Implementation Status & Results Report Niger Disaster Risk Management and Urban Development Project (P145268)

Similar documents
Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

The World Bank Municipal Services Improvement (P096481)

Public Disclosure Copy

Myanmar Southeast Asia Disaster Risk Management Project (P160931)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

Public Disclosure Copy

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

Public Disclosure Copy

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

Public Disclosure Copy

Public Disclosure Copy

The World Bank Emergency 2007 Cyclone Recovery and Restoration Project (P111272)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Public Disclosure Copy

Public Disclosure Copy

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank Burkina Faso Donsin Transport Infrastructure Project (P120960)

Bangladesh Insurance Sector Development Project (P156823)

Key Dates. Global Development Objectives. Components. Overall Ratings

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project

Jordan Ozone Depleting Substances HCFC Phase-Out Project (ODS3) (P127702)

Saint Lucia Health System Strengthening Project (P166783)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Public Disclosure Copy. Implementation Status & Results Report Pacific Regional Connectivity Program 2:Palau-FSM Connectivity Project (P130592)

TR Third Access to Finance for SMEs (SME III) (P130864)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report CAPE VERDE - Recovery and Reform of the Electricity Sector Project (P115464)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Jamaica Strategic Public Sector Transformation (P146688)

Public Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

West Bank and Gaza: Finance for Jobs (P151089)

West Bengal PRI (P105990)

Road Sector Development Project (P149322)

Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank CG Rep. Skills Development for Employability Project (P128628)

Innovative Access to Finance (P147183)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Integrated Disaster Risk Management and Resilience Program (P144539)

Public Disclosure Copy

Public Disclosure Copy

The World Bank MN-Mining Infrastructure Investment Supp (P118109) (P118109)

Public Disclosure Copy. Implementation Status & Results Report Improving Maternal and Child Health through Integrated Social Services (P123706)

Public Disclosure Copy. Implementation Status & Results Report Federally Administered Tribal Areas (FATA) Governance and Policy Program (P156412)

The World Bank DRC Multi-modal Transport (P092537)

MicroSmall&Medium Enterprise and Large Enterprise Supply Chain Finance (P157691)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy

Public Disclosure Copy

The World Bank Research and Innovation in Science and Technology Project (P121842)

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351)

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

The World Bank Water Resources and Irrigation Sector Management Program 2 (P114348)

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

The World Bank Palestinian Recovery & Development Plan MDTF (P110690)

Public Disclosure Copy

Public Disclosure Copy

Key Dates. Project Development Objectives. Components. Overall Ratings

The World Bank Mozambique Public Financial Management for Results Program (P124615)

Public Disclosure Copy. Implementation Status & Results Report Gansu Cultural and Natural Heritage Protection and Development Project (P091949)

The World Bank Pastoral Community Development Project III (P130276)

Public Disclosure Copy

Public Disclosure Copy

PNG - Small and Medium Enterprise Access to Finance Project (P120707)

West Bengal Institutional Strengthening of Gram Panchayats Program II (P159427)

The World Bank Pakistan Punjab Jobs and Competitiveness Program for Results (P155963)

The World Bank Egypt National Railways Restructuring Project (P101103)

The World Bank MW: Mining Governance and Growth Support Project (P120825)

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

IRAQ: SECOND EXPENDITURE RATIONALIZATION, ENERGY EFFICIENCY AND STATE-OWNED ENTERPRISE GOVERNANCE PROGRAMMATIC DPF (P161

The World Bank Nigeria - Public/Private Partnership Program (P115386)

Public Disclosure Copy

The World Bank Egypt National Railways Restructuring Project (P101103)

The World Bank Nigeria - Public/Private Partnership Program (P115386)

The World Bank IN Swachh Bharat Mission Support Operation (P153251)

Public Disclosure Copy. Implementation Status & Results Report Disaster Risk Management Development Policy Loan with CAT DDO (P148861)

The World Bank Mauritania Public Sector Governance Project (P146804)

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Egypt National Railways Restructuring Project (P101103)

Public Disclosure Copy. Implementation Status & Results Report Savings and Credit Sector Consolidation and Financial Inclusion Project (P123367)

Public Disclosure Copy

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy

The World Bank Kenya Cash Transfer for Orphans and Vulnerable Children (P111545)

The World Bank Urban Transport Corridor Development in Surabaya - RETF (P147893)

Public Disclosure Copy. Implementation Status & Results Report QUALISUS-REDE Brazil Health Network Formation and Quality Improvement Project (P088716)

Transcription:

Public Disclosure Authorized AFRICA Niger Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 04-Apr-2018 ISR30085 Implementing Agencies: Cabinet du Premier Ministre, Government of Niger, Prime Minister Cabinet Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:11-Dec-2013 Planned Mid Term Review Date:15-Jan-2018 Original Closing Date:30-Jun-2020 Project Development Objectives Effectiveness Date:15-Aug-2014 Actual Mid-Term Review Date:04-Dec-2017 Revised Closing Date:30-Jun-2020 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The Project Development Objective (PDO) is to improve Niger s resilience to natural hazards through selected disaster risk management interventions in targeted project sites and strengthening of Government's capacity to respond promptly and effectively to an eligible crisis or an emergency. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Global Environmental Objective (from Project Appraisal Document) N/A Public Disclosure Authorized Has the Global Environmental Objective been changed since Board Approval of the Project Objective? No Components Name Comp. 1: Flood Risk Management Investments:(Cost $73.00 M) Comp. 2: Capacity Building for Urban Development and Disaster Risk Management:(Cost $22.00 M) Comp. 3: Project Management:(Cost $5.00 M) Comp. 4: Contingency Component Page 1 of 11

Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions The project supports flood risk management through innovative combination of urban drainage and flood protection infrastructure, restoration of large irrigated schemes in peri-urban areas, enhanced planning capacities for drainage and urban development, sustainable land and water management practices in upstream watersheds, and capacity development for local and central governments to manage financial resources with due consideration for disaster risks, early warning and preparedness and response. The project has already (i) completed a large drinking water program including more than 45 mini networks and 30 equipped boreholes, with a focus on displaced people in Diffa region, and 11 km of protection dike in Niamey; (ii) recovered 8364 ha of irrigable land (the project end target is 6500 ha), developed 4218 ha of dune fixation (the project end target is 5500 ha) and 15000 ml of biological protection of koris banks. In addition, all contracts related to AHA were approved in December 2017. The project has also provided, through the IRM, an adequate and highly appreciated support to the population affected by floods in Tahoua and Agadez regions. The pace of project implementation and disbursement are satisfactory - 70% for IDA-5340 and 30% for the TF-16000), which is in line with projections. This pace is expected to further accelerate after the recent approval of some large contracts. Project management capacities continue to improve with a PCU better equipped to carry out the needed coordination, including inter-ministerial, inter-regional (4 regions and 2 regions covered under the IRM) and between deconcentrated and decentralized authorities. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Substantial Substantial Macroeconomic -- Substantial Substantial Sector Strategies and Policies -- Substantial Substantial Technical Design of Project or Program -- High High Institutional Capacity for Implementation and Sustainability -- Substantial Substantial Fiduciary -- Substantial Substantial Environment and Social -- Moderate Substantial Stakeholders -- Moderate Moderate Other -- -- -- Overall -- Substantial Substantial Results Page 2 of 11

Project Development Objective Indicators PHINDPDOTBL Direct project beneficiaries (Number, Custom) Value 0.00 1,075,729.00 1,102,877.00 4,000,000.00 Date 17-Oct-2013 16-Jun-2017 15-Mar-2018 30-Jun-2020 As per MTR agreement, actual number of total direct project beneficiaries needs to be recalculated to reflect changes on data reporting due to: (i) elimination of activities that no longer can be delivered, i.e. rehabilitation/ development of pond control structures, collapsed natural drains, gutters, collectors and sewers; and (ii) addition of IRM beneficiaries and scale-up activities proposed by the Additional Financing in Agadez and Tahoua. The revised numbers will be reflected in the AF project paper and reported on in the next ISR. PHINDPDOTBL Female beneficiaries (Percentage, Custom Supplement) Value 50.00 46.00 46.00 50.00 PHINDPDOTBL Targeted flood protection and sustainable land and water management interventions contributing to increased resilience (% of targeted interventions implemented) (Percentage, Custom) Value 0.00 56.00 67.00 100.00 Date 17-Oct-2013 16-Jun-2017 15-Mar-2018 30-Jun-2020 As agreed at MTR, the end target should be revised down to 60%, given that (i) only 5 out of 9 types of targeted interventions (56%) have been achieved or in progress, and (ii) project costs were substantially underestimated at project preparation, rendering the delivery of 4 activities no longer possible. The indicator focuses on (1) regulation of structures along tributaries, (2) rehabilitation / development of pond control structures, (3) rehabilitation of old natural drains that have collapsed, and (4) rehabilitation of drainage gutters / collectors / sewers. This indicator will be updated through the simple restructuring as part of the AF. Page 3 of 11

PHINDGEOTBL PHINDPDOTBL Performance of the early warning and response system for natural rapid onset hazards (e.g. floods, strong winds, wild landfires) (Number, Custom) Value 0.00 2.00 1.00 5.00 Date 17-Oct-2013 16-Jun-2017 15-Mar-2018 30-Jun-2020 As agreed at MTR, the indicator will be reformulated and the ISR changes of the unit of measurement and end target will be formalized through a simple restructuring under the AF, i.e. "number of national institutions contributing to early warning systems (EWS)", measured in 'number' (not in %) with an end target of 5 (not 100%) as stated in the PAD. The revised indicator will measure the active participation of institutions in the national 'disaster risk reduction and response platform', as well as the level of appropriation of DRM and DRR within the institution. The reason why the current Actual (1 institution) is reported in this ISR as below the previous Actual (2 institutions) is due to the fact that only the DGCP (Civil Protection) has actually carried out preparation planning and operations manuals for emergency response, while the Met Service faced delays regarding this; however, with the new support of the Country Risk Early Warning System (CREWS), launched in early Dec 2017, it is expected that the number of national institutions, contributing to the early warning system, will increase and that the end target can be met by project end. Overall As the project achieved its mid term, the performance of the PDO indicators are conducive towards their achievement. The MTR had the opportunity to review the pertinence of some activities, and the effectiveness of the metrics for each indicator, and agreed that updates should be introduced at the simple restructuring for the additional finance to improve its effectiveness. Global Environmental Objective Indicators Targeted flood protection and sustainable land and water management interventions contributing to increased resilience (Percentage, Custom) Value 0.00 100.00 65.00 100.00 Date 17-Oct-2013 28-Oct-2016 31-Dec-2017 30-Jun-2020 Overall PHGEOCMTS This indicator repeats to the second PDO indicator. As agreed at MTR, the end target should be revised down to 60%, given that (i) only 5 out of 9 types of targeted interventions (56%) have been achieved or in progress, and (ii) project costs were substantially underestimated at project preparation, rendering the delivery of 4 activities no longer possible. The indicator focuses on (1) regulation of structures along tributaries, (2) rehabilitation / development of pond control Page 4 of 11

structures, (3) rehabilitation of old natural drains that have collapsed, and (4) rehabilitation of drainage gutters / collectors / sewers. This indicator will be updated through the simple restructuring as part of the AF. Intermediate Results Indicators Sources of drinking water rehabilitated or developed (Number, Custom) Value 0.00 404.00 409.00 260.00 This ISR reflects the original end target of 260 (as per PAD). As the original target of 260 sources of drinking water was surpassed due to the emergency intervention in Diffa region, (where demand peaked due to security-related reallocation of a large number of people), the MTR agreed to revise the end target to 400 through a simple restructuring under the AF. Potential retention of peak flow runoff from upstream tributaries (Cubic Meter(m3), Custom) Value 0.00 0.00 0.00 500.00 Date 17-Oct-2013 09-Jun-2017 30-Sep-2017 30-Jun-2020 During the MTR it was agreed to drop this indicator through the simple restructuring, as the related activities cannot be implemented before the end of the project, as the technical studies have not yet been completed and as resources are no longer available to finance the related works due to the cost under-estimation during project preparation. Page 5 of 11

Targeted irrigable land rehabilitated (Hectare(Ha), Custom) Value 0.00 282.00 302.00 2,000.00 As agreed at MTR, the end target will be revised down to 1700 ha, to adequately reflect project coverage through activities of the original project and the MRI: (i) original project: rehabilitation of 1350 ha with 1308 ha of irrigable land (= 5 ha in Tillaberi, 3 ha in Dosso, 1 ha Niamey) and 46 ha for vegetable home-gardening, and (ii) MRI: rehabilitation of 350 ha in Agadez and Tahoua. This target will be updated through the simple restructuring under the AF and reported on in the next ISR. The low Actual is due to some delays in signing and execution of large contracts, which however are now being implemented, and the revised target is expected to be met during the remainder of the project period. Watershed protection and land restoration interventions (Hectare(Ha), Custom) Value 0.00 12,582.00 12,755.00 6,500.00 The MTR identified the need to improve reporting of this indicator, which will be done through the simple restructuring under the AF, incl (1) separation of watershed protection and land restoration into 2 indicators as the units of measures are different (ha and km), and (2) replacement of the sub-indicators "live fencing" due to lack of feasibility with "dike protection" (which was not measured before). To reflect the PAD, this ISR introduces 4 sub-indicators to breakdown activities and allow accurate reporting of achievement of Actuals and End Targets: (i) sand dune fixation; (ii) restoration of degraded land; (iii) stone walls; and (iv) live fencing. Additionally, this ISR notes the incorrectly reported end target of 6,500 ha, which only refers to restoration of degraded land (1 out of 4 sub-indicators). The planned separation of indicators will address this. The above changes will be reported on in the next ISR. Page 6 of 11

Sand dune fixation (Hectare(Ha), Custom Supplement) Value 0.00 -- 4,218.00 5,500.00 Restoration of degraded land (Hectare(Ha), Custom Supplement) Value 0.00 -- 8,364.00 6,500.00 Stonewalls (Kilometers, Custom Supplement) Value 0.00 -- 0.20 200.00 Live Fencing (Kilometers, Custom Supplement) Value 0.00 -- 0.00 3,500.00 Page 7 of 11

Development and/or updating of urban master plans and local development plans (Number, Custom) Value 0.00 12.00 14.00 39.00 Niger's current institutional framework prevents the Project to achieve this indicator. Thus, based on MTR recommendations, the indicator will be refocused on "The Preparation of Regional and Local Development Plans", which requires a reduction of the end target - this will be done through the simple restructuring under the AF and reported on in the next ISR. Quality and timely submission of Procurement and financial management reporting (Yes/No, Custom) Value Y Y Y Y As evidenced by Procurement Review and Financial Management Assessment this indicator continues to be achieved satisfactorily. Planned project activities implemented (Percentage, Custom) Value 0.00 42.17 44.82 100.00 The list of project activities is being updated. The planned simple restructuring under the AF will allow for an update, as some originally planned activities care no longer valid, or do not have budget to be implemented (due to cost under-estimation at project preparation), while new activities were carried out following the 2016 floods and emergency response Page 8 of 11

Immediate Response Mechanism (IRM) established and ready to provide access to financial resources to Niger in case of an eligible crisis or emergency (Yes/No, Custom) Value N Y Y Y All documents for activation of the IRM were prepared during the first year of implementation of the Project, including Operations Manual, Contingency Plans and staff training; and implementation is on track. Time taken to make funds available as requested by Government for an eligible crisis or emergency (Weeks, Custom) Value 0.00 4.00 4.00 4.00 The activation of the IRM is a two phase process that include: (i) the preparation/submission of the activation package by the Client, and (ii) the approval/disbursement of funds by the Bank. The current indicator does not reflect the responsibility of the Client. Hence, the MTR agreed to refocus the indicator on the time elapsed for preparation/submission of activation package by the Government and to exclude the Bank's processing time, which could lead to delays that are outside the scope of the project. Percentage of female participation in decision committees for development and/or updating urban master plans and municipal development plans (Percentage, Custom) Value 0.00 -- 0.00 25.00 Date 17-Oct-2013 -- 15-Mar-2018 30-Jun-2020 While included in the PAD, this indicator was not included in past ISRs, but is included now. The MTR identified that participation of women in municipal councils cannot be reported due to the lack of municipal elections. Therefore it was agreed to change the indicator to measure participation of women in developing regional and/or local plans, and to report it, in future, as a sub-indicator of the new indicator on "Preparation of Regional and Local Development Plans", once the simple restructuring Page 9 of 11

under the AF is effected. Respective changes will be reported on in the next ISR. Annual municipal budget for routine drainage maintanance in municipalities with a master plan (Percentage, Custom) Value 0.00 -- 0.00 5.00 Date 17-Oct-2013 -- 15-Mar-2018 30-Jun-2020 While included in the PAD, this indicator was not included in past ISRs, but is included now. Due to the difficulty to report the percentage of municipal budget for municipalities' drainage maintenance with a master plan or for those municipalities with project interventions, the MTR agreed to refocus this indicator on "percentage of municipal budget allocated to solid waste collection and processing/transformation" Changes will be effected through the simple restructuring under the AF and reported on in the next ISR. Overall. Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P145268 IDA-53400 Effective USD 100.00 100.00 0.00 64.21 27.67 70% P145932 TF-16000 Effective USD 6.65 6.65 0.00 2.02 4.63 30% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date Page 10 of 11

P145268 IDA-53400 Effective 11-Dec-2013 16-Dec-2013 15-Aug-2014 30-Jun-2020 30-Jun-2020 P145932 TF-16000 Effective 16-Dec-2013 16-Dec-2013 15-Aug-2014 30-Jun-2020 30-Jun-2020 Cumulative Disbursements Restructuring History Level 2 Approved on 28-Mar-2016 Related Project(s) P145268-Niger Disaster Risk Management and Urban Development Project,P145932-Niger Disaster Risk Management and Urban Development Project Page 11 of 11