1 ACTION FICHE FOR INDONESIA 1. IDENTIFICATION Title/Number EU-Indonesia Trade Support Programme II DCI-ASIE/2008/20069 Total cost Aid method / Method of implementation DAC-code EC contribution: Government contribution (in-kind) : Project approach partly decentralised management Ministry of Trade of Indonesia Sector Trade Policy and Administrative Management Trade Facilitation 2. RATIONALE 2.1. Sector context The Government of Indonesia's (GoI) policy direction stated in the Mid-Term Development Strategy (MDTS) , includes within its priorities the improvement of the environment for exports, through export promotion and supporting services, upgrading international trade diplomacy capacity and trade facilitation measures. Indonesia is a country open to foreign trade, but its 30 % exports-to-gdp ratio of 2007 is still relatively low compared to similar rates for ASEAN as a whole and for regional competitors. A number of issues impede the realisation of Indonesia's trade openness potential: The lack of a properly defined trade strategy and timeframe for trade policy adjustments. Moreover, there is little co-ordination between stakeholders (Ministries at central level, local authorities, business sector, donors) in the definition of these strategies/policies Insufficient concentration of efforts in competitive export sectors Weak export promotion and export supporting services High costs and delays in the transportation and import/export clearance process Difficulties in meeting international requirements in technical and phytosanitary standards Low technical skills in SMEs in export and marketing matters Low productivity (lack of capital investment and low labour skills) compared to competing countries EN 1 EN

2 The key problems identified which prevent a further integration of Indonesia into the international trade system can be summarised as follows: a) Trade Policy: The Government faces challenges in the formulation process of trade policy. There is a need for an effective policy framework and process, in line with new political and economic realities of Indonesia, and the need to support this framework through a coherent trade development strategy (competitiveness, key products / markets / outlook / competitors, relation with the actual situation of the productive sector, etc). Capacity constraints within the Ministry of Trade are a key factor affecting this state of affairs. Apart from a general shortage of staff and a generation gap between senior and junior levels, there is a need for training in formulation of trade policy, knowledge about international trade issues, trade impact analysis and research skills, and general management. This training has to be accompanied by an effort to build institutional capacity within the Ministry to make sustainable the actual training provided (training centres, career and competency development plans, etc). None of these basic elements are sufficiently developed at present. Problems go beyond the sphere of the Ministry. No less than fifteen Government agencies with responsibilities over trade policy decisions were identified during the identification phase. Most of them have insufficient capability, knowledge and organisational capacity to address the new challenges in the trade agenda. In addition, co-ordination between these government agencies, private sector and civil society in trade policy formulation is not optimal. b) Export Quality Infrastructure (EQI): The export quality infrastructure system comprises export quality management and control, standardisation, inspections and certification, rapid alert systems and market surveillance. The Trade Support Programme I ( ) has supported the identification, adaptation and dissemination of EU technical standards to the local industry, together with the improvement of quality control processes and sanitary/phytosanitary compliance of Indonesian exports. Despite progress observed in the capacity of competent authorities, much still needs to be done, as it has been expressed by the agencies interviewed. The fragmentation of responsibilities of public institutions in charge of export quality issues in Indonesia, the lack of an integrated road map for improvement and the insufficient interaction between these public institutions and the representatives of the business community are all factors hindering the access of Indonesian quality exports to the international markets. The fisheries sector is a case in point. Activities conducted through the TSP I such as the reinforcement of inspection regulations, training of inspectors and industry, provision of equipment and setting up of quality management process at the competent authority may have had an impact in the reduction of rapid alerts registered at the EU border. This model of support is applicable to other sectors of the Indonesian exporting industry. EN 2 EN

3 c) Export capacity of business associations and SMEs Whereas big business groups such as those involved in the production and distribution of energy resources and commodities are well positioned to export their products, Indonesian SMEs still struggle to internationalise its operations due to poor general management and export skills, insufficient knowledge of foreign markets, lack of understanding of international standards and safety requirements and insufficient access to finance. These SMEs are not well supported by their sector associations, which in general lack the level of technical knowledge and organisational capacity to provide relevant services to their members. Moreover, there is insufficient co-ordination between business associations and government agencies when it comes to promoting export development Lessons learnt The design of the programme draws on the experience and lessons learned of related past projects. In this respect, the evaluation of the EU-Indonesia Trade Support program I ( ) has shown positive results in terms of capacity strengthening for agencies involved, establishing of relationships with international counterparts (particularly quality control laboratories) and interaction with the private sector. In particular the achievements of the TSP I have been: Under component 1 WTO Capacity Building, the training of a core group of staff of the MoT and Kadin on international trade topics, resulting on the production and public presentation of research policy papers Under Component II Harmonisation of Standards with EU Practices, the setting up of strengthened management, IT and human resources systems within BSN, identification and adaptation of EU standards, and the dissemination of these standards to the local industry Under Component III Ministry of Industry Institutes, the improvement to international standards of testing and laboratory management practices in six institutes, establishment of twinning contacts with EU laboratories and the adoption of strategies to approach the local industry Under Component IV Ministry of Fisheries, the setting up of quality management structures within the Ministry, strengthening inspection regulations and capacity, deployment and use of new specialised equipment and dissemination of good management practices to the industry, all contributing to a significant reduction in rapid alerts on seafood exports to the EU The TSP I evaluation confirms the commitment and ownership demonstrated by the implementing agencies involved, but nevertheless concludes that the need for traderelated capacity building in Indonesia is still important. The programme was structured along four different components integrated under the guidance of the MoT, and did not include a strategic view of the issues at stake in the broad context of export development in Indonesia. In order to make further support effective and avoid the risk of channelling EU funding in an uncoordinated manner to the many agencies involved, it is advisable to rely on a clarification of the EQI institutional arrangement and the definition of a road map for improvement in order to prioritise areas and agencies for support. EN 3 EN

4 Preliminary recommendations also include the separation of trade infrastructure and trade development aspects in the design of future programmes; and the provision of a longer timeframe for implementation. The evaluation also suggested reconsideration of the decentralised management approach in view of the challenges encountered on its implementation. The GoI, however, has indicated its preference for a continuation of this approach, arguing that it better ensures Beneficiary's ownership and an alignment with the Paris Declaration on Aid Effectiveness Complementary actions At a regional level, the APRIS II Programme aims to further the process of ASEAN integration, with specific focus on supporting the realisation of the ASEAN Economic Community (AEC). APRIS II is divided into five Components, one of them covering regional standards and conformance. Besides institutional support to harmonization and coordination in the field of standards, APRIS has thematic entry points on cosmetics, electronics/electrical appliances and food security (development of testing methods, training on GMP and HACCP principles). Even though the two projects differ in objectives and scope, it is necessary to ensure that the activities in support of the improvement of Indonesian EQI are in line with the priorities defined for this field at the ASEAN level. Initiated by DG SANCO in cooperation with Thailand MoA ACSF national bureau, the ASEAN Rapid Alert System for Food and Feed aims at developing an information network between competent authorities (CA) in the region. Both TSP II and ASRAFF programmes show synergies and it is advisable to consider activities to support the development of such a rapid alert system in Indonesia as that would increase the level of confidence of EU countries about Indonesia agro-food products, and contribute to the clarification of institutional arrangements governing EQI. It will be necessary to ensure a link between the support to trade policy envisaged in the programme, directed primarily to the improvement of the export quality infrastructure, with other elements of an integrated trade policy to be covered by the recently established multi-donor trust fund in trade and investment policy, administered by the World Bank. The Dutch Government has already contributed to the Fund and DFID is considering its participation. The EC notes its interest to contribute in the future to the multi-donor trust fund, in full cooperation with other participating donors Donor coordination Donor co-ordination in the trade area has been affected by the dismantling of the Investment Climate Working Group of the Consultative Group of Indonesia at the end of Ad-hoc donor co-ordination fora, meeting on a quarterly or semi-annual basis, were organised by the Ministry of Trade during to discuss capacity building needs, but no formal arrangement has been established. The co-ordination of the Programme with other donors' activities will be pursued by the Delegation's future contribution and participation in the Steering Committee of EN 4 EN

5 the trust fund on Trade and Investment Climate. The Indonesian planning agency Bappenas will take an active role in ensuring this co-ordination. 3. DESCRIPTION 3.1. Objectives The objectives of the Programme support the achievement of the Millennium Development Goals (MDGs), particularly the objective to "develop further an open trading and financial system that is rule-based, predictable and non-discriminatory", through the focus on the facilitation of the Indonesian insertion into the international trade system. The Overall Objective of the EU-Indonesia Trade Support Programme II is to facilitate a further integration of Indonesia into the international trade system. The Specific Objectives of the Programme are: Improve co-ordination and transparency in the process for formulation and implementation of trade policy related to export development Upgrade the quality infrastructure that supports Indonesia's access to international markets 3.2. Expected results and main activities The Expected Results are: Improved GoI capacity to formulate and implement trade policy related to EQI Integrated and transparent trade policy processes for EQI Defined strategic road map for EQI enhancement Clarified institutional arrangements for EQI Strengthened standardisation and accreditation agencies, recognised internationally Upgraded export quality control and testing institutions, collaborating with international counterparts Better understanding and knowledge about international standards and quality requirements by Indonesian SMEs Improved export capabilities of SMEs, leading to increased exports in selected sectors The main components and activities of the programme are as follows: a) Component I: Policy Development: will pursue a cohesive legal, regulatory and institutional framework for the strengthening of the overall EQI system. It will support a MoT-led process to further strengthen export development and the specific role of EQI. Specific activities within this Component are: Technical assistance to analyse the constraints to export development for priority sectors, with a particular emphasis on EQI issues Provision of expertise to review trade policy processes across Ministries Provision of expertise to map the current institutional framework supporting the EQI system and to advise on its revision and clarification EN 5 EN

6 Provision of expertise to support the design of a strategic roadmap for EQI improvement Capacity building to identify and prioritise EQI areas and agencies for support, and define action plans for their improvement Training to strengthen the capacity of the Ministry of Trade (MoT) and relevant stakeholders to formulate trade policy for improvement of export development and quality infrastructure b) Component II: Institutional strengthening: the Component will provide technical assistance to the range of government institutions engaged on EQI and related activities. The support provided will be based on the strategic definition and prioritisation concluded in Component I. The assistance will focus on the following EQI activities and functions: Technical assistance to upgrade accreditation capability, leading to international recognition Training to improve quality and management systems for competent authorities, laboratories and certifying bodies Capacity building to strengthen certification bodies Technical assistance and provision of equipment to enhance quality of testing laboratories to reach international benchmarks Technical assistance and provision of equipment to improve metrology and calibration services Capacity building to strengthen competent authorities in areas such as SPS, monitoring of residues, market surveillance, inspection services, rapid alert systems Technical assistance to enhance capacities in areas related to Technical Barriers to Trade (TBT) such as New Approach, Global Approach to conformity assessment, REACH regulation, ISO standards and UN-ECE standards in the automotive sector Workshops and seminars to increase access of Indonesian SMEs to up-to-date technical conformity assessment and recognised testing and certification bodies, through dissemination and marketing activities Pilot programmes led by MoT and including relevant government agencies, business associations and their members, to strengthen export capacity in priority sectors 3.3. Risks and assumptions Assumptions: Continuous commitment of the present and future GoI to the economic reform process leading to a further integration into the world economy Risks and suggested mitigation actions: Risk: lack of integration and unclear roles and responsibilities in the Indonesian EQI system. Mitigation actions: (1) The SC includes all relevant parties involved in this system; (2) the programme includes as initial activities the definition of a road map for improvement of export quality infrastructure and the clarification of the institutional arrangements which would support the prioritisation of support activities at agency level EN 6 EN

7 Risk: insufficient capacity within the MoT to undertake necessary leadership in the programme. Mitigation actions: (1) the application of the decentralised management approach ensures a firm commitment from the MoT to drive the programme; (2) technical assistance will be available for MoT to support implementation Risk: application of decentralised management approach could mean delays and work overload for Beneficiary. Mitigation actions: (1) as above, technical assistance in financial and administrative management will be made available Crosscutting Issues The programme will indirectly yield a positive environmental impact, through specific measures such as the national monitoring system for residues and control of dangerous substances, and benefits for the environment derived from a better adaptation of Indonesian products to international standards (CE marking, REACH, etc) Good governance will also be indirectly impacted, as many of the activities foreseen will improve the management and quality systems of public institutions Stakeholders The programme will operate in a fragmented context in terms of number of stakeholders and their responsibilities. Several agencies are considered as target groups: MoT: Main co-ordinator of trade policy: its Directorate of Standards and Quality Control (DSQC) is responsible for providing product certification and of legal metrology Ministry of Industry, Agency for Research and Development of Industry (ARDI), with centres providing testing and quality control facilities for products in different sectors Ministry of Marine Affairs and Fisheries (MMAF): good practices in fisheries production and distribution, testing on quality standards in fisheries exports Ministry of Agriculture (MoA): guidelines for good agricultural and food production & distribution practices, quality standards for fresh food, health certification for food exports Indonesian Standardisation Agency (BSN): setting of national standards and identification and dissemination of international standards National Accreditation Committee (KAN): responsible for accreditation and conformity assessment of local quality control and testing establishments National Agency for Drug & Food Control: food safety legislation, control & inspection The business community, represented by relevant Indonesian business associations (primarily Indonesian Chamber of Commerce KADIN) and their members will gain a better access to information about export quality standards Direct Beneficiaries will be the Indonesian competent authorities who will increase their capacity to conduct trade policy and to upgrade the export quality infrastructure EN 7 EN

8 and also the companies who will increase their opportunities to access the international market. Final Beneficiaries will be the Indonesian population in general, through an increase in foreign trade, which should have a positive effect in employment creation and poverty alleviation. 4. IMPLEMENTATION ISSUES 4.1. Method of implementation Partly decentralised management through the signature of a Financing Agreement with the Government of Indonesia. Partly decentralised activities to the Ministry of Trade of Indonesia (see budget table). The Commission controls ex ante the contracting procedures for procurement contracts > EUR and ex post for procurement contracts EUR. The Commission controls ex ante the contracting procedures for all grant contracts. Through the programme estimates, payments are decentralised for operating costs and contracts up to the ceilings indicated in the table below. The Authorising Officer ensures that, by using the model of Financing Agreement for decentralised management, the segregation of duties between the authorising officer and the accounting officer or of the equivalent functions within the delegated entity will be effective, so that the decentralisation of the payments can be carried out for contracts up to the ceilings specified below. Works Supplies Services Grants < EUR < EUR < EUR EUR The Programme will be governed by a Steering Committee chaired by the MoT and including the main GoI government agencies involved in trade policy/export quality infrastructure issues, representatives of the business community and the EC Delegation. The Steering Committee will co-ordinate all programme activities, approve work plans, review progress and identify and resolve implementation issues. Other donors participating in related cooperation programmes will also be invited to participate as observers Procurement and grant award procedures / programme estimates Contracts All contracts implementing the action must be awarded and implemented in accordance with the procedures and standard documents laid down and published by the Commission for the implementation of external operations, in force at the time of the launch of the procedure in question. EN 8 EN

9 Participation in the award of contracts for the present action shall be open to all natural and legal persons covered by the DCI Regulation. Specific rules on programme estimates All programme estimates must respect the procedures and standard documents laid down by the Commission, in force at the time of the adoption of the programme estimates in question Budget and calendar The total cost of the project is EURO entirely funded by the European Commission. Category Breakdown EC Contribution Other expected donors contribution Total funds required Contracting / Paying Authority (in EUR) (in EUR) (in EUR) 1.Services EC/Executing Authority 1.1 Technical assistance EC 1.2 Organisation of training events in Indonesia 1.3 Organisation of international training events and study tours EC/ Executing Authority EC/ Executing Authority 1.4 Studies and Publications EC/ Executing Authority 1.5 Monitoring and evaluation EC 1.6 Auditing EC 2. Supplies EC/Executing Authority 2.1 Equipment EC/Executing Authority 3. Operating Costs Executing Authority 3.1 Local support staff and related operational expenditures (secretarial, logistics, financial and administrative management, etc) EN 9 EN

10 4. Information Executing Authority 5. Contingencies EC TOTAL The Government of Indonesia will provide in-kind contribution to cover salaries of participating staff, office space, communication, working facilities, local travel costs for participating staff, and in general any programme-related operating costs not included in the EC contribution. This in-kind contribution is estimated at The programme will have an operational duration of 60 months as from the signature of the Financing Agreement. Procurement Services will be managed by the EC Delegation in Indonesia through the signature of service contracts following a call for tenders and frameworks contracts, which are planned to be launched in Supplies will be managed by the Executing Authority following calls for tenders, which are planned to be launched between the second half of 2009 and first half of Performance monitoring Regular monitoring will be a continuous process as part of the Commission's responsibilities. External impact monitoring might be also carried out by independent consultants recruited directly by the Commission in accordance with EC rules and procedures on specifically established terms of reference. The main indicators for measuring achievement of results will be: Improved assessment of Indonesian trade policy process as per WTO Trade reviews Improved compliance of Indonesian exports to international quality standards as per reports of Ministry of Trade 4.5. Evaluation and audit Evaluations (mid-term, final, ex post) and audit arrangements are integral part of the contractual arrangements with the selected contractors. External evaluations and audits will be carried out by independent consultants recruited directly by the Commission trough Framework contracts. EN 10 EN

11 4.6. Communication and visibility The Programme will include dissemination and communication plans with activities describing objectives and accomplishments. The Guidelines for EU visibility actions will apply to the Programme. EN 11 EN

12 ACTION FICHE FOR INDONESIA 1. IDENTIFICATION Title/Number Contribution to Local Development (PNPM Multi-Donor Support Facility) DCI-ASIE/2008/20070 Total cost EC contribution: Other donors contribution approx (joint co-financing): Dutch Government: Danish Government: Australia Government: Aid method / Method of implementation Project approach - Centralised management and Joint management with the World Bank DAC-code Sector Economic & Development Policy/Planning 2. RATIONALE 2.1. Sector context Indonesia achieved substantial poverty reduction results during the period from late 1970s to mid 1990s, reducing the poverty rate from 40.1 % in 1976 to 17.7 % of the population in However, while economic growth has picked up since the 1997 financial crisis, there has been a less marked impact on poverty, which reached a level of 16.6 % in Furthermore, a large percentage of the population is still highly vulnerable to shocks of all kinds, as around 42 % of the Indonesian population, not officially counted as poor, still live with between one and two US$ a day. Poverty distribution in Indonesia shows marked regional disparities. The pockets of poverty concentrate in densely populated regions, but the highest poverty incidence prevails in the rural world, where most of the poor work in the agriculture sector, and particularly in Eastern Indonesia. Poor infrastructure and low agricultural productivity are the main root causes for the weak economic activity and high poverty concentration in rural areas. Low quality roads hinder local economic activities while high transport costs burden the competitiveness of rural producers. Low public investment in health, education and sanitary infrastructure are a constraint for the provision of these services to the rural poor. Stagnant productivity in agriculture depresses local incomes and often forces the unskilled peasants to move to urban areas. The overall policy objectives related to poverty reduction are laid down in the Poverty Reduction Strategy Paper (PRSP) and the National Mid-term Development Plan (RPJMN). Both documents outlines foreseen policy actions, EN 1 EN

13 directly linked to ten defined basic rights, but provides limited direct policy guidance, as these policies are neither measurable nor time-bound, and also lack cost estimates and budget prioritisation. Steady increase of expenditure, from 5.5 % of total budget in 2004 to 6.7 % in 2007, shows the Government's commitment to strengthen pro-poor development programmes. The 2008 budget allocation for poverty reduction amounts to US $ 6.07 billion, and represents an increase of 13.3 % over the previous year. With the "big bang" decentralisation process started in 2001, responsibility for local economic development and provision of basic services was fully transferred to the district level 1. The central government is currently transferring about one third of its fiscal resources to the regions. Decentralisation offers considerable opportunities for better governance, however regional and local authorities often lack capacity to efficiently plan, execute and monitor its resources. In addition, with poverty alleviation being a key national development objective, a number of programmes that have an impact in local communities have been funded from the central budget. This has led to poor coordination among agencies and lack of clarity regarding responsibilities of different governmental levels. In September 2006, the GoI decided to give a new impetus to its local development efforts through the establishment of the National Programme for Self-reliant Community Empowerment (PNPM). Under the responsibility of the Coordinating Minister for People's Welfare, the objective of the Programme is to streamline and accelerate local community development, employment opportunities and poverty alleviation and to increase effectiveness and efficiency by means of better coordination. The programme will integrate the roughly 60 to 70 currently implemented community development projects, with a budget of approximately $1.96 billion and aims at achieving the targets of the Millennium Development Goals (MDGs) by The PNPM has the following specific objectives: 1. increase income and employment for the poor; 2. increase public participation of the poor, women, and other marginalised groups; 3. improve access of the poor to productive economic activities and access to associations, capital, markets, information and innovation 4. improve public institutions' capacity to provide public services especially for the poor The PNPM grants have mainly been used to fund local development and productive investments such as irrigation, roads, bridges, etc but have also been directed towards improving social infrastructure. The PNPM is a very ambitious programme, both in regard to the GoI aiming at scaling existing programmes up to a fully nationwide coverage and the aim of having a large number of individual donor and government programmes brought together under a 1 Below the national level, Indonesia has political and administrative structure at provincial and district level. District administrations are in the rural areas divided into sub-districts (kecamatan) which again are comprised of villages with elected village heads. EN 2 EN

14 unified framework. In that context there is a substantial need for additional assistance to strengthen the capacity of national and local governmental levels to implement and manage local development initiatives and programmes in an effective manner. In order to provide this support and to facilitate the involvement of foreign donors, the (GoI) established in early 2008 the PNPM Support Facility Trust Fund (SFTF), a multi-donor trust fund administered by the World Bank (WB). Approximately 30 million euro have been committed to the SFTF and the first set of actions have already been launched. Apart from technical advice and monitoring, substantial funds have been committed towards promoting environmental investments in the PNPM approach Lessons learnt The decentralisation process initiated in Indonesia is an attempt to improve the efficiency in the provision of public services to the population. This mainly top-down approach has, however, not reached the most disadvantaged rural communities in the desired short timeframe. This effort should be complemented by a bottom up approach which directly empowers the village level operationally and financially and generates a momentum which could be sustained by the involvement of the local authorities. When it comes in particular to local community development initiatives, programmes now integrating PNPM (KDP, UPP, SPADA, PKS, Generasi) have covered issues such as rural infrastructure, health, education, microfinance, support to particularly disadvantage regions and management of direct cash transfers to poor families. PNPM will build on the experience gained by these programmes over the past ten years, and extend their coverage to 70,000 rural and urban communities by Evaluations conducted on these local development and poverty alleviation programmes show mixed results. In the positive side, basic infrastructures including transport, water and sanitation have been completed and show adequate technical quality. Moreover, local community groups have been involved in the implementation of the programmes, leading to an overall acceptable satisfaction rate within beneficiaries (60 %). However, important shortcomings have been identified in (i) programme evaluation and quality control systems, (ii) targeting of local economic development efforts to the most disadvantaged, (iii) socialisation of project objectives and results, (iv) capacity building of local authorities and community groups involved and (v) sustainability of the results obtained. Past co-ordination between the multitude of projects and programmes for local economic development and poverty alleviation implemented by executing agencies has been weak, with sometimes overlapping and duplication of interventions at regional and local level. This assessment was one of the very reasons for the establishment of PNPM Complementary actions The Multi-Donor Trust Fund for Aceh and Nias is an important reference for the proposed project as it uses a similar implementation mechanism, and has channelled EN 3 EN

15 a significant amount of resources to local community development through the KDP, UPP and SPADA programmes in these regions. The EC is the main contributor to this Trust Fund and acts also as co-chair of its Steering Committee. The KDP and UPP programmes in Aceh have supported (i) small-scale rural infrastructure works such as roads, bridges, clean water supply and sanitation, (ii) economic activities and socially vulnerable groups, and (iii) urban neighbourhoods to rehabilitate and develop community infrastructure. Total funding managed under the MDTF totalled US $ 64.7 million for KDP and US $ 20 million for UPP. Another important complementary initiative is the Decentralisation Support Facility (DSF), a multi-donor trust fund set up in early 2005 to support the decentralisation agenda of the Government of Indonesia (see The DSF includes DFID, the World Bank, ADB, the Netherlands, AusAID, CIDA, GTZ, USAID and UNDP as partners. The EC, in cooperation with other donors, will seek to ensure that the support to the PNPM and bottom-up community planning/development is supportive of the overall decentralisation process and builds on activities already implemented under DSF Donor coordination The GoI has indicated that it regards PNPM as the umbrella for co-ordination of local development and poverty alleviation initiatives and its SFTF as the main vehicle for channelling foreign aid funds. The aim is to establish one common framework for community level programmes through the PNPM and its Support Facility. A number of donors, mainly EU Member States, have already contributed funds to the Support Facility, or are planning to do so in the near future (they are also participating in the Steering Committee): Dutch Government: contributed (and prospective additional funds of approx ) Danish Government (DANIDA): contributes Australian Government (AusAid): contributed British Government (DFID): prospective DESCRIPTION 3.1. Objectives The aim of the PNPM is to reduce poverty and improve local level governance in rural areas of Indonesia through the provision of investment resources to support productive proposals developed by communities, using a participatory planning process. The Overall Objective of the proposed Action is to support the efforts of the Government of Indonesia to develop the local economy through the PNPM programme. The Specific Objectives of the project are: to strengthen the capacity of local authorities to plan and implement pro-poor economic policies with adequate resources and monitoring EN 4 EN

16 to empower local communities to plan and implement social and economic initiatives 3.2. Expected results and main activities The expected results are: Increased capacity to selected local authorities trained in pro-poor economic development planning Increased transparency of selected local authorities reporting on progress in implementation of local development programmes Increased accountability and efficiency in pro-poor service delivery, with adequate monitoring and evaluations systems of PNPM programmes in place which involve central and local authorities The main activities supported by the trust fund are as follows: a) Provision of support for small infrastructure works, social services projects and other community-led poverty reduction initiatives b) Provision of support to intermediary NGOs and other civil society groups which engage in poverty reduction activities at grassroots level to be ongranted to groups which provide special services to poor communities, or to develop the capacity of such intermediary NGOs or groups to engage in such on-granting activities c) Provision of technical advisory services an other material assistance to agencies of the Republic of Indonesia to support their long term capacity to engage in the long-term management of the PNPM d) Provision of technical advisory services to support PNPM-related special studies and programmes, including establishment and operation of partnership office for harmonisation and co-ordination of PNPM-related programmes and technical advisory services, monitoring and evaluation activities, special activities, workshops and facilitated comparative studies, as well as activities in support of national and local government poverty reduction programmes or to develop the capacity of universities, think tanks and other organisations likely to contribute to the achievement of the purposes of the PNPM Through the participation on the Steering Committee of the Support Facility, the EC will ensure particular attention is given to the following activities: Technical assistance for local authorities (district, sub-district and village level) to develop and implement pro-poor economic policies Technical assistance for the definition and implementation of monitoring and evaluation systems which involve central and local authorities The Steering Committee (SC) of the Support Facility, where donors participate, has already been established to oversee and validate the overall direction and policy objectives pursued by the fund, approve projects to be funded and to act as a forum EN 5 EN

17 for discussion between GoI and donors in this area. The SC is chaired by the Indonesian Planning Agency Bappenas, and shall meet at least twice a year. 2 The Dutch, Danish, British and Australian Governments are participating, amongst others, in the Steering Committee Risks and assumptions Assumptions: Continuous commitment of the present and future GoI to the poverty alleviation and local economic development efforts through the PNPM. Risks and mitigation actions: Risk: a programme of the scale and complexity of PNPM will be difficult to manage by the GoI, and the success will depend on the level of co-ordination among central and local government institutions. Mitigation Action: the SFTF will provide technical assistance for the long-term management of the PNPM, and so support the GoI in its integration and coordination effort. Risk: the scope of activities of the SFTF tends to continuously expand and thus could loose the original focus. Mitigation Action: through the participation in the Steering Committee the EC should ensure that the initial objectives of the Trust Fund are pursued, and that those are regularly monitored Crosscutting Issues Gender equality is an important stated objective of the PNPM, and efforts are being made to ensure an increased public participation of women and other marginalised social groups. Specific initiatives under PNPM have an important environmental angle. The project "Green KDP" covers watershed management, renewable resource energy and environmental education, and is supported by Denmark and in future the Netherlands. Good governance is also a key crosscutting issue covered by the PNPM, as its main purpose is to improve Government's efficiency in co-ordinating local development initiatives Stakeholders The organizational structure of PNPM covers all parties involved in achieving the goals of PNPM, including government, local communities, facilitators, technical experts both at central and at local levels. The Inter-ministerial Committee for Poverty Reduction (TKPK) chaired by the Coordinating Minister of People's Welfare acts as the Steering Committee, and integrates 12 Ministers, 6 State Ministers, the Cabinet Secretary and 3 Heads of State Agencies. The Support Facility is chaired by the Indonesian Planning Agency Bappenas, and has the World Bank as Trustee. Target groups of the proposed action will be the local authorities (Kabupaten, Kota, Kecamatan) and locally-based community institutions (Inter-village Co-ordination Forum BKAD, Inter-village Consultative Forum MAD) who will increase their 2 The Steering Committee is composed by the Tim Pengendali (inter-ministerial PNPM oversight committee) and donors contributing more than $1 million. As trust fund administrator the World Bank co-chairs the Steering Committee. EN 6 EN

18 capacity to develop and implement pro-poor economic policies. The management structure of the PNPM programme (PNPM Technical Team) will also constitute a target group as it will increase its capacity to monitor and evaluate the performance of the different local economic development activities. Direct beneficiaries of the project are rural and urban communities, particularly the poor, women's groups, indigenous communities, and other community groups, so far sidestepped and marginalized in the economic development process. They will increase their participation, autonomy and authority in development policy decision making and project implementation. 4. IMPLEMENTATION ISSUES 4.1. Method of implementation Centralised and Joint management A Financing Agreement will be signed with the Beneficiary Government covering the entire project. The project will be implemented by joint management through the signature of an Administration Agreement with the World Bank in support to the PNPM Support Facility Trust Fund. 3 Evaluation and monitoring services will be implemented through framework contract in centralised management by the Delegation Procurement and grant award procedures Centralised management All contracts implementing the action must be awarded and implemented in accordance with the procedures and standard documents laid down and published by the Commission for the implementation of external operations, in force at the time of the launch of the procedure in question. Joint management with an international organisation All contracts implementing the action will be awarded and implemented in accordance with the procedures and standard documents laid down and published by the international organisation concerned. 3 A Memorandum of Understanding between the Government of Indonesia and the World Bank on support to PNPM was signed in December According to this agreement, the World Bank will act as the administrator of the SFTF. This agreement is valid until 31 st December EN 7 EN

19 4.3. Budget and calendar The total cost of the action is EURO. The EC will contribute EURO, of which EURO as contribution to the PNPM multi-donor Trust Fund, and EURO for centralised activities (monitoring and evaluation). Category Breakdown EC Euro Other contributions 4 (approx. in Euro) Total Euro Contracting /Paying Authority 1. Services EC 1.1 Monitoring and evaluation 2. Joint management 2.1 Administration Agreement with the World Bank (PNPM support facility trust fund) EC TOTAL The operational period of the project will be a maximum of 60 months as of the signature of the Financing Agreement. 5 It is expected that the Administration Agreement will be signed in 2009 immediately after the signature of the FA by the Government Performance monitoring The PNPM has twelve Key Performance Indicators for measuring progress. This system and corresponding baselines established by PNPM management will be the main basis for measuring the performance of the EC action and the impact on poverty, local economic development and capacity improvement at local level. 4 The Government of Netherlands has contributed (and is considering to provide additional funds of approx ), the Government of Denmark has contributed and the Government of Australia has contributed In addition DFID is considering to contribute approx The initial completion date for the trust fund has been set up by the World Bank in agreement with the GoI to the 31 December EN 8 EN

20 Two of these indicators refer to the priority activities to be followed up by the EC: Improved composition of regional budget for poverty alleviation activities Increased number and quality of local regulations which are pro-poor The World Bank will in accordance with the EC's administration agreement provide detailed reporting of the activities of the PSFP Evaluation and audit Evaluations and audit arrangements are integral part of the contractual arrangements with the selected international organisation. External evaluations (mid-term, final, ex-post) and audits will also be carried out by independent consultants recruited directly by the Commission in accordance with EC rules and procedures on specifically established terms of reference Communication and visibility The EC will ensure proper donor visibility is provided through the Trust Fund activities and the guidelines for visibility of EC actions are applied. EN 9 EN

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode ANNEX 1. IDTIFICATION Title Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode DAC-code 15010 Project approach Partially decentralised management.

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE ANNEX 1 1. IDTIFICATION Title/Number Support Services to the National Authorising Officer CRIS NO: FED/2009/021-496 Total cost Total: 315,800 (EC Contribution:

More information

Action Fiche for Syrian Arab Republic. 1. IDENTIFICATION Support to the EU-Syria Association Agreement Programme (SAAP I)

Action Fiche for Syrian Arab Republic. 1. IDENTIFICATION Support to the EU-Syria Association Agreement Programme (SAAP I) Action Fiche for Syrian Arab Republic 1. IDTIFICATION Title/Number Support to the EU-Syria Association Agreement Programme (SAAP I) Total cost EU contribution: EUR 5 000 000 Beneficiary contribution: tbc

More information

Project approach - Decentralised management. DAC-code Government Administration

Project approach - Decentralised management. DAC-code Government Administration ANNEX Annex1 ACTION FICHE FOR SYRIAN ARAB REPUBLIC / ENPI / LOCAL DEVELOPMENT 1. IDENTIFICATION Title/Number Promoting Decentralisation and Local Development (DLD) Total Cost EC contribution 20,000,000

More information

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management ANNEX Action Document for 11 th EDF EU-TL Co-operation Support Facility (CSF) 1. IDENTIFICATION Title/Number Total cost 11 th EDF EU-TL Co-operation Support Facility (CSF) CRIS number: 2014/37442 Total

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

DAC-code Sector Public Sector Policy and Administrative Management

DAC-code Sector Public Sector Policy and Administrative Management ANNEX 1 ANNUAL ACTION PROGRAMME 2012 FOR UKRAINE PART 1 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementatio n Framework Programme in support of EU-Ukraine Agreements CRIS: ENPI/2012/23714

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures EN ANNEX V Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures 1. Title/basic act/ CRIS number 2. Zone benefiting from the action/location CRIS number: 2018/41357

More information

ANNEX. Aid method / Method of implementation. Trade policy and administrative management 2. RATIONALE Sector context

ANNEX. Aid method / Method of implementation. Trade policy and administrative management 2. RATIONALE Sector context ANNEX 1. IDENTIFICATION Title EU-Philippines Trade Related Technical Assistance Project 3 (TRTA 3) Republic of the Philippines / Trade Related Technical Assistance DCI-ASIE/2012/023-158 Total cost Total

More information

Action Fiche for Libya

Action Fiche for Libya Action Fiche for Libya 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation Public administration capacity-building facility (ENPI/2011/276-708) EU contribution: EUR 4.5 million

More information

Annex 1. IDENTIFICATION

Annex 1. IDENTIFICATION 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation Annex DAC-code 15112 Sector Ghana Decentralisation Support Programme - GDSP- Component I CRIS ref. GH/FED/022-108 EUR 5 000

More information

Action Fiche for Mongolia. EU contribution: EUR

Action Fiche for Mongolia. EU contribution: EUR Action Fiche for Mongolia IDENTIFICATION Title/Number Support to Technical and Vocational Education and Training (TVET) Programme DCI-ASIE/2011/022-921 Total cost EUR 7 000 000 Aid method / Method of implementation

More information

EN 7 EN. Annex II Action Fiche for West Bank and Gaza Strip/ENPI. 1. IDENTIFICATION Title/Number Total cost 10,500,000

EN 7 EN. Annex II Action Fiche for West Bank and Gaza Strip/ENPI. 1. IDENTIFICATION Title/Number Total cost 10,500,000 Annex II Action Fiche for West Bank and Gaza Strip/ENPI 1. IDENTIFICATION Title/Number Total cost 10,500,000 Aid method / Method of implementation PEGASE: Governance and Social Development [note: No co-financing

More information

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting. EN EN EN ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA 1. IDENTIFICATION Beneficiary Bosnia and Herzegovina CRIS number 2010 / 022-674 Year 2010 Cost EUR 6 000 000 Implementing Authority

More information

EAP Task Force. EAP Task

EAP Task Force. EAP Task EAP Task Force EAP Task Force EAPP Task JOINT MEETING OF THE EAP TASK FORCE S GROUP OF SENIOR OFFICIALS ON THE REFORMS OF THE WATER SUPPLY AND SANITATION SECTOR IN EASTERN EUROPE, CAUCASUS AND CENTRAL

More information

Action Fiche for Lebanon

Action Fiche for Lebanon Action Fiche for Lebanon 1. IDENTIFICATION Title/Number Facility in support of SMEs energy efficiency investments Total cost EU Contribution : 15,000,000 Aid method / Method of implementation Project approach

More information

This action is funded by the European Union

This action is funded by the European Union This action is funded by the European Union ANNEX 10 of the Commission implementing Decision on the Annual Action Programme 2015 of the DCI Pan-African Programme Action Document for "Support Measures Annual

More information

Annex I Action Fiche for West Bank and Gaza Strip/ ENPI

Annex I Action Fiche for West Bank and Gaza Strip/ ENPI Annex I Action Fiche for West Bank and Gaza Strip/ ENPI 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation PEGASE: Support to Recurrent Expenditures of the PA EUR 158,500,000

More information

Action Fiche for Armenia Sector Multi Sector

Action Fiche for Armenia Sector Multi Sector Action Fiche for Armenia 1. IDENTIFICATION Title Total cost Aid method / Management mode DAC-code Twinning Projects between 3 or 4 Armenian administrations and their equivalent in EU Member States to foster

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, 13.10.2011 COM(2011) 638 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE

More information

Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation CRIS n ENPI/2008/

Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation CRIS n ENPI/2008/ EN 1 EN ACTION FICHE FOR ARMENIA - ENPI AAP 2008 1. IDENTIFICATION Title Total cost Aid method / Management mode Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation

More information

Empowerment of non state actors in Botswana

Empowerment of non state actors in Botswana Annex: Empowerment of non state actors in Botswana 1. IDENTIFICATION Title/Number Empowerment of non state actors in Botswana BW/FED/022-316 Total cost EUR 10 000 000 European Union contribution : EUR

More information

ANNEX. DAC code Sector Economic and Development Planning

ANNEX. DAC code Sector Economic and Development Planning ANNEX 1. IDTIFICATION Title Total cost Aid method management mode Technical Cooperation Facility 1.5M (2.4% of NIP) Project approach partially decentralised management DAC code 15010 Sector Economic and

More information

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 02.05.2005 COM(2005) 178 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL GENERAL REPORT ON PRE-ACCESSION ASSISTANCE (PHARE ISPA

More information

UN BHUTAN COUNTRY FUND

UN BHUTAN COUNTRY FUND UN BHUTAN COUNTRY FUND Terms of Reference Introduction: 1. The UN system in Bhutan is implementing the One Programme 2014-2018. The One Programme is the result of a highly consultative and participatory

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 15 May /07 DEVGEN 89 ACP 94 RELEX 347

COUNCIL OF THE EUROPEAN UNION. Brussels, 15 May /07 DEVGEN 89 ACP 94 RELEX 347 COUNCIL OF THE EUROPEAN UNION Brussels, 15 May 2007 9558/07 DEVGEN 89 ACP 94 RELEX 347 NOTE from : General Secretariat on : 15 May 2007 No. prev. doc. : 9090/07 Subject : EU Code of Conduct on Complementarity

More information

Direct centralised management Complementary action / Technical Assistance Direct centralised management DAC-code Sector Multi-sector aid

Direct centralised management Complementary action / Technical Assistance Direct centralised management DAC-code Sector Multi-sector aid ACTION FICHE FOR ARMENIA AAP 2011 PART II 1. IDENTIFICATION Title/Number Support to the Government of Armenia for the implementation of the ENP Action Plan and preparations for the future Association Agreement

More information

Annex. 11 th EDF Support to the Office of the NAO CRIS No. TZ/FED/ Total estimated cost: EUR

Annex. 11 th EDF Support to the Office of the NAO CRIS No. TZ/FED/ Total estimated cost: EUR Annex of the Commission Decision on the individual measure in favour of Tanzania to be financed from the 11 th European Development Fund Action Document for 11 th EDF Support to the Office of the NAO 1

More information

Action Fiche for the West Bank and Gaza Strip

Action Fiche for the West Bank and Gaza Strip Action Fiche for the West Bank and Gaza Strip 1. IDENTIFICATION Title/Number Land development and basic infrastructure in Area C (ENPI/2012/023-776) Total cost EU contribution: EUR 7,000,000 Aid method

More information

ANNEX. Support to the reform of criminal justice system in Georgia - CRIS N ENPI/2008/19630

ANNEX. Support to the reform of criminal justice system in Georgia - CRIS N ENPI/2008/19630 ANNEX ACTION FICHE GEORGIA PI AAP 2008 1. IDTIFICATION Title Total cost 16 M Aid method / management mode Support to the reform of criminal justice system in Georgia - CRIS N PI/2008/19630 Sector Policy

More information

«FICHE CONTRADICTOIRE»

«FICHE CONTRADICTOIRE» «FICHE CONTRADICTOIRE» Evaluation of the Commission s External Cooperation with Angola (Country level evaluation) (*For details on the recommendations please refer to the main report) Recommendations STRATEGIC

More information

COUNTRY LEVEL DIALOGUES KEY DOCUMENTS

COUNTRY LEVEL DIALOGUES KEY DOCUMENTS COUNTRY LEVEL DIALOGUES KEY DOCUMENTS EUWI European Union Water Initiative Africa-EU Strategic Partnership on Water Affairs and Sanitation Prepared by the Working Group on Water Supply and Sanitation in

More information

Annex 1: The One UN Programme in Ethiopia

Annex 1: The One UN Programme in Ethiopia Annex 1: The One UN Programme in Ethiopia Introduction. 1. This One Programme document sets out how the UN in Ethiopia will use a One UN Fund to support coordinated efforts in the second half of the current

More information

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context 8 Mauritania ACRONYM AND ABBREVIATION PRLP Programme Regional de Lutte contre la Pauvreté (Regional Program for Poverty Reduction) History and Context Mauritania s Poverty Reduction Strategy Paper (PRSP)

More information

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level.

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level. ` Standard Summary Project Fiche Project number: TR 0305.01 Twinning number: TR03-SPP-01 1. Basic Information 1.1 Title: SUPPORT TO THE STATE PLANNING ORGANIZATION GENERAL DIRECTORATE FOR REGIONAL DEVELOPMENT

More information

Draft COMMISSION DECISION

Draft COMMISSION DECISION Draft COMMISSION DECISION of on the 2008 Annual Action Programme of Accompanying Measures for Sugar Protocol Countries in favour of Trinidad and Tobago to be financed under Article 21.060300 of the general

More information

Duration of Assignment: Approx. 150 working days from January to September 2015

Duration of Assignment: Approx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Gender Poverty Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA Funding Reports

More information

Paper 3 Measuring Performance in Public Financial Management

Paper 3 Measuring Performance in Public Financial Management Paper 3 Measuring Performance in Public Financial Management Key Issues 1. Effective financial management of public resources is essential to achieve the objectives of development programmes. It also promotes

More information

MONTENEGRO. Enhanced control and management of fisheries INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

MONTENEGRO. Enhanced control and management of fisheries INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Enhanced control and management of fisheries Action summary The objective of the Action is to align the electronic data collection

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: Limited 26 May 2015 Original: English 2015 session 21 July 2014-22 July 2015 Agenda item 7 Operational activities of the United Nations for international

More information

EU FUNDING PROGRAMMES IN THE FIELD OF DEVELOPMENT AID

EU FUNDING PROGRAMMES IN THE FIELD OF DEVELOPMENT AID EU FUNDING PROGRAMMES IN THE FIELD OF DEVELOPMENT AID EU FORDERUNG FUR MIGRANTEN ORGANISATIONEN UND TRAGER DER PARTICIPATIONS UND INTEGRATIONS ARBEIT IN BERLIN MOVE GLOBAL 25 October 2014, Berlin About

More information

Action Fiche for NEPAL. DAC-code 11200, Sector: Basic Education

Action Fiche for NEPAL. DAC-code 11200, Sector: Basic Education Action Fiche for NEPAL 1. Identification Title/Number Total cost School Sector Reform (SSR), Nepal. DCI-ASIE/2009/21209 Total cost of the project : 1 969 520 000 1 (approx.) Total EC Contribution: 26 353

More information

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) 2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External

More information

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening (1st January 31st March 2013) First-Quarter Report Contents 1. BACKGROUND OF PROJECT... 3 2. PROJECT OVERVIEW...

More information

Duration of Assignment: Apprx. 150 working days from January to September 2015

Duration of Assignment: Apprx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Governance and Institutional Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 31.1.2003 COM(2003) 44 final 2003/0020 (COD) Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL establishing a general Framework for

More information

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED 2014-2020 1. IDENTIFICATION (max. 200 characters) The purpose of this section is to identify only the programme concerned. It

More information

1050 Meeting, 11 March Administration and Logistics

1050 Meeting, 11 March Administration and Logistics Ministers Deputies CM Documents CM(2009)10 final 13 March 2009 1050 Meeting, 11 March 2009 11 Administration and Logistics 11.1 Resource Management and Mobilisation Strategy for the Council of Europe Programme

More information

INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) ALBANIA European Union Integration Facility. Action summary

INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) ALBANIA European Union Integration Facility. Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 ALBANIA European Union Integration Facility Action summary The Action will strengthen the capacity and accountability of the Albanian public administration

More information

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument Action Fiche for EU- Brazil Sector Dialogues Support Facility 1. IDENTIFICATION Title

More information

ANNEX Action Fiche for Technical Cooperation Facility II for Palau

ANNEX Action Fiche for Technical Cooperation Facility II for Palau ANNEX Action Fiche for Technical Cooperation Facility II for Palau 1. IDENTIFICATION Title Technical Cooperation Facility CRIS no. FED/2013/024-369 Total cost 180,000 (6.2% of NIP A envelope) EDF contribution

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 May /10 ECOFIN 249 ENV 265 POLGEN 69

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 May /10 ECOFIN 249 ENV 265 POLGEN 69 COUNCIL OF THE EUROPEAN UNION Brussels, 11 May 2010 9437/10 ECOFIN 249 ENV 265 POLGEN 69 NOTE from: to: Subject: The General Secretariat of the Council Delegations Financing climate change- fast start

More information

Action Fiche for Syrian Arab Republic. EUR Beneficiary contribution: tbd Project approach partly decentralised management

Action Fiche for Syrian Arab Republic. EUR Beneficiary contribution: tbd Project approach partly decentralised management Action Fiche for Syrian Arab Republic 1. IDENTIFICATION Title/Number Reforming and Modernising the Judiciary Total cost Aid method / Method of implementation EUR 5 000 000 Beneficiary contribution: tbd

More information

EN 1 EN ANNEX 1: ACTION FICHE BELARUS 1. IDENTIFICATION

EN 1 EN ANNEX 1: ACTION FICHE BELARUS 1. IDENTIFICATION EN EN EN ANNEX 1: ACTION FICHE BELARUS 1. IDENTIFICATION Title and CRIS reference Country Total cost Aid method / Method of implementation DAC code & sector Support to Belarus in the field of norms and

More information

Screening report Montenegro

Screening report Montenegro Screening report Montenegro Chapter 22 Regional policy and coordination of Structural Instruments Date of screening meetings: Explanatory meeting: 14-15 November 2012 Bilateral meeting: 18 December 2012

More information

Action Fiche for West Bank and Gaza Strip. PEGASE: Private Sector Development CRIS: 2010/22476 EU Contribution: EUR11 million.

Action Fiche for West Bank and Gaza Strip. PEGASE: Private Sector Development CRIS: 2010/22476 EU Contribution: EUR11 million. Action Fiche for West Bank and Gaza Strip 1. IDENTIFICATION Title/Number Total cost PEGASE: Private Sector Development CRIS: 2010/22476 EU Contribution: EUR11 million. Aid method / Method of implementation

More information

ANNEX 3 ANNUAL ACTION PROGRAMME 2012 FOR UKRAINE PART 1 1. IDENTIFICATION

ANNEX 3 ANNUAL ACTION PROGRAMME 2012 FOR UKRAINE PART 1 1. IDENTIFICATION ANNEX 3 ANNUAL ACTION PROGRAMME 2012 FOR UKRAINE PART 1 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation Third EU Contribution to the Eastern Europe Energy Efficiency and

More information

This action is funded by the European Union

This action is funded by the European Union EN This action is funded by the European Union ANNEX 5 of the Commission Implementing Decision on the Annual Action Programme 2017 Part II and 2018 Part I in favour of the Asia region to be financed from

More information

Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level

Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level Guidance Paper United Nations Development Group 19 MAY 2006 TABLE OF CONTENTS Introduction A. Purpose of this paper... 1 B. Context...

More information

Action Fiche Trinidad and Tobago

Action Fiche Trinidad and Tobago Action Fiche Trinidad and Tobago 1. Identification Title/Number Accompanying Measures for Sugar Protocol Countries, Trinidad and Tobago 2011-2013 CRIS Number: 023-150 Total cost EU Contribution: EUR 31

More information

not, ii) actions to be undertaken

not, ii) actions to be undertaken Recommendations, Final report Recommendation 1: Political commitment a) The European Commission should formally remind accession countries of the obligations of future member states to comply with the

More information

Action Fiche for Eastern Neighbourhood Civil Society Facility 2012 and 2013

Action Fiche for Eastern Neighbourhood Civil Society Facility 2012 and 2013 Action Fiche for Eastern Neighbourhood Civil Society Facility 2012 and 2013 1. IDENTIFICATION Title/Number Special measure: Eastern Neighbourhood Civil Society Facility 2012 and 2013 CRIS: 2012/024-279

More information

The DAC s main findings and recommendations. Extract from: OECD Development Co-operation Peer Reviews

The DAC s main findings and recommendations. Extract from: OECD Development Co-operation Peer Reviews The DAC s main findings and recommendations Extract from: OECD Development Co-operation Peer Reviews Luxembourg 2017 Luxembourg has strengthened its development co-operation programme The committee concluded

More information

Summary of Findings, Recommendations and Lessons Learnt. 1st Meeting of the Programme Steering Committee. Chisinau, Moldova September 28 29, 2012

Summary of Findings, Recommendations and Lessons Learnt. 1st Meeting of the Programme Steering Committee. Chisinau, Moldova September 28 29, 2012 Improving capacities to eliminate and prevent recurrence of obsolete pesticides as a model for tackling unused hazardous chemicals in the former Soviet Union Summary of Findings, Recommendations and Lessons

More information

Status of World Bank Assistance in the Reconstruction of Aceh and North Sumatra, Indonesia. Janelle Plummer, WSP-EAP Bill Paterson, EASTR

Status of World Bank Assistance in the Reconstruction of Aceh and North Sumatra, Indonesia. Janelle Plummer, WSP-EAP Bill Paterson, EASTR Status of World Bank Assistance in the Reconstruction of Aceh and North Sumatra, Indonesia Janelle Plummer, WSP-EAP Bill Paterson, EASTR 2 3 4 5 6 7 In Aceh The disaster was caused by a tsunami and an

More information

PNPM SUPPORT FACILITY (PSF) Project Proposal

PNPM SUPPORT FACILITY (PSF) Project Proposal PNPM SUPPORT FACILITY (PSF) Project Proposal Project Title: Objective: Executing Agency: Estimated Duration: Estimated Budget: Geographic Coverage: Implementation Arrangements: PNPM Mandiri Revolving Loan

More information

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS Informal Consultation 7 December 2015 World Food Programme Rome, Italy PURPOSE 1. This update of the country strategic planning approach summarizes the process

More information

New Zealand Vanuatu. Joint Commitment for Development

New Zealand Vanuatu. Joint Commitment for Development New Zealand Vanuatu Joint Commitment for Development 2 The Joint Commitment for Development between the Governments of New Zealand and Vanuatu establishes a shared vision for achieving long-term development

More information

L 201/58 Official Journal of the European Union

L 201/58 Official Journal of the European Union L 201/58 Official Journal of the European Union 30.7.2008 DECISION No 743/2008/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 9 July 2008 on the Community s participation in a research and development

More information

Zambia s poverty-reduction strategy paper (PRSP) has been generally accepted

Zambia s poverty-reduction strategy paper (PRSP) has been generally accepted 15 ZAMBIA The survey sought to measure objective evidence of progress against 13 key indicators on harmonisation and alignment (see Foreword). A four-point scaling system was used for all of the Yes/No

More information

EN AIDCO/ (2010) EN EN

EN AIDCO/ (2010) EN EN EN AIDCO/ (2010) 87827 EN EN Annex 1. Identification Title/Number Total cost Aid method / Method of implementation DAC-code Support to the Greenland Education and Vocational Training Sector 2010, CRIS

More information

EU Code of Conduct on Complementarity and Division of Labour in Development Policy 1

EU Code of Conduct on Complementarity and Division of Labour in Development Policy 1 EU Code of Conduct on Complementarity and Division of Labour in Development Policy 1 This Code of Conduct presents operational principles for EU donors regarding complementarity in development cooperation.

More information

SURVEY GUIDANCE CONTENTS Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness

SURVEY GUIDANCE CONTENTS Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness SURVEY GUIDANCE 2011 Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness This document explains the objectives, process and methodology agreed for the 2011 Survey on

More information

IMPLEMENTATION OF THE EUROPEAN UNION COHESION POLICY FOR PROGRAMMING PERIOD: EVOLUTIONS, DIFFICULTIES, POSITIVE FACTORS

IMPLEMENTATION OF THE EUROPEAN UNION COHESION POLICY FOR PROGRAMMING PERIOD: EVOLUTIONS, DIFFICULTIES, POSITIVE FACTORS IMPLEMENTATION OF THE EUROPEAN UNION COHESION POLICY FOR 2007-2013 PROGRAMMING PERIOD: EVOLUTIONS, DIFFICULTIES, POSITIVE FACTORS PhD Candidate Ana STĂNICĂ Abstract In an European Union that integrated

More information

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary Project fiche 1.1: Strengthening the capacity of the institutions to manage and implement the Operational Programmes 1. Basic information 1.1 CRIS Number: 2008/20-311 1.2 Title: Strengthening the capacity

More information

EN AIDCO/ (YYYY) D/NNN EN EN

EN AIDCO/ (YYYY) D/NNN EN EN EN AIDCO/ (YYYY) D/NNN EN EN ANNEX 1. IDENTIFICATION Title/Number St. Kitts and Nevis Accompanying Measures for Sugar Protocol Countries Allocation 2010 CRIS Number: 022-412 Budget heading Budget line

More information

ERAC 1202/17 MI/evt 1 DG G 3 C

ERAC 1202/17 MI/evt 1 DG G 3 C EUROPEAN UNION EUROPEAN RESEARCH AREA AND INNOVATION COMMITTEE ERAC Secretariat Brussels, 2 March 2017 (OR. en) ERAC 1202/17 NOTE From: To: Subject: ERAC Secretariat Delegations ERAC Opinion on Streamlining

More information

United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF)

United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF) United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF) Terms of Reference 29 March 2013 1 Contents I. Introduction... 3 II. Purpose, Scope and Principles of the UNDF... 4 III.

More information

ANNEX ANNEX. to the. Commission Decision

ANNEX ANNEX. to the. Commission Decision EUROPEAN COMMISSION Brussels, 16.2.2018 C(2018) 869 final ANNEX ANNEX to the Commission Decision on the adoption of the 2018 work programme for the financing of projects in the area of external trade relations,

More information

Draft COMMISSION DECISION

Draft COMMISSION DECISION Draft COMMISSION DECISION of on the Annual Action Programme 2008 on Accompanying Measures on Sugar in favour of St. Kitts and Nevis to be financed under Article 21.060300 of the general budget of the European

More information

OFFICE OF THE COORDINATING MINISTER FOR ECONOMIC AFFAIRS OF THE REPUBLIC OF INDONESIA

OFFICE OF THE COORDINATING MINISTER FOR ECONOMIC AFFAIRS OF THE REPUBLIC OF INDONESIA OFFICE OF THE COORDINATING MINISTER FOR ECONOMIC AFFAIRS OF THE REPUBLIC OF INDONESIA PRESS RELEASE The Draft 2007 : Building Hope for a Brighter Future Jakarta, 16 August 2006 The Draft 2007 represents

More information

FINAL 26 February PARTNERSHIP FOR PROGRESS: UN Civil Society Fund

FINAL 26 February PARTNERSHIP FOR PROGRESS: UN Civil Society Fund PARTNERSHIP FOR PROGRESS: UN Civil Society Fund 1 I. Introduction The UN s current policy towards civil society stems from the Millennium Declaration of 2000, which includes the commitment by member states

More information

INTRODUCTION INTRODUCTORY COMMENTS

INTRODUCTION INTRODUCTORY COMMENTS Statement of Outcomes and Way Forward Intergovernmental Meeting of the Programme Country Pilots on Delivering as One 19-21 October 2009 in Kigali (Rwanda) 21 October 2009 INTRODUCTION 1. Representatives

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

OFFICIAL -1 L(-L DOCUMENTS. Between. and

OFFICIAL -1 L(-L DOCUMENTS. Between. and Public Disclosure Authorized OFFICIAL -1 L(-L DOCUMENTS ADDENDUM No 2 TO ADMINISTRATION AGREEMENT Between Public Disclosure Authorized Public Disclosure Authorized the EUROPEAN UNION (represented by the

More information

VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP

VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP EUROPEAN COMMISSION EUROPEAN EXTERNAL ACTION SERVICE VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP ***LAST UPDATE 24 SEPTEMBER 2010*** Table of Contents PART I An Overview of the Eastern

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities Improving Public Expenditure Quality Program, SP1 (RRP VIE 50051-001) SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 Sector Road Map 1. Sector Performance,

More information

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Support to the Tax Administration Action summary This Action aims to support Montenegro in the process of fulfilling the EU preaccession

More information

Marche Region. Ex Ante Evaluation report. Executive summary. Roma, June 2015

Marche Region. Ex Ante Evaluation report. Executive summary. Roma, June 2015 Marche Region 2014-2020 COMMITTENTE RDP for Marche Ex Ante Evaluation report Roma, June 2015 Executive summary EXECUTIVE SUMMARY Introduction The Ex Ante Evaluation (EAE) of the Rural Development Programme

More information

INTERNATIONAL MONETARY FUND INTERNATIONAL DEVELOPMENT ASSOCIATION SERBIA AND MONTENEGRO. February 27, 2006 I. INTRODUCTION

INTERNATIONAL MONETARY FUND INTERNATIONAL DEVELOPMENT ASSOCIATION SERBIA AND MONTENEGRO. February 27, 2006 I. INTRODUCTION INTERNATIONAL MONETARY FUND INTERNATIONAL DEVELOPMENT ASSOCIATION SERBIA AND MONTENEGRO Joint Staff Advisory Note on the Poverty Reduction Strategy Progress Reports Prepared by the Staffs of the International

More information

EUROPEAN PARLIAMENT Committee on Regional Development

EUROPEAN PARLIAMENT Committee on Regional Development EUROPEAN PARLIAMT 2009-2014 Committee on Regional Development 27.11.2012 MANDATE 1 for opening inter-institutional negotiations adopted by the Committee on Regional Development at its meeting on 11 July

More information

EU Funds for Road Safety Multiannual Financial Framework Saving Lives on EU Roads until 2020 January 2012

EU Funds for Road Safety Multiannual Financial Framework Saving Lives on EU Roads until 2020 January 2012 EU Funds for Road Safety Multiannual Financial Framework 2014-2020 2020 Saving Lives on EU Roads until 2020 January 2012 Introduction In the context of the adoption of the new Multiannual Financial Framework

More information

FINAL CONSULTATION DOCUMENT May CONCEPT NOTE Shaping the InsuResilience Global Partnership

FINAL CONSULTATION DOCUMENT May CONCEPT NOTE Shaping the InsuResilience Global Partnership FINAL CONSULTATION DOCUMENT May 2018 CONCEPT NOTE Shaping the InsuResilience Global Partnership 1 Contents Executive Summary... 3 1. The case for the InsuResilience Global Partnership... 5 2. Vision and

More information

RATIONALE AND COUNTRY CONTEXT

RATIONALE AND COUNTRY CONTEXT ANNEX 1. IDENTIFICATION Title/Number Total cost Support to the implementation of the agriculture sector wide approach (ASWAp) and the Green Belt Initiative (GBI) CRIS: MAI/FED/23181 EUR 97 843 000 A Envelope

More information

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV 1. Basic information 1.1 CRIS Number: 2009 / 021-650 1.2 Title: Preparation for IPA components

More information

«FICHE CONTRADICTOIRE» Joint Country Level Evaluation of Bangladesh. (*For details on the recommendations please refer to the main report)

«FICHE CONTRADICTOIRE» Joint Country Level Evaluation of Bangladesh. (*For details on the recommendations please refer to the main report) Ref. Ares(2016)5406779-16/09/2016 «FICHE CONTRADICTOIRE» Joint Country Level Evaluation of Bangladesh (*For details on the recommendations please refer to the main report) Recommendations Response of Commission

More information

ANNEX. Support to the Productive Safety Net Programme (PSNP) CRIS 2008/ Total cost EC contribution : EUR 20,230,000

ANNEX. Support to the Productive Safety Net Programme (PSNP) CRIS 2008/ Total cost EC contribution : EUR 20,230,000 ANNEX 1. IDTIFICATION Title/Number Support to the Productive Safety Net Programme (PSNP) CRIS 2008/020-930 Total cost EC contribution : EUR 20,230,000 Aid method / Management mode Contribution of the beneficiary

More information

ANNEX 1. of the Commission Implementing Decision on. Action Document for Support to SME Development in Armenia

ANNEX 1. of the Commission Implementing Decision on. Action Document for Support to SME Development in Armenia ANNEX 1 of the Commission Implementing Decision on the Annual Action Programme 2014 in favour of Armenia to be financed from the general budget of the European Union Action Document for Support to SME

More information