1 1 Managing Grid Infrastructure Kevin Dasso VP, Electric Asset Management Overview
2 Risk and Opportunity Management Framework Identify Perform annual review of risk register to ensure company risks are identified Assess Leverage cross functional teams to identify and assess risk drivers, gaps and controls Mitigate Evaluate alternatives and propose improvements of controls to reduce the risk Monitor Utilize effectiveness metrics to show risk reduction progress Monitor mitigation and action item progress Update executives monthly EO Risk Register EO Risk Program 2
3 Wildfire Risk Bow-tie Analysis (Illustrative) Drivers Detective and Preventive Controls/ Mitigations Event Reactive Controls/ Mitigations Consequences Equipment Failure Patrol and Inspections Public Safety Vegetation Third Party Contact Animal Restoration, Operations Procedures Exempt Equipment Conductor Replacement Wood Pole Bridging Fire ignition related to PG&E facilities OH System Design Remote Monitoring Equipment Substitution Property Damage Environmental Damage Penalties Vegetation Management Protective Equipment Control Effectiveness: Control is adequate Animal Abatement Control is being strengthened Control is not adequate *This is an illustrative example and does not reflect actual control status 3
4 Risk-Informed Budget Allocation (RIBA) RIBA provides a common framework for evaluating work Impact Levels Negligible Minor Moderate Major Extensive Severe Catastrophic Work is evaluated in three components: safety, reliability, and the environment Level Common (7) ,000 3,162 10,000 Scores based on the frequency and impact of the worst reasonable direct consequence of not performing the work Regular (6) Frequent (5) Often (4.5) ,778 5, , ,113 In addition to the score, work is also categorized by drivers such as regulatory compliance, commitment, inter-relationship to other work, etc. Occasional (4) Infrequent (3) Rare (2) , , ,000 RIBA provides consistency across organizations, comparability of work portfolios and transparency to stakeholders Remote (1)
5 Using RIBA at PG&E Projects are scored along three dimensions: o Safety o Reliability o Environmental Additional benefits/commitments are flagged Scorers present their methodology to the broader group to ensure standard application of scoring taxonomy Projects are calibrated across portfolios Scored and calibrated projects are stackranked based on risk scores and flags Prioritization discussions are based on expanded dynamics (i.e., executability) Confidence using the RIBA process to make budget decisions in current and future years Score Calibrate Prioritize Risk-Informed Discussion Each project is riskscored by a subject matter expert RIBA expanded scoring team, including directors, participate Directors and managers across the LOBs participate Executive leadership Impact Levels Negligible Minor Moderate Major Extensive Severe Catastrophic Level , , , ,778 5, , , , , ,
6 RIBA Informs Investment Discussions Risk scores, non-risk drivers, and costs are placed into a chart to provide transparent justification for proposed work. This chart can be sorted in different ways as needed to inform budgeting decisions. ILLUSTRATIVE 6
7 Using Analytics to Plan the Grid of the Future Risk-Based Asset Management Strategies Description per Year Level Impact Level > 10 times per year > 10 Common (7) Catastrophic (7) 1-10 times per year 1-10 Regular (6) Severe (6) Once every 1-3 years Frequent (5) Extensive (5) Once every 3-10 years Once every years Once every years Once every 100+ years < 0.01 Occasional (4) Infrequent (3) Rare (2) Remote (1) Major (4) Moderate (3) Minor (2) Negligible (1) Worst Reasonable Direct Impact Improved Programmatic Risk Quantification Individual Asset Risk Analytics 7
8 Model Outputs: and Outcomes Using simulation, baseline probability distributions for event frequency and outcomes can be computed Probability distribution for events per year Probability distribution for Outcome #1 per year Probability distribution for Outcome #2 per year Mean P P P Max Units Events / year Outcome #1 /year Outcome #2 / year 8
Risk Assessment Mitigation Phase Risk Mitigation Plan Lessons Learned (RAMP B) November 30, 2016
Risk Assessment Mitigation Phase Risk Mitigation Plan Lessons Learned (RAMP B) November 30, 2016 #310403 Risk Management Framework Consistent with the historic commitment of Southern California Gas Company
More informationSAFETY MODEL ASSESSMENT
Application No.: Exhibit No.: Witnesses: A.1-0- SCE-01 M. Marelli S. Menon N. Woodward (U -E) SAFETY MODEL ASSESSMENT Before the Public Utilities Commission of the State of California Rosemead, California
More informationPACIFIC GAS AND ELECTRIC COMPANY SAFETY MODEL ASSESSMENT PROCEEDING PREPARED TESTIMONY
Application: 15-05-xxx (U 9 M) Exhibit No.: Date: May 1, 2015 Witness(es): Various PACIFIC GAS AND ELECTRIC COMPANY SAFETY MODEL ASSESSMENT PROCEEDING PREPARED TESTIMONY PACIFIC GAS AND ELECTRIC COMPANY
More informationRisk Assessment Mitigation Phase Risk Mitigation Plan Wildfires Caused by SDG&E Equipment (Including Third Party Pole Attachments) (Chapter SDG&E-1)
Risk Assessment Mitigation Phase Risk Mitigation Plan Wildfires Caused by SDG&E Equipment (Including Third Party Pole Attachments) (Chapter SDG&E-1) November 30, 2016 TABLE OF CONTENTS 1 Purpose... 3 2
More informationA concept of accident causation
SMS Senior Management Briefing Safety Traditional approach Preventing accidents ¾ Focus on outcomes (causes) ¾ Unsafe acts by operational personnel ¾ Attach blame/punish for failures to perform safely
More informationclient user GUIDE 2011
client user GUIDE 2011 STEP ACTION Accessing Risk Register 1. Type https://www.scm rms.ca/riskregister/login.aspx 2. Click in the Username field on the Risk Register home page. 3. Type your Username and
More informationRISK ASSESSMENT MITIGATION PHASE OVERVIEW. December 13, 2016
RISK ASSESSMENT MITIGATION PHASE OVERVIEW December 13, 2016 1 Agenda Topic Presenter Start End SED Opening Remarks SED 10:00 AM 10:05 AM Overview and Approach Chuck Manzuk 10:05 AM 10:25 AM Risk Framework
More informationFraud Risk Management
Fraud Risk Management Fraud Risk Assessment Part 2 2017 Association of Certified Fraud Examiners, Inc. Fraud Risk Assessment Frameworks Frameworks are helpful for performing, evaluating, and reporting
More informationUnderstanding Enterprise Risk Management: An Overview
Understanding Enterprise Risk Management: An Overview 05/2016 What is Risk? An uncertain event It exists in the future Has a cause and effect Impacts objectives Its effect may be positive and/or negative
More informationLoss Prevention Strategy & Framework for Manitoba Public Insurance
Loss Prevention Strategy & Framework for Manitoba Public Insurance May Version:. Date Revised: May, Document Name: MAIN_MPI Loss Prevention Strategy and Framework.docx Page 0 Executive Summary Manitoba
More informationAn Update On Association Policies, Health Checks & Guidelines To A Safer Hockey Association. Lauren Woods Member Engagement & Operations
An Update On Association Policies, Health Checks & Guidelines To A Safer Hockey Association Lauren Woods Member Engagement & Operations Association Health Checks Issues arising from the health check: 3/27
More informationINTEGRATED SOLUTIONS FOR REVENUE ASSURANCE
SMART ENERGY INTEGRATED SOLUTIONS FOR REVENUE ASSURANCE More than 140 utilities companies worldwide make use of Indra s Solutions indracompany.com SMART ENERGY INTEGRATED SOLUTIONS FOR REVENUE ASSURANCE
More informationProject Management for the Professional Professional Part 3 - Risk Analysis. Michael Bevis, JD CPPO, CPSM, PMP
Project Management for the Professional Professional Part 3 - Risk Analysis Michael Bevis, JD CPPO, CPSM, PMP What is a Risk? A risk is an uncertain event or condition that, if it occurs, has a positive
More informationOverhead Line Maintenance 3 DAY COURSE (3 CPD Credits) Presented by leading TAP and ESKOM professionals. and. joint venture company
Overhead Line Maintenance 3 DAY COURSE (3 CPD Credits) Presented by leading TAP and ESKOM professionals a and joint venture company About the Course COURSE DESCRIPTION AND LEARNING OBJECTIVES Overhead
More informationPrepared Remarks of Edison International CEO and CFO Second Quarter 2018 Earnings Teleconference July 26, 2018, 1:30 p.m. (PDT)
Prepared Remarks of Edison International CEO and CFO Second Quarter 2018 Earnings Teleconference July 26, 2018, 1:30 p.m. (PDT) Pedro Pizarro, President and Chief Executive Officer, Edison International
More informationRED 2.1 & 4.2: Quantifying Risk Exposure for ORSA. Moderator: Presenters: Lesley R. Bosniack, CERA, FCAS, MAAA
RED 2.1 & 4.2: Quantifying Risk Exposure for ORSA Moderator: Lesley R. Bosniack, CERA, FCAS, MAAA Presenters: Lesley R. Bosniack, CERA, FCAS, MAAA William Robert Wilkins, ASA, CERA, FCAS, MAAA SOA Antitrust
More informationApplying Risk-based Decision-making Methods/Tools to U.S. Navy Antiterrorism Capabilities
Applying Risk-based Decision-making Methods/Tools to U.S. Navy Antiterrorism Capabilities Mr. Charles Mitchell ABSG Consulting Inc. Alexandria, VA (703) 519-6387 cmitchell@absconsulting.com Commander Chris
More information2018 General Rate Case
Application No.: A.1-0- Exhibit No.: SCE-0, Vol. 1 (Appendix) Witnesses: R. Woods (U -E) 01 General Rate Case Transmission & Distribution (T&D) Volume 1 Appendix to Operational Overview and Risk-Informed
More informationPrepared Remarks of Edison International CEO and CFO Third Quarter 2018 Earnings Teleconference October 30, 2018, 1:30 p.m. (PDT)
Prepared Remarks of Edison International CEO and CFO Third Quarter 2018 Earnings Teleconference October 30, 2018, 1:30 p.m. (PDT) Pedro Pizarro, President and Chief Executive Officer, Edison International
More informationPower Workers' Union (PWU) INTERROGATORY #1. Ref (a): Participant Information Package: Exhibit C1-2-1, Page 5 of 6, Table 2 (OM&A Expenditures)
Filed: 0-0- 0-0 Tx Rates Schedule Page of Power Workers' Union (PWU) INTERROGATORY # Ref (a): Participant Information Package: Exhibit C--, Page of, Table (OM&A Expenditures) Table : 0 Board Approved versus
More informationRisk Assessment for Drug Products with Device Components
Risk Assessment for Drug Products with Device Components Khaudeja Bano, M.D. Senior Medical Director, Medical Device Safety Head, Pharmacovigilance and Patient Safety AbbVie Inc. Process consisting of:
More informationEnterprise Risk Management Economic Capital Modleing and the Financial Crisis
Risk Management and The Crisis Enterprise Risk Management Economic Capital Modleing and the Financial Crisis What worked and what did not Insurance Industry Continues to Respond to Risk Dynamics Risk Sources
More informationExamining a Top-Down Approach to Enterprise Risk Management
Examining a Top-Down Approach to Enterprise Risk Management June 25, 2018 12:30 ET Monique Allen Associate General Counsel, Clinical Operations and Privacy Memorial Hermann Health System Houston, Texas
More informationCriteria for Establishing Objectives & Targets
Impacts and Hazards Projects Alignment Process Criteria for Establishing Objectives & Targets Legal & Other Requirements Legal & Other Requirements 2 14 Technological Options 1 1 2 1 8 Financial 1 1 1
More informationRISK AND OPPORTUNITY ASSESSMENT GUIDE RISK CRITERIA
RISK AND OPPORTUNITY ASSESSMENT GUIDE RISK ASSESSMENT GUIDE TABLE OF CONTENTS 1. PURPOSE... 3 2. SCOPE... 3 3. RELATED DOCUMENTS... 3 4. PROCEDURE... 3 5. RISK MANAGEMENT PROCESS... 3 6. STEP 1 RISK ANALYSIS...
More informationbuilding a successful investment program in a changing economy
WEB FEATURE EARLY EDITION June 2017 Lisa Schneider healthcare financial management association hfma.org building a successful investment program in a changing economy Aligning investment strategy with
More informationCity Auditor s Office
City Auditor s Office TO: THRU: FROM: Mayor and Council Members Margaret Krym, City Auditor Oscar B. Claudio, Assistant City Auditor DATE: November 17, 2015 SUBJECT: Citywide Risk Assessment Attached you
More informationRisk Management Framework
Risk Management Framework Anglican Church, Diocese of Perth November 2015 Final ( Table of Contents Introduction... 1 Risk Management Policy... 2 Purpose... 2 Policy... 2 Definitions (from AS/NZS ISO 31000:2009)...
More informationThe Proactive Quality Guide to. Embracing Risk
The Proactive Quality Guide to Embracing Risk Today s Business Uncertainties Are Driving Risk Beyond the Control of Every Business. Best Practice in Risk Management Can Mitigate these Threats The Proactive
More informationIndependent Review of Aurora Network summary of findings. Michael Van Doornik, Manager Advisory (VIC) 31 October 2018
Independent Review of Aurora Network summary of findings Michael Van Doornik, Manager Advisory (VIC) 31 October 2018 Agenda 1. Terms of reference 2. Limitations of the review 3. Our approach to undertaking
More informationKidsafe NSW Risk Management Plan. August 2014
Kidsafe NSW Risk Management Plan August 2014 Document Control Document Approval Name & Position Signature Date Document Version Control Version Status Date Prepared By Comments Document Reviewers Name
More informationRisk Management Policy and Framework
Risk Management Policy and Framework Risk Management Policy Statement ALS recognises that the effective management of risks is a fundamental component of good corporate governance and is vital for the
More informationManaging tax administration reforms
Fiscal Affairs Department Effects of Good Government, by Ambrogio Lorenzetti, Siena, Italy, 1338-39 Managing tax administration reforms It all starts with a scoping mission Rene Ossa Fiscal Affairs Department
More informationIndex. Managing Risks in Commercial and Retail Banking By Amalendu Ghosh Copyright 2012 John Wiley & Sons Singapore Pte. Ltd.
Index A absence of control criteria, as cause of operational risk, 395 accountability, 493 495 additional exposure, incremental loss from, 115 advances and loans, ratio of core deposits to, 308 309 advances,
More informationRating Methodology Stephen Irwin, Vice President, A.M. Best Doniella Pliss, Managing Senior Financial Analyst, A.M. Best
Rating Methodology 2017 Stephen Irwin, Vice President, A.M. Best Doniella Pliss, Managing Senior Financial Analyst, A.M. Best Impetus for Change Timeline Building Block Approach Rating Implications Questions
More informationModerator: Kevin M Madigan MAAA,ACAS,CERA. Presenters: Barry A Franklin MAAA,FCAS,CERA Kevin M Madigan MAAA,ACAS,CERA
Session 26: The Role of a Model Risk Management Framework in P&C Insurers SOA Antitrust Disclaimer SOA Presentation Disclaimer Moderator: Kevin M Madigan MAAA,ACAS,CERA Presenters: Barry A Franklin MAAA,FCAS,CERA
More informationRisk management procedures
Purpose and scope In accordance with the BizOps Enterprises risk management policy, these procedures describe the organisation s standard process for risk management, including: 1. Risk identification
More informationVULNERABILITY AND RISK ASSESSMENT FOR THE PFRA IN IRELAND
WG F THEMATIC WORKSHOP FLOODS AND ECONOMICS VULNERABILITY AND RISK ASSESSMENT FOR THE PFRA IN IRELAND Mark Adamson 25 th October 2010 OVERVIEW OF PFRA OVERALL APPROACH Risk Assessment Historic FRA (What
More informationCatastrophe Risk Modelling. Foundational Considerations Regarding Catastrophe Analytics
Catastrophe Risk Modelling Foundational Considerations Regarding Catastrophe Analytics What are Catastrophe Models? Computer Programs Tools that Quantify and Price Risk Mathematically Represent the Characteristics
More informationPractical Water Utility Asset Management Plans
Kevin Campanella, Utility Planning Leader, Burgess & Niple September, 2016 Practical Water Utility Asset Management Plans Inconsistency Treatment plants One tracked pencils, another didn t track small
More informationThe ORSA opportunity:
The ORSA opportunity: Compliance and business value 12 March 2014 Today s agenda Background and regulatory update ORSA overview Industry perspectives Achieving long-term business value Page 2 Today s agenda
More informationCompetition Commission of Mauritius Guidelines: GENERAL PROVISIONS
CCM 7 Competition Commission of Mauritius Guidelines: GENERAL PROVISIONS November 2009 Competition Commission of Mauritius 2009 Guidelines General provisions 2 1. Introduction... 3 Guidelines... 3 Guidelines
More informationAMA Implementation: Where We Are and Outstanding Questions
Federal Reserve Bank of Boston Implementing AMA for Operational Risk May 20, 2005 AMA Implementation: Where We Are and Outstanding Questions David Wildermuth, Managing Director Goldman, Sachs & Co Agenda
More informationLOGISTICS ASSISTANCE REPRESENTATIVES
CECOM Directorate of Safety Risk Management Risk Management CECOM LOGISTICS ASSISTANCE REPRESENTATIVES Training Risk Management Why Safety? Battle and Non-battle Casualties Army W.W.II Korea Vietnam DS/S
More informationSeptember 21, Panelists: Scott Soukup, Quality Specialist, RCA Inc. Joan M. Ward, Quality Subject Matter Expert, RCA Inc.
Conducting CAPA Investigations September 21, 2016 Panelists: Scott Soukup, Quality Specialist, RCA Inc. Joan M. Ward, Quality Subject Matter Expert, RCA Inc. Moderator and Panelist: Susan Schniepp, Distinguished
More informationPerformance-Based Ratemaking
Performance-Based Ratemaking Rhode Island Utility Business Models Discussion April 24, 2017 Tim Woolf Consultant for the Division of Public Utilities and Carriers Outline Financial incentives under traditional
More informationUsing Tolerable Risk to Drive Asset Management Decision Making
Using Tolerable Risk to Drive Asset Management Decision Making Richmond, Virginia May 12, 2016 1 Principal Asset Management Consultant with GHD and has over 25 years experience in utility management. Nationally
More informationSECTION B ADMINISTRATIVE RULES INDEX
M. P. S. C. No. 2 Electric 2 nd Revised Sheet No. B-1.0 NORTHERN STATES POWER COMPANY, Cancels 1 st Revised Sheet No. B-1.0 SECTION B ADMINISTRATIVE RULES INDEX B1. TECHNICAL STANDARDS FOR ELECTRIC SERVICE
More informationPresented by: Steven Flores. Prepared for: The Predictive Modeling Summit
Presented by: Steven Flores Prepared for: The Predictive Modeling Summit November 13, 2014 Disease Management Introduction A multidisciplinary, systematic approach to health care delivery that: Includes
More informationCustom Benchmarking Report Prepared for: Pinnacle Foods Group
Custom Benchmarking Report Prepared for: Peer companies selected:,,,, Reynolds American Inc.,, powered by public responses from CDP 2017 climate change information request brought to you by CDP reporter
More informationBanking, Saving, and Payday Loans
Banking, Saving, and Payday Loans Lesson 1: Student Activities Ages 14-18 1 Lesson 1: The Payoff Student Activities Lesson Procedures Part 1: Play The Payoff Part 2: Pre-quiz Directions: RESPOND to this
More informationThe Art and Science of Multi-Year Planning
The Art and Science of Multi-Year Planning Bethany Pugh Managing Director PFM Financial Advisors LLC www.pfm.com Kevin Kuhar Senior Solutions Consultant PFM Solutions LLC www.whitebrichsoftware.com 1/31
More informationUse of QRM to Quantify Particulate Contamination Risks
Use of QRM to Quantify Particulate Contamination Risks PDA Ireland Chapter Quality Risk Management Seminar NIBRT Mount Merrion, Blackrock, Co. Dublin Chris Roberts Agenda Background Objective / Scope Execution
More informationThirty-Second Board Meeting Risk Management Policy
Thirty-Second Board Meeting Risk Management Policy 00 Month 2014 Location, Country Page 1 Board Decision THE RISK MANAGEMENT POLICY Purpose: 1. This document, Risk Management Policy (), presents: i) a
More informationRisk-based land use planning
Risk-based land use planning Wendy Saunders, James Beban, Margaret Kilvington, Independent Social Research What is risk based planning? Not new Developed as part of PhD Envirolink Tools funding to further
More informationSam McLeod, Saturation Diver
I always balk when people describe it (Saturation Diving) as being dangerous; Danger would infer we are incompetent. We are not. It is high risk, but at the same time we are good risk managers. That is
More informationThird Quarter 2018 Financial Results. October 30, 2018
Third Quarter 2018 Financial Results October 30, 2018 Forward-Looking Statements Statements contained in this presentation about future performance, including, without limitation, operating results, capital
More informationStochastic Modeling Concerns and RBC C3 Phase 2 Issues
Stochastic Modeling Concerns and RBC C3 Phase 2 Issues ACSW Fall Meeting San Antonio Jason Kehrberg, FSA, MAAA Friday, November 12, 2004 10:00-10:50 AM Outline Stochastic modeling concerns Background,
More informationA Better Way to Assess Benefits, Costs, and Risks in a Product Support Business Case Analysis
A Better Way to Assess Benefits, Costs, and Risks in a Product Support Business Case Analysis Frank Camm, John Matsumura, Lauren A. Mayer, and Kyle Siler-Evans March 2018 Traditional DoD Approach to BCA
More informationSERC Reliability Corporation Business Plan and Budget
SERC Reliability Corporation 3701 Arco Corporate Drive, Suite 300 Charlotte, NC 28273 704.357.7372 Fax 704.357.7914 www.serc1.org SERC Reliability Corporation 2018 Business Plan and Budget FINAL June 28,
More informationRisk Management & FMEAs. By Jay P. Patel, ASQ Fellow CEO & President QPS Institute
Risk Management & FMEAs By Jay P. Patel, ASQ Fellow CEO & President QPS Institute Learning Objectives Understand Risk management process elements Learn the principles involved in the Risk process Know
More informationRisk Management Procedure
Risk Management Procedure 2017 Number: Date Written: Authorised by: Review Date: Version 4.0 15 December 2016 Bernie Wilson 30 December 2018 Contents Amendment and Review... 2 Document Control / Amendments...
More informationRISK MANAGEMENT. Budgeting, d) Timing, e) Risk Categories,(RBS) f) 4. EEF. Definitions of risk probability and impact, g) 5. OPA
RISK MANAGEMENT 11.1 Plan Risk Management: The process of DEFINING HOW to conduct risk management activities for a project. In Plan Risk Management, the remaining FIVE risk management processes are PLANNED
More informationOffice of the Superintendent of Financial Institutions (OSFI) - Enterprise-wide Risk Management (ERM)
Office of the Superintendent of Financial Institutions (OSFI) - Enterprise-wide Risk Management (ERM) Michele Bridges, Managing Director of Finance and Corporate Planning Financial Management Institute
More informationSections of the ORSA Report
Lessons Learned From Orsa Reviews Impact on Risk Focused Examination NAIC Insurance Summit INS Companies Joe Fritsch, Director INS Companies Don Carbone, Exam Manager INS Companies Sections of the ORSA
More informationSECOND PARTY 1 OPINION ON THE SUSTAINABILITY OF EDF S GREEN BOND 2 Issued in September 2016
SECOND PARTY 1 OPINION ON THE SUSTAINABILITY OF EDF S GREEN BOND 2 Issued in September 2016 SCOPE Vigeo Eiris was commissioned to provide an independent opinion on the sustainable credentials of the Green
More informationSession 73 PD, Predictive Modeling for the Marketing Actuary. Moderator: Maria Patricia Marcelo Arellano, FSA, CERA, MAAA
Session 73 PD, Predictive Modeling for the Marketing Actuary Moderator: Maria Patricia Marcelo Arellano, FSA, CERA, MAAA Presenters: Andy Ferris, FSA, FCA, MAAA Sarah R. Hinchey, FSA, CERA Patrick Sugent
More informationPolicy Number Functional Field. Governance and Management. Related Policies. Policy of Making University Policies.
Policy Title Risk Management Policy Policy Number -0 Functional Field Related Policies Responsibility of Issuing Office Governance and Management Policy of Making University Policies Risk Management Office
More informationUniversity of California Be Smart About Safety Program Guidelines
University of California Be Smart About Safety Program Guidelines Table of Contents Table of Contents 1 Program Guidelines........ 2 Approval Tree (Appendix A).. 6 Frequently Asked Questions (Appendix
More informationReforms to Victoria s native vegetation permitted clearing regulations
Reforms to Victoria s native vegetation permitted clearing regulations Outline 1. Background to native vegetation regulation 2. Reforms to Victoria s native vegetation permitted clearing regulations 3.
More informationProject Integration Management
Project Integration Management The Key to Overall Project Success: Good Project Integration Management Project managers must coordinate all of the other knowledge areas throughout a project s life cycle.
More informationCorporate Relations 77 Beale Street San Francisco, CA (415) PG&E Corporation Reports Third-Quarter 2016 Financial Results
Corporate Relations 77 Beale Street San Francisco, CA 94105 1 (415) 973-5930 www.pgecorp.com November 4, 2016 PG&E Corporation Reports Third-Quarter 2016 Financial Results Net income was $0.77 per share
More informationDid poor methodology. sink tower group? ARE YOU NEXT?
Did poor methodology sink tower group? ARE YOU NEXT? Tower Group: a failure in progress since 2007 1.5 1 0.5 0-0.5 Calendar year trend since 2008; 11% Most likely projection Trend to obtain TWGP reserves
More informationNDOT Five Year Capital Plan. Developing Transparent Project Priorities
NDOT Five Year Capital Plan Developing Transparent Project Priorities Agenda Introductions Capital Plan Vision Overview NDOT Partnership with Decision Lens Team Approach to the 5 Year Capital Plan Demonstration
More informationAmerican Academy of Actuaries Webinar: The Practice of ERM in the Insurance Industry. Enterprise Risk Management Committee November 19, 2013
American Academy of Actuaries Webinar: The Practice of ERM in the Insurance Industry Enterprise Risk Management Committee November 19, 2013 All Rights Reserved. 1 Presenters Bruce Jones, MAAA, FCAS, CERA
More informationTaking the stress out of operational-risk stress testing
Saptarshi Ganguly and Daniel Mikkelsen Taking the stress out of operational-risk stress testing Risk Management December 2015 Financial institutions are facing heightened supervisory scrutiny, but those
More informationStatement on Climate Change
Statement on Climate Change BMO Financial Group (BMO) considers climate change one of the defining issues of our generation. Everyone, including BMO, bears responsibility for the effectiveness of the response.
More informationRisk Management Strategy
Risk Management Strategy Document Reference MLCSU CA_WL_V3 Version 3 Authors: Donna Bamber, Midlands & Lancashire Commissioning Support Unit Senior Risk Officer Smita Shetty, Service Redesign Manager,
More informationAgenda. Overview and Context. Risk Management Association. Robust Operational Risk Program
Risk Management Association Understanding External Risks for a Robust Operational Risk Program Agenda Overview and Context Background on Loss Data Loss Data Consortiums (LDC) Benefits of Using External
More informationGuidelines for Financial Assurance Planning
For Global Fund Grants Guidelines for Financial Assurance Planning June 2016 Geneva, Switzerland The financial assurance plan provides improvements to the way the Global Fund obtains financial assurance
More informationMETHODOLOGY For Risk Assessment and Management of PPP Projects
METHODOLOGY For Risk Assessment and Management of PPP Projects December 26, 2013 The publication was produced for review by the United States Agency for International Development. It was prepared by Environmental
More informationStreamlining Risk Management Evaluations for New Manufacturing Processes
May 1-3, 2012 Javits Center New York, NY Streamlining Risk Management Evaluations for New Manufacturing Processes Mike Porter Consultant Commissioning Agents, Inc. Title Date Javits Center New York, NY
More informationAn Introductory Presentation for ECU Staff
Risk Management at ECU An Introductory Presentation for ECU Staff Phillip Draber Manager, Risk and Assurance Outcomes By the end of this session you should: Be able to complete and document risk management
More informationI. BACKGROUND AND CONTEXT
Review of the Debt Sustainability Framework for Low Income Countries (LIC DSF) Discussion Note August 1, 2016 I. BACKGROUND AND CONTEXT 1. The LIC DSF, introduced in 2005, remains the cornerstone of assessing
More informationINFOCUS. A Fundamental Shift in Models Used for Estimating Loan-Loss Reserves. The Importance of Getting CECL Right BY WILLIAN LANG WITH RYAN CHAREST
promontory.com INFOCUS OCTOBER 12, 2018 BY WILLIAN LANG WITH RYAN CHAREST A Fundamental Shift in Models Used for Estimating Loan-Loss Reserves The new U.S. accounting standard for current expected credit
More informationRisk Management at Central Bank of Nepal
Risk Management at Central Bank of Nepal A. Introduction to Supervisory Risk Management Framework in Banks Nepal Rastra Bank(NRB) Act, 2058, section 35 (a) requires the NRB management is to design and
More informationMSCI ESG UNIVERSAL INDEXES METHODOLOGY
INDEX METHODOLOGY MSCI ESG UNIVERSAL INDEXES METHODOLOGY May 2018 MAY 2018 CONTENTS 1 Introduction... 3 2 MSCI ESG Research... 4 2.1 MSCI ESG Ratings... 4 2.2 MSCI ESG Controversies... 4 2.3 MSCI ESG Business
More informationRisk Associated with Meetings
Risk Associated with Meetings Risks Associated with Meetings & Events: No Company is Exempt Meetings and events remain a necessary way for people and organizations to communicate information, build relationships,
More informationMobilizing climate investment: project preparation and financing
Mobilizing climate investment: project preparation and financing UNEP Risø Center Low-Carbon Development Group Lilongwe, 26 September 2013 The Big Picture Climate change is a "real" phenomenon, which cannot
More informationIndian Affairs-Facility Management System (IA-FMS) Training
Indian Affairs, Division of Facilities Management and Construction Indian Affairs-Facility Management System (IA-FMS) Training S&CAP Safety Inspections Webinar 7/21/2016 IA-FMS Overview Lesson S&CAP Safety
More informationVersion: th November 2010 RISK MANAGEMENT POLICY
Version: 1.2-25th November 2010 RISK MANAGEMENT POLICY Document History Document Location To be completed. Revision History Date of this revision: 17/09/2010 Date of next revision: N/A Revision Number
More informationConceptualisation Stage Continued
Conceptualisation Stage Continued Conceptualisation Inputs to conceptualisation stage Influencing factors Stakeholder analysis Feasibility Risk Outputs from conceptualisation stage Risk Structured Approach
More informationAdvancing Customer-Driven Solutions for Ontario
The Power to Connect Advancing Customer-Driven Solutions for Ontario IESO STAKEHOLDER SUMMIT PRESENTATION June 12, 2017 The Vision This is about preparing Ontario s electricity industry today for tomorrow
More informationRisk Management. CITS5501 Software Testing and Quality Assurance
Risk Management CITS5501 Software Testing and Quality Assurance (Source: Pressman, R. Software Engineering: A Practitioner s Approach. McGraw-Hill, 2005) 2017, Semester 1 Definition of Risk A risk is a
More informationQuantitative Risk Modelling, Calibration and Continuous Improvement CK UMACHI RISK MANAGEMENT ENGINEER - TIMP PACIFIC GAS & ELECTRIC
Quantitative Risk Modelling, Calibration and Continuous Improvement CK UMACHI RISK MANAGEMENT ENGINEER - TIMP PACIFIC GAS & ELECTRIC Agenda Relative vs Quantitative Risk Models PG&E s Risk Model History
More informationAn Empirically-Supported Approach to Statewide Implementation of Blueprints Programs in Georgia: The QuIP Model
An Empirically-Supported Approach to Statewide Implementation of Blueprints Programs in Georgia: The QuIP Model 2018 Blueprints Conference May 2, 2018 Westminster, CO Presenters u Dan Edwards, President;
More informationUnited Nations Environment Programme
UNITED NATIONS United Nations Environment Programme Distr. GENERAL UNEP/OzL.Pro/ExCom/64/44 15 June 2011 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE
More informationTHE GLOBAL STANDARD FOR FACTOR ANALYSIS
THE GLOBAL STANDARD FOR FACTOR ANALYSIS Are you seeing a complete investment picture? How do you draw valid conclusions across MARKETS, PEER GROUPS and PORTFOLIOS? AS AN ASSET OWNER Do you trust the investment
More informationAction 3: Fostering investment in sustainable projects reinforce advisory capacity developing sustainable infrastructure projects further measures
Action 1: Establishing an EU classification system for sustainable activities 1. Subject to the outcome of its impact assessment, the Commission will table a legislative proposal in Q2 2018 that will ensure
More information