1 Tempus IRIS Project Management Dr. Vered Holzmann 4 th Consortium Meeting Amsterdam, October, 2015 Project number TEMPUS IL-TEMPUS-JPGR This project has been funded with support from the European Commission. This publication [communication] reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein.

2 WP 9: Project Management Scope Schedule Budget Coordination & Communication Monitoring & Control

3 Project Scope WP1: Requirement analysis and benchmarking WP2: Internationalization strategic plan WP3: Development and delivery of campus internationalization programs for faculty, administrators and students WP4: Development and delivery of training activities for the qualification of IRO professionals WP5: Pilot IRO activities WP6: Quality Assurance WP7: Dissemination WP8: Exploitation and Sustainability WP9: Project Management

4 Project Scope Update WP1: Requirement analysis and benchmarking Questionnaires and research results +2 days study visits by Israeli college representatives in EU partner IROs WP2: Internationalization strategic plan 2 (of 2) workshops on strategic planning Colleges internationalization strategic plans Strategic plan on national level to Israeli CHE WP3: Development and delivery of campus internationalization programs for faculty, administrators and students 3 (of 4) workshops + a mini-conference Professional publication on IoC WP4: Development and delivery of training activities for the qualification of IRO professionals 5 (of 5) workshops on IRO Managing Internationalization + Summary feedback meeting Professional toolkit (will be developed) WP5: Pilot IRO activities 3-5 pilot activities by each college + Study visits to develop internationalization with EU partner countries universities

5 Project Scope Update cont. WP6: Quality Assurance QA evaluation reports on all project meetings QA report on project progress WP7: Dissemination Website, booklets, video clip Internal dissemination materials National & International conferences WP8: Exploitation and Sustainability Administrative, faculty and senior management mentoring kits International network Advocacy materials WP9: Project Management Coordinator change & consortium changes + International websites for the colleges Schedule extended by 4 months Budget was reallocated between headings and partners

6 Project Schedule 40 months Project Duration : Oct Feb. 2016

7 Project Budget Headings Update Travel costs &costs of stay Equipment Printing & Publishing Other costs Indirect TOTAL ELIGIBLE Staff costs ( ) ( ) ( ) ( ) ( ) Costs ( ) Costs 452, , , , , , ,210, , , , , , , ,210, % 94% 100% 88% 152% 100%

8 Project Partners Budget Update Original Budget 1 st change Budget Updated Budget

9 Monitoring & Control Half year reports including IRIS half year report Timesheets + Annex1 Annex2 Invoices & Receipts Annex3 + Expenditure plan for ALL the remaining budget (date, budget heading, purpose, sum) 31 October January 2016

10 Monitoring & Control

11 Project Control IRIS Half Project Report Submitted: 09 April 2014 Approved: 27 May 2014 IRIS Final Project Report Partners submission: Summary report: 10 January 2016 Financial reports: 31 January 2016 Financial Audit Certificate Coordinator Deadline: Two months after the end of the eligibility period (14/2/2016). Keep records 5 years after the end of the project (Feb. 2020)

12 Coordination & Communication IRIS Newsletter (14 volumes) IRIS ORT Braude: Contact Details: Dr. Vered Holzmann veredhz@braude.ac.il Contact List: Please update the coordinator about contact persons

13 Thank You Dr. Vered Holzmann 4 th Consortium Meeting Amsterdam, October, 2015 Project number TEMPUS IL-TEMPUS-JPGR This project has been funded with support from the European Commission. This publication [communication] reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein.

IN2IT FINANCIAL WORKSHOP

IN2IT FINANCIAL WORKSHOP IN2IT FINANCIAL WORKSHOP DR. VERED HOLZMANN IN2IT PROJECT MANAGER MTA, 13 MARCH 2016 Agenda Part A: Erasmus+ Office: Rationale of the Erasmus+ budget management Unit costs vs. Actual costs Control unit

More information

Financial and Reporting Rules IRIS Project

Financial and Reporting Rules IRIS Project Financial and Reporting Rules IRIS Project February 18 th, 2013 Sivan Schmidt Project number 530315-TEMPUS-1-2012-1-IL-TEMPUS-JPGR This project has been funded with support from the European Commission.

More information

Project Management and Financial Reporting

Project Management and Financial Reporting Horizon 2020 and ERC Project Management and 11-13 April 2018 Brussels Horizon 2020 Project Management and AGENDA DAY 1 08:30 09:00 Registration 09:00 09:30 Event opening 09:30 10:30 How to Coordinate and

More information

Model Grant Agreement LUMP SUM PILOT S2R JU

Model Grant Agreement LUMP SUM PILOT S2R JU HORIZON HORIZON 2020 2020 Model Grant Agreement LUMP SUM PILOT S2R JU Lump sum grant: introduction The grant agreement will set out the lump sum (EU funding) corresponding to the full accomplishment of

More information

Why? Disclaimer: Information not legally binding

Why? Disclaimer: Information not legally binding LUMP SUM PILOT Why? Why? Simplification: No financial reporting, no time sheets, no financial audit. Payment exclusively based on completion of activity. Pilot scheme to evaluate results view to FP9 Start

More information

Modernization of WBC universities through strengthening of structures and services for knowledge transfer, research and innovation

Modernization of WBC universities through strengthening of structures and services for knowledge transfer, research and innovation Internal Monitoring Report Project Acronym: WBCInno strengthening of Project full title: structures and services for knowledge transfer, research and innovation Project No: 530213-TEMPUS-1-2012-1-RS-TEMPUS-JPHES

More information

Reporting and Payments. Legal Basis

Reporting and Payments. Legal Basis HORIZON HORIZON 2020 2020 Reporting and Payments Legal Basis Types of payments (Article 21) One pre-financing One or several interim payments One payment of the balance Payments Payments will be made to

More information

PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS

PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS Establishing the European Geological Surveys Research Area to deliver a Geological Service for Europe PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS Joint Call on applied

More information

Gouvernance et Emergence de la Recherche en Sciences Humaines au Cambodge GEReSH-CAM

Gouvernance et Emergence de la Recherche en Sciences Humaines au Cambodge GEReSH-CAM 1 Gouvernance et Emergence de la Recherche en Sciences Humaines au Cambodge GEReSH-CAM Quality Assurance Plan www.geresh-cam.eu 2 Réferentiel projet Dear Partners, This Quality Assurance Plan summarises

More information

Presentation on Financial and Administrative activities. L.Garvia (D Appolonia)

Presentation on Financial and Administrative activities. L.Garvia (D Appolonia) Presentation on Financial and Administrative activities L.Garvia (D Appolonia) Tableof ofcontent New in HORIZON 2020 o Reimbursment rate; Method for calculation of indirect costs; Electronic signatures

More information

FCH 2 JU Financial Workshop Brussels, 30 March Direct Costs. Thanos BATSILAS, FCH 2 JU Financial Officer.

FCH 2 JU Financial Workshop Brussels, 30 March Direct Costs. Thanos BATSILAS, FCH 2 JU Financial Officer. FCH 2 JU Financial Workshop Brussels, 30 March 2017 Direct Costs Thanos BATSILAS, FCH 2 JU Financial Officer http://www.fch.europa.eu/ General eligibility criteria Article 6 Actually incurred! Incurred

More information

TEMPUS Reformation of the Curricula on Built Environment in the Eastern Neighbouring Area

TEMPUS Reformation of the Curricula on Built Environment in the Eastern Neighbouring Area TEMPUS Reformation of the Curricula on Built Environment in the Eastern Neighbouring Area Lina Zemeckyte lina.zemeckyte@vgtu.lt Hierarchy of TEMPUS documentation CALL FOR PROPOSALS Grant Agreement: SPECIAL

More information

Erasmus+ Capacity Building:

Erasmus+ Capacity Building: Erasmus+ Capacity Building: Update on implementation modalities (Feb 2014) Elements of Continuity (1/2) - Objectives: focus on reforms and capacity building - Expected impact: institutions and systems

More information

Financial Reporting. Tempus IV. Kyiv-Mohyla Academy Kiev 16 November Ana Ramon de la Cruz and Giulia Moro

Financial Reporting. Tempus IV. Kyiv-Mohyla Academy Kiev 16 November Ana Ramon de la Cruz and Giulia Moro Financial Reporting Tempus IV Kyiv-Mohyla Academy Kiev 16 November 2016 Ana Ramon de la Cruz and Giulia Moro 1 1. General principles Exchange rate Co-financing Transfer of money 2. Budget headings (purpose,

More information

Guide for Applicants

Guide for Applicants The Romanian-EEA Research Programme 2012-2017 RO14 - Programme Area: Research within priority Sectors Monica Cruceru Program Coordinator UEFISCDI I. Definitions II. Eligibility of applicants and project

More information

FP6 Contract and Financial Reporting. The Basics for EC Consortia. Linda Polik Research Services

FP6 Contract and Financial Reporting. The Basics for EC Consortia. Linda Polik Research Services FP6 Contract and Financial Reporting The Basics for EC Consortia Linda Polik Research Services linda.polik@admin.ox.ac.uk Overview of Presentation 1) Contractual Issues 2) Financial Issues 3) Reporting

More information

DRAFT FACULTY ASSEMBLY MEETING MINUTES 15 Nov :00-Noon - COPH Auditorium

DRAFT FACULTY ASSEMBLY MEETING MINUTES 15 Nov :00-Noon - COPH Auditorium DRAFT FACULTY ASSEMBLY MEETING MINUTES 15 Nov 2013 10:00-Noon - COPH Auditorium Faculty in attendance: See attached roster. 1. Meeting called to order by Dr. Perrin 2. Dean s Report: Budget Update a. See

More information

The Lump Sum Pilot Methodology

The Lump Sum Pilot Methodology HORIZON HORIZON 2020 2020 Stakeholders Workshop on Simplification The Lump Sum Pilot Methodology Brussels, 20 October 2017 Peter Haertwich Lump sum: Why? Huge simplification potential: Despite all simplification,

More information

PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS

PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS Establishing the European Geological Surveys Research Area to deliver a Geological Service for Europe PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS Joint Call on applied

More information

WBCInno presentation. Kick off meeting. Prof. Dr Vesna Mandić University of Kragujevac 18 th December Dr.

WBCInno presentation. Kick off meeting. Prof. Dr Vesna Mandić University of Kragujevac 18 th December Dr. Kick off meeting 18 th December 2012 WBCInno presentation Prof. Dr Vesna Mandić mandic@kg.ac.rs Project CV basic information Modernization of Contract number 530213-TEMPUS-1-2012-1-RS-TEMPUS- JPHES Project

More information

Financial management of H2020 projects: Tips & Tricks

Financial management of H2020 projects: Tips & Tricks Financial management of H2020 projects: Tips & Tricks BESTPRAC Training School: "Finance for Beginners" Per Inge Andresen Senior adviser NTNU Norwegian University of Science and Technology Agenda General

More information

UNIVERSITY OF GREENWICH

UNIVERSITY OF GREENWICH UNIVERSITY OF GREENWICH INSURANCE RENEWAL AND CLAIMS PROCEDURES The University of Greenwich maintains a comprehensive portfolio of insurance policies designed to mitigate the risks inherent in the operations

More information

3. ON THE SPOT CHECKS

3. ON THE SPOT CHECKS Version: 4.0 Date: October 2009 Page 1/6 Annex V The check-list below represents a non-exhaustive list of actions to take/questions to ask/issues to check during project visits. When this check-list is

More information

CIVINET ACTIVITY FUND CALL For New CIVITAS National Networks

CIVINET ACTIVITY FUND CALL For New CIVITAS National Networks CIVINET ACTIVITY FUND CALL For New CIVITAS National Networks CIVINET WEBINAR, 11 September 2017 Jerome Simpson Regional Environmental Center for CEE Contents What are the CIVINETs? An Activity Fund Extra

More information

P Periodic project report Please remove this front page when using the template

P Periodic project report Please remove this front page when using the template P Periodic project report Please remove this front page when using the template IMI1 programme Template for periodic project report Recommendations for project coordinators When preparing a periodic report,

More information

H2020 proposal preparation RI-Links2UA Horizon 2020 Info Day 8 June, 2018

H2020 proposal preparation RI-Links2UA Horizon 2020 Info Day 8 June, 2018 H2020 proposal preparation RI-Links2UA Horizon 2020 Info Day 8 June, 2018 Acknowledgement Slides, prepared by Gorazd Weiss are used in this presentation Today s topics 1. INTRODUCTION FROM IDEA TO IMPLEMENTATION

More information

PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS

PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS Establishing the European Geological Surveys Research Area to deliver a Geological Service for Europe PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS Joint Call on applied

More information

BIOSURF. (BIOmethane SUstainable and Renewable Fuel) Project Handbook (D1.1) Loriana PAOLUCCI & Stefano PROIETTI (ISIS)

BIOSURF. (BIOmethane SUstainable and Renewable Fuel) Project Handbook (D1.1) Loriana PAOLUCCI & Stefano PROIETTI (ISIS) (BIOmethane SUstainable and Renewable Fuel) Project Handbook (D1.1) Authors: Loriana PAOLUCCI & Stefano PROIETTI (ISIS) Version: Final Quality Review: Stefano PROIETTI Date: 28-02-2015 Grant Agreement

More information

CONTRACTUAL AGREEMENT BETWEEN THE CONTRACTOR AND THE PARTNER

CONTRACTUAL AGREEMENT BETWEEN THE CONTRACTOR AND THE PARTNER DIRECTORATE GENERAL OF HEALTH & CONSUMER PROTECTION DIRECTORATE C PUBLIC HEALTH AND RISK ASSESSMENT CONTRACTUAL AGREEMENT BETWEEN THE CONTRACTOR AND THE PARTNER This contract, drawn up under the Community

More information

ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS

ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions Where the grant takes the form of a unit

More information

PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL

PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL Establishing the European Geological Surveys Research Area to deliver a Geological Service for Europe PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL Joint Call on applied geoscience

More information

Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information

Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information P R O C U R E M E N T N O T I C E Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information 1.1 Background information on the Regional School of

More information

SPECIFIC AGREEMENT No XXXX/XXXXX..

SPECIFIC AGREEMENT No XXXX/XXXXX.. Education, Audiovisual And Culture Executive Agency Unit SPECIFIC GRANT AGREEMENT FOR AN ACTION CREATIVE EUROPE PROGRAMME (2014-2020) Cinema Networks Call for Proposals EACEA.10.2016 SPECIFIC AGREEMENT

More information

Financial management of H2020 projects

Financial management of H2020 projects Financial management of H2020 projects BESTPRAC Training School: "Finance for Beginners" Per Inge Andresen Senior adviser NTNU Norwegian University of Science and Technology NTNU Norwegian University of

More information

Project management - WP2

Project management - WP2 ASSEMBLE Plus Kick-Off Meeting Project management - WP2 DGRTT European Affairs Office A. Stécy JOMBERT ASSEMBLE Plus Project Manager Alice.jombert@upmc.fr +33(0)144 27 51 43 19/10/2017 Project Overview

More information

Financial Guidelines for Beneficiaries EDCTP Association October 2016

Financial Guidelines for Beneficiaries EDCTP Association October 2016 Financial Guidelines for Beneficiaries EDCTP Association October 2016 This document is prepared as a supplement to the Grant Agreement (GA), where majority of the information is extracted from. In the

More information

Financial Webinar. IMI 2 projects :00 CET

Financial Webinar. IMI 2 projects :00 CET Financial Webinar IMI 2 projects 12.05.2017 10:00 CET Agenda How to use GoToWebinar o Gaëlle Lanckmans, IMI Finance Cost Eligibility o Gaëlle Lanckmans, IMI Finance Reporting requirements and Migration

More information

Call for proposals. for civil society capacity building and monitoring of the implementation of national Roma integration strategies

Call for proposals. for civil society capacity building and monitoring of the implementation of national Roma integration strategies Call for proposals for civil society capacity building and monitoring of the implementation of national Roma integration strategies For Cyprus, Denmark, Estonia, Finland, Latvia, Lithuania, Luxembourg

More information

Terms of Reference. Contract #: (to be provided by PSU)

Terms of Reference. Contract #: (to be provided by PSU) Independent Evaluation of the Accelerating the Implementation of the Investment Case for Maternal, Newborn and Child Health in Asia and the Pacific Programme Terms of Reference Contract #: (to be provided

More information

GUIDELINES TO FINANCIAL REPORTING. COSME Finance Sector C1.2 SAG meeting 14 October 2016

GUIDELINES TO FINANCIAL REPORTING. COSME Finance Sector C1.2 SAG meeting 14 October 2016 GUIDELINES TO FINANCIAL REPORTING COSME Finance Sector C1.2 SAG meeting 14 October 2016 Main speaking points: - A few reminders - Guidelines for the final financial reporting - "What's new", and so what

More information

UNIVERSITY COLLEGE CORK FINANCE OFFICE Office of Research Grants & Contracts Research Procedures

UNIVERSITY COLLEGE CORK FINANCE OFFICE Office of Research Grants & Contracts Research Procedures 1. RESEARCH GRANTS AND CONTRACTS: The (ORGC) was established to provide assistance to the University and individual researchers in the administrative and financial aspects of the Universities funded research

More information

Transnational Access in H2020

Transnational Access in H2020 Transnational Access in H2020 EU funding of Research Infrastructures (RI) Funding of Integrated Activities in H2020 Best Practise of TNA Dr. Ute Krell Head of the EU-Project Office @ DESY CREMLIN, WP2

More information

Spatial Planning for Energy and Communities In All Landscapes London PPC1 Meeting TCPA. Wifi: TCPAMain PW: TCpa2005

Spatial Planning for Energy and Communities In All Landscapes London PPC1 Meeting TCPA. Wifi: TCPAMain PW: TCpa2005 Spatial Planning for Energy and Communities In All Landscapes London PPC1 Meeting TCPA Wifi: TCPAMain PW: TCpa2005 Spatial Planning for Energy and Communities In All Landscapes 8 March 2013 7 March 2016

More information

Project costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs.

Project costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs. Financial issues Extract from the guide for BONUS applicants 1 8. How to prepare project budget? Only the real costs required for the implementation should be indicated in the planned budget for the project.

More information

Multi-beneficiary Model Grant Agreement

Multi-beneficiary Model Grant Agreement Partnership for Research and Innovation in the Mediterranean Area Programme (PRIMA) Multi-beneficiary Model Grant Agreement Version 5.0 30 January 2018 Disclaimer This document is aimed at assisting applicants

More information

MSOE STUDENT TRAVEL POLICY Revised 12 January 2016

MSOE STUDENT TRAVEL POLICY Revised 12 January 2016 MSOE STUDENT TRAVEL POLICY Revised 12 January 2016 PURPOSE In order to protect the safety and well being of the institution and its members, in an effort to align with the university s overall mission,

More information

Terms of Reference. External monitoring mission for the Project Mid-Term Review

Terms of Reference. External monitoring mission for the Project Mid-Term Review I- BACKGROUND Project: Supporting Citizens Access to Justice Terms of Reference External monitoring mission for the Project Mid-Term Review a) Standard UNDP M&E requirements The UNDP M&E (monitoring and

More information

Project Manual

Project Manual KUNGSBACKA KOMMUN EUCVET European class in vocational education and training Project Manual 2014-10-23 Index 1 Project summary... 2 1.1 Aim... 2 1.2 Objectives... 2 1.3 Work plan... 3 1.4 Responsibilities...

More information

Business Calendar

Business Calendar 2018-2019 Business Calendar Monthly Reminders for July 2018 Budget Transfers are approved Tuesdays and Thursdays Bank Reconciliation & Campus Sales Tax Report due 7/10/18 Business Services Orientation

More information

ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS

ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions Where the grant takes the form of a unit

More information

Business Calendar

Business Calendar 2017-2018 Business Calendar July 2017 S u n M o n Tue W e d T h u F r i S a t 2 3 4 5 6 7 8 SUMMER BREAK 9 10 11 12 13 14 15 Purchasing Activity Bank Reconciliation & Sales Tax Report due All FY 16-17

More information

Framework Programmes

Framework Programmes GZ: RL/10-ZGI/2017 Framework Programmes Co-financing of Austrian Civil Society Organisations (CSOs) Funding Guideline the operational unit of the Austrian Development Cooperation Zelinkagasse 2, 1010 Vienna,

More information

DEVELOPMENT OF NATIONAL SPORTS STRUCTURE

DEVELOPMENT OF NATIONAL SPORTS STRUCTURE WORLD PROGRAMMES COACHES DEVELOPMENT OF NATIONAL SPORTS STRUCTURE Olympic Solidarity 2013-2016 World Programmes DEVELOPMENT OF NATIONAL SPORTS STRUCTURE OBJECTIVE The development of sport in certain countries

More information

PLANT ACCOUNTING: FABRICATED PROPERTY P ACCOUNTING MANUAL Page 1 PLANT ACCOUNTING: FABRICATED PROPERTY. Contents. I.

PLANT ACCOUNTING: FABRICATED PROPERTY P ACCOUNTING MANUAL Page 1 PLANT ACCOUNTING: FABRICATED PROPERTY. Contents. I. ACCOUNTING MANUAL Page 1 PLANT ACCOUNTING: FABRICATED PROPERTY Contents I. Introduction 2 II. Fabricated Equipment for University Use--Inventoried 2 A. Definition 2 B. Reporting and Recording 2 Page 1.

More information

TEMPUS Modernising Higher Education. Tempus Monitoring Policy

TEMPUS Modernising Higher Education. Tempus Monitoring Policy TEMPUS Modernising Higher Education Tempus Monitoring Policy By Jacques Kemp & Aziza Abdurakhmanova Tempus project representatives meeting Brussels, 26-27 November 2012 1 WHY Monitoring Management instrument

More information

CLARIN-PLUS WP1 - Management. Hetty Winkel, Franciska de Jong Utrecht, 9 September 2015

CLARIN-PLUS WP1 - Management. Hetty Winkel, Franciska de Jong Utrecht, 9 September 2015 CLARIN-PLUS WP1 - Management Hetty Winkel, Franciska de Jong Utrecht, 9 September 2015 WP1 Objectives To take care of the financial, administrative and legal execution of the project in accordance with

More information

LUMP SUM GRANT AGREEMENT UNICA 13 th EURLO MEETING Rome, October 22 nd 2018

LUMP SUM GRANT AGREEMENT UNICA 13 th EURLO MEETING Rome, October 22 nd 2018 LUMP SUM GRANT AGREEMENT UNICA 13 th EURLO MEETING Rome, October 22 nd 2018 Sabrina BOZZOLI International Research Division - UNIVERSITY OF ROME TOR VERGATA LUMP SUM GRANT: WHY? Funding based on reimbursement

More information

KA2 Strategic Partnerships Financial Management. 21st September

KA2 Strategic Partnerships Financial Management. 21st September KA2 Strategic Partnerships Financial Management 21st September 2017 Leargas.Ireland @Leargas www.leargas.ie 1 Overview General Principles of Financial Management Eligibility of Expenses (eligible and ineligible

More information

ITN 2010 Finance and Budget

ITN 2010 Finance and Budget Brussels, February 2011 ITN Coordinators meeting ITN 2010 Finance and Budget Research Executive Agency Marie Curie host-driven actions Financial Management of ITN Projects 1. The EU contribution The cost

More information

European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement. (EMPIR MGA - Multi)

European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement. (EMPIR MGA - Multi) European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement (EMPIR MGA - Multi) Version 5.0 12 March 2018 Version Publication Date 1.0 16.07.2015 Initial version

More information

Fiscal Year 2015 Year End Closeout

Fiscal Year 2015 Year End Closeout Fiscal Year 2015 Year End Closeout Welcome Representative from: Procurement Services (formerly Purchasing) Accounts Payable/Travel General Accounting/Payroll Budget A little housekeeping Please turn all

More information

Education, Audiovisual and Culture Executive Agency GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES

Education, Audiovisual and Culture Executive Agency GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES Education, Audiovisual and Culture Executive Agency «DEFU_UNOP» GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES Mixed financing (reimbursement based on percentage of eligible costs and lump sum(s)

More information

Texas Higher Education Coordinating Board Carl D. Perkins Grants for Program Year Cost Category Schedule A: Salaries and Fringe Benefits

Texas Higher Education Coordinating Board Carl D. Perkins Grants for Program Year Cost Category Schedule A: Salaries and Fringe Benefits Cost Category Schedule A: Salaries and Fringe Benefits Only) II. Title/Position III. % of Time on Project IV. Amount Three Part-Time CTE Academic Advisors (TBD) 100 % $ 31,350 Special Populations Lloyd

More information

UKF Project Monitoring Guidelines Version 4

UKF Project Monitoring Guidelines Version 4 REPUBLIC OF CROATIA MINISTRY OF SCIENCE, EDUCATION AND SPORTS UKF Project Monitoring Guidelines Version 4 UNITY THROUGH KNOWLEDGE FUND office@ukf.hr, www.ukf.hr, +385 1 2352 685 Planinska 1, HR-10000 Zagreb,

More information

Berlin, 1 st 3 rd May 2017

Berlin, 1 st 3 rd May 2017 Berlin, 1 st 3 rd May 2017 WP1: MANAGEMENT ACTIVITIES L i b by Wood and Hanns Lochmüller Libby and Sebastien - introduction 2 Might be good to introduce yourselves with photos since you are both new 16

More information

Education, Audiovisual and Culture Executive Agency GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES AGREEMENT NUMBER [ ]

Education, Audiovisual and Culture Executive Agency GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES AGREEMENT NUMBER [ ] Education, Audiovisual and Culture Executive Agency Erasmus+ : Prospective Initiatives, Policy Networks, Programme and Linguistic Support GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES AGREEMENT

More information

ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS

ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions Where the grant takes the form of a unit

More information

Financial workshop. Creative Europe - Culture 10 October 2018

Financial workshop. Creative Europe - Culture 10 October 2018 Financial workshop Creative Europe - Culture 10 October 2018 OBJECTIVES of workshop Awareness and clarification about key financial issues Recommendations on the financial management Preparation of the

More information

Assignment Name: Workshop on EU Budget Support for civil servants from Montenegro, Trainer 1

Assignment Name: Workshop on EU Budget Support for civil servants from Montenegro, Trainer 1 P R O C U R E M E N T N O T I C E Assignment Name: Workshop on EU Budget Support for civil servants from Montenegro, Trainer 1 Section 1. Introductory Information 1.1 Background information on the Regional

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 25.11.2016 C(2016) 7553 final COMMISSION DECISION of 25.11.2016 modifying the Commission decision of 7.3.2014 authorising the reimbursement on the basis of unit costs for

More information

JUST/2015/RGEN/AG/ROLE JUST/2016/RGEN/AG/VAWA

JUST/2015/RGEN/AG/ROLE JUST/2016/RGEN/AG/VAWA Project Management JUST/2015/RDAP/AG/MULT JUST/2015/RGEN/AG/ROLE JUST/2016/RGEN/AG/VAWA Kick-off Meeting 14 March 2017 1 Who s who? different actors Beneficiaries (mono or multi) and other project partners

More information

ECSEL JU Moving Forward in 2016

ECSEL JU Moving Forward in 2016 ECSEL JU Moving Forward in 2016 Bert De Colvenaer Executive Director Torino, 22 March 2016 1 Electronic Components and Systems for European Leadership a Public-Private Partnership Keeping Europe at the

More information

Guide for Applicants

Guide for Applicants EUROPEAN COMMISSION EUROSTAT Guide for Applicants Eurostat Grants Version 4.0 11 January 2018 1/55 IMPORTANT NOTICE The Guide for Applicants is a user guide that aims to explain to applicants and beneficiaries

More information

Multi-beneficiary Model Grant Agreement for Members

Multi-beneficiary Model Grant Agreement for Members Clean Sky 2 Joint Undertaking (CS2) Multi-beneficiary Model Grant Agreement for Members (CS2 JU Members MGA Multi) Version 5.0 28 November 2017 Disclaimer This document is aimed at assisting applicants

More information

European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer

European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer Alexandros IATROU Deputy Head of Administration and Finance Unit, Directorate for Energy DG Research and Innovation JOPRAD

More information

ERA-NET COFUND Financial Aspects General Principles. An overview and practical examples October 2016

ERA-NET COFUND Financial Aspects General Principles. An overview and practical examples October 2016 ERA-NET COFUND Financial Aspects General Principles An overview and practical examples October 2016 1 Content general financial aspects ERA-NET Cofund eligible costs and EC contribution calculation of

More information

POSITION DETAILS FOR OFFICE USE ORGANOGRAM. Chair & trustees of UCTRF. Principal Officer Level 12. Benefits Administrator Level 8

POSITION DETAILS FOR OFFICE USE ORGANOGRAM. Chair & trustees of UCTRF. Principal Officer Level 12. Benefits Administrator Level 8 HR191 JOB DESCRIPTION NOTES Forms must be downloaded from the UCT website: http://www.uct.ac.za/depts/sapweb/forms/forms.htm This form serves as a template for the writing of job descriptions. A copy of

More information

Research for the benefit of SMEs The new approach. Amaury NEVE European Commission DG Research - Unit T4: SMEs

Research for the benefit of SMEs The new approach. Amaury NEVE European Commission DG Research - Unit T4: SMEs Research for the benefit of SMEs The new approach Amaury NEVE European Commission DG Research - Unit T4: SMEs Research for the benefit of SMEs Objectives Strengthen the innovation capacities of SMEs to

More information

FCH 2 JU Financial Workshop. Third parties. Georgiana Buznosu Legal Officer FCH 2 JU. Brussels, 21 March 2018

FCH 2 JU Financial Workshop. Third parties. Georgiana Buznosu Legal Officer FCH 2 JU. Brussels, 21 March 2018 FCH 2 JU Financial Workshop Third parties Georgiana Buznosu Legal Officer FCH 2 JU Brussels, 21 March 2018 THIRD PARTIES Overview Notion of third parties in H2020 Individual overview: linked third parties,

More information

The ICC Quality Assurance Scheme

The ICC Quality Assurance Scheme The ICC Quality Assurance Scheme What is it? The ICC Certificate of Quality Assurance and Best Practice offers recognition within the ICC, its partner organisations around the world and the wider international

More information

ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS

ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions Where the grant takes the form of a unit

More information

Assessment Method 1: Evaluate users' training needs.

Assessment Method 1: Evaluate users' training needs. 2013-2014 Assessment Report Associate VP Business & Finance Controller/Financial Reporting Expected Outcome 1: E-journal voucher system users will be trained on applicable topics. The Controller s office

More information

MARIE CURIE INITIAL TRAINING NETWORK

MARIE CURIE INITIAL TRAINING NETWORK ANNEX III SPECIFIC PROVISIONS MARIE CURIE INITIAL TRAINING NETWORK [MULTI BENEFICIARY] III. 1 Definitions In addition to the definitions in Article II.1, the following definitions apply to this grant agreement:

More information

Association for Communication Excellence (ACE) In Agriculture, Natural Resources, and Life and Human Sciences RFP FOR ASSOCIATION MANAGEMENT SERVICES

Association for Communication Excellence (ACE) In Agriculture, Natural Resources, and Life and Human Sciences RFP FOR ASSOCIATION MANAGEMENT SERVICES Association for Communication Excellence (ACE) In Agriculture, Natural Resources, and Life and Human Sciences RFP FOR ASSOCIATION MANAGEMENT SERVICES HISTORY OF ACE Since 1913, ACE has been providing professional

More information

Administrative, Financial and Operational Aspects of Project Management

Administrative, Financial and Operational Aspects of Project Management Administrative, Financial and Operational Aspects of Project Management European Commission Directorate General Environmental Technologies Unit Presentation 1. General overview of Grant Agreement 2. Duties

More information

TEMPUS SK-JPHES

TEMPUS SK-JPHES and training for public 5 Ivan Špánik Total number of applications received Applications Received 676 proposals 146 (21.5%) PC applicants 700 600 146 500 400 102 PC applicants 300 200 530 423 EU applicants

More information

Financial relations within the 6th Framework Programme

Financial relations within the 6th Framework Programme Financial relations within the 6th Framework Programme Preamble: This is a succinct summary of the relations and financial procedures within the 6th Framework Programmes R&D contracts. These reminders

More information

H2020-ITN-2015 Info Day. Finance. Francisca CUESTA SÁNCHEZ. Research Executive Agency Unit REA-A1

H2020-ITN-2015 Info Day. Finance. Francisca CUESTA SÁNCHEZ. Research Executive Agency Unit REA-A1 H2020-ITN-2015 Info Day Finance Francisca CUESTA SÁNCHEZ Research Executive Agency Unit REA-A1 Overview 1. EU contribution 2. Eligible & ineligible costs 3. Funding mechanism 4. Cost categories 5. Records

More information

W R I T I N G C E N T E R W E E K L Y A C T I V I T Y O V E R V I E W F A L L S P R I N G

W R I T I N G C E N T E R W E E K L Y A C T I V I T Y O V E R V I E W F A L L S P R I N G W R I T I N G C E N T E R W E E K L Y A C T I V I T Y O V E R V I E W F A L L 2 0 1 6 - S P R I N G 2 0 1 7 The following report provides a snapshot of the average weekly activities in the Writing Center

More information

ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS

ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions Where the grant takes the form of a unit

More information

UW-STOUT Annual Operating Budget Process

UW-STOUT Annual Operating Budget Process UW-STOUT Annual Operating Budget Process An institution s budget process is shaped by institutional character; institutional size; administrative sophistication; faculty governance structures and processes;

More information

Guidelines for the Use of the Grant

Guidelines for the Use of the Grant Education, Audiovisual and Culture Executive Agency Erasmus+ Programme Capacity-Building projects in the field of Higher Education (E+CBHE) Guidelines for the Use of the Grant For grants awarded in 2016

More information

Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues

Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues 1 CONTRACT OBJECTIVES & EXPECTED RESULTS 2 1.1 Background to the Project 2 1.2 Background to the Assignment 3 1.3

More information

Trip Coordinator Training

Trip Coordinator Training Trip Coordinator Training BGSU Travel Initiative When a registered student organization desires to participate in, or sponsors an event that occurs off the campus, and participation requires vehicle use,

More information

Education, Audiovisual and Culture Executive Agency GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES AGREEMENT NUMBER [ ]

Education, Audiovisual and Culture Executive Agency GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES AGREEMENT NUMBER [ ] Education, Audiovisual and Culture Executive Agency Erasmus+ : Prospective Initiatives, Policy Networks, Programme and Linguistic Support GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES AGREEMENT

More information

South East Europe (SEE) SEE Control Guidelines

South East Europe (SEE) SEE Control Guidelines South East Europe (SEE) SEE Control Guidelines Version 1.4. Final version approved by the MC 10 th June 2009 1 st amendment to be approved by MC (2.0) 1 CONTENTS 1 Purpose and content of the SEE Control

More information

MENTORED RESEARCH PROJECT DETAILED BUDGET REQUEST FORM

MENTORED RESEARCH PROJECT DETAILED BUDGET REQUEST FORM MENTORED RESEARCH PROJECT DETAILED BUDGET REQUEST FORM INSTRUCTIONS FOR FELLOWS: This form asks you to provide specific budget information for direct costs requests (up to $20,000 USD) related to your

More information

ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS

ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS ANNEX III FINANCIAL AND CONTRACTUAL RULES KEY ACTION 2 SCHOOL EXCHANGE PARTNERSHIPS [KA229] I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions

More information

Proposed workplan and budget for the financial period

Proposed workplan and budget for the financial period 66 Conference of the Parties to the WHO Framework Convention on Tobacco Control Seventh session Delhi, India, 7 12 November 2016 Provisional agenda item 7.4 FCTC/COP/7/25 22 August 2016 Proposed workplan

More information

Eligibility of costs in the Horizon 2020 funded EUROfusion project

Eligibility of costs in the Horizon 2020 funded EUROfusion project Eligibility of costs in the Horizon 2020 funded EUROfusion project Garching, 3 December 2015 Other Direct Costs: Travel,, Other Goods & Services Presented by: Melanie John, EUROfusion Coordinator Unit,