Bangladesh: Emergency 2007 Cyclone Recovery and Restoration Project Implementation Support Review June 10-14, 2018 Aide Memoire

Size: px
Start display at page:

Download "Bangladesh: Emergency 2007 Cyclone Recovery and Restoration Project Implementation Support Review June 10-14, 2018 Aide Memoire"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Bangladesh: Emergency 2007 Cyclone Recovery and Restoration Project Implementation Support Review June 10-14, 2018 Aide Memoire 1. During June 10 to 14, 2018, a World Bank Team 1 carried out the last Implementation Support Review of the Emergency 2007 Cyclone Recovery and Restoration Project (ECRRP). This Aide Memoire (AM) summarizes the findings on the status of project implementation, recommendations and agreements reached with the relevant agencies to take corrective measures and/or to expedite implementation. The AM was discussed at the wrap-up meeting on June 12, 2018 with Secretary of the Ministry of Planning as the Chair. As agreed at the wrap-up meeting, this AM will be classified as Public under the World Bank s Access to Information policy. OVERALL STATUS AND KEY PROJECT DATA 2. The project has achieved all Project Development Objective (PDO) indicators. The end of project target has been exceeded concerning total direct project beneficiaries due to the rehabilitation of protective infrastructure as well as the recovery of the agriculture sector and livelihoods for cycloneaffected populations. Regarding reduced risk to cyclone-affected populations, as of June 18, 2018, 4.80 million people are estimated to have benefited directly. 3. Components A (Recovery of Agriculture Sector) and D (Long-Term Disaster Risk Management) were completed successfully within their closing dates. Component B (Reconstruction and Improvement of Multipurpose Disaster Shelters), the overall implementation has been excellent. The team commends Local Government Engineering Department (Implementing Agency: Component B) for their dedication and commitment in achieving concrete results on the ground and enabling the multipurpose disaster shelters to become a flagship intervention in the country. 4. Component C (Rehabilitation of Coastal Embankments) during project implementation, faced delays and challenges, however, the pace of overall implementation improved recently by the time of closing. The key project data as of June 18, 2018, are shown below: Project Data Board Approval: November 06, 2008 Effectiveness Date: December 24, 2008 Mid-Term Review: November 8 to 19, 2012 and January 8 to 16, 2013 Closing Date Original Credit: December 31, 2014 Closing Date AF-I: December 31, 2016 Closing Date AF-II: June 30, 2018 Table 1: Project Data KEY POINTS DISCUSSED AND AGREED ACTIONS Additional Financing Credit (AF-II): SDR 91.1 million (US$ million equivalent) Additional Financing Credit (AF-II) (Disbursed): SDR million (US$ million equivalent) Additional Financing Credit (AF-I): SDR million (US$ million equivalent) Original Credit SDR million (US$ million equivalent) Component B: Reconstruction and Improvement of Multipurpose Disaster Shelters 1 Swarna Kazi (Senior Disaster Risk Management Specialist and Task Team Leader); Mohammad Reaz Uddin Chowdhury (Senior Financial Management Specialist); Md. Akhtar Zaman (Senior Social Development Specialist); Arafat Istiaque (Procurement Specialist); K.M. Maqsoodul Mannan (Engineer); Md. Rafiqul Islam (Engineer); Md Istiak Sobhan (Environment Specialist); Jorge Luis Alva-Luperdi (Sr. Counsel); Satish Kumar Shivakumar (Finance Officer); Mohammad Sayeed (Disbursement Consultant); Debashish Paul Shuvra (Disaster Risk Management Analyst); S.M. Mehedi Hasan (Technical Consultant); Mohammad Rafiqul Islam (Disaster Risk Management Analyst); Dewan Rakibul Islam (Technical Consultant), Md Ariful Hossain Tuhin (Technical Consultant), Md. Faruk Hossain (Research Assistant), and Md Abul Fayez Khan (Program Assistant) 1

2 5. Local Government Engineering Department (LGED) has completed the construction of 352 new multipurpose disaster shelters (DSs) out of the target of 353. The improvement of 459 existing DSs out of the target 460 has been completed. LGED has completed construction of 343 km of roads to the DSs out of the target of 343 km. The two DSs that are not being implemented through ECRRP will be implemented from other government resources as agreed during the April 2017 mission. Component C: Rehabilitation of Coastal Embankments 6. The implementation support review notes that Bangladesh Water Development Board (BWDB). has confirmed the completion of 501 km of the embankment, out of the total target of 502 km. The construction of remaining 1km of embankment has been dropped due to social safeguard issues of compensation payment. BWDB will construct 1km of the embankment from other resources. 7. In addition to completion of 501 kilometers of embankment, BWDB carried out additional works and completed construction of 166 new sluices and repair of 191 sluices for sustainable water management as well as 17,695 meters of embankment protective works to protect embankment against river erosion. 8. D&S Consultant (Engineer) is finalizing the final Interim Payment Certificates with the contractors of three works packages. The Project Implementation Unit (PIU) is expected to share with the Bank the schedule of payment to contractors by. It is anticipated that the PIU will complete the financial transactions with the contractors as outlined in the payment schedule. 9. The Contractors of three packages (W-18, W-19 and W-20) are handing over km of Rehabilitation of Coastal Embankment (Re-sectioning and Retired Embankment) as well as other works to the Employer (BWDB). The PIU is expected to complete the Post-Work Measurement by. 10. The Task Team carried out 16 technical field visits (Annex IV) since the March 2016 mission and shared the field visit reports with BWDB and Project Coordination and Monitoring Unit (PCMU). The technical field visits highlighted the activities that needed to be improved to complete the works packages within the contract period. Based on the suggestion, the PIU completed the works as per the technical specifications within the planned date. Component F: Project Management, Technical Assistance, Strategic Studies and Training, and Emergency Support for Future Disasters 11. The Project s Monitoring and Evaluation (M&E) Resettlement Action Plan (RAP) team is currently reviewing and evaluating the RAP implementation performance of rehabilitation of coastal embankments. It will cover both the physical progress of all activities under the RAPs and the outcome of their implementation versus the objectives as laid out in the RAPs. 12. As the project draws to its scheduled closing, the implementation support review discussed and agreed on the next steps activities for the preparation of the Implementation Completion Report (ICR), including the Bank s ICR preparation activities and the Recipient contribution to the ICR. The ICR is due by December 30, 2018, and it is important that the ICR preparation efforts should be geared towards capturing significant lessons to be learned from the project which should not be lost. Furthermore, data points which are essential for the efficiency analysis and demonstrating achievement of the PDO for the ICR are provided in Annex V. The PCMU will coordinate with the M&E Consultant team to finalize the Project Completion Report by June 25, FIDUCIARY COMPLIANCE 13. Procurement Performance: All Implementing Agencies (IAs) have completed their procurement activities. It has been mentioned that since the Project will close on June 30, 2018 all works are to 2

3 be completed or services performed on or before the closing date of the project. All PIUs are expected to share the updated ECRRP Procurement Plan for IDA by. 14. Financial Management (FM) Performance: Financial management performance of the project is Moderately Satisfactory (MS). Interim Unaudited Financial Reports (IUFR) were submitted mostly on a timely manner and found to be acceptable based on the Bank s desk review. The external audit report for the FY has already been submitted to the Bank. The auditors have expressed an unqualified opinion on the financial statement of the project and reported 12 audit observations out of which 6 observations were noted to be material from the Bank s perspective. The project has not yet responded to the Bank with their clarification and action plan to resolve the observations. It was agreed that the project will submit their written clarification on pending audit observations and an action plan by June 23, The financial management staffing noted to be adequate with the completion of hiring process of the Financial Management Specialist in PCMU. 15. Disbursements Status: The total disbursement under credit number has reached to 92.91% as of June 18, Currently according to client connection report, the undisbursed balance under the project is US$ 6.46 million. The implementation support review understands BWDB is experiencing cost-overruns due to the additional works (variation orders), price adjustment as well as Income Tax, Value Added Tax Excess of National Board of Revenue Current Rate over contract rate, etc. In the other hand, LGED will not be using its full allocation since the agency has completed all major tasks. Based on the request of BWDB, the Bank agreed to allow category over draw to BWDB for LGED s un-utilized funds not exceeding US$ 6.46 million. BWDB will incur all the costs within the closing date of the project and submit withdrawal application for the overdraw amount to the Bank for direct payment to the contractors. 16. The closing date of the project is June 30, Eligible Expenditures as per the Financing Agreement incurred till the closing date can only be claimed under the project. The Disbursement deadline of the project is October 31, There are undocumented Designated Account balances under DA-A (BWDB), DA-C (LGED) and DA-D (PCMU). Withdrawal applications in respect of undocumented Designated Account balances should be submitted to the Association before the Disbursement deadline date. Undocumented Designated Account balance as on the Disbursement deadline date should be refunded to the Association promptly. We request the project to plan the payment and refund actions as per this timeline to avoid application of the Association s remedies. Financing Agreements Table 2: Disbursement Status (as of June 18, 2018) Signed Amount (US$ million) Revised (*) Amount (US$ million) Disbursed Amount (US$ million) Percent (%) Disbursed Original IDA Credit IDA Additional Financing I IDA Additional Financing II Total IDA BCCRF TF (**) GFDRR TF KfW Total ECRRP Funding (*) Revised amount after Level II restructuring in December 2015 (**) US$ 1.94 million Cancelled. 3

4 SAFEGUARD MANAGEMENT 17. Environmental Safeguards: LGED has completed all environmental safeguard documentation for of 469 rehabilitation shelters and 352 new cyclone shelters. Overall most of the on-site environmental aspects have been complied including provisions of safety gears for workers and health and safety measures. 18. BWDB has also completed all environmental safeguard documentation for 14 Polder under three works packages. It is noted that improvements have taken place in environmental management, especially on environmental health and safety issues, with new signage, and increased use of protective gears. Furthermore, BWDB has implemented km afforestation program in Polder 55/2D (5.875 km) and 55/3 (5.000 km). BWDB has planted selected mangrove and other salt tolerant species as a protective belt on the tidal inundation zone on the riverside of the embankment (on BWDB s own land). The afforestation program will ensure social, environmental and economic sustainability of the Polders. 19. Social Safeguards: All civil works by LGED under Component B for rehabilitation and improvement shelters were completed on existing available lands free from incumbrances without any issue of social safeguards. Works for rehabilitation of coastal embankments by BWDB involved involuntary resettlement in 28 out of 29 polders and land acquisition in 12 of them. Resettlement of involuntarily displaced squatters has largely been completed (99% progress). Land acquisition compensation payment is complete in 7 polders and is ongoing for the remaining Deputy Commissioners (DC) in Barguna, Patuakhali and Pirojpur have identified all the land owners, have received funds from BWDB accordingly, and are making payment of compensation for land in the remaining 5 polders with 65% progress as of May 31, The Implementation Support Review proposed that any pending land acquisition compensation payments after the project s closing would be supervised through the ongoing BWDB implemented Coastal Embankment Improvement Project Phase-1 (CEIP-I). The mission has discussed the approach by CEIP-I PMU to monitor, track, catalyze and coordinate with the DC offices for completing payments to the remaining affected land owners and report to the Bank on a monthly basis. The CEIP-I PMU will coordinate and report to the World Bank CEIP-I Task Team. 21. It is to be noted, as per the Government laws, funds placed with DC s account must be paid to the legal owners. If there is ownership dispute under settlement in the court of law, the court decides, the payment goes to the wining claimer(s) as per verdict. Overall Project Outcome: 22. The Project achieved multi-sectoral long-term disaster preparedness that included improved farmer resilience through improved agricultural inputs, training and technology and construction of new disaster-resilient shelters and embankments (with build-back-better elements). ECRRP also had a bottom up approach towards building long-term preparedness by focusing on local risk reduction capacity building interventions. The feasibility, preparation, and development of three ongoing World Bank financed projects were a result of ECRRP, including the US$ 375 million Multipurpose Disaster Shelter Project (MDSP), the US$ 400 million Coastal Embankment Improvement Project (CEIP-I) and the US$ 210 million Modern Grain Storage Facilities Project, in addition, the preparation of the River Management Improvement Project was also undertaken by ECRRP. 23. The implementation support review is pleased to note that Bangladesh is recognized as a global leader in the achievements of vulnerability reduction. The country has proactively invested in disaster risk management and ECRRP is considered a flagship intervention for long-term disaster risk management in Bangladesh. 4

5 Annexes Table of Contents Annex I: ECRRP: Summary of Agreed Actions... Annex I-1 Annex II: List of People Met... Annex II-1 Annex III: Results Framework... Annex III-1 Annex IV: List of Technical Field Visits... Annex IV-1 Annex V: Data Points Required from Implementing Agencies for the ICR.Annex V-1 5

6 Annex I: ECRRP: Summary of Agreed Actions SL. Activity Due Date Agreed during June 10 to 14, 2018, Implementation Support Review Component B (Implementing Agency: LGED) Current Status (June 10, 2018) 1. Construction of 353 New Disaster Shelters (DS) 2. Improvement of 460 Existing Disaster Shelters 3. Construction of 343 km Roads and Associated Structures to the Disaster Shelters 4. Prepare and submit Interim Unaudited Financial Report 5. Updating all financial records, including cash book and ledger Completed (June 10, 2018) 352 Completed 459 DSs Completed (June 10, 2018) Done Monthly ongoing 459 DSs 343 km SL. Activity Due Date Agreed during November 2017 Mission Component C (Implementing Agency: BWDB) 6. Post-work measurement of the completed works 7. BWDB will complete the rehabilitation of 502 km of coastal embankment. 8. BWDB will adopt a time-bound action plan for social safeguard and share with the Bank 9. BWDB Will Provide a Payment Schedule of works contracts 10. Submit the responses for the auditor s reconsideration to FAPAD and also hold a meeting in order to clarify the issues March 31, 2018 December 31, 2017 December 31, 2017 December 31, 2017 Due Date Agreed during June 10 to 14,2018 Implementation Support Review Done: 501 km (May 24, 2018) Done: June 3, 2018 Current Status Completed under previous nine Contracts: km Completed under current three Contracts: km (out of km) Annex I-1

7 Annex I-2

8 Social Safeguard Progress Milestones (W-18, W-19, and W-20) Land Acquisition SL Polder Placement of Payment to DC office Current Status /7B (W-18) Done Payment is ongoing. DC Barguna will make the payment as soon as possible /3 (W-19) Done DC Patuakhali will make the payment as soon as possible /1A (W-20) Done Payment is ongoing. DC Barguna will make the payment as soon as possible /1B (W-20) Done Payment is ongoing. DC Pirojpur will make the payment within as soon as possible /1C (W-20) Done Payment is ongoing. DC Pirojpur will make the payment as soon as possible. Resettlement Action Plan Implementation (Squatter Payment) Works Package W-18 No. Polder Completion of Completion Date of RAP Updated RAP Implementation /7B Done Done Works Package W /2D Done Done /3 Done Done (B) Done Done /4 Done Done /5 Done Done Done Pending payment of 4 squatters (They are absentee) /1 Done Done Works Package W /1A Done Pending payment of 8 squatters (They are absentee) /1B Done Done /1C Done Done Physical Progress Milestones (W-18, W-19, and W-20) SL. Polders Date of Completion Achievement as of June 10 to 14, 2018 Implementation Support Review Works Package W Length of Coastal Embankment (Resectioning and Retired May 24, 2018 (Completed) Total Target km km Annex I-3

9 Embankment) Rehabilitated (km) /2A December 31, 2017 Completed /6B March 31, 2018 Completed /7B March 31, 2018 Completed /53B Completed Completed Works Package W Length of Coastal May 24, km Embankment (Resectioning (Completed) and Retired Total Target km Embankment) Rehabilitated (km) /2D March 31, 2018 Completed /3 March 31, 2018 Completed (B) Completed Completed /4 December 31, 2017 Completed /5 December 31, 2017 Completed December 31, 2017 Completed /1 Completed Completed Works Package W Length of Coastal May 24, km Embankment (Resectioning 2018(Completed) and Retired Total Target km Embankment) Rehabilitated (km) /1A March 31, 2018 Completed /1B March 31, 2018 Completed (900 m remaining) /1C March 31, 2018 Completed (100 m remaining) SL. Activity Due Date Agreed during November 2017 Mission Component F (Implementing Agency: PCMU) 44. Complete hiring process of Jr. Financial Management Consultant 45. Submission of annual external audit report 46. Provide update on the audit observations 47. M&E Consultant: Draft Project Completion Report 48. Resolution of all external audit observations of DDM January 2, 2018 December 31, 2017 December 31, 2017 Due Date Agreed during June 10 to 14, 2018 Implementation Support Review Done December 31, 2018 Current Status Done Send a note to the Bank Annex I-4

10 SL. Activity Due Date Agreed during November 2017 Mission 49. Report on Non-Payments with lists of awardees (i) with ownership litigation to be resolved in court; (ii) out of the country; (iii) unwilling to claim due to infeasibly low amount of compensation; and any other category of reasons 50. Report on payment of compensation out of the 1700 land owners with clear and complete ownership documents 51. Payment projection report for the pending payments with interventions required outside the court of law 52. RAP implementation evaluation report All PIUs 53. Component Specific Implementation Completion Report 54. Updated ECRRP Procurement Plan for IDA Submit PIUs written clarification on pending audit observations and an action plan Due Date Agreed during June 10 to 14, 2018 Implementation Support Review June 25, 2018 June 23, 2018 Current Status Annex I-5

11 Government of Bangladesh Annex II: List of People Met Planning Division, Ministry of Planning Mr. Md. Ziaul Islam, Secretary Mr. Md. Syeedul Haque, Division Chief Economic Relations Division (ERD), Ministry of Finance Mr. Sarwar Mahmud, Joint Secretary Mr. Mohammad Khaled-Ur-Rahman, Senior Assistant Secretary Ministry of Water Resources Mr. Kabir Bin Anwar, Secretary Project Coordinating Monitoring Unit (PCMU), Programming Division, Ministry of Planning Mr. Anjan Kumar Biswas, Director General Mr. Khairul Hasan, Director Ms. Jahan Ara, Deputy Director Local Government Engineering Department (LGED), Ministry of Local Government Rural Development & Cooperatives Mr. Md. Abdur Rashid Khan, Project Director Mr. Arun Kumar Chowdhury, Executive Engineer Mr. Md. Ataur Rahman, Accounts Officer Bangladesh Water Development Board (BWDB), Ministry of Water Resources Mr. Md. Mahfuzur Rahman, Director General Mr. Md. Habibur Rahman, Superintending Engineer/ Project Director Mr. Md. Shafiul Huda Khan, Executive Engineer Mr. Md. Abdul Awal, Financial Management Specialist Design and Supervision Consultant (ECRRP, Component: C; BWDB Part) Engr. G M Akram Hossain, Team Leader Mr. Md. Abdul Mannan, Deputy Team Leader Annex II- 1

12 Annex III: Results Framework Project Development Objective Indicators Unit of Indicator Name Core Measure Baseline Actual(Current) End Target Direct project beneficiaries Number Value 1,300, ,000 4,360,000 Date 10-Jun Jun-2018 Reduced risk to cyclone affected population due to rehabilitation of protective infrastructure (e.g. embankments, disaster shelters) Text Value 1.30 mill 4.80 million 4.36 million Date 24-Dec Jun Jun-2018 Recovery of agriculture sector and livelihoods for cyclone affected populations Text Value 0 Crops: 230,000 HH Livestock: 38,000 HH Fisheries: 37,000 HH Crops: 224,000 HH Livestock: 33,000 HH Fisheries: 26,700 HH Date 24-Dec Jun Dec-2015 Strengthened disaster risk management in the government Text Value Limited capacity Emergency equipment in use Early Warning System (EWS) set up Improved response during emergencies Date 24-Dec Jun Jun-2018 Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Actual(Current) End Target Number Value Annex III- 1

13 Number of Agriculture Equipment (Power tillers, Power threshers, Hand sprayer) distributed Improved rice seeds distributed (in MT) Total fertilizers distributed (in MT) Number of livestock (cow, goat/sheep) distributed Number of dairy production facilities (cattle sheds and portable poultry sheds) distributed Number of Aquaculture packages (Carp, Golda, Bagda+Tilapia) distributed Mechanized fishing boats distributed Number of Farmers Field School (FFS) formed Date 24-Dec Jun Jun-2014 Number Value Date 24-Dec Jun Jun-2014 Number Value Date 24-Dec Jun Jun-2014 Number Value Date 24-Dec Jun Jun-2014 Number Value Date 24-Dec Jun Jun-2014 Number Value Date 24-Dec Jun Jun-2014 Number Value Date 24-Dec Jun Jun-2014 Number Value Date 24-Dec Jun Jun-2014 Annex III- 2

14 Number of newly constructed shelters with improved design standards and connectivity with the community Numbers of shelters repaired and improved upon with improved connectivity (such as access roads) with the community Length of coastal embankments including appurtenant structures rehabilitated and upgraded with improved design standards Number of emergency vehicles for effective communication and response to disasters Detailed multi-hazard models are used to generate maps Preparation of future operations for the long-term disaster risk reduction program. This includes, RBIP, CEIP, and DSS. Text Value Date 24-Dec Jun Jun-2018 Number Value Date 24-Dec Jun Jun-2018 Text Value km 502 Date 24-Dec Jun Jun-2018 Text Value Date 24-Dec May Dec-2016 Text Value No maps exist Final Multi-Hazard Risk and Vulnerability Assessment (MRVA), Model and Map submitted MRVA Maps and Atlas generated and used Date 24-Dec Dec Dec-2016 Text Value No report CEIP, MDSP under implementation, RMIP (RBIP) negotiated. Completion of preparation and study reports including design and bidding documents Date 24-Dec Dec Jun-2018 Annex III- 3

15 Timely submission of quarterly M&E reports Household survey completed at MTR and once in every year thereafter PCMU to capture the results of the project components and submit report at MTR and at project closing Support Strategic study and detailed design for a pilot project identified during project implementation Text Value No report 32 (24 Quarterly and 8 Annual Progress Reports) Date 24-Dec Jun Jun-2018 Text Value Baseline survey done in (HH survey report at MTR in 2012, Project Evaluation Report in 2013, Project Evaluation Report in 2014 and Impact Evaluation in 2018) Date 24-Dec Jun Jun-2018 Text Value No results report Same as before (Draft by June 14, 2018) 30 4 Final report on results submitted Date 24-Dec Jun Jun-2018 Text Value No study Strategic studies and detailed designs carried out during implementation. The Coastal Embankment Improvement Project and the Multipurpose Disaster Shelter Project are now under implementation. The River Management Improvement Project was Negotiated. Projects implemented Date 24-Dec Jun Dec-2015 Annex III- 4

16 Annex III- 5

17 Annex IV: List of Technical Field Visits List of Technical Field Visits SL Date 1 April 16-19, June 2-4, November 11-14, January 17-20, February 15-18, February 25-28, March 30- April 01, May 21-23, July 11-13, November 5-9, December 12-14, December 26-28, January 6-9, February 6-8, April 4-8, April 22-26, 2018 Annex IV- 1

18 Annex V: Data Points Required from Implementing Agencies for the ICR Component B 1. Data from the field on use of newly constructed/rehabilitated shelters under ECRRP during cyclones and heavy rains. In how many instances were shelters used by approximately how many people? This was requested in December 2017 from LGED. Component C 1. Updated number of people and hectare of agricultural land benefited due to rehabilitation and upgradation of embankments. As of the last draft, based on M&E estimates, the number was over 3.8 million 2 people including 848,700 farm families (exceeding the estimated 3.7 million target defined in the inception report) and hectares of agricultural land due to the rehabilitation and upgradation of kilometers of coastal embankments under ECRRP. EFFICIENCY ANALYSIS For Efficiency Analysis, following clarifications/data are required. 1. Need clarification from PCMU/M&E consultants on the following table (from 2014 progress report) pertaining to achieving the objective of recovery of livelihood. Baseline 2010 MTR 2012 PE 2013 PE 2014 Percent HSS with annual income of BDT60,000 and above (BDT5,000 and above per month) Percent HSS with annual income of BDT 48, ,999 (BDT4,000-4,999) Percent below upper poverty line (a) Percent below lower poverty line (b) Percent households reporting income is adequate to meet basic needs Percent households reporting having regular monthly saving Percent households reporting availing of credit (a) Upper poverty line 44,500 53,845 59,230 62,784 (b) Lower poverty line 32,532 39,365 43,300 45,898 (c) Problems with this table: 1. It is not clear whether the income above BDT 60,000 is defined in nominal or real terms. If nominal, then BDT 60,000 in 2010 is not the same as BDT 60,000 in 2014 because of significant inflation. 2. In fact, if you look at the upper poverty line on this table, the BDT 63,000 in 2014 was equivalent to BDT 44,500 in So, the first row of this table does not make any sense. 2 Calculation by M&E consultants is based on 7075persons per kilometer of completed embankment, which is a 2009 baseline figure. The average growth rate of population in Bangladesh is around 1.4% (higher in southern Bangladesh). Considering this growth trend, the benefited people per kilometer stands at around 7798 in Annex V- 1

19 3. If we correct for inflation between 2010 and 2014, and use row 3: percent below upper poverty line (a) as the starting point. We can calculate: Percent HSS with real annual income of BDT62,784 and above in 2014 prices Baseline MTR PE PE That is to say, 40% of the households moved from below poverty line to above the line. It does not tell us the average increase in income of these households. A dollar value of benefit cannot be put based on these numbers. For the component A Average income in 2014 prices is required for the table below: Baseline 2010 Non-beneficiary households in the project area: Beneficiary households in the project area: MTR 2012 PE 2013 PE 2014 PE 2017 For the project as a whole: Actual and projected expenditure in constant dollars by components and year is required: Project component costs in constant USD million by Year Total Component A Recovery of Agricultural Sector and Improvement Program A.1: Crops sub-sector A.2: Fisheries sub-sector A.3: Livestock sub-sector Total Component B: Construction and Improvement of Multi-Purpose Shelters B1. New Shelters B.2: Improvement of existing B.3: Communication network B.4: Design and construction Supervision Total Component C: Rehabilitation of Coastal Embankments C.1: Rehabilitation C.2: Design and construction Supervision Total Annex V- 2

The World Bank Emergency 2007 Cyclone Recovery and Restoration Project (P111272)

The World Bank Emergency 2007 Cyclone Recovery and Restoration Project (P111272) Public Disclosure Authorized SOUTH ASIA Bangladesh Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Emergency Recovery Loan FY 2009 Seq No: 14 ARCHIVED on 31-Dec-2015 ISR21491

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864) Public Disclosure Authorized SOUTH ASIA Afghanistan Transport & Digital Development Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 09-Feb-2018

More information

Nepal: Power Sector Reform and Sustainable Hydropower Development (IDA Credit 5728-NP) Implementation Support Review (September 12-15, 2017)

Nepal: Power Sector Reform and Sustainable Hydropower Development (IDA Credit 5728-NP) Implementation Support Review (September 12-15, 2017) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Nepal: Power Sector Reform and Sustainable Hydropower Development (IDA Credit 5728-NP)

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

INTEGRATED COASTAL ZONE MANAGEMENT APPROVED ON JUNE 15, 2010 THE REPUBLIC OF INDIA

INTEGRATED COASTAL ZONE MANAGEMENT APPROVED ON JUNE 15, 2010 THE REPUBLIC OF INDIA The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES30277 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INTEGRATED COASTAL ZONE MANAGEMENT APPROVED ON JUNE 15, 2010 TO ENVIRONMENT & NATURAL

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Liberia Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 11 ARCHIVED on 10-Nov-2016 ISR24991 Implementing Agencies: Infrastructure Implementation

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020001 Public Disclosure Authorized Project ID P100580 Country Ukraine Project Name ROADS & SAFETY IMPROVEMENT

More information

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy AFRICA Ethiopia Social Protection & Labor Global Practice IBRD/IDA Sector Investment and Maintenance Loan FY 2013 Seq No: 12 ARCHIVED on 09-Oct-2015

More information

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy AFRICA Ghana Environment & Natural Resources Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 8 ARCHIVED on 29-Feb-2016 ISR22549 Implementing

More information

The World Bank Third Secondary and Local Roads Project (P148048)

The World Bank Third Secondary and Local Roads Project (P148048) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THIRD SECONDARY AND LOCAL ROADS PROJECT APPROVED ON JULY 3, 2014 TO GEORGIA REPORT NO.:

More information

Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785)

Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785) Operation Name:

More information

Document of The World Bank

Document of The World Bank Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No. 15998 Public Disclosure Authorized IMPLEMENTATION COMPLETION REPORT BANGLADESH Public Disclosure Authorized COASTAL

More information

Public Disclosure Copy

Public Disclosure Copy SOUTH ASIA Bangladesh Financial Management Global Practice Recipient Executed Activities Technical Assistance Loan FY 2011 Seq No: 4 ARCHIVED on 26-Feb-2015 ISR18034 Implementing Agencies: Key Dates Key

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy AFRICA Ghana Environment & Natural Resources Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 7 ARCHIVED on 10-Aug-2015 ISR18623 Implementing

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

REQUEST FOR EXPRESSION OF INTEREST

REQUEST FOR EXPRESSION OF INTEREST The Gujarat State Disaster Management Authority Government of Gujarat Block No.11, 5 th Floor, Udyog Bhavan, Sector-11, Gandhinagar, Pin Code 382011 Phone No : +91-79-23259283 Fax : 079-23259275 / 079-23259302

More information

SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)

SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270) Public Disclosure Authorized SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR EUROPE AND CENTRAL ASIA Kazakhstan Transport & ICT Global Practice IBRD/IDA Specific Investment

More information

Country Practice Area(Lead) Additional Financing Afghanistan Governance P150632,P150632

Country Practice Area(Lead) Additional Financing Afghanistan Governance P150632,P150632 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021292 Public Disclosure Authorized Public Disclosure Authorized Project ID P120427 Project Name AF: ARTF-Public Fin. Mgmt. Reform II Country

More information

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325) AFRICA Mozambique Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2007 Seq No: 24 ARCHIVED on 29-Aug-2018 ISR33744 Implementing Agencies: ROAD FUND (Fundo de Estradas),

More information

Country Practice Area(Lead) Additional Financing Sao Tome and Principe Environment & Natural Resources P158636

Country Practice Area(Lead) Additional Financing Sao Tome and Principe Environment & Natural Resources P158636 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021333 Public Disclosure Authorized Public Disclosure Authorized Project ID P111669 Project Name ST

More information

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED

More information

The World Bank Second Karnataka State Highway Improvement (P107649)

The World Bank Second Karnataka State Highway Improvement (P107649) Public Disclosure Authorized SOUTH ASIA India Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 10 ARCHIVED on 31-Jul-2015 ISR18834 Implementing Agencies: Karnataka Road

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Nigeria Governance Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq

More information

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435)

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Water Global Practice Requesting Unit: EACVF Responsible Unit: GWA02 IBRD/IDA Program-for-Results Financing FY 2013 Team Leader(s): Lilian Pena

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Lebanon Social Protection & Labor Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 09-Jan-2017

More information

Implementation Status & Results Report Niger Disaster Risk Management and Urban Development Project (P145268)

Implementation Status & Results Report Niger Disaster Risk Management and Urban Development Project (P145268) Public Disclosure Authorized AFRICA Niger Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 04-Apr-2018 ISR30085 Implementing

More information

Country Practice Area(Lead) Additional Financing Finance, Competitiveness and

Country Practice Area(Lead) Additional Financing Finance, Competitiveness and Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020839 Public Disclosure Authorized Public Disclosure Authorized Project ID P108080 Project Name XK

More information

Scoping of Integration of Waterlogging Risk Reduction into National and Local Planning and Budgeting Processes

Scoping of Integration of Waterlogging Risk Reduction into National and Local Planning and Budgeting Processes Summary Report Scoping of Integration of Waterlogging Risk Reduction into National and Local Planning and Budgeting Processes January 2018 Programming Division Planning Commission Government of Bangladesh

More information

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org www.adb.org/evaluation Evaluation Approach Project Performance

More information

(Punjab Barrages Improvement Phase-II Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and PROVINCE OF PUNJAB

(Punjab Barrages Improvement Phase-II Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and PROVINCE OF PUNJAB Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7900-PK Public Disclosure Authorized Project Agreement (Punjab Barrages Improvement Phase-II Project) Public Disclosure Authorized between INTERNATIONAL

More information

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325) AFRICA Mozambique Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2007 Seq No: 22 APPROVED ISR29261 Implementing Agencies: Key Dates Key Project Dates Bank Approval Date:23-May-2007

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22644 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Implementation Status & Results Kazakhstan SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)

Implementation Status & Results Kazakhstan SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Kazakhstan SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized LOAN NUMBER 4753 -IN Public Disclosure Authorized Loan Agreement (Rural Roads Project) between Public Disclosure Authorized INDIA and INTERNATIONAL BANK FOR RECONSTRUCTION

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 12 ARCHIVED on 08-Dec-2017

More information

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Water and Urban I1 Africa Region Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL

More information

ANNEX. Objectives, Terms, and Conditions of the Grant

ANNEX. Objectives, Terms, and Conditions of the Grant Public Disclosure Authorized August 30, 2001 His Excellency DR. Boediono Minister of Finance Ministry of Finance Jakarta, Indonesia Dear Mr. Minister: Public Disclosure Authorized Public Disclosure Authorized

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA1417

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA1417 PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No: PIDA1417 Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Parent Project ID Borrower(s)

More information

The World Bank Burkina Faso Donsin Transport Infrastructure Project (P120960)

The World Bank Burkina Faso Donsin Transport Infrastructure Project (P120960) Public Disclosure Authorized AFRICA Burkina Faso Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 29-Dec-2017 ISR30740 Implementing Agencies: MOAD, Government

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized RESTRUCTURING PAPER ON A Report No: RES19152 Public Disclosure Authorized Public Disclosure Authorized PROPOSED PROJECT

More information

Country Practice Area(Lead) Additional Financing Bangladesh Environment & Natural Resources P155106

Country Practice Area(Lead) Additional Financing Bangladesh Environment & Natural Resources P155106 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020923 Public Disclosure Authorized Public Disclosure Authorized Project ID P125447 Project Name BD:

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF-17383,TF Jun ,540,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF-17383,TF Jun ,540,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020847 Public Disclosure Authorized Public Disclosure Authorized Project ID P149629 Country Mozambique

More information

May, Richard Greene Mission Director USAID/Bangladesh Madani Avenue, Dhaka 1212, Bangladesh

May, Richard Greene Mission Director USAID/Bangladesh Madani Avenue, Dhaka 1212, Bangladesh World Bank Office, Dhaka w(" IAL O 9 D 1207. Banglad.h INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELO E Tel (S-2) 815-9oo1, 880) 9&-0440-40 INTERNATIONAL DEVELOPMENT ASSOCATIONFax,(88D-2) 81 5-9030,

More information

Implementation Status & Results India Assam State Roads Project (P096018)

Implementation Status & Results India Assam State Roads Project (P096018) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results India Assam State Roads Project (P096018) Operation Name: Assam State Roads Project (P096018) Project Stage: Implementation

More information

Financing Agreement. between. Dated, 2014 CREDIT NUMBER 5313-IN. (Uttarakhand Disaster Recovery Project) INDIA. and

Financing Agreement. between. Dated, 2014 CREDIT NUMBER 5313-IN. (Uttarakhand Disaster Recovery Project) INDIA. and Public Disclosure Authorized OFFICIAL DOCUMENTS i CREDIT NUMBER 5313-IN Public Disclosure Authorized Financing Agreement Public Disclosure Authorized I (Uttarakhand Disaster Recovery Project) between INDIA

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Togo Agriculture and Rural Development Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 16-Jan-2015 ISR17841 Implementing Agencies: General

More information

The World Bank DTF: MA-Local Government Support Program (P144438)

The World Bank DTF: MA-Local Government Support Program (P144438) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Morocco Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Investment Project Financing FY 2014

More information

Public Disclosure Copy. East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit

Public Disclosure Copy. East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Public Disclosure Authorized East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Corridor EUROPE AND CENTRAL ASIA Kazakhstan Transport & ICT Global Practice

More information

Global Environment Facility Grant Agreement

Global Environment Facility Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF GRANT NUMBER TF092100 Public Disclosure Authorized Global Environment Facility Grant Agreement (Agricultural Development Program Support Project) Public

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021272 Public Disclosure Authorized Public Disclosure Authorized Operation ID P159774 Country Fiji Operation Name Fiji Post-Cyclone Winston

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy AFRICA Ghana Environment & Natural Resources Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 9 ARCHIVED on 15-Sep-2016 ISR24903 Implementing

More information

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Responsible

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized AFRICA Africa Environment & Natural Resources Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 13 ARCHIVED on 29-Dec-2016 ISR26629 Implementing Agencies: Ministry

More information

Results of Implementation of Joint 2006 Country Portfolio Performance Review Action Plan 2006

Results of Implementation of Joint 2006 Country Portfolio Performance Review Action Plan 2006 Attachment I: Results of Implementation of Joint 2006 Country Portfolio Performance Review Action Plan 2006 ISSUES BACKGROUND ACTIONS DEADLINE RESPONSIBLE STATUS as of 15 June 2008 1.1 With relevant capacity

More information

Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Montenegro Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 13 ARCHIVED on 12-Apr-2016 ISR23062 Implementing Agencies:

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Oct ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Oct ,000,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021153 Public Disclosure Authorized Public Disclosure Authorized Project ID P126180 Country Sierra Leone Project Name Sierra Leone Energy

More information

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Indonesia Global Practice

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Indonesia Global Practice Public Disclosure Authorized 1. Project Data Report Number : ICRR0021284 Public Disclosure Authorized Public Disclosure Authorized Project ID P111577 Project Name ID-Local Government and Decentralization

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Country Practice Area(Lead) Additional Financing Kyrgyz Republic Water P126390

Country Practice Area(Lead) Additional Financing Kyrgyz Republic Water P126390 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020801 Public Disclosure Authorized Public Disclosure Authorized Project ID P096409 Project Name OIP-2

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Document of The World Bank Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No: RES22488 Public Disclosure Authorized

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Uzbekistan Water Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 12-Jan-2018 ISR30620 Implementing Agencies: Republic

More information

Key Dates. Global Environmental Objectives. Components. Overall Ratings

Key Dates. Global Environmental Objectives. Components. Overall Ratings Public Disclosure Authorized EAST ASIA AND PACIFIC Philippines Environment & Natural Resources Global Practice Global Environment Project Specific Investment Loan FY 2010 Seq No: 10 ARCHIVED on 20-May-2016

More information

Financing Agreement. (Strengthening Regional Cooperation for Wildlife Protection in Asia Project) between NEPAL. and

Financing Agreement. (Strengthening Regional Cooperation for Wildlife Protection in Asia Project) between NEPAL. and Public Disclosure Authorized CONFORMED COPY GRANT NUMBER H666-NP Public Disclosure Authorized Financing Agreement (Strengthening Regional Cooperation for Wildlife Protection in Asia Project) between Public

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.02 Page 1 of 2 PROJECT ADMINISTRATION MISSIONS A. Introduction 1. ADB missions dispatched for loan and technical assistance (TA) project administration are classified

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Water Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 7 ARCHIVED on 19-Jun-2015 ISR19914 Implementing Agencies: Ministry of

More information

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Transport Connectivity and Asset Management Project (P132833) Public Disclosure Authorized SOUTH ASIA Sri Lanka Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2016 Seq No: 2 ARCHIVED on 30-Jan-2017 ISR26613 Implementing Agencies: Public Disclosure

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

US$M): Sector Board : Agriculture and Rural (US$M US$M): Cofinancing (US$M

US$M): Sector Board : Agriculture and Rural (US$M US$M): Cofinancing (US$M Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 06/30/2014

More information

Tuvalu: Outer Island Maritime Infrastructure Project

Tuvalu: Outer Island Maritime Infrastructure Project Project Design Advance Project Number: 48484-003 November 2015 Tuvalu: Outer Island Maritime Infrastructure Project This document is being disclosed to the public in accordance with ADB s Public Communications

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized The World Bank REPORT NO.: RES30835 RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF REHABILITATION AND

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT Public Disclosure Authorized The World Bank REPORT NO.: RES30161 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE

More information

Public Disclosure Copy. Implementation Status & Results Report FATA Rural Livelihoods and Community Infrastructure Project (RLCIP) (P126833)

Public Disclosure Copy. Implementation Status & Results Report FATA Rural Livelihoods and Community Infrastructure Project (RLCIP) (P126833) SOUTH ASIA Pakistan Agriculture and Rural Development Global Practice Recipient Executed Activities Specific Investment Loan FY 2012 Seq No: 7 ARCHIVED on 08-May-2015 ISR19105 Implementing Agencies: FATA

More information

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Operation Name: Transport Rehabilitation

More information

LRTF Quarterly Report March 1, As of February 22, 2012, the LRTF status was as follows: USD million

LRTF Quarterly Report March 1, As of February 22, 2012, the LRTF status was as follows: USD million LRTF Quarterly Report March 1, 2012 I. LRTF Administration As of February 22, 2012, the LRTF status was as follows: USD million Contributions Received Cash Contributions $146,902,156.80 Investment Income

More information

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components Public Disclosure Authorized Public Disclosure Copy AFRICA Ghana Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 17 ARCHIVED on 29-Jun-2017 ISR28824 Implementing

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011 Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND

More information

Implementation Status & Results Sudan Revitalizing the Sudan Gum Arabic Production and Marketing (P110588)

Implementation Status & Results Sudan Revitalizing the Sudan Gum Arabic Production and Marketing (P110588) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Sudan Revitalizing the Sudan Gum Arabic Production and Marketing (P11588) o o Operation Name: Revitalizing

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

6 Report No.: JSDSC1361 1

6 Report No.: JSDSC1361 1 Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE 6 Report No.: JSDSC1361 1,2 Date ISDS Prepared/Updated: 05-Nov-2015 Date ISDS Approved/Disclosed: 06-Nov-2015 Public Disclosure

More information

DISBURSEMENTS IN WORLD BANK OPERATIONS. Loan Closing Issues. The World Bank

DISBURSEMENTS IN WORLD BANK OPERATIONS. Loan Closing Issues. The World Bank DISBURSEMENTS IN WORLD BANK OPERATIONS Loan Closing Issues Important considerations: Outstanding commitments Closing date Grace period Payment of audit and retention Return of unutilized funds Closure

More information

The World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992)

The World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MOZAMBIQUE - ARTISANAL FISHERIES AND CLIMATE CHANGE APPROVED ON MARCH

More information

Draft Terms of Reference. Mozambique Climate Change Technical Assistance Project

Draft Terms of Reference. Mozambique Climate Change Technical Assistance Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. Background Context Draft Terms of Reference Mozambique Climate Change Technical Assistance

More information

by Mr. Iqbal Abdullah Harun Joint Secretary, Finance Division, Ministry of Finance The People's Republic of Bangladesh

by Mr. Iqbal Abdullah Harun Joint Secretary, Finance Division, Ministry of Finance The People's Republic of Bangladesh Geneva, 23 th 25 th November 2015 Ensuring Sustainability in the Face of Climate Change by Mr. Iqbal Abdullah Harun Joint Secretary, Finance Division, Ministry of Finance The People's Republic of Bangladesh

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF-10112,TF-15895,TF Jun ,100,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF-10112,TF-15895,TF Jun ,100,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020397 Public Disclosure Authorized Project ID P125584 Project Name PK: KP Emergency Roads Recovery

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-48890,IDA-H Jun ,250,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-48890,IDA-H Jun ,250,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020165 Public Disclosure Authorized Project ID P113030 Country Chad Project Name TD-Local Dev Prog Sup

More information

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Transport Connectivity and Asset Management Project (P132833) SOUTH ASIA Sri Lanka Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2016 Seq No: 3 ARCHIVED on 31-Aug-2017 ISR29065 Implementing Agencies: Democratic Socialist Republic of Sri Lanka,

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 8 ARCHIVED on 14-Dec-2015

More information

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

Public Disclosure Copy

Public Disclosure Copy EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Technical Assistance Loan FY 2013 Seq No: 4 ARCHIVED on 28-Dec-2015 ISR21722

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Afghanistan Governance Global Practice Recipient Executed Activities Technical Assistance Loan FY 2011 Seq No: 12 ARCHIVED on 15-May-2017 ISR28000 Implementing Agencies:

More information

Project development objective/outcomes

Project development objective/outcomes Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE SAINT VINCENT & THE GRENADINES HIV/AIDS PREVENTION AND CONTROL PROJECT PE-PO76799

More information

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions Public Disclosure Authorized AFRICA Africa Water Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 3 ARCHIVED on 27-Jun-2016 ISR22945 Implementing Agencies: Zambezi River Authority

More information

Transformation of Agriculture Sector Program Phase 3 PforR (P148927)

Transformation of Agriculture Sector Program Phase 3 PforR (P148927) Public Disclosure Authorized AFRICA Rwanda Agriculture Global Practice Requesting Unit: AFCE2 Responsible Unit: GFA07 IBRD/IDA Program-for-Results Financing FY 2015 Team Leader(s): Winston Dawes Seq :

More information

Program-for-Results Financing 1

Program-for-Results Financing 1 Operational Manual BP 9.00 - Program-for-Results Financing These procedures were prepared for use by World Bank staff and are not necessarily a complete treatment of the subject. BP 9.00 February, 2012

More information

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P117308,P Bolivia

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P117308,P Bolivia Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021219 Public Disclosure Authorized Public Disclosure Authorized Project ID P083979 Project Name BO

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized AFRICA Nigeria Environment & Natural Resources Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 6 ARCHIVED on 07-Dec-2015 ISR20416 Implementing Agencies: Public