1 LUMP SUM GRANT AGREEMENT UNICA 13 th EURLO MEETING Rome, October 22 nd 2018 Sabrina BOZZOLI International Research Division - UNIVERSITY OF ROME TOR VERGATA

2 LUMP SUM GRANT: WHY? Funding based on reimbursement of incurred costs requires extensive financial reporting and is prone to error. Lump sum funding provides considerable simplification potential. removes all obligations on cost reporting (e.g. the need for timesheets and for financial ex-post audits) shifts the focus on financial management and checking costs to the scientific-technical content of the projects Lump Sum Pilot is one of the main elements of the second wave of simplification of H2020

3 LUMP SUM GRANT: INTRODUCTION The grant agreement will set out the lump sum (EU funding) corresponding to the full accomplishment of the work committed in Annex 1. The lump sum for the grant is set out at its signature, the costs actually incurred are not relevant. 3

4 LUMP SUM GRANT: TWO OPTIONS AMOUNT OF THE LUMP SUM PER PROJECT, fixed in the Call DEFINED BY APPLICANTS in the proposal 4

5 LUMP SUM GRANT: OPTION 1 THE LUMP SUM PER PROJECT IS FIXED BY THE COMMISSION IN THE WORK PROGRAMME Proposals describe the efforts and resources that the applicants commit to mobilize for the pre-defined lump sum amount. Applicants must also provide the proposed split of the lump sum per work package and per beneficiary. Proposal evaluation ensures that an appropriate level of resources is committed. PILOT TOPIC 2018: Digital plug and produce on-line equipment platforms for manufacturing [DT-NMBP ]

6 LUMP SUM GRANT: OPTION 2 THE LUMP SUM IS DEFINED BY APPLICANTS IN THEIR PROPOSAL Applicants propose a lump sum based on a detailed estimation of costs (personnel, travel, equipment, consumables, other goods and services, etc ). Following evaluation of the proposal and taking into account expert advice, an individual lump sum is fixed in each grant agreement. PILOT TOPIC 2018: New anti-infective agents for prevention or treatment of neglected infectious diseases [SC1-BHC ]

7 LUMP SUM GRANT: BUDGET ALLOCATION ANNEX 2 - GA CONSORTIUM JOINTLY LIABLE FOR IMPLEMENTATION!!! FINANCIAL LIABILITY of beneficiaries limited to their EU contribution WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 Total Beneficiary A Beneficiary B Beneficiary C Beneficiary D Tot Share of the lump sum per WP LUMP SUM= Maximum grant amount 7

8 LUMP SUM GRANT: HOW MANY WPS? As many as needed but no more than what is manageable Work package means a major sub-division of the proposed project A single activity is not a WP A single task is not a WP A % of progress of work is not a WP (e.g. 50 % of the tests) A lapse of time is generally not a WP (e.g. activities of year 1) WP Management may be a special case WP 4 WP 1 WP 2 WP 3 8

9 PAYMENTS (pre-fin., interim, PoB) LUMP SUM GRANT: DISTRIBUTION OF FUNDS Beneficiary C Beneficiary D Coordinator Beneficiary B! Distribution of funds does not impact on financial liability set in Annex 2 9

10 1 0 LUMP SUM GRANT: BUDGET TRANSFERS! All budget transfers require an amendment WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 Total Beneficiary A Beneficiary B Beneficiary C Beneficiary D Total Transfer of budget between Work Packages only acceptable if: Work Packages not already completed (and declared) Justified by the technical and scientific implementation of the action A review confirms that it does not call into question the decision awarding the grant or breach the principle of equal treatment

11 Pre-financing payment Interim payment(s) Payment of the balance LUMP SUM GRANT: PAYMENTS Same functioning that in the general MGA Coordinator distributes the amount according to consortium agreement One or more Pay the shares of the lump sum set out in Annex 2 for the WPs completed & approved in the reporting period Closes the financial aspects of the grant Uncompleted WPs will (generally) NOT be paid Releases the guarantee fund

12 Tasks Beneficiary A Tasks Beneficiary B Tasks Beneficiary D LUMP SUM GRANT: FINANCIAL REPORTS Each beneficiary declares it share of the lump sum allocated to Work Packages fully completed in the reporting period 100 % 100 % 65 % WP 8 NOT fully completed Work Package 8

13 LUMP SUM GRANT: INTERIM PAYMENTS Sum of the shares of the lump sum allocated to Work Packages fully completed in the reporting period WP1 WP2 WP3 WP4 WP5 Beneficiary A Beneficiary B Beneficiary C Annex 2 Beneficiary D Tot WP1 WP2 WP3 WP4 WP5 Beneficiary A Completed Initiated Initiated Beneficiary B Completed Completed Not initiated Beneficiary C Completed Not initiated Not initiated Beneficiary D Completed Completed State of play at the end of the reporting period X X

14 LUMP SUM GRANT: BENEFICIARY TERMINATION PARTICIPATION OF A BENEFICIARY IS TERMINATED: 1. Contradictory procedure with the beneficiary about the shares of the lump sum approved by the Commission. Only shares for WPs in which it has completed its tasks may be approved. 2. Amount approved> payments from coordinator? If YES = coordinator pays the difference If NOT= beneficiary repays to coordinator If beneficiary does not repay Guarantee fund pays Coord. Partne r

15 LUMP SUM GRANT: PAYMENT OF THE BALANCE All work completed as indicated in Annex 1: The Commission pays the remaining amount up to the total lump sum (and releases the Guarantee Fund) Some WP not completed as indicated in Annex 1: WP rejected (in full or in part) Grant reduced Consortium loses the share allocated to that WP The Guarantee Fund does NOT intervene

16 LUMP SUM GRANT: EX POST CONTROLS CHECKS, REVIEWS & AUDITS only on proper implementation of the action and compliance with GA obligations You need Technical documents Publications, prototypes, deliverables Who did what? any document proving that the work was done as detailed in Annex 1 You don't need Time-sheets Pay-slips or contracts Depreciation policy Travel invoices.actual costs

17 ERC PROOF OF CONCEPT AND THE LUMP SUM PILOT Proof-of-Concept (PoC) picked for pilot because PoC projects are focused, short-term and predictable Fixed lump sum of , applicants cannot request lower amounts Each PoC grant is considered as one single activity Applicants to provide a description of resources planned for implementation of proposed projects Evaluation experts asked to assess whether resources described in the proposal are appropriate for project implementation Payment not linked to actual costs: if project is implemented properly payment is due in full "regardless of the costs actually incurred" For multi-beneficiary grants, applicants need to provide a breakdown of the shares of the costs incurred by each partner mga-erc-poc-lumpsum-pilot_en.pdf

18 THANKS FOR YOUR ATTENTION

Model Grant Agreement LUMP SUM PILOT S2R JU

Model Grant Agreement LUMP SUM PILOT S2R JU HORIZON HORIZON 2020 2020 Model Grant Agreement LUMP SUM PILOT S2R JU Lump sum grant: introduction The grant agreement will set out the lump sum (EU funding) corresponding to the full accomplishment of

More information

The Lump Sum Pilot Methodology

The Lump Sum Pilot Methodology HORIZON HORIZON 2020 2020 Stakeholders Workshop on Simplification The Lump Sum Pilot Methodology Brussels, 20 October 2017 Peter Haertwich Lump sum: Why? Huge simplification potential: Despite all simplification,

More information

Why? Disclaimer: Information not legally binding

Why? Disclaimer: Information not legally binding LUMP SUM PILOT Why? Why? Simplification: No financial reporting, no time sheets, no financial audit. Payment exclusively based on completion of activity. Pilot scheme to evaluate results view to FP9 Start

More information

Webinar on Introduction to Lump Sum funding in Horizon Martin Baumgartner (FFG Austria) Morten Gylling (DAFSHE Denmark)

Webinar on Introduction to Lump Sum funding in Horizon Martin Baumgartner (FFG Austria) Morten Gylling (DAFSHE Denmark) Webinar on Introduction to Lump Sum funding in Horizon 2020 Martin Baumgartner (FFG Austria) Morten Gylling (DAFSHE Denmark) Who are we? A key objective of the NCP Academy project is to provide harmonised

More information

in pilots in H2020 (June 2017)

in pilots in H2020 (June 2017) NCP Flanders November 2017 SUMMARY: HORIZON 2020 LUMP SUM FUNDING in multi beneficiary projects 1. Lump sum funding output based funding introduction NCP Flanders (May 2017) 2. Lump sum pilot, state of

More information

Multi-beneficiary Model Grant Agreement

Multi-beneficiary Model Grant Agreement Partnership for Research and Innovation in the Mediterranean Area Programme (PRIMA) Multi-beneficiary Model Grant Agreement Version 5.0 30 January 2018 Disclaimer This document is aimed at assisting applicants

More information

European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement. (EMPIR MGA - Multi)

European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement. (EMPIR MGA - Multi) European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement (EMPIR MGA - Multi) Version 5.0 12 March 2018 Version Publication Date 1.0 16.07.2015 Initial version

More information

H2020 Annotated Model Grant Agreement (AGA) v 5.0 ( ) track changes

H2020 Annotated Model Grant Agreement (AGA) v 5.0 ( ) track changes H2020 GENERAL MGA 17 third parties Participants roles should correspond to their real contribution to the project. Main actors should be the beneficiaries and third parties should perform secondary tasks.

More information

Multi-beneficiary Model Grant Agreement for Members

Multi-beneficiary Model Grant Agreement for Members Clean Sky 2 Joint Undertaking (CS2) Multi-beneficiary Model Grant Agreement for Members (CS2 JU Members MGA Multi) Version 5.0 28 November 2017 Disclaimer This document is aimed at assisting applicants

More information

Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities

Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities Ann Van Menxel DG CNECT H6 Brussels, 17 December 2013 Legal references Reimbursement

More information

Mono-Beneficiary Model Grant Agreement

Mono-Beneficiary Model Grant Agreement European Research Council (ERC) Mono-Beneficiary Model Grant Agreement ERC Proof of Concept (H2020 ERC MGA PoC Mono) Version 5.0 18 October 2017 Disclaimer This document is aimed at assisting applicants

More information

H2020-ITN-2015 Info Day. Finance. Francisca CUESTA SÁNCHEZ. Research Executive Agency Unit REA-A1

H2020-ITN-2015 Info Day. Finance. Francisca CUESTA SÁNCHEZ. Research Executive Agency Unit REA-A1 H2020-ITN-2015 Info Day Finance Francisca CUESTA SÁNCHEZ Research Executive Agency Unit REA-A1 Overview 1. EU contribution 2. Eligible & ineligible costs 3. Funding mechanism 4. Cost categories 5. Records

More information

Multi-Beneficiary Model Grant Agreement

Multi-Beneficiary Model Grant Agreement European Research Council (ERC) Multi-Beneficiary Model Grant Agreement ERC Starting Grants, Consolidator Grants and Advanced Grants (H2020 ERC MGA Multi) Version 5.0 18 October 2017 Disclaimer This document

More information

Mono-Beneficiary Model Grant Agreement

Mono-Beneficiary Model Grant Agreement Justice Programme & Rights, Equality and Citizenship Programme Mono-Beneficiary Model Grant Agreement (JUST/REC MGA Mono) Version 2.0 10 January 2017 Disclaimer This document is aimed at assisting applicants

More information

FRAMEWORK PARTNERSHIP AGREEMENT

FRAMEWORK PARTNERSHIP AGREEMENT NUMBER FPA2016/EIT/CLIMATE-KIC Ref.: 00198.EIT.2016.I FRAMEWORK PARTNERSHIP AGREEMENT NUMBER FPA2016/EIT/CLIMATE-KIC This Framework Partnership Agreement is between the following parties: on the one part,

More information

Guide for Applicants

Guide for Applicants EUROPEAN COMMISSION EUROSTAT Guide for Applicants Eurostat Grants Version 4.0 11 January 2018 1/55 IMPORTANT NOTICE The Guide for Applicants is a user guide that aims to explain to applicants and beneficiaries

More information

Multi-Beneficiary Model Grant Agreement

Multi-Beneficiary Model Grant Agreement H2020 Programme Multi-Beneficiary Model Grant Agreement Pre-Commercial Procurement (PCP) and Procurement of Innovative Solutions (PPI) (H2020 MGA PCP/PPI Multi) Version 5.0 18 October 2017 Disclaimer This

More information

H2020 General Model Grant Agreement Multi (H2020 General MGA Multi)

H2020 General Model Grant Agreement Multi (H2020 General MGA Multi) H2020 General Model Grant Agreement Multi (H2020 General MGA Multi) Version 2.1 1 October 2015 Disclaimer This document is aimed at assisting applicants for Horizon 2020 funding. It shows the full range

More information

This is the flowchart for stating/reporting the budget starting from the proposal phase tup till diurng control by an auditor. The key message is

This is the flowchart for stating/reporting the budget starting from the proposal phase tup till diurng control by an auditor. The key message is 1 2 3 This is the flowchart for stating/reporting the budget starting from the proposal phase tup till diurng control by an auditor. The key message is that funding is not based on the estimated budget,

More information

Shift2Rail Joint Undertaking

Shift2Rail Joint Undertaking Shift2Rail Joint Undertaking S2R JU Members Lump Sum Pilot - Additional changes relevant to S2R JU Members 5 February 2018 7 March 2018 9 April 2018 2 Purchases and subcontracting Specific Lump-Sum rules.

More information

SUNFRAIL Final conference

SUNFRAIL Final conference SUNFRAIL Final conference 07.02.2018 Project management administrative aspects Marc VANDENBROECK, Scientific Project Officer European Commission Health, Agriculture and Food (CHAFEA) Health, Agriculture

More information

FINANCE AND BUDGET. Research Executive Agency Marie Curie host-driven actions. ITN Coordinators Meeting Brussels, September 2012

FINANCE AND BUDGET. Research Executive Agency Marie Curie host-driven actions. ITN Coordinators Meeting Brussels, September 2012 FINANCE AND BUDGET Research Executive Agency Marie Curie host-driven actions ITN Coordinators Meeting Brussels, September 2012 Financial Management of ITN Projects 1. EU contribution - cost categories,

More information

CEF Model Grant Agreement Audit Aspects Introducing Annex VII Certificate on Financial Statements

CEF Model Grant Agreement Audit Aspects Introducing Annex VII Certificate on Financial Statements CEF Model Grant Agreement Audit Aspects Introducing Annex VII Certificate on Financial Statements Ben Griffiths Head of External Audit, INEA Content of Presentation Background to the Annex VII Certificate

More information

Eligibility of costs in the Horizon 2020 funded EUROfusion project

Eligibility of costs in the Horizon 2020 funded EUROfusion project Eligibility of costs in the Horizon 2020 funded EUROfusion project Garching, 3 December 2015 Subcontractors and other third party support Presented by: Michael Erdmann, EUROfusion Coordinator Unit, Max-Planck-Institute

More information

Financial workshop. Creative Europe - Culture 10 October 2018

Financial workshop. Creative Europe - Culture 10 October 2018 Financial workshop Creative Europe - Culture 10 October 2018 OBJECTIVES of workshop Awareness and clarification about key financial issues Recommendations on the financial management Preparation of the

More information

CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS

CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS MATERIALS PREPARED BY THE WORKING GROUP ON CERTIFICATE ON THE METHODOLOGY UNDER FP7: DG RESEARCH AND INNOVATION DG

More information

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No. 2018 Erasmus+ Grant agreement multi-beneficiary Special conditions Agreement number: [complete] Standard grant agreement (multi beneficiaries) GRANT AGREEMENT for a: Project with multiple beneficiaries

More information

GENERA guidelines on reporting. Kick-off Meeting Brussels. Paula Mota Alves

GENERA guidelines on reporting. Kick-off Meeting Brussels. Paula Mota Alves GENERA guidelines on reporting Kick-off Meeting 17.09.2015 Brussels Paula Mota Alves Unit B5 Spreading Excellence, Widening Participation, Science with and for Society Outline of presentation o Horizon

More information

European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer

European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer Alexandros IATROU Deputy Head of Administration and Finance Unit, Directorate for Energy DG Research and Innovation JOPRAD

More information

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No. GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1 AGREEMENT NUMBER [EPLUS LINK Generated No.] This Agreement ( the Agreement ) is concluded between the following

More information

Project costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs.

Project costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs. Financial issues Extract from the guide for BONUS applicants 1 8. How to prepare project budget? Only the real costs required for the implementation should be indicated in the planned budget for the project.

More information

FCH 2 JU Grant Agreement.

FCH 2 JU Grant Agreement. FCH 2 JU Grant Agreement Nicolas.brahy@fch.europa.eu Why should I care about the GA at this stage? Time to Grant reduced 5 months for evaluation 3 months for signature no time for real negotiation! no

More information

Financial Webinar. IMI 2 projects :00 CET

Financial Webinar. IMI 2 projects :00 CET Financial Webinar IMI 2 projects 12.05.2017 10:00 CET Agenda How to use GoToWebinar o Gaëlle Lanckmans, IMI Finance Cost Eligibility o Gaëlle Lanckmans, IMI Finance Reporting requirements and Migration

More information

Amendments to the Grant Agreement

Amendments to the Grant Agreement HORIZON HORIZON 2020 2020 Amendments to the Grant Agreement Article 55 MGA WHAT? An amendment to the grant agreement is necessary to change the terms and conditions of a GA (only specific data, options),

More information

Horizon 2020 Are We On the Path to Success?

Horizon 2020 Are We On the Path to Success? Horizon 2020 Are We On the Path to Success? UKRO Annual Conference 2016 Glasgow, 30 June 1 July 2016 Wolfgang Burtscher Deputy Director-General DG Research & Innovation Horizon 2020 State of play Horizon

More information

ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS

ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions Where the grant takes the form of a unit

More information

Legal and Financial Issues in H2020

Legal and Financial Issues in H2020 Legal and Financial Issues in H2020 BESTPRAC Training School September 27, 2016 Katarina Rohsmann, FFG OVERVIEW ü Minimum requirements for participation ü Funding instruments and funding rates ü Grant

More information

Project Management and Financial Reporting

Project Management and Financial Reporting Horizon 2020 and ERC Project Management and 11-13 April 2018 Brussels Horizon 2020 Project Management and AGENDA DAY 1 08:30 09:00 Registration 09:00 09:30 Event opening 09:30 10:30 How to Coordinate and

More information

Guide to Financial Issues relating to ICT PSP Grant Agreements

Guide to Financial Issues relating to ICT PSP Grant Agreements DG COMMUNICATIONS NETWORKS, CONTENT AND TECHNOLOGY ICT Policy Support Programme Competitiveness and Innovation Framework Programme Guide to Financial Issues relating to ICT PSP Grant Agreements Version

More information

FINANCIAL REPORTING, CONTROLS AND AUDITS. Legal and Financial framework in H2020 proposals. HNN 2.0 Rome 28th October 2015 Gonzalo AREVALO.

FINANCIAL REPORTING, CONTROLS AND AUDITS. Legal and Financial framework in H2020 proposals. HNN 2.0 Rome 28th October 2015 Gonzalo AREVALO. FINANCIAL REPORTING, CONTROLS AND AUDITS Legal and Financial framework in H2020 proposals. HNN 2.0 Rome 28th October 2015 Gonzalo AREVALO. ISCIII Index Contents Periodic and Final Reporting Completion

More information

Guidance Amendment types & supporting documents. Version November 2016

Guidance Amendment types & supporting documents. Version November 2016 Guidance Amendment types & supporting documents Version 1.0 25 vember 2016 COVERED PROGRAMMES Horizon 2020, 3rd Health Programme, Asylum, Migration and Integration Fund, Consumer Programme, COSME, Internal

More information

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No. GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1 AGREEMENT NUMBER [EPLUS LINK Generated No.] This Agreement ( the Agreement ) is concluded between the following

More information

H2020 proposal preparation RI-Links2UA Horizon 2020 Info Day 8 June, 2018

H2020 proposal preparation RI-Links2UA Horizon 2020 Info Day 8 June, 2018 H2020 proposal preparation RI-Links2UA Horizon 2020 Info Day 8 June, 2018 Acknowledgement Slides, prepared by Gorazd Weiss are used in this presentation Today s topics 1. INTRODUCTION FROM IDEA TO IMPLEMENTATION

More information

DG Justice & Consumers. Project Management.General Principles

DG Justice & Consumers. Project Management.General Principles DG Justice & Consumers Project Management.General Principles Project Life-Cycle Start Eligibility Monitoring End Eligibility Closing of Project A M E N D M E N T S Proposal Grant Agreement Progress report

More information

LIFE Grant Agreement Financial Aspects Highlights

LIFE Grant Agreement Financial Aspects Highlights LIFE Grant Agreement Financial Aspects Highlights Kick-off Meetings Call 2016 Action Grants Strand buddies (EASME) Congratulations for obtaining the Grant! And Welcome to the Finance presentation SUMMARY

More information

Administrative, Financial and Operational Aspects of Project Management

Administrative, Financial and Operational Aspects of Project Management Administrative, Financial and Operational Aspects of Project Management European Commission Directorate General Environmental Technologies Unit Presentation 1. General overview of Grant Agreement 2. Duties

More information

Guide to Financial Issues relating to FP7 Indirect Actions

Guide to Financial Issues relating to FP7 Indirect Actions Guide to Financial Issues relating to FP7 Indirect Actions Version 18/03/2013 Disclaimer This guide is aimed at assisting beneficiaries. It is provided for information purposes only and its contents are

More information

H2020 Participant Guarantee Fund H2020 COORDINATOR'S DAY 24 FEBRUARY 2016

H2020 Participant Guarantee Fund H2020 COORDINATOR'S DAY 24 FEBRUARY 2016 H2020 Participant Guarantee Fund H2020 COORDINATOR'S DAY 24 FEBRUARY 2016 DG RTD Designated service of the Commission for the management of the Guarantee Funds Alba MARINO-ENRIQUEZ Mario PICARELLA Agenda

More information

ITN 2010 Finance and Budget

ITN 2010 Finance and Budget Brussels, February 2011 ITN Coordinators meeting ITN 2010 Finance and Budget Research Executive Agency Marie Curie host-driven actions Financial Management of ITN Projects 1. The EU contribution The cost

More information

Annex II Draft specific grant agreement

Annex II Draft specific grant agreement Model specific agreement: December 2016 Annex II Draft specific grant agreement SPECIFIC AGREEMENT No./.. This Specific agreement ("the Specific agreement") is concluded between the following parties:

More information

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No. GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1 AGREEMENT NUMBER [EPLUS LINK Generated No.] This Agreement ( the Agreement ) is concluded between the following

More information

Overview on the changed articles of H2020 MGAs with retroactive applicability

Overview on the changed articles of H2020 MGAs with retroactive applicability Overview on d articles of H2020 with retroactive applicability Change dictionary: In red new text added to the Articles Strikethrough text removed from the Articles Changes in version 4.0 In effect from

More information

P2P and support to Joint Programming under Horizon Dr Jörg Niehoff Head of Sector Joint Programming DG Research & Innovation

P2P and support to Joint Programming under Horizon Dr Jörg Niehoff Head of Sector Joint Programming DG Research & Innovation P2P and support to Joint Programming under Horizon 2020 Dr Jörg Niehoff Head of Sector Joint Programming DG Research & Innovation Public-public partnerships in Horizon 2020 (Art.26) 1. Horizon 2020 shall

More information

EACEA. Cluster Meeting

EACEA. Cluster Meeting EACEA Cluster Meeting European Policy Experimentations the Way Forward 21 June 2017 Audit Type I & II Certificates Alexandre Virosztek Unit R2 «Legal and Regulatory» 1 Controls & Checks Controls (wide)

More information

European Maritime and Fisheries Fund Guide for Applicants

European Maritime and Fisheries Fund Guide for Applicants European Maritime and Fisheries Fund Guide for Applicants Version 3.0 2 April 2019 IMPORTANT NOTICE The Guide for Applicants is a general user guide that aims to explain to applicants and beneficiaries

More information

ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS

ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS ANNEX III FINANCIAL AND CONTRACTUAL RULES KEY ACTION 2 SCHOOL EXCHANGE PARTNERSHIPS [KA229] I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions

More information

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No. GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1 AGREEMENT NUMBER [EPLUS LINK Generated No.] This Agreement ( the Agreement ) is concluded between the following

More information

Gouvernance et Emergence de la Recherche en Sciences Humaines au Cambodge GEReSH-CAM

Gouvernance et Emergence de la Recherche en Sciences Humaines au Cambodge GEReSH-CAM 1 Gouvernance et Emergence de la Recherche en Sciences Humaines au Cambodge GEReSH-CAM Quality Assurance Plan www.geresh-cam.eu 2 Réferentiel projet Dear Partners, This Quality Assurance Plan summarises

More information

ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS

ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions Where the grant takes the form of a unit

More information

Model Grant Agreement FINANCIAL ISSUES

Model Grant Agreement FINANCIAL ISSUES HORIZON HORIZON 2020 2020 Model Grant Agreement FINANCIAL ISSUES Next Steps MGA Amendment 27/02/2017: Most relevant novelties Article 6.2.A.1 Direct personnel costs: new definition for additional remuneration

More information

Model Grant Agreement FINANCIAL ISSUES

Model Grant Agreement FINANCIAL ISSUES HORIZON HORIZON 2020 2020 Model Grant Agreement FINANCIAL ISSUES Table of Contents 1. FP7 : Lessons learned 2. H2020: Model Grant Agreement 3. Cost Categories and Reporting Issues a. Types of Staff Contracts

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 25.11.2016 C(2016) 7553 final COMMISSION DECISION of 25.11.2016 modifying the Commission decision of 7.3.2014 authorising the reimbursement on the basis of unit costs for

More information

Model Grant Agreement FINANCIAL ISSUES

Model Grant Agreement FINANCIAL ISSUES HORIZON HORIZON 2020 2020 Model Grant Agreement FINANCIAL ISSUES Table of Contents 1. FP7 : Lessons learned 2. H2020: Model Grant Agreement 3. Cost Categories and Reporting Issues a. Personnel cost calculation

More information

ARTICLE EUROPEAN COMMISION PROPOSAL AMENDMENT RATIONALE

ARTICLE EUROPEAN COMMISION PROPOSAL AMENDMENT RATIONALE REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL establishing Horizon Europe the Framework Programme for Research and Innovation, laying down its rules for participation and dissemination ARTICLE

More information

Marina ZANCHI DG Research Directorate N International scientific cooperation

Marina ZANCHI DG Research Directorate N International scientific cooperation Marina ZANCHI DG Research Directorate N International scientific cooperation E-mail: marina.zanchi@cec.eu.int 1 Kick-off meeting Sofia 27 May 2005 Contract Reporting and Deliverables Financial Statements

More information

Creative Europe Sub-programme Culture Financial management

Creative Europe Sub-programme Culture Financial management Creative Europe Sub-programme Culture Financial management 10 November 2014 Sandra Delespesse & Maria-Paz Benito 1 Content Financial tasks Eligibility of costs Important documents Checks, audit and evaluation

More information

Financial Guidelines for Beneficiaries EDCTP Association October 2016

Financial Guidelines for Beneficiaries EDCTP Association October 2016 Financial Guidelines for Beneficiaries EDCTP Association October 2016 This document is prepared as a supplement to the Grant Agreement (GA), where majority of the information is extracted from. In the

More information

Model Grant Agreement FINANCIAL ISSUES

Model Grant Agreement FINANCIAL ISSUES HORIZON HORIZON 2020 2020 Model Grant Agreement FINANCIAL ISSUES Table of Contents 1. FP7 : Lessons learned 2. H2020: Model Grant Agreement 3. Cost Categories and Reporting Issues a. Personnel cost calculation

More information

Model Grant Agreement FINANCIAL ISSUES

Model Grant Agreement FINANCIAL ISSUES HORIZON HORIZON 2020 2020 Model Grant Agreement FINANCIAL ISSUES Table of Contents 1. Introduction 2. H2020: Model Grant Agreement 3. Cost Categories and Reporting Issues a. Personnel cost calculation

More information

TEMPUS Reformation of the Curricula on Built Environment in the Eastern Neighbouring Area

TEMPUS Reformation of the Curricula on Built Environment in the Eastern Neighbouring Area TEMPUS Reformation of the Curricula on Built Environment in the Eastern Neighbouring Area Lina Zemeckyte lina.zemeckyte@vgtu.lt Hierarchy of TEMPUS documentation CALL FOR PROPOSALS Grant Agreement: SPECIAL

More information

WP1 Administration, coordination and reporting

WP1 Administration, coordination and reporting ECGFA NET II Work Plan WP1 Administration, coordination and reporting Content 1. Work package objectives... 1 2. Project Management of the ECGFA NET II Project... 1 2.1 Organization and Decision Making

More information

Model Grant Agreement. Pilot Project on defence research

Model Grant Agreement. Pilot Project on defence research Model Grant Agreement For the Pilot Project on defence research 29 April 2016 GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES AGREEMENT NUMBER [insert] This Pilot Project is funded by the European

More information

GUIDELINES TO FINANCIAL REPORTING. COSME Finance Sector C1.2 SAG meeting 14 October 2016

GUIDELINES TO FINANCIAL REPORTING. COSME Finance Sector C1.2 SAG meeting 14 October 2016 GUIDELINES TO FINANCIAL REPORTING COSME Finance Sector C1.2 SAG meeting 14 October 2016 Main speaking points: - A few reminders - Guidelines for the final financial reporting - "What's new", and so what

More information

Legal and financial issues in Horizon Bonn,

Legal and financial issues in Horizon Bonn, Legal and financial issues in Horizon 2020 Bonn, 01.02.2017 www.nks-ruf.de National Contact Point Legal & Financial Issues Located in the EU-Bureau of the BMBF in Bonn and Berlin Advice on legal and financial

More information

Financial management of H2020 projects

Financial management of H2020 projects Financial management of H2020 projects BESTPRAC Training School: "Finance for Beginners" Per Inge Andresen Senior adviser NTNU Norwegian University of Science and Technology NTNU Norwegian University of

More information

Reporting and Payments. Legal Basis

Reporting and Payments. Legal Basis HORIZON HORIZON 2020 2020 Reporting and Payments Legal Basis Types of payments (Article 21) One pre-financing One or several interim payments One payment of the balance Payments Payments will be made to

More information

Project Administration

Project Administration Co-funded by the European Union Project Administration Maria Grazia Bonanomi, UCSC Diverse Kick-off meeting - Milan, 22-24 January 2014 Outline: - Context - Key features - Final Reporting Package - Eligible

More information

IN2IT FINANCIAL WORKSHOP

IN2IT FINANCIAL WORKSHOP IN2IT FINANCIAL WORKSHOP DR. VERED HOLZMANN IN2IT PROJECT MANAGER MTA, 13 MARCH 2016 Agenda Part A: Erasmus+ Office: Rationale of the Erasmus+ budget management Unit costs vs. Actual costs Control unit

More information

EU framework programme processes

EU framework programme processes Briefing January 2018 Adoption, implementation, evaluation SUMMARY Over the past 35 years, the European Union ( EU) institutions have adopted eight framework programmes for research. The lifecycles of

More information

The Marie Curie Actions FP7 Financial Guidelines

The Marie Curie Actions FP7 Financial Guidelines The Marie Curie Actions FP7 Financial Guidelines SPECIFIC PROVISIONS RELATED TO MARIE CURIE ACTIONS FINANCED UNDER THE FP7 "PEOPLE" PROGRAMME Part 3: Projects funded in the PEOPLE Work Programmes calls

More information

Project Development - Rules on eligibility of expenditure

Project Development - Rules on eligibility of expenditure Project Development - Rules on eligibility of expenditure Interreg finance management camp 20 23 March 2018 I Sofia, Bulgaria Iuliia Kauk, Interact Programme Hierarchy of rules Rules on eligibility of

More information

Belarus, 28 February 2008

Belarus, 28 February 2008 National Documentation Center (EKT/NHRF) FP7 Rules of Participation Funding schemes Financial issues Evaluation Criteria Implementation Submission Maria Samara, Administrative project officer Maria Koutrokoi,,

More information

Amendment Request Form National Authorities for Apprenticeships

Amendment Request Form National Authorities for Apprenticeships Executive Agency, Education Audiovisual and Culture ERASMUS + PROGRAMME Amendment Request Form National Authorities for Apprenticeships Agreement number: Proposal number: Title: Coordinator: DECLARATION

More information

FCH 2 JU GRANT AGREEMENT

FCH 2 JU GRANT AGREEMENT FCH 2 JU GRANT AGREEMENT Georgiana Buznosu - Legal Officer http://www.fch.europa.eu/ LEGAL FRAMEWORK OF A H2020 PROJECT EU Financial Regulation 1. H2020 Rules for Participation Applicable Work Plan 2.

More information

Clinical Studies in H2020 Proposals

Clinical Studies in H2020 Proposals Clinical Studies in H2020 Proposals V 4.0 - March 2015 Mark Goldammer Mila Bas Sanchez Cornelius Schmaltz Directorate Health Research & Innovation European Commission Financial and Contractual Aspects

More information

FCH JU GRANT AGREEMENT

FCH JU GRANT AGREEMENT FCH JU GRANT AGREEMENT COORDINATORS DAY Brussels, September 23 rd 2016 Georgiana Buznosu Legal framework of a H2020 project EU Financial Regulation 1. H2020 Rules for Participation Applicable Work Plan

More information

PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS

PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS Establishing the European Geological Surveys Research Area to deliver a Geological Service for Europe PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS Joint Call on applied

More information

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME WORKING NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP/ COORDINATION GROUP

More information

ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS

ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS ANNEX III FINANCIAL and CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions Where the grant takes the form of a unit

More information

Full Application Form

Full Application Form Full Application Form PART A Project summary A.1 Project identification Programme priority Specific objective Project acronym Project title Project number Name of the Lead Applicant organization in English

More information

INTERREG III B CADSES. Payment Claim Manual

INTERREG III B CADSES. Payment Claim Manual INTERREG III B CADSES Payment Claim Manual 1) Background / Description of involved actors The following chapters give a short overview about the actors involved in the PIC Interreg III B Cadses, their

More information

SESAR Joint Undertaking H2020 Legal Aspects

SESAR Joint Undertaking H2020 Legal Aspects SESAR Joint Undertaking H2020 Legal Aspects Call ref. H2020-SESAR-2016-2 Mrs. Edita Barauskaitė Legal and Procurement Officer Brussels, 22 March 2017 Overview 1. Who & under which conditions can participate?

More information

Nuclear Fission, Safety and Radiation Protection. Deadline: 13 November 2012, at , Brussels local time 1

Nuclear Fission, Safety and Radiation Protection. Deadline: 13 November 2012, at , Brussels local time 1 Nuclear Fission, Safety and Radiation Protection Call Identifier: FP7-Fission-2013 Date of publication: 10 July 2012 Deadline: 13 November 2012, at 17.00.00, Brussels local time 1 Indicative budget: EUR

More information

Administrative and financial aspects: recommendations for the preparation of proposals

Administrative and financial aspects: recommendations for the preparation of proposals Environment (including climate change) Theme 2012 Calls 17 June 2011 Administrative and financial aspects: recommendations for the preparation of proposals Vincent Favrel Deputy Head of Unit Unit I.6 Administration

More information

Proposal Template (Technical Annex) ECSEL Innovation Actions (IA) ECSEL Research and Innovation Actions (RIA) Calls 2017

Proposal Template (Technical Annex) ECSEL Innovation Actions (IA) ECSEL Research and Innovation Actions (RIA) Calls 2017 Proposal Template (Technical Annex) ECSEL Innovation Actions (IA) ECSEL Research and Innovation Actions (RIA) Calls 2017 Please, follow the structure and text formatting of this template when preparing

More information

Presentation on Financial and Administrative activities. L.Garvia (D Appolonia)

Presentation on Financial and Administrative activities. L.Garvia (D Appolonia) Presentation on Financial and Administrative activities L.Garvia (D Appolonia) Tableof ofcontent New in HORIZON 2020 o Reimbursment rate; Method for calculation of indirect costs; Electronic signatures

More information

Annex III Model specific grant agreement

Annex III Model specific grant agreement Model specific agreement: December 2016 Annex III Model specific grant agreement SPECIFIC AGREEMENT No./.. This Specific agreement ("the Specific agreement") is concluded between the following parties:

More information

PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL

PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL Establishing the European Geological Surveys Research Area to deliver a Geological Service for Europe PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL Joint Call on applied geoscience

More information

Call for Tender - External Evaluation of the EPF 2017 Work Programme 16/03/2017

Call for Tender - External Evaluation of the EPF 2017 Work Programme 16/03/2017 Call for Tender - External Evaluation of the EPF 2017 Work Programme 16/03/2017 Contents 1. Purpose of the tender... 3 2. Tasks... 4 3. EPF - General Information... 4 4. Description of services... 5 5.

More information

Financial Reporting. Tempus IV. Kyiv-Mohyla Academy Kiev 16 November Ana Ramon de la Cruz and Giulia Moro

Financial Reporting. Tempus IV. Kyiv-Mohyla Academy Kiev 16 November Ana Ramon de la Cruz and Giulia Moro Financial Reporting Tempus IV Kyiv-Mohyla Academy Kiev 16 November 2016 Ana Ramon de la Cruz and Giulia Moro 1 1. General principles Exchange rate Co-financing Transfer of money 2. Budget headings (purpose,

More information