FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN WATER SUPPLY AND SANITATION PROJECT IBRD LOAN NO.

Similar documents
Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SECOND STATE PENSION REFORM TECHNICAL ASSISTANCE LOAN PARSEP II. January 10, 2007 TO THE

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

Public Disclosure Copy

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Nelson. b.were the project objectives/key associated outcome targets revised during implementation? No

The World Bank Urban Transport Corridor Development in Surabaya - RETF (P147893)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROVINCIAL AND RURAL INFRASTRUCTURE PROJECT (CREDIT 3822-KH)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

Document of The World Bank FOR OFFICIAL USE ONLY

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ELECTRICITY SECTOR EFFICIENCY ENHANCEMENT PROJECT CR SE. April 25, 2005 TO THE

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Indonesia Global Practice

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO.

The World Bank Transport Connectivity and Asset Management Project (P132833)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

FOR OFFICIAL USE ONLY

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007

Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785)

RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Public Disclosure Copy

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMEROON HEALTH SECTOR SUPPORT INVESTMENT PROJECT CREDIT: 4478-CM TO THE

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577)

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION

Indonesia: Metropolitan Medan Urban Development Project

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

Project Progress Report

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435)

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

Implementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313)

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WEST AFRICA REGIONAL BIOSAFETY PROJECT

RESTRUCTURING PAPER ON A

The World Bank Palestinian Recovery & Development Plan MDTF (P110690)

Public Disclosure Copy. Implementation Status & Results Report Federally Administered Tribal Areas (FATA) Governance and Policy Program (P156412)

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY

Implementation Status & Results Afghanistan Afghanistan Capacity Building for Results Facility (CBR) (P123845)

Myanmar Southeast Asia Disaster Risk Management Project (P160931)

The World Bank Research and Innovation in Science and Technology Project (P121842)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BOR REGIONAL DEVELOPMENT PROJECT

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

The World Bank Indonesia Power Transmission Development Project (P117323)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TAX MODERNIZATION PROJECT TO THE REPUBLIC OF TANZANIA AUGUST 30, 2006

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

Public Disclosure Copy

RESTRUCTURING PAPER ON A

Public Disclosure Copy

The World Bank Indonesia Power Transmission Development Project (P117323)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy

Implementation Status & Results Tajikistan Tax Administration (P127807)

The World Bank NP: Strengthening the Office of the Auditor General (P127040)

Public Disclosure Copy

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF EMERGENCY BRIDGE RECONSTRUCTION & VULNERABILITY REDUCTION PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)

West Bank and Gaza: Finance for Jobs (P151089)

Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296)

KENYA: Primary Education Development Project (PRIEDE), Grant No. P Implementation Support Review March 12 to 21, 2018 Aide Memoire

Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Public Disclosure Copy

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

Country Practice Area(Lead) Additional Financing Uzbekistan Energy & Extractives P133633,P165054

Project development objective/outcomes

Country Practice Area(Lead) Additional Financing Indonesia Water P161514

Public Disclosure Copy

Implementation Status & Results Vietnam Second Northern Mountains Poverty Reduction Project (P113493)

Implementation Status & Results Madagascar Integrated Growth Poles (P083351)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

Key Dates. Project Development Objectives. Components. Overall Ratings

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405)

Document of The World Bank RESTRUCTURING PAPER

The World Bank Water and Sanitation in Tourist Areas (P054221)

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FO OFFICIAL USE ONLY ESTUCTUING PAPE ON A POPOSED POJECT ESTUCTUING OF UBAN WATE SUPPLY AND SANITATION POJECT IBD LOAN NO. 7730-ID TO THE EPUBLIC OF INDONESIA December 19, 2013 INDONESIA SUSTAINABLE DEVELOPMENT UNIT EAST ASIA PACIFIC EGION eport No: 87027 v1 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

ABBEVIATIONS AND ACONYMS IBD KPI PA PAD PCU PDAM PIU PMM International Bank for econstruction and Development Key Performance Indicator Performance Agreement Project Appraisal Document Project Coordination Unit Perusahaan Daerah Air Minum (local water utility) Project Implementation Unit Project Management Manual egional Vice President: Country Director: Sector Manager: Task Team Leader: Axel van Trotsenburg odrigo A. Chaves Nathan M. Belete Irma Magdalena Setiono 2

INDONESIA ID-UBAN WATE SUPPLY AND SANITATION CONTENTS Page A. SUMMAY... 4 B. POJECT STATUS... 4 C. POPOSED CHANGES... 4 ANNEX 1: ESULTS FAMEWOK AND MONITOING... 6 ANNEX 2: LETTE FOM MINISTY OF FINANCE POPOSING POJECT ESTUCTUING... 9 3

ID UBAN WATE SUPPLY AND SANITATION ESTUCTUING PAPE A. SUMMAY The proposed restructuring involves revision and update to the esults Framework and its key performance indicators described in the Project Appraisal Document (PAD) to ensure that a more efficient set of indicators are applied during project implementation and they are consistently presented in the Performance Agreements between Local Governments and their respective PDAMs. This revision will also include retrofitting inclusion of the core indicator for water supply, and to make correction and update to the baseline data and targets. This restructuring will better reflect progress of project implementation and its impact in improving service performance. The proposed restructuring does not involve changes to the project implementation period, the total loan amount, loan allocation between different categories, or changes to the mechanisms to ensure compliance with the safeguard policies. The proposed changes will also not result in change of impact in any other sections of the PAD. B. POJECT STATUS Based on the latest implementation support mission conducted in April and May 2013, project implementation progress is rated as Moderately Satisfactory. The project is currently rated as Satisfactory towards achievement of its Project Development Objectives and overall Implementation Progress is rated as Moderately Satisfactory. All other IS ratings are either S or MS and there are no major issues pending. Procurement processes and implementation of construction contracts have started and are progressing in all locations (some are already completed). Disbursements have been improving and will continue to improve in the future. Disbursement rate is at 59.93% and with completion of most project activities by end of June 2014, it is very likely that all funds will be used by closing date. All budgets to fund project activities has been fully allocated in the government s budgeting system (DIPA allocation) and all key ingredients for project implementation are in place (the Project Management Manual, the Project Coordination Unit PCU, the PCU Advisory Consultant, the Project Implementation Units PIUs and their supervision consultants). There are still delays in some construction activities although there will still be adequate time to complete all constructions prior to the end of project period. The PCU and PIUs are still having issues with monitoring and evaluation and reporting the progress of Key Performance Indicators achievement due to some confusion caused by inconsistencies of definition between the KPIs stated in their respective Performance Agreement and the definition stated in their regular reporting systems, as well as in the PAD 4

C. POPOSED CHANGES The proposed changes to be included in this restructuring include: (i) revision and update of the esults Framework (description and definition of Key Performance Indicators to include core indicator and to ensure consistency between all project documents); and (ii) to correct and update baseline data and targets. The changes are proposed to assist the PCU and PIUs in having more clarity and streamlined monitoring and evaluation process, thus improving the project s reporting mechanism. With this improved monitoring and evaluation process, the project will be better positioned to reflect the progress of implementation and its impact. Changes to the results/indicators include clarification of the definitions, correction and updating baseline data and targets, as well as inclusion of core indicator of water sector. The new sets of indicators are realistic, achievable and measurable, and take into account the capacities of the PIUs. The changes to the results/indicators are shown in the Annex 1. 5

ANNEX 1: esults Framework and Monitoring Project Development Objective (PDO): Improved and expand water supply services in project areas by strengthening local water utilities to become operationally efficient and financially sustainable evised Project Development Objective: N/A PDO Level esults Indicators* Core D=Dropped C=Continue N= New =evised Unit of Measure Baseline (2009) Cumulative Target Values** 2010 2011 2012 2013 2014 Frequency Data Source/ Methodology esponsibility for Data Collection Indicator One: Increment in capacity of production system Indicator Two: Increment in number of connections Indicator Three: Number of new piped household water connections that are resulting from the project intervention Indicator Four: Improvements in customer satisfaction, indicated by: (a) Quality (b) Service Hours (c) eliability Increment in installed production capacity l/s 1,710 197 190 C HC 86,587 12,250 16,421 N HC 0 0 Improvements in customer satisfaction, indicated by: (a) Quality (a) % (b) Hours (c) % (b) 23 (c) 99.68 1,710 197 425 95,087 12,250 18,021 8,500 1,600 (b) 23.5 (c) 95.86 1,710 202 460 103,587 12,974 19,521 17,000 1,125 3,100 (b) 24 (c) 94.69 1,910 202 460 112,087 13,484 22,021 25,500 1,635 2,500 (b) 24 (c) 82.50 2,310 307 500 120,587 15,200 24,521 34,000 3,351 2,500 (b) 24 (c) >90.00 2,310 307 650 129,087 17,700 27,021 42,500 5,851 2,500 (b) 24 (c) >95.00 Semi-annual project progress report Semi-annual financial management reports Annual Audit eports Annual or biannual Procurement Audit eports Annual eviews Mid Term eviews Final Completion eports PDAM s Annual Audited eport PDAM s Monthly eport Procurement Post eviews PCU Monitoring and Evaluations Bank Implementation Support Missions and Field Visits PIU/PDAM/ PEMDA PCU Independent Financial Auditor (BPKP)

(b) Service Hours (c) Complaint handling (b) 8.62 (c) 95.59 M. Enim (b) 5 (c) 100 (b) 10.41 (c) 91 (3 M. Enim (b) 5 (c) 89.2 (b) 9.5 (c) 90 M. Enim (b) 5 (c) 100 (b) 8.43 (c) 100 M. Enim (b) 5 (c) 100 (b) 14 (c) >95 M. Enim (a) >90 (b) 6 (c) >90 (b) 18 (c) >95 M. Enim (a) >90 (b) 12 (c) >90 Indicator Five: Operating atio Indicator Six: Debt Service Coverage atio (only for Bogor) C 0.91 1.31 1.2 <1 1.5 1.06 <1 1.5 0.98 <1 <1 <1 <1 <1 <1 C 2.68 >1.3 >1.3 >1.3 >1.3 >1.3 <1 <1 <1 INTEMEDIATE ESULTS Intermediate esult (Outcome 1): Improved PDAM Operations One: Additional volume of water produced Two: Non-evenue Water Three: Number of bulk meters replaced, repaired or installed evised Intermediate esult (Outcome 1): N/A Increment volume of water produced C D l/s % Unit 1,322 120.8 114.6 34.39 42 25 1,452 125 188 33.39 48.10 24 1,582 125.2 250 32.39 39.90 23 1,712 137.5 300 31.39 36.20 22 1,842 160 350 30.39 35.00 21 1,972 200 400 29.39 34.00 20 7

Four: Number of individual meters replaced or repaired One: Number of employees per connection Two: Water tariffs collection period Number of individual meters replaced or repaired, or calibrated Unit 19,437 238 21,000 202 238 21,164 94 600 Intermediate esult (Outcome Two): Improvement of PDAM Corporate Management evised Intermediate esult (Outcome Two): N/A Number of employees per 1,000 connections Water tariffs collection efficiency Staff % 6.54 10.13 9.07 94 90 84.48 6.00 13.33 11.67 94 96 89.33 6.00 12.18 9.71 95 97 91.30 Intermediate esult (Outcome Two): Improvement in PEMDA Corporate Ownership evised Intermediate esult (Outcome Two): N/A C One: % Tariff increases to maintain operating ratio 10 0 10 60 10 0 20,113 416 600 5.00 11.72 9 95 97 >90 20 0 27,000 500 600 5.00 10.20 8.5 96 >95 >90 0 0 30,000 750 600 5.00 8.00 8.0 96 >95 >90 0 30 *Please indicate whether the indicator is a Core Sector Indicator (see further http://coreindicators) **Target values should be entered for the years data will be available, not necessarily annually. 8

Annex 2 Letter from Ministry of Finance