FOREWORD. There are five sections to this document:

Similar documents
FOREWORD. There are five sections to this document:

FOREWORD. There are five sections to this document:

TEXAS DEPARTMENT OF TRANSPORTATION

RAS PROJECTS THE GOOD, THE BAD, AND THE UGLY. Ryan Barborak, P.E. CST Flexible Pavements Branch

CONSTRUCTION STAFFING. Mario R. Jorge, P.E. District Engineer San Antonio District

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0

15,790. Bryan Waco Region. Do you own or lease a personal vehicle? What is your primary means of transportation?

TEXAS TRANSPORTATION COMMISSION MEETING ATTACHED LISTS February 26, 2015 HIGHWAY MAINTENANCE AND BUILDING CONSTRUCTION CONTRACTS-STATE LET

TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE

17,321 13,351. Overall Statewide Results. How was the survey taken? Do you own or lease a personal vehicle?

EXHIBIT A DONATIONS Cullen Blvd, An Individual Series of Forefunders Partners, LLC. Houston District

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION

How to Read the Project Modification Listings Roadway Section

Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates

UNIFIED TRANSPORTATION PROGRAM

December Update of 2018 UTP Category 2 and Category 10 CBI. Requested Amount

TEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P

EXHIBIT A DONATIONS April 26, 2018


Overview of the Homestead Exemption Increase (SJR 1 and SB 1, 84 th Legislature)

Transportation Improvement Program Page 39

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013

$ Monthly Rent Affordable to Selected Income Levels Compared with Two-Bedroom FMR. Gap between Rent Affordable and FMR $66

FY STIP. Lufkin District. February 2012 Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

$ FACTS ABOUT TEXAS: WAGE STATE FACTS HOUSING MOST EXPENSIVE AREAS WAGE RANKING

How to Read the Project Modification Listings - Roadway Section

L.zu? V fl1i. VARIOUS Counties MINUTE ORDER Page 1 of 1. VARIOUS Districts

EXHIBIT A DONATIONS December 13, 2018

Construction Spending, Labor & Materials Outlook

TEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY

TXDOT CONGESTION RELIEF INITIATIVE, INCLUDING

Region 5 Upcoming Projects for Summer/Fall 2018

Appendix D Total Project Cost and Year of Expenditure Breakdown

New York state medical malpractice coverage premiums

6 MCF REPORT RESIDENTIAL GAS BILL ANALYSIS TEXAS DISTRIBUTION UTILITIES. Second Quarter Published by:

U.S. Economic Outlook

CASH MANAGEMENT & CONTRACT AWARDS

TEXAS METROPOLITAN MOBILITY PLAN: FUNDING NEW OPPORTUNITIES

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

TEXAS TRANSPORTATION COMMISSION

Table of Contents. Study Overview. Corridor Needs Analysis. Financial Strategies. Legislative Review

TEXAS TRANSPORTATION COMMISSION

SPECIAL PROVISION Legal Relations and Responsibilities to the Public

FY February Quarterly Revision. Bryan DISTRICT

Selected Economic Data for Texas Cooperative Extension, Central Texas District (8)

STATE BAR OF TEXAS Department of Research and Analysis

Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted)

Salvador Contreras University of Texas Rio Grande Valley January 27, Research Assistants: Jacob Almaguer Ruth Cano Ivan Vazquez

How to Read the Project Modification Listings Roadway Section

Contribution and Benefit Decision-Making for Texas Public Retirement Systems

The widening gap between home price and household

Approved STIP Formal Amendments for the Period of 11/01/2018-3/15/2019

IN THIS ISSUE A MONTHLY NEWSLETTER OF THE TEXAS WORKFORCE COMMISSION. Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) 4.

30C VARIOUS Counties MINUTE ORDER Page 1 of 1. VARIOUS Districts

Public Hearing Tarrant County. April 14, 2009

ABILENE MPO TRANSPORTATION POLICY BOARD MEETING

IN THIS ISSUE A MONTHLY NEWSLETTER OF THE TEXAS WORKFORCE COMMISSION. Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) 6.

Texas: Sources of Children s Coverage by County,

Fiscal Year nd Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending February 28, 2018

FY STIP. Amarillo District May Quarterly Revisions STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY

A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN

10-Year Capital Highway Investment Plan DRAFT


SPECIAL PROVISION Legal Relations and Responsibilities to the Public

RECOMMENDATIONS REPORT WITH COMMENTS AND RESPONSES. October Submitted for Review to TxDOT Executive Management

FY TRANSPORTATION IMPROVEMENT PROGRAM

These tariff sheets have an effective date of July 2, 2013.

85 th Legislature: Impact on Funding and UTP

A A MONTHLY NEWSLETTER OF OF THE THE TEXAS WORKFORCE COMMISSION TEXAS

... TEXPERS. The Texas Association of Public Employee Retirement Systems

Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) Growth in Total Nonagricultural Employment in Texas topped

MINUTES OF THE ABILENE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION POLICY BOARD. May 19, 2015

TEXAS TRANSPORTATION COMMISSION

Funding Update. House Transportation Subcommittee on Long-Term Infrastructure Planning September 10, 2015, 9:00 A.M. Capitol Extension E2.

Map the Meal Gap 2018: Overall Food Insecurity in Texas by County in

City of Grand Forks Staff Report

Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) Total Nonagricultural Employment in Texas slid by 1,300 jobs in

2016 Texas Economic Outlook: Riding the Energy Roller Coaster Keith Phillips Assistant Vice President and Senior Economist

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6

... TEXPERS. The Texas Association of Public Employee Retirement Systems

Statewide Transportation Improvement Program INTRODUCTION

METRO INVESTMENT REPORT ALL FUNDS

Texas Mid-Year Economic Outlook: The Skies are Beginning to Clear Keith Phillips Assistant Vice President and Senior Economist

Wednesday, June 6, 2018

Section C Forms

The tariff sheets have an effective date of July 3, 2012.

SOLUTIONS FOR SAVING LIVES ON TEXAS ROADS

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION

2015 INCOME FACT SHEET. Published August 2016 Analysis by Invariance Dynamics Consulting Nils Greger Olsson, PhD

Regional Toll Revenue Annual Financial Report

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM

STATE BAR OF TEXAS DEPARTMENT OF RESEARCH & ANALYSIS

Fiscal Year th Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending August 31, 2018

Programed Totals $39,761 $35,676 $75,437 $73,111 $2,326 $0 $17,109 $17,109 $17,109 $0 $0 $14,580 $14,580 $14,580 $0

Capital Improvements Program. City Council October 14, 2014

CDFI. Community Development Financial Institutions. By: Holly R. Logue IBAT Annual Convention September 21, 2015

Big Country Electric Cooperative Trust Operation Round Up Program

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION

Undergraduate Admissions

Pavement Preservation

Transcription:

1

FOREWORD * This document contains candidate projects which have been identified by districts as ready for letting or obligation of funds in fiscal year 2018 by TxDOT. There are five sections to this document: 1. Projects that are scheduled to let through the statewide letting process at Austin headquarters 2. Projects that are approved by the TxDOT administration to let by a local entity such as a city or county 3. Other financial obligations that do not go through a letting process 4. Project selected as Comprehensive Development Agreement 5. Projects selected as Design Build Projects and other financial obligations are funded by various funding sources, the details of which are provided on the following page. The State Highway is TxDOT s traditional method of project funding and in recent years the department has received additional financial tools from the Legislature to advance projects. The projects and financial obligations in this schedule are based on the current estimated construction costs of the projects and the current forecast of available funds for fiscal year 2018. Changing conditions may result in projects being removed or added to this Letting Schedule. These changes could include financial issues such as receiving more or less revenues than forecasted, adjustments to fit within obligation limits, the execution of funding agreements, bids on projects being higher or lower than the project estimates, and increasing or decreasing cost on existing contracts through change orders or quantity overruns. Likewise, some projects and financial obligations may move out of or into the Letting Schedule due to project development issues associated with receiving environmental clearance or required right of way, changes in project priorities at the local or statewide level, or conflicts with other ongoing construction or maintenance work. *The following list includes projects known at the time of publication based on input from the districts. The current letting schedule will be reflected each week according to district requested project scheduling changes. 2

FISCAL YEAR 2018 PLANNED STATEWIDE SUMMARY INCLUDES STATEWIDE LETTINGS, LOCAL LETTINGS AND OTHER OBLIGATIONS (In Millions) ALL S BASED ON CURRENT District State Highway 1 2 2 SIB Pass Toll SH 130 Rail Local Texas 1 14 Through Rev Conc Mobility Prog 1 Bond Finance Prog 2 Total 5 ABILENE $85.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $85.59 AMARILLO $133.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.03 $0.00 $133.24 ATLANTA $48.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.38 $0.00 $48.75 AUSTIN $137.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $301.03 $0.00 $438.03 BEAUMONT $269.91 $0.00 $0.00 $0.00 $0.00 $0.00 $20.13 $0.00 $0.00 $0.00 $0.00 $0.00 $290.04 BROWNWOOD $23.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $23.49 BRYAN $52.76 $0.38 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $53.14 CHILDRESS $25.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $25.16 CORPUS CHRISTI $264.22 $10.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.50 $0.00 $276.20 DALLAS $215.40 $43.20 $0.00 $0.00 $0.00 $0.00 $0.00 $20.27 $0.00 $0.00 $8.97 $0.00 $287.84 EL PASO $138.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $15.74 $0.00 $153.97 FORT WORTH $491.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $20.00 $0.00 $0.00 $18.84 $0.00 $530.30 HOUSTON $864.87 $7.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $150.99 $10.89 $1,034.25 LAREDO $77.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3.62 $0.00 $81.20 LUBBOCK $110.01 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.32 $0.00 $110.33 LUFKIN $152.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $152.51 ODESSA $205.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.65 $0.00 $207.28 PARIS $177.26 $2.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $40.18 $0.00 $219.79 PHARR $154.08 $5.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $14.30 $0.00 $173.85 SAN ANGELO $85.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $85.03 SAN ANTONIO $484.24 $9.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $17.76 $0.00 $511.90 TYLER $101.02 $0.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $101.13 WACO $109.95 $21.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3.89 $0.00 $135.55 WICHITA FALLS $34.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $34.61 YOAKUM $356.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $356.10 DESIGN DIVISION $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TRAFFIC DIVISION $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 District Total: $4,797.70 $101.09 $0.00 $0.00 $0.00 $0.00 $20.13 $40.27 $0.00 $0.00 $579.21 $10.89 $5,549.29 * Actual totals may include local letting and other obligations remaining to be obligated and/or concurrence of award. 1 2 State Highway consists of federal, state and local funds. State Highway Revenue Bonds (osition and ostion 14) allow for the advancement of projects payable from future deposits to the State Highway. 3 State Infrastructure Bank Loans. 3

FISCAL YEAR 2018 PLANNED STATEWIDE LETTING SUMMARY (In Millions) BASED ON CURRENT District State 2 2 SIB Pass Toll SH 130 Rail Local Texas Highway 1 14 Through Rev Conc Mobility Prog 1 Prog 2 Bond Finance Total ABILENE $85.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $85.59 AMARILLO $133.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.03 $0.00 $133.24 ATLANTA $48.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.38 $0.00 $48.75 AUSTIN $132.27 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $166.60 $0.00 $298.88 BEAUMONT $265.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $265.75 BROWNWOOD $23.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $23.49 BRYAN $52.76 $0.38 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $53.14 CHILDRESS $25.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $25.16 CORPUS CHRISTI $263.19 $10.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.50 $0.00 $275.17 DALLAS $167.73 $43.20 $0.00 $0.00 $0.00 $0.00 $0.00 $20.10 $0.00 $0.00 $1.19 $0.00 $232.23 EL PASO $109. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $15.50 $0.00 $4.62 FORT WORTH $462.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $13.08 $0.00 $475.74 HOUSTON $737.43 $7.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $36.45 $0.69 $782.07 LAREDO $56.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $56.00 LUBBOCK $110.01 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.32 $0.00 $110.33 LUFKIN $152.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $152.51 ODESSA $205.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.65 $0.00 $207.28 PARIS $138.03 $2.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $140.38 PHARR $135.85 $5.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5.65 $0.00 $146.97 SAN ANGELO $85.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $85.03 SAN ANTONIO $428.48 $9.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $13.68 $0.00 $452.06 TYLER $100.02 $0.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $100.13 WACO $92.45 $21.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $114.16 WICHITA FALLS $34.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $34.61 YOAKUM $356.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $356.10 DESIGN DIVISION $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TRAFFIC DIVISION $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 District Total: $4,401.48 $101.09 $0.00 $0.00 $0.00 $0.00 $0.00 $20.10 $0.00 $0.00 $256.04 $0.69 $4,779.41 1 2 State Highway consists of federal, state and local funds. State Highway Revenue Bonds (osition and ostion 14) allow for the advancement of projects payable from future deposits to the State Highway. 3 State Infrastructure Bank Loans. 4

ABILENE DISTRICT FISCAL YEAR 2018 PLANNED STATEWIDE LETTING SUMMARY (In Millions) BASED ON CURRENT Month State Highway 1 Prog 1 Prog 2 14 SIB Pass Through Finance Toll Rev SH 130 Conc Rail Local Texas Mobility Total SEPTEMBER $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 OCTOBER $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 NOVEMBER $6.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6.80 DECEMBER $22.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $22.96 JANUARY $10.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $10.22 FEBRUARY $11.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $11.58 MARCH $9.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9.19 APRIL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 MAY $1.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.76 JUNE $5.07 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5.07 JULY $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 AUGUST $18.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $18.00 District Total: $85.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $85.59 5

ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE HOWARD IH 20 0005-06-116 0.200 NOV 2017 INSTALL INTERSECTION FLASHING BEACON, ADVANCE WARNININGSIGNALS AND SIGNS, INSTALL PAVEMENT MARKINGS LIMITS FROM: AT FM 700 LIMITS TO: FRONTAGE ROADS ONLY ABILENE CALLAHAN IH 20 0006-07-075 0.200 NOV 2017 INSTALL INTERSECTION FLASHING BEACON, ADVANCE WARNININGSIGNALS AND SIGNS, INSTALL PAVEMENT MARKINGS LIMITS FROM: AT FM 1707 LIMITS TO: FRONTAGE ROADS ONLY ABILENE JONES US 83 0033-05-088 0.200 NOV 2017 INSTALL INTERSECTION FLASHING BEACON,ADVANCE WARNING SIGNALSINTERSECTION-EXISTING SIGNAL,FLASHING BEACON OR STOP SIGNS LIMITS FROM: AT FM 707 ABILENE SCURRY US 84 0053-08-067 0.200 NOV 2017 INSTALL INTERSECTION FLASHING BEACON, ADVANCE WARNININGSIGNALS AND SIGNS, SAFETY LIGHTING LIMITS FROM: AT FM 1673(INT WITH N.FRONT RD) ABILENE CALLAHAN SH 36 0181-02-030 0.200 NOV 2017 SAFETY LIGHTING AT INTERSECTION LIMITS FROM: @ FM 604 LIMITS TO: @ FM 604 ABILENE BORDEN US 180 0295-02-027 0.200 NOV 2017 INSTALL INTERSECTION FLASHING BEACON, INSTALL ADVANCEINTERSECTION WARNING SIGNALS AND SIGNS, SAFETY LIGHTING LIMITS FROM: @ FM 1054 LIMITS TO: @ FM 1054 ABILENE HOWARD FM 700 0668-02-015 0.200 NOV 2017 IMPROVE TRAFFIC SGNLS, INSTL ADV INT WARNING SIG & SIGNS,SAFETY LT INTERSECTION, INSTL TRANSVERS RUMBLE STRIPS LIMITS FROM: AT BIRDWELL LANE ABILENE HOWARD FM 700 0668-02-018 0.200 NOV 2017 INSTALL INTERSECTION FLASHING BEACON LIMITS FROM: FM 700 & 11TH LIMITS TO: FM 700 & 11TH ABILENE TAYLOR FM 89 0699-01-053 0.200 NOV 2017 IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW,SAFETY LIGHTING AT INTERSECTION LIMITS FROM: AT FM 707 ABILENE TAYLOR FM 6 0733-03-055 0.956 NOV 2017 INSTALL ADVANCE CURVE WARNING SIGNALS LIMITS FROM: 1.356 MI S OF FM 1085 LIMITS TO: 2.3 MI S OF FM 1085 ABILENE TAYLOR FM 6 0733-03-056 0.673 NOV 2017 INSTALL ADVANCE CURVE WARNING SIGNALS LIMITS FROM: 3.598 MI S OF FM 1085 LIMITS TO: 4.271 MI S OF FM 1085 ABILENE SCURRY FM 1606 1526-01-020 0.581 NOV 2017 INSTALL ADVANCE CURVE WARNING SIGNALS - EXISTING WARNINGSIGNS LIMITS FROM: 0.269 MI NW OF FM 2085 LIMITS TO: 0.3 MI E OF FM 2085 ABILENE SCURRY FM 69 1873-02-023 1.180 NOV 2017 INSTALL ADVANCE CURVE WARNING SIGNALS - EXISTING WARNING SIGSIGNS, INSTALL CHEVRONS ON CURVE LIMITS FROM: GARZA CO LINE LIMITS TO: 1.18 MI S OF GARZA CO LINE $ 137,371 HES $ 72,4 HES $ 58,793 HES $ 100,576 HES $ 50,355 HES $ 56,408 HES $ 179,981 HES $ 37,784 HES $ 161,630 HES $ 31,547 HES $ 31,271 HES $ 31,7 HES $ 54,455 HES LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 6

ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING LIMITS FROM: GARZA CO LINE LIMITS TO: 1.18 MI S OF GARZA CO LINE PROJ NUM: STP ( )HES CONTRACT CSJ: 0005-06-116 NOV 2017 13 Projects $ 1,004,295 ABILENE NOLAN BI 20-M 0006-15-034 0.360 NOV 2017 REPLACE BRIDGE & APPROACHES LIMITS FROM: AT THE UPRR LIMITS TO: IN SWEETWATER (PSN 044) 0006-15-035 CONTRACT CSJ: 0006-15-034 NOV 2017 $ 5,800,000 PROJ NUM:BR 1702(521) $ 5,800,000 NOV 2017 TOTAL: 14 Projects 2 Contracts $ 6,804,295 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 7

ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE HOWARD IH 20 0005-05-109 8.815 DEC 2017 ROADWAY REHABILITATION / ARMORING LIMITS FROM: MARTIN COUNTY LINE LIMITS TO: NEAR US 87 (WB LANES ONLY) CONTRACT CSJ: 0005-05-109 DEC 2017 $ 8,005,015 $ 8,005,015 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 8

ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE JONES US 83 0033-05-092 18.354 DEC 2017 MAINLANES AND FRONTAGE ROADSEXCEPT OUT SOUTHBOUND MAINLANES ANSON TO HAWLEY(003305091) LIMITS FROM: 13TH ST IN ANSON LIMITS TO: TAYLOR COUNTY LINE ABILENE STONEWALL US 380 0106-06-034 9.651 DEC 2017 LIMITS FROM: US 83 IN ASPERMONT LIMITS TO: SH 283 ABILENE SHACKELFORD US 283 05-04-032 17.309 DEC 2017 LIMITS FROM: THROCKMORTON COUNTY LIMITS TO: US 180 IN ALBANY ABILENE HASKELL US 277 0157-09-002 4.524 DEC 2017 LIMITS FROM: BU 277 NORTH INTERSECTION LIMITS TO: BU 277 SOUTH INTERSECTION ABILENE KENT LIMITS FROM: US 380 SH 70 0263-02-018 16.776 DEC 2017 LIMITS TO: FISHER COUNTY LINE ABILENE FISHER SH 70 0263-04-031 0.692 DEC 2017 LIMITS FROM: 0. MILES SOUTH OF FISHER CR 303 LIMITS TO: NORTH ROBY CITY LIMITS ABILENE FISHER SH 70 0263-05-023 15.751 DEC 2017 LIMITS FROM: NORTH ROBY CITY LIMITS LIMITS TO: NOLAN COUNTY LINE ABILENE JONES SH 92 0318-01-031 17.467 DEC 2017 LIMITS FROM: US 83 LIMITS TO: US 277 ABILENE HASKELL US 380 0360-02-029 5.913 DEC 2017 LIMITS FROM: STONEWALL COUNTY LINE LIMITS TO: SH 6 IN ABILENE HASKELL LIMITS FROM: SH 6 US 380 0360-03-022 9.761 DEC 2017 LIMITS TO: US 277 EAST FRONTAGE ROAD ABILENE NOLAN FM 1856 0488-01-015 10.008 DEC 2017 LIMITS FROM: IH 20 NORTH FRONTAGE RD LIMITS TO: SH 70 INTERSECTION ABILENE BORDEN FM 669 0558-02-013 14.444 DEC 2017 LIMITS FROM: GARZA COUNTY LINE LIMITS TO: US 180 ABILENE BORDEN LIMITS FROM: US 180 ABILENE HOWARD LIMITS FROM: US 87 FM 669 0558-03-025 19.261 DEC 2017 LIMITS TO: HOWARD COUNTY LINE RM 33 0558-05-0 6.829 DEC 2017 LIMITS TO: GLASSCOCK COUNTY LINE $ 2,442,000 $ 372,000 $ 650,000 $ 439,000 $ 866,000 $ 35,000 $ 794,000 $ 865,000 $ 283,000 $ 524,000 $ 258,000 $ 610,000 $ 633,000 $ 256,000 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 9

ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE HOWARD LIMITS FROM: FM 820 SH 350 0693-01-035 11.734 DEC 2017 LIMITS TO: MITCHELL COUNTY LINE ABILENE SCURRY SH 350 0693-03-044 16.213 DEC 2017 LIMITS FROM: MITCHELL COUNTY LINE LIMITS TO: US 180 ABILENE NOLAN FM 419 0983-03-027 3.779 DEC 2017 LIMITS FROM: FISHER COUNTY LINE LIMITS TO: BI 20-M ABILENE HOWARD FM 1584 1503-02-010 11.760 DEC 2017 LIMITS FROM: BORDEN COUNTY LINE LIMITS TO: US 87 ABILENE SCURRY FM 1607 1529-02-009 4.702 DEC 2017 LIMITS FROM: FM 1609 S OF US 180 LIMITS TO: US 180 ABILENE HOWARD FM 461 1653-01-010 2.294 DEC 2017 LIMITS FROM: GLASSCOCK COUNTY LINE LIMITS TO: US 87 ABILENE HOWARD FM 846 1872-01-009 5.655 DEC 2017 LIMITS FROM: US 87 LIMITS TO: FM 699 ABILENE JONES FM 3326 3455-01-010 8.894 DEC 2017 LIMITS FROM: US 83 LIMITS TO: FM 26 CONTRACT CSJ: 0033-05-092 DEC 2017 22 Projects $ 1,301,000 $ 864,000 $ 166,000 $ 359,000 $ 165,000 $ 70,000 $ 133,000 $ 209,000 $,294,000 ABILENE CALLAHAN REHABILITATION US 283 0437-02-014 0.250 DEC 2017 LIMITS FROM: IH 20 LIMITS TO: APPROX.25 MILES NORTH OF IH 20 ABILENE CALLAHAN REHABILITATION US 283 0437-03-040 0.737 DEC 2017 LIMITS FROM: BAIRD SOUTH CITY LIMITS LIMITS TO: EAST 6TH STREET IN BAIRD CONTRACT CSJ: 0437-02-014 DEC 2017 2 Projects $ 1,247,989 $ 1,408,495 $ 2,656,484 DEC 2017 TOTAL: 25 Projects 3 Contracts $ 22,955,499 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 10

ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE TAYLOR SH 351 0011-01-036 1.559 JAN 2018 MILL,SPOT REPAIR,LEVEL-UP & OVERLAY LIMITS FROM: BU 83-D (TREADAWAY ST) LIMITS TO: RAINY CREEK CONTRACT CSJ: 0011-01-036 JAN 2018 ABILENE JONES US 277 0157-05-060 7.280 JAN 2018 SPOT BASE REPAIR,MILL & FILL DRIVING LANES,1-COURSE SURFACETREATMENT,1" SP D OVER ENTIRE ROADBED LIMITS FROM: HASKELL COUNTY LINE LIMITS TO: FM 1636 (EAST) CONTRACT CSJ: 0157-05-060 JAN 2018 ABILENE TAYLOR MINOR BRIDGE REPAIR VA 0908-00-083 0.001 JAN 2018 LIMITS FROM: VARRIOUS LOCATIONS ON IH 20 LIMITS TO: IN ABILENE DISTRICT CONTRACT CSJ: 0908-00-083 JAN 2018 $ 2,4,342 $ 2,4,342 $ 7,562,080 $ 7,562,080 $ 536,801 $ 536,801 JAN 2018 TOTAL: 3 Projects 3 Contracts $ 10,223,223 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 11

ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE CALLAHAN FM 18 0006-11-022 15.494 FEB 2018 PROFILE EDGELINE MARKINGS LIMITS FROM: TAYLOR C/L LIMITS TO: BI 20T ABILENE TAYLOR IH 20 0006-05-116 2.618 FEB 2018 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: 0.717 MI E OF FM 3438 LIMITS TO: NEAR OLD ANSON RD ABILENE TAYLOR IH 20 0006-06-102 8.276 FEB 2018 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: OLD ANSON RD LIMITS TO: 0.089 MI W OF CALLAHAN CO LINE ABILENE CALLAHAN BI 20-T 0007--007 2.826 FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: FM 2047 LIMITS TO: IH 20 ABILENE SHACKELFORD SH 351 0011-04-025 13.836 FEB 2018 PROFILE CENTERLINE-EDGELINE MARKINGS LIMITS FROM: FM 604 LIMITS TO: US 180 ABILENE SHACKELFORD US 180 0011-06-044 11.294 FEB 2018 PROFILE CENTERLINE-EDGELINE MARKINGS LIMITS FROM: 0.206 MI E OF US 283 LIMITS TO: 0.063 MI W OF STEPHENS C/L ABILENE STONEWALL US 83 0032-07-031.264 FEB 2018 TEXTURIZE SHOULDERS AND CENTER LINEROLLED-IN OR MILLED-IN LIMITS FROM: FM 63 LIMITS TO: US 380 ABILENE STONEWALL US 83 0033-01-039.311 FEB 2018 TEXTURIZE SHOULDERS AND CENTER LINEROLLED-IN OR MILLED-IN LIMITS FROM: 0.811 MI S OF FM 610 LIMITS TO: FISHER COUNTY LINE ABILENE FISHER US 83 0033-02-018 1.610 FEB 2018 TEXTURIZE SHOULDERS AND CENTER LINEROLLED-IN OR MILLED-IN LIMITS FROM: STONEWALL COUNTY LINE LIMITS TO: JONES COUNTY LINE ABILENE JONES US 83 0033-03-028 0.733 FEB 2018 TEXTURIZE SHOULDERS AND CENTER LINEROLLED-IN OR MILLED-IN LIMITS FROM: FISHER COUNTY LINE LIMITS TO: FM 540 ABILENE JONES US 83 0033-04-068 15.136 FEB 2018 PROFILE EDGELINE MARKINGS LIMITS FROM: 0.9 MI S OF SH 92 LIMITS TO: US 277 ABILENE SCURRY BU 84-H 0053-16-005 3.035 FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: US 84 (N) LIMITS TO: US 84 (S) ABILENE STONEWALL US 83 0106-05-032 1.958 FEB 2018 TEXTURIZE SHOULDERS AND CENTER LINEROLLED-IN OR MILLED-IN LIMITS FROM: US 380 LIMITS TO: 2 MI S OF US 380 ABILENE SHACKELFORD US 180 0107-02-039 10.554 FEB 2018 PROFILE CENTERLINE-EDGELINE MARKINGS LIMITS FROM: SH 6 LIMITS TO: 0.057 MI W OF SH 351 $ 175,703 HES $ 18,019 HES $ 55,894 HES $ 83,428 HES $ 205,378 HES $ 167,645 HES $ 174,325 HES $ 176,319 HES $ 23,059 HES $ 10,498 HES $ 209,915 HES $ 79,002 HES $ 27,832 HES $ 156,661 HES LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD

ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE SHACKELFORD US 283 05-04-029 15.130 FEB 2018 PROFILE EDGELINE MARKINGS LIMITS FROM: THROCKMORTON COUNTY LINE LIMITS TO: 2.717 MI S OF FM 2482 ABILENE TAYLOR SH 36 0181-01-059 5.969 FEB 2018 TEXTURIZE SHOULDERS AND CENTER LINEROLLED-IN OR MILLED-IN LIMITS FROM: 1.61 MI S OF FM 18 LIMITS TO: CALLAHAN COUNTY LINE ABILENE BORDEN US 180 0295-03-031 16.147 FEB 2018 TEXTURIZE SHOULDERS-ROLLED-IN OR MILLED-IN LIMITS FROM: FM 669 LIMITS TO: SCURRY COUNTY LINE ABILENE BORDEN US 180 0295-03-033 16.056 FEB 2018 MILLED CENTERLINE RUMBLE STRIPS LIMITS FROM: FM 669 LIMITS TO: SCURRY CO LINE ABILENE SCURRY US 180 0295-04-045 10.226 FEB 2018 TEXTURIZE SHOULDERS-ROLLED-IN OR MILLED-IN LIMITS FROM: BORDEN COUNTY LINE LIMITS TO: FM 1609 ABILENE FISHER US 180 0296-03-036 13.720 FEB 2018 PROFILE EDGELINE MARKINGS LIMITS FROM: SH 70 LIMITS TO: JONES COUNTY LINE ABILENE TAYLOR US 277 0407-06-043 4.092 FEB 2018 MILLED EDGELINE AND CENTERLINE RUMBLE STRIPS LIMITS FROM: 0.405 MI N OF FM 35 LIMITS TO: 5 MI N OF FM 89 ABILENE MITCHELL SH 208 0454-03-043 10.204 FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: IH 20 LIMITS TO: FM 644 ABILENE HOWARD RM 33 0558-05-011 5.932 FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: GLASSCOCK COUNTY LINE LIMITS TO: FM 818 ABILENE TAYLOR FM 35 0663-04-013 5.933 FEB 2018 PROFILE EDGELINE MARKINGS LIMITS FROM: US 277 LIMITS TO: FM 89 ABILENE HASKELL FM 618 0985-01-022 7.965 FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: FM 600 LIMITS TO: US 277 ABILENE HOWARD FM 818 1134-01-017 6.505 FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: FM 461 LIMITS TO: RM 33 ABILENE HOWARD FM 846 1155-02-013 6.499 FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: MARTIN COUNTY LINE LIMITS TO: US 87 ABILENE KENT SH 208 2011-02-0 16.668 FEB 2018 TEXTURIZE SHOULDERS-ROLLED-IN OR MILLED-IN LIMITS FROM: DICKENS COUNTY LINE LIMITS TO: US 380 $ 52,852 HES $ 86,467 HES $ 220,968 HES $ 148,951 HES $ 139,941 HES $ 188,718 HES $ 58,928 HES $ 255,717 HES $ 172,557 HES $ 76,031 HES $ 2,652 HES $ 166,320 HES $ 166,320 HES $ 229,549 HES LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 13

ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE KENT SH 208 2011-02-014 16.637 FEB 2018 MILLED CENTERLINE RUMBLE STRIPS LIMITS FROM: DICKENS CO LINE LIMITS TO: US 380 ABILENE JONES FM 600 2032-02-014 11.163 FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: US 180 LIMITS TO: FM 1082 ABILENE JONES FM 600 2032-03-0 6.316 FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: FM 1082 LIMITS TO: TAYLOR COUNTY LINE ABILENE TAYLOR FM 600 2032-04-010 2.048 FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: JONES COUNTY LINE LIMITS TO: IH 20 ABILENE JONES FM 18 2109-02-014 7.951 FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: FM 6 LIMITS TO: FM 707 ABILENE HASKELL FM 3495 2232-01-004 2.586 FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: FM 618 LIMITS TO: 2.586 MI E OF FM 618 ABILENE TAYLOR SL 322 2398-01-049 6.459 FEB 2018 TEXTURIZE SHOULDERS-ROFILE PAVEMENT MARKERS LIMITS FROM: IH 20 FR LIMITS TO: 0.425 MI E OF BU 83-D ABILENE CALLAHAN FM 2047 2856-01-007 3.821 FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: 3.8 MI N OF IH 20 LIMITS TO: IH 20 ABILENE JONES FM 2833 2859-01-009 7.021 FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: FM 1082 LIMITS TO: TAYLOR COUNTY LINE ABILENE TAYLOR FM 2833 2859-02-011 2.510 FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: JONES COUNTY LINE LIMITS TO: SH 351 CONTRACT CSJ: 0006-11-022 FEB 2018 38 Projects $ 154,341 HES $ 257,635 HES $ 145,769 HES $ 51,006 HES $ 150,638 HES $ 65,934 HES $ 188,781 HES $ 97,726 HES $ 119,542 HES $ 42,736 HES $ 5,013,757 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 14

ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE NOLAN US 84 0053--064 0.300 FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: 0.262 MI NW OF IH 20 LIMITS TO: 0.038 MI NW OF IH 20 ABILENE JONES FM 707 0484-01-022 0.400 FEB 2018 HIGH FRICTION SURFACE TREATMENT-CURVE,TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: 3.3 MI S OF FM 2746 LIMITS TO: 3.7 MI S OF FM 2746 ABILENE JONES FM 6 0733-01-015 0.406 FEB 2018 HIGH FRICTION SURFACE TREATMENT-CURVE, TEXTURIZE SHOULDERSPROFILE PAVEMENT MARKERS LIMITS FROM: 0.283 MI S OF US 83 LIMITS TO: 0.689 MI S OF US 83 ABILENE SHACKELFORD FM 142 0972-01-016 0.400 FEB 2018 HIGH FRICTION SURFACE TREATMENT-CURVE, TEXTURIZE SHOULDERSPROFILE PAVEMENT MARKERS LIMITS FROM: 0.756 MI E OF JONES C/L LIMITS TO: 1.156 MI E OF JONES C/L ABILENE SHACKELFORD FM 576 1031-05-016 0.559 FEB 2018 HIGH FRICTION SURFACE TREATMENT-CURVE, TEXTURIZE SHOULDERSPROFILE PAVEMENT MARKERS LIMITS FROM: 0.244 MI E OF FM 23 LIMITS TO: 0.804 MI E OF FM 23 ABILENE TAYLOR FM 382 1070-01-007 0.400 FEB 2018 HIGH FRICTION SURFACE TREATMENT-CURVE, TEXTURIZE SHOULDERSPROFILE PAVEMENT MARKERS LIMITS FROM: 1.9 MI S OF FM 614 LIMITS TO: 2.3 MI S OF FM 614 ABILENE FISHER FM 1085 51-01-011 0.300 FEB 2018 HIGH FRICTION SURFACE TREATMENT-CURVE,TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: 7.818 MI S FO FM 57 LIMITS TO: 8.118 MI S FO FM 57 ABILENE SCURRY FM 2085 2034-02-006 0.4 FEB 2018 HIGH FRICTION SURFACE TREATMENT-CURVE, TEXTURIZE SHOULDERSPROFILE PAVEMENT MARKERS LIMITS FROM: 0.4 MI W OF FM 1606 LIMITS TO: FM 1606 CONTRACT CSJ: 0053--064 FEB 2018 8 Projects $ 3,6 HES $ 214,055 HES $ 187,683 HES $ 214,055 HES $ 258,550 HES $ 228,628 HES $ 149,6 HES $ 190,457 HES $ 1,566,166 ABILENE NOLAN US 84 0053--065 5.013 FEB 2018 ROADWAY REHABILITATION / ARMORING LIMITS FROM: MITCHELL COUNTY LINE (EBL ONLY) LIMITS TO: 5 MI EAST OF MITCHELL COUNTY LINE CONTRACT CSJ: 0053--065 FEB 2018 $ 3,000,000 $ 3,000,000 ABILENE TAYLOR VA 0908-00-903 0.100 FEB 2018 FY 2018 TRAFFIC CONTROL DEVICES PLACE HOLDER CSJ LIMITS FROM: VARIOUS LOCATIONS IN THE LIMITS TO: ABILENE DISTRICT CONTRACT CSJ: 0908-00-903 LS PROJ NUM: $ 2,000,000 $ 2,000,000 FEB 2018 TOTAL: 48 Projects 4 Contracts $ 11,579,923 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 15

ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE NOLAN IH 20 0006-03-134 0.695 MAR 2018 REHABILITATE ROADWAY, AND INSTALL LIMITED CURB & GUTTER LIMITS FROM: BS 70-G_(NORTH FRONTAGE ROAD ONLY) LIMITS TO: EAST ARIZONA AVENUE (IN SWEETWATER) CONTRACT CSJ: 0006-03-134 MAR 2018 ABILENE JONES US 83 0033-05-091 10.453 MAR 2018 SPOT BASE REPAIR, MILL & FILL DRIVING LANES WITH 1-CST AND1" THIN OVERLAY MIX LIMITS FROM: ANSON SOUTH CITY LIMITS LIMITS TO: HAWLEY (SOUTHBOUND MAINLANES ONLY) CONTRACT CSJ: 0033-05-091 MAR 2018 $ 1,700,000 $ 1,700,000 $ 6,188,719 $ 6,188,719 ABILENE TAYLOR OVERLAY LIMITS FROM: IH 20 FM 6 0733-03-054 1.508 MAR 2018 LIMITS TO: MERKEL SOUTH CITY LIMIT CONTRACT CSJ: 0733-03-054 MAR 2018 $ 1,299,745 $ 1,299,745 MAR 2018 TOTAL: 3 Projects 3 Contracts $ 9,188,464 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 16

ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE HOWARD IH 20 0005-05-111 2.232 MAY 2018 INSTALL MEDIAN BARRIER LIMITS FROM: MARTIN CO LINE LIMITS TO: FM 818 CONTRACT CSJ: 0004-06-036 MAY 2018 ABILENE TAYLOR IH 20 0006-04-072 0.070 MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT NOODLE CREEK (IH 20 & NFR & SFR) LIMITS TO: 0.10 MI E OF FM 1085 ABILENE TAYLOR IH 20 0006-04-073 0.066 MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT BITTER CREEK (IH 20 & NFR & SFR) LIMITS TO: 2.50 MI E OF FM 1085 ABILENE TAYLOR IH 20 0006-04-074 0.065 MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT LITTLE BITTER CK (IH 20 & N FTG) LIMITS TO: 3.10 MI W OF FM 6 ABILENE TAYLOR IH 20 0006-04-075 0.062 MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT MULBERRY CREEK BRANCH (ML & FTG) LIMITS TO: 4.55 MI E OF FM 6 ABILENE TAYLOR IH 20 0006-04-076 0.066 MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT DRAW (IH 20 ML & N FRTG) LIMITS TO: 1.05 MI W OF FM 6 ABILENE TAYLOR IH 20 0006-04-077 0.071 MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT E FORK BITTER CREEK (IH 20 & FR) LIMITS TO: 0.35 MI E OF FM 6 ABILENE TAYLOR IH 20 0006-04-078 0.062 MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT DRAW (IH 20 ML & FRTG RD) LIMITS TO: 1.95 MI E OF FM 6 ABILENE TAYLOR IH 20 0006-05-1 0.063 MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT INDIAN CREEK (IH 20 & N FRTG RD) LIMITS TO: 0.35 MI W OF FM 707 ABILENE TAYLOR IH 20 0006-05-113 0.082 MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT DRAW (IH 20 WB) LIMITS TO: 0.20 MI E OF US 83 CONTRACT CSJ: 0006-04-072 MAY 2018 ABILENE LIMITS FROM: NORTH 10 TH TAYLOR ILLUMINATION UPGRADE US 83 0033-06-114 0.648 MAY 2018 LIMITS TO: SOUTH 1ST CONTRACT CSJ: 0033-06-114 MAY 2018 9 Projects $ 408,707 HES $ 408,707 $ 73,876 PROJ NUM:BR ( ) $ 47,672 PROJ NUM:BR ( ) $ 20,601 PROJ NUM:BR ( ) $ 35,738 PROJ NUM:BR ( ) $ 53,822 PROJ NUM:BR ( ) $ 56,690 PROJ NUM:BR ( ) $ 33,118 PROJ NUM:BR ( ) $ 403,062 PROJ NUM:BR ( ) $ 131,400 PROJ NUM:BR ( ) $ 855,979 $ 500,000 $ 500,000 MAY 2018 TOTAL: 1s 3 Contracts $ 1,764,686 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 17

ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE FISHER BRIDGE REPLACEMENT US 180 0296-02-033 0.146 JUN 2018 LIMITS FROM: ALKALI CREEK CONTRACT CSJ: 0296-02-033 JUN 2018 $ 3,700,000 PROJ NUM:BR ( ) $ 3,700,000 ABILENE FISHER CR 0908-23-039 0.100 JUN 2018 REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES LIMITS FROM: ON CR 198 (SIGNED CR 436) LIMITS TO: AT LIVE OAK CREEK TRIB (PSN 1) ABILENE SCURRY CR 0908-19-025 0.030 JUN 2018 REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES LIMITS FROM: ON CR 134 (SIGNED CR 398) LIMITS TO: AT CANYON CREEK TRIBUTARY (PSN 1) ABILENE FISHER CR 0908-23-040 0.031 JUN 2018 REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES LIMITS FROM: ON CR 287 (SIGNED CR 251) LIMITS TO: AT DRAW (PSN 2) ABILENE FISHER CR 0908-23-041 0.100 JUN 2018 REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES LIMITS FROM: ON CR 198 (SIGNED CR 436) LIMITS TO: AT LIVE OAK CREEK (PSN 2) ABILENE FISHER CR 0908-23-042 0.100 JUN 2018 REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES LIMITS FROM: ON CR 252(SIGNED CR 1) LIMITS TO: AT SWEETWATER CREEK (PSN 1) CONTRACT CSJ: 0908-23-039 JUN 2018 5 Projects $ 291,720 PROJ NUM:BR ( ) $ 320,892 PROJ NUM:BR ( ) $ 350,064 PROJ NUM:BR ( ) $ 262,548 PROJ NUM:BR ( ) $ 146,465 PROJ NUM:BR ( ) $ 1,371,689 JUN 2018 TOTAL: 6 Projects 2 Contracts $ 5,071,689 ABILENE TAYLOR US 83 0034-01-6 2.500 AUG 2018 CONSTRUCT OVERPASS AND RELOCATE RAMPS LIMITS FROM: S OF FM 204(CLARK/REMINGTON RD) LIMITS TO: FM 707 0034-01-132 CONTRACT CSJ: 0034-01-6 AUG 2018 ABILENE TAYLOR US 83 0034-01-8 5.819 AUG 2018 REGRADE VERTICAL CURVE TO ELIMINATE SIGHT DISTANCE ISSUES,ELIMINATE CROSS- OVERS AND ADD ACCEL AND DECEL LANES LIMITS FROM: JUST SOUTH OF FM 204 LIMITS TO: US 83 -US 84 SPLIT 0034-01-134 CONTRACT CSJ: 0034-01-8 AUG 2018 $ 10,000,000 $ 10,000,000 $ 8,000,000 $ 8,000,000 AUG 2018 TOTAL: 3 Projects 2 Contracts $ 18,000,000 ABILENE 113 Projects 22 Contracts $ 85,587,779 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 18

AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED STATEWIDE LETTING SUMMARY (In Millions) BASED ON CURRENT Month State Highway 1 Prog 1 Prog 2 14 SIB Pass Through Finance Toll Rev SH 130 Conc Rail Local Texas Mobility Total SEPTEMBER $1.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.23 OCTOBER $16.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.03 $0.00 $16.58 NOVEMBER $18.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $18.28 DECEMBER $64.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $64.00 JANUARY $25.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $25.61 FEBRUARY $2.53 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2.53 MARCH $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 APRIL $5.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5.00 MAY $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 JUNE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 JULY $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 AUGUST $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 District Total: $133.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.03 $0.00 $133.24 19

AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO POTTER CRACK SEAL VA 0904-00-169 1.000 SEP 2017 LIMITS FROM: VARIOUS LOCATIONS DISTRICTWIDE AMARILLO POTTER CRACK SEAL VA 0904-00-177 1.000 SEP 2017 LIMITS FROM: VARIOUS LOCATIONS DISTRICTWIDE CONTRACT CSJ: 0904-00-169 SEP 2017 2 Projects $ 1,037,018 PROJ NUM:STP 2018(003) $ 194,031 PROJ NUM:C 904-00-177 $ 1,231,049 SEP 2017 TOTAL: 2 Projects 1 Contract $ 1,231,049 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 20

AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO OCHILTREE US 83 0030-01-033 6.939 OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: OKLAHOMA STATE LINE LIMITS TO: SH 15 AMARILLO OCHILTREE US 83 0030-02-049 7.967 OCT 2017 PROFILE EDGELINE MARKINGS LIMITS FROM: SL 143 LIMITS TO: 3.047 MILES SE OF SH 70 AMARILLO HARTLEY US 385 0041-02-017 14.513 OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: US 87 LIMITS TO: CHANNING AMARILLO DALLAM US 287 0066-01-018 6.916 OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: OKLAHOMA STATE LINE LIMITS TO: SHERMAN COUNTY LINE AMARILLO SHERMAN US 287 0066-02-030 8.119 OCT 2017 MULLED EDGELINE RUMBLE STRIPS LIMITS FROM: DALLAM COUNTY LINE LIMITS TO: US 54 AMARILLO DALLAM US 385 0225-01-019 14.572 OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: OKLAHOMA STATE LINE LIMITS TO: 15.28 MILES NORTH OF DALHART AMARILLO DALLAM US 385 0225-02-020 14.898 OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: 15.28 MILES NORTH OF DALHART LIMITS TO: SS 17 AMARILLO HARTLEY US 385 0226-01-017 4.686 OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: CHANNING LIMITS TO: OLDHAM COUNTY LINE AMARILLO OLDHAM US 385 0226-02-037 8.038 OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: HARTLEY COUNTY LINE LIMITS TO: CANADIAN RIVER AMARILLO OLDHAM US 385 0226-03-058 26.991 OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: CANADIAN RIVER LIMITS TO: DEAF SMITH COUNTY LINE AMARILLO DEAF SMITH US 385 0226-04-028 14.925 OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: OLDHAM COUNTY LINE LIMITS TO: SOUTH OF FM 1062 AMARILLO DEAF SMITH US 385 0226-05-066 8.900 OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: SOUTH OF FM 1062 LIMITS TO: 1.271 MILES NORTH OF FM 1058 AMARILLO HARTLEY US 87 0425-01-020.476 OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: 1.161 MILES SE OF FM 807 LIMITS TO: MOORE COUNTY LINE AMARILLO MOORE US 87 0425-02-036 9.844 OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: HARTLEY COUNTY LINE LIMITS TO: 0.816 MILES WEST OF US 287 CONTRACT CSJ: 0030-01-033 OCT 2017 14 Projects $ 168,653 PROJ NUM:STP 2018(160)HESG $ 49,714 PROJ NUM:STP 2018(161)HESG $ 78,883 PROJ NUM:STP 2018(162)HESG $ 48,204 PROJ NUM:STP 2018(163)HESG $ 57,837 PROJ NUM:STP 2018(165)HESG $ 88,641 PROJ NUM:STP 2018(165)HESG $ 107,191 PROJ NUM:STP 2018(166)HESG $ 31,277 PROJ NUM:STP 2018(167)HESG $ 56,911 PROJ NUM:STP 2018(168)HESG $ 164,592 PROJ NUM:STP 2018(169)HESG $ 84,315 PROJ NUM:STP 2018(170)HESG $ 51,538 PROJ NUM:STP 2018(171)HESG $ 103,817 PROJ NUM:STP 2018(172)HESG $ 98,513 PROJ NUM:STP 2018(173)HESG $ 1,190,086 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 21

AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO CARSON US 60 0169-04-036 5.838 OCT 2017 PRESERVATION AND SAFETY IMPROVEMENTS ON A FREIGHT CORRIDOR LIMITS FROM: 0.71 MI W OF SH 207 LIMITS TO: 3.86 MI EAST OF PANHANDLE CL AMARILLO CARSON US 60 0169-05-043 0.787 OCT 2017 PRESERVATION AND SAFETY IMPROVEMENTS ON A FREIGHT CORRIDOR LIMITS FROM: 3.86 MI EAST OF PAHANDLE CL LIMITS TO: CR S EAST OF PANHANDLE AMARILLO GRAY REHAB ROADWAY US 60 0169-06-039 1.388 OCT 2017 LIMITS FROM: FM 750 WEST OF PAMPA LIMITS TO: SH 70 AMARILLO GRAY US 60 0169-07-052 7.511 OCT 2017 PRESERVATION AND SAFETY IMPROVEMENTS ON A FREIGHT CORRIDOR LIMITS FROM: SH 70 LIMITS TO: SH 152 CONTRACT CSJ: 0169-04-036 OCT 2017 4 Projects $ 8,220,588 PROJ NUM:NH 2013(611) $ 992,749 PROJ NUM:NH 2013(611) $ 1,009,438 PROJ NUM:NH 2013(611) $ 5,168,445 PROJ NUM:NH 2013(611) $ 15,391,220 OCT 2017 TOTAL: 18 Projects 2 Contracts $ 16,581,306 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 22

AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO HEMPHILL SEALCOAT LIMITS FROM: FM 277 US 83 0030-07-019 5.333 NOV 2017 LIMITS TO: WHEELER COUNTY LINE AMARILLO RANDALL SEALCOAT SBL US 87 0067-01-080 15.652 NOV 2017 LIMITS FROM: SOUTH OF CANYON (DIVIDED SECTION) LIMITS TO: SWISHER COUNTY LINE AMARILLO RANDALL SEALCOAT NBL US 87 0067-01-081 16.652 NOV 2017 LIMITS FROM: SOUTH OF CANYON (DIVIDED SECTION) LIMITS TO: SWISHER COUNTY LINE AMARILLO RANDALL SEALCOAT IH 27 0067-17-028 18.230 NOV 2017 LIMITS FROM: SWISHER COUNTY LINE (WEST FRT RD) LIMITS TO: FM 3331 (WEST FRT RD) AMARILLO POTTER SEALCOAT BI 40-D 0090-05-096 5.050 NOV 2017 LIMITS FROM: IH 40 LIMITS TO: RM 1061 AMARILLO DEAF SMITH SEALCOAT US 60 0168-07-044 13.227 NOV 2017 LIMITS FROM: HEREFORD EAST DIVIDED 4 LANE (EBL) LIMITS TO: RANDALL COUNTY LINE AMARILLO RANDALL SEALCOAT LIMITS FROM: SL 335 (FRT RDS) IH 27 0168-09-172 6.350 NOV 2017 LIMITS TO: POTTER COUNTY LINE AMARILLO POTTER SEALCOAT IH 27 0168-10-075 0.699 NOV 2017 LIMITS FROM: RANDALL COUNTY LINE (FRT RDS) LIMITS TO: IH 40 (FRT RDS) AMARILLO LIPSCOMB SEALCOAT LIMITS FROM: OKLAHOMA STATE LINE US 60 0170-02-022 11.230 NOV 2017 LIMITS TO: HEMPHILL COUNTY LINE AMARILLO GRAY SEALCOAT IH 40 0275-11-079 5.970 NOV 2017 LIMITS FROM: FM 291 SOUTH (S FRT RD) LIMITS TO: BI40-H WEST OF MCLEAN (S FTR RD) AMARILLO OCHILTREE SEALCOAT FM 759 0308-05-0 15.446 NOV 2017 LIMITS FROM: HANSFORD COUNTY LINE LIMITS TO: SH 70 AMARILLO GRAY SEALCOAT SH 273 0310-04-027 1.966 NOV 2017 LIMITS FROM: US 60 LIMITS TO: LP171/FM 749 AMARILLO HANSFORD SEALCOAT LIMITS FROM: FM 759 SH 15 0355-05-042 7.850 NOV 2017 LIMITS TO: OCHILTREE COUNTY LINE AMARILLO HUTCHINSON SEALCOAT SH 136 0356-01-104 9.520 NOV 2017 LIMITS FROM: BORGER TRAFFIC CIRCLE LIMITS TO: SH 152 STINNETT $ 1,000 $ 629,900 $ 630,600 $ 546,100 $ 491,200 $ 458,400 $ 281,700 $ 61,700 $ 435,800 $ 229,200 $ 486,600 $ 0,400 $ 320,300 $ 839,100 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 23

AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO CARSON SEALCOAT SH 207 0356-03-018 8.972 NOV 2017 LIMITS FROM: US 60 LIMITS TO: IH 40 AMARILLO HUTCHINSON SEALCOAT SS 246 0356-09-021 2.940 NOV 2017 LIMITS FROM: SH 207 LIMITS TO: SP 119 AMARILLO HUTCHINSON SEALCOAT LIMITS FROM: SH 207 SH 136 0379-01-044 14.227 NOV 2017 LIMITS TO: MOORE COUNTY LINE AMARILLO MOORE SEALCOAT SH 136 0379-05-004 0.217 NOV 2017 LIMITS FROM: HUTCHINSON COUNTY LINE LIMITS TO: POTTER COUNTY LINE AMARILLO RANDALL SEALCOAT SH 217 0464-01-026 10.329 NOV 2017 LIMITS FROM: IH 27 LIMITS TO: PR 5 AMARILLO RANDALL SEALCOAT LIMITS FROM: SH 217 PR 5 0534-01-021 10.210 NOV 2017 LIMITS TO: END AMARILLO HUTCHINSON SEALCOAT SH 152 0557-02-020 10.670 NOV 2017 LIMITS FROM: MOORE COUNTY LINE LIMITS TO: SH 207/SH 136 AMARILLO GRAY SEALCOAT LIMITS FROM: LP 171/FM 749 AMARILLO GRAY SEALCOAT LIMITS FROM: BI 40 IN MCLEAN SH 273 0560-01-031 11.207 NOV 2017 LIMITS TO: NORTH FORK RED RIVER BRIDGE SH 273 0560-02-035 19.509 NOV 2017 LIMITS TO: NORTH FORK RED RIVER BRIDGE AMARILLO GRAY SEALCOAT SH 273 0560-03-007 3.499 NOV 2017 LIMITS FROM: DONLEY COUNTY LINE LIMITS TO: BI 40 AMARILLO SHERMAN SEALCOAT SH 15 0790-03-027 13.215 NOV 2017 LIMITS FROM: CR 7 LIMITS TO: FM 119 AMARILLO MOORE SEALCOAT LIMITS FROM: FM 119 FM 281 0794-05-016 11.476 NOV 2017 LIMITS TO: HUTCHINSON COUNTY LINE AMARILLO OLDHAM SEALCOAT FM 809 0801-01-014 1.800 NOV 2017 LIMITS FROM: DEAF SMITH COUNTY LINE LIMITS TO: IH 40 AMARILLO DEAF SMITH SEALCOAT LIMITS FROM: US 60 FM 809 0801-02-021 19.081 NOV 2017 LIMITS TO: OLDHAM COUNTY LINE $ 435,700 $ 270,000 $ 1,570,500 $ 7,300 $ 592,300 $ 313,100 $ 561,600 $ 586,800 $ 936,500 $ 117,600 $ 538,100 $ 422,800 $ 5,200 $ 1,200,200 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 24

AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO DALLAM SEALCOAT LIMITS FROM: US 87 AMARILLO OLDHAM SEALCOAT LIMITS FROM: US 385 SH 102 1141-02-019 22.690 NOV 2017 LIMITS TO: NEW MEXICO STATE LINE RM 1061 45-01-015 5.840 NOV 2017 LIMITS TO: POTTER COUNTY LINE AMARILLO POTTER SEALCOAT RM 1061 45-02-045 10.100 NOV 2017 LIMITS FROM: FM 2381 LIMITS TO: BI 40 AMARILLO LIPSCOMB SEALCOAT SH 23 1337-01-024 7.487 NOV 2017 LIMITS FROM: OKLAHOMA STATE LINE LIMITS TO: FM 377 AMARILLO GRAY SEALCOAT RM 2375 1861-01-0 6.540 NOV 2017 LIMITS FROM: SH 273 LIMITS TO: FM 749 AMARILLO RANDALL SEALCOAT LIMITS FROM: 373' SOUTH OF SW 45TH SL 335 2635-03-022 1.540 NOV 2017 LIMITS TO: POTTER COUNTY LINE AMARILLO POTTER SEALCOAT SL 335 2635-04-032 0.260 NOV 2017 LIMITS FROM: RANDALL COUNTY LINE LIMITS TO: IH 40 AMARILLO LIPSCOMB SEALCOAT RM 3260 3460-03-009 9.060 NOV 2017 LIMITS FROM: SH 23 LIMITS TO: FM 1920 CONTRACT CSJ: 0030-07-019 NOV 2017 AMARILLO POTTER IH 40 0090-05-097 8.001 NOV 2017 INTERSECTION IMPROVEMENTS AT RM 2381 (BUSHLAND)AND FRT ROAD IMPROVEMENTS LIMITS FROM: 2000 WEST OF FM 2381 LIMITS TO: 2000 EAST OF FM 2381 AMARILLO OLDHAM FM 809 0801-01-013 0.570 NOV 2017 SAFETY IMPROVEMENTS BY ADDING TURN LANES AT WILDORADO HIGH LIMITS FROM: 0.57 MI N OF DEAF SMITH COUNTY LINE LIMITS TO: DEAF SMITH COUNTY LINE AMARILLO DEAF SMITH FM 809 0801-02-020 0.470 NOV 2017 SAFETY IMPROVEMENTS BY ADDING TURN LANES AT WILDORADO HIGH LIMITS FROM: OLDHAM COUNTY LINE 47 MI S OF OLDHAM COUNTY LINE CONTRACT CSJ: 0090-05-097 NOV 2017 36 Projects 3 Projects $ 853,300 $ 231,500 $ 6,600 $ 249,900 $ 176,000 $ 174,500 $ 33,000 $ 243,900 $ 15,784,400 $ 1,500,000 $ 700,000 $ 300,000 $ 2,500,000 NOV 2017 TOTAL: 39 Projects 2 Contracts $ 18,284,400 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 25

AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO POTTER OVERLAY LIMITS FROM: LP 335 US 60 0169-02-065 7.246 DEC 2017 LIMITS TO: CARSON COUNTY LINE $ 5,200,000 AMARILLO POTTER OVERLAY LIMITS FROM: US 287 INTERCHANGE IH 40 0275-01-161 4.597 DEC 2017 LIMITS TO: CARSON COUNTY LINE CONTRACT CSJ: 0169-02-065 DEC 2017 2 Projects $ 3,500,000 PROJ NUM:IM ( ) $ 8,700,000 AMARILLO POTTER IH 40 0275-01-180 0.623 DEC 2017 REPLACE EXISTING BRIDGE AND APPROACHES WB LANES LIMITS FROM: AT WHITAKER STREET AMARILLO POTTER IH 40 0275-01-181 0.660 DEC 2017 REPLACE EXISTING BRIDGE AND APPROACHES EB LANES LIMITS FROM: AT WHITAKER STREET AMARILLO POTTER IH 40 0275-01-182 0.849 DEC 2017 REPLACE EXISTING BRIDGE AND APPROACHES WB LANES LIMITS FROM: AT SL 335 (LAKESIDE DR) AMARILLO POTTER IH 40 0275-01-183 0.641 DEC 2017 REPLACE EXISTING BRIDGE AND APPROACHES EB LANES LIMITS FROM: AT SL 335 (LAKESIDE DR) AMARILLO POTTER IH 40 0275-01-184 0.666 DEC 2017 REPLACE EXISTING BRIDGE AND APPROACHES WB LANES LIMITS FROM: AT FM 58 AMARILLO POTTER IH 40 0275-01-185 0.688 DEC 2017 REPLACE EXISTING BRIDGE AND APPROACHES EB LANES LIMITS FROM: AT FM 58 AMARILLO POTTER IH 40 0275-01-198 4.247 DEC 2017 RAMPS AND MISCELLANEOUS IMPROVEMENTS LIMITS FROM:.3 MILES EAST OF EASTERN STREET LIMITS TO: US 287 SPLIT CONTRACT CSJ: 0275-01-180 DEC 2017 7 Projects $,600,000 PROJ NUM:BR ( ) $ 7,500,000 PROJ NUM:BR ( ) $ 9,300,000 PROJ NUM:BR ( ) $ 8,500,000 PROJ NUM:BR ( ) $ 6,000,000 PROJ NUM:BR ( ) $ 6,300,000 PROJ NUM:BR ( ) $ 5,100,001 $ 55,300,001 DEC 2017 TOTAL: 9 Projects 2 Contracts $ 64,000,001 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 26

AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO POTTER US 87 0041-05-050 17.426 JAN 2018 PRESERVATION AND SAFETY IMPROVEMENTS ON A FREIGHT CORRIDOR LIMITS FROM: AMARILO CREEK LIMITS TO: MOORE COUNTY LINE AMARILLO POTTER OVERLAY LIMITS FROM: IH 40 AMARILLO CARSON OVERLAY LIMITS FROM: CARSON COUNTY LINE US 287 0042-01-030 4.043 JAN 2018 LIMITS TO: CARSON COUNTY LINE US 287 0042-02-020 0.510 JAN 2018 LIMITS TO: ARMSTRONG COUNTY LINE CONTRACT CSJ: 0041-05-050 JAN 2018 AMARILLO RANDALL US 60 0168-08-070 0.200 JAN 2018 IMPROVE TRAFFIC SIGNALS LIMITS FROM: AT FM 2590 AMARILLO DEAF SMITH US 385 0226-05-063 0.200 JAN 2018 IMPROVE TRAFFIC SIGNALS LIMITS FROM: AT MOREMAN ROAD AMARILLO HUTCHINSON SH 152 0455-01-045 0.200 JAN 2018 IMPROVE TRAFFIC SIGNALS LIMITS FROM: AT SS 246 AMARILLO GRAY SH 70 0490-01-034 0.200 JAN 2018 IMPROVE TRAFFIC SIGNALS LIMITS FROM: AT KENTUCKY AMARILLO GRAY SH 70 0490-01-035 0.011 JAN 2018 IMPROVE TRAFFIC SIGNALA LIMITS FROM: AT SH 152 CONTRACT CSJ: 0168-08-070 JAN 2018 AMARILLO HARTLEY FM 767 1108-01-020 0.503 JAN 2018 REPLACE EXISTING BRIDGE LIMITS FROM: AT PUNTA DE AGUA CREEK CONTRACT CSJ: 1108-01-020 JAN 2018 3 Projects 5 Projects $ 15,300,000 $ 3,150,000 $ 400,000 $ 18,850,000 $ 76,080 HES $ 82,800 HES $ 82,800 HES $ 82,800 $ 82,800 $ 407,280 $ 6,350,000 PROJ NUM:BR ( ) $ 6,350,000 JAN 2018 TOTAL: 9 Projects 3 Contracts $ 25,607,280 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 27

AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO GRAY CR 0904-13-024 0.010 FEB 2018 REPLACE BRIDGE AND APPROACHES LIMITS FROM: ON CR 17 LIMITS TO: AT GRAPEVINE CRK AMARILLO ARMSTRONG CR 0904-06-010 0.100 FEB 2018 REPLACE BRIDGE AND APPROACHES LIMITS FROM: ON CR 25 LIMITS TO: AT WEST FORK COTTONWOOD CREEK AMARILLO GRAY CR 0904-13-025 0.010 FEB 2018 REPLACE BRIDGE AND APPROACHES LIMITS FROM: ON HOG FARM ROAD LIMITS TO: AT TURKEY CREEK BR AMARILLO GRAY REPLACE BRIDGE LIMITS FROM: ON WEST LINE ROAD CR 0904-13-026 0.100 FEB 2018 LIMITS TO: AT MCCLELLAN CREEK CONTRACT CSJ: 0904-13-024 FEB 2018 4 Projects $ 1,037,615 PROJ NUM:BR 1702(577) $ 186,654 PROJ NUM:BR 1702(575) $ 575,000 PROJ NUM:BR 1702(574) $ 734,050 PROJ NUM:BR 1702(576) $ 2,533,319 FEB 2018 TOTAL: 4 Projects 1 Contract $ 2,533,319 AMARILLO DEAF SMITH IH 40 0090-01-032 0.010 APR 2018 INSTALL CRASHWALLS AT VARIOUS LOCATIONS ON IH 40 LIMITS FROM: VARIOUS LOCATIONS ON IH 40 CONTRACT CSJ: 0090-01-032 AMARILLO RANDALL IH 27 0168-09-174 0.010 APR 2018 INSTALL CRASHWALLS AT VARIOUS LOCATIONS ON IH 40 LIMITS FROM: VARIOUS LOCATIONS ON IH 27 CONTRACT CSJ: 0168-09-174 $ 4,000,000 PROJ NUM:BR ( ) $ 4,000,000 $ 1,000,000 PROJ NUM:BR ( ) $ 1,000,000 APR 2018 TOTAL: 2 Projects 2 Contracts $ 5,000,000 AMARILLO 83 Projects 13 Contracts $ 133,237,355 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 28

ATLANTA DISTRICT FISCAL YEAR 2018 PLANNED STATEWIDE LETTING SUMMARY (In Millions) BASED ON CURRENT Month State Highway 1 Prog 1 Prog 2 14 SIB Pass Through Finance Toll Rev SH 130 Conc Rail Local Texas Mobility Total SEPTEMBER $3.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.19 $0.00 $3.40 OCTOBER $4.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4.72 NOVEMBER $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 DECEMBER $6.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.20 $0.00 $6.35 JANUARY $5.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5.75 FEBRUARY $6.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6.51 MARCH $9.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9.54 APRIL $7.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $7.69 MAY $3.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3.28 JUNE $0.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.95 JULY $0.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.57 AUGUST $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 District Total: $48.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.38 $0.00 $48.75 29