1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INFRASTRUCTURE TRANSPORT INVESTMENT PROJECT LOAN (ADDITIONAL FINANCING) Transport Sector Country Department AFCS1 Africa Region CREDIT NUMBER APPROVED ON May 22, 2007 TO THE REPUBLIC OF MADAGASCAR June 29, 2010 Report No:

2 ABBREVIATIONS AND ACRONYMS APL BOA EIB OP/BP PIU SDR Adaptable Program Loan Bank of Africa European Investment Bank Operational Policy/Bank Policy Project Implementation Unit Standard Drawing Rights Regional Vice President: Country Director: Sector Manager / Director: Task Team Leader: Obiageli K. Ezekwesili Ruth Kagia C. Sanjivi Rajasingham/Inger Anderson Pierre Graftieaux

3 MADAGASCAR INFRASTRUCTURE TRANSPORT INVESTMENT PROJECT ADDITIONAL FINANCING P CONTENTS Page ANNEX 2: REALLOCATION OF PROCEEDS... 1

4 ANNEX 2: Reallocation of Proceeds MADAGASCAR INFRASTRUCTURE TRANSPORT INVESTMENT PROJECT ADDITIONAL FINANCING CREDIT MAG P Restructuring Paper 1. Proceeds for Madagascar Infrastructure Transport Investment Project, Additional Financing, Credit , P105044, will be reallocated as follows: Category of Expenditure Allocation (SDR) % of Financing Current Revised Current Revised Current Revised (1) Works (1) Works 3,900,000 3,020, % 100% (2) Goods, audits, and Operating Costs (2) Goods, audits, and Operating Costs 6,500,000 7,380, % 100% TOTAL TOTAL 10,400,000 10,400,000 AMOUNT AMOUNT (to be reflected in the table contained in paragraph A.2 of Section 4 of the Schedule 2 of the Credit Agreement) The reallocation is considered to be minor, as the amount to be reallocated is small (SDR 880,000) and represents only 8.46 percent of the Project Additional Financing (Cr ), and 0.77 percent of the total credit ( and ). 2. Summary of Project Implementation Progress The Transport Infrastructure Investment Project is the third of a three-phase Adaptable Program Lending (APL) and was approved on December 8, The credit amount is SDR million (US$150 million equivalent). The restructuring of APL 3 was approved by the Board on January 3, This restructuring included the addition of a new component: support to the rehabilitation of the Northern Railway (operated by a private concessionaire, Madarail). An additional financing to the APL3 in an amount of SDR 10.4 million was approved on May 22, 2007 and signed on June 5, 2007, to continue supporting the rehabilitation of the Northern Railway through the financing of rail infrastructure investments (rail track, bridges, and station rehabilitation, for US$$14.1 million) and operational costs (for US$1.5 million). As of today, the Credit s cumulative disbursements represent percent, with a remaining balance of SDR 2,060, The total undisbursed funds of the project are expected to be committed by the end of

5 The railway component of APL3 was rated highly satisfactory until the advent of the 2009 political crisis. By then, all the project indicators, be they related to traffic volumes, travel times, wagon turnaround time, productivity or financial targets for the concessionaire, were being met. The last formal supervision mission conducted in December 2008 confirmed that during the period under review there was no misuse of funds from the project designated account and no major risk factors related to safeguards, fiduciary or reputational issues or risks stemming from interference of government authority. A recent Financial Management Review, carried out from 15 to 19 February, 2010, confirmed the good management of the project by the Project Implementation Unit (PIU Madarail). The proposed request meets Operational Policy criteria, namely that: (i) the project objectives continue to be achievable and this request does not modify the project description; (ii) there are no qualified or overdue audits; (iii) the performance of the PIUs is fully satisfactory; and (iv) the PIU has prepared a specific action plan acceptable to the Bank for the use of the reallocated funds. 3. The proposed reallocation is necessary to finance a cash compensation scheme to be paid to Madarail, the Northern Railway Concessionaire, as an operating costs subsidy due to the 2009 crisis. as per the terms used in the Exception to OP/BP 7.30 Memo on Madagascar, presented by the Africa Region Vice President, and approved by the Managing Director on May 6, Background: Since March 17, 2009 when the unconstitutional change of government occurred, Bank s operations have been guided by OP/BP 7.30, Dealing with de facto Governments, and no withdrawal request has been processed since that date. The abovementioned exception Memo proposes to: (i) extend projects that closed in the course of 2009, while disbursements remain on hold, (ii) allow the required level of funding for the PIUs to perform essential fiduciary/management functions, (iii) pay arrears on contractual obligations signed before March 17, 2009, and (iv) resume disbursements for the some selected projects and Trust Funds. More specifically for this project, it was agreed to: retroactively extend the closing date (The Additional Financing Project closed on February 28, 2010), pay the arrears, and provide an operating costs subsidy to Madarail in the amount of US$2.2 million. The approach is consistent with the terms of the APL3 loan agreement and has been used already under the project. Rationale for the request for fund reallocation: The rail concession s financial viability is currently in jeopardy because of the impact of the international and domestic economic crisis on Madarail s operations. Approving the requested fund reallocation would not only prevent the railway concessionnaire from going bankrupt, but would indeed help to save the rail transport mode, the existence of which is currently endangered, and allow for further competition between the rail and road transport while achieving the Credit s agreement s development objective (reducing transport costs and facilitate trade). 2

6 Madarail s current financial situation requires an immediate financial injection of about US$2.2 million, without which it will likely be forced to stop its operations by the third trimester of Madarail transport volumes which should have reached 412,000 tons in 2009 only came at 355,000 tons as overall transport demand for Madarail services contracted. Prospects for 2010 remain bleak, since the economy is expected to go through a recession, which of course will further impact Madarail s financial bottom line and results in the company s inability to service its commercial debt as well as pay its suppliers on time. On January 28, 2010, Madarail s key fund providers, i.e. the World Bank team, the Bank of Africa (BOA), and the European Investment Bank (EIB) met in Antananarivo with representatives from the Ministry of Transport to define a way out of this situation, and agreed that: The EIB and the BOA would assess the feasibility of restructuring Madarail s debt repayment terms (since this meeting, EIB and BOA senior management has approved the proposed restructuring), and The World Bank would examine the possibility of paying contractors arrears for Bank s financed works, and finance a cash compensation scheme for the net loss of cash flow endured by Madarail since the beginning of the crisis. At that time, all stakeholders acknowledged that, should one of the key players default on the proposed agreement, the likelihood of Madarail collapsing would be very high. On the Bank s side of this three-fold arrangement, a reallocation of funds, reason for this Restructuring Paper, is needed. On May 20, 2010, the Ministry of Transport sent a letter to the Bank (see attachment) to request the reallocation of SDR 880,000 from the Credit s Category 1, Works, to Category 2, Goods, audits, and Operating Costs). 3

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Water and Urban I1 Africa Region Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011 Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND

More information

The World Bank NEITI Reporting Compliance (P162344)

The World Bank NEITI Reporting Compliance (P162344) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NEITI REPORTING COMPLIANCE APPROVED ON DECEMBER 7, 2016 TO FEDERAL MINISTRY

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT Public Disclosure Authorized The World Bank REPORT NO.: RES30161 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING

More information

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

The World Bank LK GPOBA - Access to Sanitation Project (P111161) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LK GPOBA - ACCESS TO SANITATION PROJECT APPROVED ON JUNE 8, 2011 TO DEMOCRATIC

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

The World Bank Nigeria - Public/Private Partnership Program (P115386)

The World Bank Nigeria - Public/Private Partnership Program (P115386) AFRICA Nigeria Finance & Markets Global Practice IBRD/IDA Adaptable Program Loan FY 2011 Seq No: 12 DRAFT ISR29127 Implementing Agencies: Ministry of Finance, Ministry of Finance Key Dates Key Project

More information

OP Investment Project Financing. Bank Access to Information Policy Designation Public

OP Investment Project Financing. Bank Access to Information Policy Designation Public Bank Policy - Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPSVP5.03-POL.103 Issued Effective July 1, 2014 Last Revised On July 1, 2016 Retired July

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES19910 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.108

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.108 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.108 Issued August 18, 2017 Effective August 18, 2017 Retired November 9, 2017

More information

The World Bank Kabeli-A Hydro Electric Project (P122406)

The World Bank Kabeli-A Hydro Electric Project (P122406) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF KABELI-A HYDRO ELECTRIC PROJECT APPROVED ON JULY 1, 2014 TO NEPAL REPORT NO.: RES32467

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ELECTRICITY SECTOR EFFICIENCY ENHANCEMENT PROJECT CR SE. April 25, 2005 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ELECTRICITY SECTOR EFFICIENCY ENHANCEMENT PROJECT CR SE. April 25, 2005 TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMEROON HEALTH SECTOR SUPPORT INVESTMENT PROJECT CREDIT: 4478-CM TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMEROON HEALTH SECTOR SUPPORT INVESTMENT PROJECT CREDIT: 4478-CM TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1 Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO.

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.110

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.110 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.110 Issued September 30, 2018 Effective October 1, 2018 Content Operational policy

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.109

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.109 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.109 Issued November 10, 2017 Effective November 10, 2017 Content Operational policy

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INDEX-BASED LIVESTOCK INSURANCE PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INDEX-BASED LIVESTOCK INSURANCE PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Implementation Status & Results Madagascar Integrated Growth Poles (P083351)

Implementation Status & Results Madagascar Integrated Growth Poles (P083351) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized Implementation tatus & Results Madagascar Integrated Growth Poles (P83351) Operation Name: Integrated

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31045 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000) Public Disclosure Authorized The World Bank REPORT NO.: RES29565 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION

More information

The World Bank Ghana - PPP Project (P125595)

The World Bank Ghana - PPP Project (P125595) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Ghana Finance & Markets Global Practice IBRD/IDA Adaptable Program Loan FY 2012

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 06/15/2005 INTEGRATED SAFEGUARDS DATASHEET

More information

The World Bank Burkina Faso Donsin Transport Infrastructure Project (P120960)

The World Bank Burkina Faso Donsin Transport Infrastructure Project (P120960) Public Disclosure Authorized AFRICA Burkina Faso Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 29-Dec-2017 ISR30740 Implementing Agencies: MOAD, Government

More information

RESTRUCTURING PAPER ON A SECOND PROPOSED PROJECT RESTRUCTURING DAKAR DIAMNIADIO TOLL HIGHWAY PROJECT CREDIT 4579-SN BOARD APPROVAL DATE JUNE 2, 2009

RESTRUCTURING PAPER ON A SECOND PROPOSED PROJECT RESTRUCTURING DAKAR DIAMNIADIO TOLL HIGHWAY PROJECT CREDIT 4579-SN BOARD APPROVAL DATE JUNE 2, 2009 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Country Department AFCF1 Africa Region Document of The World Bank RESTRUCTURING

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Ghana Finance & Markets Global Practice IBRD/IDA Adaptable Program Loan FY 2012 Seq : 7 ARCHIVED on 27-Aug-2015 ISR20184 Implementing Agencies: Public Investment Department,

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized ocument of The World Bank RESTRUCTURING PAPER ON A PROPOSE PROJECT RESTRUCTURING OF ENERGY

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/06/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized The World Bank REPORT NO.: RES30835 RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF REHABILITATION AND

More information

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROJECT TO IMPROVE EDUCATION QUALITY IN MALAWI PROJECT LOAN TO THE REPUBLIC OF MALAWI

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROJECT TO IMPROVE EDUCATION QUALITY IN MALAWI PROJECT LOAN TO THE REPUBLIC OF MALAWI Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WEST AFRICA REGIONAL BIOSAFETY PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WEST AFRICA REGIONAL BIOSAFETY PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY DOCUMENT OF THE WORLD BANK REPORT NO.: RES29941 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 TO TRANSPORT & ICT

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Madagascar Urban Development Global Practice IBRD/IDA Specific Investment Loan FY 2006 Seq No: 21 ARCHIVED on 30-Dec-2014 ISR17647 Implementing Agencies: Public Disclosure

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TAX MODERNIZATION PROJECT TO THE REPUBLIC OF TANZANIA AUGUST 30, 2006

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TAX MODERNIZATION PROJECT TO THE REPUBLIC OF TANZANIA AUGUST 30, 2006 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

The World Bank DRC Multi-modal Transport (P092537)

The World Bank DRC Multi-modal Transport (P092537) AFRICA Congo, Democratic Republic of Transport Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 10 ARCHIVED on 06-Mar-2015 ISR17792 Implementing Agencies: Key Dates Key Project Dates Board

More information

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SEE CATASTROPHE RISK INSURANCE FACILITY TA SECO APPROVED ON SEPTEMBER

More information

The World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992)

The World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MOZAMBIQUE - ARTISANAL FISHERIES AND CLIMATE CHANGE APPROVED ON MARCH

More information

The World Bank Nigeria - Public/Private Partnership Program (P115386)

The World Bank Nigeria - Public/Private Partnership Program (P115386) AFRICA Nigeria Finance & Markets Global Practice IBRD/IDA Adaptable Program Loan FY 2011 Seq No: 11 ARCHIVED on 03-Jan-2017 ISR25243 Implementing Agencies: Ministry of Finance Key Dates Key Project Dates

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES24803 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT

More information

Loan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT OFFICIAL DMIUMTS LOAN NUMBER 8131-CN Loan Agreement (Zhanghu Railway Project) between PEOPLE'S REPUBLIC OF CHINA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated 8,2012 LOAN AGREEMENT AGREEMENT

More information

SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT APPROVED ON JUNE 1, 2010 COORDINATION DU PATMUR,MINISTERE DE L'ECONOMIE, DES FINANCES ET DU PLAN

SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT APPROVED ON JUNE 1, 2010 COORDINATION DU PATMUR,MINISTERE DE L'ECONOMIE, DES FINANCES ET DU PLAN Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES30500 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SENEGAL: TRANSPORT &

More information

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES24760 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 63424-AR PROPOSED PROJECT

More information

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 59553-KH PROPOSED PROJECT

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BOR REGIONAL DEVELOPMENT PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BOR REGIONAL DEVELOPMENT PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SUSTAINABLE DEVELOPMENT UNIT EUROPE AND CENTRAL ASIA Document of The World Bank FOR OFFICIAL

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016 Public Disclosure Authorized The World Bank REPORT NO.: RES31608 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER

More information

Guidance Note to Staff

Guidance Note to Staff Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GUIDANCE NOTE 1. The Operational Policy/Bank Procedure OP/BP 8.00 Rapid Response to Crises

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 11/15/2005 INTEGRATED SAFEGUARDS DATASHEET

More information

The World Bank Kenya Infrastructure Finance/PPP project (P121019)

The World Bank Kenya Infrastructure Finance/PPP project (P121019) Public Disclosure Authorized AFRICA Kenya Financial Systems Practice Global Practice IBRD/IDA Adaptable Program Loan FY 2013 Seq No: 4 ARCHIVED on 22-Dec-2014 ISR17114 Implementing Agencies: Public Private

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Senegal Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 01-Nov-2017 ISR29876 Implementing Agencies: Ministry of Economy,

More information

CLIMATE INVESTMENT FUNDS

CLIMATE INVESTMENT FUNDS CLIMATE INVESTMENT FUNDS CTF/TFC.1/4 November 03, 2008 First Meeting of the CTF Trust Fund Committee Washington, D.C. November 17-18, 2008 CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008 Public Disclosure Authorized RESTRUCTURING PAPER REPORT NO.: RES29620 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Senegal Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 21-May-2018 ISR32084 Implementing Agencies:

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22644 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

The World Bank Water and Sanitation in Tourist Areas (P054221)

The World Bank Water and Sanitation in Tourist Areas (P054221) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WATER AND SANITATION IN TOURIST AREAS APPROVED ON APRIL 2, 2009 TO THE

More information

The World Bank Egypt National Railways Restructuring Project (P101103)

The World Bank Egypt National Railways Restructuring Project (P101103) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 21 ARCHIVED on 05-Jun-2018

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31490 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY

More information

RESTRUCTURING PAPER ON A. PROPOSED PROJECT RESTRUCTURING OF EMERGENCY POWER REHABILITATION PROJECT (CR 3933 & TF 54718) (June 22, 2004)

RESTRUCTURING PAPER ON A. PROPOSED PROJECT RESTRUCTURING OF EMERGENCY POWER REHABILITATION PROJECT (CR 3933 & TF 54718) (June 22, 2004) Document of The World Bank Report No: RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF EMERGENCY POWER REHABILITATION PROJECT (CR 3933 & TF 54718) (June 22, 2004) TO THE ISLAMIC REPUBLIC OF AFGHANISTAN

More information

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325) AFRICA Mozambique Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2007 Seq No: 24 ARCHIVED on 29-Aug-2018 ISR33744 Implementing Agencies: ROAD FUND (Fundo de Estradas),

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SAFE AND SUSTAINABLE TRANSPORT PROJECT LOAN December 10, 2009 IN THE INITIAL AMOUNT OF (US$ {150}

More information

SEETO priority projects rating methodology. July, SEETO Priority Projects rating methodology 13/07/2012 Page 1

SEETO priority projects rating methodology. July, SEETO Priority Projects rating methodology 13/07/2012 Page 1 SEETO priority projects rating methodology July, 2012 13/07/2012 Page 1 Table of content 1 Introduction... 3 1.1 Purpose of the Rating methodology... 3 1.2 Rationale for the Rating methodology... 3 1.3

More information

Key Dates. Project Development Objectives. Components. Overall Ratings

Key Dates. Project Development Objectives. Components. Overall Ratings Public Disclosure Authorized AFRICA Madagascar Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 1 ARCHIVED on 08-Jun-2018 ISR32759 Implementing

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016 Public Disclosure Authorized The World Bank REPORT NO.: RES31986 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER

More information

The World Bank Egypt National Railways Restructuring Project (P101103)

The World Bank Egypt National Railways Restructuring Project (P101103) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 19 ARCHIVED on 08-Jun-2017 ISR28299 Implementing

More information

SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)

SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270) Public Disclosure Authorized SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR EUROPE AND CENTRAL ASIA Kazakhstan Transport & ICT Global Practice IBRD/IDA Specific Investment

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT Public Disclosure Authorized REPORT NO.: RES33563 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES

More information

OFFICIAL DOCUMENTS ZW4

OFFICIAL DOCUMENTS ZW4 Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank -TreetltW. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351)

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351) LATIN AMERICA AND CARIBBEAN Dominican Republic Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Development Policy Lending FY 2018 Seq No: 1 ARCHIVED on 26-Jan-2018 ISR31220

More information

Public Disclosure Copy. East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit

Public Disclosure Copy. East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Public Disclosure Authorized East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Corridor EUROPE AND CENTRAL ASIA Kazakhstan Transport & ICT Global Practice

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325) AFRICA Mozambique Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2007 Seq No: 22 APPROVED ISR29261 Implementing Agencies: Key Dates Key Project Dates Bank Approval Date:23-May-2007

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 30244 Public Disclosure Authorized PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) ON A LOAN/GEF GRANT Public Disclosure

More information

Region Sector. Updated Project Information Document (PID) Report No: AB542

Region Sector. Updated Project Information Document (PID) Report No: AB542 Project Name Region Sector Theme Project Borrower(s) Implementing Agency(ies) Environment Category B (Partial Assessment) Date Prepared April 29, 2004 Auth Appr/Negs Date February 3, 2004 Bank Approval

More information

Loan Administration Change Initiative (LACI) Implementation Handbook

Loan Administration Change Initiative (LACI) Implementation Handbook Loan Administration Change Initiative (LACI) Implementation Handbook Preface This Handbook sets forth the main concepts of the Loan Administration Change Initiative (LACI) and provides guidance to Bank

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:

More information

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2729-ARM LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA and ASIAN DEVELOPMENT BANK DATED 30 MAY 2011 ARM 42145 LOAN

More information

Implementation Status & Results Kazakhstan SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)

Implementation Status & Results Kazakhstan SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Kazakhstan SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC

More information

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020731 Public Disclosure Authorized Public Disclosure Authorized Project ID P116080 Project Name EXPORT

More information

September 30, 2015 (Revised document) CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS

September 30, 2015 (Revised document) CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS September 30, 2015 (Revised document) CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS INTRODUCTION 1. Among the functions of the Clean Technology Fund

More information

The World Bank Third Secondary and Local Roads Project (P148048)

The World Bank Third Secondary and Local Roads Project (P148048) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THIRD SECONDARY AND LOCAL ROADS PROJECT APPROVED ON JULY 3, 2014 TO GEORGIA REPORT NO.:

More information

The World Bank Malawi Strategic Program for Climate Resilience (P163245)

The World Bank Malawi Strategic Program for Climate Resilience (P163245) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MALAWI STRATEGIC PROGRAM FOR CLIMATE RESILIENCE APPROVED ON NOVEMBER

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section H5/BP Page 1 of 4 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ADDITIONAL FINANCING 1. The

More information

MADAGASCAR PORTFOLIO REVIEW REPORT

MADAGASCAR PORTFOLIO REVIEW REPORT AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT FUND MADAGASCAR PORTFOLIO REVIEW REPORT SOUTH REGION DEPARTMENT OCTOBER 2007 SCCD :N.A. i CURRENCY EQUIVALENTS (October 2007) UA1 = US$ 1.55665 UA1 = EURO 1.9786

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3993 STP Development Credit Agreement (Governance Capacity Building Technical Assistance

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,450,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,450,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021097 Public Disclosure Authorized Public Disclosure Authorized Project ID P111598 Country Tanzania

More information

REPUBLIC OF TURKEY FOURTH EXPORT FINANCE INTERMEDIARY LOAN (EFIL IV) (LOAN NUMBER )

REPUBLIC OF TURKEY FOURTH EXPORT FINANCE INTERMEDIARY LOAN (EFIL IV) (LOAN NUMBER ) REPUBLIC OF TURKEY FOURTH EXPORT FINANCE INTERMEDIARY LOAN (EFIL IV) (LOAN NUMBER ) ENVIRONMENTAL FRAMEWORK FOR PARTICIPATING FINANCIAL INSTITUTIONS JANUARY, 2011 III. ENVIRONMENTAL REVIEW PROCEDURES Background

More information

Country Practice Area(Lead) Additional Financing Uzbekistan Energy & Extractives P133633,P165054

Country Practice Area(Lead) Additional Financing Uzbekistan Energy & Extractives P133633,P165054 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021115 Public Disclosure Authorized Public Disclosure Authorized Project ID P118737 Project Name ENERGY

More information

The World Bank Egypt National Railways Restructuring Project (P101103)

The World Bank Egypt National Railways Restructuring Project (P101103) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 16 ARCHIVED on 12-Jan-2016 ISR22382 Implementing

More information

Table 1 the Road Network of Mozambique (in kilometers)

Table 1 the Road Network of Mozambique (in kilometers) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads

More information

TANZANIA COUNTRY PORTFOLIO PERFORMANCE REVIEW. April 3-4, 2003

TANZANIA COUNTRY PORTFOLIO PERFORMANCE REVIEW. April 3-4, 2003 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 27939 TANZANIA COUNTRY PORTFOLIO PERFORMANCE REVIEW April 3-4, 2003 iii The Government

More information

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4199 UG Public Disclosure Authorized Financing Agreement (Uganda Public Service Performance Enhancement Project) between Public Disclosure Authorized

More information

Olivier Le Ber Lead Transport Specialist World Bank

Olivier Le Ber Lead Transport Specialist World Bank World Bank Transport Projects in TRACECA Countries Olivier Le Ber Lead Transport Specialist World Bank 2 WB has 16 transport projects total US$ 4.8 billion in TRACECA countries (3 projects under preparation)

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information