1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-77000) ON A LOAN IN THE AMOUNT OF US$100 MILLION TO THE REPUBLIC OF PARAGUAY FOR A FIRST PUBLIC SECTOR PROGRAMMATIC DEVELOPMENT POLICY LOAN October 5, 2011 Poverty Reduction and Economic Management Argentina, Paraguay, Uruguay Country Management Unit Latin America and the Caribbean Region

2 CURRENCY EQUIVALENTS (Exchange Rate Effective October 5, 2011) Currency Unit = Guaraní (G$) G$1.00 US$ US$1.00 G$4, FISCAL YEAR January 1 December 31 AGPE ANDE CEP CPS DPL FEPASA HRM IBRD IFI IMAGRO IPR ISR LAFE M&E MECIP MOP NLTA PDO PEFA PETROPAR PREM SET SFP SICCA SOE UMEP USAID VAT ABBREVIATIONS AND ACRONYMS Auditoría General del Poder Ejecutivo (Office of the Executive s Internal Auditor) Administración Nacional de Electricidad (National Power Authority) Consejo de Empresas Públicas (Council for State-Owned Enterprises) Country Partnership Strategy Development Policy Loan Ferrocarriles del Paraguay Sociedad Anónima (Paraguay Railways) Human Resources Management International Bank for Reconstruction and Development International Financial Institution Impuesto a la Renta de Actividades Agropecuarias (Agricultural Income Tax) Impuesto Personal a la Renta (Individual Income Tax) Implementation Status Reports Ley de Administración Financiera (Financial Administration Law) Monitoring and Evaluation Modelo Estándar de Control Interno para las Entidades Públicas del Paraguay (Paraguay Standard Model of Internal Control) Ministerio de Obras Públicas (Ministry of Public Works) Non Lending Technical Assistance Project Development Objective Public Expenditure and Financial Accountability Petróleos Paraguayos (Paraguayan Oil Company) Poverty Reduction and Economic Management Subsecretaría de Estado de Tributación (Under-Secretariat of State Taxes) Secretaría de la Función Pública (Public Administration Secretariat) Sistema Integrado de Control de Cumplimiento de la Carrera Administrativa (Integrated System for the Consolidated Control of the Administrative Career) State-Owned Enterprise Unidad de Monitoreo de las Empresas Públicas (SOE Monitoring Unit) United States Agency for International Development Value-Added Tax Vice President: Pamela Cox Country Director: Penelope Brook Sector Manager: Arturo Herrera Project Team Leader: Alexandre Arrobbio ICR Team Leader: Alexandre Arrobbio

3 PARAGUAY First Public Sector Programmatic Development Policy Loan CONTENTS Data Sheet A. Basic Information B. Key Dates C. Ratings Summary D. Sector and Theme Codes E. Bank Staff F. Results Framework Analysis G. Ratings of Program Performance in ISRs H. Restructuring Table of Contents 1. Program Context, Development Objectives and Design Context at Appraisal Original Program Development Objectives (PDO) and Key Indicators Revised PDO and Key Indicators with Reasons/Justification Original Policy Areas Supported by the Program (as approved) Revised Policy Areas Other significant changes Key Factors Affecting Implementation and Outcomes Program Performance Major Factors Affecting Implementation Monitoring and Evaluation (M&E) Design, Implementation and Utilization Expected Next Phase/Follow-up Operation Assessment of Outcomes Relevance of Objectives, Design and Implementation Achievement of Program Development Objectives Justification of Overall Outcome Rating Overarching Themes, Other Outcomes and Impacts Summary of Findings of Beneficiary Survey and/or Stakeholder Workshops Assessment of Risk to Development Outcome Assessment of Bank and Borrower Performance Lessons Learned Comments on Issues Raised by Borrower/Implementing Agencies/Partners Annex 1. Bank Lending and Implementation Support/Supervision Processes Annex 2. Beneficiary Survey Results Annex 3. Stakeholder Workshop Report and Results Annex 4. Summary of Borrower's ICR and/or Comments on Draft ICR Annex 5. Comments of Co-financiers and Other Partners/Stakeholders Annex 6. List of Supporting Documents Annex 7. Policy Matrix for Paraguay s First Public Policy Programmatic Development Policy Loan Annex 8. Level of Fulfillment to date of Triggers for PDPL2 and Indicative Medium- Term Actions for PDPL MAP 38 ii

4

5 A. Basic Information Country: Paraguay Program Name: Paraguay Public Sector Reform Program ID: P L/C/TF Number(s): IBRD ICR Date: 10/05/2011 ICR Type: Core ICR Lending Instrument: DPL Borrower: REPUBLIC OF PARAGUAY Original Total Commitment: USD M Disbursed Amount: USD M Revised Amount: USD M Implementing Agencies: Ministry of Finance Cofinanciers and Other External Partners: B. Key Dates Process Date Process Original Date Revised / Actual Date(s) Concept Review: 12/18/2008 Effectiveness: 08/26/ /26/2009 Appraisal: 03/13/2009 Restructuring(s): Approval: 05/05/2009 Mid-term Review: Closing: 03/01/ /01/2011 C. Ratings Summary C.1 Performance Rating by ICR Outcomes: Satisfactory Risk to Development Outcome: Moderate to Significant Bank Performance: Satisfactory Borrower Performance: Satisfactory C.2 Detailed Ratings of Bank and Borrower Performance (by ICR) Bank Ratings Borrower Ratings Quality at Entry: Satisfactory Government: Satisfactory Quality of Supervision: Satisfactory Implementing Agency/Agencies: Satisfactory Overall Bank Overall Borrower Satisfactory Performance: Performance: Satisfactory C.3 Quality at Entry and Implementation Performance Indicators Implementation Performance Indicators QAG Assessments (if any) Rating: Potential Problem Program at any time (Yes/No): No Quality at Entry (QEA): None Problem Program at any time No Quality of Supervision (QSA): None iii

6 (Yes/No): DO rating before Closing/Inactive Satisfactory status: D. Sector and Theme Codes Sector Code (as % of total Bank financing) Original Actual Central government administration General agriculture, fishing and forestry sector General industry and trade sector Other social services Theme Code (as % of total Bank financing) Corporate governance Other public sector governance Public expenditure, financial management and procurement Tax policy and administration E. Bank Staff Positions At ICR At Approval Vice President: Pamela Cox Pamela Cox Country Director: Penelope J. Brook Pedro Alba Sector Manager: Arturo Herrera Gutierrez Nicholas Paul Manning Program Team Leader: Alexandre Arrobbio Alexandre Arrobbio ICR Team Leader: ICR Primary Author: F. Results Framework Analysis Alexandre Arrobbio William V. Mayville Maria Cecilia Zanetta Program Development Objectives (from Project Appraisal Document) The overall development objective of the Programmatic Development Policy Loan (PDPL) is to contribute to the effectiveness and efficiency of the public sector while maintaining a stable macroeconomic policy framework. This will be achieved by: (i) improving revenue collections and the equity of the tax system; (ii) improving the effectiveness of Central Administration internal and financial control; (iii) exerting effective SOE oversight to ensure sound and transparent financial management; (iv) improving the efficiency and equity of social capital expenditures; and (v) contributing to the professionalization of the civil service. These objectives are inter-related and address three main public sector outcomes: revenue stability, accountability, and public sector efficiency. iv

7 Revised Program Development Objectives (if any, as approved by original approving authority) (a) PDO Indicator(s) Indicator Baseline Value Original Target Values (from approval documents) v Formally Revised Target Values Actual Value Achieved at Completion or Target Years Indicator 1 : Increase Tax/GDP Ratio by at least 0.9% of GDP Value (quantitative or %* 12.8 % 13.5% Qualitative) Date achieved 12/31/ /01/ /31/2010 Achieved: Tax collections exhibited a sustained increase during the Comments period. This is remarkable, given the drop in GDP in 2009 as a result of the (incl. % international financial crisis. The original target was exceeded two years ahead achievement) of schedule. Indicator 2 : Increase in PEFA Rating for internal control and external audit (PI-20 and PI- 21) for 50 percent of the ministries and Secretariats are rated C Value (quantitative or Qualitative) 2008 IFA rating was D+ for PI-20 and PI IFA rating is C for PI-20 and PI IFA rating is expected to be C for PI-20 and PI-21 the Central Administration as a whole Date achieved 12/31/ /01/ /15/2011 Achieved: 5 out of 11 ministries representing 70% of the overall budget, have Comments established internal control norms and committees; staff has been trained in (incl. % the implementation of MECIP; their respective internal control units have achievement) adequate HR Indicator 3 : Annual publication of audited 2010 financial statements for each SOE Value (quantitative or Qualitative) No annual audited financial statements in line with international standards available for SOEs Annual publication and audited financial statements for each SOE from 2010 Audited financial statements for eight of the nine SOEs accounting for 99% of overall SOE expenditures were published in 2009 Date achieved 12/31/ /31/ /15/2011 Achieved: 4 of the 9 SOEs have already published their 2010 audited financial Comments statements, and 4 are expected to have them published soon. The ninth SOE, (incl. % which is being liquidated, is audited by the Office of the Executive s Internal achievement) Auditor (AGPE). Indicator 4 : Increase of beneficiaries of conditional cash transfers from Tekopora Program Value (quantitative or Qualitative) 13,679 beneficiaries 100,000 beneficiaries 83,100 beneficiaries Date achieved 12/31/ /31/ /31/2010 Comments Largely achieved: The Tekopora program is expected to reach its target by

8 (incl. % achievement) The selection process, based on both geographic selection & a door-todoor census, targeted the very poor. Roughly 40% of households in extreme poverty are covered under the program Percentage of the paved road network that receives periodic maintenance Indicator 5 : Value (quantitative or 25% maintenance 50% 45% Qualitative) Date achieved 12/31/ /31/ /31/2010 Largely achieved: The maintenance of the paved road network has improved Comments substantially resulting from newly earmarked budgetary allocations for road (incl. % maintenance, as well as the implementation of performance-based maintenance achievement) contracts. Indicator 6 : Value (quantitative or Qualitative) Percentage of personnel recruitments and promotions that are based on merit and professional skills Over 10,000 new 100% of new recruitments and recruitment is promotions were Merit-based personnel based on clearly based on clearly selection processes are specified meritbased selection based selection specified merit- rare criteria criteria between 2008 and 010. Date achieved 12/31/ /31/ /31/2010 Comments (incl. % achievement) Undetermined: Because there is no centralized information on recruitments and promotions, it is not possible to determine the proportion selected using meritbased criteria. (b) Intermediate Outcome Indicator(s) Indicator Baseline Value Original Target Values (from approval documents) Formally Revised Target Values Actual Value Achieved at Completion or Target Years G. Ratings of Program Performance in ISRs No. Date ISR Archived DO IP Actual Disbursements (USD millions) 1 06/23/2009 Satisfactory Satisfactory /14/2009 Satisfactory Satisfactory /28/2011 Satisfactory Satisfactory H. Restructuring (if any) Not Applicable vi

9 1. Program Context, Development Objectives and Design 1.1 Context at Appraisal 1. Upon assuming office in 2008, the Lugo administration articulated its overall strategy in the Strategic Economic and Social Plan for This Plan aimed to achieve a sustainable and equitable economic growth path, and to improve effectiveness and efficiency of the public sector, while addressing the urgent needs of Paraguay s most vulnerable groups. Given Paraguay s institutional context, public sector reform was a key priority of this Plan. The new administration, however, confronted significant challenges while pursuing these goals due to the effects of the international financial and economic crisis as well as Paraguay s specific structural and institutional constraints. 2. The Government s Plan was complemented by prudent macroeconomic policies aimed at creating fiscal space for priority spending programs, particularly in social areas. To achieve this, the Government committed itself to keeping inflation in the single digits. It also committed itself to gradually increasing tax collections through a better tax administration and the introduction of new taxes, as well as improving the efficiency of public spending. The plan also envisaged important reforms to state-owned enterprises (SOEs) to help address their poor performance in terms of service delivery and their lack of financial and managerial transparency. 3. Enhancing the performance of Paraguay s public sector was a necessary condition for enhancing governance and transparency while achieving equitable economic growth. Two decades of institutional reform under the new constitutional framework achieved a simplified tax scheme, the appointment of a new Supreme Court, and the approval of a Financial Administrative Law (LAFE). However, major subsequent public sector reform initiatives addressing high levels of inefficiency and ineffectiveness, high politicization, and widespread corruption within the public sector were systematically blocked. These included civil service reform, the privatization of loss-making SOEs, and more recently, the tax reform in The 2008 election of a reform-minded administration provided new momentum to the efforts of reform, focused on raising the public sector s weak performance in the delivery of social services and in capital expenditure. 4. The operation was prepared in a context of an uncertain economic outlook for Paraguay. Following a period of unprecedented economic expansion and prudent macroeconomic policy between 2004 and 2008, the international economic crisis posed a serious threat to the Paraguayan economy through lower commodity prices and reduced demand for Paraguayan exports, especially soy and meat. In addition, the country experienced a severe drought which further devastated the agriculture sector. In response, the government decided to implement an Anti-Crisis Plan for 2009, which aimed at safeguarding priority social and investment spending programs, maintaining liquidity in the financial system and ensuring access to credit by the productive sectors. Despite the reorientation in short-term economic priorities, the Government remained committed to the macroeconomic objectives set out in the Government Plan, including a gradual increase in tax collections through better tax administration and the introduction of new taxes; an improvement in the efficiency of public spending, and reforms of the state-owned enterprises (SOEs). 1

10 5. While the crisis had a significant impact in the short run, the Government quickly implemented a comprehensive Anti-Crisis Plan, and the economy rebounded strongly. GDP contracted by 3.8 percent in 2009, largely due to a fall in agricultural production. Paraguay s external position, on the other hand, remained relatively stable, due to the fact that imports fell even more than exports, and remittances declined by less than 1 percent. The Government s Anti-Crisis Plan was instrumental in maintaining domestic demand and investment, and in limiting the effects on the poor (see PDO 3.1). The policy response included: (i) injection of liquidity into the financial system; (ii) fiscal expansion to safeguard priority social and investment spending programs; (iii) provision of financing to productive sectors through the state-owned development agency; and (iv) mobilization of external financing from International Financial Institutions (IFIs) to ensure adequate resources for the Government Plan. As a result, economic growth began picking up in the last quarter of 2009, and reached a record 15.3 percent in On the fiscal side, and despite the stimulus, the Government maintained a small surplus thanks to better than expected tax collections, which showed that the improvements in tax administration and tax policy that began in 2004 had paid off. The fiscal stimulus was gradually reduced in 2010 and tax receipts continued to improve. The maintenance of fiscal discipline even during the crisis helped put public debt ratios back on a downward trend beginning in Key Macroeconomic Indicators (% of GDP, unless otherwise indicated) Real GDP (% change) Consumer price inflation (% change, eop) External current account balance Central Government revenues o/w tax revenue Expenditure Current expenditure Capital expenditure Primary balance Overall fiscal balance Public sector gross debt o/w foreign currency denominated debt Source: Ministry of Finance and Central Bank of Paraguay. Rationale for Bank s involvement 6. The Public Sector Programmatic DPL series was conceived within the context of the Bank s FY09-13 Country Partnership Strategy (CPS) to support the Government Plan, mainly for Public Sector Reforms, and the Anti-Crisis Plan. Specifically, the operation supported the Government Plan s overall objective of achieving sustainable and more equitable growth by providing direct support to three of its pillars: (i) macroeconomic policy; (ii) stateowned enterprises (SOEs); and (iii) state modernization. The operation also supported the Anti- Crisis Plan aimed at creating fiscal space to soften the impact of the crisis through an increase in public investment and prioritized social expenditures. 2

11 1.2 Original Program Development Objectives (PDO) and Key Indicators (as approved) 7. The short-term objective of the PDPL was to: (i) safeguard the proportion of budgeted social expenditure during execution, as part of the Anti-crisis Plan; and (ii) pave the way for reform in the areas supported by the loan. 8. The Program Development s overall medium-term objective was to contribute to the effectiveness and efficiency of the public sector while maintaining a stable macroeconomic policy framework. This, in turn, was to be achieved by focusing on four policy areas. The corresponding project-specific PDOs and Key Outcome Indicators are described below: 1 Paraguay s First Public Sector Programmatic Development Policy Loan PDPL1 Program Development Objectives (PDOs) and Key Outcome Indicators Policy Area 1. Tax System PDO 1 - Improving revenue collections and the equity of the tax system. Tax/GDP ratio increases by at least 0.9% by (i.e., to 12.8% in 2012). The elimination of credits on VAT deductions from IMAGRO has an impact equivalent to 0.75% of GDP. The designation of 114 VAT withholding agents has an impact equivalent to 0.15% of GDP. Policy Area 2. Public Sector Financial Control PDO Improving the effectiveness of the Central Administration s internal financial control. PEFA indicators for internal control and internal audits (PI-20 and PI-21) for 50% of the ministries are rated C. PDO Exerting effective oversight of state-owned enterprises (SOEs) to ensure sound and transparent financial management. Annual publication of audited financial statements for each SOE from Definition of medium-term financial targets for SOEs by the Holding. Policy Area 3. Expenditure Management PDO 3 - Improving the efficiency and equity of social and capital expenditures. Improvements are verified by the coverage of the social safety net through the increase of beneficiaries of the conditional cash transfers from the Tekoporá program to 100,000 families in extreme poverty. The quality of public infrastructure has improved, as reflected by the proportion of the paved road network that receives periodic maintenance. Policy Area 4. Human Resources Management PDO 4 - Contributing to the professionalization of the civil service. 100% of new recruitment is based on merit and skills. 1.3 Revised PDO (as approved by original approving authority) and Key Indicators with Reasons/Justification N/A 1.4 Original Policy Areas Supported by the Program (as approved) Policy Area 1 - Tax System 9. The policy goal was to improve the tax system in order to finance the Government s strategic social priorities in the medium term. The Government planned a series of measures to gradually reinforce both tax policy and tax administration. Immediate measures focused on continuing efforts to improve tax administration and correcting distortions in existing taxes, specifically the agricultural income tax (IMAGRO) and Value-added Tax (VAT). Medium-term focus was placed on the implementation of the personal income tax (IPR), adjusting the rates of excise taxes on tobacco and alcohol products, and continuing to strengthen the tax administration. 1 The Key Outcome Indicators were also identified as Medium Term Outcomes in the Policy Matrix. 3

12 Policy Area 2 - Public Sector Financial Control Internal financial control 10. The policy goal was to improve the effectiveness of the Central Administration s internal financial control. Given the ineffectiveness of internal control, the reform aimed to significantly improve accountability and to ensure that funds were used for their intended purposes. Three main lines of action were targeted for the Central Administration over the medium term: (i) expansion of financial management information systems to all spending units; (ii) implementation of a standardized internal control framework throughout all spending units in line with international practices to ensure the effectiveness, professionalism and independence of the internal audit function; and (iii) improvement and strengthening of the control environment through further professionalization and harmonization of financial administration units (UAFs) and spending units. State-owned Enterprises (SOEs) 11. The policy goal was to establish the Government s oversight of SOEs and improve their governance. Given the SOEs poor service delivery performance, their lack of financial and managerial transparency, and the ineffective institutional settings for managing this substantial proportion of public expenditures, the Government s medium-term goal was to establish a new institutional framework to ensure: (i) adequate ownership and supervision of SOEs; (ii) effective control of the execution of objectives and specific goals associated to an action plan, agreed which each enterprise; and (iii) transparent SOE reporting of financial management, business planning, and investment. Policy Area 3 - Expenditure Management 12. The policy goal was to strengthen social and capital expenditures as critical priorities in the anti-cyclical measures against the crisis. The intention was to increase and safeguard those social and capital expenditures which were associated with a significant stimulus impact and pro-poor orientation, while gradually improving the allocation and execution of these expenditures in the medium term. Social and capital expenditures in Paraguay were low by regional standards and chronic budget under-execution negatively impacted the performance of public service delivery. The need to overcome this challenge was seen as especially critical in the context of the 2008 international economic crisis. Policy Area 4 - Human Resources Management 13. The policy goal was to strengthen and implement the institutional framework for human resource management. Focus was placed on establishing a more meritocratic and professional civil service. The main short-term actions were linked to strengthening the Public Administration Secretariat (Secretaría de la Función Pública - SFP). Medium-term objectives included reform of the current Civil Service Law (No. 1626/00) and the introduction of a civil service based on a merit-based career system. 1.5 Revised Policy Areas N/A 4

13 1.6 Other significant changes 14. Originally conceived as the first in a series of three operations, PDPL1 supported fiscal management and public sector reforms. The series, under the FY09-FY13 Country Partnership Strategy (CPS), was to be executed sequentially from FY09 to FY11, with a tentative envelope of US$100 million for PDPL1, followed by two operations of US$50 million each i.e., PDPL2 and 3 accounting for nearly 40 percent of the indicative CPS envelope. The time taken to complete policy changes and actions and related triggers for PDPL 2 exceeded the maximum period allowed between PDPL operations; thus, PDPL 2 and 3 were cancelled. Despite this, PDPL1 conditions have been met; a significant proportion of triggers for PDPL2 and 3 have been fulfilled; 2 programmatic medium-term outcomes have been largely achieved; and a selfstanding DPL that builds upon the series of PDPL is currently under preparation. 15. The delays in completing PDPL2 triggers and the resulting formal cancelation of PDPL2 and 3 are attributable to both the program strategy and implementation challenges: The Program was built upon an ambitious strategy. Both the Government and the Bank decided to adopt an ambitious strategy for the design of the program, particularly for the fulfillment of the ambitious triggers of PDPL2 in the area of SOEs, with a view to incentivize outcome achievements and mitigate risks of reform fatigue and institutional constraints. The intention of both the Government and the Bank was to generate an effective impact on the results of this budget assistance program. Actual delays for PDPL2 were attributable to two SOE related triggers that could not be fulfilled before On the one hand, the Government experienced resistance against the regular publication of independent financial audits of SOEs. On the other, it needed to build a strong consensus within the executive to consider the relevance of adopting a law defining the new institutional framework before submitting it to Congress. In absolute terms, the duration of the SOE oversight reform has been reasonably short. As a comparison, the introduction of similar SOE oversight reforms in France and the United Kingdom took two and four years respectively. 3 In Ukraine, after five years of reform, there seems to be no effective government coordinating agency for SOE oversight. 4 Retrospectively this approach worked and a challenging reform of SOE oversight was accomplished in a relatively short period of time. It is likely that with a less ambitious matrix (in terms of time), the push for reform would have faded after some progress, and significant outcomes in SOEs oversight would not have been achieved. Reform delays are also attributable to Paraguay s structural governance constraints. The legislative branch has a strong role within Paraguay s power structure, including attributions more usually held by the Executive. The scope of legislative powers, compounded with party fragmentation in Congress significantly undermined overall Government effectiveness, especially given the Executive s ability to embark on reform initiatives. Therefore, submitting new legislation required building strong consensus. Finally, given the 2010 impressive economic recovery, the Government preferred to delay the PDPL as a counter-cyclical fiscal measure. Paraguay s economy grew at an impressive rate of 15 percent in 2010, and once most PDPL2 triggers had been fulfilled (at 2 See Annex 8 of the present ICR. 3 OECD (2005). Corporate Governance of State-Owned Enterprises: A Survey of OECD Countries. 4 Bank source. 5

14 the end of 2010), the Government decided to adapt the planning of budget assistance to the new economic conditions. 2. Key Factors Affecting Implementation and Outcomes 2.1 Program Performance PDPL1 (Tranche 1) Amount Expected Release Date Actual Release Date Release Single Tranche US$100 million August 26, 2009 August 26, 2009 Regular PDPL1/Tranche 1 List of conditions from Legal Agreement/ Program Document 1. Government has derogated the provision that allowed big landowners to use what they paid for VAT as fiscal credit against the agricultural income tax. 2. Government has adopted decree to designate exporters and large businesses as withholding agents of the VAT. 3. Government has (i) issued a decree to upgrade the Office of the Executive s Internal Auditor (AGPE) to ministerial level, and to give AGPE the authority to establish a standard internal control model (MECIP) also to determine the criteria for the selection of internal auditors throughout the Central Administration; and (ii) adopted the MECIP as the internal control model to be used by all public sector entities. 4. Government has issued a decree to establish a Council for State-owned Enterprises (CEP) to ensure, inter alia, (i) public sector oversight of SOEs, and (ii) the definition of a Government policy for SOE reform. 5. Ministries of Finance, Public Works and Industry and Trade, and the State Attorney s Office have signed an inter-institutional agreement, defining strategic areas to improve the corporate governance structure of SOEs. 6. Ministry of Finance maintains, in the 2009 Financial Plan, the increased proportion of social spending (including for social safety net programs) over total Central Administration expenditures mandated in the 2009 budget (as compared to the 2008 budget), focusing on financing social programs that have proven efficient and equitable. 6 Status 16. The Government has met all the conditions for PDPL1 as described in the Program Document. Project implementation and disbursement took place smoothly and without any major issues. Those conditions are: The Government has derogated the provision that allowed big landowners to use what they paid for VAT as fiscal credit against the agricultural income tax. This has eliminated significant distortions in the tax system caused by VAT credits for large land owners. In addition, a more technically robust Under-Secretariat of State Taxes (SET) has implemented a series of measures, including tightened fiscal controls and more extensive tax retention mechanisms, that have effectively helped reduce tax evasion and non-compliance. Using Decree 1164 (2008), the Government has designated exporters and large businesses as withholding agents of the VAT. This has significantly strengthened the tax administration by increasing the number of withholding agents for VAT from 98 to 754 between 2008 and 2011, in particular in areas where tax evasion is most rampant, and enhancing SET s detection of fraud and tax non-compliance. The Government has undertaken a series of actions to develop an internal control system in Paraguay. The Office of the Executive s Internal Auditor (AGPE) was upgraded through a decree to ministerial level to give it the authority to establish a standard internal control model and to determine the criteria for the selection of internal auditors throughout Met Met Met Met Met Met

15 the Central Administration. Consequently, the AGPE has adopted the internal control model MECIP (Modelo Estándar de Control Interno para las Entidades Públicas del Paraguay) as the model to be used by all public sector entities and sustained progress is being made toward its implementation at the institutional level. The Government has established an effective institutional framework for oversight of SOEs. This was achieved by issuing a decree to establish a Council for State-owned Enterprises (CEP) to ensure public sector oversight of SOEs. Some of the specific outcomes include annual external audits of SOEs and their publication, which constitutes a significant step toward enhanced transparency and accountability. This, together with the implementation and ongoing monitoring of results-based management contracts, is expected to bring about improvements in the SOEs financial performance and service delivery over the medium and long term. There are already some indications of these improvements, including significant reductions in current expenditures in the state oil company, PETROPAR, and an increase in capital expenditures as a proportion of total expenditure in the state-owned electricity company, ANDE. The Ministries of Finance, Public Works and Industry and Trade, and the State Attorney s Office have defined strategic priorities for SOE corporate Governance. This was achieved by signing an inter-institutional agreement defining those strategic priorities. The Ministry of Finance has kept the increased proportion of social spending (including for social safety net programs) over total Central Administration expenditures in the 2009 Financial Plan. This spending was mandated in the 2009 budget (as compared to the 2008 budget). Social expenditures, specifically education, health, housing, social promotion and protection, increased both in absolute terms and as a proportion of total expenditures during the period with respect to the average. The 25 percent increase in 2009 is particularly noteworthy, as it helped contain the impact of the financial crisis. 17. In 2010, while preparing PDPL2, the Government fulfilled a significant proportion of triggers for PDPL2 and PDPL3. In November 2009, after the execution of PDPL1, the preparation of PDPL2 was initiated in parallel with the implementation of a Bank-funded Non- Lending Technical Assistance (NLTA) and a Trust Fund Project, both supporting the Government Action Plan. These Technical Assistance activities and the sequencing framework provided by the PDPL Matrix contributed to fulfilling a significant proportion of Triggers for PDPL2 and PDPL3, as shown in Annex 8. This provided clear impetus for building-up a consensus around the main priorities for the reform of the framework for oversight of SOEs, and for overcoming resistance to enhanced transparency of SOEs financial statements. However, given that the time to fulfill these triggers exceeded the maximum period allowed between PDPL operations, PDPL2 and PDPL3 were cancelled and a self-standing DPL that builds upon the series of PDPL is currently under preparation. 2.2 Major Factors Affecting Implementation 18. Several factors affected implementation, in addition to those identified during appraisal. Some of the risks, including the prevalent international financial crisis, the fragmentation of the Government s political alliance, weak technical capacity, and poor interinstitutional coordination, were adequately envisioned at appraisal and effectively mitigated. Other factors affecting implementation, including those causing the delays in PDPL2 and PDPL3, are described below: 7

16 Calculated risk regarding the scope of SOE reforms: It is important to point out that the delays and eventual cancellation of the PDPL2 and 3 were the result of a strategic decision taken by the Bank and the Ministry of Finance to push for ambitious reforms in the SOE sector. It was mutually agreed to link SOE-related policy changes to PDPL2 to help maintain the momentum toward reform and enhance the visibility of the reforms. While this decision had a positive impact in terms of the implementation of these policies, it generated delays in the implementation of PDPL2 beyond the maximum period allowed between DPL operations. Need to build consensus over public sector priorities and reform strategy in tax systems and administration and internal control: Project preparation built upon the extensive sector work conducted by the Bank and other donors. This sector work, in turn, helped build consensus for the priorities for public sector reform. In addition, the Bank worked closely with the outgoing authorities in the Ministry of Finance to jointly identify the main challenges ahead, and Bank Policy Notes were prepared for the incoming administration. The Bank and the Government also organized grant-financed activities and workshops aimed at generating legislative and public opinion consensus around the need for reform. As a result of consensus building and the sustained reform efforts that had been in place for over a decade, reforms related to tax administration and internal financial controls exhibited significant maturity. As indicated in Section 1.6 (Other significant Changes) time to reform SOE oversight was longer than formally foreseen by the Program design: SOEs in the Paraguayan economy account for roughly 10 percent of GDP or 30 percent of country public expenditure. SOEs also play a critical role in the provision of basic services, including electricity, water and gas distribution. Given their poor service delivery performance, their lack of financial and managerial transparency, and the ineffective institutional settings for managing the substantial share of SOE public expenditures, the Government acknowledged the need to enhance oversight of their performance. However, the development of an adequate SOE oversight framework in such an institutional context was complex and required capacity building; implementation of institutional mechanisms and decision-making processes between the SOE Council and the Directorate of SOE Monitoring. The implementation of this reform also faced not unexpected resistance from SOEs that had previously benefited from significant discretionary management practices, coming from the lack of effective state oversight, and transparency mechanisms such as the publication of audited financial statements. For example, PETROPAR, the largest and most powerful SOE, posed resistance to having its financial statements externally audited. At the same time, the Government focused on ensuring the sustainability of the newly established institutional framework for SOE oversight through the development of a supporting legal framework. However, the consensus-building process around the new legislation took longer than planned. Over-ambitious civil service reform: In contrast with the other areas of reform, the civil service reforms envisioned under the PDPL program proved to be highly challenging and over-ambitious in a political sense. In practice, the PDPL was designed to introduce substantive civil service reform initiatives during the phases of PDPL2 and 3 which were cancelled. Consequently, despite the efforts of the SFP to increase the professionalization of the civil service and the significant progress made in terms of the number of merit-based promotions and recruitments, these are still not obligatory. Challenges such as these reveal the difficulty of coordinating inter-ministerial policies in the context of Paraguay s governance and as such, reforms to the civil service are still pending and any achievements made under this operation could be easily reversed. 8

17 Strong sense of Government ownership: The ownership of the project on the part of the Ministry of Finance led directly to the achievement of PDOs; fostered the country s dialog on development priorities; and made it possible to adapt to changes in internal and external factors that were affecting the program s implementation. Sustained engagement on the part of the Bank in Paraguay: As in most countries, Paraguay s path toward reform has been long and uneven. Some pieces of legislation that are the cornerstone of the reform process were approved a decade ago, including the Financial Administration Law (1999) and the Tax Reform Act (2004). Likewise, the reforms supported under the 2003 Economic Recovery Adjustment Loan (Loan No PA) and the 2005 Financial Sector Adjustment Loan (Loan No PA) provided the foundation for reforms supported under DPL I. Although momentum for reform subsided during the late 2000s, the Bank continued its engagement with Paraguay s Ministry of Finance through fiduciary assessments and other non-operational tasks. This sustained engagement made it possible for the Bank to respond quickly and effectively to the new administration s request for support of its reform program under PDPL Monitoring and Evaluation (M&E) Design, Implementation and Utilization Monitoring and Evaluation (M&E) Monitoring and Evaluation (M&E) Design Overall, the DPL program benefited from a strong M&E system, with clearly defined triggers for PDPL3&4 and a robust set of medium-term outcomes (Key Outcome Indicators). Only three Key Outcome Indicators exhibited some limitations: The number of Tekoporá beneficiaries was not subject to external verification; Two tax indicators i.e., reductions in IMAGRO credits and the number of VAT retention agents were expressed in terms of their estimated impact as a percentage of GDP. A more objective definition would have been preferable. The percentage of recruitments and promotions that were conducted using merit-based criteria could not be determined, as centralized data on the total number of recruitments and promotions does not exist. Monitoring and Evaluation (M&E) Implementation The Bank regularly monitored progress under the PDPL series through periodic CPS implementation reviews and Bank supervision missions. The Ministry of Finance, the main counterpart agency for the loan, provided effective overall monitoring and evaluation of the loan and collected the data needed to assess implementation progress from agreed sources. Monitoring and Evaluation (M&E) Utilization The M&E system proved useful as a basic pulse-taking tool to assess progress toward implementation of both the PDPL series as well as the Government s Plan. 2.4 Expected Next Phase/Follow-up Operation (if any) 19. A free-standing DPL focusing on Public Sector Reforms is currently being prepared. This new operation will build on the achievements of the most successful policy areas of the PDPL series. However, there are significant differences between the two operations. On the one hand, Paraguay experienced economic improvements subsequent to the international crisis. This has allowed the Government to concentrate more on public sector reforms while the PDPL series was aimed at both public sector reforms and equitable fiscal management of the crisis. On the other hand, the Government is more pragmatic vis-a-vis inter-ministerial coordination, and is more strategic in selecting a limited number of policy areas with more effective results and higher impact. 9

18 3. Assessment of Outcomes 3.1 Relevance of Objectives, Design and Implementation 20. The objectives of the PDPL series continue to be consistent with those of the Government as well as the Bank. Specifically: PDPL1 directly supported the priorities outlined by the Government in its Strategic Economic and Social Plan, which is still the roadmap for the Lugo administration. PDPL1 also supported the Government s Anti-Crisis Plan, which was effective in providing the fiscal room necessary to pursue the Government s Plan. The PDPL series constituted the centerpiece of the Country Partnership Strategy (CPS). The three cross-cutting themes addressed by the CPS program i.e., governance, poverty reduction, and equitable growth received support under the PDPL series and still remain key country priorities in The PDPL series was grounded in extensive sector work, which helped ensure its relevance. 3.2 Achievement of Program Development Objectives 21. PDPL1 has largely achieved its PDO and medium-term outcomes in three of the four policy areas it supported. In Policy Area 1, it has contributed to: i) improving revenue collection and the equity of the tax system. In Policy Area 2, the operation has contributed to: i) improving the effectiveness of the Central Administration s internal and financial control; and ii) strengthening the oversight of SOEs to ensure their sound and transparent financial management. In Policy Area 3, the operation contributed to protecting budgetary allocations for social and capital expenditures during the financial crisis, while marginally enhancing their overall efficiency and equity. While some progress was made in the professionalization of the civil service under Policy Area 4, the task ahead in this arena remains considerable. 22. The level of achievement of the PDPL1 is particularly noteworthy considering that the medium-term outcomes were programmed for , taking into consideration the implementation of the PDPL2 and 3. As noted earlier, these operations were eventually canceled due to delays in the implementation of the reforms related to enhanced SOE oversight and a decision on the part of the Government to focus more narrowly on a limited number of high-impact policy areas under the orbit of the Ministry of Finance within a separate selfstanding DPL operation. However, their cancellation did not preclude the implementation of the core programmed reforms albeit with some delays in the case of SOE oversight. As a result, medium-term outcome indicators for the programmatic series have been largely achieved. Policy Area 1 - Tax System PDO 1 To improve revenue collection and the equity of the tax system Rating: Satisfactory 23. The Government has continued to move toward a more efficient and effective tax administration and a more equitable tax system, a process that was set in motion in the 10

19 early 2000s. Significant distortions in the tax system have been eliminated, such as VAT credits for large land owners. In addition, a more technically robust Under-Secretariat of State Taxes (SET), has implemented a series of measures, including tightened fiscal controls and more extensive tax retention mechanisms, that have effectively helped reduce tax evasion and noncompliance. The successful implementation of these measures resulted in a remarkable increase in tax collections, both in absolute terms and as a proportion of GDP, even during the financial crisis. All the Key Outcome Indicators associated with this PDO have been largely achieved or exceeded (see Annex 7 Policy Matrix). Policy Framework 24. The tax system experienced important improvements over the last decade. First, the Administrative Reorganization and Fiscal Adjustment Law, which was approved in 2004, set the stage for important changes in Paraguay s tax system, including the adoption of the Personal Income Tax (IPR), and a more effective tax administration. In 2006, the Under-Secretariat of State Taxes (SET) initiated aggressive modernization of its tax administration system, including process re-engineering; the design and implementation of a new information management system; organizational restructuring and human resources strengthening. 25. As part of the reform program supported under PDPL1, the Government s goal was to continue to gradually improve revenue collection and the equity of the tax system. An important change was the introduction of modifications to the existing tax system to eliminate distortions, such as those exceptions which allowed big landowners to deduct Value Added Tax (VAT) payments from the agricultural income tax (IMAGRO) and making the IRP permanent. Although the latter had been introduced by law in 2004, its implementation was postponed by Congress. Another significant improvement was the strengthening of the tax administration by increasing the number of withholding agents for VAT, focusing on large taxpayers mainly exporters and enhancing SET s detection of fraud and tax non-compliance. Major Actions Implemented 26. In 2008, Decree 238 contributed to the reduction of tax distortion. It eliminated the exception, which allowed owners of large real estate properties to treat money paid in consideration of VAT for goods and services acquired to be used in connection with the agricultural activity of the relevant property as a deductible expenditure from their agricultural income tax. Conversely, the permanent adoption of the IRP is still pending, as its adoption continues to be postponed by Congress. 27. Tax administration has been strengthened through institution-building measures, the adoption of decrees expanding their control capacity, and enhanced enforcement. First, SET s institutional capacity has been substantially strengthened, as both budgetary and personnel resources have been assigned to the SET to endow it with the institutional and technical capacity needed for an efficient and effective tax administration. Second, Decree 1164 (2008) designated exporters and other large businesses as VAT withholding agents. As a result, the number VAT withholding agents increased from 98 to 754 between 2008 and 2011, amply exceeding the 144 that were originally anticipated. Third, Article 194 from Law N 2421 (2004) was implemented, which requires that individuals present a Tax Compliance Certificate to apply for passports, mortgages, purchase of vehicles, etc. The number of certificates issued increased from zero in 2008 to 122,000 and 280,000 in 2009 and 2010, respectively. Fourth, SET has strengthened its 11

20 focus on detection of tax fraud and non-compliance. This is illustrated, for example, in the increased number of large taxpayers subject to audits and internal controls, which quadrupled from 20 to 81 between 2008 and Finally, substantial efforts have been made on the part of both the SET and the Ministry of Industry and Commerce to increase monitoring of maquila industries by adopting enhanced reporting instruments (i.e., Form 107) and also by implementing more intense internal controls and verifications, which increased from zero to 49 maquila internal controls between 2008 and Table1: Summary of Medium-Term Outcomes for Tax System Policy Area 1. Tax System Major Actions Implemented Number of internal controls for maquila industries Number of audits targeting large taxpayers (*) Number of VAT withholding agents Number of Tax Compliance Certificates issues 0 122, ,105 Achieved Outcomes Tax revenues / GDP Number of taxpayers 471, , ,944 Tax revenues from maquila industries (G$ Millions) 1,226 1,833 3,310 Tax revenues from maquila industries as a proportion of 0.014% 0.02% 0.03% overall tax revenues (%) VAT revenues collected through withholding agents Amount (G$ million) 97, , ,579 As % of GDP 0.13% 0.63% 0.84% Granted vis-à-vis requested tax credits (G$ millions) 71% 49% 51% IMAGRO credits for VAT payments Amount (G$ millions) 659, , ,831 As % of GDP 0.89% 0.67% 0.42% (*) There were a total of 32 audits and 49 internal controls in Note: Shaded cells denote Key Outcome Indicator included in the Policy Matrix. Source: SET (2011) Target Value (PDPL) Key Outcomes 28. The process of tax reform and modernization that began in 2004 has continued to make sustained progress between 2008 and 2011, as reflected in a significant increase in both the tax base and tax revenues. Some of the specific outcomes include: Tax revenues increased as a proportion of GDP, from 11.5 percent in 2008 to 13.5 percent in 2010, exceeding the 12.8 percent anticipated for The number of tax payers has increased by over 18 percent between 2008 and Tax collection from maquila industries increased by a factor of 2.7 between 2008 and 2010, making it one of the fastest growing taxes in Paraguay. The increase in the number of VAT withholding agents by a factor of 7.7 between 2008 and 2010 had an estimated impact on the collection of VAT revenues equivalent to 0.84 percent of GDP in 2010, compared to an anticipated target of 0.15 percent. The ratio between granted and claimed tax credits (in G$ million) has decreased substantially, from 71 percent to 51 percent between 2008 and In absolute terms, the amount of granted tax credits decreased from G$275 million to G$188 during the same period equivalent to a 32 percent reduction.

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4582 Paraguay

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-80480) ON A LOAN IN THE AMOUNT OF US$ 100 MILLION TO TO THE THE REPUBLIC OF EL SALVADOR FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-80480) ON A LOAN IN THE AMOUNT OF US$ 100 MILLION TO TO THE THE REPUBLIC OF EL SALVADOR FOR A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR2743 IMPLEMENTATION COMPLETION AND RESULTS REPORT

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-76220) ON A LOAN IN THE AMOUNT OF US$4.4 MILLION TO THE UNITED MEXICAN STATES FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-76220) ON A LOAN IN THE AMOUNT OF US$4.4 MILLION TO THE UNITED MEXICAN STATES FOR A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00003027 IMPLEMENTATION COMPLETION AND RESULTS

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021272 Public Disclosure Authorized Public Disclosure Authorized Operation ID P159774 Country Fiji Operation Name Fiji Post-Cyclone Winston

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-7485) ON A LOAN IN THE AMOUNT OF US$24.8 MILLION TO THE REPUBLIC OF CHILE FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-7485) ON A LOAN IN THE AMOUNT OF US$24.8 MILLION TO THE REPUBLIC OF CHILE FOR A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00002270 IMPLEMENTATION COMPLETION AND RESULTS

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-78120, TF-95841) ON A LOAN IN THE AMOUNT OF US$20 MILLION TO THE REPUBLIC OF EL SALVADOR FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-78120, TF-95841) ON A LOAN IN THE AMOUNT OF US$20 MILLION TO THE REPUBLIC OF EL SALVADOR FOR A Public Disclosure Authorized Document of The World Bank Report No: ICR00003947 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-78120, TF-95841)

More information

Implementation Status & Results Guatemala Second Fiscal and Institutional Development Policy (P114373)

Implementation Status & Results Guatemala Second Fiscal and Institutional Development Policy (P114373) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Project Name: Implementation Status & Results Guatemala Second Fiscal and Institutional

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-80400) FOR A

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-80400) FOR A Public Disclosure Authorized Document of The World Bank Report No: ICR00003828 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-80400) FOR A

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-73020) ON A LOAN IN THE AMOUNT OF US$ 75.

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-73020) ON A LOAN IN THE AMOUNT OF US$ 75. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No:ICR0000353 IMPLEMENTATION COMPLETION AND RESULTS

More information

How many operations were planned for the

How many operations were planned for the Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 01/20/2016 Report Number: ICRR14887 Public Disclosure Authorized Public Disclosure Authorized Public

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL) Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18226 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES14735 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR

More information

Project Costs (US$M):

Project Costs (US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 10/05/2015 Report Number: ICRR14849 Public Disclosure Authorized Public Disclosure Authorized Public

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD IDA-47520) ON A LOAN/CREDIT IN THE AMOUNT OF US$4 MILLION / US$8 MILLION ST.

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD IDA-47520) ON A LOAN/CREDIT IN THE AMOUNT OF US$4 MILLION / US$8 MILLION ST. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-79190 IDA-47520)

More information

Document of The World Bank

Document of The World Bank Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-44000, TF-99140)

More information

Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4630 TF TF-96083) ON AN

Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4630 TF TF-96083) ON AN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: ICR00003680 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4630 TF-92396 TF-96083)

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID7125 Project Name Argentina-Special Structural Adjustment... Loan (SSAL)

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H2620) (IDA-4520) (IDA-46610) (IDA-47750) ON A GRANT AND THREE CREDITS

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H2620) (IDA-4520) (IDA-46610) (IDA-47750) ON A GRANT AND THREE CREDITS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H2620) (IDA-4520)

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-46500; IBRD-71410)

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-46500; IBRD-71410) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR0000629 IMPLEMENTATION COMPLETION AND RESULTS

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT Public Disclosure Authorized REPORT NO.: RES33563 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES

More information

The World Bank Income Support and Employability Project (P117440)

The World Bank Income Support and Employability Project (P117440) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN El Salvador Social Protection & Labor Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 13 ARCHIVED on 25-Aug-2016 ISR24843 Implementing

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-48290) ON A CREDIT IN THE AMOUNT OF SDR 49.6 MILLION (US$ 74.7 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-48290) ON A CREDIT IN THE AMOUNT OF SDR 49.6 MILLION (US$ 74.7 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-48290) Poverty

More information

September Preparing a Government Debt Management Reform Plan

September Preparing a Government Debt Management Reform Plan September 2012 Preparing a Government Debt Management Reform Plan Introduction Preparing a Government Debt Management Reform Plan The World Bank supports the strengthening of government debt management

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF Dec ,580,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF Dec ,580,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020620 Public Disclosure Authorized Public Disclosure Authorized Operation ID P147166 Country Haiti

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower Beneficiaries Implementing Agency Report No. PID10910 India-Andhra Pradesh Economic Reform... Loan/Credit South Asia Poverty Reduction and Economic Management

More information

Actual Project Name : Transitional Support Credit Country: Bangladesh US$M): Project Costs (US$M Sector Board : EP Cofinancing (US$M

Actual Project Name : Transitional Support Credit Country: Bangladesh US$M): Project Costs (US$M Sector Board : EP Cofinancing (US$M IEG ICR Review Independent Evaluation Group Report Number : ICRR13360 1. Project Data: Date Posted : 03/30/2010 PROJ ID : P110167 Appraisal Actual Project Name : Transitional Support Project Costs (US$M

More information

CPSCR Review Independent Evaluation Group

CPSCR Review Independent Evaluation Group For Official Use Only 1. CPS Data Country: Paraguay CPS Year: FY09 CAS/CPS Period: FY09 FY13 CPSCR Review Period: FY09 FY14 Date of this review: November 18, 2014 2. Executive Summary i. This review examines

More information

Mauritius First Public Sector Performance Development Policy Loan Region

Mauritius First Public Sector Performance Development Policy Loan Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6561 Operation Name Mauritius

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities Improving Public Expenditure Quality Program, SP1 (RRP VIE 50051-001) SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 Sector Road Map 1. Sector Performance,

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF056601) ON A MULTI DONOR TRUST FUND TF IN THE AMOUNT OF US$ MILLION EQUIVALENT TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF056601) ON A MULTI DONOR TRUST FUND TF IN THE AMOUNT OF US$ MILLION EQUIVALENT TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF056601) ON

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48650) ON A LOAN IN THE AMOUNT OF EURO 90.0 MILLION (US$ MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48650) ON A LOAN IN THE AMOUNT OF EURO 90.0 MILLION (US$ MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48650)

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H6200) ON A GRANT

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H6200) ON A GRANT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00002334 IMPLEMENTATION COMPLETION AND RESULTS

More information

Cofinancing (US$M): Monika Huppi Lourdes N. Pagaran IEGPS2

Cofinancing (US$M): Monika Huppi Lourdes N. Pagaran IEGPS2 Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14712 1. Project Data: Date Posted: 06/16/2015 Public Disclosure Authorized Public Disclosure Authorized Public

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-82210) ON A LOAN IN THE AMOUNT OF US$45.00 MILLION TO THE REPUBLIC OF PERU FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-82210) ON A LOAN IN THE AMOUNT OF US$45.00 MILLION TO THE REPUBLIC OF PERU FOR A Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-82210) ON A LOAN IN THE AMOUNT OF US$45.00

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47320) ON A LOAN IN THE AMOUNT OF US$ 9.

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47320) ON A LOAN IN THE AMOUNT OF US$ 9. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00002035 IMPLEMENTATION COMPLETION AND RESULTS

More information

The World Bank Income Support and Employability Project (P117440)

The World Bank Income Support and Employability Project (P117440) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN El Salvador Social Protection & Labor Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 12 ARCHIVED on 18-May-2016 ISR23512 Implementing

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Sep ,746,812.05

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Sep ,746,812.05 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021289 Public Disclosure Authorized Public Disclosure Authorized Project ID P121673 Country Romania

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD IBRD-74330) LOANS IN THE AMOUNTS OF US$86.

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD IBRD-74330) LOANS IN THE AMOUNTS OF US$86. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-73370 IBRD-74330)

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION AND RESULTS REPORT (LOAN NO 7829-MK, GRANT NO TF096329) FOR

FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION AND RESULTS REPORT (LOAN NO 7829-MK, GRANT NO TF096329) FOR Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: ICR00001958 IMPLEMENTATION

More information

Document of The World Bank FOR OFFICIAL USE ONLY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROGRAM DOCUMENT FOR A PROPOSED LOAN

Document of The World Bank FOR OFFICIAL USE ONLY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROGRAM DOCUMENT FOR A PROPOSED LOAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No. 52959-PY INTERNATIONAL BANK

More information

PROJECT INFORMATION DOCUMENT

PROJECT INFORMATION DOCUMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name: Region: Sector: Task Manager: Project ID Number: Borrower: Guarantor: Implementing

More information

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020731 Public Disclosure Authorized Public Disclosure Authorized Project ID P116080 Project Name EXPORT

More information

Document of The World Bank. Report No: ICR IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-83840, IBRD-85220) ON A SERIES OF TWO LOANS

Document of The World Bank. Report No: ICR IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-83840, IBRD-85220) ON A SERIES OF TWO LOANS Public Disclosure Authorized Document of The World Bank Report No: ICR00004253 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-83840, IBRD-85220)

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020665 Public Disclosure Authorized Public Disclosure Authorized Project ID P117440 Country El Salvador

More information

Operation Name Region Sector. Project ID Borrower(s) Implementing Agency

Operation Name Region Sector. Project ID Borrower(s) Implementing Agency Operation Name Region Sector Project ID Borrower(s) Implementing Agency PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3497 BR - RIO GRANDE DO SUL FISCAL SUSTAINABILITY LATIN AMERICA AND

More information

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR Economic Management Improvement Program (Subprogram 1) (RRP UZB 51350-001) SECTOR ASSESSMENT (SUMMARY): MULTISECTOR Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Public financial

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-51970) ON A CREDIT IN THE AMOUNT OF SDR MILLION (US$ 440 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-51970) ON A CREDIT IN THE AMOUNT OF SDR MILLION (US$ 440 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-51970) ON

More information

INTERNATIONAL DEVELOPMENT ASSOCIATION AND INTERNATIONAL MONETARY FUND REPUBLIC OF ARMENIA

INTERNATIONAL DEVELOPMENT ASSOCIATION AND INTERNATIONAL MONETARY FUND REPUBLIC OF ARMENIA INTERNATIONAL DEVELOPMENT ASSOCIATION AND INTERNATIONAL MONETARY FUND REPUBLIC OF ARMENIA Poverty Reduction Strategy Paper Second Progress Report Joint Staff Advisory Note Prepared by the Staffs of the

More information

I. Key development issues and rationale for Bank involvement

I. Key development issues and rationale for Bank involvement PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2491 Project Name Bangladesh Tax Administration Modernization Project Region SOUTH ASIA Sector Other industry (100%) Project ID P083781 Borrower(s)

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE ON A LOAN IN THE AMOUNT OF US$32.8 MILLION TO THE REPUBLIC OF GUATEMALA

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE ON A LOAN IN THE AMOUNT OF US$32.8 MILLION TO THE REPUBLIC OF GUATEMALA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE ON A LOAN IN

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Implementation Status & Results Brazil BR APL 1 Para Integrated Rural Dev (P082651)

Implementation Status & Results Brazil BR APL 1 Para Integrated Rural Dev (P082651) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR APL 1 Para Integrated Rural Dev (P082651)

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, 13.10.2011 COM(2011) 638 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE

More information

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351)

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351) LATIN AMERICA AND CARIBBEAN Dominican Republic Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Development Policy Lending FY 2018 Seq No: 1 ARCHIVED on 26-Jan-2018 ISR31220

More information

Central government administration (80%); Sub-national government administration (20%) Operation ID

Central government administration (80%); Sub-national government administration (20%) Operation ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE 31 March 2016 Report No.: AB7818 (The

More information

The World Bank Mauritania Public Sector Governance Project (P146804)

The World Bank Mauritania Public Sector Governance Project (P146804) Public Disclosure Authorized AFRICA Mauritania Governance Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 27-Feb-2018 ISR31581 Implementing Agencies: Ministry of Economy

More information

Recommendation of the Council on Good Practices for Public Environmental Expenditure Management

Recommendation of the Council on Good Practices for Public Environmental Expenditure Management Recommendation of the Council on for Public Environmental Expenditure Management ENVIRONMENT 8 June 2006 - C(2006)84 THE COUNCIL, Having regard to Article 5 b) of the Convention on the Organisation for

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 14 ARCHIVED on 21-Dec-2017 ISR30624 Implementing

More information

Document of The World Bank

Document of The World Bank Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT KINGDOM OF MOROCCO

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47910) ON A LOAN

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47910) ON A LOAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47910)

More information

CENTRAL BANK OF SOLOMON ISLANDS 2004 MONETARY POLICY STANCE STATEMENT. Issued by Governor of the Central Bank of Solomon Islands

CENTRAL BANK OF SOLOMON ISLANDS 2004 MONETARY POLICY STANCE STATEMENT. Issued by Governor of the Central Bank of Solomon Islands CENTRAL BANK OF SOLOMON ISLANDS 2004 MONETARY POLICY STANCE STATEMENT Issued by Governor of the Central Bank of Solomon Islands Mr. Rick N Houenipwela Honiara 8 th April 2004 - 2 Box 1. OBJECTIVES OF THE

More information

Statement by Olli-Pekka Lehmussaari, Executive Director for the Republic of Estonia June 30, 2000

Statement by Olli-Pekka Lehmussaari, Executive Director for the Republic of Estonia June 30, 2000 Statement by Olli-Pekka Lehmussaari, Executive Director for the Republic of Estonia June 30, 2000 Let me start by thanking the staff on behalf of my Estonian authorities and myself for their dedication

More information

Governance for Improved Service Delivery Region. Program-for-Results Program ID. Republic of Kenya Implementing Agency

Governance for Improved Service Delivery Region. Program-for-Results Program ID. Republic of Kenya Implementing Agency Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:PIDC0091373 (The

More information

REPORT 2015/174 INTERNAL AUDIT DIVISION

REPORT 2015/174 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/174 Audit of management of selected subprogrammes and related capacity development projects in the United Nations Economic and Social Commission for Asia and the Pacific

More information

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24 Internal Audit of the Republic of Albania Country Office January 2018 Office of Internal Audit and Investigations (OIAI) Report 2017/24 Internal Audit of the Albania Country Office (2017/24) 2 Summary

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-83730) ON A LOAN IN THE AMOUNT OF USD 100 MILLION TO THE FOR A.

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-83730) ON A LOAN IN THE AMOUNT OF USD 100 MILLION TO THE FOR A. Public Disclosure Authorized Document of The World Bank Report No: ICR00003402 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-83730) ON A LOAN IN THE AMOUNT OF USD 100

More information

Cofinancing (US$M): b.were the project objectives/key associated outcome targets revised during implementation? No

Cofinancing (US$M): b.were the project objectives/key associated outcome targets revised during implementation? No Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14890 1. Project Data: Date Posted: 02/16/2016 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Pakistan: Decentralization Support Program

Pakistan: Decentralization Support Program Validation Report Reference Number: PCV: PAK 2011-53 Program Number: 34328 Loan Numbers: 1935/1936/1937/1938 December 2011 Pakistan: Decentralization Support Program Independent Evaluation Department ABBREVIATIONS

More information

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Support to the Tax Administration Action summary This Action aims to support Montenegro in the process of fulfilling the EU preaccession

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

Practice Area(Lead) Social, Urban, Rural and Resilience Global Practice

Practice Area(Lead) Social, Urban, Rural and Resilience Global Practice Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020913 Public Disclosure Authorized Public Disclosure Authorized Operation ID P150751 Country Bolivia

More information

Country Practice Area(Lead) Additional Financing

Country Practice Area(Lead) Additional Financing Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021281 Public Disclosure Authorized Public Disclosure Authorized Project ID P149884 Project Name CF-

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-79160) ON A LOAN IN THE AMOUNT OF US$80 MILLION TO THE FOR A. June 27, 2017

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-79160) ON A LOAN IN THE AMOUNT OF US$80 MILLION TO THE FOR A. June 27, 2017 Public Disclosure Authorized Document of The World Bank Report No: ICR00004118 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-79160) ON A LOAN Public Disclosure Authorized

More information

IEG. ICR Review Independent Evaluation Group. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

IEG. ICR Review Independent Evaluation Group. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 05/26/2015 Report Number: ICRR14633 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H9370 AND IDA-D0830) FOR AN ECONOMIC GOVERNANCE REFORM OPERATION

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H9370 AND IDA-D0830) FOR AN ECONOMIC GOVERNANCE REFORM OPERATION Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized Public Disclosure Authorized Report No: ICR00004366 IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H9370 AND IDA-D0830)

More information

The World Bank Jamaica Strategic Public Sector Transformation (P146688)

The World Bank Jamaica Strategic Public Sector Transformation (P146688) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Jamaica Governance Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 28-Jun-2018 ISR32761 Implementing Agencies:

More information

PEFA Training. Dakar, Senegal January & February 1, #PEFA. PEFA Secretariat

PEFA Training. Dakar, Senegal January & February 1, #PEFA. PEFA Secretariat www.pefa.org #PEFA PEFA Training Dakar, Senegal January 30-31 & February 1, 2019 PEFA Secretariat Improving public financial management. Supporting sustainable development. INTRODUCTION Introductions Participant

More information

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue Technical Assistance Report Project Number: 46429-001 Capacity Development Technical Assistance (CDTA) April 2013 Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA AND IDA-53970) ON A SERIES OF TWO CREDITS

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA AND IDA-53970) ON A SERIES OF TWO CREDITS Public Disclosure Authorized Document of The World Bank Report No: ICR00004220 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-52150 AND IDA-53970) ON A SERIES OF TWO CREDITS

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Transport Global Practice IBRD/IDA Development Policy Lending FY 2014 Seq No: 3 ARCHIVED on 02-Jan-2015 ISR17516 Implementing Agencies: Public

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Productive Initiatives For Solidarity Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Productive Initiatives For Solidarity Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5534 Project Name Productive

More information

Cofinancing (US$M): c. Policy Areas: The policy areas included into the Program Document of the FIRM DPL were the following:

Cofinancing (US$M): c. Policy Areas: The policy areas included into the Program Document of the FIRM DPL were the following: Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 03/25/2015 Report Number: ICRR14675 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1.Name of the Project Country: Ukraine Project: Economic Reform Development Policy Loan (Ⅱ) Loan Agreement: December 4, 2015 Loan Amount: JPY

More information

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435)

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Water Global Practice Requesting Unit: EACVF Responsible Unit: GWA02 IBRD/IDA Program-for-Results Financing FY 2013 Team Leader(s): Lilian Pena

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT THE PUBLIC EXPENDITURE POLICY BASED GUARANTEE OF EUR155 MILLION

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT THE PUBLIC EXPENDITURE POLICY BASED GUARANTEE OF EUR155 MILLION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT ON Report No:

More information

El Salvador. 1. General trends. 2. Economic policy. Most macroeconomic indicators for El Salvador worsened in Real GDP increased by

El Salvador. 1. General trends. 2. Economic policy. Most macroeconomic indicators for El Salvador worsened in Real GDP increased by Economic Survey of Latin America and the Caribbean 2008-2009 173 El Salvador 1. General trends Most macroeconomic indicators for El Salvador worsened in 2008. Real GDP increased by 2.5%, two percentage

More information

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof, L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF-A Jun ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF-A Jun ,000,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020814 Public Disclosure Authorized Public Disclosure Authorized Operation ID P156865 Country West Bank

More information

Jordan Country Brief 2011

Jordan Country Brief 2011 Jordan Country Brief 2011 CONTEXT The Hashemite Kingdom of Jordan is an upper middle income country with a population of 6 million and a per-capita GNI of US $4,390. Jordan s natural resources are potash

More information

Country Practice Area(Lead) Additional Financing Afghanistan Governance P150632,P150632

Country Practice Area(Lead) Additional Financing Afghanistan Governance P150632,P150632 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021292 Public Disclosure Authorized Public Disclosure Authorized Project ID P120427 Project Name AF: ARTF-Public Fin. Mgmt. Reform II Country

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-42250)

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-42250) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR574 IMPLEMENTATION COMPLETION AND RESULTS REPORT

More information

Actual Project Name : Mn - Sustainable Livelihoods Country: Mongolia US$M): Project Costs (US$M

Actual Project Name : Mn - Sustainable Livelihoods Country: Mongolia US$M): Project Costs (US$M IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 10/29/2008 Report Number : ICRR12989 PROJ ID : P067770 Appraisal Actual Project Name : Mn - Sustainable Project Costs (US$M US$M):

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-94240) ON A GRANT. IN THE AMOUNT OF US$ Million TO THE SOCIALIST REPUBLIC OF VIETNAM FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-94240) ON A GRANT. IN THE AMOUNT OF US$ Million TO THE SOCIALIST REPUBLIC OF VIETNAM FOR A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00003046 IMPLEMENTATION COMPLETION AND RESULTS

More information

INDEPENDENT EVALUATION GROUP UKRAINE COUNTRY ASSISTANCE EVALUATION (CAE) APPROACH PAPER

INDEPENDENT EVALUATION GROUP UKRAINE COUNTRY ASSISTANCE EVALUATION (CAE) APPROACH PAPER Country Background INDEPENDENT EVALUATION GROUP UKRAINE COUNTRY ASSISTANCE EVALUATION (CAE) APPROACH PAPER April 26, 2006 1. Ukraine re-established its independence in 1991, after more than 70 years of

More information

The World Bank Palestinian Recovery & Development Plan MDTF (P110690)

The World Bank Palestinian Recovery & Development Plan MDTF (P110690) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA West Bank and Gaza Recipient Executed Activities Adaptable Program Loan FY 2008 Seq No: 6 ARCHIVED on 21-Mar-2017 ISR27335 Implementing Agencies:

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Country Partnership Strategy: Papua New Guinea, 2016 2020 Sector Road Map SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1. Sector Performance, Problems, and Opportunities 1. Strengthening public

More information

Assessment of reallocation warrants in Tanzania

Assessment of reallocation warrants in Tanzania ANALYSIS OF REALLOCATION WARRANTS Final report: Assessment of reallocation warrants in Tanzania July 2014 Scanteam: Team leader Torun Reite and team member Erlend Nordby ANALYSIS OF REALLOCATION WARRANTS

More information

Second Public Financial Management Capacity Strengthening Project (P151492)

Second Public Financial Management Capacity Strengthening Project (P151492) AFRICA Somalia Governance Global Practice Recipient Executed Activities Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 05-Nov-2018 ISR34381 Implementing Agencies: Ministry of Finance, Puntland,

More information