RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

Similar documents
RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT

The World Bank NEITI Reporting Compliance (P162344)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

The World Bank Malawi Strategic Program for Climate Resilience (P163245)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010

The World Bank Third Secondary and Local Roads Project (P148048)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008

The World Bank Social Assistance System Strengthening Project (P123960)

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

The World Bank Kabeli-A Hydro Electric Project (P122406)

Public Disclosure Copy

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

The World Bank Water and Sanitation in Tourist Areas (P054221)

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577)

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924)

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740)

The World Bank Urban Transport Corridor Development in Surabaya - RETF (P147893)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Public Disclosure Copy

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

Implementation Status & Results Indonesia Initiatives for Local Governance Reform Project (P076174)

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

Second Public Financial Management Capacity Strengthening Project (P151492)

The World Bank NP: Strengthening the Office of the Auditor General (P127040)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

Implementation Status & Results India Assam State Roads Project (P096018)

The World Bank Disease Prevention and Control Project (P128442)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT

Public Disclosure Copy

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

Public Disclosure Copy

The World Bank Strengthening Public Resource Management (P161586)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

Public Disclosure Copy

Implementation Status & Results Indonesia Government Financial Management and Revenue Administration Project (P085133)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

Implementation Status & Results Lao People's De Lao PDR Trade Development Facility Project (P106165)

INTEGRATED COASTAL ZONE MANAGEMENT APPROVED ON JUNE 15, 2010 THE REPUBLIC OF INDIA

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NATIONAL HYDROMET MODERNIZATION PROJECT LOAN NO RU

SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT APPROVED ON JUNE 1, 2010 COORDINATION DU PATMUR,MINISTERE DE L'ECONOMIE, DES FINANCES ET DU PLAN

The World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992)

The World Bank Pacific Islands Regional Oceanscape Program - Tuvalu (P151780)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INDEX-BASED LIVESTOCK INSURANCE PROJECT

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

The World Bank Palestinian Recovery & Development Plan MDTF (P110690)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy

STAR Contribution to Indonesia PFM

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Implementation Status & Results Liberia LR-Public Financial Management - IFMIS (P109775)

Public Disclosure Copy

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SERBIA COMPETITIVENESS AND JOBS PROJECT (P152104) APPROVED ON SEPTEMBER 16, 2015

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)

Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Federally Administered Tribal Areas (FATA) Governance and Policy Program (P156412)

The World Bank Indonesia Power Transmission Development Project (P117323)

The World Bank Industrial Waste Management and Cleanup Project (P122139)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MUNICIPAL SERVICES PROJECT LOAN 7885-TU

State Owned Financial Institutions Reform Project (P156837)

The World Bank Mauritania Public Sector Governance Project (P146804)

Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778)

Public Disclosure Copy

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO.

Public Disclosure Copy

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Indonesia Global Practice

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

Public Disclosure Copy

Public Disclosure Copy

Transcription:

Public Disclosure Authorized The World Bank REPORT NO.: RES31608 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016 TO ASOSIASI AUDITOR INTERN PEMERINTAH INDONESIA (AAIPI) Public Disclosure Authorized GOVERNANCE EAST ASIA AND PACIFIC Public Disclosure Authorized Regional Vice President: Country Director: Senior Global Practice Director: Practice Manager/Manager: Task Team Leader: Victoria Kwakwa Rodrigo A. Chaves Deborah L. Wetzel Roberto Tarallo Novira Kusdarti

ABBREVIATIONS AND ACRONYMS

Note to Task Teams: The following sections are system generated and can only be edited online in the Portal. BASIC DATA Product Information Project ID P159448 Original EA Category Not Required (C) Approval Date 23-Sep-2016 Financing Instrument Investment Project Financing Current EA Category Not Required (C) Current Closing Date 28-Feb-2018 Organizations Borrower ASOSIASI AUDITOR INTERN PEMERINTAH INDONESIA (AAIPI) Responsible Agency ASOSIASI AUDITOR INTERN PEMERINTAH INDONESIA (AAIPI) Project Development Objective (PDO) Original PDO The primary objective of our engagement is to contribute to government's efforts to improve the capacity of the internal audit institutions to progress towards level 3 of IA-CM requirements. Internal Audit Capability Model (IA-CM) is a framework that identifies the fundamentals needed for effective internal auditing in government and the broader public sector. It illustrates the levels and stages through which an intern audit activity can evolve as it defines, implements, measures, controls and improves its processes andpractices. The IA-CM provides a road map for continuous improvement in processes and practices to establish effective internal auditing in an organization. There are 5 capability levels in IA-CM, where level 1 is the lowest with no sustainability and high dependency on individual efforts and level 5 is the inspirational level. Level 3 is where internal audit management and professional practices are uniformly applied and the practice generally conforms to the internal audit standards and an established Quality AssuranceImprovement Program (QAIP).

Level 3 of IA-CM requires advisory services and performance audit to be practiced uniformly and the use of risk based audit plan within the internal audit institutions. To ensure such internal audit professional practice, qualified IA-CM accessors and certified QAIP reviewers should be available to support such transformation. Summary Status of Financing TF Approval Signing Effectiveness Closing Net Commitment Disbursed Undisbursed TF-A3211 23-Sep-2016 23-Sep-2016 23-Sep-2016 28-Feb-2018.66.56.10 Policy Waiver(s) Does this restructuring trigger the need for any policy waiver(s)? No Note to Task Teams: End of system generated content, document is editable from here. I. PROJECT STATUS AND RATIONALE FOR RESTRUCTURING The project ratings on the progress towards achievement of the PDO and overall implementation progress (IP) are Satisfactory. Although there has been a significant delay in the initial stage, project implementation has significantly improved. Bank disbursements as of December 31, 2017 is 86% of the total allocated grants while AAIPI has utilized only 72% of the funds advanced by the Bank. Component 1: Internal Audit Capacity Enhancement: Three activities approved by the Donors. 1. Stakeholder Learning Workshop was completed. 2. Development of distance learning modules is currently ongoing and expected to complete by end of February 2018. 3. The Capacity Building to Implement Audit Universe and Risk Based Planning is expected to complete by end of February 2018. Component 2: Piloting use of Technology in Conducting Internal Audit: Computer Aided Audit Techniques (CAAT) has been developed and piloted within the IG MoF. Plans are being made to implement the CAAT in IGs from other ministries. Further development of CAAT to be used by local inspectorates is also being considered. Component 3. Institutional Support and Project Management: Preparation of AAIPI s strategic plan is currently on going and is expected to be completed by end of February 2018. The Bank team will be seeking approval from the donor Management Committee of the remaining eight activities (six activities under component one and 2 activities under component 3) at their forthcoming MC meeting on early March 2018. The team believes that sufficient funds available in the TF to finance the remaining two activities.

The PDO indicators request for 20 internal audit units in level 3 IA-CM, while currently based on the information provided, 33 internal audit units already in level 3 IA-CM (8 Inspector Generals, 8 provinces and 17 municipality local inspectorates). PDO indicators also requested use of IT for conducting Internal Audit and currently it was reported that IG MoF is already use for its audit on SPAN. Development of Strategic Plan exercise is currently on going and expected to be completed by end of February, but possibly slip into March 2018. Extension of the closing date is required, the project has sent a request to extend the project closing date from February 28, 2018 to February 28, 2019 to allow for completion of ongoing activities as well as to seek additional financing from donors for activities already approved by the Bank. There were thirteen activities approved by the Bank in the project paper, of which five activities already either completed or on going and eight activities are yet to be endorsed by the donors. The eight activities are (a) performance audit guidelines; (b) training of Trainers Program for IA-CM Assessors Certification; (c) Training of Trainers Program for Quality Assurance Improvement Program (QAIP); (d) Independent Validation of BPKP IA-CM Self-assessment and QAIP; (e) Implementation Support on COSO and IA-CM at Local Government Level; (f) Internal Control Workshop; (g) Institutional Support to AAIPI; and (h) Development AAIPI Membership Database. The activities cost is USD 444,650. These activities are important to the achievement of level 3 of IA-CM and AAIPI required sufficient time to do it after endorsement achieved by the donors. Currently all ToRs of the above activities are already reviewed and NoLs have been issued. Advance procurement process is expected to start soon to expedite the project implementation. The project will go through interim extension up to April 30, 2018 while waiting for PFM MDTF (parent TF) extension process. Further extension up to February 28, 2019 will be granted after the parent TF extension completed. II. DESCRIPTION OF PROPOSED CHANGES As the eight activities are yet to be endorsed in next MC meeting (scheduled on March 7, 2018), the current project paper will only cover interim extension of the project. The project will go through interim extension up to April 30, 2018 while waiting for PFM MDTF (parent TF) extension process. Further extension up to February 28, 2019 will be granted after the parent TF extension completed. The change to include additional eight activities will be proposed after endorsement received from the donors in the upcoming MC meeting. Note to Task Teams: The following sections are system generated and can only be edited online in the Portal. III. SUMMARY OF CHANGES Changed Change in Loan Closing Date(s) Not Changed Change in Implementation Schedule

OPS_DETAILEDCHANGES_LOANCLOSING_TABLE The World Bank Change in Implementing Agency Change in Project's Development Objectives Change in Results Framework Change in Components and Cost Cancellations Proposed Additional Financing Proposed Reallocation between Disbursement Categories Change in Disbursements Arrangements Change in Disbursement Estimates Change in Overall Risk Rating Change in Safeguard Policies Triggered Change of EA category Change in Legal Covenants Change in Institutional Arrangements Change in Financial Management Change in Procurement Other Change(s) IV. DETAILED CHANGE(S) LOAN CLOSING DATE(S) TF Status Original Closing Revised Closing(s) Proposed Closing Proposed Deadline for Withdrawal Applications TF-A3211 Effective 28-Feb-2018 30-Apr-2018 30-Jun-2018 Note to Task Teams: End of system generated content, document is editable from here.