1 TERMS OF REFERENCE FOR DRAFTING OF A BUSINESS CONTINUITY PLAN (BCP) FOR EBID April

2 I. BRIEF PRESENTATION OF EBID 1. The ECOWAS Bank for Investment and Development (EBID) is an international financial institution of which the fifteen (15) Member States of ECOWAS, namely Benin, Burkina-Faso, Cabo Verde, Côte d'ivoire, the Gambia, Ghana, Guinea, Guinea-Bissau, Liberia, Mali, Niger, Nigeria, Senegal, Sierra Leone and Togo are shareholders. It emerged from the transformation of the ECOWAS Fund for Cooperation, Compensation and Development (ECOWAS Fund) as decided at the twenty-second Meeting of the Authority of Heads of State and Government held in December The new entity comprises two operational windows of which one is dedicated to the private sector while the other is dedicated to the public sector. 3. The Authorized capital of EBID is one billion ( ) units of account (UA) comprising one million ( ) shares of a nominal value of one thousand units of account. 4. As its corporate object stipulated in its Articles of Association, EBID shall: a. grant loans and provide guarantees for the financing of investment projects and programmes relating to the economic and social development of Member States, participate in the capital of public and private or public companies and carry out all other investments with special priority to: i. projects or programmes which by their nature or scope concern at least two Regional Members States, especially projects to establish regional integration, enhancing infrastructure and all other development projects in both the public and private sectors; ii. iii. projects or programmes aimed at strengthening the economies of the least developed Member States of the Community, and reconstructing countries which experienced serious armed conflicts or socio-political crises; projects or programmes which contribute towards making the economies of the Community more complementary, and special programmes and projects designed to fight poverty and social inequality; b. mobilize resources within and outside the Community, for the financing of such investment projects and programmes; c. provide such technical assistance as may be needed in the Community for the study, preparation, financing and execution of development projects or programmes; 2

3 d. receive and manage, in conformity with Protocol A/P1/7/96 of 27 July 1996 relating to the Conditions Governing Application of the ECOWAS Community Levy and by virtue of any other relevant provision, the portion of the resources of the Levy meant for the financing of Community development activities; e. manage all Community Special Funds relevant to its object; f. undertake any commercial, industrial or agricultural activity where such an activity is secondary to its object or necessary for the recovery of its debts. 5. For its governance, EBID has: a Board of Governors (General Meeting) which is the highest decision-making organ comprising the representatives (Ministers of Finance) of the ECOWAS Member States; a Board of Directors appointed by the Board of Governors; A Management (a President and two Vice-Presidents) responsible for the dayto-day running of the Bank. II. BACKGROUND 6. The sustainability of any Firm certainly depends on its economic and financial performance. However, in a global environment that is increasingly complex, marked by threats of all kinds, security issues have become unavoidable issue bothering on the continuity and development strategies of firms. 7. A broad range of threats which may include socio-political, structural crisis or cyberattacks targeting vital information system resources, or even natural disasters, terrorists attacks, etc. of which the nature and scope may disrupt and even jeopardize the operations of enterprises require that henceforth, strategies and measures that are indispensable as much as the productive investment, the growth or the drive to conquer market shares be put in place. 8. Hence, for the purpose of preparing a Business Continuity Plan that seeks to preserve the physical integrity of employees through a plan for geographical fallback, to safeguard and recover the computer resources, by limiting the risks of loss of vital resources, also, give customer relations the assurances of continuity and ability to resume activity in all circumstances and within a short interval has become a fundamental concern of all leaders of public and private corporate enterprises. EBID is no exemption to this rule and intends to put in place a Business Continuity Plan that meets highest standards. 3

4 III. CONTENTS OF THE MISSION 9. In connection with its mission, the Bank must guarantee the continuity of its activity, in case of information system impairment or of its office, among others. 10. The activities and organization of the Bank have grown significantly in recent years and new risks have emerged and must be taken into account in the management of its information system. In line with its concern to align with best international standards, EBID intends to draft its BCP in accordance with standards set by ISO relating to management of Business Continuity. 11. In this regard, EBID is inviting proposals from consultancy firms, with a view to Drafting of a Business Continuity Plan (BCP) in accordance with ISO standard. IV. OBJECTIVES OF THE MISSION 12. The BCP must describe the continuity strategy to be adopted to address, by order of priority, the risks identified and outlined according to their gravity and the likelihood of occurrence. 13. In this regard, the Consultant would have to: 1) Carry out Business Impact Assessment; 2) Develop a risk map of the risks faced by EBID in the course of its activities (threats and vulnerabilities having impact on the activities of the Bank and those of its partners) which clearly shows the level of severity, the probability of occurrence, etc.; 3) Identify the needs for continuity of key activities in the event of disaster, and advise on their criticality in the light of the various departments and /or divisions of the Bank; the Consultant will have to propose the responses to be provided to each identified situation, in line with the risk mapping; 4) Determine the financial, regulatory, operational and reputational impact of unavailability of services on the critical business activities (likely impact, scale and justify the resources to be committed to this, in order to meet the potential continuity requirements); 5) Provide technical assistance and advice for identification of business recovery sites for EBID in the sub-region, based on the various scenarios; 6) Provide a technical assistance plan for implementation of a parallel information system back-up center where data and applications could be saved in real time or in accordance with an acceptable frequency which anticipates any possibility of data loss; 4

5 7) Prepare a crisis management plan and a communication plan in a crisis situation; this plan must provide detailed profile of the stakeholders, their roles and responsibilities before, during and after the crises, as well as the procedures in line with good practice (ITIL, COBIT, etc.); 8) Identify the training needs for stakeholders of the BCP, for steering it and for sustaining it in operational conditions; 9) Support EBID in implementing the BCP («Call Tree Test», fire evacuation exercise, crisis management test; business recovery site test, data recovery test). V. DELIVRABLES 14. The Consultant shall submit a Business Continuity Plan in different volumes, as follows: 1) Volume 1: A Risk Mapping that would enable EBID to understand the threats and vulnerabilities having impact on the critical activities. This mapping must be detailed in a manner as to enable EBID understand the impact which such event could engender on its activities; 2) Volume 2: A Business Impact Assessment outlining the following key stages: a) Identification of activities and critical processes of EBID; b) Analysis of impact that could arise if there is a shutdown of these activities and of critical processes and determining the trend of this impact in the event of prolonged shutdown; c) Identifying and examining of any other critical activity that is contingent on suppliers, services providers and other stakeholders of EBID; d) Estimation of the target time for restoring the identified activities after a disaster; e) Estimation of resources (human, technical, logistical, suppliers) which each identified critical activity requires for its resumption; 3) Vol. 3: A Crisis Management Plan comprising: a. A proposal of typical organization of BCP stakeholders and their role in the Plan; b. A communication plan in a crisis situation; 4) Vol. 4: A strategic risk management plan for each identified critical activity with measures that enable: a. Reducing the probability of occurence of activity shutdown; b. Avoiding sudden business shutdown; c. Limiting the impact of a shutdown on the activities of EBID; 5

6 5) Vol. 5: A Business Recovery Site Plan comprising preparation of criteria for choosing of business recovery sites for EBID in the sub-region, based on the different scenarios; 6) Vol. 6: A Technology Recovery Plan comprising among others: a) A matrix of Bank data, classifying them by importance and clearly showing critical data; b) A back-up and recovery policy (for data in real time or according to the acceptable frequency and the software); c) A detailed sheet on installation, configuration and disaster recovery of each server (operational system, users access, etc.); d) A detailed sheet on installation, setting and disaster recovery for each software; e) The Terms of Reference (ToR) for choosing and putting in place of sites (local and remote) for data and software back-up and replication; 7) Vol. 7: The detailed procedures of the following tests: a) Call Tree Test; b) Fire Evacuation Exercice; c) Crisis Management Test; d) Business Recovery Site Test; e) Technology Recovery Site Test; 8) Vol. 8: A training plan for stakeholders of the BCP relating to its management and sustenance under operational conditions; 9) Vol. 9: A continuous improvement plan of the BCP comprising: a) Exercises and tests to be carried out periodically, in consonance with the perimeter of the Business continuity management system (BCMS) that allows a review of the adequacy of the Plan to exigencies linked to EBID s activities; b) A definition of the monitoring and evaluation measures to be carried out with a view to guaranteeing sustainability of the activity situation; c) A revision policy of the BCP to ensure adequacy and efficiency; d) An internal audit plan of the BCP taking into account analysis of the business, evaluation of risks and mitigation measures for these risks; 10) All other documents or deliverables which the Consultant shall deem pertinent. 15. The deliverables shall be submitted in five (5) physical copies and in electronic medium in French and in English. 16. The Consultant shall submit a provisional version of each deliverable of his mission to EBID within the timeframe agreed in the contract and shall make an oral presentation of his assignment. 17. Within eight (8) working days following receipt of the provisional versions, EBID shall make its written observations on these versions and submit these to the Consultant; 18. Within eight (8) days following receipt of EBID s observations, the Consultant shall submit the final documents to EBID in the form and quantity required in the contract. 6

7 VI. TIME FRAME OF THE MISSION 19. The present mission shall be executed within sixty (60) calendar days (this duration does not include the timeframe for implementation). VII. PROFILE OF THE CONSULTANT 20. The Consultant (preferably a firm) must meet the following conditions: a) Have a confirmed experience of at least five (5) years in preparing manual of procedures; b) Have a sound experience and proven knowledge of the banking environment; c) Have a sound experience on missions relating to preparation of Business Continuity manual ; d) Have proven advanced qualifications (minimum Master s degree) in corporate management, business administration, law, management or any other equivalent certificate (submit CV of the staff dedicated to the mission); e) A sound experience on similar contract with financial institutions operating in ECOWAS countries would be an advantage; f) Have proven skills (training and implementation) in familiarity with ISO (or current similar standards) and ability to diagnose information systems. VIII. MODALITIES FOR EXECUTION OF THE MISSION 21. The practical modalities for execution of the above-stated mission shall be defined in a contract to be signed between the successful Consultant and EBID. IX. OBLIGATION OF EBID 22. EBID shall provide the Consultant with all information required for carrying out its mission. X. EVALUATION CRITERIA 23. Proposals from bidders shall be assessed in line with the following criteria: a) General qualifications and skills for the assignment to be carried out: 20%; b) ISO22301 or similar certification: 10%; c) Experience in the preparation of manuals of procedures: 10%; d) Specific experience in the assignment described in the terms of reference: 30%; e) Methodology: 30%. 7

8 24. Only technical offers that would have obtained 75% or more points shall have their financial offers examined. 25. The Consultant shall bear all medical insurance costs and all medical costs during execution of his services as well as all transport and accommodation costs necessary for the mission. 26. The Consultant shall take all steps with a view to obtaining visas and / or residence permit he will need to carry out his assignment and fulfill his obligations related to the contract. The Bank shall provide assistance to the Consultant in his initiatives whenever this shall be necessary. XI. SUBMISSION OF OFFERS 27. The bids shall be submitted in ONE (1) sealed envelope containing TWO (2) DISTINCT ENVELOPES: 1) One envelope N 1 containing three printed versions of the technical proposal/offer (original + two [2] copies), the administrative documents (documents attesting to the legal existence of the firm, up-to-date payment of social security contributions and tax obligations) as well as every information deemed indispensable for execution of the contract, except financial proposal/offer; 2) One envelope N 2 containing three printed versions of the financial offer expressed in US dollars (original + two [2] copies). The financial offers shall be expressed less of tax. The bidder shall ensure that his financial offer is valid for at least ninety (90) days, with effect from the deadline for receiving of the submissions as indicated here-above. 28. The service provider is advised to note that the copy marked «Original» of both the technical offer and the financial offer shall take precedence over all other versions of the document. 29. The sealed envelope bid containing the two numbered envelopes shall bear the following inscriptions: «Bid for drafting of a Business Continuity Plan (BCP) for EBID», «To be opened only in session. 30. The deadline for submission of tenders has been fixed at May 15, 2018, at 3.00 p.m. GMT. All bids must be submitted at the following address: ECOWAS BANK FOR INVESTMENT AND DEVELOPMENT 128, Bd. du 13 janvier, BP 2704, Lomé Togo Tél: +(228) Fax: +(228) Bids are not to be submitted by electronic mail. 32. EBID shall only acknowedge proposals/bids submitted within the specified time and date mentioned above. 8

9 33. EBID reserves the right not to give any response to the present invitation to tender. 34. For further information or clarification, the bidders are requested to contact either of the following persons at least five working days before the deadline mentioned above for the submission of tenders,: a) Jean Luc Assah: or b) Mensan Amégavie: 9

TERMS OF REFERENCE FOR THE RECRUITMENT OF A CONSULTANCY FIRM TO PREPARE THE CONDITIONS OF SERVICE AND TERMINAL BENEFITS OF THE PRESIDENT OF THE

TERMS OF REFERENCE FOR THE RECRUITMENT OF A CONSULTANCY FIRM TO PREPARE THE CONDITIONS OF SERVICE AND TERMINAL BENEFITS OF THE PRESIDENT OF THE TERMS OF REFERENCE FOR THE RECRUITMENT OF A CONSULTANCY FIRM TO PREPARE THE CONDITIONS OF SERVICE AND TERMINAL BENEFITS OF THE PRESIDENT OF THE ECOWAS BANK FOR INVESTMENT AND DEVELOPMENT (EBID) MARCH,

More information

The ECOWAS Bank EBID IN BRIEF.

The ECOWAS Bank EBID IN BRIEF. The ECOWAS Bank EBID IN BRIEF www.bidc-ebid.org BACKGROUND The ECOWAS Bank for Investment and Development (EBID) is the financial arm of the Economic Community of West African States (ECOWAS) comprising

More information

EBID IN BRIEF. The ECOWAS Bank

EBID IN BRIEF. The ECOWAS Bank EBID IN BRIEF The ECOWAS Bank 2016 1 BACKGROUND EBID is an international financial institution established by the 15 Member States of the Economic Community of West African States (ECOWAS) comprising Benin,

More information

WAPP Project Implementation Strategy

WAPP Project Implementation Strategy WAPP Project Implementation Strategy WAPP Generation & Transmission Master Plan Its identified all the Generation and Transmission Projects required to develop and implement the power pool project; Provided

More information

IT Risk in Credit Unions - Thematic Review Findings

IT Risk in Credit Unions - Thematic Review Findings IT Risk in Credit Unions - Thematic Review Findings January 2018 Central Bank of Ireland Findings from IT Thematic Review in Credit Unions Page 2 Table of Contents 1. Executive Summary... 3 1.1 Purpose...

More information

REGIONAL MATTERS ARISING FROM REPORTS OF THE WHO INTERNAL AND EXTERNAL AUDITS. Information Document CONTENTS BACKGROUND

REGIONAL MATTERS ARISING FROM REPORTS OF THE WHO INTERNAL AND EXTERNAL AUDITS. Information Document CONTENTS BACKGROUND 2 June REGIONAL COMMITTEE FOR AFRICA ORIGINAL: ENGLISH Sixty-seventh session Victoria Falls, Republic of Zimbabwe, 28 August 1 September Provisional agenda item 19.9 REGIONAL MATTERS ARISING FROM REPORTS

More information

AFRICAN DEVELOPMENT BANK GROUP

AFRICAN DEVELOPMENT BANK GROUP REQUEST FOR EXPRESSION OF INTEREST FOR AN INDIVIDUAL CONSULTANT AFRICAN DEVELOPMENT BANK GROUP 01, Avenue Joseph Anoma, Plateau, BP 1387, Abidjan, Côte d Ivoire Financial Management Department (FIFM) /

More information

Increasing aid and its effectiveness in West and Central Africa

Increasing aid and its effectiveness in West and Central Africa Briefing Paper Strengthening Social Protection for Children inequality reduction of poverty social protection February 29 reaching the MDGs strategy security social exclusion Social Policies social protection

More information

FINANCIAL CONTROLLER S 2016 INTERIM REPORT

FINANCIAL CONTROLLER S 2016 INTERIM REPORT COMUNIDADE ECONOMICA DOS ESTADOS DA AFRICA OCIDENTAL ECONOMIC COMMUNITY OF WEST AFRICAN STATES COMMUNAUTE ECONOMIQUE DES ETATS DE L AFRIQUE DE L OUEST ECW/CM/LXXVII/4 Original: English 77 TH ORDINARY SESSION

More information

ECOWAS BANK FOR INVESTMENT AND DEVELOPMENT (EBID)

ECOWAS BANK FOR INVESTMENT AND DEVELOPMENT (EBID) ECOWAS BANK FOR INVESTMENT AND DEVELOPMENT (EBID) CONSOLIDATED FINANCIAL STATEMENTS 128 Boulevard du 13 Janvier BP : 2704 Lomé-TOGO Tél : (228) 22 21 68 64 Fax : (228) 22 21 86 84 Site web: www.bidc-ebid.org

More information

128, boulevard du 13 janvier BP : 2704 Tel : (228) Fax : (228) Télex : 5339 TG Lomé-TOGO

128, boulevard du 13 janvier BP : 2704 Tel : (228) Fax : (228) Télex : 5339 TG Lomé-TOGO 128, boulevard du 13 janvier BP : 2704 Tel : (228) 221 68 64 Fax : (228) 221 86 84 Télex : 5339 TG Lomé-TOGO Table of contents TABLE OF CONTENTS... 1 LIST OF TABLES... 2 LIST OF BOXES... 3 LIST OF CHARTS...

More information

Building Resilience in Fragile States: Experiences from Sub Saharan Africa. Mumtaz Hussain International Monetary Fund October 2017

Building Resilience in Fragile States: Experiences from Sub Saharan Africa. Mumtaz Hussain International Monetary Fund October 2017 Building Resilience in Fragile States: Experiences from Sub Saharan Africa Mumtaz Hussain International Monetary Fund October 2017 How Fragility has Changed since the 1990s? In early 1990s, 20 sub-saharan

More information

Gari s.a. Guarantee Fund for Private Investments in West Africa

Gari s.a. Guarantee Fund for Private Investments in West Africa Gari s.a. Guarantee Fund for Private Investments in West Africa Contents Introduction.4 Objectives 5 Services 5 Eligible companies...5 Beneficiary establishments..6 Guaranteed operations.6 Rules of interventions..6

More information

Introduction to MALI. BNP Paribas presence. Working with BNP Paribas. Currency. Summary. Currency. Bank accounts

Introduction to MALI. BNP Paribas presence. Working with BNP Paribas. Currency. Summary. Currency. Bank accounts Introduction to MALI Mali is a poor, predominantly desert country with a high dependency on gold and cotton exports. The agricultural sector accounts for 40% of GDP, and the economy is therefore highly

More information

IFAD s participation in the Heavily Indebted Poor Countries Debt Initiative. Proposal for the Comoros and the 2010 progress report

IFAD s participation in the Heavily Indebted Poor Countries Debt Initiative. Proposal for the Comoros and the 2010 progress report Document: EB 2010/101/R.16 Agenda: 12 Date: 16 November 2010 Distribution: Public Original: English E IFAD s participation in the Heavily Indebted Poor Countries Debt Initiative Proposal for the Comoros

More information

Challenges and opportunities of LDCs Graduation:

Challenges and opportunities of LDCs Graduation: Challenges and opportunities of LDCs Graduation: UNDP as a Strategic Partner in the Graduation Process Ayodele Odusola, PhD Chief Economist and Head Strategy and Analysis Team UNDP Regional Bureau for

More information

Information on intergovernmental organizations

Information on intergovernmental organizations United Nations Industrial Development Organization Distr.: General 25 October 2018 Original: English Industrial Development Board Forty-sixth session Vienna, 26 28 November 2018 Item 16 of the provisional

More information

African Financial Markets Initiative

African Financial Markets Initiative African Financial Markets Initiative African Domestic Bond Fund Feasibility Study Frankfurt, November 2011 This presentation is organised into four sections I. Introduction to the African Financial Markets

More information

Annual Report 2015 ANNUAL REPORT 2015

Annual Report 2015 ANNUAL REPORT 2015 ANNUAL REPORT 2015 May 2016 MESSAGE FROM THE PRESIDENT I am pleased to submit the Annual Report of the ECOWAS Bank for Investment and Development (EBID) for 2015. The Bank continued to deliver on its mandate

More information

ECOWAS BANK FOR INVESTMENT AND DEVELOPMENT (EBID)

ECOWAS BANK FOR INVESTMENT AND DEVELOPMENT (EBID) ECOWAS BANK FOR INVESTMENT AND DEVELOPMENT (EBID) CONSOLIDATED FINANCIAL STATEMENTS July 2016 128 Boulevard du 13 Janvier BP : 2704 Lomé-TOGO Tél : (228) 22 21 68 64 Fax : (228) 22 21 86 84 Site web: www.bidc-ebid.org

More information

ECREE REGIONAL OFF GRID ELECTRIFICATION PROJECT - ROGEP

ECREE REGIONAL OFF GRID ELECTRIFICATION PROJECT - ROGEP ECREE REGIONAL OFF GRID ELECTRIFICATION PROJECT - ROGEP COMPONENT 2 - ACCESS TO FINANCE COMPONENT 1C RISK MITIGAITON FACILITY Funded by Festus William Amoyaw Finance and E&S Expert - ROGEP CAPITAL FLOWS

More information

Redefining the Landscape of Payment Systems:

Redefining the Landscape of Payment Systems: Redefining the Landscape of Payment Systems: Challenges and Opportunities for the African Payments Landscape World Bank Global Payment Systems Conference 2009 Cape Town, South Africa, 7 April 2009 1 PRESENTATION

More information

Request for Proposals (RFP)

Request for Proposals (RFP) Macroeconomic and Financial Manag ement Institute of Eastern and Southern Africa 9 Earls Road Alexandra Park P. O. Box A1419, Avondale Harare, Zimbabwe Tel: +263 4 745988-89/91-94 Fax: +263 4 745547-8

More information

William Nicol - Tel ;

William Nicol - Tel ; For Official Use DCD/DAC(2014)37/FINAL DCD/DAC(2014)37/FINAL For Official Use Organisation de Coopération et de Développement Économiques Organisation for Economic Co-operation and Development 12-Aug-2014

More information

In 2012, the Franc Zone countries posted particularly strong economic growth of 5.8% on average compared

In 2012, the Franc Zone countries posted particularly strong economic growth of 5.8% on average compared OVERVIEW In 01, the Franc Zone countries posted particularly strong economic growth of 5.8% on average compared with an average of.9% for Sub-Saharan Africa. The Franc Zone countries benefited from ongoing

More information

Definitions. Terms of Reference

Definitions. Terms of Reference Terms of Reference National or International consultants: International Description of the assignment (Title of consultancy): Mid-Term Review of the LEPAP project Project Title: Lebanon Environmental Pollution

More information

J. W. Sutherland, K. O. Agadzi and Emmanuel M. K. Amekor Environment and Sustainable Development Department, VRA.

J. W. Sutherland, K. O. Agadzi and Emmanuel M. K. Amekor Environment and Sustainable Development Department, VRA. RATIONALISING THE ENVIRONMENTAL IMPACT ASSESSMENT PROCEDURES IN ECOWAS MEMBER COUNTRIES: AN ESSENTIAL INGREDIENT IN PROMOTING REGIONAL INTEGRATION THROUGH ESTABLISHMENT OF POWER POOLS AND INTERCONNECTIONS

More information

WEST AFRICA: ECONOMIC OVERVIEW BY PROFESSOR AKPAN H. EKPO

WEST AFRICA: ECONOMIC OVERVIEW BY PROFESSOR AKPAN H. EKPO WEST AFRICA: ECONOMIC OVERVIEW BY PROFESSOR AKPAN H. EKPO Presented at the SWIFT BUSINESS FORUM WEST AFRICA 2016, EKO HOTEL, LAGOS, NOVEMBER 8, 2016. Professor of Economics and Director General, West African

More information

Fiscal Policy Responses in African Countries to the Global Financial Crisis

Fiscal Policy Responses in African Countries to the Global Financial Crisis Fiscal Policy Responses in African Countries to the Global Financial Crisis Sanjeev Gupta Deputy Director Fiscal Affairs Department International Monetary Fund Outline Global economic outlook Growth prospects

More information

Employees Provident Fund

Employees Provident Fund Employees Provident Fund Sri Lanka No. 13, Sir Baron Jayathilake Mawatha, Colombo 01 Tel Number: +9411 2206601 Fax Number: +94112206630 E-mail Address: sepf@cbsl.lk REQUEST FOR EXPRESSION OF INTEREST (EOI)

More information

BANK OF MAURITIUS REQUEST FOR PROPOSAL (RFP) Consultancy Services for the Implementation of IFRS 9 by. Bank of Mauritius

BANK OF MAURITIUS REQUEST FOR PROPOSAL (RFP) Consultancy Services for the Implementation of IFRS 9 by. Bank of Mauritius BANK OF MAURITIUS REQUEST FOR PROPOSAL (RFP) Consultancy Services for the Implementation of IFRS 9 by Bank of Mauritius MARCH 2018 1 BID Information Sheet 4 2 INTRODUCTION... 5 2.1 STATEMENT OF PURPOSE...

More information

Terms of Reference (ToR) Earthquake Hazard Assessment and Mapping Specialist

Terms of Reference (ToR) Earthquake Hazard Assessment and Mapping Specialist Terms of Reference (ToR) Earthquake Hazard Assessment and Mapping Specialist I. Introduction With the support of UNDP, the Single Project Implementation Unit (SPIU) of the Ministry of Disaster Management

More information

PROGRESS REPORT ON THE ISLAMIC SOLIDARITY FUND FOR DEVELOPMENT (ISFD)

PROGRESS REPORT ON THE ISLAMIC SOLIDARITY FUND FOR DEVELOPMENT (ISFD) ISLAMIC DEVELOPMENT BANK GROUP PROGRESS REPORT ON THE ISLAMIC SOLIDARITY FUND FOR DEVELOPMENT (ISFD) 33 rd Session of the COMCEC (Istanbul, Turkey, 20-23 November 2017) ISLAMIC SOLIDARITY FUND FOR DEVELPMENT

More information

Paying Taxes 2019 Global and Regional Findings: AFRICA

Paying Taxes 2019 Global and Regional Findings: AFRICA World Bank Group: Indira Chand Phone: +1 202 458 0434 E-mail: ichand@worldbank.org PwC: Sharon O Connor Tel:+1 646 471 2326 E-mail: sharon.m.oconnor@pwc.com Fact sheet Paying Taxes 2019 Global and Regional

More information

ASX CLEAR OPERATING RULES Guidance Note 10

ASX CLEAR OPERATING RULES Guidance Note 10 BUSINESS CONTINUITY AND DISASTER RECOVERY The purpose of this Guidance Note The main points it covers To assist participants to understand the disaster recovery and business continuity arrangements they

More information

MARKETS AND FOOD POLICIES. Bharat Ramaswami, Indian Statistical Institute, Delhi & Kensuke Kuobo, ISI and Institute of Developing Economies, Tokyo

MARKETS AND FOOD POLICIES. Bharat Ramaswami, Indian Statistical Institute, Delhi & Kensuke Kuobo, ISI and Institute of Developing Economies, Tokyo MARKETS AND FOOD POLICIES Bharat Ramaswami, Indian Statistical Institute, Delhi & Kensuke Kuobo, ISI and Institute of Developing Economies, Tokyo TWO QUESTIONS A. How do markets deal with high food prices?

More information

ISLAMIC DEVELOPMENT BANK PROGRESS REPORT ON THE ACTIVITIES OF THE ISLAMIC SOLIDARITY FUND FOR DEVELOPMENT (ISFD)

ISLAMIC DEVELOPMENT BANK PROGRESS REPORT ON THE ACTIVITIES OF THE ISLAMIC SOLIDARITY FUND FOR DEVELOPMENT (ISFD) ISLAMIC DEVELOPMENT BANK PROGRESS REPORT ON THE ACTIVITIES OF THE ISLAMIC SOLIDARITY FUND FOR DEVELOPMENT (ISFD) 31 st Meeting of the Follow-up Committee of the COMCEC 13-14 May 2015, Ankara, Turkey Report

More information

Addis Ababa, ETHIOPIA P. O. Box 3243 Telephone: Fax: website: www. africa-union.org

Addis Ababa, ETHIOPIA P. O. Box 3243 Telephone: Fax: website: www. africa-union.org AFRICAN UNION UNION AFRICAINE UNIÃO AFRICANA Addis Ababa, ETHIOPIA P. O. Box 3243 Telephone: 002511-15-517-700 Fax: 002511-15-513-036 website: www. africa-union.org ASSEMBLY OF THE AFRICAN UNION Nineteenth

More information

World Meteorological Organization

World Meteorological Organization WMO World Meteorological Organization Working together in weather, climate and water REGIONAL WORKSHOP ON IMPLEMENTATION OF WEATHER- AND CLIMATE- RELATED SERVICES IN THE LEAST DEVELOPED COUNTRIES (LDCs)

More information

Working Party on Export Credits and Credit Guarantees

Working Party on Export Credits and Credit Guarantees Unclassified TAD/ECG(2008)1 TAD/ECG(2008)1 Unclassified Organisation de Coopération et de Développement Economiques Organisation for Economic Co-operation and Development 11-Jan-2008 English - Or. English

More information

Nigeria Trust Fund Financial Statements and Report of the Independent Auditor Year ended December 31, 2014

Nigeria Trust Fund Financial Statements and Report of the Independent Auditor Year ended December 31, 2014 Financial Statements and Report of the Independent Auditor Year ended December 31, 2014 Balance Sheet 226 Income Statement 228 Statement of Comprehensive Income 229 Statement of Changes in Equity 229 Statement

More information

Ecobank: Banking for the Bottom Billions. Kigali, March 15, 2012

Ecobank: Banking for the Bottom Billions. Kigali, March 15, 2012 Ecobank: Banking for the Bottom Billions Kigali, March 15, 2012 «WE DO NOT HAVE AN AFRICAN STRATEGY 2 AFRICA IS OUR STRATEGY» - Arnold Ekpe, Ecobank s Group CEO 3 Contents I Financially Excluded Bottom

More information

BCMS APPROACH. Implementing Business Continuity for Organization

BCMS APPROACH. Implementing Business Continuity for Organization BCMS APPROACH Implementing Business Continuity for Organization BC INSTANCES Flight EK521 arriving from Trivandrum, India crash-lands in Dubai 282 passengers and 18 crew on board including 24 Britons One

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 20.12.2011 COM(2011) 907 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL PROGRESS REPORT ON THE DEVELOPMENT OF THE SECOND GENERATION SCHENGEN INFORMATION

More information

30% DEPOSIT BONUS FOR OUR TRADERS IN AFRICA PROMOTION. Terms and Conditions

30% DEPOSIT BONUS FOR OUR TRADERS IN AFRICA PROMOTION. Terms and Conditions 30% DEPOSIT BONUS FOR OUR TRADERS IN AFRICA PROMOTION Terms and Conditions INTRODUCTION FXTM 1 is running the 30% Deposit Bonus for Our Traders in Africa Promotion (hereinafter referred to as the Promotion

More information

Update on Multilateral Debt Relief Initiative (MDRI) and Grant Compensation

Update on Multilateral Debt Relief Initiative (MDRI) and Grant Compensation Update on Multilateral Debt Relief Initiative (MDRI) and Grant Compensation Discussion Paper ADF-11 Replenishment: Third Consultation September 2007 Bamako, Mali AFRICAN DEVELOPMENT FUND Executive Summary

More information

GAO POTENTIAL TERRORIST ATTACKS. More Actions Needed to Better Prepare Critical Financial Markets. Testimony

GAO POTENTIAL TERRORIST ATTACKS. More Actions Needed to Better Prepare Critical Financial Markets. Testimony GAO United States General Accounting Office Testimony Before the House Committee on Financial Services, Subcommittee on Capital Markets, Insurance, and Government Sponsored Enterprises For Release on Delivery

More information

Making Countries Competitive Beyond the roads and bridges

Making Countries Competitive Beyond the roads and bridges The Role of the Private Sector, Soft Infrastructure and Making Countries Competitive Beyond the roads and bridges Ms Patricia Francis Executive Director 2010 ECOWAS Aid for Trade Meeting World Bank s Prospects

More information

July Podesta & Co. Business Continuity Plan (BCP)

July Podesta & Co. Business Continuity Plan (BCP) July 2015 Podesta & Co. Business Continuity Plan (BCP) I. Emergency Contact Persons Our firm s emergency contact persons at our main office are: Carol P. Foley, 312/899-0133, cfoley@podestaco.com and Victor

More information

PUNJAB SKILLS DEVELOPMENT FUND TENDER DOCUMENT HIRING OF HR CONSULTING FIRM

PUNJAB SKILLS DEVELOPMENT FUND TENDER DOCUMENT HIRING OF HR CONSULTING FIRM TENDER DOCUMENT HIRING OF HR CONSULTING FIRM May, 2017 Submission Date for Sealed Bids: 2 nd June, 2017 (10:30 AM) 21-A, H-Block, Dr. Mateen Fatima Road, Gulberg-II, Lahore Pakistan Phone: +92-42-35752408-10

More information

Benin 27 August 2015

Benin 27 August 2015 Benin 27 August 2015 PAGE 1 OF 6 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country (or region) Benin Submission Date 27/08/2015 NDA or Focal Point Directorate

More information

Global Mobility Services: Taxation of International Assignees Country - Cabo Verde

Global Mobility Services: Taxation of International Assignees Country - Cabo Verde www.pwc.com/cv/pt.html Global Mobility Services: Taxation of International Assignees Country - Cabo Verde People and Organisation Global Mobility Country Guide (Folio) Last Updated: June 2018 This document

More information

Assessing Fiscal Space and Financial Sustainability for Health

Assessing Fiscal Space and Financial Sustainability for Health Assessing Fiscal Space and Financial Sustainability for Health Ajay Tandon Senior Economist Global Practice for Health, Nutrition, and Population World Bank Washington, DC, USA E-mail: atandon@worldbank.org

More information

GEOGRAPHICAL SITUATION OF THE West Africa Monetary Union (WAMU) ECONOMIC ENVIRONMENT AND INSTITUTIONAL FRAMEWORK

GEOGRAPHICAL SITUATION OF THE West Africa Monetary Union (WAMU) ECONOMIC ENVIRONMENT AND INSTITUTIONAL FRAMEWORK GEOGRAPHICAL SITUATION OF THE West Africa Monetary Union (WAMU) The WAMU is a monetary union that encompasses 8 countries from France s former colonies in West Africa. The current member states are: Benin,

More information

REQUEST FOR TENDERS ANALYSIS OF IMPLICATIONS OF THE PROPOSED ESTABLISHMENT OF A TRIPARTITE FTA BETWEEN COMESA, SADC AND THE EAC ON SACU

REQUEST FOR TENDERS ANALYSIS OF IMPLICATIONS OF THE PROPOSED ESTABLISHMENT OF A TRIPARTITE FTA BETWEEN COMESA, SADC AND THE EAC ON SACU REQUEST FOR TENDERS ANALYSIS OF IMPLICATIONS OF THE PROPOSED ESTABLISHMENT OF A TRIPARTITE FTA BETWEEN COMESA, SADC AND THE EAC ON SACU RFT Number: PDR/02/2010 Issued on: 13 December 2010 Closing Date:

More information

CITY UNIVERSITY OF HONG KONG Business Continuity Management Standard

CITY UNIVERSITY OF HONG KONG Business Continuity Management Standard CITY UNIVERSITY OF HONG KONG Business Continuity Management Standard (Approved by the Information Strategy and Governance Committee in December 2013; revision 1.1 approved by Chief Information Officer

More information

Ebola Recovery and Reconstruction Trust Fund Grant Agreement

Ebola Recovery and Reconstruction Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GRANT NUMBER: TFOA1023 Public Disclosure Authorized Ebola Recovery and Reconstruction Trust Fund Grant Agreement (LABOR-INTENSIVE PUBLIC WORKS TO MITIGATE

More information

Terms of Reference (ToR) Business Potential survey in Doti District

Terms of Reference (ToR) Business Potential survey in Doti District Terms of Reference (ToR) Business Potential survey in Doti District 1. Background Good Neighbors International (GNI) is an international humanitarian and development NGO in general consultative status

More information

TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT

TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT Advertised on behalf of: TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT POST TITLE: National Consultant to formulate the upgraded guideline packages of the District Development Fund (DDF) AGENCY/PROJECT

More information

East African Community

East African Community East African Community TERMS OF REFERENCE AND SCOPE OF WORK FOR A CONSULTANCY TO DEVELOP THE EAC REGIONAL MINIMUM PACKAGE OF SERVICES FOR VULNERABLE CHILDREN AND YOUTH IN THE EAC REGION 1. INTRODUCTION

More information

Fourth United Nations Conference on the Least Developed Countries

Fourth United Nations Conference on the Least Developed Countries United Nations A/CONF.219/IPC/1/Rev.1 Fourth United Nations on the Least Developed Countries Distr.: General 9 December 2010 Istanbul, Turkey 9-13 May 2011 Original: English Intergovernmental Preparatory

More information

12 April, Introduction

12 April, Introduction INVITATION FOR EXPRESSION OF INTEREST TO ACT AS A FINANCIAL ADVISER TO THE HELLENIC REPUBLIC ASSET DEVELOPMENT FUND FOR THE PROVISION OF SERVICES REGARDING THE EXPLOITATION OF ITS SHAREHOLDING STAKES IN

More information

THE NATIONAL CREDIT REGULATOR SEPTEMBER 2017 TERMS OF REFERENCE FOR THE APPOINTMENT OF AN ADVERTISING AND MEDIA BUYING AGENCY RFP NUMBER: NCR445/09/17

THE NATIONAL CREDIT REGULATOR SEPTEMBER 2017 TERMS OF REFERENCE FOR THE APPOINTMENT OF AN ADVERTISING AND MEDIA BUYING AGENCY RFP NUMBER: NCR445/09/17 THE NATIONAL CREDIT REGULATOR SEPTEMBER 2017 TERMS OF REFERENCE FOR THE APPOINTMENT OF AN ADVERTISING AND MEDIA BUYING AGENCY RFP NUMBER: NCR445/09/17 DUE DATE: 3 OCTOBER 2017 1 SECTION 1 GENERAL TERMS

More information

PUBLIC-PRIVATE PARTNERSHIP GUIDELINES

PUBLIC-PRIVATE PARTNERSHIP GUIDELINES PUBLIC-PRIVATE PARTNERSHIP GUIDELINES Table of Contents I. PURPOSE OF GUIDELINES... 3 II. DEFINITIONS... 3 III. USE OF QUALIFIED PROFESSIONALS... 5 IV. PROCUREMENT PROCEDURES... 5 V. PROJECT FEASIBILITY

More information

Ministry of Finance, Banking & Postal Services Republic of the Marshall Islands

Ministry of Finance, Banking & Postal Services Republic of the Marshall Islands Ministry of Finance, Banking & Postal Services Republic of the Marshall Islands Consultant Recruitment Announcement Project to Strengthen Budget Execution and Financial Reporting Systems (BEFR) Project

More information

AUSTRACLEAR REGULATIONS Guidance Note 10

AUSTRACLEAR REGULATIONS Guidance Note 10 BUSINESS CONTINUITY AND DISASTER RECOVERY The purpose of this Guidance Note The main points it covers To assist participants to understand the disaster recovery and business continuity arrangements they

More information

Perspectives on Global Development 2012 Social Cohesion in a Shifting World. OECD Development Centre

Perspectives on Global Development 2012 Social Cohesion in a Shifting World. OECD Development Centre Perspectives on Global Development 2012 Social Cohesion in a Shifting World OECD Development Centre Perspectives on Global Development Trilogy through the lens of Shifting Wealth: 1. Shifting Wealth 2.

More information

INVITATION FOR APPOINTMENT OF CHARTERED ACCOUNTANTS FIRM FOR DIRECT AND INDIRECT TAXATION MATTERS OF WEBEL TECHNOLOGY LIMITED

INVITATION FOR APPOINTMENT OF CHARTERED ACCOUNTANTS FIRM FOR DIRECT AND INDIRECT TAXATION MATTERS OF WEBEL TECHNOLOGY LIMITED INVITATION FOR APPOINTMENT OF CHARTERED ACCOUNTANTS FIRM FOR DIRECT AND INDIRECT TAXATION MATTERS OF WEBEL TECHNOLOGY LIMITED Last date for submission of application : 20.01.2019 WEBEL TECHNOLOGY LIMITED

More information

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase GCF/B.10/05 21 June 2015 Meeting of the Board 6-9 July 2015 Songdo, Republic of Korea Provisional Agenda item

More information

Making Risks Manageable. Technical Risk Management for your Business

Making Risks Manageable. Technical Risk Management for your Business Making Risks Manageable Technical Risk Management for your Business Aon Your Partner in Technical Risk Questions Leave your risk management to a partner who helps you with the assessment, design and improvement

More information

WEST AFRICA HUMANITARIAN RESPONSE FUND (WAHRF) 1. GENERAL INFORMATION 2

WEST AFRICA HUMANITARIAN RESPONSE FUND (WAHRF) 1. GENERAL INFORMATION 2 WEST AFRICA HUMANITARIAN RESPONSE FUND (WAHRF) GUIDELINES FOR 2009 FUNDING ROUND 1. GENERAL INFORMATION 2 1.1 Background 2 1.2 Funding for the 2009 Competition 2 1.3 What can WAHRF funding be used for?

More information

Bidding Rules for the Auctions Under the Competitive Bidding Process of Ohio Power Company

Bidding Rules for the Auctions Under the Competitive Bidding Process of Ohio Power Company Bidding Rules for the Auctions Under the Competitive Bidding Process of Ohio Power Company CBP Rules Contents Contents Contents... i ARTICLE I. Introduction...1 I.1. Background...1 I.2. Overview...1 ARTICLE

More information

Business Continuity Plan

Business Continuity Plan Business Continuity Plan IMMEDIATE ACTIONS Manager/Supervisor 1. Ensure emergency services contacted 2. Ensure safety of personnel 3. Co-ordinate with the emergency services 4. Contact Senior members of

More information

Use of Internal Models for Determining Required Capital for Segregated Fund Risks (LICAT)

Use of Internal Models for Determining Required Capital for Segregated Fund Risks (LICAT) Canada Bureau du surintendant des institutions financières Canada 255 Albert Street 255, rue Albert Ottawa, Canada Ottawa, Canada K1A 0H2 K1A 0H2 Instruction Guide Subject: Capital for Segregated Fund

More information

MDRI HIPC. heavily indebted poor countries initiative. To provide additional support to HIPCs to reach the MDGs.

MDRI HIPC. heavily indebted poor countries initiative. To provide additional support to HIPCs to reach the MDGs. Goal To ensure deep, broad and fast debt relief and thereby contribute toward growth, poverty reduction, and debt sustainability in the poorest, most heavily indebted countries. HIPC heavily indebted poor

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

ANNUAL DISCLOSURES FOR 2010 ON AN UNCONSOLIDATED BASIS

ANNUAL DISCLOSURES FOR 2010 ON AN UNCONSOLIDATED BASIS ANNUAL DISCLOSURES FOR 2010 ON AN UNCONSOLIDATED BASIS ACCORDING TO THE REQUIREMENTS OF ORDINANCE 8 OF THE BULGARIAN NATIONAL BANK FOR THE CAPITAL ADEQUACY OF CREDIT INSTITUTIONS /ART. 335 OF ORDINANCE

More information

WEST AFRICAN MONETARY AGENCY (WAMA) TAX EFFORT IN ECOWAS COUNTRIES

WEST AFRICAN MONETARY AGENCY (WAMA) TAX EFFORT IN ECOWAS COUNTRIES WEST AFRICAN MONETARY AGENCY (WAMA) TAX EFFORT IN ECOWAS COUNTRIES Freetown, Dec 2011 LIST OF ABBREVIATIONS AND ACRONYMS ECOWAS EMCP UEMOA WAMA WAMZ ECONOMIC COMMUNITY OF WEST AFRICAN STATES ECOWAS MONETARY

More information

Florida Department of Children and Families

Florida Department of Children and Families 2. Provide support to the ACCESS Florida System Replacement Project where necessary and as directed throughout the duration of the contract. This Statement of Purpose provides only a summary of the Department

More information

An Introduction to DeMPA

An Introduction to DeMPA An Introduction to DeMPA DeMPA Training Mexico City, Mexico February 28 March 4, 2011 1. Methodology 2.Links with Lifecycle of a loan 3. Implementation 4. Reform Plan 2 1 What is the Debt Management Performance

More information

1. Procurement Guidelines

1. Procurement Guidelines 1. Procurement Guidelines In support of the Authority s mission as outlined in section 2 of this manual, the Board adopts annually the NYSBA Procurement Guidelines. The following Guidelines were amended

More information

Debt Limits Review: Main Findings and Options for Reform

Debt Limits Review: Main Findings and Options for Reform Debt Limits Review: Main Findings and Options for Reform Reza Baqir Division Chief, Debt Policy Division Strategy, Policy, and Review Department April 2013 Key Features of Current Policy 2 Debt limits

More information

A. Significant Business Disruptions (SBDs)

A. Significant Business Disruptions (SBDs) Updated 9.3.18 I. Emergency Contact Persons Our firm s two emergency contact persons are: Gilman C. Perkins ( Executive Principal ), 107 John Street, Southport, CT 06890, (203) 418-2010, cperkins@pfm-llc.com,

More information

Labour Statistics in Afristat Member States: Summary of the Situation *

Labour Statistics in Afristat Member States: Summary of the Situation * United Nations ESA/STAT/AC.88/26 Statistics Division 24 April 2003 Expert Group Meeting on Setting the Scope of Social Statistics United Nations Statistics Division in collaboration with the Siena Group

More information

BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS

BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS Regulatory and Institutional Framework for PPPs Does the regulatory framework in your country allow procuring PPPs?. If yes, please specify the relevant regulatory

More information

Expressions of Interest to Develop a Concept Note for USAID s Food for Peace Emergency Food Security Activity Survey Sampling Strategies

Expressions of Interest to Develop a Concept Note for USAID s Food for Peace Emergency Food Security Activity Survey Sampling Strategies REQUEST FOR EXPRESSION OF INTEREST Expressions of Interest to Develop a Concept Note for USAID s Food for Peace Emergency Food Security Activity Survey Sampling Strategies Date of Issuance: October 16,

More information

INVITATION TO SUBMIT AN EXPRESSION OF INTEREST FOR AN INVESTMENT IN CYTA HELLAS S.A.

INVITATION TO SUBMIT AN EXPRESSION OF INTEREST FOR AN INVESTMENT IN CYTA HELLAS S.A. Nicosia, 12 September 2017 INVITATION TO SUBMIT AN EXPRESSION OF INTEREST FOR AN INVESTMENT IN CYTA HELLAS S.A. 1 Introduction 1.1 CYPRUS TELECOMMUNICATIONS AUTHORITY ("CYTA") is a public corporation established

More information

The R.L. Brown Advisory Group, LLC Business Continuity Plan (BCP)

The R.L. Brown Advisory Group, LLC Business Continuity Plan (BCP) The R.L. Brown Advisory Group, LLC Business Continuity Plan (BCP) I. Emergency Contact Persons Our firm s emergency contact person is: Robert L. Brown, President, 925-425-9610, bob@rlbrownadvisors.com

More information

REPORT ON: IDB s WTO-RELATED TECHNICAL ASSISTANCE AND CAPACITY BUILDING PROGRAM

REPORT ON: IDB s WTO-RELATED TECHNICAL ASSISTANCE AND CAPACITY BUILDING PROGRAM ISLAMIC DEVELOPMENT BANK REPORT ON: IDB s WTO-RELATED TECHNICAL ASSISTANCE AND CAPACITY BUILDING PROGRAM 33 rd Session of the COMCEC (Istanbul, Turkey, 20-23 November 2017) IDB WTO-RELATED TECHNICAL ASSISTANCE

More information

Annex C DAMAGE ASSESSMENT I. PURPOSE

Annex C DAMAGE ASSESSMENT I. PURPOSE Annex C DAMAGE ASSESSMENT I. PURPOSE This Annex describes the uniform damage assessment process to document damage from incidents or disasters in Iowa. Information gathered with this process may be used

More information

Complementary study on a West African Regional Action Plan to control fruit fly

Complementary study on a West African Regional Action Plan to control fruit fly Complementary study on a West African Regional Action Plan to control fruit fly EXECUTIVE SUMMARY 4 September 2009 Prepared by the COLEACP team: Frédéric Plumelle Babacar Samb Nicolas Gergely Catherine

More information

MDRI HIPC MULTILATERAL DEBT RELIEF INITIATIVE HEAVILY INDEBTED POOR COUNTRIES INITIATIVE GOAL GOAL

MDRI HIPC MULTILATERAL DEBT RELIEF INITIATIVE HEAVILY INDEBTED POOR COUNTRIES INITIATIVE GOAL GOAL GOAL To ensure deep, broad and fast debt relief and thereby contribute toward growth, poverty reduction, and debt sustainability in the poorest, most heavily indebted countries. HIPC HEAVILY INDEBTED POOR

More information

Business Continuity Plan Client Disclosure Document

Business Continuity Plan Client Disclosure Document Business Continuity Plan Client Disclosure Document BARR Financial Services, LLC Introduction The purpose of this letter is to provide you with very important information about BARR Financial Services,

More information

CIRCULAR CSSF 13/563

CIRCULAR CSSF 13/563 COMMISSION de SURVEILLANCE du SECTEUR FINANCIER In case of discrepancies between the French and the English text, the French text shall prevail Luxembourg, 19 March 2013 To all credit institutions, investment

More information

TOWN OF MIDLAND ADMINISTRATION DEPARTMENT REQUEST FOR PROPOSAL FILE # F Information Technology Strategic Plan

TOWN OF MIDLAND ADMINISTRATION DEPARTMENT REQUEST FOR PROPOSAL FILE # F Information Technology Strategic Plan TOWN OF MIDLAND ADMINISTRATION DEPARTMENT REQUEST FOR PROPOSAL FILE # F18-047891 Information Technology Strategic Plan Carolyn Tripp January, 2015 Chief Administrative Officer The Corporation of the Town

More information

GLOBAL TERMS OF REFERENCE FRAMEWORK CONTRACT SERVICES FOR THE IMPLEMENTATION OF EXTERNAL AID (SIEA) 2018 EUROPEAID/138778/DH/SER/MULTI CONTENTS

GLOBAL TERMS OF REFERENCE FRAMEWORK CONTRACT SERVICES FOR THE IMPLEMENTATION OF EXTERNAL AID (SIEA) 2018 EUROPEAID/138778/DH/SER/MULTI CONTENTS GLOBAL TERMS OF REFERENCE FRAMEWORK CONTRACT SERVICES FOR THE IMPLEMENTATION OF EXTERNAL AID (SIEA) 2018 EUROPEAID/138778/DH/SER/MULTI CONTENTS 1 BACKGROUND INFORMATION... 2 1.1 GENERAL INFORMATION...

More information

Request for Proposal. Fabrication and Installation of Municipal Way-finding Signage Town of Orangeville. June 15, 2015

Request for Proposal. Fabrication and Installation of Municipal Way-finding Signage Town of Orangeville. June 15, 2015 Request for Proposal Fabrication and Installation of Municipal Way-finding Signage Town of Orangeville 1.0 Introduction and Background June 15, 2015 1.1 Fabrication and Installation of Municipal Way-finding

More information

7/25/2013. Presented by: Erike Young, MPPA, CSP, ARM. Chapter 2. Root Cause Analysis

7/25/2013. Presented by: Erike Young, MPPA, CSP, ARM. Chapter 2. Root Cause Analysis Presented by: Erike Young, MPPA, CSP, ARM 1 Chapter 2 Root Cause Analysis 1 Introduction to Root Cause Analysis Root Cause The event or circumstance that directly leads to an occurrence Root Cause Analysis

More information

COMMISSION IMPLEMENTING DECISION. of

COMMISSION IMPLEMENTING DECISION. of EUROPEAN COMMISSION Brussels, 17.9.2012 C(2012) 6299 final COMMISSION IMPLEMENTING DECISION of 17.9.2012 on adopting the annual work programme for 2013 for the specific programme on the "Prevention, Preparedness

More information

H. R. To provide for the cancellation of debts owed to international financial institutions by poor countries, and for other purposes.

H. R. To provide for the cancellation of debts owed to international financial institutions by poor countries, and for other purposes. [0hih]... (Original Signature of Member) 0TH CONGRESS ST SESSION H. R. To provide for the cancellation of debts owed to international financial institutions by poor countries, and for other purposes. IN

More information