION DEPARTMENT OCTOBER 2007 SCCD :N.A. i CURRENCY EQUIVALENTS (October 2007) UA1 = US$ 1.55665 UA1 = EURO 1.9786

More information

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

MANUAL OF PROCEDURES FOR DISBURSEMENT OF FUNDS TO PARTICIPATING PARTNERS

MANUAL OF PROCEDURES FOR DISBURSEMENT OF FUNDS TO PARTICIPATING PARTNERS MANUAL OF PROCEDURES FOR DISBURSEMENT OF FUNDS TO PARTICIPATING PARTNERS Global Strategy to Improve Agricultural and Rural Statistics The main steps of the procedure for disbursement of funds (from the

More information

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity PROGRESS REPORT THE PREPARATION

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity PROGRESS REPORT THE PREPARATION Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity PROGRESS REPORT ON THE PREPARATION OF THE NATIONAL POVERTY ERADICATION PROGRAMME (NPEP) Prepared by The National Committee

More information

05.01 Strengthen environmental impact assessment

05.01 Strengthen environmental impact assessment 05.01 Strengthen environmental impact assessment 1. Basic Information 1.1.Desiree Number:PL0007.01 1.2 Title: Strengthen environmental impact assessment 1.3 Sector : Environment Twinning code: PL2000/IB/EN01

More information

COUNTRY LEVEL DIALOGUES KEY DOCUMENTS

COUNTRY LEVEL DIALOGUES KEY DOCUMENTS COUNTRY LEVEL DIALOGUES KEY DOCUMENTS EUWI European Union Water Initiative Africa-EU Strategic Partnership on Water Affairs and Sanitation Prepared by the Working Group on Water Supply and Sanitation in

More information

Guideline for strengthened bilateral relations. EEA and Norway Grants

Guideline for strengthened bilateral relations. EEA and Norway Grants Guideline for strengthened bilateral relations EEA and Norway Grants 2009 2014 Adopted by the Financial Mechanism Committee 29.03.2012, amended on 28 January 2016 Contents 1 Purpose of the guideline...

More information

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II Introduction This Project proposal has been prepared by the HLCM Procurement Network (PN)

More information

Vietnam: IMF-World Bank Relations *

Vietnam: IMF-World Bank Relations * -1- Vietnam: IMF-World Bank Relations * Partnership in Vietnam s Development Strategy The government of Vietnam s development strategy is set forth in its Comprehensive Poverty Reduction and Growth Strategy

More information

BOSNIA AND HERZEGOVINA

BOSNIA AND HERZEGOVINA INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 BOSNIA AND HERZEGOVINA European Integration Facility Action Summary The Action is designed to provide support to institutions in Bosnia and Herzegovina

More information

Multi-country European Integration Facility

Multi-country European Integration Facility 1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries

More information

REPUBLIC OF ZAMBIA. Ministry of National Development Planning

REPUBLIC OF ZAMBIA. Ministry of National Development Planning REPUBLIC OF ZAMBIA Ministry of National Development Planning Terms of References For Individual Local Consultant to Develop Guidelines and Procedures for a Comprehensive Framework for Public Investment

More information

2011 SURVEY ON MONITORING THE PARIS DECLARATION

2011 SURVEY ON MONITORING THE PARIS DECLARATION TASK TEAM ON MONITORING THE PARIS DECLARATION 2011 SURVEY ON MONITORING THE PARIS DECLARATION Revised Survey Materials Initial Annotated Draft 3 May 2010 FOR COMMENT This initial text with annotations

More information

Liberia Reconstruction Trust Fund Implementation Manual

Liberia Reconstruction Trust Fund Implementation Manual Liberia Reconstruction Trust Fund Implementation Manual Updated November 2009 2011-02-28 LRTF Implementation Manual 1 I. Background... 3 II. Coverage... 3 III. General Principles... 4 IV. Project Development

More information

Mongolia: Social Security Sector Development Program

Mongolia: Social Security Sector Development Program Validation Report Reference Number: PVR196 Project Number: 33335 Loan Numbers: 1836 and 1837(SF) November 2012 Mongolia: Social Security Sector Development Program Independent Evaluation Department ABBREVIATIONS

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Investment in the transport sector in Viet

More information

Macedonia: Social Infrastructure Programme I-III

Macedonia: Social Infrastructure Programme I-III Macedonia: Social Infrastructure Programme I-III Ex-post evaluation OECD sector 43030 - Urban development and management; 15140 - Government administration (Phase III) BMZ project ID 2000 65 037; 2000

More information

P. O. Box 3243, Addis Ababa, ETHIOPIA Tel.: (251-11) Fax: (251-11)

P. O. Box 3243, Addis Ababa, ETHIOPIA Tel.: (251-11) Fax: (251-11) AFRICAN UNION UNION AFRICAINE UNIÃO AFRICANA P. O. Box 3243, Addis Ababa, ETHIOPIA Tel.: (251-11) 5517700 Fax: (251-11) 5517844 www.au.int VACANCY ANNOUNCEMENT: FINANCE OFFICER TO WORLD BANK FUNDED PROJECTS

More information

SERBIA. Support to participation in Union Programmes INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

SERBIA. Support to participation in Union Programmes INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 SERBIA Support to participation in Union Programmes Action summary This Action will facilitate Serbian participation in EU programmes by cofinancing

More information

UNDAF Outcome(s)/Indicator(s): Sustainable development, disaster management and energy efficiency

UNDAF Outcome(s)/Indicator(s): Sustainable development, disaster management and energy efficiency INITIATION PLAN FOR A GEF PROJECT PREPARATION GRANT (PPG) UNDAF Outcome(s)/Indicator(s): Sustainable development, disaster management and energy efficiency Country Islamic Republic of Iran Expected Outcome(s)/Indicator

More information

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities IDP REVIEW PROCESS PLAN DEPARTMENT OF THE OFFICE OF THE MUNICIPAL MANAGER JULY 2009-JUNE2010 TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS Roles and responsibilities 2.1 Council

More information

Joint Education Sector Working Group Terms of Reference (Revised)

Joint Education Sector Working Group Terms of Reference (Revised) Introduction Joint Education Sector Working Group Terms of Reference (Revised) At the Myanmar Development Cooperation Forum (MDCF) held in January 2013, the Government of Myanmar (GoM) and its Development

More information

DESK REVIEW UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN

DESK REVIEW UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN UNITED NATIONS DEVELOPMENT PROGRAMME DESK REVIEW OF UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN Report No. 1310 Issue Date: 9 October 2014 Table of

More information

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv

More information

Report No.: ISDSA13978

Report No.: ISDSA13978 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o Date ISDS Prepared/Updated: 29-Jul-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

Annex I Action Fiche for West Bank and Gaza Strip/ ENPI

Annex I Action Fiche for West Bank and Gaza Strip/ ENPI Annex I Action Fiche for West Bank and Gaza Strip/ ENPI 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation PEGASE: Support to Recurrent Expenditures of the PA EUR 158,500,000

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of Kenya Project: Health Sector Policy Loan for Attainment of the Universal Health Coverage Loan

More information

South Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR)

South Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR) South Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR) 14 February 2012 List of Acronyms AA Administrative Agent AB Advisory Board CAP Consolidated Appeal Process CHF Common Humanitarian

More information

Democratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement

Democratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement Document: EB 2017/120/R.13/Sup.1 Agenda: 9(b)(iii) Date: 8 April 2017 Distribution: Public Original: English E Democratic Socialist Republic of Sri Lanka Smallholder Agribusiness Partnerships (SAP) Programme

More information

Al-Amal Microfinance Bank

Al-Amal Microfinance Bank Impact Brief Series, Issue 1 Al-Amal Microfinance Bank Yemen The Taqeem ( evaluation in Arabic) Initiative is a technical cooperation programme of the International Labour Organization and regional partners

More information

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18 Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18 1. Basic information 1.1. CRIS Number: 2010/022-154 1.2. Title: Technical Assistance and Project Preparation Facility (TA&PPF)

More information

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting. EN EN EN ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA 1. IDENTIFICATION Beneficiary Bosnia and Herzegovina CRIS number 2010 / 022-674 Year 2010 Cost EUR 6 000 000 Implementing Authority

More information

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming READINESS AND PREPARATORY SUPPORT PROPOSAL PAGE 1 OF 10 Country

More information