1 SOUTH ASIA REGIONAL INITIATIVE FOR ENERGY INTEGRATION (SARI/EI) Agenda Notes 3 rd MEETING OF TASK FORCE 2 ADVANCEMENT OF TRANSMISSION SYSTEMS INTERCONNECTION 25 th 26 th February, 2015 Colombo, Sri Lanka S

2 SOUTH ASIA REGIONAL INITIATIVE FOR ENERGY INTEGRATION (SARI/EI) Agenda Notes 3 rd MEETING OF TASK FORCE 2 ON ADVANCEMENT OF TRANSMISSION SYSTEMS INTERCONNECTION 25 th 26 th February, 2015 Colombo, Sri Lanka

3 Agenda 3 rd Meeting of Task Force 2 on Advancement of Transmission Systems Interconnection 25 th -26 th February, 2015 Colombo, Sri Lanka Meeting Objectives: Review latest developments in Nepal power sector including the status of Dhalkebar (Nepal) - Muzaffarpur (India) 400 kv Transmission Line Cross-Border Interconnection Review latest updates on the planned and proposed Cross-Border Transmission lines between India - Bangladesh Present and discuss the progress and preliminary draft findings of the study on the Assessment of the Electricity Trading Potential in the South Asia region Presentation on India s Cross Border Interconnections and Power Trade Discuss and seek suggestions/recommendations from the members on the draft findings of the study Assessment of the Electricity Trading Potential in the South Asia region *To be confirmed Day 1: 25th February, 2015 INAUGURAL SESSION Welcome address: Ms. Monali Zeya Hazra, Regional Energy Manager and Clean Energy Specialist SARI/EI, USAID/India Key note address: Mr. M.M.C. Ferdinando, Secretary, Ministry of Power & 10:00 A.M. 10:30 A.M. Energy, Government of Sri Lanka* Special address: Mr. Upali Daranagama, Additional Secretary, Ministry of Power & Energy, Government of Sri Lanka Vote of Thanks: Mr. V.K. Kharbanda, Project Director, SARI/EI, IRADe 10:30 A.M. 11:00 A.M. Group Photograph and High Tea SESSION-II 11:00 A.M. 11:30 P.M. Presentation on SARI/EI Program Review: Progress of activites undertaken in and Annual Work Plan for : Mr V K Kharbanda, Project Director, SARI/EI-IRADe 11:30 P.M. 12:00 P.M. Presentation on the latest developments in Nepal Power Sector including status of the Dhalkebar-Muzaffarpur 400 kv Cross-Border Interconnection: Mr. Surendra Rajbhandari, Director, Nepal Electricity Authority 12:00 P.M. 12:30 P.M. Presentation on the latest updates of planned and proposed Cross-Border Transmission lines between India-Bangladesh: Mr. Arun Kumar Saha, Superintending Engineer, Power Grid Company Of Bangladesh Ltd 12:30 P.M. 1:00 P.M. Presentation on Cross Border Interconnection and Power Trade with Neighbouring Countries: Mr. Goutam Roy, Director, System Planning and Project Appraisal, Power Systems, CEA, India 1:00 P.M.-2:00 P.M. Lunch SESSION-III 2:00 P.M.-3:30 P.M. Presentation on the progress and preliminary findings of the study on Assessment of the Electricity Trading Potential in the South Asia region : ICF International 3:30 P.M.-4:30 P.M. Discussions followed by suggestions/recommendations from the members on the preliminary findings of the study on Assessment of the Electricity Trading Potential in the South Asia region 4:30 P.M. 4:45 P.M. Summary & the Way Forward 4:45 P.M. 5: 00 P.M. High Tea Day 2: 26th February, 2015 SITE VISIT 8.15 A.M P.M. Site Visit to Ugadanavi Power Station - 270MW Combined Power Plant, Kerawalapitiya (North of Colombo)

4 South Asia Regional Initiative for Energy Integration (SARI/EI) Background The countries of South Asia (SA), comprising Afghanistan, Bangladesh, Bhutan, India, the Maldives, Nepal, Pakistan, and Sri Lanka, are home to one-fifth (23 percent) of the world s population. Over the last two decades, South Asia has been one of the fastest growing regions in the world, with an average annual growth rate of six percent as measured by GDP per capita. This robust macroeconomic growth has translated into declining poverty and significant improvements in human development indexes in the region. The average annual growth rate of six to seven percent is expected to be maintained over , driven by increased export demand, policy reforms, stronger investment activity, and normal agricultural production. To sustain high-level economic growth in the long run, it is imperative that the electricity sector grows in a sustainable manner, as power is one of the fundamental inputs to the economy. However, despite this impressive macroeconomic growth, the power sector in the region has not been able to keep pace, and each of the countries continues to experience electricity shortages and poor quality of supply due to various factors such as the sub-optimal utilization of energy resources both domestic & imported and inadequate investments in the power sector. The existing power shortages and growing import of fossil fuels impose a heavy cost of energy insecurity to the region. Thereby, the need to ensure energy security in today s economic climate is imperative and urgent as the gap between the latent demand and supply of energy is a major concern for the South Asian region and the only long-term solution is the sustained increase in regional energy cooperation among South Asian nations. USAID s South Asia Regional Initiative/Energy s (SARI/E) role over the past decade in advocating energy cooperation in South Asia has transited to the next phase of advancing regional energy integration and Cross-Border Electricity Trade. This fourth and the final phase titled South Asia Regional Initiative for Energy Integration (SARI/EI) is designed to build upon SARI/Energy s successful initiatives of the past to move South Asian countries towards increased regional energy security. The program addresses policy, legal, and regulatory issues related to energy in the region; promote transmission interconnections; and work towards establishing a regional market exchange for electricity. PROGRAM MESSAGE: The main message of the program is to Promote integration of Energy Systems and enhance Cross- Border Electricity Trade (CBET) among the South Asian countries by focusing on the following three development outcomes for overall socio-economic development of the region: Coordination of Policy, Legal and Regulatory Framework The key result of the Harmonization of Policy, Legal and Regulatory Issues component is to create the enabling systemic conditions for a sustainable market for investment and implementation of Cross-Border Energy Trade. Advance Transmission Systems Interconnection The key result of the Advancement of Transmission Systems Interconnection component is to create the enabling, systemic conditions for a sustainable market for investment and implementation of sub-regional bilateral transmission interconnections beginning with the eastern sub-region of South Asia. South Asia Regional Electricity Markets The key result of this component on Establishment of South Asia Regional Energy Market is to create the enabling and systemic conditions for a sustainable market for energy trading and exchange among the South Asian countries. The overarching objective of the South Asia Regional Initiative for Energy Integration (SARI/EI) program is to develop a common template for technical and commercial aspects of power

5 exchange among the South Asian countries. It intends to create the right enabling environment to support the establishment of a South Asian electricity market, gain consensus and support from the key decision makers and stakeholders in the South Asia region. Importance of Task Force 2 on Advancement of Transmission Systems Interconnection Importance of Task Force 2 on Advancement of Transmission Systems Interconnection Transmission interconnection is key to Cross Border Electricity Trade (CBET) in South Asia, and is a necessary precondition to regional electricity market integration as well as advancing energy access to populations in South Asia who are underserved or un-served. South Asia is partially energy integrated region in the world comparatively. Very limited Cross-Border Transmission Interconnections and Cross Border Trading Transactions are taking place i.e., India Bhutan, India-Bangladesh and to a lesser extent between India-Nepal. The problem of regional grid integration is influenced by political, economic, technical and social considerations. Although the need for adequate transmission infrastructure to support CBET seems obvious, there are various requirements needed to ensure its timely development and construction. For the South Asia region, without additional cross-border interconnection, the business case for development of additional hydro resources in the north or wind resources in the south will be much more difficult to achieve. While there are development challenges in linking the several South Asia country electricity grids, these connections and harmonizing the systems is well within the state of art technologically. Cross-Border Electricity Trade efforts begin with the identification of bilateral objectives and an examination of how individual national planning efforts can utilize crossborder interconnection as one tool to meet unserved load across the broader region. An effective generation and transmission infrastructure is critical to support cross-border power trading. Generation development is largely driven by power purchase agreements that can support the long-term financing of this capital-intensive investment. Transmission assets are enablers and they by themselves, generate market revenues for the asset owners and are subject to competition. Transmission assets provide the means by which bottled up generation can realize its true value and efficiently serve the needs of distant customers. At the time investment decisions are being made for generation, there needs to be a clear implementable plan to assure that the necessary transmission can be constructed to maximize the output of that generation on the grid. A critical next step is to develop the operational protocols and formulate required coordination procedures for stable regional/national grid operations so as to support the effective development of several cross-border interconnection projects that are under execution in South Asia and also the ones to come up in the near future. The key intended result of the Task Force 2 on Advancement of Transmission Systems Interconnection component is to create the enabling, systemic conditions for a sustainable market for investment and implementation of bilateral transmission interconnections. It is also to identify interconnecting points for technically and economically feasible Cross-Border Interconnections considering generation capacity additions over the next years, evaluation of the electricity available for Cross Border transfer and formulation of the required operational procedures for stable regional/national grid operations. Task Force 2 will develop a road map that would give prospective investors a comfort level on a long term basis to set up power plants within the South Asia region for electricity export / import of power without congestion.

6 In view of the above, the Task Force on Advancement of Transmission Systems Interconnection comprises of the following nominated members. Task Force 2 (TF2) Members : Advancement of Transmission Systems Interconnection Name Designation Organisation Country Mobile Office Mr. Arun Kumar Saha Superintending Engineer Power Grid Company Of Bangladesh Ltd Bangladesh / arunsaha60@gmail.com Ms. Kamani Jayasekera Deputy General Manager (Transmission and Generation Planning) Ceylon Electricity Board Sri Lanka dgmtgp@ceb.lk Mr. Karma Tshewang Head/Chief Engineer Transmission & Power Systems Division The Department of Hydropower & Power Systems, Ministry of Economic Affairs Bhutan ktshewan@gmail.com, pcd.doe@gmail.com Mr. Surendra Rajbhandari Director Nepal Electricity Authority Nepal surendra13.rajbhandari@ gmail.com Mr. Shekeeb Ahmad Nessar Chief Operating Officer (COO) Da Afghanistan Breshna Sherkat(DABS) Afghanistan , shekeeb.nessar@dabs.af Mr. Goutam Roy Director, System planning and Project Appraisal, Power Systems Central Electricity Authority India goutam.roy@nic.in

7 Terms of Reference: Task Force 2: Generation and Transmission Infrastructure Planning Task Force 2 (TF2) will comprise of members engaged in the power system planning, operations and design functions of the participating South Asia nations. The key deliverables of this Task Force are as follows: Assessment of the economically feasible potential for electricity exchange / trade in the South Asian region over the next years. Development of minimum inter-country coordination procedures & standards required with respect to power system planning, design and operations, in consistent with the legal and regulatory practices that would facilitate such electricity exchange / trade. 1. Objective: TF2 will identify import-export points for technically and economically feasible Cross Border Interconnections considering generation capacity additions in the pipeline over the next years, evaluate the electricity available for Cross Border Exchange transfer and formulate required coordination procedures for stable regional/national grid operations. TF2 will develop a road map that would give prospective investors a comfort level on a long term basis to set up power plants within the South Asia region for electricity export / import with a minimum level of power flow congestion. 2. Constitution of Task Force: Task Force shall be constituted with one member from each country from their power system planning / operations / design functions. 3. Term of Reference: 3.1. Evolve a South Asia Regional Electricity Plan preferably up to the year 2035 based on country specific master plans and in consultation with country planning agencies Review generation capacity of addition program and identify the measures required to facilitate any additional corresponding infrastructure/ institutional development or augmentation required to achieve target outcomes in capacity addition up to the year Review country specific supply demand projections up to year Identify electricity that would be available for Cross Border Transfer over different time periods with technical and economic feasibility Review power system adequacy under different load flow conditions and suggest remedial measures against any congestions arising Review the extent to which Cross Border Power Transfer can be accommodated over interconnections planned and the technical improvements required to enhance such transfer Review of existing country criteria and practices on the following aspects and suggest any improvements based on proven international best practices Long term Electricity Demand Forecasting.

8 3.9. Long term Power Generation and Transmission Planning Open access in Power Transmission Power Transmission Congestion Management Power Transmission Pricing and Loss Sharing Balancing mechanism for unscheduled power input/output deviations Power Transmission system design, connectivity, and grid operation codes.

9 4. Time Schedule: 4.1. The task forces shall meet periodically The TF shall prioritize the various deliverables with a view to enhancing public/private investment in power system expansion and deliver them on a timely basis The activities assigned shall be completed within a period of 24 months from the date of constitution of the Task Force. 5. Program Secretariat: 5.1. The Program Secretariat shall be provided by IRADe. It would facilitate holding of Task Force meetings, prepare agenda, coordinate the meetings and provide minutes In case the Task Force finds the need for a study or assistance of an external consultant for advice, the Program Secretariat would arrange for the same from its internal resources or by engaging a consultant. 6. Working Groups: 6.1. The Task Force can set up working groups to carry out some of the functions. If a working group consists of members of two or more countries then the Program Secretariat shall formally form a working group, arrange and coordinate its meetings also If a sub group is formed within a country for facilitating the functioning of the country s Task Force member then the respective country may form such group on its own and keep the Program Secretariat informed of the same. 7. Deliverables: a) Review the supply demand scenario up to b) Review of Power generation capacity addition program for infrastructure, availability and readiness of enabling institutions required to achieve planned outcomes in capacity addition up to the year c) Assess CBET opportunities in years time frame. d) Prepare Regional Electricity plan in years time frame in periods of 5 years based on National plans. e) Check and formulate risk analysis & mitigation policies, if any. f) Standard Technical specifications for equipment of different voltage levels with parameters and list of codes to be prescribed for cross border equipment. g) Review open access and congestion management policies. h) Evolve transmission cost and loss sharing guidelines. i) Develop coordinated system operating procedures to be adopted for import export tie lines. j) Any other report to meet the objectives.

10 SARI/EI Activities: Progress of and Plan for Accomplishments and Key Activities ( ): Organised high level South Asia Regional Inaugural Conference of SARI/EI on Cross-Border Electricity Trade at New Delhi, India on October 4 th -5 th, Prepared and Published a Background Paper on Prospects for Regional Cooperation on Cross-Border Electricity Trade in South Asia. Successfully obtained Government of India s nomination to the Project Steering Committee and Task Forces. Project Steering Committee: Organized the 2 nd Project Steering Committee Meeting, SARI/EI on 8 th January, 2014 at New Delhi, India. Task Force 1: Organized the 2 nd meeting of Task Force-1 on Coordination of Policy, Legal and Regulatory Framework at Colombo, Sri Lanka on 19 th & 20 th February, Organized the 3 rd meeting of Task Force 1 on Coordination of Policy, Legal and Regulatory Framework at Thimphu, Bhutan on 4 th -5 th June, Awarded the Task Force 1 study on Review of Electricity Laws, Regulations, Policies (EL&R&P) of South Asia Countries to Mercados Energy Private Limited. Task Force 2: Organized the 2 nd meeting of Task Force 2 on "Advancement of Transmission Systems Interconnection on 16 th April-17th April, 2014 at Kathmandu, Nepal. Awarded the Task Force 2 study on Assessment of the Electricity Trading Potential in the South Asian region to ICF International. Task Force 3: Constitution of Task Force 3: Formation of Task Force 3 on South Asia Regional Electricity Markets with nominations from South Asian countries. 1 st meeting of Task Force 3 on "South Asia Regional Electricity Markets" on 29 th -30 th April, 2014 at Mumbai, India. Road Map of South Asia Regional Electricity Markets Organised Study Tour to European Regional Power Markets (Amsterdam & Paris) from July 13 th 19 th, Successfully organized the South Asia Investor s Workshop on Cross-Border Electricity Trade in association with Confederation of Indian Industry (CII) on 24 th -25 th September, 2014 at New Delhi, India. Prepared and Published a Concept Paper on Cross-Border Electricity Trade in South Asia: Challenges and Investment Opportunities Task Force 2 on "Advancement of Transmission Systems Interconnection : The Task Force 2 is working on the Advancement of Transmission Systems Interconnection in South Asian countries. To meet the deliverables of the Task Force 2 as defined in the Terms of Reference, one has to create the enabling systematic conditions for a sustainable market for investment and implementation of bilateral transmission interconnections. The Task Force 2 main objective is to identify import-export points for technically and economically feasible cross border interconnections considering generation capacity additions in the pipeline over the next years, evaluate the electricity available for cross border exchange transfer and formulate required coordination procedures for stable regional/national grid operations.

11 The Task Force will develop a road map that would give prospective investors a comfort level on a long term basis to set up power plants within the South Asia region for electricity export /import with a minimum level of power flow congestion. Since Task Force 2 deals mostly with the technical and operational issues involved in the interconnection, therefore Task Force 2 meetings agenda shall be designed to address both the technical and operational issues concerning the cross border interconnections. Task Force 2 meeting shall be designed with an aim to achieve objectives and deliverables of the task forces. Task Force 2 Activities ( ): Organized the 2 nd meeting of Task Force 2 on "Advancement of Transmission Systems Interconnection (16 th April-17 th April, 2014 Kathmandu, Nepal) Awarded the Task Force 2 study on Assessment of the Electricity Trading Potential in the South Asian region to ICF International. 2nd meeting of Task Force 2 on "Advancement of Transmission Systems Interconnection (16 th April-17 th April, 2014 Kathmandu, Nepal) The 2nd Meeting of Task Force 2 on Advancement of Transmission Systems Interconnection was held from 16th 17th April, 2014 at Kathmandu, Nepal. Task Force Members from various South Asian countries along with representatives from IRADe and USAID attended the meeting. Country presentations were made by respective members on Generation & Transmission Planning, Technical & Operational issues related to Transmission Systems Interconnection and prospects &challenges as far as Cross-Border Electricity Trade infrastructure is concerned. IRADe also made presentations on Infrastructure Financing in South Asian Power Sector and Features of Indian Electricity Grid Code. Studies/Exercises in order to achieve deliverables of Task Force 2 were discussed and IRADe presented the terms of reference of the studies on Trading Potential and Harmonization of Operating Procedures such as Grid codes, protection and equipment standards, etc. The same was deliberated upon in detail during the meeting. Based on the two Day s extensive deliberation on Advancement of Transmission Systems Interconnection prevailing in South Asian countries, IRADe s Project Secretariat put up the Summary and Way Forward as follows:

12 Need to build requisite transmission infrastructure for regional and bilateral power trade. Need to have Regional Transmission Master Plan for regional power trade. Transmission System Master Plan and Generation Expansion Plan related to Regional Power Trade needs to be coordinated among South Asian countries. Need to harmonize technical standards and grid codes among the South Asian nations. Need to have a holistic approach for the development of South Asian Power Sector covering Generation, Transmission and Distribution. Need to have a conducive environment for private sector participation to harness hydro potential in the South Asian region. Need to identify country wise trading potential over a typical day, week, month, season and annually for each of the years period. Trading Potential shall be assessed based on the commissioning schedules of the new generating stations and their associated transmission systems as prepared by the respective countries. Need to have an integrated and holistic road map for the development of regional optimal transmission systems. Need to review the proposed/existing transmission interconnections for import/export of electricity. Scope of Work for the studies relating to Trading Potential and Operating Procedures to be carried out was discussed and deliberated. IRADe shall initiate the process of carrying out the studies on Trading Potential and Operating Procedures either in house or through a consultant on the basis of Scope of work finalized. Progress for the studies relating to Trading Potential and Operating Procedures to be presented and deliberated before the Task Force 2 Members in the next meeting. A combined meeting of all the Task Forces was proposed to have inter se coordination activities of the respective task forces. Need to support SAARC Energy Center for Intergovernmental Agreements. Task Force 2 Studies: Study on Assessment of the Electricity Trading Potential in the South Asia region : The main objective of undertaking this study/exercise is to identify the trading potential in (MW, MWh.) of the South Asian nations (Afghanistan, Bangladesh, Bhutan, India, Pakistan, Nepal, Sri Lanka & the Maldives) over a period of next years. The trading potential will be assessed by reviewing the following: Existing long term Demand-Supply (D-S) projection scenarios of the participating countries. If long term projections are not available, study will be carried out for projecting demand supply for the South Asia nations. The above study shall also take in to account the present Demand-Supply scenario and the expected developments in the next years by taking in to account the Cross Border Electricity Trade (CBET) potential as a means to meet the additional demand of power by each country and/or by exporting surplus power through CBET to other South Asian Nations. The study shall also identify country wise trading potentials over various seasons and annually for each of the years period. The study has been awarded to ICF International and is currently under progress. The draft report is expected by July 2015.

13 Study on Harmonization of Grid Codes, Operating procedures and standards to facilitate/promote Cross Border Electricity Trade in the South Asia region : The main objective of undertaking this study is to: Review of the Grid Codes of the respective South Asia nations covering procedures/codes/ standards such as power system operating procedures, protection code, metering code, connection code, planning code, system security, demand estimation systems, outage planning, recovery procedures, etc. Identify relevant provisions in each of the above documents operating procedures/ Grid codes and standards that have the potential to impact cross border electricity trade ; and Suggest possible measures with necessary changes to be made in each of the above of the respective South Asian countries to facilitate/promote optimal and economic cross border electricity trade in the region. The study on Harmonization of Grid Codes, Operating procedures and standards to facilitate/promote Cross Border Electricity Trade in the South Asia region is expected to be awarded by February, The draft report is expected by August/September, Key Activities ( ): The year /16 will focus on Task Force meetings, finalization of the recommendations emerged from Task Forces and consensus building. By taking in to account the overall progress of the SARI/EI program so far, key lessons learnt from , inputs of Project Steering Committee, recent positive developments (like signing of Power Trade Agreement (PTA) between India and Nepal; adoption of Framework agreement on Energy (Electricity) Cooperation among SAARC member countries) and Program Implementation Plan, the essence and strategy of the Plan for is to focus on the following: Intensive task force meetings where each of the Task Forces will work to address the specific issues concerning CBET and achieve respective deliverables; Demand driven studies; Country specific consensus building for buy in of the Task Force findings; Study Tour to Regional Power Markets such as Greater Mekong Region, South African Power Pool,Nord Pool, etc. ; Analytical study on Economic Benefits of Cross-Border Electricity Trade; Technical Assistance to Nepal Tangible outputs from Task Force 2 by the end of : By the end of , Task Force 2 will produce the following outputs: Member s findings on demand-supply projections vis-a-vis trading potential for the region over a time period of years and a draft report on the same. Member s findings on Harmonization of Grid Codes, Operating procedures, standards, etc. to facilitate/promote Border Electricity Trade in the South Asia region "and a draft report on the same. Outreach /Country specific consensus building workshops/meetings (Task Force Findings/ Recommendations. Initiate the preparation of long term South Asia Electricity Master Plan.

14 Session: II Latest developments in Nepal Power Sector including status of the Dhalkebar-Muzaffarpur 400 kv Cross-Border Interconnection: Mr. Surendra Rajbhandari, Director, Nepal Electricity Authority India-Nepal has concluded a historic agreement on Electric Power Trade, cross-border transmission interconnection and grid connectivity commonly referred as the Power Trade Agreement (PTA). Some of the key provisions of the PTA are as follows: Enabling cooperation in the power sector, including developing transmission interconnections, grid connectivity, power exchange and trading through the governmental, public and private enterprises of the two countries on mutually acceptable terms. It encourages and facilitates investments including joint venture investments between the two countries in power sector on mutually agreed terms. Cooperation on various aspects of policy harmonization for the realization of cross-border interconnections, grid connectivity & power trade and shall work mutually towards resolving issues relating to barriers including tariff, fees, taxes, duties or charges of similar effects, if any, in the cross-border exchange and trade of electricity. To allow the authorized/licensed electricity producers/buyers/traders of each country to engage in cross-border electricity trade including Power Exchanges. Power Trade Agreement (PTA) has set a platform for development of large hydro-power generation and cross-border transmission infrastructures and related investments. In the year 2006, Nepal Electricity Authority, Nepal (NEA) and IL&FS Infrastructure Development Corporation (IIDC) with support from the Ministry of Water Resources (MOWR)/Ministry of Finance (MOF) Nepal and Embassy of India in Nepal took initiative to facilitate the development of transmission interconnection between India and Nepal. For exchange of power, a 400KV DC interconnection of about 145 Km, to be initially charged at 220 KV, from Muzaffarpur (in India) to Dhalkebar (in Nepal) was decided to be implemented. The presentation will cover all the latest developments/updates in Nepal Power Sector.

15 Session-II Latest updates of planned and proposed Cross-Border Transmission lines between India-Bangladesh Mr. Arun Kumar Saha, Superintending Engineer, Power Grid Company of Bangladesh Ltd Bangladesh has prominently put Cross-Border Electricity Trade in their priority to achieve energy security and is planning to procure 3500 MW power through the regional power market by The current regional power interconnection line between India-Bangladesh is from Baharampur (India) to Bheramara (Bangladesh) 400 KV line. This interconnection is 100 Km long, where 73 Km long transmission line is situated in Indian side and 27 Km in Bangladesh. The power is flowing through this regional link from October The other proposed interconnection which is under consideration is a 800 KV HVDC Transmission line from Rangia/Rowta in Assam (North East Region-India) to Barapukuria/ Jamalpur in Bangladesh and further to Western Region/Northern Region of India. The transmission capacity of this proposed interconnection is 6500 MW from Assam to Bangladesh. Bangladesh shall draw about 500/1000 MW and about 5500 MW will be transferred to the North Region/Western Region, India. This will be a win-win situation for both the countries. Apart from the above mentioned interconnection, Bangladesh has also proposed to procure power from Silchar (India-750 MW), Pallatana (India-250 MW), Myanmar 500 MW and Kishanganj (India-500 MW) by constructing suitable interconnecting lines. The presentation will cover all the latest updates of planned and proposed Cross-Border Transmission lines between India-Bangladesh.

16 Session III Progress and preliminary findings of the study on Assessment of the Electricity Trading Potential in the South Asia region : ICF International I. Objective of the study: The main objective of undertaking this study/exercise is to identify the trading potential in (MW, MWh.) of the South Asian nations over a period of next years. The trading potential will be assessed by reviewing the 1) Existing long term Demand-Supply (D-S) projection scenarios of the participating countries and 2) If long term projections are not available, study will be carried out for projecting demand supply for the SA nations. The above studies shall also take in to account the present D-S scenario and the expected developments in the next years by taking in to account the Cross Border Electricity Trade (CBET) potentials as a means to meet additional demand of power by each country and/or by exporting surplus power through CBET to other South Asian Nations. The study shall also identify country wise trading potentials over various seasons and annually for each of the years period. II. Terms of Reference for the study: 1. The study shall take into account all types of Generating plants viz Hydro, Thermal, Nuclear and Renewable. 2. Collect, compile, review and analyse the existing /prevailing long term D-S projections/data available in respect of each SA country. This shall include different generation capacity addition scenarios. The sources of data can be CEA (India), CEB (Sri Lanka), Bangladesh Power Development Board (Bangladesh), NEA (Nepal), WAPDA (Pakistan), MEA (Afghanistan). Data from other sources like previously conducted studies by reputed organisations such as ADB, SARRC & WB related to ascertaining the Demand-Supply forecasts, may also be utilized in consultation with IRADe. 3. To assess whether existing Demand-Supply projection have adequately been taken up and have explored the CBET potentials of each SA country from the trading perspectives and in the time horizon of years. 4. If the data including the perspective generation capacity addition projections are not available from various sources for the time horizon of years, a proper methodology needs to be adopted to arrive at reasonable D-S projections to explore the CBET potential of each SA country. The methodology to be adopted for arriving at these projections shall be finalized in consultation with the respective TF-2 country members and shall include a sensitivity analyses of the same. Based on the approved methodology, Country wise projections shall be made in respect of the various seasonal scenarios (including peak/off-peak conditions) and in terms of both MW and MWhr for the specified time horizon of next years. 5. The above D-S projections shall include the year wise trading opportunities that arise out of seasonal variations, time zone difference, difference in load curve, different weekends and holidays being followed in each SA nation.

17 III. Deliverables: 1. (a) Submit a Draft report on the findings/analysis on the existing Demand-Supply projections (MW, MWh) of each South Asian Nations. (b) Wherever the data projections are not available up to the specified time horizon, a separate draft report shall be submitted, identifying the shortcomings and the projections (including the assumptions) made in respect of the Demand-Supply (MW, MWh) in respect of each South Asian Nation for a period of next years covering plant wise break up of generation and the fuel being used etc. Both of the above draft reports shall include a brief on the Method used for the D-S projections and the Sensitivity analysis carried out on the same. Both of the Draft reports shall also include an assessment of the year wise opportunities available for meeting additional demand and exporting surplus power through Cross Border Electricity Trade by each country. 2. Make presentation(s) on the above Draft reports to the TF-2 members as and when required. 3. Submit an interim Report, incorporating all suggestions/recommendations to the respective provisions by the TF2 members and IRADe. 4. Make presentation(s) before the TF-2 members, Project Steering Committee (PSC), IRADe and USAID on the interim report, as and when required. Presentation Key Points: ICF International will provide an update of the work done till date under this assignment. A review of historical power Demand-Supply trends and Demand-Supply projections as per respective power system master-plan/expansion plan for all South Asian nations will be presented. The study has been carried out through collation of data available in public domain. In case of countries for which projections till the year 2034 are not available, an estimation based on appropriate assumptions has been developed. The methodology followed for estimation of unrestricted electricity demand, electricity supply and peak demand forecast for various countries will be shared. The power sector data gathered till date for each South Asian country will be discussed along with the information gaps that need to be filled. A coalesced qualitative-quantitative approach has been followed to capture the dynamics of power markets of all South Asian countries and address specific objectives of the study on assessment of the Electricity Trading Potential in South Asia. As a next step, ICF will develop a modeling case using ICF s I-IPM (India Integrated Planning Model) to assess the electricity trading potential in the South Asian region under different scenarios. Towards populating the modeling framework, ICF will develop assumptions on demand, supply, future generation and transmission builds, fuel supply and renewable forecasts besides other areas. Details on these assumptions, parameters on which data for member countries is needed and sample model run results for India will be discussed during the session.

18

Cross Border Electricity Trade in South Asia- Role of Regional Regulatory Guidelines & Way Forward

Cross Border Electricity Trade in South Asia- Role of Regional Regulatory Guidelines & Way Forward Cross Border Electricity Trade in South Asia- Role of Regional Regulatory Guidelines & Way Forward SEC Video Conferencing 18 th -19th October,2016 Regulatory Issues and Challenges in Cross Border Electricity

More information

Regional Regulatory Guidelines for promoting Cross Border Electricity Trade in South Asia Region

Regional Regulatory Guidelines for promoting Cross Border Electricity Trade in South Asia Region Regional Regulatory Guidelines for promoting Cross Border Electricity Trade in South Asia Region Workshop on Sustainable Development of Power Sector and Enhancement of Electricity Trade in the South Asian

More information

Cross Border Electricity Trade

Cross Border Electricity Trade Cross Border Electricity Trade Afghanistan Pakistan Nepal Bhutan India First meeting of core team on South Asian Regional Power Exchange (SARPEX) Bangladesh 7 th - 9 th February, 2017 New Delhi, India

More information

Role of Power Market and Market Intermediaries in Facilitating Investments in South Asian Region

Role of Power Market and Market Intermediaries in Facilitating Investments in South Asian Region Role of Power Market and Market Intermediaries in Facilitating Investments in South Asian Region Harish Saran Executive Director PTC India Ltd. harishsaran@ptcindia.com Existing Regional Cooperation in

More information

South Asia Regional Energy Integration (SARI/EI): Task Force-3 Roadmap

South Asia Regional Energy Integration (SARI/EI): Task Force-3 Roadmap South Asia Regional Energy Integration (SARI/EI): Task Force-3 Roadmap S. K. RAY TECHNICAL SPECIALIST, SARI/EI COMBINED MEETING OF ALL TASK FORCES: 5 TH -6 TH AUGUST 2015, NEW DELHI INDIA Background The

More information

Role of Private Sector in the growth of Power Infrastructure in South Asia. Mukunda Paudyal, Joint Secretary, Investment Board, Government of Nepal

Role of Private Sector in the growth of Power Infrastructure in South Asia. Mukunda Paudyal, Joint Secretary, Investment Board, Government of Nepal Role of Private Sector in the growth of Power Infrastructure in South Asia Mukunda Paudyal, Joint Secretary, Investment Board, Government of Nepal Outline of Presentation 1. The case for Private Investment

More information

19 th July 2017 Pokhara, Nepal

19 th July 2017 Pokhara, Nepal Regional Investment Framework and Policy Guidelines for promoting investment in South Asian Power Sector and in Cross-Border Electricity Trade in South Asia 19 th July 2017 Pokhara, Nepal 1 Agenda 1 Background

More information

Rajiv Ratna Panda Head-Technical, SARI/EI/IRADe

Rajiv Ratna Panda Head-Technical, SARI/EI/IRADe Terms of Reference/Scope of Work on developing the Model Framework for Trading licence regime and Guidelines for Grant of Trading licence in SA countries Rajiv Ratna Panda Head-Technical, SARI/EI/IRADe

More information

SARPEX Mock Exercise Day Ahead Market ( DAM) in the South Asian Region

SARPEX Mock Exercise Day Ahead Market ( DAM) in the South Asian Region SARPEX Mock Exercise Day Ahead Market ( DAM) in the South Asian Region Afghanistan Pakistan Nepal Bhutan India Presented by: Bangladesh Mr. S.K. Ray, Technical Specialist, SARI/EI, IRADe Mr. Gaurav Jain,

More information

Regional Power Market Challenges and Opportunities from Nepalese perspective

Regional Power Market Challenges and Opportunities from Nepalese perspective Regional Power Market Challenges and Opportunities from Nepalese perspective Hitendra Dev Shakya Director, Power Trade Department, Nepal Electricity Authority Outline of the Presentation 1. Energy sector

More information

SOUTH ASIA REGIONAL WORKSHOP ON

SOUTH ASIA REGIONAL WORKSHOP ON SOUTH ASIA REGIONAL WORKSHOP ON THE REGULATORY ROLE OF PROMOTING CROSS BORDER ENERGY TRADE 26 28 JUNE 2012 RUPOSHI BANGLA HOTEL DHAKA, BANGLADESH UNDER THE SOUTH ASIA REGIONAL ENERGY PARTNERSHIP PROGRAM

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: NEP 37196 TECHNICAL ASSISTANCE TO THE KINGDOM OF NEPAL FOR RESTRUCTURING OF NEPAL ELECTRICITY AUTHORITY December 2004 CURRENCY EQUIVALENTS (as of 3 November 2004) Currency Unit

More information

No. 14/1/2016-Trans Government of India Ministry of Power. Office Memorandum

No. 14/1/2016-Trans Government of India Ministry of Power. Office Memorandum No. 14/1/2016-Trans Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi, dated s" December, 2016 Office Memorandum Subject: Guidelines on Cross Border Trade of Electricity At

More information

75 working days spread over 4 months with possibility of extension 1. BACKGROUND

75 working days spread over 4 months with possibility of extension 1. BACKGROUND TERMS OF REFERENCE 1. Environmental Finance Expert Contracting Agency: Coordinating Agency: Place: Expected duration: United Nations Development Programme (UNDP) Bhutan UNDP Country Office Thimphu, Bhutan.

More information

Realizing a Central Asia-South Asia Regional Electricity Market: CASA-1000

Realizing a Central Asia-South Asia Regional Electricity Market: CASA-1000 Realizing a Central Asia-South Asia Regional Electricity Market: CASA-1000 Conference on Normalizing India-Pakistan Trade Salman Zaheer, The World Bank New Delhi, January 22, 2014 Examples of Regional

More information

South Asian Regional Power Exchange- Mock Exercise (SARPEX)

South Asian Regional Power Exchange- Mock Exercise (SARPEX) South Asian Regional Power Exchange- Mock Exercise (SARPEX) Afghanistan Pakistan Nepal Bhutan India Bangladesh S. K. Ray, Technical Specialist, IRADe, SARI/EI & Gaurav Jain, Senior Research Analyst, SARI/EI,

More information

Financial Sector of South Asia Revisiting the Benchmark Condition

Financial Sector of South Asia Revisiting the Benchmark Condition Financial Sector of South Asia Revisiting the Benchmark Condition Presentation by Dr Khondaker Golam Moazzem Additional Research Director Centre for Policy Dialogue (CPD) Contents 1. Introduction 2. Financial

More information

CASA-1000 Project List of FAQs

CASA-1000 Project List of FAQs 1. What is the objective of the project? CASA-1000 Project List of FAQs The objective of the CASA-1000 project is to provide for the export of the available summer electricity surpluses from Tajikistan

More information

CONCEPT NOTE. I. Background

CONCEPT NOTE. I. Background Regional Meeting on Financing Graduation Gaps of Asia-Pacific LDCs Jointly organized by The Government of Bangladesh The United Nations Economic and Social Commission for Asia and the Pacific (UNESCAP)

More information

What is Global Hunger Index & Position of India in the Index?

What is Global Hunger Index & Position of India in the Index? Frequently Asked Questions IC Division- 1. Global Hunger Index(GHI) What is Global Hunger Index & Position of India in the Index? The Global Hunger Index(GHI) is an Index which ranks countries on a 100-

More information

Project Preparation in Energy Sector in Nepal

Project Preparation in Energy Sector in Nepal Project Preparation in Energy Sector in Nepal SESSION IV : PROJECT PREPARATION SKILLS Presented at Regional Meeting on Sustainable Energy for Asia-Pacific Least Development Countries by Mahesh P. Acharya

More information

FINANCIAL ANALYSIS: PROJECT 1

FINANCIAL ANALYSIS: PROJECT 1 Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy

More information

Journal of Internet Banking and Commerce

Journal of Internet Banking and Commerce Journal of Internet Banking and Commerce An open access Internet journal (http://www.icommercecentral.com) Journal of Internet Banking and Commerce, April 2017, vol. 22, no. 1 THE SOURCES AND COMPONENTS

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 40280 September 2007 Islamic Republic of Afghanistan: Technical Assistance for Support for Economic Policy Management (Cofinanced by the Government of Australia

More information

CLIMATE INVESTMENT READINESS INDEX (CIRI) - A Tool to Assess Investment Climate for Climate Investments

CLIMATE INVESTMENT READINESS INDEX (CIRI) - A Tool to Assess Investment Climate for Climate Investments CLIMATE INVESTMENT READINESS INDEX (CIRI) - A Tool to Assess Investment Climate for Climate Investments Background Mitigating climate-change while addressing development needs will involve massive scale-up

More information

Role of Policies, Regulations and Laws to Promote Investment in the South Asian Power Sector Bhutan

Role of Policies, Regulations and Laws to Promote Investment in the South Asian Power Sector Bhutan Role of Policies, Regulations and Laws to Promote Investment in the South Asian Power Sector Bhutan South Asia Investor Workshop on Cross-Border Electricity Trade September 24-25, 2014 Delhi, India Overview

More information

Japanese ODA Loan. Ex-ante Evaluation

Japanese ODA Loan. Ex-ante Evaluation Japanese ODA Loan Ex-ante Evaluation 1. Name of the Program Country: The Islamic Republic of Pakistan Project: Energy Sector Reform Program Loan Agreement Signed: June 4, 2014 Loan Amount: 5,000 million

More information

Financing for Sustainable Urbanization

Financing for Sustainable Urbanization Place Date here Financing for Sustainable Urbanization Rana Hasan* Asian Development Bank The 4th Asian Think Tank Development Forum New Delhi, India October 27 2016 This presentation has benefited from

More information

Annual Activity Report-2012

Annual Activity Report-2012 Afghanistan Bangladesh Bhutan India Maldives Nepal Pakistan Sri Lanka South Asian Federation of Accountants (An Apex Body of SAARC) Annual Activity Report-2012 South Asian Federation of Accountants Activity

More information

GCF Readiness Programme Fiji

GCF Readiness Programme Fiji GCF Readiness Programme Fiji In Fiji, The Programme will target two important aspects of the GCF approach, access to funds and private sector engagement. In this context the Programme focuses on a range

More information

162,951,560 GOOD PRACTICES 1.9% 0.8% 5.9% INTEGRATING THE SDGS INTO DEVELOPMENT PLANNING BANGLADESH POPULATION ECONOMY US$

162,951,560 GOOD PRACTICES 1.9% 0.8% 5.9% INTEGRATING THE SDGS INTO DEVELOPMENT PLANNING BANGLADESH POPULATION ECONOMY US$ GOOD PRACTICES INTEGRATING THE SDGS INTO DEVELOPMENT PLANNING BANGLADESH In this brief: Country context The whole of society approach Institutional arrangements for achieving the SDGs The Development Results

More information

SARPEX Mock Exercise Results for selected 71 days

SARPEX Mock Exercise Results for selected 71 days SARPEX Mock Exercise Results for selected 71 days Afghanistan Pakistan Nepal Bhutan India Bangladesh Presented By: Puneet Chitkara Executive Director, KPMG Maldives... Sri Lanka Combined meeting of TF-2

More information

Short term indicators

Short term indicators Short term indicators Seminar on developing the capacity to produce economic statistics, including national accounts in accordance with the 2008 SNA, in the Asian and Pacific region 10-13 October 2011,

More information

Gains from Nepal-India CBET IRADe Study for SARI

Gains from Nepal-India CBET IRADe Study for SARI Gains from Nepal-India CBET IRADe Study for SARI South Asia Regional Initiative for Energy Integration(SARI/EI) Nov, 216 New Delhi Integrated Research and Action for Development (IRADe) 1 The Objective

More information

Bangladesh: Bangladesh India Electrical Grid Interconnection Project

Bangladesh: Bangladesh India Electrical Grid Interconnection Project Completion Report Project Number: 44192-013 Loan Numbers: 2661 and 3031 September 2016 Bangladesh: Bangladesh India Electrical Grid Interconnection Project This document is being disclosed to the public

More information

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT. Regional Public Financial Management Expert

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT. Regional Public Financial Management Expert TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT POST TITLE: AGENCY/PROJECT NAME: COUNTRY OF ASSIGNMENT: Regional Public Financial Management Expert Governance of Climate Change Finance team, UNDP Bangkok Regional

More information

SOUTH ASIA- REGIONAL COOPERATION OF TRADE FACILITATION: WAY FORWARD 1

SOUTH ASIA- REGIONAL COOPERATION OF TRADE FACILITATION: WAY FORWARD 1 Release as received SOUTH ASIA- REGIONAL COOPERATION OF TRADE FACILITATION: WAY FORWARD 1 Arvind Mehta India Asia Pacific Trade Facilitation Forum 2011 Trade facilitation is important to increase trade

More information

Scaling up Climate Finance (Improving The Impact Of Our Interventions)

Scaling up Climate Finance (Improving The Impact Of Our Interventions) Scaling up Climate Finance (Improving The Impact Of Our Interventions) 27 January, 2017 *: FY13-15 Overview & IFC s Strategy Climate Change Is threatening our developmental gains in South Asia Source:

More information

Workshop on Regional Electricity Trade and Market Development

Workshop on Regional Electricity Trade and Market Development Workshop on Regional Electricity Trade and Market Development Cross-border Electricity Trade and Tariffs April 23, 2014 Cross-border Electricity Trade (CBT) Flows within which part of the transmission

More information

Unit 4. Mixed Macroeconomic Performance of Nepal TULA RAJ BASYAL * ABSTRACT

Unit 4. Mixed Macroeconomic Performance of Nepal TULA RAJ BASYAL * ABSTRACT Unit 4 Mixed Macroeconomic Performance of Nepal TULA RAJ BASYAL * ABSTRACT Nepal continues to remain an Least Developed Country (LDC) with a per capita income of around US $ 300. The structure of the economy

More information

USAID-Funded Nepal Hydropower Development Project (NHDP)

USAID-Funded Nepal Hydropower Development Project (NHDP) USAID-Funded Nepal Hydropower Development Project (NHDP) Electricity Regulatory Commission and the Emerging Legal, Policy, and Regulatory Framework for Hydropower in Nepal Arun Anandan Regulatory Advisor

More information

Meeting on the Post-2015 Development Agenda for LDCs, LLDCs and SIDS in Asia and the Pacific: Nepal s Perspective

Meeting on the Post-2015 Development Agenda for LDCs, LLDCs and SIDS in Asia and the Pacific: Nepal s Perspective Meeting on the Post-2015 Development Agenda for LDCs, LLDCs and SIDS in Asia and the Pacific: Nepal s Perspective Yuba Raj Bhusal, Member Secretary National Planning Commission, Nepal Contents 1. Nepal:

More information

Economic and Social Survey of Asia and the Pacific 2017 Governance and Fiscal Management

Economic and Social Survey of Asia and the Pacific 2017 Governance and Fiscal Management Economic and Social Survey of Asia and the Pacific 217 Governance and Fiscal Management Launch and Panel Discussion on the UN Economic and Social Survey of Asia and the Pacific 217: Korean Perspective

More information

Key Considerations for Running Mock. Exercise

Key Considerations for Running Mock. Exercise Key Considerations for Running Mock Afghanistan Exercise Pakistan Nepal Bhutan Presented by: Yasir Altaf,, Associate director, KPMG India Bangladesh Maldives... Sri Lanka Combined meeting of TF-2 and TF-3,

More information

Investment Policy and Regulatory Framework in Nepal, FY ( )

Investment Policy and Regulatory Framework in Nepal, FY ( ) Investment Policy and Regulatory Framework in Nepal, FY 2073-74 (2016-2017) Introduction Due to narrow fiscal space in the government finance and feeble capacity of private sector, foreign investment is

More information

Secretariat of the Scaling Up Nutrition (SUN) Movement. Annual Financial Report of Expenditures 1 January December 2017.

Secretariat of the Scaling Up Nutrition (SUN) Movement. Annual Financial Report of Expenditures 1 January December 2017. Secretariat of the Scaling Up Nutrition (SUN) Movement Annual Financial Report of Expenditures 1 January 31 December 1 P a g e Contents About this Report... 3 Key financial elements of the year ()... 3

More information

Filed with the Iowa Utilities Board on May 31, 2017, E STATE OF IOWA DEPARTMENT OF COMMERCE UTILITIES BOARD

Filed with the Iowa Utilities Board on May 31, 2017, E STATE OF IOWA DEPARTMENT OF COMMERCE UTILITIES BOARD STATE OF IOWA DEPARTMENT OF COMMERCE UTILITIES BOARD IN RE: MIDAMERICAN ENERGY IN RE: DOCKET NOS. E-22269, E-22270, AND E-22271 DOCKET NO. E-22279 (consolidated) ITC MIDWEST LLC BRIEF BY THE MIDCONTINENT

More information

WORKSHOP ON TRANSMISSION SUPPORT AGREEMENTS

WORKSHOP ON TRANSMISSION SUPPORT AGREEMENTS WORKSHOP ON TRANSMISSION SUPPORT AGREEMENTS Indo-Nepal Transmission Interconnection Project Kathmandu, Nepal July 2009 John W. Gulliver John W. Gulliver Pierce Atwood LLP One Monument Square Portland,

More information

MUHAMMAD DAUD Ex GM Planning/Consultant Planning NTDC/ Member Pakistan Working Group for CASA For SAARC Workshop Lahore, 30th, September, 2015

MUHAMMAD DAUD Ex GM Planning/Consultant Planning NTDC/ Member Pakistan Working Group for CASA For SAARC Workshop Lahore, 30th, September, 2015 AN INTRODUCTION OF CASA- 1000 PROJECT BY MUHAMMAD DAUD Ex GM Planning/Consultant Planning NTDC/ Member Pakistan Working Group for CASA For SAARC Workshop Lahore, 30th, September, 2015 CASA-1000 PROJECT

More information

Climate Risk Management For A Resilient Asia-pacific Dr Cinzia Losenno Senior Climate Change Specialist Asian Development Bank

Climate Risk Management For A Resilient Asia-pacific Dr Cinzia Losenno Senior Climate Change Specialist Asian Development Bank Climate Risk Management For A Resilient Asia-pacific Dr Cinzia Losenno Senior Climate Change Specialist Asian Development Bank APAN Training Workshop Climate Risk Management in Planning and Investment

More information

DISASTER RISK FINANCING ADB Operational Innovations in South Asia

DISASTER RISK FINANCING ADB Operational Innovations in South Asia DISASTER RISK FINANCING ADB Operational Innovations in South Asia Erik Kjaergaard, Disaster Risk Management Specialist South Asia Department with input from Mayumi Ozaki, Senior Portfolio Management Specialist

More information

Aide Memoire. Diagnostic Technical Integration Study: Technical Mission to Zambia May 31 June 11, 2004

Aide Memoire. Diagnostic Technical Integration Study: Technical Mission to Zambia May 31 June 11, 2004 Aide Memoire Diagnostic Technical Integration Study: Technical Mission to Zambia May 31 June 11, 2004 1. The Main Technical Mission for the Diagnostic Trade Integration Study (DTIS) visited Zambia from

More information

3. The paper draws on existing work and analysis. 4. To ensure that this analysis is beneficial to the

3. The paper draws on existing work and analysis. 4. To ensure that this analysis is beneficial to the 1. INTRODUCTION AND BACKGROUND 1. The UNFCCC secretariat has launched a project in 2007 to review existing and planned investment and financial flows in a concerted effort to develop an effective international

More information

TERMS OF REFERENCE BASELINE SURVEY OF PRODUCTION CAPACITIES OF EDIBLE OIL MANUFACTURERS IN THE EAC BY 2017

TERMS OF REFERENCE BASELINE SURVEY OF PRODUCTION CAPACITIES OF EDIBLE OIL MANUFACTURERS IN THE EAC BY 2017 TERMS OF REFERENCE BASELINE SURVEY OF PRODUCTION CAPACITIES OF EDIBLE OIL MANUFACTURERS IN THE EAC BY 2017 1.0 The client The East African Business Council (EABC) is the apex body of business associations

More information

Synthesis report on the progress made in the implementation of the remaining elements of the least developed countries work programme

Synthesis report on the progress made in the implementation of the remaining elements of the least developed countries work programme United Nations FCCC/SBI/2014/INF.17 Distr.: General 23 October 2014 English only Subsidiary Body for Implementation Forty-first session Lima, 1 8 December 2014 Item 11(b) of the provisional agenda Matters

More information

StG16-1. Agenda. ADB/OECD Anti-Corruption Initiative for Asia and the Pacific. Meeting objectives. Background documents. Venue

StG16-1. Agenda. ADB/OECD Anti-Corruption Initiative for Asia and the Pacific. Meeting objectives. Background documents. Venue 16th Steering Group Meeting New Delhi, India, 27 September 2011 Agenda Public Management, Governance and Participation Division Asian Development Bank Anti-Corruption Division Organisation for Economic

More information

Ministry of Foreign Affairs of Denmark. Concept Note Danida Business Finance Project Development Facility

Ministry of Foreign Affairs of Denmark. Concept Note Danida Business Finance Project Development Facility Ministry of Foreign Affairs of Denmark Danida Concept Note Danida Business Finance Project Development Facility 5 May 2017 File No.: 2017-8006 1. CONTEXT... 3 2. PRESENTATION OF THE PROGRAMME... 5 3. MANAGEMENT

More information

BRAZIL MRP IMPLEMENTATION STATUS REPORT (ISR)

BRAZIL MRP IMPLEMENTATION STATUS REPORT (ISR) BRAZIL MRP IMPLEMENTATION STATUS REPORT (ISR) 1. SUMMARY INFORMATION Implementing Country/Technical Partner: Federative Republic of Brazil Reporting Period: From 10/01/2015 to 09/30/2016 Report Date: 10/04/2016

More information

The Addis Ababa Action Agenda of the Third. United Nations Capacity Development Programme on International Tax Cooperation

The Addis Ababa Action Agenda of the Third. United Nations Capacity Development Programme on International Tax Cooperation United Nations Capacity Development Programme on International Tax Cooperation Contents Link to the Addis Ababa Action Agenda and the 2030 Agenda for Sustainable Development 1 Mandate 2 Relationship with

More information

Achievements and Challenges

Achievements and Challenges LDCs Graduation in Asia-Pacific: Achievements and Challenges Ministerial Meeting of Asia-Pacific Least Developed Countries on Graduation and Post 2015 Development Agenda Kathmandu, Nepal 16-18 December

More information

ASIA-PACIFIC HIGH-LEVEL CONSULTATION ON FINANCING FOR DEVELOPMENT April 2015 Jakarta. Chair s summary

ASIA-PACIFIC HIGH-LEVEL CONSULTATION ON FINANCING FOR DEVELOPMENT April 2015 Jakarta. Chair s summary ASIA-PACIFIC HIGH-LEVEL CONSULTATION ON FINANCING FOR DEVELOPMENT 29-30 April 2015 Jakarta Chair s summary 1. The Asia-Pacific High-level Consultation on Financing for Development was held from 29 to 30

More information

29 November Organized by

29 November Organized by 29 November 2013 Royal Government of Cambodia National Committee for ESCAP Asia-Pacific Regional Workshop on Graduation Strategies from the Least Developed Country Category as part of the Implementation

More information

Conference on. Deepening Financial Sector Reforms and Regional Cooperation in South Asia. India Habitat Centre in Delhi on November 6 & 7, 2008

Conference on. Deepening Financial Sector Reforms and Regional Cooperation in South Asia. India Habitat Centre in Delhi on November 6 & 7, 2008 Conference on Deepening Financial Sector Reforms and Regional Cooperation in South Asia India Habitat Centre in Delhi on November 6 & 7, 2008 (2 nd ICRIER InWEnt Annual Conference) Background Financial

More information

(Blackline) VOLUME NO. III Page No. 878 SCHEDULING PROTOCOL

(Blackline) VOLUME NO. III Page No. 878 SCHEDULING PROTOCOL VOLUME NO. III Page No. 878 SCHEDULING PROTOCOL VOLUME NO. III Page No. 879 SCHEDULING PROTOCOL Table of Contents SP 1 SP 1.1 OBJECTIVES, DEFINITIONS AND SCOPE Objectives SP 1.2 Definitions SP 1.2.1 Master

More information

Report is prepared by: Members. SARI/EI-Task Force-1 (on Coordination of Laws, Regulations and Policies)

Report is prepared by: Members. SARI/EI-Task Force-1 (on Coordination of Laws, Regulations and Policies) Report is prepared by: SARI/EI-Task Force-1 (on Coordination of Laws, Regulations and Policies) Members Afghanistan Mr. Mohammad Humayoon Kohistani Energy Programming Director, Ministry of Energy and Water

More information

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS ASSIGNMENT TITLE: International Planning/Budgeting Expert Discussion Paper - Integration of the SDGs into Myanmar s Planning and Budgeting Frameworks DURATION:

More information

Financing the MDG Gaps in the Asia-Pacific

Financing the MDG Gaps in the Asia-Pacific Financing the MDG Gaps in the Asia-Pacific Dr. Nagesh Kumar Chief Economist, ESCAP And Director, ESCAP Subregional Office for South and South-West Asia, New Delhi 1 2 Outline Closing the poverty gap: interactions

More information

Economic and Social Council

Economic and Social Council United Nations E/CN.3/2016/10 Economic and Social Council Distr.: General 17 December 2015 Original: English Statistical Commission Forty-seventh session 8-11 March 2016 Item 3 (f) of the provisional agenda*

More information

Central Asia South Asia Electricity Transmission and Trade Project

Central Asia South Asia Electricity Transmission and Trade Project Central Asia South Asia Electricity Transmission and Trade Project Update on Progress and Recent Developments November 6, 2014 1 The CASA-1000 project is the most advanced initiative on regional cooperation

More information

Simple Macroeconomic Model for MDGs based Planning and Policy Analysis. Thangavel Palanivel UNDP Regional Centre in Colombo

Simple Macroeconomic Model for MDGs based Planning and Policy Analysis. Thangavel Palanivel UNDP Regional Centre in Colombo Simple Macroeconomic Model for MDGs based Planning and Policy Analysis Thangavel Palanivel UNDP Regional Centre in Colombo Outline of the presentation MDG consistent Simple Macroeconomic framework (SMF)

More information

Armenia: Infrastructure Sustainability Support Program

Armenia: Infrastructure Sustainability Support Program Technical Assistance Report Project Number: 46220 Policy and Advisory Technical Assistance (PATA) December 2012 Armenia: Infrastructure Sustainability Support Program The views expressed herein are those

More information

CGN INAUGURAL GREEN BOND ISSUANCE

CGN INAUGURAL GREEN BOND ISSUANCE CGN INAUGURAL GREEN BOND ISSUANCE Table of Contents 1. Independent Limited Assurance Statement 1 Appendix: Green Bond Management Statement 3 2. Green Bond Framework 6 Page 1 of 13 Page 2 of 13 Appendix

More information

CC is a development issue - not just an environmental concern CC impacts on human development, economic growth, poverty alleviation and the

CC is a development issue - not just an environmental concern CC impacts on human development, economic growth, poverty alleviation and the CC is a development issue - not just an environmental concern CC impacts on human development, economic growth, poverty alleviation and the achievement of MDGs Long term: human lives and livelihoods are

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK TAR:LAO 29284 ASIAN DEVELOPMENT BANK TECHNICAL ASSISTANCE TO ThE LAO PEOPLE'S DEMOCRATIC REPUBLIC FOR ThE CORPORATE AND FINANCIAL DEVELOPMENT OF ELECTRICIT DU LAO LI LI May 1996 - -I CURRENCY EQUIVALENTS

More information

Contents Introduction Chapter 1 - Security Policy... 6

Contents Introduction Chapter 1 - Security Policy... 6 Policy statement Contents Introduction... 5 PURPOSE... 5 SYSTEM OPERATOR POLICIES TO ACHIEVE THE PPOS and dispatch objective... 5 Avoid Cascade Failure... 5 Frequency... 6 Other Standards... 6 Restoration...

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

Infrastructure Financing Challenges in Southeast Asia

Infrastructure Financing Challenges in Southeast Asia Infrastructure Financing Challenges in Southeast Asia Alfredo Perdiguero Director, Regional Cooperation and Coordination Division Southeast Asia Department Asian Development Bank Policy Dialogue on Infrastructure

More information

FUNCTIONS AND STRUCTURE OF THE PLANNING COMMISSION ( IN BRIEF )

FUNCTIONS AND STRUCTURE OF THE PLANNING COMMISSION ( IN BRIEF ) FUNCTIONS AND STRUCTURE OF THE PLANNING COMMISSION ( IN BRIEF ) Planning Commission was set up in March, 1950. A copy of the Resolution of Government of India has been given in Unit I of this document.

More information

1. Introduction. Food Security and Environment Protection, Economic Cooperation and Social Development Peace and Security and Humanitarian Affairs

1. Introduction. Food Security and Environment Protection, Economic Cooperation and Social Development Peace and Security and Humanitarian Affairs TERMS OF REFERENCE FOR CONSULTANCY TO UNDERTAKE REGIONAL TRAINING NEEDS ASESSMENT ON REGIONAL TRADE AND INTEGRATION ISSUES AS SUPPORT TO CAPACITY BUILDING IN TRADE NEGOTIATION SKILLS. 1. Introduction The

More information

September Preparing a Government Debt Management Reform Plan

September Preparing a Government Debt Management Reform Plan September 2012 Preparing a Government Debt Management Reform Plan Introduction Preparing a Government Debt Management Reform Plan The World Bank supports the strengthening of government debt management

More information

MINISTRY OF FINANCE AND ECONOMIC AFFAIRS

MINISTRY OF FINANCE AND ECONOMIC AFFAIRS MINISTRY OF FINANCE AND ECONOMIC AFFAIRS Contents 1. PREAMBLE 4 2. THE POLICY OBJECTIVES 5 3. DEFINITION OF PPP 5 4. BENEFITS OF PPP 6 5. KEY GUIDING PRINCIPLES 7 6. SCOPE AND APPLICATION OF PPP PROJECTS

More information

Current status of the implementation of the results of TNAs including success stories.

Current status of the implementation of the results of TNAs including success stories. Technology Executive Committee 12 March 2013 Fifth meeting TEC/2013/5/7 Current status of the implementation of the results of TNAs including success stories. Summary: This background paper informs on

More information

3 rd Meeting of Task Force 1 on Coordination of Policy, Legal and Regulatory Framework. 4-5 June 2014, Thimphu, Bhutan

3 rd Meeting of Task Force 1 on Coordination of Policy, Legal and Regulatory Framework. 4-5 June 2014, Thimphu, Bhutan Study on Review of Electricity Laws, Regulations, Policies (EL&R&P) & Legal Structure of South Asian Countries (SAC) to Identify Areas that can Hinder Cross Border Electricity Trade (CBET) and to recommend

More information

Effectiveness of Aid for Trade

Effectiveness of Aid for Trade Effectiveness of Aid for Trade Lessons from the Philippines Regional Workshop on Promoting Intraregional Trade, Investment and Connectivity through Bankable Aid for Trade Projects : Addressing Developmental

More information

VACANCY ANNOUNCEMENT

VACANCY ANNOUNCEMENT VACANCY ANNOUNCEMENT Financial Management Officer, P-3 Administrative Services (AS) Programme Deadline for application Announcement number Expected date for entry on duty Duration of appointment Duty Station

More information

REPORT 2015/115 INTERNAL AUDIT DIVISION

REPORT 2015/115 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/115 Audit of the statistics subprogramme and related technical cooperation projects in the Economic Commission for Africa Overall results relating to effective management

More information

NPCC Regional Reliability Reference Directory # 5 Reserve

NPCC Regional Reliability Reference Directory # 5 Reserve NPCC Regional Reliability Reference Directory # 5 Task Force on Coordination of Operations Revision Review Record: December 2 nd, 2010 October 11 th, 2012 Adopted by the Members of the Northeast Power

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK . ASIAN DEVELOPMENT BANK TAR: BAN 35242 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR PREPARING THE GAS SECTOR DEVELOPMENT PROJECT April 2004 CURRENCY EQUIVALENTS (as of 21 April 2004)

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE (CAPITAL MARKET) 1. Sector Performance, Problems, and Opportunities 1

SECTOR ASSESSMENT (SUMMARY): FINANCE (CAPITAL MARKET) 1. Sector Performance, Problems, and Opportunities 1 Capital Market Development Program (RRP SRI 49365) Sector Road Map SECTOR ASSESSMENT (SUMMARY): FINANCE (CAPITAL MARKET) 1. Sector Performance, Problems, and Opportunities 1 1. Market development. From

More information

Journal of Peace Studies Vol. 5, Issue 1, January-February, SAARC Moving Towards SAFTA: Prospects of India s Regional Trade. Rajashree Kanungo*

Journal of Peace Studies Vol. 5, Issue 1, January-February, SAARC Moving Towards SAFTA: Prospects of India s Regional Trade. Rajashree Kanungo* Journal of Peace Studies Vol. 5, Issue 1, January-February, 1998 SAARC Moving Towards SAFTA: Prospects of India s Regional Trade Rajashree Kanungo* *Rajashree Kanungo is a Research Scholar in School of

More information

MODALITY FOR FUNDING ADDITIONAL ACTIVITIES UNDER THE PMR: DRAFT PROPOSAL FOR DISCUSSION. PMR Note PA

MODALITY FOR FUNDING ADDITIONAL ACTIVITIES UNDER THE PMR: DRAFT PROPOSAL FOR DISCUSSION. PMR Note PA MODALITY FOR FUNDING ADDITIONAL ACTIVITIES UNDER THE PMR: DRAFT PROPOSAL FOR DISCUSSION PMR Note PA13 2015-4 October 14, 2015 I. INTRODUCTION 1. In an effort to further facilitate discussions on the PMR

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 36. Congestion Revenue Rights... 3 36.1 Overview Of CRRs And Procurement Of CRRs... 3 36.2 Types Of CRR Instruments... 3 36.2.1 CRR Obligations... 3 36.2.2 CRR Options... 3 36.2.3 Point-To-Point

More information

UNFCCC Expert Meeting on Loss and Damage from Climate Change

UNFCCC Expert Meeting on Loss and Damage from Climate Change UNFCCC Expert Meeting on Loss and Damage from Climate Change Asia Regional Workshop Bangkok, Thailand 27 29 August 2012 Session 4 Approaches to Address Loss and Damage at National Level Charles Rodgers

More information

Vietnam: IMF-World Bank Relations *

Vietnam: IMF-World Bank Relations * -1- Vietnam: IMF-World Bank Relations * Partnership in Vietnam s Development Strategy The government of Vietnam s development strategy is set forth in its Comprehensive Poverty Reduction and Growth Strategy

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE

SECTOR ASSESSMENT (SUMMARY): FINANCE Country Partnership Strategy: Bhutan, 2014 2018 SECTOR ASSESSMENT (SUMMARY): FINANCE Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Bhutan s finance sector developed steadily during

More information

New Member Cost Allocation Review Process. Prepared by: COST ALLOCATION WORKING GROUP

New Member Cost Allocation Review Process. Prepared by: COST ALLOCATION WORKING GROUP New Member Cost Allocation Review Process Prepared by: COST ALLOCATION WORKING GROUP TABLE OF CONTENTS 1. HISTORY AND BACKGROUND... 1 2. PURPOSE / GOAL STATEMENT... 3 3. OVERVIEW OF PROCESS... 3 4. NEW

More information

INFRASTRUCTURE NEEDS

INFRASTRUCTURE NEEDS INFRASTRUCTURE NEEDS Key messages Developing Asia needs $26 trillion (in 2015 prices), or $1.7 trillion per year, for infrastructure investment in 2016-2030 Without climate change mitigation and adaptation,

More information

South Asia Regional Initiative for Energy Integration (SARI/EI)

South Asia Regional Initiative for Energy Integration (SARI/EI) Request for Proposal (RFP) For Study on Developing Regional Dispute Settlement Framework/Procedure and Mechanism for Advancing Cross Border Electricity Trade in South Asian Region South Asia Regional Initiative

More information

Maldives: Enhancing Tax Administration Capacity

Maldives: Enhancing Tax Administration Capacity Completion Report Project Number: 47150-001 Technical Assistance Number: 8525 August 2018 Maldives: Enhancing Tax Administration Capacity This document is being disclosed to the public in accordance with

More information