RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

Similar documents
RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT

The World Bank NEITI Reporting Compliance (P162344)

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Third Secondary and Local Roads Project (P148048)

The World Bank Malawi Strategic Program for Climate Resilience (P163245)

Public Disclosure Copy

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

The World Bank Social Assistance System Strengthening Project (P123960)

The World Bank Kabeli-A Hydro Electric Project (P122406)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

The World Bank Urban Transport Corridor Development in Surabaya - RETF (P147893)

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577)

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

The World Bank Palestinian Recovery & Development Plan MDTF (P110690)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

Implementation Status & Results Indonesia Initiatives for Local Governance Reform Project (P076174)

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924)

Second Public Financial Management Capacity Strengthening Project (P151492)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

The World Bank Water and Sanitation in Tourist Areas (P054221)

The World Bank Strengthening Public Resource Management (P161586)

Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740)

The World Bank NP: Strengthening the Office of the Auditor General (P127040)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

Public Disclosure Copy

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)

Implementation Status & Results Indonesia Government Financial Management and Revenue Administration Project (P085133)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

Public Disclosure Copy

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

Public Disclosure Copy

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Public Disclosure Copy

Public Disclosure Copy

Implementation Status & Results Liberia LR-Public Financial Management - IFMIS (P109775)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008

Implementation Status & Results Lao People's De Lao PDR Trade Development Facility Project (P106165)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Public Disclosure Copy

Implementation Status & Results India Assam State Roads Project (P096018)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

The World Bank Disease Prevention and Control Project (P128442)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Document of The World Bank RESTRUCTURING PAPER

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Indonesia Global Practice

Public Disclosure Copy. Implementation Status & Results Report Federally Administered Tribal Areas (FATA) Governance and Policy Program (P156412)

State Owned Financial Institutions Reform Project (P156837)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NATIONAL HYDROMET MODERNIZATION PROJECT LOAN NO RU

Public Disclosure Copy

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

Public Disclosure Copy

INTEGRATED COASTAL ZONE MANAGEMENT APPROVED ON JUNE 15, 2010 THE REPUBLIC OF INDIA

Public Disclosure Copy

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy

Public Disclosure Copy

SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT APPROVED ON JUNE 1, 2010 COORDINATION DU PATMUR,MINISTERE DE L'ECONOMIE, DES FINANCES ET DU PLAN

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO.

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SERBIA COMPETITIVENESS AND JOBS PROJECT (P152104) APPROVED ON SEPTEMBER 16, 2015

The World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992)

The World Bank Indonesia Power Transmission Development Project (P117323)

The World Bank Research and Innovation in Science and Technology Project (P121842)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Public Disclosure Copy

Public Disclosure Copy

Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE KARNATAKA HEALTH SYSTEM DEVELOPMENT AND REFORM PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PUBLIC FINANCIAL MANAGEMENT AND REVENUE ADMINISTRATION REFORM PROGRAM

Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Mauritania Public Sector Governance Project (P146804)

STAR Contribution to Indonesia PFM

Public Disclosure Copy. Implementation Status & Results Report Transparency and Accountability in Mongolian Education (TAME) (P150842)

DOCUMENTS. Letter No. CD-159/PFM-MDTF/VII/2014 July 18, Public Disclosure Authorized

Transcription:

Public Disclosure Authorized The World Bank REPORT NO.: RES31986 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016 TO ASOSIASI AUDITOR INTERN PEMERINTAH INDONESIA (AAIPI) Public Disclosure Authorized GOVERNANCE EAST ASIA AND PACIFIC Public Disclosure Authorized Regional Vice President: Country Director: Senior Global Practice Director: Practice Manager/Manager: Task Team Leader: Victoria Kwakwa Rodrigo A. Chaves Deborah L. Wetzel Arturo Herrera Gutierrez Novira Kusdarti

ABBREVIATIONS AND ACRONYMS AAIPI BPKP CAAT IA-CM IG MoF MDTF PFM QAIP = Asosiasi Auditor Intern Pemerintah Indonesia (Government Internal Auditor Association) = Badan Pengawasan Keuangan dan Pembangunan (Finance & Development Supervisory Agency) or known as Government National Internal Audit Institution = Computer Aided Audit Techniques = Internal Audit Capability Model = Inspector General = Ministry of Finance = Multi Donors Trust Funds = Public Financial Management = Quality Assurance Improvement Program

Note to Task Teams: The following sections are system generated and can only be edited online in the Portal. BASIC DATA Product Information Project ID P159448 Original EA Category Financing Instrument Investment Project Financing Current EA Category Approval Date 23-Sep-2016 Current Closing Date 30-Apr-2018 Organizations Borrower ASOSIASI AUDITOR INTERN PEMERINTAH INDONESIA (AAIPI) Responsible Agency ASOSIASI AUDITOR INTERN PEMERINTAH INDONESIA (AAIPI) Project Development Objective (PDO) Original PDO The primary objective of our engagement is to contribute to government's efforts to improve the capacity of the internal audit institutions to progress towards level 3 of IA-CM requirements. Internal Audit Capability Model (IA-CM) is a framework that identifies the fundamentals needed for effective internal auditing in government and the broader public sector. It illustrates the levels and stages through which an intern audit activity can evolve as it defines, implements, measures, controls and improves its processes andpractices. The IA-CM provides a road map for continuous improvement in processes and practices to establish effective internal auditing in an organization. There are 5 capability levels in IA-CM, where level 1 is the lowest with no sustainability and high dependency on individual efforts and level 5 is the inspirational level. Level 3 is where internal audit management and professional practices are uniformly applied and the practice generally conforms to the internal audit standards and an established Quality AssuranceImprovement Program (QAIP).

Level 3 of IA-CM requires advisory services and performance audit to be practiced uniformly and the use of risk based audit plan within the internal audit institutions. To ensure such internal audit professional practice, qualified IA-CM accessors and certified QAIP reviewers should be available to support such transformation. Summary Status of Financing TF Approval Signing Effectiveness Closing Net Commitment Disbursed Undisbursed TF-A3211 23-Sep-2016 23-Sep-2016 23-Sep-2016 30-Apr-2018.66.56.10 Policy Waiver(s) Does this restructuring trigger the need for any policy waiver(s)? No Note to Task Teams: End of system generated content, document is editable from here. I. PROJECT STATUS AND RATIONALE FOR RESTRUCTURING The project ratings on the progress towards achievement of the PDO and overall implementation progress (IP) are Satisfactory. Although there was delay in the initial stage, project implementation has significantly improved. Bank disbursements as of March31, 2018 is 86% of the total allocated grants while AAIPI has utilized only 88% of the funds advanced by the Bank. AAIPI had commitment amounted to USD 594,350 covering five activities endorsed by the Donors earlier from the initial allocation of USD 655,350. Following are the details progress of the activities in each component. Component 1: Internal Audit Capacity Enhancement: 1. Stakeholder Learning Workshop was completed. Two workshops were already conducted. Each workshop attended by 750 800 internal auditors from ministries / agencies inspectorate general (IG s) and from local government IG s. The first Workshop was conducted on November 30, 2016 to share and learn experience in moving towards level 3 of Internal Audit Capability Model (IA-CM). The second workshop was conducted on September 30, 2017 to monitor the progress of IA-CM of Ministries/agencies while providing update on use of technology for internal audit and risk based audit plan. Both are required for level 3 IA-CM. 2. The development of distance learning modules was completed. The AAIPI distance learning application already attached in AAIPI website. The application consists of the following modules (i) Government Internal Audit Standard; (ii) Government Auditor Code of Ethic; (iii) Peer Review Standard and (iv) performance Audit Standard. The application is also accessible through smart phone. 3. The Capacity Building to Implement Audit Universe and Risk Based Planning is recently completed. The guidelines to implement risk based planning has been prepared and piloted in planning of cross sectoral poverty alleviation and food sustainability program (using activity approach) in BPKP and IG of Ministry of State Owned Enterprises and Jakarta Local Inspectorate (using unit auditee approach).

Component 2: Piloting use of Technology in Conducting Internal Audit: Computer Aided Audit Techniques (CAAT) has been developed and piloted within the Inspector General of Ministry of Finance (IG MoF). Plans are being made to implement the CAAT in IGs from other ministries. Further development of CAAT to be used by local inspectorates is also being considered. Component 3. Institutional Support and Project Management: Preparation of AAIPI s strategic plan is already completed and presented to AAIPI Board. To support AAIPI vision to be a leading professional organization to support internal auditor as the assurance and consultant for accountable financial management at central government and local governments, AAIPI will (i) provide methodology, technic, and approach and good practice in internal audit which in-line with international practice; (ii) provide input for prosper, professional internal auditor with good integrity; and (iii) conduct cooperation with other national and international professional organization. Other than the above, AAIPI is maintaining and continuously developing the internal audit standard, code of ethic and peer review standard which already developed earlier. The Project Development Objective (PDO) indicators are showing progress. The number of internal audit units in level 3 IA-CM (PDO1), is already above the end target (20), currently reaching 125 internal audit units. The use of Information Technology (IT) for internal audit practice within IG MoF (PDO2) has also been achieved. It was reported that IG MoF is using IT for its audit on SPAN. The preparation of AAIPI Strategic plan (PDO3) is also completed as explained above. Extension of the closing date is required, the client has sent a request to extend the project closing date from February 28, 2018 to February 28, 2019 to allow for completion of ongoing activities as well as to seek additional financing from donors for activities already approved by the Bank. The project went through interim extension up to April 30, 2018 while waiting for PFM MDTF (parent TF) extension process. As the parent TF was recently extended up to August 30, 2019. The project is proposed for extension up to March 27, 2019. Recent endorsement by Donors. There were thirteen activities approved by the Bank in the project paper, of which five activities already completed. The Bank team received endorsement from the donor Management Committee of the remaining eight activities (six activities under Component 1 and 2 activities under Component 3) at MC meeting on March 14, 2018. Additional activities endorsed by Donors are (a) performance audit guidelines; (b) training of Trainers Program for IA-CM Assessors Certification; (c) Training of Trainers Program for Quality Assurance Improvement Program (QAIP); (d) Independent Validation of BPKP IA-CM Self-assessment and QAIP; (e) Implementation Support on COSO and IA-CM at Local Government Level; (f) Internal Control Workshop; (g) Institutional Support to AAIPI; and (h) Development AAIPI Membership Database. These activities could significantly contribute to the achievement of PDOs. AAIPI requires an extension to implement them as they were recently endorsed by the donors. Currently all Term of Reverences (ToRs) of the above activities have been reviewed and No Objection Letters (NOLs) have been issued. Procurement process is expected to start soon to expedite the project implementation. II. DESCRIPTION OF PROPOSED CHANGES The project had interim extension up to April 30, 2018 while waiting for parent TF extension process. Eight activities endorsed by the donors in MC meeting dated March 14, 2018 are as follows: (a) development of performance audit guidelines; (b) training of Trainers Program for IA-CM Assessors Certification; (c) Training of Trainers Program for Quality Assurance Improvement Program (QAIP); (d) Independent Validation of BPKP IA-CM Self-assessment and QAIP; (e) Implementation Support on COSO and IA-CM at Local Government Level; (f) Internal Control Workshop; (g) Institutional Support to AAIPI; and (h) Development AAIPI Membership Database. These activities could significantly

contribute to the achievement of PDOs. An additional fund allocation of USD344,650 (after considering the initial allocation of USD 655,350) bring the total cumulative allocation for AAIPI into USD 1,000,000. AAIPI requires extension to implement these activities. All Term of Reverences (ToRs) of the above activities have been reviewed and No Objection Letters (NOLs) have been issued. Procurement process is expected to start soon to expedite the project implementation. As the parent TF already extended up to August 31, 2019, the project is proposed to be extended up to March 27, 2019 with reduce grace period from four months into three months. The recipients are fully aware that the grace period for submitting the withdrawal application will only be about three months after March 27, 2019. DFI clearance has been obtained. Note to Task Teams: The following sections are system generated and can only be edited online in the Portal. III. SUMMARY OF CHANGES Changed Change in Loan Closing Date(s) Not Changed Additional Financing Proposed Change in Disbursement Estimates Change in Implementation Schedule Change in Implementing Agency Change in Project's Development Objectives Change in Results Framework Change in Components and Cost Cancellations Proposed Reallocation between Disbursement Categories Change in Disbursements Arrangements Change in Overall Risk Rating Change in Safeguard Policies Triggered Change of EA category Change in Legal Covenants Change in Institutional Arrangements Change in Financial Management Change in Procurement Other Change(s)

OPS_DETAILEDCHANGES_LOANCLOSING_TABLE The World Bank IV. DETAILED CHANGE(S) LOAN CLOSING DATE(S) TF Status Original Closing Revised Closing(s) Proposed Closing Proposed Deadline for Withdrawal Applications TF-A3211 Effective 28-Feb-2018 30-Apr-2018 27-Mar-2019 30-Jun-2019 OPS_DETAILEDCHANGES_ADDITIONAL_FINANCING_TABLE ADDITIONAL FINANCING Source Currency Amount USD Equivalent Indonesia - Support Public Financial Management(IDFM) USD 344,650.00 344,650.00 Existing Net Commitment USD Amount 660,000.00 Total 1,004,650.00 OPS_DETAILEDCHANGES_DISBURSEMENT_TABLE DISBURSEMENT ESTIMATES Change in Disbursement Estimates Yes Year Current Proposed 2017 0.00 399,380.00 2018 0.00 487,151.00 2019 0.00 113,469.00 2020 0.00 0.00 2021 0.00 0.00 2022 0.00 0.00 2023 0.00 0.00 Note to Task Teams: End of system generated content, document is editable from here.