Airside Efficiency Program

Size: px
Start display at page:

Download "Airside Efficiency Program"

Transcription

1 Reduces energy, operating expenses, and deferred maintenance campus wide. Athletic Facility Theater Student Union Vivarium Library Admin Offices Lab Classroom Lab Classroom Typical Aircuity Installations It s Good Business. Great

2 What is Airside Efficiency? Aircuity s solution can be easily replicated in a variety of buildings providing low risk and a high return through deep energy savings, plus a reduction in O&M, enhanced IEQ and deferred maintenance costs. Aircuity is typically one of the most impactful energy conservation measures available. Critical Spaces: 50% HVAC energy costs Variable Occupancy Spaces: 15-30% HVAC energy costs A choice of airside efficiency solutions is available, making it easy to get started regardless of budget and resources. World-class facilities help to attract world-class students and/or employees. An airside program touches many areas of an organization and helps drive toward core business goals.

3 The Benefits Part of what makes an airside efficiency program unique is the value it delivers across the business and over the life of your portfolio Energy Savings Reduced Deferred Maintenance Validated M&V of Energy Savings Reduced O&M Information Layer for Continuous Commissioning % Savings of Total Energy Spend, O&M and a Reduced Deferred Maintenance Backlog Validate M&V Energy Savings Continuous Commissioning Reduced O&M 3 4

4 Solution Offerings Aircuity makes it simple for institutions to develop and deploy their airside efficiency program with two product offerings, depending on the capital and resources available. Capital Project Budget Best for: Institutions that will fund their projects out of a capital budget and have the proper internal resources. Aircuity s solution can provide benefits for any project type: New Construction Project Lower energy costs and contributes valuable LEED points First cost savings by right sizing HVAC and mechanical systems Energy Renovation Project Energy savings and improved IEQ regardless of building age Easy to install ESCO Program Great foundation to an ESCO program Aircuity s short ROI complements other energy conservation measures Energy Services Agreement (ESA) Best for: Institutions that want to start making an immediate and large impact on their HVAC energy costs, but don t necessarily want to fund the program out of their capital project budget and instead prefer to use their utility/operating expenses budget to fund the program. An ESA Allows for: No capital outlay A portfolio approach Easy implementation process Low risk Faster deployment of energy projects across a portfolio Under an ESA: All design and construction costs are covered Positive net cash flow from day 1 Payments are made for measured quantities of energy saved Payments are likely to be treated as an operating expense under the utility budget

5 Results across millions of square feet Many customers have already discovered the power of an airside efficiency program. More than 250 other customers are engaged to follow suit. University of Pennsylvania s Current Airside Program Results* Annual kwh Reduction Annual Therm Reduction ROI (Years) IRR 11,757,292 1,125, % *Numbers will adjust as the University continues to expand its Airside Program. Airside Programs are best practice. Customers tell us it s a smart investment!

6 Proven Savings Smart Lab Initiative kicked off resulting in a 61% energy efficiency improvement, driven by airside efficiency Before: 2/3 of all energy on campus was from lab buildings After: Aircuity reduced that by 1/2, netting a 1/3 campus energy reduction University Case Study As is: No Airside Efficiency Improvements Implemented Current Status of Energy Levels

7 The Process Proven Minimizes Risk Maximizes Benefits Program Viability Funding Options: Capital or ESA Department Collaboration Portfolio Assessment: Building prioritization, including total cost and savings analysis Space Assessment: EH&S and head vet Phase I Development: Site surveys of desired project Phase I Implementation Measurement &Verification: Savings and safety Phase II Development: Typically whole and/or multiple buildings Continuous Commissioning: Ongoing O&M support

8 Getting Started 1. Evaluate program viability, conduct discussion about feasibility & ROI requirements. 2. Confirm funding sources. 3. Create timeline to bring department heads together to drive understanding & alignment on the program. Aircuity creates measurably better environments while taking a bite out of energy goals. The company s smart automated airside solutions optimize air change rates based on comprehensive indoor environmental data. As a result, commercial, institutional and lab building owners can lower operating costs, improve safety and cut energy use by up to 60%. Vision + Leadership = Results Aircuity, Inc info@aircuity.com Visit us at AEPB 3/16

The Real Meaning of Total Cost of Ownership (TCO)

The Real Meaning of Total Cost of Ownership (TCO) The Real Meaning of Total Cost of Ownership (TCO) Presented by David Patnaude Director of Plant and Sustainability Riverdale Country School Lawrence Eighmy Managing Principle 1 The Real Meaning of Total

More information

Delivering Efficiency as a Service: The Metrus ESA

Delivering Efficiency as a Service: The Metrus ESA Delivering Efficiency as a Service: The Metrus ESA May 22, 2018 Overview Metrus develops, finances, owns, and operates large-scale efficiency projects for Fortune 500 companies and major industrial customers.

More information

Appendix B. The EnergyRM EE PPA

Appendix B. The EnergyRM EE PPA Appendix B The EnergyRM EE PPA Description One specific variant of an EE PPA that is being discussed in Oregon and the Northwest is a model proposed by EnergyRM and Equilibrium Capital, which will be referred

More information

Seeing financing in a new light

Seeing financing in a new light Seeing financing in a new light Managing capital budgets is no easy task. Every department seems to have a unique opportunity they want to pursue or a pressing problem that has to be solved. Opportunities

More information

Agency Invitation to Interview an ESCO For EPC Services

Agency Invitation to Interview an ESCO For EPC Services Agency Invitation to Interview an ESCO For EPC Services for the Arkansas Energy Performance Contracting Program Version 1.1 March 2014 Arkansas Economic Development Commission Energy Office 900 West Capitol

More information

Guaranteed Energy Savings

Guaranteed Energy Savings Guaranteed Energy Savings Mark J. Gallick Account Manager Shayne Homan, P.E., C.E.M. - Director of Energy Services Brian Moore, LEED GA, CIPE Engineering Operations Manager Michael Grochalski, E.I.T.,

More information

ENERGY MANAGEMENT PLAN ENERGY MANAGEMENT POLICY: ERG-1

ENERGY MANAGEMENT PLAN ENERGY MANAGEMENT POLICY: ERG-1 Our Commitment Effective energy management begins with the specific, visible expression of commitment by the senior authorities in the Municipality to making the reduction of energy consumption an organizational

More information

Integrated Planning 1

Integrated Planning 1 Integrated ning 1 What? DEFINITION Integrated planning (IP) is the process whereby all planning and resource allocation activities throughout every level of the organization are effectively linked and

More information

Board of County Commissioners Worksession June 5, UCPS Current Expense and Capital Budget. FY 2015 Operating and Capital Budget Union County, NC

Board of County Commissioners Worksession June 5, UCPS Current Expense and Capital Budget. FY 2015 Operating and Capital Budget Union County, NC Board of County Commissioners Worksession 1 UCPS Current Expense and Capital Budget Today s Meeting Discussion of Manager's Amended Proposed Budget Why the proposed funding? Board Direction from June 2

More information

PROGRAM REVIEW FACILITIES PLANNING & SERVICES DIVISION

PROGRAM REVIEW FACILITIES PLANNING & SERVICES DIVISION 2013-14 PROGRAM REVIEW FACILITIES PLANNING & SERVICES DIVISION I. Division Purpose Plan, construct and maintain a safe, functional, clean and attractive physical environment for the users of El Camino

More information

To: Mayor and City Council Through: Bill Monahan, City Manager. Subject: Proceeding with the ESCO Process

To: Mayor and City Council Through: Bill Monahan, City Manager. Subject: Proceeding with the ESCO Process MILWAUKIE CITY COUNCIL STAFF REPORT Agenda Item: WS 4. Meeting Date: 9-16-14 To: Mayor and City Council Through: Bill Monahan, City Manager Subject: Proceeding with the ESCO Process From: Gary Parkin,

More information

Classroom and Class Lab Utilization

Classroom and Class Lab Utilization Classroom and Class Lab Utilization Tom Keaton Director, Finance and Resource Planning Texas Higher Education Coordination Board Space Performance Scoring (SPS) Current Guideline Classroom Use, 38 Hours

More information

Richmond Building Energy Challenge

Richmond Building Energy Challenge Richmond Building Energy Challenge Robert Greenwald, P.Eng., MBA, President (Principal) Robert Greenwald has 25 years of energy management experience including developing energy plans, determining opportunities,

More information

Introduction to the Fund-Mapping Tool

Introduction to the Fund-Mapping Tool Introduction to the Fund-Mapping Tool 2018 What is the Fund-Mapping Tool? The fund-mapping tool helps community and public agency leaders to make better investments in supports and services for children

More information

Minnesota's Guaranteed Energy Savings Program (GESP)

Minnesota's Guaranteed Energy Savings Program (GESP) Minnesota's Guaranteed Energy Savings Program (GESP) Division of Energy Resources & CERTs Roles Energy Savings Performance Contracting The Power of Bundling Energy Conservation Measures Minnesota s new

More information

CATEGORY 8 PLANNING CONTINUOUS IMPROVEMENT

CATEGORY 8 PLANNING CONTINUOUS IMPROVEMENT INTRODUCTION The College s processes related to Planning Continuous Improvement are very mature. JC s key planning processes are aligned. Clear processes are in place for strategic planning and the College

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS The SMART FAQS are provided to answer questions regarding the SMART Initiative and will be updated on an ongoing basis. On November 4, 2014, Broward County voters approved a

More information

MCGILL GUIDE TO UNIT-LEVEL CLIMATE AND SUSTAINABILITY ACTION PLANNING

MCGILL GUIDE TO UNIT-LEVEL CLIMATE AND SUSTAINABILITY ACTION PLANNING MCGILL GUIDE TO UNIT-LEVEL CLIMATE AND SUSTAINABILITY ACTION PLANNING Prepared by the McGill Office of Sustainability January 2018 Introduction Context McGill adopted a Climate and Sustainability Action

More information

TRIPLE BOTTOM LINE CALCULATOR

TRIPLE BOTTOM LINE CALCULATOR TRIPLE BOTTOM LINE CALCULATOR PRESENTED BY: ALVARO LIMA BRA Director of Research City of Boston January 2012 IEDC 2012 Leadership Summit Overview of Presentation Background and rationale of the project

More information

School District of Horicon Community Survey Results. Fall 2017

School District of Horicon Community Survey Results. Fall 2017 School District of Horicon Community Survey Results Fall 2017 Survey Summary The survey was conducted in November December of 2017. Residents within the District were mailed a paper survey. Each survey

More information

Request for Proposal on Qualifications (RFP/Q) Juniata County Government

Request for Proposal on Qualifications (RFP/Q) Juniata County Government Request for Proposal on Qualifications (RFP/Q) For Energy Performance Contracting Services For Juniata County Government Proposals Due June 5, 2015 by 4:00 p.m. Request for Qualifications: Energy Performance

More information

Looks Like Finance, but It s All About Solutions: The Public-Purpose ESCO Enterprise Model

Looks Like Finance, but It s All About Solutions: The Public-Purpose ESCO Enterprise Model Looks Like Finance, but It s All About Solutions: The Public-Purpose ESCO Enterprise Model Elizabeth Chant, Peter Adamczyk, David Barash, Beth Sachs Vermont Energy Investment Corporation ABSTRACT The public-purpose

More information

Building Systems and Performance: an Introduction to Building Operator Certification Lesson 19: Energy Audits

Building Systems and Performance: an Introduction to Building Operator Certification Lesson 19: Energy Audits Building Systems and Performance: an Introduction to Building Operator Certification Lesson 19: Energy Audits CUNY Institute for Urban Systems Building Performance Lab Introduction to Energy Audits 2 Topic

More information

CHAPTER 4: FIVE-YEAR CONSTRUCTION PLAN

CHAPTER 4: FIVE-YEAR CONSTRUCTION PLAN CHAPTER 4: FIVE-YEAR CONSTRUCTION PLAN 4.1 Overview 4.2 Master Plan Summary 4.3 List of Projects in Order of Priority 4.4 Cumulative Capacities and Loads for each Space Type 4.5 The Capacity of Existing

More information

Energy Savings Performance Contracting Program Process Description

Energy Savings Performance Contracting Program Process Description Energy Savings Performance Contracting Program Process Description I. Program History The Energy Savings Performance Contracting (ESPC) program was developed to provide a means to install energy conservation

More information

10 Year OSU Capital Forecast

10 Year OSU Capital Forecast 10 Year OSU Capital Forecast Presentation 2004-17 Define financial boundaries Describe criteria Identify data sources Summarize proposed capital projects Financial boundaries Forecast to align with financial

More information

Sacramento City College

Sacramento City College Sacramento City College Strategic ning System Title: Type: OPR: Collaborative Groups: References: Unit Procedures Unit (Departments, Divisions and/or Direct Reporting ) Academic Senate Budget Campus Development

More information

2017 Annual Delegates Meeting

2017 Annual Delegates Meeting 2017 Annual Delegates Meeting Board Member Congratulations System s Financials Benefits Video Series Benefit Profile Redesign? MyNYSTRS Security Enhancements Online Retirement Application NYSTRS Mobile

More information

False Dilemmas, Energy Projects and Value Creation

False Dilemmas, Energy Projects and Value Creation False Dilemmas, Energy Projects and Value Creation Jonathan A. Coburn President, Building Asset Insight LLC Abstract A false dilemma is created when options are presented in an either/or" context when

More information

Examining the Cost of Green. October 2004

Examining the Cost of Green. October 2004 INTRODUCTION Architects and clients around the world are embracing sustainable design, using their vision and skills to create buildings that give back to the environment, brightening the future for future

More information

6-YEAR CAPITAL IMPROVEMENT PROJECTS (CIP) PLAN FISCAL YEARS AND FISCAL YEAR CIP BIENNIUM BUDGET

6-YEAR CAPITAL IMPROVEMENT PROJECTS (CIP) PLAN FISCAL YEARS AND FISCAL YEAR CIP BIENNIUM BUDGET 6-YEAR CAPITAL IMPROVEMENT PROJECTS (CIP) PLAN FISCAL YEARS 2018-2023 AND FISCAL YEAR 2018 2019 CIP BIENNIUM BUDGET FACILITIES AND PLANNING COMMITTEE NOVEMBER 3, 2016 What is a 6-year CIP Strategy? Establishes

More information

Minnesota's Guaranteed Energy Savings Program (GESP)

Minnesota's Guaranteed Energy Savings Program (GESP) Minnesota's Guaranteed Energy Savings Program (GESP) Division of Energy Resources Role Energy Savings Performance Contracting The Power of Bundling Energy Conservation Measures Minnesota s new Guaranteed

More information

Sacramento City College Strategic Planning System

Sacramento City College Strategic Planning System Sacramento City College Strategic Planning System Title: Plan Type: OPR: Collaborative Groups: Resource Management and Capital Outlay Master Plan 2018 Institutional VPA Resource Allocation Groups: Budget

More information

RENOVATE AMERICA GREEN BOND PRE-ISSUANCE REVIEW

RENOVATE AMERICA GREEN BOND PRE-ISSUANCE REVIEW RENOVATE AMERICA GREEN BOND PRE-ISSUANCE REVIEW November 27, 2017 Introduction In 2017, Renovate America developed the HERO 2017 Green Bond Framework under which it intends to issue multiple series of

More information

Building Energy Retrofit Program

Building Energy Retrofit Program Building Energy Retrofit Program produced by the Building Owners & Managers Association (BOMA) International and the Clinton Climate Initiative (CCI) Building Owners & Managers Association (BOMA) International

More information

Financing for Energy & Sustainability

Financing for Energy & Sustainability Financing for Energy & Sustainability Understanding the CFO and Translating Metrics This resource was completed with support from the Department of Energy s Office of Energy Efficiency and Renewable Energy

More information

MEASUREMENT AND VERIFICATION AND THE IPMVP

MEASUREMENT AND VERIFICATION AND THE IPMVP MEASUREMENT AND VERIFICATION AND THE IPMVP EPC TOOLKIT FOR HIGHER EDUCATION APRIL 2009 INDEX IPMVP: THE PRINCIPLES IPMVP: THE DIFFERENT OPTIONS THE COSTS OF M&V 3 4 7 With permission from the author, this

More information

SALESFORCE LIGHTNING

SALESFORCE LIGHTNING R O I C A S E S T U D Y P R O G R A M : C U S T O M E R R E L A T I O N S H I P M A N A G E M E N T D O C U M E N T N U M B E R : S 159 O C T O B E R 2 0 1 8 ROI: 500% Payback: 2.4 Months SALESFORCE LIGHTNING

More information

2018 Investor Day. Mike Roman Chief Executive Officer. November 15, 2018

2018 Investor Day. Mike Roman Chief Executive Officer. November 15, 2018 2018 Investor Day Mike Roman Chief Executive Officer November 15, 2018 Today s meeting highlights Our 3M Value Model positions us to win Four strategic priorities delivering value for our customers and

More information

UNC System Building Reserve Model Instructions

UNC System Building Reserve Model Instructions Instructions Introduction: These are instructions for filling out the two building reserve templates. One template is for new buildings - UNC System Building Reserve Model for New Buildings; and one template

More information

Developing the Capital Plan is only Half the Battle

Developing the Capital Plan is only Half the Battle Western Connecticut State University Western Oregon University Westfield State University Widener University Williams College Worcester Polytechnic Institute Worcester State University Xavier University

More information

Guaranteed Energy Savings Program (GESP) February 21, CERTS Conference

Guaranteed Energy Savings Program (GESP) February 21, CERTS Conference Guaranteed Energy Savings Program (GESP) February 21, 2013 2013 CERTS Conference Facility Issues Growing Deferred Maintenance Occupant Comfort and Productivity Health, Safety and Environmental Energy Price

More information

Modernizing Your Budget Process. Northwest Ellucian User Group July 2018

Modernizing Your Budget Process. Northwest Ellucian User Group July 2018 Modernizing Your Budget Process Northwest Ellucian User Group July 2018 INTRODUCTION Purpose: Discuss current state of budgeting in higher education and introduce Kaufman Hall s approach Take-aways Learn

More information

California Community Colleges

California Community Colleges California Community Colleges Capital Outlay Planning Background California Community Colleges capital outlay demands far exceed the available state resources to fund them. Currently, there is a backlog

More information

October 4, 2007 Page 1 of 8

October 4, 2007 Page 1 of 8 Children and adults learn and perform best in a safe and comfortable environment. Arlington Public Schools therefore provides safe, comfortable, accessible, efficient and attractive spaces for instructional

More information

Performance Contracting. Energy Management for Small Water Systems. Len Hoey, PEM State Energy Office Department of Commerce

Performance Contracting. Energy Management for Small Water Systems. Len Hoey, PEM State Energy Office Department of Commerce Performance Contracting Energy Management for Small Water Systems Len Hoey, PEM State Energy Office Department of Commerce Savings or Avoided Costs What is Performance Contracting An ESCO proposes and

More information

Capital Projects Completed since 1988

Capital Projects Completed since 1988 Projects Completed since 1988 Project Cost FY1988 ICCB Building Illinois Repair & Renovation - Replace Carpet in Classroom Buildings, Library and Lobby of Admin $ 51,901.00 $ 51,901.00 $ 51,901.00 FY1990

More information

An Overview: Responsibility Center Management (RCM) Treasurer s Town Hall January 15, 2015

An Overview: Responsibility Center Management (RCM) Treasurer s Town Hall January 15, 2015 An Overview: Responsibility Center Management (RCM) Treasurer s Town Hall January 15, 2015 Common University Budget Models EVERY TUB ON ITS OWN BOTTOM INCREMENTAL FORMULA-BASED RESPONSIBILITY CENTER MANAGEMENT

More information

SIRF: Sustainability Initiatives Revolving Fund

SIRF: Sustainability Initiatives Revolving Fund SIRF: Sustainability Initiatives Revolving Fund FY 2012 Annual Report SIRF provides energy savings opportunities, makes good business sense February 1, 2013 We are pleased to present you with Arizona State

More information

Levies February 2010 Supporting Seattle s Children. Seattle School Board Work Session September 2, 2009

Levies February 2010 Supporting Seattle s Children. Seattle School Board Work Session September 2, 2009 Levies February 2010 Supporting Seattle s Children Seattle School Board Work Session September 2, 2009 Agenda Introduction and Overview Operations Levy BMAR BTA III Board Guidelines BTA III Project / BTA

More information

University of California, Berkeley

University of California, Berkeley University of California, Berkeley 2 nd Annual Finance Leadership Summit Pauley Ballroom November 29, 2012 Agenda 1 2 3 Campus Financial Vision for the Future UC Berkeley s Evolving Financial Philosophy

More information

38 th A n n u a l C o n f e r e n c e o n S c h o o l F a c i l i t i e s

38 th A n n u a l C o n f e r e n c e o n S c h o o l F a c i l i t i e s MANAGING RISK v. REWARD HOW TO BALANCE CREATIVE DESIGN WITH THE REALITIES OF PROJECT BUDGETS, SCHEDULES & SCOPE 38 th A n n u a l C o n f e r e n c e o n S c h o o l F a c i l i t i e s Panel Moderator:

More information

Summary of Capital Budget Request Tennessee Board of Regents. of the. September 21, 2017

Summary of Capital Budget Request Tennessee Board of Regents. of the. September 21, 2017 Summary of Capital Budget Request 2018-2019 of the Tennessee Board of Regents September 21, 2017 1 This is the Summary of the Capital Budget Request for Fiscal Year 2018-2019 for the Finance and Business

More information

Policy Number: Policy Name: Capital Development Plan

Policy Number: Policy Name: Capital Development Plan Page 1 7-107 Capital Development Plan A. Applicability: The Capital Development Plan Phase will be used for those projects meeting the requirements as previously defined in this chapter. B. Schedule: 1.

More information

Clinton Public Schools Proposed Budget. Maryann O Donnell Superintendent of Schools January 29, 2018

Clinton Public Schools Proposed Budget. Maryann O Donnell Superintendent of Schools January 29, 2018 Clinton Public Schools 2018-2019 Proposed Budget Maryann O Donnell Superintendent of Schools January 29, 2018 Budget Packet Cover Sheet Mission, Strategic Priorities, & Goals Foundation Skills & Competencies

More information

PACE: A World Changing Green Financing Tool Oct 10, 2018

PACE: A World Changing Green Financing Tool Oct 10, 2018 PACE (Property Assessed Clean Energy) is an innovative financing instrument which permits building and land owners to upgrade their buildings with energy and resource saving retrofits 1 or install renewable

More information

US Experience with Energy Savings Performance Contracts

US Experience with Energy Savings Performance Contracts US Experience with Energy Savings Performance Contracts John A. Shonder Oak Ridge National Laboratory Building Systems 2006 Conference Helsinki, Finland March 22, 2006 Background U.S. is the world s largest

More information

13.0 Capital Improvements

13.0 Capital Improvements 13.0 Capital Improvements Goal 1: To Provide Capital Facilities to Meet the Space Needs of the University on a Continuing Basis as the Needs are Identified. Objective 1.1: Provide a schedule of capital

More information

FIVE YEAR PLAN FOR ENERGY EFFICIENCY

FIVE YEAR PLAN FOR ENERGY EFFICIENCY FIVE YEAR PLAN FOR ENERGY EFFICIENCY Executive Summary Prepared for: Holy Cross Energy Navigant Consulting, Inc. 1375 Walnut Street Suite 200 Boulder, CO 80302 303.728.2500 www.navigant.com July 15, 2011

More information

Capital Budget Basics November 18, 2014

Capital Budget Basics November 18, 2014 Capital Budget Basics November 18, 2014 A how-to session on including maintenance schedules & capital expenses into annual budget preparation. Presented by: Anne Gulati, Needham Public Schools & Kurtis

More information

PUC Financing Session May 18 th, 2017

PUC Financing Session May 18 th, 2017 PUC Financing Session May 18 th, 2017 3 Year Plan Financing Vision National Grid will offer a suite of financing options which will: Decrease barriers for our customers who have not yet participated Assist

More information

Loss Prevention Strategy & Framework for Manitoba Public Insurance

Loss Prevention Strategy & Framework for Manitoba Public Insurance Loss Prevention Strategy & Framework for Manitoba Public Insurance May Version:. Date Revised: May, Document Name: MAIN_MPI Loss Prevention Strategy and Framework.docx Page 0 Executive Summary Manitoba

More information

Energy Services Coalition (ESC) Nevada Chapter. Local Public Sector ESPC Training. August 10, 2017

Energy Services Coalition (ESC) Nevada Chapter. Local Public Sector ESPC Training. August 10, 2017 Energy Services Coalition (ESC) Nevada Chapter Local Public Sector ESPC Training August 10, 2017 1 Why do ESPC Projects Generate Happy Customers? Repurposes existing expenditures and invests in your own

More information

Facilities Operations Issues 2013

Facilities Operations Issues 2013 Facilities Operations Issues 2013 PRBC Presentation April 12, 2013 Willem van der Pol Agenda Summary Why Building Conditions Matter Historical Context 2012/13 Budget Request Chargeback True Budget Needs

More information

Facilities Development and Operations

Facilities Development and Operations Facilities Development and Operations Dashboard/Metrics Report California State University, East Bay July 1, 2016 to June 30, 2017 1 Who We Are: Vice President Administration & Finance Division Associate

More information

Final Project Proposal 20 -

Final Project Proposal 20 - APPENDIX E: FINAL PROJECT PROPOSAL Final Project Proposal 20 - Community College Construction Act of 1980 Capital Outlay Budget Change Proposal Proposal Name Community College District College or Center

More information

Saving Money On Electricity Bills With Solar

Saving Money On Electricity Bills With Solar Saving Money On Electricity Bills With Solar A Net Metering Case Study As electricity rates continue to rise, smart businesses are locking in their energy costs to protect themselves against growing operating

More information

Morocco s experience in financing solar projects

Morocco s experience in financing solar projects Morocco s experience in financing solar projects February 5, 2019 1 Morocco s Energy Strategy 2 RENEWABLE ENERGIES, AT THE HEART OF MOROCCO S ENERGY STRATEGY Strong will of increasing renewable energy

More information

Protection notice / Copyright notice

Protection notice / Copyright notice Financing Infrastructure for K12 Presented by : Deval Allums Denise Granado Chavez November 22, 2013 Protection notice / Copyright notice Presentation Key Points Academics is priority #1, but operational

More information

GLOBAL VASCULAR INSTITUTE BUFFALO, NY PENN STATE AE SENIOR CAPSTONE PROJECT MADISON SMITH CONSTRUCTION MANAGEMENT DR.

GLOBAL VASCULAR INSTITUTE BUFFALO, NY PENN STATE AE SENIOR CAPSTONE PROJECT MADISON SMITH CONSTRUCTION MANAGEMENT DR. PENN STATE AE SENIOR CAPSTONE PROJECT DR. RILEY CM ADVISOR PENN STATE AE SENIOR CAPSTONE PROJECT DR. RILEY CM ADVISOR PROJECT BACKGROUND Location 100 High Street, Buffalo, NY Function Medical Research

More information

STATE CAPITAL OUTLAY PLANNING

STATE CAPITAL OUTLAY PLANNING STATE CAPITAL OUTLAY PLANNING CCC Chancellor s Office Cheryl Larry Lan Yuan San Mateo CCD Jose Nunez Karen Pinkham CCFC 2016 AGENDA Overview Eligibility Priority Review/Approval Effective Practices 1 Key

More information

Lake Mills Area School District Community Survey Results. Spring 2018

Lake Mills Area School District Community Survey Results. Spring 2018 Lake Mills Area School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in late May through mid-june of 2018. Residents within the District were mailed a paper survey.

More information

Capital Planning Framework

Capital Planning Framework Capital Planning Framework ALBERTA SENIORS AND HOUSING Main Heading Sub-heading September Month 20XX 2017 Table of Contents INTRODUCTION... 1 WHAT IS CAPITAL PLANNING?... 1 ALBERTA SENIORS AND HOUSING

More information

The Ohio State University Board of Trustees. October 28, 2009

The Ohio State University Board of Trustees. October 28, 2009 The Ohio State University Board of Trustees TOPIC: October 28, 2009 CONTEXT: Capital Recommendations At the September 17 th Fiscal Affairs Committee meeting, the University Administration promised to come

More information

RESOURCE. Sequoias Community College District. College of the Sequoias

RESOURCE. Sequoias Community College District. College of the Sequoias RESOURCE A L L O C AT I O N Sequoias Community College District College of the Sequoias College of the Sequoias 2014 Resource Allocation Manual College of the Sequoias Community College District Visalia

More information

Incident and Accident Reporting and Investigation. September 29, 2014

Incident and Accident Reporting and Investigation. September 29, 2014 Incident and Accident Reporting and Investigation September 29, 2014 Outline Purpose Definitions General Reporting Guidance Electronic Submission of Forms Specific Reporting Requirements Summary Purpose

More information

IACP 2017 New York Conference Blockchain For Claims Professionals June 2017

IACP 2017 New York Conference Blockchain For Claims Professionals June 2017 IACP 2017 New York Conference Blockchain For Claims Professionals June 2017 Table of Contents OVERVIEW OF BLOCKCHAIN 3 USE CASE EXAMPLE 9 DEPLOYMENT JOURNEY 12 2 Copyright 2017 Deloitte Development LLC.

More information

Tertiary Education Estate Framework Model

Tertiary Education Estate Framework Model Tertiary Education Estate Framework Model Integrating and automating the campus masterplan process Naomi Nielsen(JLL) Bradley Williamson (Monash University) TEMC Conference September, 2014 Agenda Current

More information

West Bend School District Community Survey Results. Spring 2018

West Bend School District Community Survey Results. Spring 2018 West Bend School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in June of 2018. Residents within the District were mailed a paper survey. Each survey included a

More information

Can Simple Payback Justify Building Energy Improvements?

Can Simple Payback Justify Building Energy Improvements? Can Simple Payback Justify Building Energy Improvements? By: David Schurk DES, CEM, LEED AP. Automated Logic Corporation Houston, Texas When deciding whether or not to implement Energy Improvement Opportunities

More information

2018 Educational and Facilities Master Plan (EFMP) and Proposed Bond Projects. June 27, 2018 // Board of Trustees Meeting

2018 Educational and Facilities Master Plan (EFMP) and Proposed Bond Projects. June 27, 2018 // Board of Trustees Meeting 2018 Educational and Facilities Master Plan (EFMP) and Proposed Bond Projects June 27, 2018 // Board of Trustees Meeting Proposed Bond Projects Overall Phasing Phase 1A Phase 1B Phase 2 Phase 3 Phase TBD

More information

ENROLLED ACT NO. 18, HOUSE OF REPRESENTATIVES SIXTY-FOURTH LEGISLATURE OF THE STATE OF WYOMING 2018 BUDGET SESSION

ENROLLED ACT NO. 18, HOUSE OF REPRESENTATIVES SIXTY-FOURTH LEGISLATURE OF THE STATE OF WYOMING 2018 BUDGET SESSION AN ACT relating to school finance; modifying the formula and payment structure for major maintenance funding for public K-12 schools; revising the definition of major maintenance; amending requirements

More information

EFFECTIVE IMPLEMENTATION OF IPMVP OPTION C- WHOLE BUILDING MEASUREMENT MEASUREMENT AND VERIFICATION PLANS

EFFECTIVE IMPLEMENTATION OF IPMVP OPTION C- WHOLE BUILDING MEASUREMENT MEASUREMENT AND VERIFICATION PLANS EFFECTIVE IMPLEMENTATION OF IPMVP OPTION C- WHOLE BUILDING MEASUREMENT MEASUREMENT AND VERIFICATION PLANS PREPARED BY TAC-TOUR ANDOVER CONTROLS TODD PORTER, KLIP WEAVER, KEVIN VAUGHN AUGUST 12, 2005 1

More information

January Ontario Financing Authority

January Ontario Financing Authority January 2018 Ontario Financing Authority Ontario s Economic and Fiscal Highlights Ontario s Economy Over the 2014 to 2017 period, Ontario s economic growth is on pace to exceed that of all G7 countries.

More information

BUILDING SUCCESS. Company Overview

BUILDING SUCCESS. Company Overview BUILDING SUCCESS. Company Overview www.venturerealestatecompany.com 513-407-9123 info@venturerealestatecompany.com Philosophy Vision, Mission, Values Building Success. At Venture, success is not simply

More information

Region: Year Total Expense Total Revenue Difference ,377,200 2,377, ,795,300 24,795, Prior Years

Region: Year Total Expense Total Revenue Difference ,377,200 2,377, ,795,300 24,795, Prior Years Project Number: 07-230 Chittum Elementary School - Modernization & Addition Addition or Expansion Year Identified: 2019 Start Date: 7/7/2018 Est. Completion Date: 9/30/2021 This project will provide for

More information

The Potential Role of Public-Private Partnerships in Delivering Metro Projects

The Potential Role of Public-Private Partnerships in Delivering Metro Projects The Potential Role of Public-Private Partnerships in Delivering Metro Projects PUBLIC-PRIVATE PARTNERSHIPS (P3) Public Sector Common Interest Private Sector What is a Public-Private Partnership? > Collaboration

More information

Capital Maintenance. 2. Deferred Maintenance, May 18, 2009 <http://en.wikipedia.org/wiki/deferred_maintenance>

Capital Maintenance. 2. Deferred Maintenance, May 18, 2009 <http://en.wikipedia.org/wiki/deferred_maintenance> Capital Maintenance Capital Maintenance Capital maintenance has previously been known as deferred maintenance, the act of postponing maintenance in order to save money or avoid costs. 2 At NYU, the term

More information

ENGINEERING SERVICES

ENGINEERING SERVICES ENGINEERING SERVICES Engineering Services group provides innovative, high-quality, and costeffective solutions to meet our customers needs and ensure the long-term reliability and successful operation

More information

R E Q U E S T F O R P R O P O S A L O N Q U A L I F I C A T I O N S F O R A C A M P U S W I D E E N E R G Y S E R V I C E S P R O G R A M

R E Q U E S T F O R P R O P O S A L O N Q U A L I F I C A T I O N S F O R A C A M P U S W I D E E N E R G Y S E R V I C E S P R O G R A M U N I V E R S I T Y O F N O R T H A L A B A M A R E Q U E S T F O R P R O P O S A L O N Q U A L I F I C A T I O N S F O R A C A M P U S W I D E E N E R G Y S E R V I C E S P R O G R A M R F P 2 0 1 7-23

More information

Board of Trustees Budget, Finance and Facilities Committee Meeting January 24, 2019

Board of Trustees Budget, Finance and Facilities Committee Meeting January 24, 2019 Board of Trustees Budget, Finance and Facilities Committee Meeting January 24, 2019 PRESENTED BY Finance and Administration Florida Agricultural and Mechanical University 1 ACTION ITEM IV: Approval of

More information

Conservation and Demand Management Information Solution (CDM-IS) FAQ s

Conservation and Demand Management Information Solution (CDM-IS) FAQ s Conservation and Demand Management Information Solution (CDM-IS) FAQ s This document is a living document that will be updated as frequently asked questions are raised with regards to the implementation

More information

TIME PROJECT TEAM S LOCKER ROOM

TIME PROJECT TEAM S LOCKER ROOM NEW PARKLAND HOSPITAL HALF TIME VISITING THE PROJECT TEAM S LOCKER ROOM H A N K A D A M S, A I A, A C H A, E D A C V I C E P R E S I D E N T / D I R E C T O R H E A L T H C A R E, H D R D E S I G N M A

More information

REQUEST FOR PROPOSALS For. Guaranteed Energy Savings Contract

REQUEST FOR PROPOSALS For. Guaranteed Energy Savings Contract 702 KAR 4:160 REQUEST FOR PROPOSALS For Guaranteed Energy Savings Contracts School District Name: Garrard County Schools School District Address: 322 West Maple Avenue, Lancaster, KY 40444 Project: Guaranteed

More information

Sustainable Revolving Loan Fund

Sustainable Revolving Loan Fund Sustainable Revolving Loan Fund Overview: The Sustainable Revolving Loan Fund aims to: Reduce greenhouse gas emissions Empower students, faculty, staff, and administration to be proactive in contributing

More information

Exhibit DAS-1. Tucson Electric Power Company Demand-Side Management Program Portfolio Plan

Exhibit DAS-1. Tucson Electric Power Company Demand-Side Management Program Portfolio Plan Exhibit DAS-1 Tucson Electric Power Company Demand-Side Management Program Portfolio Plan 2008-2012 TABLE OF CONTENTS 1. Introduction...3 2. DSM Portfolio Performance Costs, Savings and Net Benefits...3

More information

SWATeam Recommendation

SWATeam Recommendation SWATeam Recommendation Name of SWATeam: Energy Conservation and Building Standards SWATeam Chair: Marian Huhman Date Submitted to isee: 5/17/2016 Specific Actions/Policy Recommended (a few sentences):

More information

Budgeting for Small Schools

Budgeting for Small Schools Budgeting for Small Schools College Business Management Institute July 2017 Presented by Lisa Marie McCauley, Ed.D, CPA Senior Vice President for Finance Middle States Commission on Higher Education Chief

More information

Guadalajara Integrated Action Plan

Guadalajara Integrated Action Plan Guadalajara Integrated Action Plan V 1.1 February 2018 1 Contents Guadalajara... 1 Integrated Action Plan... 1 V 1.1... 1 January 2018... 1 Contents... 2 Executive Summary... 3 1 Smart Guadalajara... 5

More information