The World Bank Second Karnataka State Highway Improvement (P107649)

Similar documents
Public Disclosure Copy

Road Sector Development Project (P149322)

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Indonesia Power Transmission Development Project (P117323)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank Indonesia Power Transmission Development Project (P117323)

MicroSmall&Medium Enterprise and Large Enterprise Supply Chain Finance (P157691)

Public Disclosure Copy. East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit

The World Bank Burkina Faso Donsin Transport Infrastructure Project (P120960)

Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project

Public Disclosure Copy

Public Disclosure Copy

The World Bank Transport Connectivity and Asset Management Project (P132833)

Public Disclosure Copy

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

Innovative Access to Finance (P147183)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Implementation Status & Results India Assam State Roads Project (P096018)

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

Public Disclosure Copy

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479)

Public Disclosure Copy

TR Third Access to Finance for SMEs (SME III) (P130864)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Transport Connectivity and Asset Management Project (P132833)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Savings and Credit Sector Consolidation and Financial Inclusion Project (P123367)

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

The World Bank Palestinian Recovery & Development Plan MDTF (P110690)

Public Disclosure Copy

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

Public Disclosure Copy

The World Bank Jamaica Strategic Public Sector Transformation (P146688)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Public Disclosure Copy

The World Bank Municipal Services Improvement (P096481)

Public Disclosure Copy

The World Bank Water Resources and Irrigation Sector Management Program 2 (P114348)

Public Disclosure Copy

West Bengal PRI (P105990)

The World Bank Revenue Administration Modernization Project (P130202)

IRAQ: SECOND EXPENDITURE RATIONALIZATION, ENERGY EFFICIENCY AND STATE-OWNED ENTERPRISE GOVERNANCE PROGRAMMATIC DPF (P161

West Bank and Gaza: Finance for Jobs (P151089)

The World Bank Egypt National Railways Restructuring Project (P101103)

Public Disclosure Copy

Justice Sector Support Project (P104749)

Public Disclosure Copy. Implementation Status & Results Report QUALISUS-REDE Brazil Health Network Formation and Quality Improvement Project (P088716)

Public Disclosure Copy

Public Disclosure Copy

The World Bank NP: Strengthening the Office of the Auditor General (P127040)

Public Disclosure Copy. Implementation Status & Results Report Gansu Cultural and Natural Heritage Protection and Development Project (P091949)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Egypt National Railways Restructuring Project (P101103)

Public Disclosure Copy. Implementation Status & Results Report CAPE VERDE - Recovery and Reform of the Electricity Sector Project (P115464)

Public Disclosure Copy. Implementation Status & Results Report Pacific Regional Connectivity Program 2:Palau-FSM Connectivity Project (P130592)

The World Bank Ghana - PPP Project (P125595)

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

The World Bank Pakistan Punjab Jobs and Competitiveness Program for Results (P155963)

Bangladesh Insurance Sector Development Project (P156823)

The World Bank Egypt National Railways Restructuring Project (P101103)

The World Bank IN Swachh Bharat Mission Support Operation (P153251)

The World Bank Research and Innovation in Science and Technology Project (P121842)

Public Disclosure Copy

The World Bank Nigeria - Public/Private Partnership Program (P115386)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Federally Administered Tribal Areas (FATA) Governance and Policy Program (P156412)

PNG - Small and Medium Enterprise Access to Finance Project (P120707)

Public Disclosure Copy. Implementation Status & Results Report Improving Maternal and Child Health through Integrated Social Services (P123706)

Implementation Status & Results China China Wuhan Second Urban Transport (P112838)

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Key Dates. Global Development Objectives. Components. Overall Ratings

The World Bank Nigeria - Public/Private Partnership Program (P115386)

The World Bank Egypt National Railways Restructuring Project (P101103)

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351)

Public Disclosure Copy

Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778)

The World Bank Mauritania Public Sector Governance Project (P146804)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Public Disclosure Copy. Implementation Status & Results Report Transparency and Accountability in Mongolian Education (TAME) (P150842)

The World Bank MW: Mining Governance and Growth Support Project (P120825)

The World Bank DRC Multi-modal Transport (P092537)

Public Disclosure Copy

Transcription:

Public Disclosure Authorized SOUTH ASIA India Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 10 ARCHIVED on 31-Jul-2015 ISR18834 Implementing Agencies: Karnataka Road Development Corporation Limited Public Disclosure Authorized Key Dates Key Project Dates Board Approval date:24-mar-2011 Planned Mid Term Review Date:11-Nov-2013 Original Closing Date:31-Dec-2016 Project Development Objectives Effectiveness Date:19-Jul-2011 Actual Mid-Term Review Date:04-Dec-2013 Revised Closing Date:31-Dec-2016 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) To accelerate the development of the Core Road Network through leveraging public sector outlays with private sector financing and improving the institutional effectiveness of the road sector agencies to deliver effective and safe roads to users. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Public Disclosure Authorized Name Component 1: Road Improvement Works (IBRD: US$260 million, GOK: US$94 million, Developer: US$249 million):(cost $603.00 M) Component 2: Highway Financing Modernization: (IBRD:US$67 million; GOK: US$56 million; Developers/Financial Institutions: US$251 mil lion):(cost $374.00 M) Component 3: Road Safety Improvement (IBRD: US$11 million; GOK: US$3 million):(cost $14.00 M) Component 4: Road Sector Policy and Institutional Development. (IBRD: US$9.4 million; GOK: US$2.4 million).:(cost $11.80 M) Project Management (This is not a formal component) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Unsatisfactory Moderately Unsatisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Satisfactory 7/31/2015 Page 1 of 10

Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions This Implementation Status Report is based on the observations of the Implementation Support Mission during July 7-17, 2015. The Project Development Objective (PDO): Since the last supervision mission in June 2014, the project made notable progress in (a) implementation of the ongoing item-rate contracts and the two DBFOMT (Design-Build-Finance-Operate-Maintain-Transfer) concessions; (b) procurement of 3 new itemrate contracts (awarded) and 5 co-financing packages (in bid evaluation stage); (c) commenced civil works on Safe Corridor Demo Project; and (d) in various institutional strengthening activities including ISO certifications for Environment and Quality management, Training, IT-ICT-MIS. Keeping this in view, the rating for the Implementation Progress has been revised upwards to Moderately Satisfactory. However, owing to the delyas in major procurements that had already occured since inception of the project, the balance time available till the current closing date (December 31, 2016) is insufficient for completing the remaining activities and achieving the project development objective. Keeping this in view, the rating for the achievement of DO has been retained at Modertely Unsatisfactory. Recently, GoK have made a request to the DEA for restructuring of the project including an extension of the closing date. Risks 7/31/2015 Page 2 of 10

Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Moderate Moderate Macroeconomic -- Low Low Sector Strategies and Policies -- Moderate Moderate Technical Design of Project or Program -- Substantial Substantial Institutional Capacity for Implementation and Sustainability -- Moderate Moderate Fiduciary -- Moderate Moderate Environment and Social -- Substantial Substantial Stakeholders -- Moderate Moderate Other -- -- -- Overall -- Substantial Substantial Results Project Development Objective Indicators PHINDPDOTBL Achievement by GOK in generating at least US$500 million in new private sector capital for CRN improvement and management by end-of-project (EOP). (Amount(USD), Custom) Value 200.00 295.00 295.00 500.00 Date 24-Mar-2011 01-Jan-2015 30-Jul-2015 -- PHINDPDOTBL 15% reduction in Vehicle Operating costs and 25% reduction in Travel Time Cost on project corridors by EOP (Text, Custom) Value VOC: $0.26 TT: $0.074 -- -- VOC:$0.20 TT: $0.06 Date -- 20-Jun-2014 -- -- PHINDPDOTBL 30% reduction in road accident related fatalities on safe corridor pilots by EOP (Number, Custom) 7/31/2015 Page 3 of 10

Value 31.00 -- -- 22.00 Date 15-Feb-2011 20-Jun-2014 -- -- PHINDPDOTBL Share of Core Road Network in good condition (IRI < 4) increases from 50 percent to 65 percent by EOP. (Percentage, Custom) Value 50.00 57.00 57.00 65.00 Date -- 31-Dec-2011 31-Dec-2011 -- Overall Comments Intermediate Results Indicators Completion of upgrading and widening of about 269 km. through item rate contracts (Kilometers, Custom) Value 0.00 192.00 242.00 269.00 Date 24-Mar-2011 31-Dec-2014 18-Jul-2015 31-Dec-2016 Completion of upgrading, widening of about 562 km. through DBFOMT (Annuity) Concessions (Kilometers, Custom) Value 0.00 -- 50.00 562.00 7/31/2015 Page 4 of 10

Environmental Management - (a) implementation of EMP as agreed (b) ISO 14001 certification obtained for operational units (Text, Custom) Value 0 Implementation of EMP is being carried out, however safety on and off site, and regulatory clearances remain below satisfactory level ISO certification has been delayed as procurement of the external certifier is ongoing. Implementation of EMP is being carried out. ISO certification is being completed. PIU certified and 1 field division certified KRDCL generates additional road user revenues and commits them for mobilizing debt financing(via securitization) and/or making payment for PPP transactions (Text, Custom) Y1 Target of Passing of Tolling Policy: Completed Y1 Target of Passing of Tolling Policy: Completed Value Passing of Tolling Policy Y2 Target of Tolling on selected roads: Not achieved. Attempts to award BOTtollconcessions did not find any takers Y3 Target of KRDCL issues debt or develops PPP transactions backed by toll revenues: In progress Y2 Target of Tolling on selected roads: Not achieved. Attempts to award BOTtollconcessions did not find any takers Y3 Target of KRDCL issues debt or develops PPP transactions backed by toll revenues: In progress KRDCL issues debt or develops PPP transaction backed y toll revenues 7/31/2015 Page 5 of 10

Completion of upgrading widening and O&M of about 400 km through co-financing arrangement (Text, Custom) Value Screening commenced Y1 Target of Cofinancing arrangements established: In progress Y1 Target of Transaction adviser engaged: completed Y2 Target of DPR completed: In progress. First stage of the twostage procurement process for works is completed. Second stage in progress. Y1 Target of Cofinancing arrangements established: In progress Y1 Target of Transaction adviser engaged: completed Y2 Target of DPR completed: In progress. First stage of the twostage procurement process for works is completed. Second stage in advanced state with Bid Evaluation Report expected soon. Construction completed Effective implementation of Safe Corridor (Text, Custom) Y1 Target of Lead Agency established: done with delay Y1 Target of Lead Agency established: done with delay Value Lead Agency Established: pilot corridor identified Y1 Target of Pilot corridor identified: Yes Y2 Target of Consultant Services procured: Yes Y3 Target of Multi sector intervention implementation started: Delayed. However, civil works procurement is making progress Y1 Target of Pilot corridor identified: Yes. Civil works contract awarded. Y2 Target of Consultant Services procured: Yes Y3 Target of Multi sector intervention implementation started: Procurement of other equipment in progress minimum 3 star rating achieved through irap investigation 7/31/2015 Page 6 of 10

Satisfactory implementation of agreed action plan for institutional development and governance improvement (Text, Custom) Y1 Target of IDSAP and GAAP endorsed: completed Y1 Target of IDSAP and GAAP endorsed: completed Value IDSAP and GAAP Endorsed Y2 Target of Key consultant services procured: a few delayed Y3 Target of Studiescompleted: Delayed with varying state of progress. Y2 Target of Key consultant services procured: a few delayed Y3 Target of Studiescompleted: Delayed with varying state of progress. Assessment of IDSAP and GAAP results made Roads constructed, non-rural (Kilometers, Core) Value 0.00 192.00 242.00 269.00 Date 31-Mar-2011 31-Dec-2014 17-Jul-2015 31-Dec-2016 Roads constructed, non-rural (Kilometers, Core) Value 0.00 0.00 50.00 562.00 Date 24-Mar-2011 20-Jun-2013 17-Jul-2015 31-Dec-2016 7/31/2015 Page 7 of 10

Land acquisition and resettlement implementation (a) land acquisition completed (phase I) (Percentage, Custom) Value 0.00 55.00 35.00 100.00 Date 24-Feb-2011 31-Dec-2014 17-Jul-2015 31-Dec-2016 Comments The current value also includes the figures related to the co-financing component. Wt. Ave: 35%: 98% for 90 acres in Item rate contracts; 79% of 276 acres in annuity concessions; 4 % 0f 105 acres in new Item rate contracts; and 0% of 405 acres of Highway Financing contracts LA and Resettlement Implementation- (a) Land acquisition completed (Phase I) (b) Key R&R assistance provided (alternative housing and livelihood support - PhaseI) (Percentage, Custom) Value 0.00 82.00 55.00 100.00 Date 24-Feb-2011 31-Dec-2014 17-Jul-2015 31-Dec-2016 Comments The current value also includes the figures related to the co-financing component. Wt. Ave: 55% 96% 350 families in Item rate contracts; 75% of 624 families in annuity concessions; 77 % of 383 families in new item rate contracts;and 0% of 770 families in Highway Financing contracts LA and Resettlement Implementation (c) Improve the living standards (measured % PAFs with increase/restored income/assets) Phase I (Percentage, Custom) Value 0.00 -- -- 100.00 Date 24-Feb-2011 20-Jun-2014 17-Jul-2015 31-Dec-2016 Comments Not Available. 7/31/2015 Page 8 of 10

Overall Comments Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P107649 IBRD-80220 Effective USD 350.00 350.00 0.00 81.91 268.09 23% P107649 TF-92428 Closed USD 0.44 0.18 0.26 0.18 0.00 100% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P107649 IBRD-80220 Effective 24-Mar-2011 30-May-2011 19-Jul-2011 31-Dec-2016 31-Dec-2016 P107649 TF-92428 Closed 09-Jul-2008 09-Jul-2008 17-Jul-2008 29-Jun-2010 31-Dec-2010 Cumulative Disbursements Restructuring History 7/31/2015 Page 9 of 10

There has been no restructuring to date. Related Project(s) There are no related projects. 7/31/2015 Page 10 of 10