RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

Similar documents
The World Bank Kabeli-A Hydro Electric Project (P122406)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT

The World Bank NEITI Reporting Compliance (P162344)

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

The World Bank Social Assistance System Strengthening Project (P123960)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016

The World Bank Malawi Strategic Program for Climate Resilience (P163245)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Disease Prevention and Control Project (P128442)

The World Bank Third Secondary and Local Roads Project (P148048)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT APPROVED ON JUNE 1, 2010 COORDINATION DU PATMUR,MINISTERE DE L'ECONOMIE, DES FINANCES ET DU PLAN

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

The World Bank Water and Sanitation in Tourist Areas (P054221)

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

Central Asia South Asia Electricity Transmission and Trade Project

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RIO GRANDE DO SUL SWAP APPROVED ON MAY 1, 2012 STATE OF RIO GRANDE DO SUL, BRAZIL

INTEGRATED COASTAL ZONE MANAGEMENT APPROVED ON JUNE 15, 2010 THE REPUBLIC OF INDIA

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)

The World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992)

FOR OFFICIAL USE ONLY

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

RESTRUCTURING PAPER ON A. PROPOSED PROJECT RESTRUCTURING OF EMERGENCY POWER REHABILITATION PROJECT (CR 3933 & TF 54718) (June 22, 2004)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Bangladesh Insurance Sector Development Project (P156823)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INCOME SUPPORT AND EMPLOYABILITY PROJECT LOAN 7811-SV

Implementation Status & Results Tajikistan Tax Administration (P127807)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

Implementation Status & Results India Assam State Roads Project (P096018)

Regional Power Transmission Interconnection Project (Afghanistan and Tajikistan)

The World Bank Industrial Waste Management and Cleanup Project (P122139)

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

The World Bank Sustainable Croatian Railways in Europe (P147499)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

XML Publisher Balance Sheet Vision Operations (USA) Feb-02

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MUNICIPAL SERVICES PROJECT LOAN 7885-TU

Public Disclosure Copy

Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE KARNATAKA HEALTH SYSTEM DEVELOPMENT AND REFORM PROJECT

Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Copy. Implementation Status & Results Report Federally Administered Tribal Areas (FATA) Governance and Policy Program (P156412)

Public Disclosure Copy


RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SERBIA COMPETITIVENESS AND JOBS PROJECT (P152104) APPROVED ON SEPTEMBER 16, 2015

Supreme Audit Office 0 Government of Islamic Republic of Afghanistan

Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO.

The World Bank Municipal Services Improvement (P096481)

FOR OFFICIAL USE ONLY

TA for Capacity Development in Hydropower and Mining Sector (P109736)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

STATUS OF PROJECTS IN EXECUTION FY09 SOPE

Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740)

Second Public Financial Management Capacity Strengthening Project (P151492)

Public Disclosure Copy

The World Bank Indonesia Power Transmission Development Project (P117323)

Implementation Status & Results Central African Republic Support to Vulnerable Groups Community Development Project (P111679)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

The World Bank MN-Mining Infrastructure Investment Supp (P118109) (P118109)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank St. Petersburg Economic Development Project (P069063)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TAX MODERNIZATION PROJECT TO THE REPUBLIC OF TANZANIA AUGUST 30, 2006

Public Disclosure Copy. Implementation Status & Results Report Improving Maternal and Child Health through Integrated Social Services (P123706)

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577)

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy

Public Disclosure Copy

Transcription:

Public Disclosure Authorized The World Bank REPORT NO.: RES29565 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000) APPROVED ON MARCH 27, 2014 TO ISLAMIC REPUBLIC OF AFGHANISTAN Public Disclosure Authorized ENERGY & EXTRACTIVES SOUTH ASIA Public Disclosure Authorized Regional Vice President: Country Director: Senior Global Practice Director: Practice Manager/Manager: Task Team Leader: Ethel Sennhauser Shubham Chaudhuri Riccardo Puliti Demetrios Papathanasiou Husam Mohamed Beides, Anh Nguyet Pham, Takhmina Mukhamedova

ABBREVIATIONS AND ACRONYMS ARTF CSP DABS PIU Afghanistan Reconstruction Trust Fund Community Support Program Da Afghanistan Breshna Sherkat of Afghanistan Project Implementing Unit

BASIC DATA Product Information Project ID P145054 Original EA Category Full Assessment (A) Approval Date 27-Mar-2014 Financing Instrument Investment Project Financing Current EA Category Full Assessment (A) Current Closing Date 30-Jun-2020 Organizations Borrower Islamic Republic of Afghanistan,Ministry of Finance,Islamic Republic of Pakistan,Kyrgyz Republic Responsible Agency Da Afghanistan Breshna Sherkat,National Electric Grid of Kyrgyzstan,Barki Tajik,National Transmission and Despatch Company (NTDC) Project Development Objective (PDO) Original PDO The objective of the project is to create the conditions for sustainable electricity trade between the Central Asian countries oftajikistan and Kyrgyz Republic and the South Asian countries of Afghanistan and Pakistan. Summary Status of Financing Ln/Cr/Tf Approval Signing Effectiveness Closing Net Commitment Disbursed Undisbursed IDA-54090 27-Mar-2014 11-May-2015 30-Jun-2020 120.00 0 114.09 IDA-54380 27-Mar-2014 24-Apr-2015 29-Jan-2018 30-Jun-2020 38.25 0 36.43 IDA-H9270 27-Mar-2014 24-Apr-2015 24-Jan-2018 30-Jun-2020 316.50 2.34 296.93 IDA-H9410 27-Mar-2014 24-Apr-2015 30-Jun-2020 45.00 0 41.07 IDA-H9420 27-Mar-2014 24-Apr-2015 29-Jan-2018 30-Jun-2020 6.75 0 6.41 TF-A4615 14-Sep-2017 14-Sep-2017 14-Dec-2017 30-Jun-2020 1.00 0 1.00

TF-A4613 12-Sep-2017 30-Jun-2020.10 0.10 TF-A4614 02-Aug-2017 02-Aug-2017 02-Aug-2017 30-Jun-2020 1.00.10.90 TF-16252 29-Jul-2014 29-Jul-2014 24-Nov-2014 30-Jun-2017.50.50 0 TF-16254 28-Jul-2014 05-Aug-2014 04-Nov-2014 30-Jun-2017.65.65 0 Policy Waiver(s) Does this restructuring trigger the need for any policy waiver(s)? No I. PROJECT STATUS AND RATIONALE FOR RESTRUCTURING 1. This restructuring in the form of amendment is to the Financing Agreement between the International Development Association (IDA) and Islamic Republic of Afghanistan (the Recipient) (Grant No H927-AF, hereinafter Financing Agreement), signed on April 24, 2015, for the Central Asia South Asia Electricity Transmission and Trade Project (CASA-1000, P145054). 2. The CASA-1000 Project was approved on March 27, 2014 and became effective on January 24, 2018. In Afghanistan, all three components under the Project have been making progress. Under Part A-(Construction of High Voltage Transmission Infrastructure), three contracts for the HVDC line in Afghanistan were signed on December 11, 2017. Survey and design activities under the initial phase of the contracts are underway. Under Part B-Technical Assistance and Project Implementation Support- Da Afghanistan Breshna Sherkat of Afghanistan (DABS), the project implementing entity has set up a CASA Project Implementing Unit (CASA PIU). CASA PIU has been instrumental in the on-going preparation of the country specific ESIA and selection of consultant to support the Resettlement Action Planning for the HVDC line. The CASA PIU has been also coordinating its work closely with the Ministry of Rural Rehabilitation and Rural Development which is implementing the CASA Community Support Program (CSP) supported by the CASA-1000 Community Support Program Project (P149410) funded by a US $40million grant financing from the Afghanistan Reconstruction Trust Fund (ARTF). However, since effectiveness of the CASA Project and the closing of the Project Preparation Grant (PPG), no disbursement has been made for the consultant services and eligible expenditure under Part B due to the lack of clarity in regard to the condition of disbursement in the Financing Agreement as described below 3. The amendment is to introduce a definition of Project Management Firm which was not defined in the Financing Agreement. This will allow the Recipient to meet the condition of disbursement for eligible expenditures under Part B (Technical Assistance and Project Implementation Support) of the Project and hence to use the project funds for pending project eligible expenditure. The request for the proposed amendment dated March 31, 2018 was received from Ministry of Finance, Afghanistan.

II. DESCRIPTION OF PROPOSED CHANGES 4. The Section IV.B.1(b) of Schedule 2 to the Financing Agreement stipulates that no withdrawal of funds under the Category (2) of the Project shall be made unless a Project Management Firm has been selected in accordance with the provisions of paragraph C of Section III of Schedule 2 of the Financing Agreement. Category (2) covers goods, nonconsulting services, consultants services, training and workshops and Incremental Operating Costs for Part B of the Project. The Financing Agreement does not include a definition of the term Project Management Firm. 5. This condition of disbursement was to ensure that DABS has sufficient management support before launching project implementation. Due to a lack of clarity regarding the term Project Management Firm in the Financing Agreement, it was agreed between the Bank Team and DABS, that DABS had the option to select either a firm, or a group of individual consultants for the project management support. DABS decided to choose the latter approach. At present, a team of such consultants has been put in place within the CASA PIU. 6. To allow for disbursing of funds and to enhance the implementation of the CASA-1000 Project, the Ministry of Finance in its letter dated March 31st, 2018 requested the World Bank to add in the Financing Agreement a definition of the term Project Management Firm. It is proposed to include the following definition in Section I of the Appendix to the Financing Agreement: Project Management Firm means a firm or group of individual consultants selected to support the Project Implementing Entity to implement the Project, referred to in Section IV.B.1(b) of Schedule 2 to the Financing Agreement. III. SUMMARY OF CHANGES Changed Other Change(s) Not Changed Change in Implementing Agency Change in DDO Status Change in Project's Development Objectives Change in Results Framework Change in Components and Cost Change in Loan Closing Date(s) Cancellations Proposed

Reallocation between Disbursement Categories Change in Disbursements Arrangements Change in Disbursement Estimates Change in Overall Risk Rating Change in Safeguard Policies Triggered Change of EA category Change in Legal Covenants Change in Institutional Arrangements Change in Financial Management Change in Procurement Change in Implementation Schedule Change in Economic and Financial Analysis Change in Technical Analysis Change in Social Analysis Change in Environmental Analysis IV. DETAILED CHANGE(S)