1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INFRASTRUCTURE TRANSPORT INVESTMENT PROJECT LOAN (ADDITIONAL FINANCING) Transport Sector Country Department AFCS1 Africa Region CREDIT NUMBER APPROVED ON May 22, 2007 TO THE REPUBLIC OF MADAGASCAR June 29, 2010 Report No:
2 ABBREVIATIONS AND ACRONYMS APL BOA EIB OP/BP PIU SDR Adaptable Program Loan Bank of Africa European Investment Bank Operational Policy/Bank Policy Project Implementation Unit Standard Drawing Rights Regional Vice President: Country Director: Sector Manager / Director: Task Team Leader: Obiageli K. Ezekwesili Ruth Kagia C. Sanjivi Rajasingham/Inger Anderson Pierre Graftieaux
3 MADAGASCAR INFRASTRUCTURE TRANSPORT INVESTMENT PROJECT ADDITIONAL FINANCING P CONTENTS Page ANNEX 2: REALLOCATION OF PROCEEDS... 1
4 ANNEX 2: Reallocation of Proceeds MADAGASCAR INFRASTRUCTURE TRANSPORT INVESTMENT PROJECT ADDITIONAL FINANCING CREDIT MAG P Restructuring Paper 1. Proceeds for Madagascar Infrastructure Transport Investment Project, Additional Financing, Credit , P105044, will be reallocated as follows: Category of Expenditure Allocation (SDR) % of Financing Current Revised Current Revised Current Revised (1) Works (1) Works 3,900,000 3,020, % 100% (2) Goods, audits, and Operating Costs (2) Goods, audits, and Operating Costs 6,500,000 7,380, % 100% TOTAL TOTAL 10,400,000 10,400,000 AMOUNT AMOUNT (to be reflected in the table contained in paragraph A.2 of Section 4 of the Schedule 2 of the Credit Agreement) The reallocation is considered to be minor, as the amount to be reallocated is small (SDR 880,000) and represents only 8.46 percent of the Project Additional Financing (Cr ), and 0.77 percent of the total credit ( and ). 2. Summary of Project Implementation Progress The Transport Infrastructure Investment Project is the third of a three-phase Adaptable Program Lending (APL) and was approved on December 8, The credit amount is SDR million (US$150 million equivalent). The restructuring of APL 3 was approved by the Board on January 3, This restructuring included the addition of a new component: support to the rehabilitation of the Northern Railway (operated by a private concessionaire, Madarail). An additional financing to the APL3 in an amount of SDR 10.4 million was approved on May 22, 2007 and signed on June 5, 2007, to continue supporting the rehabilitation of the Northern Railway through the financing of rail infrastructure investments (rail track, bridges, and station rehabilitation, for US$$14.1 million) and operational costs (for US$1.5 million). As of today, the Credit s cumulative disbursements represent percent, with a remaining balance of SDR 2,060, The total undisbursed funds of the project are expected to be committed by the end of
5 The railway component of APL3 was rated highly satisfactory until the advent of the 2009 political crisis. By then, all the project indicators, be they related to traffic volumes, travel times, wagon turnaround time, productivity or financial targets for the concessionaire, were being met. The last formal supervision mission conducted in December 2008 confirmed that during the period under review there was no misuse of funds from the project designated account and no major risk factors related to safeguards, fiduciary or reputational issues or risks stemming from interference of government authority. A recent Financial Management Review, carried out from 15 to 19 February, 2010, confirmed the good management of the project by the Project Implementation Unit (PIU Madarail). The proposed request meets Operational Policy criteria, namely that: (i) the project objectives continue to be achievable and this request does not modify the project description; (ii) there are no qualified or overdue audits; (iii) the performance of the PIUs is fully satisfactory; and (iv) the PIU has prepared a specific action plan acceptable to the Bank for the use of the reallocated funds. 3. The proposed reallocation is necessary to finance a cash compensation scheme to be paid to Madarail, the Northern Railway Concessionaire, as an operating costs subsidy due to the 2009 crisis. as per the terms used in the Exception to OP/BP 7.30 Memo on Madagascar, presented by the Africa Region Vice President, and approved by the Managing Director on May 6, Background: Since March 17, 2009 when the unconstitutional change of government occurred, Bank s operations have been guided by OP/BP 7.30, Dealing with de facto Governments, and no withdrawal request has been processed since that date. The abovementioned exception Memo proposes to: (i) extend projects that closed in the course of 2009, while disbursements remain on hold, (ii) allow the required level of funding for the PIUs to perform essential fiduciary/management functions, (iii) pay arrears on contractual obligations signed before March 17, 2009, and (iv) resume disbursements for the some selected projects and Trust Funds. More specifically for this project, it was agreed to: retroactively extend the closing date (The Additional Financing Project closed on February 28, 2010), pay the arrears, and provide an operating costs subsidy to Madarail in the amount of US$2.2 million. The approach is consistent with the terms of the APL3 loan agreement and has been used already under the project. Rationale for the request for fund reallocation: The rail concession s financial viability is currently in jeopardy because of the impact of the international and domestic economic crisis on Madarail s operations. Approving the requested fund reallocation would not only prevent the railway concessionnaire from going bankrupt, but would indeed help to save the rail transport mode, the existence of which is currently endangered, and allow for further competition between the rail and road transport while achieving the Credit s agreement s development objective (reducing transport costs and facilitate trade). 2
6 Madarail s current financial situation requires an immediate financial injection of about US$2.2 million, without which it will likely be forced to stop its operations by the third trimester of Madarail transport volumes which should have reached 412,000 tons in 2009 only came at 355,000 tons as overall transport demand for Madarail services contracted. Prospects for 2010 remain bleak, since the economy is expected to go through a recession, which of course will further impact Madarail s financial bottom line and results in the company s inability to service its commercial debt as well as pay its suppliers on time. On January 28, 2010, Madarail s key fund providers, i.e. the World Bank team, the Bank of Africa (BOA), and the European Investment Bank (EIB) met in Antananarivo with representatives from the Ministry of Transport to define a way out of this situation, and agreed that: The EIB and the BOA would assess the feasibility of restructuring Madarail s debt repayment terms (since this meeting, EIB and BOA senior management has approved the proposed restructuring), and The World Bank would examine the possibility of paying contractors arrears for Bank s financed works, and finance a cash compensation scheme for the net loss of cash flow endured by Madarail since the beginning of the crisis. At that time, all stakeholders acknowledged that, should one of the key players default on the proposed agreement, the likelihood of Madarail collapsing would be very high. On the Bank s side of this three-fold arrangement, a reallocation of funds, reason for this Restructuring Paper, is needed. On May 20, 2010, the Ministry of Transport sent a letter to the Bank (see attachment) to request the reallocation of SDR 880,000 from the Credit s Category 1, Works, to Category 2, Goods, audits, and Operating Costs). 3
Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Water and Urban I1 Africa Region Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011
Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND
More informationThe World Bank NEITI Reporting Compliance (P162344)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NEITI REPORTING COMPLIANCE APPROVED ON DECEMBER 7, 2016 TO FEDERAL MINISTRY
More informationDocument of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT
Public Disclosure Authorized The World Bank REPORT NO.: RES30161 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING
More informationThe World Bank LK GPOBA - Access to Sanitation Project (P111161)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LK GPOBA - ACCESS TO SANITATION PROJECT APPROVED ON JUNE 8, 2011 TO DEMOCRATIC
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationThe World Bank Nigeria - Public/Private Partnership Program (P115386)
AFRICA Nigeria Finance & Markets Global Practice IBRD/IDA Adaptable Program Loan FY 2011 Seq No: 12 DRAFT ISR29127 Implementing Agencies: Ministry of Finance, Ministry of Finance Key Dates Key Project
More informationOP Investment Project Financing. Bank Access to Information Policy Designation Public
Bank Policy - Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPSVP5.03-POL.103 Issued Effective July 1, 2014 Last Revised On July 1, 2016 Retired July
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES19910 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationBank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.108
Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.108 Issued August 18, 2017 Effective August 18, 2017 Retired November 9, 2017
More informationThe World Bank Kabeli-A Hydro Electric Project (P122406)
Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF KABELI-A HYDRO ELECTRIC PROJECT APPROVED ON JULY 1, 2014 TO NEPAL REPORT NO.: RES32467
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ELECTRICITY SECTOR EFFICIENCY ENHANCEMENT PROJECT CR SE. April 25, 2005 TO THE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMEROON HEALTH SECTOR SUPPORT INVESTMENT PROJECT CREDIT: 4478-CM TO THE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1 Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationBank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.110
Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.110 Issued September 30, 2018 Effective October 1, 2018 Content Operational policy
More informationBank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.109
Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.109 Issued November 10, 2017 Effective November 10, 2017 Content Operational policy
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INDEX-BASED LIVESTOCK INSURANCE PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationImplementation Status & Results Madagascar Integrated Growth Poles (P083351)
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized Implementation tatus & Results Madagascar Integrated Growth Poles (P83351) Operation Name: Integrated
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT
Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31045 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)
Public Disclosure Authorized The World Bank REPORT NO.: RES29565 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION
More informationThe World Bank Ghana - PPP Project (P125595)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Ghana Finance & Markets Global Practice IBRD/IDA Adaptable Program Loan FY 2012
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 06/15/2005 INTEGRATED SAFEGUARDS DATASHEET
More informationThe World Bank Burkina Faso Donsin Transport Infrastructure Project (P120960)
Public Disclosure Authorized AFRICA Burkina Faso Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 29-Dec-2017 ISR30740 Implementing Agencies: MOAD, Government
More informationRESTRUCTURING PAPER ON A SECOND PROPOSED PROJECT RESTRUCTURING DAKAR DIAMNIADIO TOLL HIGHWAY PROJECT CREDIT 4579-SN BOARD APPROVAL DATE JUNE 2, 2009
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Country Department AFCF1 Africa Region Document of The World Bank RESTRUCTURING
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Ghana Finance & Markets Global Practice IBRD/IDA Adaptable Program Loan FY 2012 Seq : 7 ARCHIVED on 27-Aug-2015 ISR20184 Implementing Agencies: Public Investment Department,
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE
Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized ocument of The World Bank RESTRUCTURING PAPER ON A PROPOSE PROJECT RESTRUCTURING OF ENERGY
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/06/2010 INTEGRATED SAFEGUARDS DATASHEET
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
Public Disclosure Authorized The World Bank REPORT NO.: RES30835 RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF REHABILITATION AND
More informationThe World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROJECT TO IMPROVE EDUCATION QUALITY IN MALAWI PROJECT LOAN TO THE REPUBLIC OF MALAWI
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WEST AFRICA REGIONAL BIOSAFETY PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationINFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY
DOCUMENT OF THE WORLD BANK REPORT NO.: RES29941 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 TO TRANSPORT & ICT
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Madagascar Urban Development Global Practice IBRD/IDA Specific Investment Loan FY 2006 Seq No: 21 ARCHIVED on 30-Dec-2014 ISR17647 Implementing Agencies: Public Disclosure
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TAX MODERNIZATION PROJECT TO THE REPUBLIC OF TANZANIA AUGUST 30, 2006
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationThe World Bank DRC Multi-modal Transport (P092537)
AFRICA Congo, Democratic Republic of Transport Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 10 ARCHIVED on 06-Mar-2015 ISR17792 Implementing Agencies: Key Dates Key Project Dates Board
More informationThe World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SEE CATASTROPHE RISK INSURANCE FACILITY TA SECO APPROVED ON SEPTEMBER
More informationThe World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MOZAMBIQUE - ARTISANAL FISHERIES AND CLIMATE CHANGE APPROVED ON MARCH
More informationThe World Bank Nigeria - Public/Private Partnership Program (P115386)
AFRICA Nigeria Finance & Markets Global Practice IBRD/IDA Adaptable Program Loan FY 2011 Seq No: 11 ARCHIVED on 03-Jan-2017 ISR25243 Implementing Agencies: Ministry of Finance Key Dates Key Project Dates
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010
Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES24803 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT
More informationLoan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT
OFFICIAL DMIUMTS LOAN NUMBER 8131-CN Loan Agreement (Zhanghu Railway Project) between PEOPLE'S REPUBLIC OF CHINA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated 8,2012 LOAN AGREEMENT AGREEMENT
More informationSENEGAL: TRANSPORT & URBAN MOBILITY PROJECT APPROVED ON JUNE 1, 2010 COORDINATION DU PATMUR,MINISTERE DE L'ECONOMIE, DES FINANCES ET DU PLAN
Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES30500 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SENEGAL: TRANSPORT &
More informationDOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT
Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES24760 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationRESTRUCTURING PAPER ON A
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 63424-AR PROPOSED PROJECT
More informationRESTRUCTURING PAPER ON A
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 59553-KH PROPOSED PROJECT
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BOR REGIONAL DEVELOPMENT PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SUSTAINABLE DEVELOPMENT UNIT EUROPE AND CENTRAL ASIA Document of The World Bank FOR OFFICIAL
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016
Public Disclosure Authorized The World Bank REPORT NO.: RES31608 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER
More informationGuidance Note to Staff
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GUIDANCE NOTE 1. The Operational Policy/Bank Procedure OP/BP 8.00 Rapid Response to Crises
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 11/15/2005 INTEGRATED SAFEGUARDS DATASHEET
More informationThe World Bank Kenya Infrastructure Finance/PPP project (P121019)
Public Disclosure Authorized AFRICA Kenya Financial Systems Practice Global Practice IBRD/IDA Adaptable Program Loan FY 2013 Seq No: 4 ARCHIVED on 22-Dec-2014 ISR17114 Implementing Agencies: Public Private
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Senegal Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 01-Nov-2017 ISR29876 Implementing Agencies: Ministry of Economy,
More informationCLIMATE INVESTMENT FUNDS
CLIMATE INVESTMENT FUNDS CTF/TFC.1/4 November 03, 2008 First Meeting of the CTF Trust Fund Committee Washington, D.C. November 17-18, 2008 CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008
Public Disclosure Authorized RESTRUCTURING PAPER REPORT NO.: RES29620 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Senegal Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 21-May-2018 ISR32084 Implementing Agencies:
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22644 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationThe World Bank Water and Sanitation in Tourist Areas (P054221)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WATER AND SANITATION IN TOURIST AREAS APPROVED ON APRIL 2, 2009 TO THE
More informationThe World Bank Egypt National Railways Restructuring Project (P101103)
Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 21 ARCHIVED on 05-Jun-2018
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017
Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31490 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY
More informationRESTRUCTURING PAPER ON A. PROPOSED PROJECT RESTRUCTURING OF EMERGENCY POWER REHABILITATION PROJECT (CR 3933 & TF 54718) (June 22, 2004)
Document of The World Bank Report No: RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF EMERGENCY POWER REHABILITATION PROJECT (CR 3933 & TF 54718) (June 22, 2004) TO THE ISLAMIC REPUBLIC OF AFGHANISTAN
More informationMozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)
AFRICA Mozambique Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2007 Seq No: 24 ARCHIVED on 29-Aug-2018 ISR33744 Implementing Agencies: ROAD FUND (Fundo de Estradas),
More informationFOR OFFICIAL USE ONLY
Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SAFE AND SUSTAINABLE TRANSPORT PROJECT LOAN December 10, 2009 IN THE INITIAL AMOUNT OF (US$ {150}
More informationSEETO priority projects rating methodology. July, SEETO Priority Projects rating methodology 13/07/2012 Page 1
SEETO priority projects rating methodology July, 2012 13/07/2012 Page 1 Table of content 1 Introduction... 3 1.1 Purpose of the Rating methodology... 3 1.2 Rationale for the Rating methodology... 3 1.3
More informationKey Dates. Project Development Objectives. Components. Overall Ratings
Public Disclosure Authorized AFRICA Madagascar Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 1 ARCHIVED on 08-Jun-2018 ISR32759 Implementing
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016
Public Disclosure Authorized The World Bank REPORT NO.: RES31986 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER
More informationThe World Bank Egypt National Railways Restructuring Project (P101103)
Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 19 ARCHIVED on 08-Jun-2017 ISR28299 Implementing
More informationSOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)
Public Disclosure Authorized SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR EUROPE AND CENTRAL ASIA Kazakhstan Transport & ICT Global Practice IBRD/IDA Specific Investment
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT
Public Disclosure Authorized REPORT NO.: RES33563 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
More informationOFFICIAL DOCUMENTS ZW4
Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank -TreetltW. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationPublic Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351)
LATIN AMERICA AND CARIBBEAN Dominican Republic Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Development Policy Lending FY 2018 Seq No: 1 ARCHIVED on 26-Jan-2018 ISR31220
More informationPublic Disclosure Copy. East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit
Public Disclosure Authorized East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Corridor EUROPE AND CENTRAL ASIA Kazakhstan Transport & ICT Global Practice
More informationFOR OFFICIAL USE ONLY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL
More informationMozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)
AFRICA Mozambique Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2007 Seq No: 22 APPROVED ISR29261 Implementing Agencies: Key Dates Key Project Dates Bank Approval Date:23-May-2007
More informationDocument of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 30244 Public Disclosure Authorized PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) ON A LOAN/GEF GRANT Public Disclosure
More informationRegion Sector. Updated Project Information Document (PID) Report No: AB542
Project Name Region Sector Theme Project Borrower(s) Implementing Agency(ies) Environment Category B (Partial Assessment) Date Prepared April 29, 2004 Auth Appr/Negs Date February 3, 2004 Bank Approval
More informationLoan Administration Change Initiative (LACI) Implementation Handbook
Loan Administration Change Initiative (LACI) Implementation Handbook Preface This Handbook sets forth the main concepts of the Loan Administration Change Initiative (LACI) and provides guidance to Bank
More informationFOR OFFICIAL USE ONLY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:
More informationLOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK
LOAN NUMBER 2729-ARM LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA and ASIAN DEVELOPMENT BANK DATED 30 MAY 2011 ARM 42145 LOAN
More informationImplementation Status & Results Kazakhstan SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Kazakhstan SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC
More informationCountry Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020731 Public Disclosure Authorized Public Disclosure Authorized Project ID P116080 Project Name EXPORT
More informationSeptember 30, 2015 (Revised document) CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS
September 30, 2015 (Revised document) CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS INTRODUCTION 1. Among the functions of the Clean Technology Fund
More informationThe World Bank Third Secondary and Local Roads Project (P148048)
Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THIRD SECONDARY AND LOCAL ROADS PROJECT APPROVED ON JULY 3, 2014 TO GEORGIA REPORT NO.:
More informationThe World Bank Malawi Strategic Program for Climate Resilience (P163245)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MALAWI STRATEGIC PROGRAM FOR CLIMATE RESILIENCE APPROVED ON NOVEMBER
More informationOPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.
OM Section H5/BP Page 1 of 4 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ADDITIONAL FINANCING 1. The
More informationMADAGASCAR PORTFOLIO REVIEW REPORT
AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT FUND MADAGASCAR PORTFOLIO REVIEW REPORT SOUTH REGION DEPARTMENT OCTOBER 2007 SCCD :N.A. i CURRENCY EQUIVALENTS (October 2007) UA1 = US$ 1.55665 UA1 = EURO 1.9786
More informationDevelopment Credit Agreement
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3993 STP Development Credit Agreement (Governance Capacity Building Technical Assistance
More informationL/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,450,000.00
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021097 Public Disclosure Authorized Public Disclosure Authorized Project ID P111598 Country Tanzania
More informationREPUBLIC OF TURKEY FOURTH EXPORT FINANCE INTERMEDIARY LOAN (EFIL IV) (LOAN NUMBER )
REPUBLIC OF TURKEY FOURTH EXPORT FINANCE INTERMEDIARY LOAN (EFIL IV) (LOAN NUMBER ) ENVIRONMENTAL FRAMEWORK FOR PARTICIPATING FINANCIAL INSTITUTIONS JANUARY, 2011 III. ENVIRONMENTAL REVIEW PROCEDURES Background
More informationCountry Practice Area(Lead) Additional Financing Uzbekistan Energy & Extractives P133633,P165054
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021115 Public Disclosure Authorized Public Disclosure Authorized Project ID P118737 Project Name ENERGY
More informationThe World Bank Egypt National Railways Restructuring Project (P101103)
Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 16 ARCHIVED on 12-Jan-2016 ISR22382 Implementing
More informationTable 1 the Road Network of Mozambique (in kilometers)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads
More informationTANZANIA COUNTRY PORTFOLIO PERFORMANCE REVIEW. April 3-4, 2003
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 27939 TANZANIA COUNTRY PORTFOLIO PERFORMANCE REVIEW April 3-4, 2003 iii The Government
More informationFinancing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and
Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4199 UG Public Disclosure Authorized Financing Agreement (Uganda Public Service Performance Enhancement Project) between Public Disclosure Authorized
More informationOlivier Le Ber Lead Transport Specialist World Bank
World Bank Transport Projects in TRACECA Countries Olivier Le Ber Lead Transport Specialist World Bank 2 WB has 16 transport projects total US$ 4.8 billion in TRACECA countries (3 projects under preparation)
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More information