1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Indonesia Sustainable Development Unit Sustainable Development Department East Asia and Pacific Region Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN IN THE AMOUNT OF US$225 MILLION TO THE REPUBLIC OF INDONESIA FOR THE POWER TRANSMISSION DEVELOPMENT PROJECT May 26,2010 Report No: ID This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

2 CURRENCY EQUIVALENTS (Exchange Rate Effective as o f March 1, 2010) Currency Unit Indonesian Rupiah IDR 1,000 US$O US$1 IDR 9,260 FISCAL YEAR January 1 - December 31 ABBREVIATIONS AND ACRONYMS ADB CPS DSCR DSCR EASIS EMP ERM ERP Go1 IBRD ICB IFR IS JBIC JICA LARAP NCB NPV ORAF PLN PMC PSO PTD OBS QCBS VAT VSL Asian Development Bank Country Partnership Strategy Debt Service Cover Ratio Debt Service Coverage Ratio Indonesia Sustainable Development Unit Environment Management Plan Enterprise Risk Management Enterprise Resource Planning Government of Indonesia International Bank for Reconstruction and Development International Competitive Bidding Interim Financial Report Implementation Support Japan Bank for International Cooperation Japan International Cooperation Agency Land Acquisition and Resettlement Action Plan National Competitive Bidding Net Present Value Operational Risk Assessment Framework Perusahaan Listrik Neaara (Indonesia s State Power Company) Project Management Consultant Public Service Obligation Planning and Technology Department Quality Based Selection Quality and Cost Based Selection Value-added Tax Variable-Spread Loan Regional Vice President: Country Director: Sector Director: Sector Managers: Task Team Leader: James W. Adams Joachim von Amsberg John Roome Sonia Hammam/N. Vijay Jagannathan Leiping Wang

3 FOR OFFICIAL USE ONLY Table of Contents I. I1. I11. IV. V. VI. Strategic Context... 1 Project Development Objectives... 3 Project Description... 3 Key Risks... 6 Implementation... 6 Appraisal Summary... 7 Annexes: Annex I: Annex I: Annex 11: Annex 111: Annex IV: Annex V: Annex VI: Results Framework and Monitoring Results Framework and Monitoring Detailed Project Description Implementation Arrangements Operational Risk Assessment Framework (ORAF) Implementation Support Plan Team Composition This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

4

5 PAD DATA SHEET INDONESIA POWER TRANSMISSION DEVELOPMENT PROJECT PROJECT APPRAISAL DOCUMENT EAST ASIA AND PACIFIC Indonesia Sustainable Development Unit (EASIS) Sustainable Development Department Date: May 26,2010 Country Director: Joachim von Amsberg Sector Director: John Roome Sector Managers: Sonia Hammam and N. Vijay Jagannathan Team Leaders: Leiping WangElvi Schaefer Project ID: P Lending: Instrument: SDecific Investment Loan Y [ 3 Credit Environmental Assessment Screening Category: B, Project Financing Data: Proposed terms: [ X I Loan Sector(s): Power (1 00%) Theme(s): Infrastructure services for private sector development (100%) [ Source Total Project Cost: Cofinancing : PLN: Total Bank Financing: IBRD IDA New Recommitted 3 Grant [ ] Guarantee [ 3 Other: Total Amount (US$M) Borrower: Republic of Indonesia Responsible Agency: PT PERUSAHAAN LISTRIK NEGARA (PLN) J1. Trunojoyo Blok MI/135, Indonesia, Tel: (62-21) Fax: (62-21) Web site: Contact Person: Nasri Sebayang, Director of Planning and Technology Telephone No.: (62-21) / Fax No.: (62-21)

6 Does the project meet the Regional criteria for readiness for imulementation? I OYes ONO I The development objective of the proposed project is to assist the Borrower to meet growing electricity demand and improve the reliability of electricity supply in Java and south-central Sumatra by streng;thening the Dower transmission svstem. Project description The Project consists of the following parts: 1. Java-Bali Transmission Substation Expansion and Construction (a) Expansion of four (4) existing 500 / 150 kv and twenty (20) to twenty-five (25) existing 150 / 20 kv substations through the installation of new transformers and associated equipment. (b) Construction of one (1) new 150 / 20 kv substation, including two (2) 60 MVA transformers, and installation of associated equipment. 2. South-Central Sumatra Transmission Substation Upgrading and Expansion (a) Upgrading of five (5) existing 150 kv substations through the installation of new transformers and associated equipment. (b) Expansion of ten (10) to fifteen (15) existing 150 / 20 kv substations through the installation of new transformers and associated equipment. Safeguard policies triggered? Environmental Assessment (OP/BP 4.0 1) Natural Habitats (OP/BP 4.04) Forests (OP/BP 4.36) Pest Management (OP 4.09) Physical Cultural Resources (OPA3P 4.1 1) Indigenous Peoples (OPBP 4.10) Involuntary Resettlement (OPBP 4.12) Safety of Dams (OPA3P 4.37) Projects on International Waters (OP/BP 7.50) Projects in Disputed Areas (OPBP 7.60) *Yes ono oyes *No oyes *No oyes *No oyes *No oyes *No *Yes ono oyes *No oyes *No oyes *No

7 Conditions and Legal Covenants: Loan/Project Agreement Reference Description of Covenant 1. Section 4.01 of the The Additional Conditions of Effectiveness: LA. (a) Subsidiary Loan Agreement executed on behalf of the Borrower and the Project Implementing Entity. (b)., Project Implementation Plan and Procurement Manual adopted by the Project Implementing Entity. 2. Section I A. 5 of The project Implementing Entity shall establish, and thereaft& maintain throughout Project implementation, the Schedule to the PA Procurement Committee, chaired by a manager of the Department of Strategic Procurement, with an adequate composition, institutional framework, functions, and resources The project Implementing Entity shall appoint and maintain 3. Section I A. 6 of throughout Project implementation, a Project Management Schedule to the PA Consultant with qualifications, experience, and terms of reference satisfactory to the Borrower and the Bank, who shall be responsible for coordination between the various departments of the Project Implementing Entity, 4. Section I1 A. 1 (a) The Project Implementing Entity shall monitor and of Schedule to the evaluate the progress of the Project and prepare Project Reports. Each such Project Report shall cover the period of PA one (1) calendar year, and shall be furnished to the Bank. 5. Section I1 B. 2 of The Project Implementing Entity shall prepare and furnish to the Bank, interim un-audited financial reports for the Schedule to the PA Project covering the quarter, in form and substance satisfactory to the Borrower and the Bank. The Project Implementing Entity shall have its financial 6. Section I1 B. 3 of statements audited by independent auditors acceptable to Schedule to the the Borrower and the Bank, in accordance with consistently PA applied auditing standards acceptable to the Borrower and the Bank. Each audit of these financial statements shall cover the period of one (1) fiscal year of the Project Implementing Entity. Audited financial statements for each period shall be furnished to the Borrower and the Bank. 7. Section II.B.4 (a) Except as the Bank shall otherwise agree, the Project of Schedule to the Implementing Entity shall not incur any debt unless a PA reasonable forecast of the revenues and expenditures of the Project Implementing Entity shows that the estimated net revenues of the Project Implementing Entity for each fiscal year, during the term of the debt to be incurred, shall be at least 1.5 times the estimated debt service requirements of the Project Implementing Entity in such year on all debt of the Project Implementing Entity, including the debt to be Date Due Before effectiveness of the loan. No later than one (1) month after the Effective Date. No later than three (3) months after the Effective Date. Not later than one (1) month after the end of the period covered by such report. Not later than forty-five (45) days after the- end of each calendar quarter. Not later than six ( 6 ) months after the end of the period.

8

9 I. Strategic Context A. Country Context A decade after the Asian financial crisis, Indonesia is emerging economically and fiscally 1. stronger than many had expected. Real GDP has been growing at 5 to 6 percent annually since 2003, reaching 6.1 percent in Despite the global financial crisis, the country s GDP growth rate reached 4.2 percent in 2009, one of the highest in the region. Its fiscal position also remains strong, providing Indonesia with options to respond to the global financial crisis as well as providing additional resources for meeting infrastructure development priorities. Successful implementation of priority infrastructure projects will be essential for Indonesia to emerge as a strong middle income country in the coming decade. B. Sectoral and Institutional Context Although the power sector underwent rapid expansion between the early 1980s and late s, it was significantly weakened by the East Asian financial crisis of the late 1990s. For about a decade thereafter, from the late 1990s to 2007, investments in the power sector were below the level needed to ensure reliable supply. As a result, Indonesia still has the lowest per capita electricity consumption and electricity access rate among all of the Bank s middle-income member countries in the East Asia region. Most parts of the country are currently experiencing serious power shortages. 3. The power sector is facing the following challenges to sustain economic growth and social development: Electrification rates remain low, while robust and sustained economic growth is driving the demandfor electricity to grow at an annual rate of over seven percent. There is tremendous pressure on the sector to keep pace with economic growth due to the strong correlation between energy and GDP growth. In addition, around 70 million2 people still do not have access to electricity, or electricity supply is unreliable. To reach the Government s target of electrifying 90 percent of the population by 2020, the power sector will need to connect roughly two million new subscribers annually, double the rate of the past few years. The current electricity tarijjs are insufficient to cover the cost of supply of the national power utility (PLN), leading to unsustainable Government subsidies to provide PLN withfinancial support. PLN s financial condition was negatively impacted upon the removal of petroleum fuel subsidies in 2005, the suspension of electricity price increases since 2004, and the increase in fuel prices. The company s financial viability is reliant upon the Government s public service obligation (PSO) subsidies, which reached US$7.2 billion (48 percent of the total revenues) in 2008, and was US$5.6 billion (37 percent of Elasticity of electricity sales growth to GDP growth was on average greater than 1.5 in the past 15 years. World Bank, Electricity for All,

10 total revenues) in 2009, raising doubts about the long-term sustainability of this financial support mechanism. The restructuring and institutional reform of PLN remains influx, weakening the Government?s ability to provide public financing for power sector development. Although the Government of Indonesia (GoI) started to pursue decentralization, unbundling, corporatization, and restructuring of PLN as early as 1993, progress has been inconsistent and slow as a result of the East Asian financial crisis of the late 1990s and the ongoing legal uncertainty regarding PLN?s future. Effective institutional restructuring and strengthening of the sector is critical for facilitating the Government?s ability to attract private finance and to improve the efficiency of the power sector. While abundant renewable resources are largely unexploited, the rapid increase of coal in the generation fuel mix may expose the country to environmental risks, both locally and globally. According to PLN?s long-term capital investment plan, the share of coal in the generation fuel mix will increase from around 35 percent today to roughly 70 percent by The magnitude of this expansion is raising concerns of the likely negative environmental impact in the heavily populated areas of Java and Bali, and in the environmentally sensitive areas of some of the outer islands. Also, Indonesia?s greenhouse gas emissions will continue to grow at a much faster pace than most of its neighbors. Although Indonesia is rich in renewable energy resources, especially geothermal, hydropower and biomass, the lack of incentives and regulatory certainty, combined with the relatively weak institutional capacity of major national and local institutions, has hindered the rapid development of these indigenous and clean energy resources. 4. After the successful completion of the general election in July 2009, the new administration was established in October Although the new government is still redefining its energy sector policy priorities, the emerging energy sector strategy is focusing on: (a) facilitating private investments and increasing public financing to grow supply capacity; (b) improving the generation fuel mix by developing coal fired and renewable energy, especially geothermal and hydropower generation; (c) rationalizing the electricity tariff and subsidy regime; and (d) further strengthening institutional capacity and improving the management efficiency of PLN. 5. In line with the Bank?s Country Partnership Strategy (CPS) and GoI?s strategic priorities, the Bank is supporting a large investment lending program to finance: (a) public sector power infrastructure projects, especially renewable energy, to sustain economic growth; (b) development policy lending programs to support GoI?s efforts to establish a sustainable policy environment for infrastructure project development and move the energy sector towards a lowcarbon development path; and (c) technical assistance to rationalize the electricity tariff and subsidy regime, establish incentives for geothermal resource development, and strengthen the capacity of national state-owned companies in the energy sector. 2

11 C. Higher Level Objectives to which the Project Contributes The proposed project will form an integral part of the Bank s assistance program to the 6. energy sector to rapidly eliminate the bottlenecks in major transmission systems. It will strengthen the main transmission system in Java-Bali and upgrade the main transmission system in south and central Sumatra. When implemented successfully, the proposed project will play an important role in supporting economic growth in both islands over the medium to long term. 7. The proposed project is also consistent with the Country Partnership Strategy for Indonesia FY , which inter alia, supports the building of effective and accountable institutions in the power sector. It will contribute to the country program by: (a) improving the business climate by better meeting the increasing demand for electricity (in line with Core Engagement 1 for supporting private sector development); and (b) strengthening the technical, managerial and operational capacity of PLN to implement large scale investment projects (in line with Core Engagement 2 for support for infrastructure development). 11. Project Development Objectives A. PDO 8. The development objective of the proposed project is to assist the Borrower to meet growing electricity demand and improve the reliability of electricity supply in Java and southcentral Sumatra by strengthening the power transmission system. B. Beneficiaries 9. Direct beneficiaries of the project include people who directly benefit from electricity supply from all substations financed by the project, a population of 56.2 million (49.0 million in Java and 7.2 million in south-central Sumatra). Indirect beneficiaries include people who are not directly connected to the substations financed by the project, but connected to the power grids indirectly supported by the project, a population of 74.6 million in Java and Bali, and 8.4 million in south-central Sumatra. This indirect support will improve the security of supply and reduce losses of the power grids as a whole. C. PDO Level Results Indicators 10. Achievement of the development objective will be assessed through increase in electricity sales, as well as reduction in transmission interruptions and transmission losses, as a result of the strengthening of transmission systems in Java and south- central Sumatra Project Description A. Project components The Project has two components with a total investment cost estimated at $254.1 million, 11, of which $225 million will be financed by IBRD. Each component is described below (See 3

12 Annex I for a detailed project description). Java-Bali Transmission Substation Expansion and Construction: (a) Expansion of four existing 500 / 150 kv and twenty to twenty-five existing 150 / 20 kv substations through the installation of new transformers and associated equipment. (b) Construction of one new 150 / 20 kv substation, including two 60 MVA transformers, and installation of associated equipment. South-Central Sumatra Transmission Substation Upgrading and Expansion: (a) Upgrading of five (5) existing 150 kv substations through the installation of new transformers and associated equipment. (b) Expansion of ten (10) to fifteen (15) existing 150 / 20 kv substations through the installation of new transformers and associated equipment. B. Project Financing Lending Instrument 12. PLN, in agreements reached with the Ministry of Finance, has selected a variable-spread loan (VSL) of US$225 million for the project. Repayments will be annuity, with a total maturity of 24.5 years, including 9 years of grace. Project Financing Table 13. Total project financing requirements are estimated at US$254.1 million, inclusive of price and physical contingencies, taxes, interest during construction, and the front-end fee. PLN will finance US$29.1 million for land acquisition, project management, tax, interest during construction, and the front-end fee. The remaining costs of US$225.0 million for goods, works, and contingencies will be funded by the IBRD loan. Detailed information on costs and financing sources is provided in Table 1 and Table 2. 4

13 Table 1. Project Costs by Component and Use of Financing Local Project Cost By Component and/or Activity A. Infrastructure 1. Expansion and Construction of Transmission Substations in the Java-Bali System 1.1. Expansion of kv substations in Java kv Millennium substation in West Java 1.3. Expansion of 150 kv substations in Central Java 2. Upgrading of and Expansion of Transmission Substations in South-Central Sumatra System 2.1. Upgrading of 275 kv substations in South-Central Sumatra 2.2. Expansion of kv substations in South-Central Sumatra Subtotal B. Service Project Management C. Land Acquisition and Compensation Total Baseline Cost Contingency Physical Price Tax (VAT) Total Project Costs Interest During Construction Front-End Fee Total Financing Required Foreign Total $ million $ million $ million ~ Table 2. Project Costs by Component and Source of Financing PLN Project Cost By Component and/or Activity A. Infrastructure 1. Expansion and Construction of Transmission Substations in Java-Bali System 1.1. Expansion of kv substations in Java kv Millennium substation in West Java 1.3. Expansion of 150 kv substations in Central Java 2. Upgrading of and Expansion of Transmission Substations in South-Central Sumatra System 2.1. Upgrading of 275/150 kv substations in South-Central Sumatra 2.2. Expansion of kv substations in South-Central Sumatra Total Financing Required Note: Base costs are at early 2010price level. 5 IBRD Total $ million $ million $ million

14 IV. KeyRisks 14. The proposed project is a technically simple project to be implemented by an established power utility which has successfully implemented many Bank projects. Potential risks are summarized in the Operational Risk Assessment Framework (see Annex IV). The overall project risks are rated moderate. Risks identified are manageable and mitigation measures are in place. V. Implementation A. Institutional and Implementation Arrangements 15. PLN will be the implementing agency. The Planning and Technology Department (PTD) of PLN will be responsible for overseeing and coordinating project implementation, including monitoring and reporting. A project coordinator will be designated to take on this responsibility. A project implementation plan (PIP) has been developed and will be adopted for project implementation. Procurement activities will be managed from PLN headquarters by the Strategic Procurement Department (SPD). A Procurement Committee, chaired by a manager of SPD, will be established to carry out procurement of goods and works under the project. 16. Under the guidance of the Department for the Operation of the Java-Bali Region and the Department for the Operation of the West Indonesia Region, the two regional project offices in Java Bali and in Sumatra (the Regional Project Office of the Generation and Transmission Unit for Java, Bali and Nusa Tenggara, and the Regional Project Office of the Generation and Transmission Unit for South Sumatera) will be directly in charge of supervising the construction of their respective components. Disbursement and financial reporting will be carried out by PLN s Finance Department (FD). A Project Management Consultant (PMC) will be employed by PLN to provide support to: (a) the PTD on project coordination, monitoring, and reporting; (b) the FD on financial management, reporting, and disbursement issues; (c) the Procurement Committee for preparing bid documents and in bid evaluation; and (d) the two regional offices for project reporting. The PMC will be on board before project effectiveness. B. Results Monitoring and Evaluation 17. PLN maintains a good statistical system with sufficient data to monitor most of the outcomes of the project e.g., electricity sales in the project areas, and reliability statistics for transformers. Project progress will be monitored by the regional project offices in Java and south-central Sumatra. With the assistance of the PMC, PTD will compile the data and monitor the performance of project implementation. C. Sustainability 18. Sustainability of the proposed project will ultimately be determined by the sustainability of the power sector, and at the project level, by the proper implementation and operation of the proposed project. 6

15 19. Go1 is committed to strengthening the electricity sector s institutional capacity, along with PLN s management efficiency. It is also taking key measures to rationalize the electricity tariff and subsidy regime to improve the financial sustainability of PLN and improve the sector s investment climate. The need to make substantial investments in the power transmission system is well understood by Go1 after the recent failure of several high voltage substations supplying the Jakarta region, which resulted in widespread power interruptions across the capital. 20. At the project level, PLN has demonstrated a high level of commitment to the project through accelerated project preparation already has well established operational capacity. Sustainability of the project is further supported by robust electricity demand growth in the country. VI. Appraisal Summary A. Economic and Financial Analysis Economic Analysis 21, The economic internal rate of return (ERR) of the project has been assessed for the five subcomponents of the project using the cost benefit approach. As shown in Table 3 below, the ERRS range from 25 to 65 percent. Sensitivity analysis carried out demonstrates that the project remains economically viable against a simultaneous 10 % drop in benefits, 10% increase in investment costs, and 10% increase in supply costs. More details on the economic analysis are available in the project files. Table 3. Summary of Economic Analysis 7

16 Financial Analysis 22. PLN s Financial Performance and Financial Condition. PLN s financial condition continues to be substantially reliant upon the Government subsidy which covers the shortfall between electricity tariffs and PLN s cost of power upp ply.^ In PLN s net operating income of Rp trillion (inclusive of Government subsidies) was 3.2 times higher than the 2008 net operating income of Rp. 3.6 trillion. Operating revenues decreased by Rp trillion as a result of a reduction in Government subsidy, which fell due to a decline in fuel costs. Operating expenses decreased by Rp. 26 trillion as a result of lower fuel costs. However, in the absence of gas supply, PLN will remain vulnerable to fuel price increases in the near to medium term due to the heavy utilization of high grade diesel in PLN s Combined Cycle Gas Turbine power plants. PLN also booked a foreign exchange gain of Rp 4.7 trillion in 2009 as a result of the strengthening of the IDR. 23. PLN has shown an ability to raise financing for its investments in local and global financial markets, but this capacity is dependent on the implicit and explicit Government backing of its financial obligations. PLN s capital expenditures were approximately Rp. 3 1 trillion in This increase reflects the scale-up in implementation of its on-going capacity expansion program to build the country s energy capacity by investing in generation and in transmission projects. 24. PLN s Financial Projections. PLN expects an annual sales growth of around 10 percent from 2011 to Combined with projected average annual tariff increases of 12% over the same period, PLN expects revenues (excluding Government subsidies) to grow at an average annual rate of about 22 percent during As a result of the projected higher revenues, government subsidies are expected to decline from Rp trillion in 2010 to Rp trillion in 2015 in Net income, after taxes, will grow to Rp trillion in 2015, compared to Rp trillion in This substantial growth is mainly driven by electricity sales growth, increase in electricity tariffs, a change in the fuel mix away from fuel oil, and the addition of new generating capacity. 25. Monitoring PLN s Financial Condition. In the context of the above financial projections, the key financial measure to monitor PLN s financial viability would be the company s liquidity; this would ensure that the company is able to meet its financial obligations and raise sufficient funding for its capital investment requirements. The financial covenant of a DSCR of 1.5 times (which is the same as in the on-going Java-Bali Power Sector Restructuring and Strengthening Project, Loan 7758-ID) is considered appropriate for this project. 26. Evaluation of the preliminary 2009 unaudited financial information indicates that PLN has significantly improved its liquidity from 2008 to PLN received a 5 percent PSO The Government is obliged to pay a public service obligation subsidy under the State-Owned Enterprise Law 19/2003. In addition, MOF Decree No. 11 I/PMK.02/2007 ensures that the difference between sales and cost of roduction is covered. Based on 2009 unaudited financial information provided by PLN. Based on PLN s 2009 unaudited financial information. Actual capital expenditure will be known upon the release of audited financial statements by end June

17 subsidy margin in 2009 that added to its revenues. PLN also raised US$2 billion from the issuance of corporate bonds in the global financial marketss6. In addition, PLN exercised prudent financial management by deferring the use of these funds for capital investment until they are needed, and instead used this liquidity to pay down its third-party arrears on which it was incurring significant financial charges. However, even after paying third party arrears and meeting all other 2009 financial obligations, PLN had a cash balance of US$ 1.3 billion, thereby remaining sufficiently liquid. Under the circumstances, PLN s financial performance is satisfactory, despite the possibility that the DSCR might not meet the agreed target for PLN is also expected remain liquid throughout the duration of the project. However, the company is undertaking a significant investment program, while the sector is expected to undergo reform in pricing and subsidies that may impact its financial condition. In view of this, PLN s financial condition would need to be monitored during 2010 and beyond to ensure that its financial strategy is consistent with the assumptions made in its current financial forecasts. 28. More information on PLN s financial condition is available in the Project files. B. Technical 29. Feasibility studies of the project were reviewed and found to be sound. All the subprojects selected for the proposed project form part of PLN s least cost transmission system expansion plan, and the selection has been verified through regional load flow and stability analyses to ensure that system reliability and security requirements are followed. Individual technical designs of all subprojects meet Indonesian technical standards, which are consistent with international standards. The Bank has also reviewed PLN s planning approach and methodology, and has found it acceptable. C. Financial Management 30. A financial management assessment has been conducted by the Bank, and actions to strengthen PLN s financial management capacity have been agreed with PLN. The assessment has concluded that with the implementation of these actions, the proposed financial management arrangements will satisfy the Bank s minimum requirements under OPh3P Taking into account the risk mitigation measures proposed, the overall financial management risk for this financing is assessed as moderate, both before and after mitigation. Annex I11 provides additional information on financial management. The detailed financial management capacity assessment and arrangements are available in the project files. 5 With large companies such as PLN, it is common to access financing when market conditions are most favorable. As a result, it is not uncommon to have a mismatch in timing between the availability of financing and its capital expenditure needs. It can be acceptable practice to utilize the resulting excess liquidity for other purposes that may improve the company s financial position. 9

18 D. Procurement 3 1. A procurement assessment has been carried out and has concluded that PLN has adequate experience and capacity to carry out procurement activities related to the proposed project. PLN is familiar with Bank procurement procedures through its experience with implementing past projects financed by the Bank. As a result, procurement risk is assessed as moderate. Risk mitigation measures have been discussed with PLN and agreed. The procurement plan for the project has been received by the Bank and found to be acceptable. It will be updated at least annually (or as required) to reflect project implementation needs. A brief summary of the procurement capacity assessment and project procurement arrangements are provided in Annex 111. More details are available in the project files. 32. A Governance and Accountability Framework (GAF) has been developed for the project to mitigate fraud and corruption risks. It summarizes the actions that have been agreed to and will be undertaken by PLN to reinforce project governance, thereby enhan cing transparency of project activities, increasing public accountability, and reducing opportunities for corruption, collusion or fraud. The GAF is available in project files. E. Social 33. Negative social impacts of the proposed project are in general limited and manageable. No indigenous people, as defined by OP 4.10, are present in, or are collectively attached to, the project areas. Four substations in Sumatra involve land acquisition, with no resettlement or impact on building structures; the remaining substations do not require land acquisition. PLN has prepared a land acquisition and resettlement action plan (LAMP) for the four subprojects in Sumatra. The LAMP has been reviewed by the Bank and found to be satisfactory. The LAMP has been disclosed locally and in the Infoshop. The institutional capacity of PLN has also been reviewed and is regarded as being adequate for the implementation of the LAMP. F. Environment 34. The project is rated as a Category B project. PLN has prepared an Environment Management Plan (EMP) for the proposed project. No cultural property or natural habitats are impacted by the subprojects. Environment impacts are likely to be short term, site-specific, non sensitive or irreversible, and in every case, mitigation measures can be designed to reduce the negative impacts. The EMP has proposed practical methods of mitigating the impact during construction and operation, and it has been reviewed by the Bank and found satisfactory. An assessment of PLN s capacity concluded that it has adequate capacity to carry out the activities necessary to comply with the Bank s safeguards requirements. The EMP has been disclosed locally and in the InfoShop. 35. Due diligence was conducted to identi@ any potential environmental and social liabilities of the existing substations where the Bank will finance expansion or upgrading, including any physically connected projects and other potential corporate reputational risks, such as the potential climate change impact of the project. The due diligence confirmed that PLN has acceptable environmental, health and safety policies in place, with no potential environmental 10

19 and social liabilities identified in the existing substations. It also confirmed that there are no other projects which are related directly or significantly to the proposed project activities as defined by OP They are also in compliance with relevant national environmental and social regulations and policies. Due diligence also confirmed that the proposed project will rapidly eliminate transmission bottlenecks in the two most important power systems in Indonesia. This will allow PLN to reduce transmission losses and optimally dispatch its generation system, which will result in fossil fuel savings and therefore reduce greenhouse gas emissions. 11

20

21 Annex I: Results Framework and Monitoring The results framework is designed to represent the underlying logic to achieve the Project Development Objective (PDO). All project outcome indicators, e.g., electricity sales, transmission systems losses, and reliability indicators of the transformers, are directly related to the PDO. The intermediate outcome indictors are directly linked to the commissioning schedule of the project, are easy to monitor, and are consistent with the project outcome indicators. All these indicators are specific, measurable, realistic, relevant and time-bound. 12

22 m.- :s.;" Y I +c c+ +c +c +c +c +c +c I 1 j +c +c +c c= E" 0 gg +c +c +c +c + R c c c c gg m 3

23 Annex 11: Detailed Project Description INDONESIA: POWER TRANSMISSION DEVELOPMENT PROJECT 1. The development objective of the proposed project is to assist the Borrower to meet growing electricity demand and improve the reliability of electricity supply in Java and southcentral Sumatra by strengthening the power transmission system. 2. The project has two components, each of which is described in detail below. The total project investment cost is estimated at $254.1 million. The Bank will finance the supply and installation of all equipment and civil works at US$225 million. PLN will finance land acquisition, taxes, interest during construction, and project management at around $29.1 million. Component 1: Java-Bali Transmission Substation Expansion and Construction 3. This component includes: (a) expansion of four existing 500 / 150 kv and twenty to twenty-five existing 150 / 20 kv substations through the installation of new transformers and associated equipment; and (b) construction of one (1) new 150 / 20 kv substation, including two 60 MVA transformers, and installation of associated equipment. It will significantly strengthen the transmission capacity of the 500 kv transmission network and increase the transmission capacity of the 150 kv systems in Java. The total investment cost is estimated at $103.5 million, of which IBRD financing is estimated at $91.7 million. Component 1 includes: Expansion of the Depok 500/150 kv substation in West Java (1x500 MVA); Expansion of the Balaraja 500/150 kv substation in West Java (1x500 MVW); Expansion of the Pedan 500/150 kv substation in Central Java (1x500 MVA); Expansion of the Krian 500/150 kv substation in East Java (1x500 MVA) ; Construction of the Millennium 150/20 kv substation, which includes two transformers with a 60 MVA capacity, associated substation equipment, and civil works; and Expansion of approximately twenty to twenty-five existing 150/20 kv substations in Central Java; each subproject will install one or two 150/20 kv transformers and associated substation equipment. Component 2: South-Central Sumatra Transmission Substation Upgrading and Expansion 4. This component includes: (a) upgrading of five existing 150 kv substations through the installation of new transformers and associated equipment; and (b) expansion of ten to fifteen existing 150 / 20 kv substations through the installation of new transformers and associated equipment. It will significantly strengthen the capacity of the transmission link between south and central Sumatra, and increase the capacity of the transmission systems in south and central Sumatra. The total investment cost is estimated at $ million of which IBRD financing is estimated at $133.4 million. Component 2 includes: Upgrading Lahat 275/150 kv Substation, which includes the installation of 2x250 MVA 275/150 kv transformers and associated equipment; 14

24 e e e e e Upgrading Lubuk Linggau 275/150 kv Substation, which includes the installation of a 275/150 kv transformer at 250 MVA and associated equipment; Upgrading Bangko 275/150 kv Substation, which includes the installation of a 275/150 kv transformer at 250 MVA and associated equipment; Upgrading Muara Bungo 275/150 kv Substation, which includes the installation of a 275/150 kv transformer at 250 MVA and associated equipment; Upgrading Kiliranjao kv Substation, which includes the installation of a 275/150 kv transformer at 250 MVA and associated equipment; and Expansion ten to fifteen existing 150/20 kv substations, each of which includes the installation of one 150/20 kv transformer at 60 or 30 MVA, and associated equipment on the existing premises of the substation. 5. Project scope for the following will not be changed during implementation: (a) the expansion of four 500/150 kv existing substations and the construction of the new Millennium Substation in Java; and (b) upgrading of the five 275/150 kv substations. In the case of the expansion of the existing 150/20 kv substations, since investment priorities may change during project implementation, some specific subprojects under the two components may be dropped and new subprojects may be put forward for financing. However, all new subprojects (expansion of 150/20 kv existing substations only) must meet the following criteria: The subproject will contribute to the development objective of the project; The design of the subproject will meet Indonesian technical standards; The subproject has been formulated after taking into account alternative investments to ensure that it is a least cost option; The subproject has an economic rate of return of at least 10 percent, calculated using methodology acceptable to the Bank; The EMP amendment to reflect the specific site conditions, satisfactory to the Bank, has been prepared and disclosed in accordance with the generic EMP adopted by PLN for the project; The new subprojects will not require land acquisition; All necessary clearances/approvals for implementing the sub-projects, including the feasibility study and environmental approval, have been given by the relevant domestic agencies or authorities; and Financing, procurement, and implementation plans satisfactory to the Bank have been prepared. I 15

25 Annex 111: Implementation Arrangements INDONESIA: POWER TRANSMISSION DEVELOPMENT PROJECT 1. Project Administration Mechanisms 1.1 Project implementation institutional arrangements 1. PLN will be the implementing agency, with detailed project administration arrangements as follows: The Planning and Technology Department (PTD) of PLN will be responsible for overseeing and coordinating project implementation, including monitoring and reporting. A project coordinator will be designated to take on this responsibility. A project implementation plan (PIP) will be adopted for project implementation. Under the guidance of the Department for Operation of the Java-Bali Region and the Department for Operation of the West Indonesia Region, the two regional project offices will be directly in charge of detailed engineering design, development of bidding documents, and construction supervision of their respective components. Construction will be undertaken by contractors under supply and installation contracts. Contractors will be selected through international competitive bidding. Procurement activities will be managed from PLN headquarters by the Strategic Procurement Department (SPD). A Procurement Committee, chaired by a manager of SPD, will be established to carry out procurement of goods and works. Disbursement and financial management reporting will be carried out by PLN?s Finance Department (FD) with the support of the two regional offices. 1.2 Measures to address capacity constraints 2. To address lack of coordination among various implementation units in financial management, reporting and procurement experienced during the implementation of the on-going Bank financed Java Bali Power Sector Restructuring and Strengthening Project (Ln IND), an internal Project Management Consultant (PMC) will be employed by PLN to provide support to: (a) the PTD on project coordination, monitoring and reporting; (b) the FD on financial management and disbursement issues; (c) the Procurement Committee for bid document preparation and for bid evaluation; and (d) the two regional offices for project supervision and reporting. The PMC will be on board within three months of project effectiveness. In addition, training and capacity building support will be provided to PLN teams during the project implementation (details in Annex 5). 16

26 2. Financial Management, Disbursement and Procurement 2.1 Financial Management 3. Overall, the residual financial management risk for the project is assessed as Moderate. PLN is an established State-owned Enterprise that has received financial assistance from 4. several donors, including the Bank. Its FM performance on past projects is considered satisfactory. There is sufficient segregation of duties between technical and financial/administration functions. Operational policies are documented in a manual that is adhered to. PLN is audited by a public accounting firm and its last three audit reports have been received on time. The audit reports are unqualified and have not reported any significant accountability issues. The key FM issues experienced under the last project (Java Bali Power Project) were: (a) 5. slow processing of payment to contractors; and (b) expenditures paid under the project not accounted in a timely manner in PLN records. These were mainly the result of a lack of coordination between the corporate treasury office in Jakarta and project offices elsewhere in the country. Some measures have been agreed to mitigate risks arising from these issues. PLN will 6. hire an individual consultant to coordinate between project offices and the corporate office. This consultant will be responsible for monitoring claims processing and ensuring that payments will be made within acceptable period of time. The problem of timely recording of transactions in PLN records has been partly alleviated through providing an access to client connection to PLN accounting department. 7. Budgeting and Flow of Funds. The current PLN budget process will be followed, i.e. the budget will be prepared bottom-up from decentralized units, then consolidated and discussed centrally. The IBRD loan will finance only supply and installation of equipment. Direct payment, reimbursement, and special commitment method of disbursement will be used. There are no risks associated with funds flow, as all payments are to be controlled centrally from PLN head quarters. 8. Accounting and Reporting. All project transactions will follow the existing PLN system and will be included in the PLN financial statements. Some of PLN offices, including HQ, have implemented SAP, while other offices use another software. Because of this, PLN uses excel spreadsheets to consolidate accounts for financial reporting. This is not ideal, and PLN proposes to adopt SAP company-wide by PLN will continue to separately report project transactions to the Bank on a quarterly basis through Interim Financial Reports (IFRs). PLN will submit IFRs to the Bank no later than 45 days after the end of each calendar quarter. 10. Internal Control. PLN has adequate internal controls in place for preparation and approval of transactions and segregation of duties. FM procedures and policies are documented 17

27 in a manual. All changes in finance/accounting policies and procedures are formalized through the issue of circulars by the Finance Director PLN has an internal audit department at Head Office reporting to the President Director. This department and its units undertake internal audit based on an annual work program. The proposed project will be included in the annual internal audit work program of the department. 12. PLN will be audited by a public accounting firm. A copy of the audited financial statements of the company, along with the auditor s opinion will be submitted to the Bank not later than six months after the end of each financial year. The auditor will provide information about the loan, use of funds and their opinion concerning the use of funds separately within the main audit report of PLN. 13. The following action plan was agreed with PLN. FINANCIAL MANAGEMENT ACTION PLAN Action Actions to be followed up during implementation Hiring of FM Consultant not later than 3 months after project effectiveness. Disbursement Arrangements Designated accounts will not be opened for this project. The disbursement methods will 14. be: (a) direct payment; (b) reimbursement method; and (c) special commitment, subject to the minimum amount per withdrawal application at US$lOO,OOO, except the last withdrawal application. Expenditures or invoices below the minimum amount need to be paid by PLN, and consolidated for submission to the Bank for reimbursement when the amount reaches the minimum of US$ 100,000 equivalent. Applications requesting direct payment and reimbursement shall be supported by records of such expenditures and evidence of all payments made (in the case of reimbursements). 15. All documentation showing expenditures shall be retained by PLN and shall be made available for audit, and to the Bank and its representatives, if requested. 2.3 Procurement Procurement review thresholds 16. Procurement for the proposed Project would be carried out in accordance with the World Bank s Guidelines: Procurement under IBRD Loans and IDA Credits dated May 2004, revised in October 2006, and Guidelines: Selection and Employment of Consultants by World Bank Borrowers dated May 2004, revised in October 2006; and the provisions stipulated in the Legal Agreement. 18

28 17. Prior-Review Thresholds. Prior-review and procurement method thresholds for the project are indicated in Table 3.1. Table 3.1: Procurement Thresholds Prior Review Thresholds Proposed (USD Procurement Method Thresholds Proposed (USD million) 18. Procurement Plan and Procurement Arrangements. Procurement Plan for the project, prepared by PLN, has been reviewed by the Bank and accepted. This plan will be updated annually to reflect the latest circumstances. The Procurement Plan comprises six supply and installation ICB contracts, as indicated in Table 3.2. The World Bank Standard Bidding Document for Supply and Installation of Plant and Equipment will be used for these contracts. Table 3.2: Procurement Arrangement and Schedule for Goods and Works (YesiNo) Domestic Preference (YesiNo) (PriorPost) Expected Bid Opening date ICB No No Prior Aug- 10 ICB No No Prior Sep- 10 ICB No No Prior Sep- 10 ICB No No Prior Oct- 10 ICB No No Prior Oct-10 ICB No No Prior Sep- IO Packages Project Title and Scope Procurement Pre-qualif. 1 2 Method 3 A J B s-1 s-2 s-3 'ote: Lots J JAVA PART Supply and Installation 500/150 kv Interbus Power Transformer 500 mva for Java Supply and Installation 150 kv Millennium Substation in West Java Supply and Installation 150 kv Power Transformers for Central Java SUMATERA PART Supply and Installation 275 kv Lahat, Lubuklinggau Substations Supply and Installation 275 kv Bangko, Muarabungo,Kiliranjao Substations Supply and installation 150/20 kv Transformer for Substations in Sumatera vi11 under one package. 19 Bank Review

29 19. Selection of Consultants. No consulting services are expected at this stage. If, during project implementation, any consulting service becomes necessary, PLN may use QCBS,QBS, Selection based on Consultants Qualification, Fixed Budget Selection, Least Cost Selection, Single Source Selection, and Selection of Individual Consultants as appropriate, subject to approval by the Bank. Risks and Mitigation Measures 20.. Procurement risk for the project is assessed as moderatey,as only one type of procurement is envisaged, and all contracts are subject to prior review. The following measures were agreed to mitigate the remaining risks: e e A Procurement Manual, prepared by PLN, which clarifies that Bank Guidelines should be followed in case of conflict between PLN RegulationKeppres 80 and the World Bank Guidelines, will be used for procurement using loan funds. A Procurement Committee, comprised of qualified members, preferably staff who have experience with procurement financed by international financing institutions, will be established by PLN. The credentials and qualifications for committee members will be provided to the World Bank for information. PLN should appoint a sufficient number of experienced staff for this project in the Department of Strategic Procurement. PLN will prepare a detailed schedule of procurement activities for monitoring progress by both PLN and the World Bank. Staff from the regional project offices should be involved in the Procurement Committee to ensure smooth transfer after the contracts are signed. 3. Environmental and Social Safeguards 3.1 Project types, locations and impact assessments 21. Project types and locations. Project investments (subprojects) are located in various provinces in Java and in South and Central Sumatra. The project involves three types of subprojects: (a) subprojects implemented within the existing fence of an existing substation, with no land acquisition involved (thirty six subprojects); (b) subprojects implemented adjacent to an existing substation site, requiring some land acquisition (four subprojects); and (c) the Millennium subproject, which involves the construction of a new substation on land transferred to PLN by the owner of the industrial zone free of cost. 22. Environmental Impacts. Environmental impacts are likely to be modest, non-sensitive and reversible, and in every case, mitigation measures can be designed to reduce the negative impact. For both components, there are no conservation areas or cultural sites within 10 k m s of any of the substations in the area. All the components are classified as Category Byas defined by paragraph 8(b) of OP Expected impact during construction include: (a) increased level of dust and noise from the use and movement of machinery; (b) non-toxic solid waste during construction; (c) oil spill 20

30 or leakage from machinery or transformers; (d) prohibition of Polychlorinated Biphenyl (PCB); and (e) worker health and safety from existing electromagnetic fields (EMFs). Impact during operations include: (a) oil leak from transformers; (b) fire and emergency preparedness; (c) solid waste; and (d) worker health and safety. 24. Social Impacts. Land acquisition, including public consultation, and satisfactory compensation for the population residing in the project area, are the main social issues of the project. Since land acquisition is limited, social impacts are modest, and are limited to the acquisition of small pieces of land or cutting down of a few trees. 25. The Emergency Preparedness and Response procedures and Worker Health and Safety requirements of PLN were reviewed by the Bank team and found to be consistent with international good practice. 26. Resettlement. Four subprojects in Sumatra involve land acquisition, with no resettlement or impact on building structures: acquisition of 3.9 ha of permanent land and 6.9 ha of land for Right of Way (ROW) during construction and subject to limited use during operation. 17 households will have their fields or garden land acquired; 24 households will have their agricultural trees cut under ROW. 27. Potential indirect impact. The project will result in improvement of the quality and adequacy of power supply in the project areas, which is a key ingredient for economic growth and in the quality of life for households. By eliminating transmission bottlenecks in the two most important power systems in Indonesia, the project will allow PLN to optimally dispatch its generation system and reduce transmission losses; these will result in fossil fuel savings and reduce green house gas emissions. There are no long term adverse impacts as a result of project activities. 28. PLN has acceptable environmental, health and safety policies in place. No potential environmental and social liabilities were identified in the existing substations. In addition, none of the substations is located close to areas of ecological or cultural significance. A review of other projects which are physically connected to Bank activities under this project confirmed that these are not directly or significantly related to the project activities as defined by OP In particular: Coal thermalplants. Two coal thermal power plants and the two associated 150 kv transmission lines will connect to the Lahat 150/20 kv substation, which is a part of the Bank project. However, while the timing of the two power plants overlaps with the Lahat subproject, the thermal plants are neither required nor necessary for the subproject to achieve its objective. The two thermal plant projects are in compliance with national regulations on land acquisition and compensation, as well as on environmental policies and regulations. Land Acquisition for the Millenium Substation. Land acquired by PLN for the Millenium Substation from a private company (PT. Bumi Citra Permai, the owner of the industrial zone to which the substation will supply electricity) was in compliance with national 21

31 regulations and no controversial issue was recorded. The Millennium substation will deliver power to a number of industries in the industrial park; these industries are operating with valid operating permits, and are in compliance with all Indonesian legal requirements (including environment). 3.2 Key Measures to be taken by the Borrower to Address Safeguards Policy Issues 29. PLN has prepared an EMP for all subprojects and LAMPs for four subprojects that involve land acquisition. The EMP and the LARAPs meet Bank requirements. 30. Mitigation Measures. Environmental impacts will be mitigated according to measures set out in the EMP, which include: (a) sprinkling construction sites with water; (b) limiting construction activities to normal working hours, and notifying the local community in advance if construction activities have to be performed outside these hours; (iii) removal of contaminated soils and solid waste, and their disposal to sites approved by local authorities; and (d) highlighting the prohibition of equipment containing PCB in bidding documents. The EMP will be included in the bidding documents and contracts as legal obligations for contractors. The EMP will be transferred to the respective operating entities for implementation. 31. Compensation. Permanent land will be compensated in the form of land substitution or cash at market value. Crops and trees will be compensated at market value or be replaced. Temporary use of ROW land during construction, and limitations on ROW land use during operation, will be compensated at negotiated values to be agreed with the affected households and in consultation with local governments. 32. Capacity for Safeguard Implementation. The two PLN Regional Project Offices at Java and Sumatra are directly responsible for the preparation and implementation of the EMP and the LAMPs. PLN and the Regional Project Office in Java have experience with preparation and implementation of EMPs and LAMPs for Bank projects. The Regional Project Office in Sumatra lacks such experience, but has four competent environmental and social specialists on its permanent staff, who are very experienced with national regulations on land acquisition and environmental management under domestic regulations. Environment and social staff of the two project offices received training from the Bank team, and have prepared satisfactory EMP and LAMPs for subprojects under their responsibility. Further training will be provided to PLN staff in charge of social and environment management during project implementation. 33. Public Consultations. Public consultations on EMP were held for those subprojects in Sumatra that involve land acquisition and for the Millennium subproject. For subprojects that will be implemented within their existing premises, public comments were solicited through posting the EMP on the PLN website and in the respective project offices, and announcements were made in local newspapers in this regard. Stakeholder concerns have been incorporated into the project design and in the EMP. 34. Consultations were conducted throughout the land compensation process, including inventory and public meetings. The process has been described in the LARAP. 22

32 35. Disclosure. The draft EMP and the draft L A M P S have been disclosed in accordance with the Bank s policy and were sent to the Infoshop in Washington D.C. in February The EMP and the LARAPs were disclosed in the project areas in Bahasa Indonesia. Governance and Accountability Framework (GAF) A guideline on Good Corporate Governance is in place in PLN, incorporating an Enterprise Risk Management ( E M ) system. Operational since 2007, PLN s internal procedures mandate that all major activities should be subject to a review by the Risk Management Division under the Director of Business and Risk Management. Risks evaluated include those associated with the delivery of project objectives, reputational risks, social and environmental risks, and risks of fraud and corruption. Risk criteria have been established, and risk ratings are determined based on likelihood and impact, and mitigation measures are proposed. The risk assessment is considered by a designated Committee of Directors and mitigation measures approved. PLN s own internal risk assessment and proposed mitigation for the Indonesia Power Transmission Development Project will complement actions outlined in the GAF, as agreed with PLN. 37. The following provides a summary of the GAF action plan (the full GAF is available in project files): Enhanced Disclosure Provisions and Transparency. The project will make use of the website and other communication channels (notice boards at the project website, press releases and/or conferences, public meetings) to disclose information regarding the project. All forms of communication will also display channels available to the public to make inquiries and to file complaints. Contractors will be required to take pictures of activities and/or physical progresses as part of their report, to be uploaded in PLN s website at regular intervals. The risk of corrupt practices arising from land acquisition and resettlement will be addressed separately through transparent consultation and deliberation process as defined in the Bank s social safeguards framework. 0 0 Civil Society Participation in Oversight. The Enhanced Disclosure Provisions and Transparency component of the Action Plan will serve as a catalyst to bring the project closer to its internal and external stakeholders. Enhanced participation will also be achieved through intensive communication with local government, and the public will be invited to oversee the project - at least virtually through the project website. Complaints Handling Mechanism. A complaints handling mechanism will be established and integrated with the existing mechanism at PLN. Apart from the existing customer service phone and web hotline, PLN should make other channels (such as mail and addresses, text message numbers) available for the public to file complaints. The available channels will be displayed in the project s communication materials such as bid documents, public notices at the project site, and PLN s website ( The complaints will be acted upon in a professional and timely fashion, and without risk of reprisal to whistleblowers,by maintaining confidentiality of the sources of information. Complaints and follow up actions will be presented as part of the project report. 23

33 0 0 Sanctions & Remedies. In all procurement contracts, evidence of corruption, collusion or nepotism will result in termination of the relevant contract, possibly with additional penalties imposed (such as fines, blacklisting, etc.) and in accordance with Bank and Government regulations. In addition, requirements in the contract will enable PLN to terminate contractors for poor performance as stipulated in the contracts. Mitigating Collusion, Fraud & Nepotism. PLN will make use of its semi eprocurement system in its official website ( disclose procurement related information. It will also maintain fairness and transparency in the procurement processes by managing complaints effectively, and enforcing sanctions appropriately and consistently if there are proven cases of collusive and corrupt practices. Audit. An independent audit of PLN will be conducted and will include a paragraph explaining the loan, the status of funds used, and the auditor s opinion on the use of funds. 5. Monitoring and Evaluation 38. PLN maintains a good statistical system with sufficient data to monitor project outcomes. Data on electricity sales, transmission losses, and reliability statistics of transformers will be provided by the power system dispatching centers in the project areas. These indicators are monitored by the dispatching centers on a daily basis and statistics will be collected monthly. Data will be provided to the project offices in Java and south-central Sumatra by related dispatching centers annually for project monitoring and evaluation, starting from Project progress will be monitored by the regional project offices in Java and southcentral Sumatra. During the early stages of the project implementation, progress monitoring will focus on progress of procurement activities against the agreed procurement plan, implementation of the agreed L A M P S and EMP, and construction progress on sub-projects. Starting from 2013 monitoring will focus on progress in commissioning of sub-projects. With the assistance of the project management consultant, PLN s PTD will compile data 40. and monitor project implementation at least once a year. During regular supervision missions, the Bank team will work closely with the project coordinator and the regional project offices to evaluate implementation progress. The cost of data collection, monitoring and evaluation will be covered by the administrative budget of PLN for the dispatching centers, the two project offices and the PTD. No extra budget is required. 24

34

Loan Agreement. (Indonesia Infrastructure Finance Facility Project) between REPUBLIC OF INDONESIA. and

Loan Agreement. (Indonesia Infrastructure Finance Facility Project) between REPUBLIC OF INDONESIA. and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7731-ID Public Disclosure Authorized Loan Agreement (Indonesia Infrastructure Finance Facility Project) Public Disclosure Authorized between REPUBLIC

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/27/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Initial Project Information Document () Report No: AB484 Project Name INDONESIA - Domestic

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 30244 Public Disclosure Authorized PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) ON A LOAN/GEF GRANT Public Disclosure

More information

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT Sustainable Energy Access in Eastern Indonesia Electricity Grid Development Program (RRP INO 50016) PROGRAM EXPENDITURE AND FINANCING ASSESSMENT 1. The program expenditure and financing assessment reviews

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated: 31-Aug-2016 Report : PIDISDSC18959 Public Disclosure Authorized Public Disclosure Authorized

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

More information

The World Bank Indonesia Power Transmission Development Project (P117323)

The World Bank Indonesia Power Transmission Development Project (P117323) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 7 ARCHIVED on 07-Jul-2015 ISR18557 Implementing Agencies:

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Russia

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES14735 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Financing (In USD Million) Financing Source

Financing (In USD Million) Financing Source Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 06-Dec-2012 I. BASIC INFORMATION 1. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/10/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE . Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDSPrepared/Updated: Date ISDS Approved/Disclosed I. BASIC INFORMATION 1. Basic

More information

OFFICIAL DOCUMENTS. Project Agreement LOAN NUMBER 8715-ID

OFFICIAL DOCUMENTS. Project Agreement LOAN NUMBER 8715-ID Public Disclosure Authorized OFFICIAL DOCUMENTS LOAN NUMBER 8715-ID Public Disclosure Authorized Project Agreement Increasing PT Indonesia Infrastructure Finance Financing Capacity in Accelerating Infrastructure

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 15-Oct-2014

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Responsible

More information

Loan Agreement LOAN NUMBER 8714-ID. (Regional Infrastructure Development Fund Project) between REPUBLIC OF INDONESIA. and

Loan Agreement LOAN NUMBER 8714-ID. (Regional Infrastructure Development Fund Project) between REPUBLIC OF INDONESIA. and Public Disclosure Authorized OFFICIAL DOCUMENTS LOAN NUMBER 8714-ID Public Disclosure Authorized Loan Agreement Public Disclosure Authorized (Regional Infrastructure Development Fund Project) between REPUBLIC

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 3978 IND Loan Agreement Public Disclosure Authorized (Second Power Transmission and Distribution Project) between REPUBLIC OF INDONESIA and INTERNATIONAL

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857 Project

More information

FINANCIAL MANAGEMENT ASSESSMENT

FINANCIAL MANAGEMENT ASSESSMENT Greater Malé Environmental Improvement and Waste Management Project (RRP MLD 51077) EXECUTIVE SUMMARY FINANCIAL MANAGEMENT ASSESSMENT 1. The financial management assessment (FMA) was conducted for the

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE GUINEA: EDUCATION FOR

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country.

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619 Project

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7744-TN Public Disclosure Authorized Loan Agreement (Energy Efficiency Project) Public Disclosure Authorized between INTERNATIONAL BANK FOR RECONSTRUCTION

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC56822

More information

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Indonesia Global Practice

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Indonesia Global Practice Public Disclosure Authorized 1. Project Data Report Number : ICRR0021284 Public Disclosure Authorized Public Disclosure Authorized Project ID P111577 Project Name ID-Local Government and Decentralization

More information

The World Bank Indonesia Power Transmission Development Project (P117323)

The World Bank Indonesia Power Transmission Development Project (P117323) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 13 ARCHIVED on 28-Dec-2017 ISR30911 Implementing

More information

Financing Agreement OFFICIAL OCUMENTS. Public Disclosure Authorized CREDIT NUMBER 5152-UZ. Public Disclosure Authorized

Financing Agreement OFFICIAL OCUMENTS. Public Disclosure Authorized CREDIT NUMBER 5152-UZ. Public Disclosure Authorized Public Disclosure Authorized OFFICIAL OCUMENTS CREDIT NUMBER 5152-UZ Public Disclosure Authorized Financing Agreement (Additional Financing for the Second Rural Enterprise Support Project) between Public

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

RECONSTRUCTION AND DEVELOPMENT

RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized CONFRORMED COPY LOAN NUMBER 7905-ID Public Disclosure Authorized Project Agreement (Additional Financing for the Extended Deployment of the Enterprise Resource Planning System

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961 Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower Implementing Agency Environmental Category PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961 IMPROVING

More information

INO: Java-Bali 500-Kilovolt Power Transmission Crossing

INO: Java-Bali 500-Kilovolt Power Transmission Crossing Audited Project Financial Statements Project Number: 42362-013 Loan Number: 3083/8276 Period covered: 1 January 2017 to 31 December 2017 INO: Java-Bali 500-Kilovolt Power Transmission Crossing Prepared

More information

(Java-Bali Power Sector Restructuring and Strengthening Project) between REPUBLIC OF INDONESIA. and

(Java-Bali Power Sector Restructuring and Strengthening Project) between REPUBLIC OF INDONESIA. and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4712-IND Public Disclosure Authorized Loan Agreement (Java-Bali Power Sector Restructuring and Strengthening Project) Public Disclosure Authorized

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,450,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,450,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021097 Public Disclosure Authorized Public Disclosure Authorized Project ID P111598 Country Tanzania

More information

CONFORMED COPY LOAN NUMBER 4100 IND LOAN NUNMBER 4100 IND

CONFORMED COPY LOAN NUMBER 4100 IND LOAN NUNMBER 4100 IND Public Disclosure Authorized Loan Agreement CONFORMED COPY LOAN NUMBER 4100 IND Public Disclosure Authorized (Second Village Infrastructure Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Roads and highways (70%);Railways

More information

Project Agreement. (Indonesia Infrastructure Finance Facility Project) among INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.

Project Agreement. (Indonesia Infrastructure Finance Facility Project) among INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7731-ID Public Disclosure Authorized Project Agreement (Indonesia Infrastructure Finance Facility Project) Public Disclosure Authorized among INTERNATIONAL

More information

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS)

More information

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4199 UG Public Disclosure Authorized Financing Agreement (Uganda Public Service Performance Enhancement Project) between Public Disclosure Authorized

More information

Central government administration (80%); Sub-national government administration (20%) Operation ID

Central government administration (80%); Sub-national government administration (20%) Operation ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE 31 March 2016 Report No.: AB7818 (The

More information

EAST ASIA AND PACIFIC. Indonesia

EAST ASIA AND PACIFIC. Indonesia Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA853 Project Name HCFC

More information

FINANCIAL ANALYSIS: PROJECT 1

FINANCIAL ANALYSIS: PROJECT 1 Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy

More information

Loan Agreement OFFIAL DOCUMENTS LOAN NUMBER 8229-AM. (Lifeline Road Network Improvement Project) between REPUBLIC OF ARMENIA. and

Loan Agreement OFFIAL DOCUMENTS LOAN NUMBER 8229-AM. (Lifeline Road Network Improvement Project) between REPUBLIC OF ARMENIA. and Public Disclosure Authorized OFFIAL DOCUMENTS LOAN NUMBER 8229-AM Public Disclosure Authorized Loan Agreement Public Disclosure Authorized (Lifeline Road Network Improvement Project) between REPUBLIC OF

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower(s) Report No. PID5794 Lebanon-Municipal Infrastructure Project (@+) Middle East and North Africa Region Other Urban Development LBPE50544 Lebanese Republic

More information

OP Investment Project Financing. Bank Access to Information Policy Designation Public

OP Investment Project Financing. Bank Access to Information Policy Designation Public Bank Policy - Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPSVP5.03-POL.103 Issued Effective July 1, 2014 Last Revised On July 1, 2016 Retired July

More information

Ebola Recovery and Reconstruction Trust Fund Grant Agreement

Ebola Recovery and Reconstruction Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GRANT NUMBER: TFOA1023 Public Disclosure Authorized Ebola Recovery and Reconstruction Trust Fund Grant Agreement (LABOR-INTENSIVE PUBLIC WORKS TO MITIGATE

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory

More information

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING. Parent Project ID:

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING. Parent Project ID: Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING Date ISDS Prepared/Updated: 10-Aug-2015 Report.: ISDSA15003 Date ISDS Approved/Disclosed: 03-Aug-2015, 16-Aug-2015 Public

More information

Table 1 the Road Network of Mozambique (in kilometers)

Table 1 the Road Network of Mozambique (in kilometers) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads

More information

Loan Agreement. (Alma Electricity Transmission Project) between JOINT STOCK COMPANY KAZAKHSTAN ELECTRICITY GRID OPERATING COMPANY.

Loan Agreement. (Alma Electricity Transmission Project) between JOINT STOCK COMPANY KAZAKHSTAN ELECTRICITY GRID OPERATING COMPANY. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7965-KZ Public Disclosure Authorized Loan Agreement (Alma Electricity Transmission Project) Public Disclosure Authorized between JOINT STOCK COMPANY

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/06/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 24-Feb-2015

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.108

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.108 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.108 Issued August 18, 2017 Effective August 18, 2017 Retired November 9, 2017

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

OFFICIAL DOCUMENTS. Loan Agreement LOAN NUMBER 8734-GD. (OECS Regional Tourism Competitiveness Project) between GRENADA

OFFICIAL DOCUMENTS. Loan Agreement LOAN NUMBER 8734-GD. (OECS Regional Tourism Competitiveness Project) between GRENADA Public Disclosure Authorized OFFICIAL DOCUMENTS LOAN NUMBER 8734-GD Public Disclosure Authorized Loan Agreement (OECS Regional Tourism Competitiveness Project) between GRENADA Public Disclosure Authorized

More information

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

(Real Estate Cadastre and Registration Project Additional Financing) between. FORMER YUGOSLAV REPUBLIC OF MACEDONIA (the Borrower) and

(Real Estate Cadastre and Registration Project Additional Financing) between. FORMER YUGOSLAV REPUBLIC OF MACEDONIA (the Borrower) and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7928-MK Public Disclosure Authorized Public Disclosure Authorized Loan Agreement (Real Estate Cadastre and Registration Project Additional Financing)

More information

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 13-Jan-2014 INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

More information

Decision The decision review meeting, held on November 26, 2012 authorized the team to continue with appraisal and negotiation.

Decision The decision review meeting, held on November 26, 2012 authorized the team to continue with appraisal and negotiation. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA798 Project Name TURKEY

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 12/13/2006

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 12/13/2006 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 12/13/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

Report No.: ISDSA13978

Report No.: ISDSA13978 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o Date ISDS Prepared/Updated: 29-Jul-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

Indonesia: Java-Bali Electricity Distribution Performance Improvement Project

Indonesia: Java-Bali Electricity Distribution Performance Improvement Project Validation Report November 2017 Indonesia: Java-Bali Electricity Distribution Performance Improvement Project Reference Number: PVR-535 Program Number: 40061-013 Loan Number: 2619 and 8245 Grant Number:

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

PEOPLE S REPUBLIC OF CHINA

PEOPLE S REPUBLIC OF CHINA Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7529-CN Public Disclosure Authorized Loan Agreement (Energy Efficiency Financing Project) Public Disclosure Authorized between PEOPLE S REPUBLIC

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,040,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,040,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020616 Public Disclosure Authorized Public Disclosure Authorized Project ID P119939 Country Uzbekistan

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:

More information

OFFICIAL LvG-K DOCUMENTS

OFFICIAL LvG-K DOCUMENTS Public Disclosure Authorized OFFICIAL LvG-K DOCUMENTS LOAN NUMBER 8677-TR Public Disclosure Authorized Loan Agreement (Sustainable Cities Project) Public Disclosure Authorized between ILLER BANKASI ANONIM

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE PY Energy Sector Strengthening

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDONESIA INFRASTRUCTURE FINANCE FACILITY PROJECT LOAN 7731-ID JUNE 24, 2009 TO THE REPUBLIC

More information

Loan Agreement. (Shandong Ecological Afforestation Project) between PEOPLE S REPUBLIC OF CHINA. and

Loan Agreement. (Shandong Ecological Afforestation Project) between PEOPLE S REPUBLIC OF CHINA. and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7882-CN Public Disclosure Authorized Loan Agreement (Shandong Ecological Afforestation Project) Public Disclosure Authorized between PEOPLE S REPUBLIC

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22644 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.110

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.110 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.110 Issued September 30, 2018 Effective October 1, 2018 Content Operational policy

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.109

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.109 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.109 Issued November 10, 2017 Effective November 10, 2017 Content Operational policy

More information

Loan Agreement. (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT CONFORMED COPY LOAN NUMBER 4643 IND Loan Agreement (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated January 22,

More information

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING

More information

FINANCIAL ANALYSIS. 3. Assumptions. The following assumptions were used in carrying out the financial analysis:

FINANCIAL ANALYSIS. 3. Assumptions. The following assumptions were used in carrying out the financial analysis: Java Bali 500-Kilovolt Power Transmission Crossing Project (RRP INO 42362) FINANCIAL ANALYSIS 1. General Methodology. Financial analysis of the project has been undertaken in accordance with Asian Development

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT CONFORMED COPY LOAN NUMBER 7971-BY Loan Agreement (Road Upgrading and Modernization Project) between REPUBLIC OF BELARUS and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated November 19, 2010

More information

ANNEX. Objectives, Terms, and Conditions of the Grant

ANNEX. Objectives, Terms, and Conditions of the Grant Public Disclosure Authorized August 30, 2001 His Excellency DR. Boediono Minister of Finance Ministry of Finance Jakarta, Indonesia Dear Mr. Minister: Public Disclosure Authorized Public Disclosure Authorized

More information

Loan Agreement. (Additional Financing for Laguna de Bay Institutional Strengthening and Community Participation Project) between

Loan Agreement. (Additional Financing for Laguna de Bay Institutional Strengthening and Community Participation Project) between Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 8035-PH Public Disclosure Authorized Loan Agreement Public Disclosure Authorized (Additional Financing for Laguna de Bay Institutional Strengthening

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 16-Mar-2012

More information

Power Distribution Development Program Region. East Asia & Pacific Country. Energy & Extractives Lending Instrument. Program-for-Results Program ID

Power Distribution Development Program Region. East Asia & Pacific Country. Energy & Extractives Lending Instrument. Program-for-Results Program ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: 99377 (The report

More information

Cambodia: Rural Credit and Savings Project

Cambodia: Rural Credit and Savings Project Project Validation Report Reference Number: CAM 2008-06 Project Number: 30327 Loan Number: 1741 July 2008 Cambodia: Rural Credit and Savings Project Operations Evaluation Department ABBREVIATIONS ADB Asian

More information

Project Agreement OFFICIAL. Public Disclosure Authorized. onr'unients LOAN NUMBER 2300 IND. Public Disclosure Authorized. (Thirteenth Power Project)

Project Agreement OFFICIAL. Public Disclosure Authorized. onr'unients LOAN NUMBER 2300 IND. Public Disclosure Authorized. (Thirteenth Power Project) Public Disclosure Authorized Public Disclosure Authorized OFFICIAL onr'unients LOAN NUMBER 2300 IND Project Agreement (Thirteenth Power Project) Public Disclosure Authorized between INTERNATIONAL BANK

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011 Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND

More information

Procurement. OP January 2011 Page 1 of 10. Revised July 1, 2014

Procurement. OP January 2011 Page 1 of 10. Revised July 1, 2014 Page 1 of 10 "OP/BP11:00 "Procurement, were revised on July 2014 to take into account the recommendations in " World Bank Group A New Approach to Country Engagement" (R2014-0089), which were approved by

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.: AB6515 Afghanistan New Market Development Project Region SOUTH ASIA Sector General industry and trade sector (100%) Project ID P118053

More information

Project development objective/outcomes

Project development objective/outcomes Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE SAINT VINCENT & THE GRENADINES HIV/AIDS PREVENTION AND CONTROL PROJECT PE-PO76799

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 09-Dec-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,212,149.53

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,212,149.53 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021311 Public Disclosure Authorized Public Disclosure Authorized Project ID P110051 Country India Project

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK . ASIAN DEVELOPMENT BANK TAR: BAN 35242 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR PREPARING THE GAS SECTOR DEVELOPMENT PROJECT April 2004 CURRENCY EQUIVALENTS (as of 21 April 2004)

More information

Environmental Assessment

Environmental Assessment OP 4.01 January 1999 These policies were prepared for use by World Bank staff and are not necessarily a complete treatment of the subject. Environmental Assessment (Archived August 2004) Note: OP and BP

More information