Second Level Control: process and most common findings

Size: px
Start display at page:

Download "Second Level Control: process and most common findings"

Transcription

1 The CENTRAL EUROPE Programme Second Level Control: process and most common findings Training on Project, Finance Management and Communication Vienna - 11 September 2013

2 Content 1. Second Level Control process Legal basis and functions Flowchart of the process Steps of the process 2. Most common findings Formal/sub-system findings Financial findings

3 Legal basis and functions The body in charge of carrying out Second Level Controls is the Audit Authority (AA) The AA is set up in accordance with Art. 59 (1) (c) of EC Reg. 1083/2006 Legal Basis for Second Level Control Art 62 of EC Reg. 1083/2006 Art 16 of EC Reg. 1828/2006 Chapter 4 of Control and Audit Guidelines Art. 9 of Subsidy Contract Art. 6 of Partnership Agreement

4 Flowchart of the process Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Projects sampled by AA and approved by GoA JTS introduction to LP/PPs On-the-spot audit visit Draft Audit Report Final Audit Report JTS corrective and followup measures Auditors to LPs/PPs to plan audit visit Contradictory procedure FAR sent to LPs/PPs/FLC /JTS PM&FM Corrective measures/fcf/ Recovery Letter sent to LP/PP/FLC

5 Projects sampled by AA and approved by GoA The JTS provides the Audit Authority with an overview table including expenditures declared to EU COM for the reference audit year The Audit Authority takes the sample of projects to be audited [approved by Group of Auditors (GoA)] on a random basis The sample together with the explanatory note is then communicated to the MA/JTS

6 JTS introduction to LP/PPs On the basis of the sample communicated by the AA, the MA/JTS send out an introduction to LPs/PPs to announce audit visits by auditors. Such communication: Copies First Level Controller (FLC), GoA Member, Lead Partner (in case of PP) and JTS Project and Finance Managers Reminds the audited LP/PP the duties set out in 9 of Subsidy Contract and 6 of Partnership Agreement (e.g. relevant project documentation available, responsible persons present during the audit, etc.) Informs the LP/PP that it will be further contacted by auditors to fix the date of the audit and to be given more information

7 On-the-spot audit visit The on-the-spot audit visit usually takes place in one or two days at the premises of the relevant LP/PP Even if the audit visit runs smoothly and no findings are detected on-thespot, this does NOT prevent or exclude that findings may be later included in the Draft Audit Report The MA/JTS encourage FLC participation in audit visits in order to provide support to LP/PPs.

8 Draft Audit Report Once the on-the-spot audit visit is completed, the Draft Audit Report (DAR) is drawn up by the auditors and approved by GoA member DAR is sent to MA/JTS that initiate the contradictory procedure (via e- mail) involving audited LP/PP, LP (in case of PP) and FLC and providing a deadline within which all comments shall be received Once the contradictory procedure is finalized, the MA/JTS send out the comments received to the AA

9 Final Audit Report Once contradictory procedure is finalized, AA prepares the Final Audit report (FAR) based on comments put forward by LP/PP, FLC and MA/JTS FAR is provided to the MA/JTS that send it to relevant LP/PP copying FLC, LP(in case of PP) and JTS Project and Finance Managers

10 JTS corrective and follow-up measures In case of findings included in FAR, the MA JTS take the relevant corrective and follow-up measures If finding is formal - MA/JTS checks that LP/PP/FLC take remedial action. If finding is financial - MA/JTS kick off relevant procedure to withdraw or recover the ineligible amount: If project is still running - a Financial Correction Form is generated by the MA/JTS and sent to the LP If project is closed - a Recovery Letter is sent out If financial finding is systemic - MA/JTS ask FLC to take corrective measures

11 Most common findings Audits of Operations carried out in 2012 Main findings detected concerning FLC and/or LP/PPs: LP/PPs No posting of expenditures in the separate accounting system Incorrect allocation of costs among WPs/BLs Public procurement issues (e.g. contract not sufficiently detailed - lack of link between services delivered and services contracted) FLC Lack of check concerning immediate transfer of ERDF payments from LP to PP Incorrect annulling procedure/stamp Checks not performed on originals but on copies of documents Lack of check of proof of payment

12 Most common findings Audits of Operations carried out in 2012

13 Most common findings Audits of operations - Comparing financial findings detected in 2011 and 2012 Audit of Operations 2011 Audit of Operations 2012

Knowledge and Innovation Consultants. Financial Management and Reporting Greek Magistral Lesson Izmir, 28/06/2011

Knowledge and Innovation Consultants. Financial Management and Reporting Greek Magistral Lesson Izmir, 28/06/2011 Knowledge and Innovation Consultants Financial Management and Reporting Greek Magistral Lesson Izmir, 28/06/2011 Financial Management and Reporting 1 The financial management of a project requires the

More information

How to close the project

How to close the project Training on Project & Financial Management and Communication; Vienna, 11-12 September 2013 How to close the project JTS CENTRAL EUROPE Agenda of the workshop Time span from 10h30 13h00 Welcome Presentation

More information

FIRST LEVEL CONTROL: PRINCIPLES AND PRACTICE

FIRST LEVEL CONTROL: PRINCIPLES AND PRACTICE CENTRAL EUROPE PROGRAMME 2007-2013 Project financial management and controls Vienna, 7 th April 2011 FIRST LEVEL CONTROL: PRINCIPLES AND PRACTICE 1. Validation of expenditure: the FLC 2. General principles

More information

Fact Sheet; Errors, financial corrections, irregularities, recoveries and withdrawals

Fact Sheet; Errors, financial corrections, irregularities, recoveries and withdrawals The 2014 2020 Interreg Programme Management Handbook is composed of fact sheets. Each theme is covered by one fact sheet so that the reader can easily and quickly choose the relevant fact sheet. Fact Sheet;

More information

PART 7: OVERVIEW ON PROJECT IMPLEMENTATION PRINCIPLES

PART 7: OVERVIEW ON PROJECT IMPLEMENTATION PRINCIPLES Applicants Manual for the period 2014-2020 Version 1.1 PART 7: OVERVIEW ON PROJECT IMPLEMENTATION PRINCIPLES edited by the Managing Authority/Joint Secretariat Budapest, Hungary, 2015 Applicants Manual

More information

ERDF SUBSIDY CONTRACT NO...

ERDF SUBSIDY CONTRACT NO... The Government Office for Development and European Cohesion Policy, Kotnikova 5, SI 1000 Ljubljana, Slovenia, acting as the Managing Authority of the Cooperation Programme Interreg V-A Slovenia-Hungary

More information

INTERREG III B CADSES. Payment Claim Manual

INTERREG III B CADSES. Payment Claim Manual INTERREG III B CADSES Payment Claim Manual 1) Background / Description of involved actors The following chapters give a short overview about the actors involved in the PIC Interreg III B Cadses, their

More information

Follow up and reporting procedures. Lead partners seminar 5th targeted call Lydwine Lafontaine

Follow up and reporting procedures. Lead partners seminar 5th targeted call Lydwine Lafontaine Follow up and reporting procedures Lead partners seminar 5th targeted call Lydwine Lafontaine Table of contents Background information Subsidy contract Lead partner principles 1. Progress of the project:

More information

INTERREG 2 Seas Mers Zeeën First Level Control Manual

INTERREG 2 Seas Mers Zeeën First Level Control Manual INTERREG 2 Seas Mers Zeeën 2014-2020 First Level Control Manual Version of 29/11/2018 Table of Content 1. INTRODUCTION... 5 1.1. PURPOSE AND OBJECTIVE OF THIS MANUAL... 5 1.2. TERMINOLOGY... 5 2. LEGAL

More information

South East Europe (SEE) SEE Control Guidelines

South East Europe (SEE) SEE Control Guidelines South East Europe (SEE) SEE Control Guidelines Version 1.4. Final version approved by the MC 10 th June 2009 1 st amendment to be approved by MC (2.0) 1 CONTENTS 1 Purpose and content of the SEE Control

More information

Lead Partner Seminar. JS/MA Riga

Lead Partner Seminar. JS/MA Riga Lead Partner Seminar JS/MA 9.12.2015 Riga Welcome to the Lead Partner Seminar Objective of the day: Give the Lead Partner the needed tools to best implement the project To know where to come with questions

More information

Central Baltic INTERREG V A Cross-border Co-operation Programme

Central Baltic INTERREG V A Cross-border Co-operation Programme AUDIT REPORT Central Baltic INTERREG V A Cross-border Co-operation Programme 2014 2020 DATE OF THE REPORT: 18/10/2017 Audit number (as in the audit file): Date of the final audit report: CB-9/2017 18/10/2017

More information

Guidance for Member States on the Drawing of Management Declaration and Annual Summary

Guidance for Member States on the Drawing of Management Declaration and Annual Summary EGESIF_15-0008-02 19/08/2015 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on the Drawing of Management Declaration and Annual Summary Programming period 2014-2020

More information

Updated Guidance for Member States on treatment of errors disclosed in the annual control reports

Updated Guidance for Member States on treatment of errors disclosed in the annual control reports EGESIF_15-0007-01 final 09/10/2015 EUROPEAN COMMISSION European Structural and Investment Funds Updated Guidance for Member States on treatment of errors disclosed in the annual control reports (Programming

More information

Closure of the Structural Funds programme programming period

Closure of the Structural Funds programme programming period Closure of the Structural Funds programme 2000-2006 programming period Court s experience Turning ideas into reality! 20 th September 2012 The closure process Legal definition The closure of an operational

More information

EUROPEAN COMMISSION DG Regional Policy DG Employment, Social Affairs and Equal Opportunities

EUROPEAN COMMISSION DG Regional Policy DG Employment, Social Affairs and Equal Opportunities Final version of 07/12/2011 EUROPEAN COMMISSION DG Regional Policy DG Employment, Social Affairs and Equal Opportunities COCOF_11-0041-01-EN GUIDANCE ON TREATMENT OF ERRORS DISCLOSED IN THE ANNUAL CONTROL

More information

CLOSURE GUIDELINES SEMINAR. Section 4 Submission of closure documents

CLOSURE GUIDELINES SEMINAR. Section 4 Submission of closure documents CLOSURE GUIDELINES SEMINAR Section 4 Submission of closure documents 4.1.2 CLOSURE DOCUMENTS for IPA CBC 1. Final statement of expenditure (as integral part of the final payment application) issued by

More information

Partners and FLC Info day. Madrid, 22/06/2017

Partners and FLC Info day. Madrid, 22/06/2017 Partners and FLC Info day Madrid, 22/06/2017 Fraud and conflict of Interest Fraud and conflict of interest. Definitions. Prevention & sensibilisation. Detection. Reporting. Correction Conflict of interest

More information

MED PROGRAMME. First Level Control in practice. Most common mistakes - Follow-up measures

MED PROGRAMME. First Level Control in practice. Most common mistakes - Follow-up measures MED PROGRAMME First Level Control in practice Most common mistakes - Follow-up measures Torino 11 April 2011 BACKGROUND Major common mistakes detected during JTS check 1 st and 2 nd PR Delays in finalization

More information

ABBREVIATIONS AND GLOSSARY

ABBREVIATIONS AND GLOSSARY Applicants Manual for the period 2014-2020 Version 1.1 edited by the Managing Authority/Joint Secretariat Budapest, Hungary, 2016 Applicants Manual Abbreviations and Glossary 1 ABBREVIATIONS AA AF AfR

More information

FLC Guidance. Page 1. Version. September *Disclaimer: This is a living document and further content will be developed at a later stage.

FLC Guidance. Page 1. Version. September *Disclaimer: This is a living document and further content will be developed at a later stage. FLC Guidance Version September 2017 *Disclaimer: This is a living document and further content will be developed at a later stage. Page 1 Table of Contents... 1 CHAPTER 1 General principles... 3 1.1 Introduction...

More information

Factsheet N 6 Project implementation: delivering project outputs, achieving project objectives and bringing about the desired change

Factsheet N 6 Project implementation: delivering project outputs, achieving project objectives and bringing about the desired change Project implementation: delivering project outputs, achieving project objectives and bringing about the desired change Version No 13 of 23 November 2018 Table of contents I. GETTING STARTED: THE INITIATION

More information

Central Baltic INTERREG V A Cross-border Co-operation Programme

Central Baltic INTERREG V A Cross-border Co-operation Programme AUDIT REPORT Central Baltic INTERREG V A Cross-border Co-operation Programme 2014 2020 DATE OF THE REPORT: 17/11/2017 Audit number (as in the audit file): Date of the final audit report: CB-8/2017 17/11/2017

More information

First level control report including checklist

First level control report including checklist First level control report including checklist Project title Project acronym Project number Report Number 1. Project and progress report Name 2. Project Partner Name Organisation Job title Division/Unit/Department

More information

Partnership Agreement between the Lead Partner and the other project partners

Partnership Agreement between the Lead Partner and the other project partners Partnership Agreement between the Lead Partner and the other project partners Foreword This Partnership Agreement is signed on the basis of the following documents that form the legal framework applicable

More information

EUROSTAT 2017 Control programme

EUROSTAT 2017 Control programme EUROSTAT 2017 Control programme Information meeting on Financial Issues Luxembourg 14 March 2017 ESTAT Unit A4 Budget, financial management and internal control Control objectives Legal basis: Art. 66(5)

More information

Implementation Manual. Version 2.1 December 2016

Implementation Manual. Version 2.1 December 2016 Implementation Manual Version 2.1 December 2016 Content INTRODUCTION... 6 A. HOW TO GET STARTED WITH THE PROJECT... 9 A.1. General requirements... 9 A.1.1. Signing the subsidy contract... 9 A.1.2. Setting

More information

INTERREG V-A GREECE-ITALY PROGRAMME PATRA 24/04/2018 PREVEZA 26/04/2018

INTERREG V-A GREECE-ITALY PROGRAMME PATRA 24/04/2018 PREVEZA 26/04/2018 INTERREG V-A GREECE-ITALY PROGRAMME 2014-2020 PATRA 24/04/2018 PREVEZA 26/04/2018 1 FIRST LEVEL CONTROL GUIDELINES & PROCEDURES 2 General Guidelines (1/8) Regulation (EU) 1303/2013, Article 125 Functions

More information

GUIDANCE DOCUMENT ON THE FUNCTIONS OF THE CERTIFYING AUTHORITY. for the programming period

GUIDANCE DOCUMENT ON THE FUNCTIONS OF THE CERTIFYING AUTHORITY. for the programming period Final version of 25/07/2008 COCOF 08/0014/02-EN GUIDANCE DOCUMENT ON THE FUNCTIONS OF THE CERTIFYING AUTHORITY for the 2007 2013 programming period Table of contents 1. Introduction... 3 2. Main functions

More information

INTERREG - IPA CBC ROMANIA-SERBIA PROGRAMME

INTERREG - IPA CBC ROMANIA-SERBIA PROGRAMME ANTI-FRAUD STRATEGY INTERREG - IPA CBC ROMANIA-SERBIA PROGRAMME VERSION 2016 1 TABLE OF CONTENTS PRINCIPLE 4 FOREWORD 4 LEGAL BASIS 4 DEFINITIONS 5 I. GENERAL CONSIDERATIONS 5 I.1. AIM 5 I.2. MISSION 6

More information

Financial control. Wolfgang Schrattenecker Managing Authority

Financial control. Wolfgang Schrattenecker Managing Authority Financial control Wolfgang Schrattenecker Managing Authority Thi s p r og r am m e is co- f i nanced by t he E ur op ean R eg i onal D ev el op m ent F und. Financial flows and reporting European Commission

More information

GUIDELINES FOR FIRST LEVEL CONTROL on CBC Programmes, co-financed by IPA BULGARIA - SERBIA BULGARIA - MACEDONIA BULGARIA - TURKEY

GUIDELINES FOR FIRST LEVEL CONTROL on CBC Programmes, co-financed by IPA BULGARIA - SERBIA BULGARIA - MACEDONIA BULGARIA - TURKEY GUIDELINES FOR FIRST LEVEL CONTROL on CBC Programmes, co-financed by IPA BULGARIA - SERBIA BULGARIA - MACEDONIA BULGARIA - TURKEY Version* Date: Notes 1.1. May, 2011 Final approved version, valid for BG

More information

Annual Implementation Report CITIZEN S SUMMARY

Annual Implementation Report CITIZEN S SUMMARY INTERREG V-A Italy Croatia 2014-2020 CCI 2014TC16RFCB042 Annual Implementation Report CITIZEN S SUMMARY Article 50(9) of Regulation (EU) No 1303/2013 Draft 2/2017 XX.06.2016 The INTERREG V A Cross-border

More information

Simplified Cost Options:

Simplified Cost Options: Simplified Cost Options: DG EMPL audit approach Jeroen Jutte Head of Unit Relations with Control Authorities, Legal Procedures, Audit Direct Management and EGF Audit implications Need to consider audit

More information

IMPLEMENTATION MANUAL. Version 3.1 July 2018

IMPLEMENTATION MANUAL. Version 3.1 July 2018 IMPLEMENTATION MANUAL Version 3.1 July 2018 Content INTRODUCTION... 6 A. HOW TO GET STARTED WITH THE PROJECT... 9 A.1. General requirements... 9 A.1.1. Signing the subsidy contract... 9 A.1.2. Setting

More information

CEF Model Grant Agreement Audit Aspects Introducing Annex VII Certificate on Financial Statements

CEF Model Grant Agreement Audit Aspects Introducing Annex VII Certificate on Financial Statements CEF Model Grant Agreement Audit Aspects Introducing Annex VII Certificate on Financial Statements Ben Griffiths Head of External Audit, INEA Content of Presentation Background to the Annex VII Certificate

More information

First Level Controller MANUAL

First Level Controller MANUAL First Level Controller MANUAL P r o g r a m m e co- f i n a n c e d b y E R D F P a g e 1 72 Version 2 (08/03/2018) P r o g r a m m e co- f i n a n c e d b y E R D F P a g e 2 72 This document will be

More information

Greece - the former Yugoslav Republic of Macedonia IPA Cross-Border Programme PROJECT MANUAL - 1 -

Greece - the former Yugoslav Republic of Macedonia IPA Cross-Border Programme PROJECT MANUAL - 1 - PROJECT MANUAL - 1 - TABLE OF CONTENTS 1. INTRODUCTION...3 1.1 ABBREVIATIONS 3 1.2 GLOSSARY 4 1.3 PURPOSE 6 1.4 GENERAL PROGRAMME INFORMATION 6 1.4.1. SCOPE-PRIORITY AXES... 6 1.4.2. WHICH IS THE AREA

More information

Financial Control. Thi s p r og r am m e is co- f i nanced by t he E ur op ean R eg i onal D ev el op m ent F und.

Financial Control. Thi s p r og r am m e is co- f i nanced by t he E ur op ean R eg i onal D ev el op m ent F und. Financial Control Thi s p r og r am m e is co- f i nanced by t he E ur op ean R eg i onal D ev el op m ent F und. Financial flows and reporting European Commission Managing Authority/Certifying Authority

More information

EC Guidance. Management verifications and audit

EC Guidance. Management verifications and audit EC Guidance Management verifications and audit Rafael López Sánchez, Deputy Head of Unit C.1 Directorate C Audit Directorate-General Regional and Urban Policy #ficompass Management verifications and audit

More information

Guidance for Member States on Article 41 CPR - Requests for payment

Guidance for Member States on Article 41 CPR - Requests for payment EGESIF_15-0006-01 08/06/2015 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Article 41 CPR - Requests for payment DISCLAIMER This is a working document prepared

More information

Control and audit. One of the main concerns of the EU COMM. Single audit system recommended by European Court of Auditors:

Control and audit. One of the main concerns of the EU COMM. Single audit system recommended by European Court of Auditors: Control and audit One of the main concerns of the EU COMM. Single audit system recommended by European Court of Auditors: Integrated audit approach whereby the work of auditors at one level may be used

More information

Winding up of the programming period in Poland Audit results

Winding up of the programming period in Poland Audit results Winding up of the programming period 2004-2006 in Poland Audit results, Senior Public Audit Expert Department of Audit Methodology and Professional Development Supreme Audit Office of Poland Main audit

More information

Index. Executive Summary 1. Introduction 3. Audit Findings 11 MANDATE 1 AUDIT PLAN 1 GENERAL OBSERVATION AND MAIN CONCLUSIONS 1 RECOMMENDATIONS 2

Index. Executive Summary 1. Introduction 3. Audit Findings 11 MANDATE 1 AUDIT PLAN 1 GENERAL OBSERVATION AND MAIN CONCLUSIONS 1 RECOMMENDATIONS 2 Report to the Contact Commiittee of the heads of the Supreme Audit Institutions of the Member States of the European Union and the European Court of Auditors On the Parallel Audit on the Costs of controlls

More information

Fact Sheet 13 Roles and responsibilities in project partnerships

Fact Sheet 13 Roles and responsibilities in project partnerships Roles and responsibilities in project partnerships Valid from Valid to Main changes Version 3 03.05.17 -Minor wording change recommending the use of the same FLC for local partnerships. -Clarified the

More information

Greece The former Yugoslav Republic of Macedonia IPA Cross-Border Programme SUBSIDY CONTRACT A

Greece The former Yugoslav Republic of Macedonia IPA Cross-Border Programme SUBSIDY CONTRACT A Greece The former Yugoslav Republic of Macedonia IPA Cross-Border Programme 2007-2013 SUBSIDY CONTRACT A No. : < > SUBSIDY CONTRACT No. In Athens, today, the , at the Ministry of Development,

More information

How to Prepare the Winding-Up Declaration

How to Prepare the Winding-Up Declaration How to Prepare the Winding-Up Declaration This presentation is a summarisation of a presentation prepared by Marianna Miklós- Molnár, Director of Strategy and Methodology, Directorate General for Audit

More information

Guidance on a common methodology for the assessment of management and control systems in the Member States ( programming period)

Guidance on a common methodology for the assessment of management and control systems in the Member States ( programming period) Final version of 12/09/2008 EUROPEAN COMMISSION DIRECTORATE-GENERAL MARITIME AFFAIRS AND FISHERIES EFFC/27/2008 Guidance on a common methodology for the assessment of management and control systems in

More information

ESPON 2013 (The European Observation Network on Territorial Development and Cohesion)

ESPON 2013 (The European Observation Network on Territorial Development and Cohesion) CCI 2007 CB 163 PO 022 ESPON 2013 (The European Observation Network on Territorial Development and Cohesion) Annual Report 2011 STRUCTURAL FUNDS 2007-2013 TERRITORIAL COOPERATION OBJECTIVE Annual implementation

More information

Guidance for Member States on Audit of Accounts

Guidance for Member States on Audit of Accounts EGESIF_15_0016-04 03/12/2018 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Audit of Accounts Revision 2018 DISCLAIMER: This is a document prepared by the Commission

More information

1st Level Control in the North Sea Region Programme

1st Level Control in the North Sea Region Programme 1st Level Control in the North Sea Region Programme First Level Control Seminar, 6/7 October 2010, Bergen Tomasz Petrykowski Joint Technical Secretariat Viborg Relevant bodies of the programme Organisations

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 23.3.2016 C(2016) 1921 final COMMISSION DECISION of 23.3.2016 concerning the suspension of the interim payments from the European Regional Development Fund for the operational

More information

How to prepare for Second Level Control Audits

How to prepare for Second Level Control Audits How to prepare for Second Level Control Audits Experiences from Saxony Economic Development Corporation, Project Partner in 2 nd call CE project AutoNet Transnational Network in Central Europe Sebastian

More information

Project Changes. Lead Partner Seminar 4th Call for Proposal Budapest 10th December 2012

Project Changes. Lead Partner Seminar 4th Call for Proposal Budapest 10th December 2012 Project Changes Lead Partner Seminar 4th Call for Proposal Budapest 10th December 2012 Content 1. 2. 3. Fundamental principles Main categories of project change Single types of project change Fundamental

More information

GUIDE FOR PROJECT IMPLEMENTATION

GUIDE FOR PROJECT IMPLEMENTATION GUIDE FOR PROJECT IMPLEMENTATION PRACTICAL GUIDANCE FOR PROJECT PARTNERS Version 5.0 (15.1.2019) Contents 1. Introduction... 3 2. Starting up the project... 4 2.1. Fulfilling conditions... 5 2.2. Hand

More information

Reporting and First Level Control of Finance and Activities

Reporting and First Level Control of Finance and Activities Reporting and First Level Control of Finance and Activities First Level Control Seminar, 6/7 October 2010, Bergen Isabella Leong, Jesper Jönsson, Christian Zieske Joint Technical Secretariat Viborg Rules

More information

Financial rules and procedures in Interreg Europe - second call projects

Financial rules and procedures in Interreg Europe - second call projects European Union European Regional Development Fund Sharing solutions for better regional policies Financial rules and procedures in Interreg Europe - second call projects Aleksandra Niechajowicz Finance

More information

Annex 3 First level control report including checklist

Annex 3 First level control report including checklist European Union European Regional Development Fund Sharing solutions for better regional policies Anne 3 First level control report including checklist The first level control report and checklist constitute

More information

Guidance on management verifications Cooperation Programme Interreg V-A Greece - Italy

Guidance on management verifications Cooperation Programme Interreg V-A Greece - Italy Guidance on management verifications Cooperation Programme Interreg V-A Greece - Italy 2014-2020 Greece-Italy v.10 1 Table of contents Introduction 1. General 1.1 Regulatory requirements 1.2 General principles

More information

Decommitment methodology and process in

Decommitment methodology and process in Decommitment methodology and process in 2014-2020 Halfway through the programming 2014-2020 halfway through the programme spending? 22 February 2018 I Nice, France Iuliia Kauk, Interact Decommitment Carrot

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2006R1828 EN 01.12.2011 003.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B C1 COMMISSION REGULATION (EC) No 1828/2006 of

More information

ELIGIBILITY OF EXPENSES: APPLICABLE RULES

ELIGIBILITY OF EXPENSES: APPLICABLE RULES INFO DAY ON PROJECT IMPLEMENTATION 1 ST CALL FOR PROJECT PROPOSALS ELIGIBILITY OF EXPENSES: APPLICABLE RULES Hierarchy of rules on eligibility of expenditure Rules defined in EU legal framework ERDF Programme

More information

Guidance for Member States on Audit of Accounts

Guidance for Member States on Audit of Accounts EGESIF_15_0016-02 final 29/01/2015 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Audit of Accounts DISCLAIMER: This is a document prepared by the Commission

More information

Interreg CENTRAL EUROPE Programme Implementation Manual. Version 1 ( )

Interreg CENTRAL EUROPE Programme Implementation Manual. Version 1 ( ) Interreg CENTRAL EUROPE Programme Implementation Manual Version 1 (08.07.2015) TABLE OF CONTENTS INTRODUCTION... 1 A. HOW TO GET STARTED WITH THE PROJECT... 3 A.1. General requirements... 3 A.1.1. Signing

More information

COMMISSION DELEGATED REGULATION (EU) /... of

COMMISSION DELEGATED REGULATION (EU) /... of EUROPEAN COMMISSION Brussels, 30.10.2015 C(2015) 7554 final COMMISSION DELEGATED REGULATION (EU) /... of 30.10.2015 amending Delegated Regulation (EU) No 110/2014 on the model financial regulation for

More information

Financial Reporting First Level Control

Financial Reporting First Level Control Financial Reporting First Level Control Xander Storms Frank Everaarts It s not that hard! Report twice a year about content, progress and costs The Lead Beneficiary collects and integrates the data Those

More information

DG REGIO, DG EMPL and DG MARE in cooperation with OLAF. Joint Fraud Prevention Strategy. for ERDF, ESF, CF and EFF

DG REGIO, DG EMPL and DG MARE in cooperation with OLAF. Joint Fraud Prevention Strategy. for ERDF, ESF, CF and EFF EUROPEAN COMMISSION REGIONAL POLICY EMPLOYMENT,SOCIAL AFFAIRS AND EQUAL OPPORTUNITIES OLAF MARE DG REGIO, DG EMPL and DG MARE in cooperation with OLAF Joint Fraud Prevention Strategy for ERDF, ESF, CF

More information

Eligibility rules, Financial control, Procurement

Eligibility rules, Financial control, Procurement Eligibility rules, Financial control, Procurement Get started! seminar Munich Germany 2 February 2016 Christina Bauer Magdalena Friedwagner-Maislinger Wolfgang Schrattenecker Managing authority Thi s p

More information

CENTRAL EUROPE PROGRAMME

CENTRAL EUROPE PROGRAMME CENTRAL EUROPE PROGRAMME 2007-20132013 CENTRAL EUROPE INFODAY Venice, 4 March 2008 Barbara Di Piazza JTS CENTRAL EUROPE PROGRAMME PROGRAMME AREA FINANCIAL ALLOCATION ERDF budget National contribution Total

More information

FAQ. Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014)

FAQ. Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014) FAQ Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014) CORRIGENDUM: In the first version of the Application Guide,

More information

ANNEX A - I. Note: it is important that each tenderer has read the Working Practice and its annexes very carefully.

ANNEX A - I. Note: it is important that each tenderer has read the Working Practice and its annexes very carefully. ANNEX A - I Note: it is important that each tenderer has read the Working Practice and its annexes very carefully. WORKING PRACTICE 1.GENERAL INFORMATION 1.1.THE AUDIT CO-ORDINATOR 1.1.1.The Audit Co-ordinator

More information

Fit for Health 2.0 Brussels 13 September Audits in H2020 Mr Vittorio Morelli Deputy Head of the CAS

Fit for Health 2.0 Brussels 13 September Audits in H2020 Mr Vittorio Morelli Deputy Head of the CAS HORIZON HORIZON 2020 2020 Fit for Health 2.0 Brussels 13 September 2017 Audits in H2020 Mr Vittorio Morelli Deputy Head of the CAS Table of Contents 1. What is this presentation about? 2. Why do we do

More information

Practical Reporting Do s and Dont s

Practical Reporting Do s and Dont s Practical Reporting Do s and Dont s First Level Control Seminar March 2011 Isabella Leong Joint Technical Secretariat Viborg Rules of procedure Informal Feel free to Comment Ask questions...at any time...

More information

Central Baltic INTERREG V A Cross-border Co-operation Programme Progress report No 1 (01/05/ /10/2015) EUR 4062.

Central Baltic INTERREG V A Cross-border Co-operation Programme Progress report No 1 (01/05/ /10/2015) EUR 4062. AUDIT REPORT Central Baltic INTERREG V A Cross-border Co-operation Programme 2014 2020 DATE (e.g. 31.12.12) Audit number (as in the audit file) CB-4/2016 Accounting period 01/07/2015 30/06/2016 Audit scope

More information

CCI 2007 CB 163 PO 037 DESCRIPTION OF THE MANAGEMENT AND CONTROL SYSTEM

CCI 2007 CB 163 PO 037 DESCRIPTION OF THE MANAGEMENT AND CONTROL SYSTEM Operational Programme Italy-Malta 2007-2013 ERDF European Territorial Cooperation Objective CCI 2007 CB 163 PO 037 DESCRIPTION OF THE MANAGEMENT AND CONTROL SYSTEM November 2013 LIST OF CONTENTS Description

More information

PART 1: DANUBE TRANSNATIONAL PROGRAMME

PART 1: DANUBE TRANSNATIONAL PROGRAMME Applicants Manual for the period 2014-2020 Version 1 PART 1: DANUBE TRANSNATIONAL PROGRAMME edited by the Managing Authority/Joint Secretariat Budapest, Hungary, 2015 Applicants Manual Part 1 1 PART 1:

More information

Role & Responsibilities of the Certifying Authority at Closure

Role & Responsibilities of the Certifying Authority at Closure Role & Responsibilities of the Certifying Authority at Closure Barry North MA MBA Head of Closure Compliance European Programmes & Local Growth Delivery Directorate Department of Communities & Local Government

More information

PROCUREMENT OF SERVICES OPEN CALL FOR TENDERS (Article 29 decree No of 30/12/2005) FRAMEWORK CONTRACT

PROCUREMENT OF SERVICES OPEN CALL FOR TENDERS (Article 29 decree No of 30/12/2005) FRAMEWORK CONTRACT PROCUREMENT OF SERVICES OPEN CALL FOR TENDERS (Article 29 decree No. 2005-1742 of 30/12/2005) FRAMEWORK CONTRACT Object: The externalisation of First Level Control activities within the framework of the

More information

Quick appraisal of major project. Guidance application: for Member States on Article 41 CPR. Requests for payment

Quick appraisal of major project. Guidance application: for Member States on Article 41 CPR. Requests for payment Quick appraisal of major project Guidance application: for Member States on Article 41 CPR Requests for payment Europe Direct is a service to help you find answers to your questions about the European

More information

Creative Europe Sub-programme Culture Financial management

Creative Europe Sub-programme Culture Financial management Creative Europe Sub-programme Culture Financial management 10 November 2014 Sandra Delespesse & Maria-Paz Benito 1 Content Financial tasks Eligibility of costs Important documents Checks, audit and evaluation

More information

Project Progress Report User Guide

Project Progress Report User Guide Project Progress Report User Guide Transnational Cooperation Programme Interreg Balkan-Mediterranean 2014-2020 CCI 2014TC16M4TN003 Balkan-Mediterranean is co-financed by European Union and National Funds

More information

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION ANNUAL REPORT ON THE COHESION FUND (2003) (SEC(2004) 1470)

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION ANNUAL REPORT ON THE COHESION FUND (2003) (SEC(2004) 1470) COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 15.12.2004 COM(2004) 766 final. REPORT FROM THE COMMISSION ANNUAL REPORT ON THE COHESION FUND (2003) (SEC(2004) 1470) EN EN TABLE OF CONTENTS 1. Budget

More information

User s guide for filling in the Execution Report

User s guide for filling in the Execution Report User s guide for filling in the Execution Report Investing in our commun future JTS Final-Version January 2011 1 JTS Final-Version January 2011 2 Table of Contents A - The implementation report form: general

More information

Interreg IPA Cross-border Cooperation Programme Greece-Albania

Interreg IPA Cross-border Cooperation Programme Greece-Albania Interreg IPA Cross-border Cooperation Programme Greece-Albania 2014-2020 SUBSIDY CONTRACT No. In Thessaloniki, today, the , at the premises of the Managing Authority located at 65, Leoforos

More information

Version 4: 29 th June 2017

Version 4: 29 th June 2017 PROGRAMME RULES INTERREG VA CROSS-BORDER PROGRAMME FOR TERRITORIAL CO-OPERATION 2014-2020 NORTHERN IRELAND, BORDER REGION OF IRELAND AND WESTERN SCOTLAND & PEACE IV EU PROGRAMME FOR PEACE AND RECONCILIATION

More information

EUROPEAN COMMISSION. EGESIF_ final 22/02/2016

EUROPEAN COMMISSION. EGESIF_ final 22/02/2016 EGESIF_14-0015-02 final 22/02/2016 EUROPEAN COMMISSION GUIDELINES FOR DETERMINING FINANCIAL CORRECTIONS TO BE MADE TO EXPENDITURE CO-FINANCED BY THE EU UNDER THE STRUCTURAL FUNDS AND THE EUROPEAN FISHERIES

More information

Report to the. Contact Committee. of the heads of the Supreme Audit Institutions. of the Member States of the European Union

Report to the. Contact Committee. of the heads of the Supreme Audit Institutions. of the Member States of the European Union Report to the Contact Committee of the heads of the Supreme Audit Institutions of the Member States of the European Union and the European Court of Auditors on the parallel audit of Analysis of (types

More information

Guidance document on a common methodology for the assessment of management and control systems in the Member States ( programming period)

Guidance document on a common methodology for the assessment of management and control systems in the Member States ( programming period) EUROPEAN COMMISSION DG Regional Policy DG Employment, Social Affairs and Equal Opportunities Guidance document on a common methodology for the assessment of management and control systems in the Member

More information

Eligibility principles and sound financial management

Eligibility principles and sound financial management Eligibility principles and sound financial management Joint Secretariat Marco Popolizio Finance Officer LP Seminar - 1st Set of Call for Proposals Standard+ Projects Venice 26th of June 2018 GENERAL ELIGIBILITY

More information

GRANT AGREEMENT / DONATION CONTRACT NO... Article 1. General Provisions

GRANT AGREEMENT / DONATION CONTRACT NO... Article 1. General Provisions Project Rural and Regional Development Support to the Republic of Serbia is financed by the Swiss Agency for Development and Cooperation (hereinafter referred to as: Donor ) and implemented by a NIRAS

More information

Guidance document on. management verifications to be carried out by Member States on operations co-financed by

Guidance document on. management verifications to be carried out by Member States on operations co-financed by Final version of 05/06/2008 COCOF 08/0020/04-EN Guidance document on management verifications to be carried out by Member States on operations co-financed by the Structural Funds and the Cohesion Fund

More information

First Level Control Systems Study

First Level Control Systems Study First Level Control Systems Study Analysis of FLC systems used in ETC programmes across Europe co-financed by the European Regional Development Fund (ERDF) ISBN 978-80-971481-5-7 Copyright notice: INTERACT

More information

Financial Instruments supported by the European Structural and Investment (ESI) Funds in

Financial Instruments supported by the European Structural and Investment (ESI) Funds in Regional Financial Instruments supported by the European Structural and Investment (ESI) Funds in 2014-2020 REGIO B3, DG Regional and Urban European Commission Regional 2 ERDF support through financial

More information

Programme and Project Implementation Manual COOPERATION PROGRAMME INTERREG V-A: GREECE BULGARIA CCI: 2014TC16RFCB022

Programme and Project Implementation Manual COOPERATION PROGRAMME INTERREG V-A: GREECE BULGARIA CCI: 2014TC16RFCB022 Programme and Project Implementation Manual COOPERATION PROGRAMME INTERREG V-A: GREECE BULGARIA 2014-2020 CCI: 2014TC16RFCB022 Version 5.0 September 2017 1- Table of Contents Abbreviations... 4 Glossary...

More information

COMMISSION DELEGATED REGULATION (EU) /... of

COMMISSION DELEGATED REGULATION (EU) /... of EUROPEAN COMMISSION Brussels, 16.5.2018 C(2018) 2857 final COMMISSION DELEGATED REGULATION (EU) /... of 16.5.2018 amending Commission Delegated Regulation (EU) No 1042/2014 of 25 July 2014 supplementing

More information

FINANCIAL REPORTING, CONTROLS AND AUDITS. Legal and Financial framework in H2020 proposals. HNN 2.0 Rome 28th October 2015 Gonzalo AREVALO.

FINANCIAL REPORTING, CONTROLS AND AUDITS. Legal and Financial framework in H2020 proposals. HNN 2.0 Rome 28th October 2015 Gonzalo AREVALO. FINANCIAL REPORTING, CONTROLS AND AUDITS Legal and Financial framework in H2020 proposals. HNN 2.0 Rome 28th October 2015 Gonzalo AREVALO. ISCIII Index Contents Periodic and Final Reporting Completion

More information

WORKING DOCUMENT. EN United in diversity EN. European Parliament

WORKING DOCUMENT. EN United in diversity EN. European Parliament European Parliament 2014-2019 Committee on Budgetary Control 15.6.2017 WORKING DOCUMT on the certification bodies new role on CAP expenditure: a positive step towards a single audit model but with significant

More information

Fact Sheet 14 - Partnership Agreement

Fact Sheet 14 - Partnership Agreement - Partnership Agreement Valid from Valid to Main changes Version 2 27.04.15 A previous version was available on the programme website but all projects must use this version. Core message: It is a regulatory

More information

Control Guidelines for INTERREG IPA CBC Programmes

Control Guidelines for INTERREG IPA CBC Programmes Control Guidelines for INTERREG IPA CBC Programmes Version 3.0 June 2018-1 - Contents ABBREVIATIONS 4 1. EXECUTIVE SUMMARY 5 2. LEGISLATIVE AND INSTITUTIONAL FRAMEWORK 5 2.1. European legislative framework

More information

Financial Regulation. Applicable to the budget of the European Medicines Agency. 15 January 2014 EMA/MB/789566/2013 Management Board

Financial Regulation. Applicable to the budget of the European Medicines Agency. 15 January 2014 EMA/MB/789566/2013 Management Board 15 January 2014 EMA/MB/789566/2013 Management Board Applicable to the budget of the European Medicines Agency 7 Westferry Circus Canary Wharf London E14 4HB United Kingdom Telephone +44 (0)20 7418 8400

More information