Executive Summary. Prepared by: The Ohio Department of Transportation

Similar documents
Unified Planning Work Program

I-80 Corridor Unsolicited Proposal Transportation Board Meeting December 3, 2018

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six

Public Hearing Tarrant County. April 14, 2009

I-64 Capacity Improvements Segment III Initial Financial Plan

Allen Road Individual Environmental Assessment (EA)

Corridors of Commerce DRAFT Scoring and Prioritization Process. Patrick Weidemann Director of Capital Planning and Programming November 1, 2017

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five

Financial Plan Fifth Annual Update

SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer March 15, 2016

SOUND TRANSIT STAFF REPORT MOTION NO. M D Street-to-M Street Track & Signal Project Preferred Alternative

Quarterly Status Report

PROJECT EVALUATION FORM

TYSONS CORNER. Neighborhood Traffic Impact Study. Traffic Analysis Report. Task Order No Prepared by: Prepared for:

SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION

UNIFIED TRANSPORTATION PROGRAM

City of Portsmouth Portsmouth, New Hampshire Department of Public Works

Newark Rotary February 14, Joe Rutherford, District Deputy Director Jerry Wray, Director John Kasich, Governor

Hot Springs Bypass Extension TIGER 2017 Application. Benefit-Cost Analysis Methodology Summary

Planning Board Worksession No.6: Transportation and Staging

Development of the Cost Feasible Plan

Amendment 6 - OKI 2030 REGIONAL TRANSPORTATION PLAN

Texas Department of Transportation Corpus Christi District

Transportation Planning FAQ s

Transportation Improvement Program

SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania

South Montgomery County Mobility Plan

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

SCOPE OF SERVICES FOR SR 77 FEASIBILITY STUDY PROJECT DESCRIPTION: FROM NORTH OF BLUE LAKE ROAD TO JACKSON COUNTY LINE FDOT

NASHVILLE AREA MPO. ADJUSTMENT to The Fiscal Years Transportation Improvement Program. Adjustment Number: TIP Number:

Chairman Smedberg and the VRE Operations Board

Travel Forecasting for Corridor Alternatives Analysis

Fiscal Year th Quarter Report Quarterly Report of Actual Traffic and Revenue For period ending August 31, 2017

Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis

Corridor Management Committee. May 6, 2015

JACKSONVILLE URBAN AREA METROPOLITAN PLANNING ORGANIZATION UNIFIED PLANNING WORK PROGRAM AMENDMENT 1 FISCAL YEAR 2018 TABLE OF CONTENTS

FY 2011 Continuing Appropriations Act. TIGER Discretionary Grant Program

RMTA FY2016 Annual Traffic and Toll Revenue Report

ALL Counties. ALL Districts

Review and Update of Year 2035 Regional Transportation Plan

CITY OF RAMSEY PRELIMINARY WORK PLAN FOR: 2040 COMPREHENSIVE PLAN UPDATE (DETAILED WORK PLANS TO BE DEVELOPED IN FUTURE STEPS)

Environmental Justice Analysis. Appendix 3 to SFY MORPC TIP

STUDY SCHEDULE STUDY PURPOSE

NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY

FY 2011 Continuing Appropriations Act. TIGER Discretionary Grant Program

SR 520 BRIDGE. Investment Grade Traffic and Revenue Study Update. SR 520 Bridge and the Eastside plus West Approach Bridge Project

Concept Development Activity Descriptions July, 2017

LOCAL MAJOR BRIDGE PROGRAM

Alameda County s 20-Year Transportation Expenditure Plan. July 2000

DMP (Decision Making Process)

32 nd Street Corridor Improvements

SCOPE OF SERVICES FOR PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDIES I-75 (SR 93) FROM E OF SR 951 TO SR

I-75 at Overpass Road Interchange

Martin and St. Lucie Counties Regional Land Use Study Final Report

Economic Appraisal Objectives

TRANSMITTAL #2 FUNDING AGREEMENT BETWEEN SOUTH BAY CITIES COUNCIL OF GOVERNMENTS AND CITY OF LOS ANGELES HARBOR DEPARTMENT (PORT OF LOS ANGELES)

SCOPE OF SERVICES FOR CORRIDOR FEASIBILITY STUDY. District Three Escambia County

SOUTH CENTRAL PLANNING AND DEVELOPMENT COMMISSION. Scope of Services. Terrebonne Parish

Planning Board Worksession No.1-Transportation and Staging

Memorandum. Jt~1A. Jordan, P.E. Assistant City Manager CITY OF DALLAS

MEETING MINUTES SUMMARY

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

Chapter 6 Transportation Improvements & Financial Plan

REQUEST FOR COUNCIL ACTION

TSM Limited Scope Project Customization Guideline. December, 2016

95 Express Monthly Operations Report January 2018

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

Fiscal Year nd Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending February 28, 2018

SCOPE OF SERVICES FOR PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDIES I-4 (SR 400) FROM W OF SR 570 (POLK PARKWAY) TO W OF US 27 INTERCHANGE FDOT

Transportation Improvement Program Project Priority Process White Paper

EXHIBIT A DONATIONS April 26, 2018

TEXAS METROPOLITAN MOBILITY PLAN: FUNDING NEW OPPORTUNITIES

RCTC 91 Express Lanes Toll Policy Adopted June 7, 2012

REQUEST FOR INFORMATION

Quarterly Status Report

STATUS In Progress - Programmed FEDERAL Local Fund $0 $0 $0 $13,041 $13, TAP CL STBG $0 $0 $0 $247,789 $247,789

TTFAC Hearing Regarding Chesapeake Transportation System June 18, 2012

Quarterly Status Report

TEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY

I-81 Corridor Improvement Plan. October 2018 Public Meetings

Year 2014 Engineer s Report regarding the Status of ownership, Working order and Condition of the Public Infrastructure.

Fiscal Year th Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending August 31, 2018

Prioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016

Quarterly Status Report

JANUARY 2018 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS

Region of Waterloo Transportation and Environmental Services Rapid Transit

Administration and Projects Committee STAFF REPORT March 1, 2018 Page 2 of 9 Below is a summary of the FY adopted budget and the proposed midy

Administration and Projects Committee STAFF REPORT June 4, 2015 Page 2 of 2 Attachments A. Letter from Caltrans dated May 15, 2015 Changes from Commit

final report Benefit/Cost Analysis for U.S. 41 Corridor ITS New Start - Winnebago, Outagamie, and Brown Counties

Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC:

Chapter 6: Financial Resources

SCOPE OF SERVICES FOR PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY PROJECT DESCRIPTION FDOT District 3 Gadsden County & Leon County

MEETING NOTICE AND AGENDA

DATA COLLECTION. March 15, 2013

SCOPE OF SERVICES FOR FEASIBILITY STUDY. District Three Okaloosa, Walton, and Washington County

Call to Order. 70/75 Logistics Project. Resolution IBI Modification #1. Lyons Road Pedestrian Access Project

SEPTEMBER 2018 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS

Transcription:

Executive Summary Prepared by: The Ohio Department of Transportation

Table of Contents Executive Summary 1 Project History 1 Purpose and Need 1 Alternatives Analysis 1 Recommendations 3 Subdivision of Projects 3 Phasing and Funding 4 Public Involvement 4 Actions & Next Steps 5 List of Tables Table 1 Phase Funding 4 Table 2 Phase Funding Based on Subdivision of Projects 4 List of Figures Figure 1 North Central Outerbelt Study Area Map 2 Figure 2 Delivery Strategy for I-270 at SR 315 & US 23 5 Figure 3 Delivery Strategy for I-270 at I-71 6!" # $! May 2004 Page i

Executive Summary Project History During the 2003 fiscal year, the Department identified the North-Central Outerbelt (NCO) section of I-270 in Franklin County (which includes the interchanges of I-270 with SR 315, US 23, and I-71) is the fourth most congested/high crash location in the state. Therefore, the Department launched the North Central Outerbelt Study (see Figure 1) in June of 2003 which would follow the first four steps of the Department's 14-step Project Development Process (PDP). Work for this study was built upon the "I-270 North Outerbelt Corridor Major Investment Study" completed by Mid Ohio Regional Planning Commission (MORPC) in June of 1996. Purpose and Need Analysis of existing conditions found that the current design of the interchanges on the NCO were inadequate for current traffic volumes. Traffic volumes are expected to increase by 37 percent by the year 2028. Several locations with failing traffic conditions and high crash rates correspond to weave areas at and between the interchanges. These conditions are exacerbated by freight traffic on I-270 which is designated a Hazardous Cargo Route. Solutions to these issues must: Improve traffic flow and operational efficiency by reducing congestion Improve safety by improving roadway geometrics and eliminating some of the weave areas Alternatives Analysis This study is based on the I-270 North Outerbelt Corridor MIS completed by MORPC in 1996. Other conceptual alternatives evaluated by the MIS included Travel Demand Management (TDM), transit, high-occupancy vehicle facilities (HOV), Transportation Systems Management (TSM), and surface street improvements. However, none of these conceptual alternatives, either individually or in combination, were found to provide sufficient improvement to eliminate the need for general purpose capacity and geometric improvements on I-270. This current study addresses the interchange areas in the study corridor to correct safety and geometric deficiencies. The MIS s recommendations were the catalyst for this current study. Goals and Objectives were established for this study with the assistance of local stakeholders. Screening factors were developed from the Goals and Objectives to reflect existing and anticipated future needs of the NCO. They enabled preliminary analysis of the conceptual alternatives to be conducted. The conceptual alternatives which met all of the screening factors were advanced for more detailed evaluation. Evaluation criteria were developed from the Goals and Objectives and applied to the advanced alternatives to quantify their impacts. Page 1

Figure 1: North Central Outerbelt Study Area Map Page 2

Recommendations Based upon the analysis of the evaluation criteria the following concepts are recommended for the various segments of the study area. (See graphic representations of recommendations in Part 4 of the Final Planning Study Report). I-270 at SR 315 Create a SR 315 northbound to I-270 westbound flyover ramp and a SR 315 southbound to I-270 eastbound flyover ramp. I-270 at US 23 Modify the existing cloverleaf interchange to a Partial Cloverleaf (Parclo) Type A interchange. US 23 - From I-270 to Flint Rd. Create a grade-separated, northbound-only roadway which by-passes the signals on US 23 between I-270 and Flint Rd. The grade separated roadway would be below normal grade, and located between the northbound and southbound "surface" roadways. York Temple Drive Relocate/extend York Temple Dr. to access West Campus View Boulevard. I-270 at I-71 Create an I-270 eastbound to I-71 northbound flyover ramp which replaces the existing loop ramp. Subdivision of Projects Due to the close proximity of the segments of the I-270 interchange at SR 315, the I-270 interchange at US 23, US 23 north of I-270, and York Temple Drive, these segments are recommended to be designed together by a single design agency. The remaining segment of the I-270 interchange at I-71 should be designed separately since the improvements recommended at this location are substantially simpler to design and construct. In addition, the improvements recommended at the I-270 & I-71 Interchange clearly have separate, independent utility from the improvements at SR 315 and US 23. Page 3

Phasing and Funding Planning level cost estimates are provided in Table 1 below for each of the study segments. It includes the estimated costs for each phase of the project (PE - Design; R/W - Right-of-Way acquisition; Const. - Construction). Costs are in millions of dollars. Phase SR-315 Interchange Alt 1 Table 1: Phase Funding US-23 Interchange Alt 1 Location US-23 North of I-270 Alt C York Temple Dr. Relocation I-71 Interchange PE $4.7 M $3.4 M $5.0 M $0.01 M $2.2 M R/W $2.0 M $1.9 M $14.7 M $0.40 M $2.8 M Construction $47.4 M $33.9 M $50.1 M $0.10 M $21.9 M TOTAL $54 M $39 M $70 M $0.51 M $27 M Table 2 below provides phasing and funding data based upon the recommended subdivision of projects. Design Projects I-270 @ SR 315 & US 23, US 23 North of I-270, and York Table 2: Phase Funding Based on Subdivision of Projects PE RW Construction Year Cost Year Cost Year Cost 2004 $13 M 2006 $10 M 2008 $66 M Project Total $164 M Temple Drive 2007 $9 M 2009 $66 M I-270 @ I-71 2004 $2 M 2005 $3 M 2006 $22 M $27 M NCOS TOTAL $191 M Public Involvement Stakeholder involvement is essential for every step in the PDP. Stakeholders provide information and offer a unique perspective in identifying the problem and what changes or improvements are needed to have a successful project. To that end, ODOT developed a Public Involvement Plan (PIP) that weaved together the technical aspects of the study with the appropriate level of public participation activities. The PIP outlined the formation of an Advisory Committee (comprised of public and private stakeholders in the NCO), public meetings, an internet website, and several media stories and articles. Numerous comments have been received as a result of public involvement activities to date. The majority of these comments express frustration over existing problems with the NCO. Comments pertaining to the recommended alternatives have, for the most part, been positive. Page 4

Actions & Next Steps Preliminary Engineering & Detailed Design ODOT - District 6 will be the responsible agency for advancing the projects through the environmental, preliminary engineering, design, right-of-way, and construction phases. The study area is to be divided into two different design projects. Due to the complexity of the recommended conceptual alternatives, I-270 at I-71 will follow the Minor PDP and I-270 at SR 315 and US 23 will continue to follow the Major PDP. I-270 at SR 315 & US 23 (Major PDP) A consultant team has been selected and authorized to proceed with work on all relevant tasks in Steps 5 through 7 (authorization to proceed with additional Steps will come at a later date). The recommendations for this part of the study area are quite expensive and complicated to construct. Consequently, the final construction activities for this location will likely be sub-divided into several different projects to provide logical construction sequencing. The number of sub-projects and their limits will be determined by Step 8. Each sub-project will have its own delivery strategy. The schedule below shows the anticipated overall delivery strategy for all of the projects at this location. PE / Env Design Right of Way Award Construction 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 Figure 2: Delivery Strategy for I-270 at SR 315 & US 23 I-270 at I-71 (Minor PDP) A consultant team has been selected and authorized to proceed with work on all relevant tasks in Steps 3 and 4. Final construction activities for this location will be conducted as a single project. The schedule below shows the anticipated delivery strategy for this location: Page 5

PE/Env/Design Right of Way Award Construction 2004 2005 2006 2007 2008 Figure 3: Delivery Strategy for I-270 at I-71 Page 6