1 Cooperation between Managing Authority and Paying Agency RDP Brussels, September 2010 Ministry of Agriculture and Rural Development Republic of Poland 1
2 Programme budget 17,4 bn,, of which the EAFRD contribution 13,4 bn Axis 1 (11 measures) 43% of total budget Axis 2 (4 measures) 30,9% Axis 3 (4 measures) 20,1% Axis 4 (3 measures) 4,5% Technical Assistance 1,5% Progress of implementation of RDP* Over 3,5 million of applications submitted in all measures of the Programme Over 54% of available funds have been contracted Over 4,1 billion euros transferred to beneficiaries, Financial execution of the Programme 23,94% *financial data as of September, 17th 2010
3 Managing Authority (MA) Minister of Agriculture and Rural Development (MARD) National Rural Network National Network Unit (Secretariat) - in the structure of the MARD 16 Regional Network Units in the structures of 16 Regional Self Governments Paying Agency 19 Implementing Entities (IE) Certifying Body (CB) Agency for Restructuring and Modernisation of Agriculture (ARMA) -ARMA -Agricultural Market Agency (AMA), -16 Regional Self Governments (RSG SG) -Foundation of Assistance Programmes for Agriculture (FAPA) General Inspector of f Fiscal Control (Ministry of Finance) Coordinating Body Minister of Agriculture and Rural Development (MARD)
4 Implementing Entities performing tasks of the MA ARMA 15 measures RSG 6 measures AMA 1 measure FAPA 1 measure 4
5 The scope of cooperation between MA and PA } Checks of the performance of tasks by IE } Guidelines concerning tasks of MA } Audit of management and control system } Procedures and explanations } Training for IE } Monitoring of RDP } Programme changes 5
6 Examples of good practices } Mutual passing of information on the results of checks carried out by MA and AP in IE } MA gives opinion on implementation procedures prepared by PA for some RDP measures } Agreeing the way to implement the recommendations of the audits of the management and control system } Passing on, to the attention of each other, explanations about rules and procedures } Publishing on MARD and ARMA websites updated information on RDP } The common system of training for trainers in the IE } Representatives of PA and IE take part in sessions of the Monitoring Committee } Cooperation concering detailed rules for measures implementation } PA and IE may submit proposals concerning RDP changes 6
7 Checks in IE } MA carries out checks in IE concerning performance of tasks delegated by MA } PA carries out checks in IE (RSG, FAPA, AMA) concerning performance of tasks delegated by MA and PA } Checks carried out by PA are planned according to the schedule consulted and approved by MA } MA and PA share information on the results of checks carried out 7
8 Guidelines concerning tasks of MA } MA issues to the IE guidelines concerning tasks delegated by MA } The scope of the gudelines covers: procedures for handling applications for support, requirements for the organizational, technical and personnel conditions to be met by organizational units (OU) of the IE that carry out checks requirements for security of information, data and documents } Draft guidelines are consulted with PA 8
9 Audit of management and control system } PA carries out audit of management and control system in IE (RSG, FAPA, AMA), according to the schedule } MA may ask PA to conduct additional audit task } MA receives schedule of audit tasks and information on the outcome of audit tasks carried out by PA 9
10 } PA is responsible for the preparation of procedures } Procedures concernig the tasks of MA are accepted by MA and passed on to RSG to the attention of PA } Procedures concernig tasks of PA are passed on by PA to RSG, to the attention of MA } Explanations on granting aid and eligibility rules, performing tasks of MA - provided by MA and passed on to the attention of PA } Explanations on performing tasks of the PA - provided by PA and passed on to the attention of MA
11 Setting the scope of training Selection of trainers Training of trainers MA IE MA & PA Trainings in IE Issuing certificates Exam for the trainers: - preparation of tests - validation of tests trainers MA Around 200 trainers have successfully completed the trainings organized by MA & PA
12 Monitoring of the RDP Process collective current reports collective half-yearly and annual reports final report AMA ARMA MARD (DRD) Monitoring and Reporting Division Monitoring Committee RSG annual reports Resolution final report FAPA PROWie ci European Commission 12
13 } PROWie ci a monthly publication devoted to the RDP and presenting updated information on implementation of the Programme } NRN Bulletin
14 } government representatives, } local government representatives, } social and economic partners representatives including nongovernmental organizations connected with environmental protection. In Monitoring Committee sessions as observes take part representatives of: } Agency for Restructuring and Modernisation of Agriculture, } Agricultural Market Agency, } Foundation of Assistance Programmes for Agriculture
15 Implemented mechanisms concerning Clear division of tasks and responsibilities Flow of information On-going cooperatrion between MA and PA, providing coherent approach in the area of Programme implementation Great number of staff with experience in implementation of similar programmes (SAPARD, SOP AGRI, RDP ) is a great value
16 Thank you for your attention Micha Marciniak Director Department of Rural Development Ministry of Agriculture and Rural Development Ministry of Agriculture and Rural Development (MA) - Agency for Restructuring and Modernisation of Agriculture (PA) - National Rural Network
Instrument for Pre-accession Assistance (IPA): the Rural Development Component IPARD
Instrument for Pre-accession Assistance (IPA): the Rural Development Component IPARD Elitsa Yanakieva European Commission, DG AGRI, Unit for Pre-accession assistance 5th meeting of EU-the former Yugoslav
More informationLump sum under preparatory support and flat rate under running and animation costs (SCOs for LAGs under RDP in Poland)
Lump sum under preparatory support and flat rate under running and animation costs (SCOs for LAGs under RDP 2014-2020 in Poland) Łukasz Tomczak Ministry of Agriculture and Rural Development in Poland Simplified
More information04.02 EAGGF EAGGF - p.1
04.02 EAGGF 1. Basic information 1.1. CRIS Number : 2002/000-605-04.02 Twinning number: PL02-AG-05 1.2. Title: EAGGF 1.3. Sector: Agriculture 1.4. Location: Poland 2. Objectives: 2.1. Overall objective:
More informationThe integrated supply-chain projects in Emilia-Romagna region, Italy
This series of informative fiches aim to present, in summary, examples of practices and approaches that EU Member States and Regions have put in place in order to implement their rural development programmes
More informationDelivery mechanisms of rural development policy in Poland. Katarzyna Zawalińska, IRWiR Polish Academy of Sciences
Delivery mechanisms of rural development policy in Poland Katarzyna Zawalińska, IRWiR Polish Academy of Sciences December, 2010 Thematic Working Group 4 The overall mandate of TWG4 Delivery mechanisms
More informationLEADER/CLLD - COMMUNITY LED LOCAL DEVELOPMENT. Alina Cunk Perklič, May 19th 2017
LEADER/CLLD - COMMUNITY LED LOCAL DEVELOPMENT Alina Cunk Perklič, May 19th 2017 HISTORY CRPOV PROGRAMMES: 1991-1996 Regional rural development programmes: 1996 2003 SAPARD (pre accession): no LEADER measure
More informationImplementing new challenges type measures in Finland
Implementing new challenges type measures in Finland 2 nd Seminar on RDP Management 2007-2013, 28-29 September 2010 Brussels Tiina Malm, Ministry of Agriculture and Forestry, Finland Rural Development
More informationTHE COUNCIL OF MINISTERS DECREED:
DECREE 182 of the Council of Ministers dated 21 July, 2006 on the Establishment of Monitoring Committees of the National Strategic Reference Framework and the Operational Programmes Co-Financed by the
More informationDECREE No 104 OF 17 MAY 2008 ON ORGANIZATION AND COORDINATION OF MANAGEMENT OF RESOURCES FROM THE FUNDS OF THE EUROPEAN UNION
DECREE No 104 OF 17 MAY 2008 ON ORGANIZATION AND COORDINATION OF MANAGEMENT OF RESOURCES FROM THE FUNDS OF THE EUROPEAN UNION Effective as of 20 May 2008 Promulgated, SG No 47 of 20 May 2008, as amended,
More informationDG AGRI follow-up as regards the ECA report on Leader (Special Report No. 5 / 2010)
C Judith Bermúdez Morte DG AGRI follow-up as regards the ECA report on Leader (Special Report No. 5 / 2010) FARNET MA meeting 27 January 2011 Pedro Brosei, DG AGRI Unit G1 Structure of presentation 1)
More informationClick to edit Master title style Enabling LEADER through improved. funding mechanisms
Enabling LEADER through improved Click to edit Master text styles funding mechanisms Financing for LEADER/CLLD: Opportunities and relevant practices 12 November 2013 Peter Toth, ENRD CP Pedro Brosei, DG
More informationChallenges Of The Indirect Management Of Eu Funds In Albania
Challenges Of The Indirect Management Of Eu Funds In Albania Neritan Totozani, Msc Central Financing & Contracting Unit, Ministry of Finance, Albania doi: 10.19044/esj.2016.v12n7p170 URL:http://dx.doi.org/10.19044/esj.2016.v12n7p170
More informationThe EAFRD: Activities of the European Network for Rural Development on the delivery system
The EAFRD: Activities of the European Network for Rural Development on the delivery system Jean-Michel Courades European Commission DG AGRI G3 Farnet Meeting of Managing Authorities, 28-29 September 2010,
More informationon coordinatine aid to the applicant countries in the framework of the pre-accession strateey
COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 18.03.1998 COM(1998) 150 final 98/0094 (CNS) Proposal for a COUNCIL REGULATION (EC) on coordinatine aid to the applicant countries in the framework of the
More informationLEADER implementation update Leader/CLLD subgroup meeting Brussels, 21 April 2015
LEADER 2007-2013 implementation update Leader/CLLD subgroup meeting Brussels, 21 April 2015 #LeaderCLLD 2,416 2,416 8.9 Progress on LAG selection in the EU (2007-2013) 3.000 2.500 2.000 2.182 2.239 2.287
More informationRepublic of Serbia BILATERAL SCREENING Chapter 22 Regional Policy and Coordination of Structural Instruments INSTITUTIONAL FRAMEWORK
Republic of Serbia BILATERAL SCREENING Chapter 22 Regional Policy and Coordination of Structural Instruments INSTITUTIONAL FRAMEWORK PART I DESIGNATION OF AUTHORITIES RESPONSIBLE FOR THE PROGRAMMING AND
More informationCHAPTER 4. Overview of the EU Rural Development Policy
CHAPTER 4. Overview of the EU Rural Development Policy 2007-2013 Council Regulation (EC) No 1698/2005 of 20 September 2005 on support for rural development by the European Agricultural Fund for Rural Development
More informationENRD Seminar. Seizing opportunities for improving. Laurent Vignaud, Agence de Service et de Paiement. ENRD seminar Seizing opportunities for improving
ENRD Seminar Laurent Vignaud, Agence de Service et de Paiement ENRD seminar 1 Workshop n 3 Coordination and capacity building challenges in Member States with regional RDPs ENRD seminar 2 Overview of the
More informationLEADER implementation update Leader/CLLD subgroup meeting Brussels, 21 April 2015
LEADER 2007-2013 implementation update Leader/CLLD subgroup meeting Brussels, 21 April 2015 #LeaderCLLD 2,416 2,416 8.9 Progress on LAG selection in the EU (2007-2013) 3 000 2 500 2 000 2 182 2 239 2 287
More informationCOMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL
COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 02.05.2005 COM(2005) 178 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL GENERAL REPORT ON PRE-ACCESSION ASSISTANCE (PHARE ISPA
More informationPreparatory support... 4 Q. In the context of multi-funded CLLD, can preparatory support be funded by one Fund only?. 4
LEADER/CLLD FAQs Contents LEADER/CLLD implementation...4 Preparatory support... 4 Q. In the context of multi-funded CLLD, can preparatory support be funded by one Fund only?. 4 Q. Could preparatory support
More informationImplementing Strategic Environmental Assessment (SEA) at Agriculture and Agri-Food Canada
Implementing Strategic Environmental Assessment (SEA) at Agriculture and Agri-Food Canada Kathy Wilson, Agri-Environmental Policy Bureau Global Conference on SEA, Prague, Czech Republic September 26-30,
More informationFOCUS AREA 2A: Improving economic performance of all farms, farm restructuring and modernisation
Rural Development Programmes 2014-2020: Key facts & figures FOCUS AREA 2A: Improving economic performance of all farms, farm restructuring and modernisation 1. Introduction Focus Area (FA) 2A is designed
More informationCOMMISSION DECISION. Having regard to the Treaty establishing the European Community,
EN EN EN COMMISSION DECISION of approving the programme for agriculture and rural development of the Republic of Croatia under the instrument for pre-accession assistance (IPA) THE COMMISSION OF THE EUROPEAN
More information23 January Special Report No 16/2017. Rural Development Programming: less complexity and more focus on results needed
23 January 2018 EP Com. on Agriculture and Rural Development Special Report No 16/2017 Rural Development Programming: less complexity and more focus on results needed Janusz Wojciechowski ECA Member Page
More informationFINANCIAL ENGINEERING SCHEMES IN ROMANIA. Belgrade, East Agri meeting, June 19 th, 2014
FINANCIAL ENGINEERING SCHEMES IN ROMANIA Belgrade, East Agri meeting, June 19 th, 2014 Common issues Banks Reluctance in lending loans for agriculture Low average loan size for agriculture per borrower
More informationDecree No 151 of July 16, 2012 on the adoption of the Rules of Organization and Procedure of State Fund Agriculture
Decree No 151 of July 16, 2012 on the adoption of the Rules of Organization and Procedure of State Fund Agriculture Decree No 151 of July 16, 2012, on the adoption of the Rules of Organization and Procedure
More information3 rd Call for Project Proposals
IPA CROSS-BORDER PROGRAMME "GREECE THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA 2007-2013" 3 rd Call for Project Proposals Project Selection Criteria CCI: 2007 CB 16 I PO 009 The following Project Selection
More informationEU Funds investments and projections, preparation for the period December, 2014
EU Funds investments and projections, preparation for the 2014-2020 period December, 2014 Content 1.Implementation progress 2.Risks 3.Progress of EU funds planning documents 2014-2020 4.Preparation for
More informationOireachtas Joint Committee on Agriculture, Food and the Marine. Opening Statement by Minister Creed
Oireachtas Joint Committee on Agriculture, Food and the Marine Opening Statement by Minister Creed Review of Spending under Ireland s Rural Development Programme 2014-2020 I am very pleased to meet with
More informationREPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL
EUROPEAN COMMISSION Brussels, 27.9.2017 COM(2017) 554 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL 10th FINANCIAL REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND
More information2014 NRN Mapping Report: NRNs in transition. (March 2014)
2014 NRN Mapping Report: NRNs in transition (March 2014) Table of Contents 1. Introduction... 4 2. Organization of the support for policy rural networks from 2014... 5 3. Operational setup of the NSUs
More informationCLLD planning in & LEADER Cooperation
CLLD planning in 2014-2020 & LEADER Cooperation Elena Maccioni, ENRD CP Heraklion, 30 June 2015 #LeaderCLLD LEADER evolution LEADER + 2000-2006 LEADER/Axis 2007-2013 2,402 LAGs Mainstreamed LEADER/Measure
More informationMarche Region. Ex Ante Evaluation report. Executive summary. Roma, June 2015
Marche Region 2014-2020 COMMITTENTE RDP for Marche Ex Ante Evaluation report Roma, June 2015 Executive summary EXECUTIVE SUMMARY Introduction The Ex Ante Evaluation (EAE) of the Rural Development Programme
More informationCompliance audit of the Managing Authority of Estonia Russia Cross- Border Cooperation Programme
Compliance audit of the Managing Authority of Estonia Russia Cross- Border Cooperation Programme Audit report No III-1/2016 13/10/2017 TABLE OF CONTENTS 1 Introduction... 3 1.1 Objective of the audit report...
More informationFAQs Selection criteria
FAQs Selection criteria - Version: 12 July 2016 - Contents 1. Background and Overview...3 2. FAQs...4 2.1. FAQs by topic... 4 2.1.1 General aspects... 4 2.1.2 Eligibility and selection criteria... 4 2.1.3
More informationStandard Summary Project Fiche. The project meets the following Accession Partnership priorities:
Standard Summary Project Fiche 1. Basic Information: 1.1 CRIS Number: BG2003/004-937.10.04 1.2 Title: Setting up a coherent system for the Structural Funds and the Cohesion Fund in Bulgaria for the Managing
More informationLITHUANIAN EXPERIENCE IN IMPLEMENTING EUSBSR
LITHUANIAN EXPERIENCE IN IMPLEMENTING EUSBSR 12 July 2017 Tekstas European Parliament REGI Committee Workshop on EU macro-regional strategies CONTENT 2 Lithuanian experience in implementing EUSBSR Legal
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL COMMUNICATION Representations in the Member States Edinburgh
European Commission EUROPEAN COMMISSION DIRECTORATE-GENERAL COMMUNICATION Representations in the Member States Edinburgh 25/08/2015 Dear Mr Martin, Paul Martin MSP Convener to the Public Audit Committee
More informationCOMMISSION STAFF WORKING DOCUMENT. on the assessment of root causes of errors in the implementation of rural development policy and corrective actions
EUROPEAN COMMISSION Brussels, 27.6.2013 SWD(2013) 244 final COMMISSION STAFF WORKING DOCUMENT on the assessment of root causes of errors in the implementation of rural development policy and corrective
More informationPRESSNOTE DOCUMENTATION. Social Protection Reform Project Component 1: Training in Spain, 19 June/3 July 2016
PRESSNOTE DOCUMENTATION EU-China /490 "Training in Spain" from 19 June to 3 July The European Union-China has organised a training activity in Spain dealing with population ageing and pension reform Spain
More informationCOMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION
EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, C(2007) NOT FOR PUBLICATION COMMISSION DECISION of [ ] adopting the "Bulgaria- the former Yugoslav Republic of Macedonia IPA cross-border programme"
More informationIspa will have until 2006 an annual budget of about 1,040m (expressed in 1999 price).
15 June 2000 The Instrument for Structural Policies for Pre-accession (Ispa) is the European Commission s instrument to help the ten Central European candidate countries to adapt to the environmental and
More informationDRAFT GUIDANCE FICHE FOR DESK OFFICERS PROGRAMMING OF TECHNICAL ASSISTANCE AT THE INITIATIVE OF THE MEMBER STATES VERSION 2 25/06/2014
DRAFT GUIDANCE FICHE FOR DESK OFFICERS PROGRAMMING OF TECHNICAL ASSISTANCE AT THE INITIATIVE OF THE MEMBER STATES VERSION 2 25/06/2014 Regulation Common Provisions Regulation (N 1303/2013) European Territorial
More informationMacro-regional conference on EAFRD financial instruments for agriculture and rural development in
Macro-regional conference on EAFRD financial instruments for agriculture and rural development in 2014-2020 Mr Nivelin Noev Policy expert DG Agriculture and Rural Development European Commission #ficompass
More informationThe ex ante evaluation of SWOT and needs assessment prerequisite for a sound RDP intervention logic?
B o n no e r EN v a lu N a tio E n evn A L The ex ante evaluation of SWOT and needs assessment prerequisite for a sound RDP intervention logic? SWOT analysis, needs assessment and priorities of rural development
More informationFINANCIAL MANAGEMENT OF THE EUROPEAN AGRICULTURAL FUNDS
FINANCIAL MANAGEMENT OF THE EUROPEAN AGRICULTURAL FUNDS Agenda Introduction (slides 3-7) Principles of shared financial management (slides 8-17) Financial management of EAGF (slides 18-22) Financial management
More informationThe main objectives of the eu rural development policy for
The main objectives of the eu rural development policy for 2014-2020 PhDs. Mihai Dinu Bucharest University of Economic Studies, Bucharest, Romania mihai.dinu@ymail.com ABSTRACT In this article will be
More informationAnnex 1 Citizen s summary 1
Programming process Annex 1 Citizen s summary 1 The process of preparation of the Cooperation Programme was coordinated by the Managing Authority (Ministry of Regional Development and EU Funds of the Republic
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL FOR AGRICULTURE AND RURAL DEVELOPMENT SUMMARY REPORT
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR AGRICULTURE AND RURAL DEVELOPMENT Directorate G. Horizontal aspects of rural development G.3. European Network and monitoring of rural development policy SUMMARY
More informationExperience with the Development and Carrying-out of CAP Audits
Experience with the Development and Carrying-out of CAP Audits Auditing the CAP from the European Commission s Perspective Michael Niejahr European Commission Directorate General for Agriculture and Rural
More informationIMPACT ASSESSMENT OF THE DRAFT EU STRUCTURAL FUNDS REGULATIONS
This research was performed by a group of authors lead by H. Brožaitis from the public non-profit organisation Public Policy and Management Institute on the order of the Prime Minister Office of the Republic
More informationPaying agency and Integrated Administrative and Control System (IACS)
Montenegro Institutional Development and Agricultural Strengthening Project (MIDAS) Workshop: Direct payments and IACS pilot project Paying agency and Integrated Administrative and Control System (IACS)
More informationCommunication, Legal Affairs & Civil Protection Protecting the Natural Environment Unit: Nature and Biodiversity
DG Environment Commissioner: Stavros Dimas Director-General: Mogens Peter Carl Direction A: Direction B: Direction C: Direction D: Direction E: Direction F: Direction G: Communication, Legal Affairs &
More informationThe European Agricultural Fund for Rural Development. Financial instruments
advancing with ESIF financial instruments The European Agricultural Fund for Rural Development co-funded by the European Agricultural Fund for Rural Development are a sustainable and efficient way to invest
More informationIntegration of biodiversity into EU Funding
Integration of biodiversity into EU Funding Brussels 05 June 2013 Peter Torkler, WWF torkler@wwf.de Presentation based on: http://ec.europa.eu/environment/integration/pdf /ENEA%20BiodivFINAL%2002042013.pdf
More informationItalian Partnership Agreement and Community-Led Local Development
Italian Partnership Agreement and Community-Led Local Development Fisheries CLLD perspective and implications for OPs Dr. Michele Lariccia The public debate about European fund for the next period 2014-2020
More informationMontenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Montenegro Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 15 ARCHIVED on 26-May-2017 ISR27925 Implementing Agencies:
More informationCOTOVELEA Alexandru Răzvan
Europass Curriculum Vitae Personal information First name(s) / Surname(s) Address(es) Telephone(s) Fax(es) E-mail Nationality Date of birth Gender Desired employment / Occupational field Work experience
More informationSTRATEGIC PLANNING AT CANTONAL LEVEL STEP CLOSER TO EU: CANTON SARAJEVO EXAMPLE
DOI 10.5644/PI2013-153-17 STRATEGIC PLANNING AT CANTONAL LEVEL STEP CLOSER TO EU: CANTON SARAJEVO EXAMPLE Emir Kurtović * Senad Softić ** Maida Fetahagić *** Gordana Memišević **** Abstract This article
More informationSTRATEGY OF PUBLIC INTERNAL FINANCIAL CONTROL DEVELOPMENT IN THE REPUBLIC OF SERBIA FOR THE PERIOD OF
Ministry of Finance STRATEGY OF PUBLIC INTERNAL FINANCIAL CONTROL DEVELOPMENT IN THE REPUBLIC OF SERBIA FOR THE PERIOD OF 2017-2020 www.mfin.gov.rs REPUBLIC OF SERBIA MINISTRY OF FINANCE TABLE OF CONTENTS
More informationCommission to recover 54.3 million of CAP expenditure from the Member States
EUROPEAN COMMISSION - PRESS RELEASE Commission to recover 54.3 million of CAP expenditure from the Member States Brussels, 16 February 2012 A total of 115.2 million of EU agricultural policy funds unduly
More informationGLOSSARY Programming EUROPEAN SOCIAL FUND AND EMPLOYMENT STRATEGY. Community Support Framework (CSF)
CARDS 2004 Local Partnerships for Employment Phase 2 This project is funded by the European Union GLOSSARY 2000-2006 EUROPEAN SOCIAL FUND AND EMPLOYMENT STRATEGY Community Support Framework (CSF) The CSF,
More information3. PRESENTATION OF MAJOR ERROR RATES CAUSES AND CORRECTIVE ACTION REPORT
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR AGRICULTURE AND RURAL DEVELOPMENT Directorate G. Horizontal aspects of rural development G.3. European Network and monitoring of rural development policy Brussels,
More informationSenior Officials Conference on the European Neighbourhood Programme for Agriculture and Rural Development (ENPARD) DRAFT
Senior Officials Conference on the European Neighbourhood Programme for Agriculture and Rural Development (ENPARD) DRAFT organised in co-operation with the Directorate General for Agriculture and Rural
More informationMONTENEGRO. Enhanced control and management of fisheries INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)
INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Enhanced control and management of fisheries Action summary The objective of the Action is to align the electronic data collection
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1710 Leader
More informationFOCUS AREA 5B: Energy efficiency
Rural Development Programmes 204-2020: Key facts & figures FOCUS AREA 5B: Energy efficiency. Introduction Focus Area (FA) 5B is designed to increase efficiency in energy use in agriculture and food processing.
More informationAxis 4 (Leader) Implementing Local Development Strategies
Axis 4 (Leader) Implementing Local Development Strategies Basic Information: Axis 4 Leader: Implementing local development strategies with a view to achieving the objectives of one or more of the axes
More informationAgriculture and rural areas in Poland in the light of budgetary expenditures I and II pillar of the CAP in the long period. The attempt to compare 1
Agriculture and rural areas in Poland in the light of budgetary expenditures I and II pillar of the CAP in the long period. The attempt to compare 1 1. Introduction Prof. Andrzej Czyżewski, Full Professor
More informationAgricultural Producers Support Act
Agricultural Producers Support Act Promulgated, State Gazette No. 58/22.05.1998, amended and supplemented, SG No. 79/10.07.1998, amended, SG No. 153/23.12.1998, effective 1.01.1999, SG No. 12/12.02.1999,
More informationWORKSHOP 1 AUDIT OF LEGALITY AND REGULARITY
33 RD CONFERENCE OF THE DIRECTORS OF EU PAYING AGENCIES APRIL 2013 WORKSHOP 1 AUDIT OF LEGALITY AND REGULARITY Michael Cooper Director, UK Co-ordinating Body 1 ECA's audit opinion on the implementation
More informationEUROPEAN COMMISSION. The Commission has based its decision on the following considerations:
EUROPEAN COMMISSION Brussels, 1.2.2017 C(2017) 693 final Subject: State aid Germany SA.43902 (2016/N-2) Saxony Natural heritage: nature protection related public relation and education activities Sir,
More informationRural Development Programmes. Financial Instruments: making funding go further
Financial Instruments: making funding go further EU rural development funding provides significant benefits for EU citizens and even more benefits are possible by using Financial Instruments (FIs) to recycle
More informationGuidance for Member States on Performance framework, review and reserve
EGESIF_18-0021-01 19/06/2018 Version 12.0 07/01/2015 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Performance framework, review and reserve This version was
More informationConditions for successful preparation and absorption of assistance. Joint presentation by respective units in DGs AGRI, EMPL and REGIO
IPA Components III, IV and V: Conditions for successful preparation and absorption of assistance Joint presentation by respective units in DGs AGRI, EMPL and REGIO IPA framework: Structures and programming
More information7611/16 MDL/io 1 DGB 1 A
Council of the European Union Brussels, 7 April 2016 (OR. en) 7611/16 AGRI 165 AGRIFIN 28 AGRIORG 21 NOTE From: To: Subject: General Secretariat of the Council Council Market situation and support measures
More information13 14 March 2018, Vientiane, Lao PDR
SUMMARY REPORT OF THE 6 th MEETING OF ASEAN PLUS THREE EMERGENCY RICE RESERVE (APTERR) COUNCIL INTRODUCTION 13 14 March 2018, Vientiane, Lao PDR 1. The 6 th Meeting of ASEAN Plus Three Emergency Rice Reserve
More informationGuidance for Member States on Performance framework, review and reserve
EGESIF_18-0021-01 19/06/2018 Version 2.0 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Performance framework, review and reserve This version was updated further
More informationCOMMISSION IMPLEMENTING DECISION. of
EUROPEAN COMMISSION Brussels, 8.12.2015 C(2015) 8873 final COMMISSION IMPLEMENTING DECISION of 8.12.2015 on the Annual Action Programme 2015 (part 2) and 2016 (part 1) in favour of Afghanistan to be financed
More informationEconomic and Social Council
UNITED NATIONS E Economic and Social Council Distr. GENERAL CEP/AC.13/2005/4/Rev.1 23 March 2005 ENGLISH/ FRENCH/ RUSSIAN ECONOMIC COMMISSION FOR EUROPE COMMITTEE ON ENVIRONMENTAL POLICY High-level Meeting
More informationEVALUATION REPORTS. Agenda item 6
Executive Board Second Regular Session Rome, 8 11 November 2010 EVALUATION REPORTS Agenda item 6 For consideration E MANAGEMENT RESPONSE TO THE RECOMMENDATIONS OF THE SUMMARY REPORT OF THE MID-TERM EVALUATION
More informationCOMMISSION IMPLEMENTING DECISION. of XXX
EUROPEAN COMMISSION Brussels, XXX [ ](2015) XXX draft COMMISSION IMPLEMENTING DECISION of XXX approving certain elements of the cooperation programme "Interreg V-A Germany/Mecklenburg-Vorpommern/Brandenburg-Poland"
More informationEU Funds investments and projections, preparation for the period March, 2014
EU Funds investments and projections, preparation for the 2014-2020 period March, 2014 Content 1.Implementation progress 2.Risks 3.Progress of 2014-2020 21.03.2014 2 1.1. 2007-2013 absorption by 31.01.2014.
More informationMontenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Montenegro Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 13 ARCHIVED on 12-Apr-2016 ISR23062 Implementing Agencies:
More informationREPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL
EUROPEAN COMMISSION Brussels, 17.9.2018 COM(2018) 629 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL 11th FINANCIAL REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND
More informationEVALUATION AND FITNESS CHECK (FC) ROADMAP
TITLE OF THE EVALUATION/FC LEAD DG RESPONSIBLE UNIT TYPE OF EVALUATION EVALUATION AND FITNESS CHECK (FC) ROADMAP Evaluation of the impact of the CAP measures towards the general objective "viable food
More informationCOUNCIL OF THE EUROPEAN UNION. Brussels, 4 October /04 ENV 519. NOTE from : Presidency
COUNCIL OF THE EUROPEAN UNION Brussels, 4 October 2004 12999/04 ENV 519 NOTE from : Presidency to : Council No. prev. doc. : 12998/04 ENV 518 No. Cion prop. : 11590/04 ENV 418 - COM(2004) 431 final Subject
More informationCommon Agricultural Policy Modernisation and Simplification
Common Agricultural Policy Modernisation and Simplification PORTUGUESE NATIONAL AGRICULTURAL FAIR IN SANTARÉM 12th and 13th of June Flavio Coturni, Head of Unit C1, Policy Perspectives DG Agriculture and
More informationStandard Summary Project Fiche
Standard Summary Project Fiche 1. Basic Information 1.1 CRIS Number: 2003/005-026.07.01 Twinning EE03-IB-AG-02 1.2 Title: Development of an IT System for administration of EAGGF Guarantee section Rural
More informationTHE CURRENT STATE OF STRUCTURAL FUNDS ABSORPTION IN ROMANIA THROUGH OPERATIONAL PROGRAMME ENVIRONMENT
THE CURRENT STATE OF STRUCTURAL FUNDS ABSORPTION IN ROMANIA THROUGH OPERATIONAL PROGRAMME ENVIRONMENT Phd. Professor VASILE POPEANGĂ Faculty of Economics and Business Administration Constantin Brancusi
More informationEUROPE S RURAL FUTURES
EUROPE S RURAL FUTURES EMERGING MESSAGES FOR EU RURAL DEVELOPMENT POLICY Background to Europe s Rural Futures The Nature of Rural Development Europe s Rural Futures the Nature of Rural Development was
More informationLeader approach and local development strategies in Slovenia
Matej Bedrac, Tomaž Cunder 245 1 Agricultural Institute of Slovenia, Department of Agricultural Economics, Hacquetova 17, Ljubljana matej.bedrac@kis.si; tomaz.cunder@kis.si Leader approach and local development
More informationPHARE 2003 STANDARD SUMMARY PROJECT FICHE
PHARE 2003/005-551.06.03 version of 16.06.2003 PHARE 2003 STANDARD SUMMARY PROJECT FICHE 1. Basic information 1.1 CRIS Number: PHARE 2003/005-551.06.03 1.2 Title: Support for improving the participation
More informationProgramming Period. European Social Fund
2014 2020 Programming Period European Social Fund f Legislative package 2014-2020 European Regional Development Fund (EC) 1301/2013 Cohesion Fund (EC) 1300/2013 European Social Fund (EC) 1304/2013 European
More informationLoans for rural development , Estonia. Case Study. - EAFRD - EUR 36 million - Rural enterprise support - Estonia
- EAFRD - EUR 36 million - Rural enterprise support - Estonia Loans for rural development 2014-2020, Estonia... supporting rural growth and investment through financial instruments... DISCLAIMER This document
More informationEUROPEAN COMMISSION. State aid No. N 303/2008 Creating value-added agricultural products Latvia
EUROPEAN COMMISSION Brussels, C(2009) PUBLIC VERSION WORKING LANGUAGE This document is made available for information purposes only. Subject: State aid No. N 303/2008 Creating value-added agricultural
More informationEFSI Achieving complementarity with the EAFRD and setting up Investment Platforms
EFSI Achieving complementarity with the EAFRD and setting up Investment Platforms Collection of FAQs - Version: 12 July 2016 - This set of FAQs on the complementarity between the European Fund for Strategic
More informationDRAFT GUIDANCE FICHE FOR DESK OFFICERS VERSION 3-28/01/2014 RELEVANT PROVISIONS IN THE LEGISLATION INTEGRATED TERRITORIAL INVESTMENT (ITI)
DRAFT GUIDANCE FICHE FOR DESK OFFICERS INTEGRATED TERRITORIAL INVESTMENT (ITI) VERSION 3-28/01/2014 RELEVANT PROVISIONS IN THE LEGISLATION Regulation Articles Article 36 - Integrated territorial investment
More informationDemocratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement
Document: EB 2017/120/R.13/Sup.1 Agenda: 9(b)(iii) Date: 8 April 2017 Distribution: Public Original: English E Democratic Socialist Republic of Sri Lanka Smallholder Agribusiness Partnerships (SAP) Programme
More information