Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis

Similar documents
Chapter 5: Cost and Revenues Assumptions

Chapter 6: Financial Resources

Development of the Cost Feasible Plan

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One

Technical Report No. 4. Revenue and Costs

Tampa Bay Express Planning Level Traffic and Revenue (T&R) Study

2040 Long Range Transportation Plan - Needs Assessment: System Preservation Pavement, Bridges, and Transit Costs and Benefits

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six

Route Route Z Intersection Realignment

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

LAKE~SUMTER MPO - COST FEASIBLE PROJECTS

CAPITAL IMPROVEMENTS ELEMENT

Military Highway Continuous Flow Intersection (CFI) Initial Financial Plan

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District One

GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34 the basics

Forecasting Traffic and Revenue Traditional and Express Lane Tolling

LADOTD COST ESTIMATING PROCESS. Charles Nickel, P.E. Value Engineering & Cost Estimate Director Office: (225)

SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION

Stormwater Utility Fund Delivery of Services

Pasco County, Florida. Multi-Modal Mobility Fee 2018 Update Study

AGENDA CENTRAL FLORIDA EXPRESSWAY AUTHORITY BOARD WORKSHOP April 11, 2019 Immediately following the 9:00 a.m. board meeting

How did we get here?

Mobility Fee Legislation

I-75 at Overpass Road Interchange

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

TRANSPORTATION CAPITAL PROGRAM

EXHIBIT A DONATIONS April 26, 2018

This page intentionally left blank

THIS AMENDED AND RESTATED DEVELOPMENT AGREEMENT (DA) is made and entered into by W I T N E S S E T H:

SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania

Unified Planning Work Program

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary

County Population

Florida Turnpike Enterprise; Toll Roads Bridges

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five

Appendix E: Revenues and Cost Estimates

I-64 Capacity Improvements Segment III Initial Financial Plan

Oakland Park Transportation Improvement Program (TIP) Projects. Mobility. Oakland Park Blvd. Total Funding Amounts ($):

Capital Improvement Program

1998 Bond Program. Margaret Hunt Hill Bridge (Woodall Rodgers) Prop 11 (Trinity River) $ 28,000,000 Complete

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Four

STUDY SCHEDULE STUDY PURPOSE

Capital Improvement Program Fund

UNIFIED TRANSPORTATION PROGRAM

TOWN OF JUPITER Community Redevelopment Agency

Town of Prescott Valley 2014 Development Impact Fee Report. Raftelis Financial Consultants, Inc.

1. identifies the required capacity of capital improvements to serve existing and future development based on level-of-service (LOS) standards;

draft report FTC Study of Cost Savings for Expressway Authorities Florida Transportation Commission Cambridge Systematics, Inc.

NASHVILLE AREA MPO. ADJUSTMENT to The Fiscal Years Transportation Improvement Program. Adjustment Number: TIP Number:

SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Four

Florida Department of Transportation Toll Facilities Toll Rates for SunPass, Cash and TOLL-BY-PLATE. Alligator Alley (Everglades Parkway)

Traffic Impact Analysis Guidelines Methodology

SCOPE OF SERVICES FOR SR 77 FEASIBILITY STUDY PROJECT DESCRIPTION: FROM NORTH OF BLUE LAKE ROAD TO JACKSON COUNTY LINE FDOT

COUNTY ADMINISTRATOR PUBLIC WORKS

ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY Traffic Volumes At Mainline Toll Plazas Existing System

Innovative But Familiar: Delivering Chisholm Trail Parkway

Dominion Boulevard Improvements with Toll System VDOT Initial Financial Plan February 1, 2012

Transportation Improvement Program

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO

2. We continue to work on the year end close in preparation of the audits commencement.

TRANSPORTATION 138 COMMUNITY DEVELOPMENT. Mission Statement. Mandates. Expenditure Budget: $4,660, % of Community Development

NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY

REQUEST FOR COUNCIL ACTION

Pinellas County Metropolitan Planning Organization

2025 COMPREHENSIVE PLAN PASCO COUNTY, FLORIDA CHAPTER 11 TABLE OF CONTENTS

LOCAL MAJOR BRIDGE PROGRAM

Meadow Pointe III Community Development District. Financial Statements (Unaudited) January 31, 2016

Follow this and additional works at: Part of the Business Commons

County Population

Traffic Engineer s Annual Report

Indiana LTAP Road School 2007 Purdue University West Lafayette, Indiana March 7, 2007

FY 2018 FY 2022 Capital Improvement Program (CIP) Executive Summary

4362 Northlake Boulevard Suite 204 Palm Beach Gardens, FL Fax

City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Bicycle/Pedestrian Safety Grants CIP Fund (3004)

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

CAPITAL IMPROVEMENT ELEMENT Inventory Analysis

Receive and file capital works report CW providing an update on the Burloak grade separation.

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment

Florida Senate SB 718 By Senator Sebesta

AGENDA REPORT. DATE: November 27, City Commission. Kim D. Leinbach, Interim City Manager

Executive Summary. Prepared by: The Ohio Department of Transportation

CITY OF PORT ST. LUCIE CAPITAL IMPROVEMENT FUNDS ANNUAL BUDGET

Annual Listing of Obligated Projects Federal Fiscal Year 2013

Regional Toll Revenue Annual Financial Report

City of Grand Forks Staff Report

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM

AGENDA ITEM ST. JOHNS COUNTY BOARD OF COUNTY COMMISSIONERS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

EXHIBIT A DONATIONS Cullen Blvd, An Individual Series of Forefunders Partners, LLC. Houston District

Remaining / Planned Expenditures. Remaining Amount Private

OKEECHOBEE COUNTY ROAD STRIPING AND MARKING SERVICES

City of Sea Isle City Department of Construction and Zoning Physical Location: 4501 Park Road (rear entrance)

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

Transportation Improvement Program

MAINE TURNPIKE AUTHORITY. Project Development Process

MPOAC REVENUE STUDY. MPOAC Revenue Study Governing Board and Staff Directors Joint WORKSHOP January 26, 2012 Tallahassee, FL

City of Portsmouth Portsmouth, New Hampshire Department of Public Works

Transcription:

Attachment B Project Cost Estimates for: Ridge Road Extension Alternatives Analysis PREPARED FOR: Pasco County Engineering Services Department PREPARED BY: NV5, INC. 6989 E. FOWLER AVENUE TAMPA, FLORIDA 33617 April 2015

Project Cost Estimates for Ridge Road Extension Alternatives Analysis TABLE OF CONTENTS Section Page 1.0 General B-1 2.0 Alternatives Included B-1 3.0 Construction Cost Estimates B-2 3.1 Methodology B-2 3.2 Adjustment to FDOT Construction Costs B-2 4.0 Right of Way Acquisition Cost Estimates B-3 4.1 Methodology B-3 4.2 Implementation of FDOT Spreadsheet B-3 5.0 Mitigation Cost Estimates B-4 6.0 Cost Estimate Results B-4 6.1 Tower Road Adjustments B-4 6.2 Summary of Costs B-4 TABLES B-1 Developer Responsibilities Used for Tower Road Cost Estimates B-4 B-2 Summary and Comparison of Cost B-5 APPENDICES B-1 FDOT Roadway Cost Per Centerline Mile B-2 Pasco Traffic Impact Studies & Substandard Road Review Guidelines (Excerpt) B-3 FDOT Right of Way Cost Estimate Spreadsheet B-4 Construction Cost Estimates for Alternatives B-5 Summary of Right of Way Cost Estimates for Alternatives B-6 Pasco County Provided Information for Roadway Construction Costs i

1.0 General Pasco County has applied for a permit from the United States Army Corps of Engineers (USACE) to construct an extension of Ridge Road from its current terminus at DeCubellis/Moon Lake Road eastward to US 41. The project would construct a new four lane divided roadway known as the Ridge Road Extension (RRE). The project includes ramp connections to an existing overpass at the Suncoast Parkway. Florida s Turnpike Enterprise, a part of the Florida Department of Transportation (FDOT), is a co-applicant for this project. The purpose of this document is to outline the process and assumptions that were used to develop the cost estimates for the alternatives to be analyzed for the Ridge Road Extension. The geographic limits for determination of costs is from Starkey Boulevard/Moon Lake Road on the west to US 41 on the east. The cost estimates include construction costs, engineering costs, right of way acquisition costs and mitigation costs. The results of the cost estimate analysis are also presented herein. 2.0 Alternatives Included Alternative 1 is no action to the current roadway network therefore it was not included below. The following is a list of the alternatives for which a cost estimate has been prepared and an abbreviated description. Alt No. Abbreviated Description 2 4-Lane RRE - 6D 3 4-Lane RRE - 6E 4 4-Lane RRE - 6F 5 4-Lane RRE - 6G 6 4-Lane RRE Elevated 1 7 4-Lane RRE Partially Elevated 1 8 SR 52 Add 4-Lanes 9 SR 54 Add 4-Lanes 10 4-Lane Tower Rd 11 SR 54 4-Lane Elevated 12 2-Lane Tower Rd & SR 54 Add 2-Lanes 13 SR 52 Add 2-Lanes & SR 54 Add 2-Lanes 14 2-Lane Tower Rd & SR 52 Add 2-Lanes 15 2-Lane RRE & 2-Lane Tower Rd 16 2-Lane RRE & SR 52 Add 2-Lanes 17 2-Lane RRE & SR 54 Add 2-Lanes 1 Elevated or partially elevated only within limits of Serenova Preserve. B-1

A more complete description of each of the alternatives, figures showing the conceptual alignments and typical cross sections are included in Attachment A of the Alternatives Analysis. 3.0 Construction Cost Estimates 3.1 Methodology Construction cost estimates have been generated using costs developed by the FDOT Planning office. For roadways, these construction costs are based on the typical design characteristics of common road types for a centerline mile of roadway and average price estimates for pay items. The basis of the estimates is the FDOT s Long Range Estimate (LRE) system. The LRE System is a parametric estimating tool used for planning estimates prior to the development of design quantities. Since construction costs vary across the state, the latest available cost information specific to District 7, which includes Pasco County, was utilized (June 2014). The tables of Roadway Cost Per Centerline Mile and Bridge Cost Per Square Foot are provided in Appendix B-1. These tables are available on FDOT s website at: http://www.dot.state.fl.us/planning/policy/costs/costs-d7.pdf The costs for roadway include roadway and drainage construction, maintenance of traffic, mobilization, and a contingency. Bridges, signalization work and other construction items such as Multi-Use Trails are not included and are added as applicable. For bridges, the construction costs are per square foot of deck area. Bridge costs do not include bridge approach (roadway) work and this cost is included in the roadway portion of the estimate. The design and construction engineering costs were included under the construction cost for each alternative. 3.2 Adjustment to FDOT Construction Costs The FDOT District 7 roadway centerline mile costs include factors for MOT (Maintenance of Traffic) at 10%, Mobilization at 10%, Scope Contingency (project unknowns) at 25%, PE Design (Preliminary Engineering Design) at 15% and CEI (Construction Engineering and Inspection) at 15%. These costs have been used for alternatives that are on the state highway system. For alternatives not on the state highway system the adjustments specified in the Pasco County s Traffic Impact Studies and Substandard Road Review Guidelines (TIS Guidelines), dated December 2007, have been made to the standard FDOT District 7 costs. The adjustments made to the FDOT costs are listed on page 14 of the TIS Guidelines, included in Appendix B-2. These adjustments include: Construction cost based on 85% of the cost shown in the Subtotal column Design cost should be 5% of the construction cost B-2

Construction Engineering & Inspection cost should be 3% of the construction cost Contingency cost shall be 10% of the construction cost For alternatives on new alignment, there is no traffic to maintain during construction and the maintenance of traffic factor was not utilized. 4.0 Right of Way Acquisition Cost Estimates 4.1 Methodology The Pasco County TIS Guidelines specifies that right of way costs from a location specific study be used when available. The FDOT s Guidance Document 2, Right of Way Cost Estimates, dated January 7, 2011, provides guidance concerning items and practices to be considered in the preparation of cost estimates for right of way in accordance with their Right of Way Manual. Section III.D of the Guidance Document suggests that each District should develop a worksheet to use for summarizing the cost estimate. The FDOT developed Right of Way Cost Estimate spreadsheet, included as Attachment 4, will be used to prepare location specific cost estimates for each alternative. As indicated on the Application and System Information sheet included with the spreadsheet, Anyone can use or give copies of this application software to anyone else. 4.2 Implementation of the FDOT Spreadsheet Development of input for right of way cost estimates will be from a desk top analysis of each alternative. Areas of acquisition shall be determined based on the location of existing right of way and property lines compared to proposed right of way lines associated with each alternative. Impacts to buildings or other site improvements that are discernible on aerial maps will be included as applicable. Land and structure values will be based data available from the Pasco County Property Appraiser web site. Default factors included in the spreadsheet for estimating professional and support costs will be used without modification. These include estimated costs such as appraisal and review fees, CPA fees, court reporter and witness fees, outside counsel fees, title search fees and in-house direct costs. Some features of the spreadsheet are not applicable, such as the Phase Contrast form and the Inflate table, and will not be implemented for any alternatives. Based on F.S. 337.168 it is believed the completed spreadsheets will be confidential and not for public disclosure. A summary of estimated right of way costs for each alternative derived from the use of the spreadsheets that do not include reference to specific parcels or owners is included as in the alternatives study. B-3

5.0 Mitigation Costs Compensatory mitigation costs were estimated assuming that each acre of direct wetland impact would cost $150,000 to mitigate. The asking price for mitigation credits varies by type of wetland and by individual mitigation bank. Asking prices for credits in six mitigation banks within Pasco, Hillsborough and Polk Counties can range from $120,000 to $180,000, but final costs are negotiated and usually lower than the upper range. The $150,000 figure is simply an estimate to use for comparison purposes in the alternatives analysis. 6.0 Cost Estimate Results 6.1 Tower Road Adjustments To account for developer commitments to provide right of way and/or construct portions of Tower Road within the next five years, all alternatives involving Tower Road, Alternatives 10, 12, 14 and 15, were developed using input from Pasco County that defined the developer responsibilities (see Appendix B-6). Table B-1 below shows a summary of the developer responsibilities for design, construction or right of way costs associated with the construction of 10 segments of Tower Road. Where the Table shows a Yes under Developer Responsibility, the associated cost of that item (design, right of way or construction) was not included in the cost estimate for that alternative. Table B-1 Developer Responsibilities Used for Tower Road Cost Estimates Developer Responsibility Segment FROM TO Length (Mi) Design ROW Const. 1) Starkey Blvd. approx. 1/4 mile west of Trinity Ext 1.52 No Yes No 2) West of Trinity Ext 1/2 mile East of Trinity Extension 0.75 Yes Yes Yes 3) East of Trinity Ext Eastern Boundary of Starkey 1.13 No Yes No 4) Eastern Boundary of Starkey Western Boundary of Behnke(Asturia) 0.66 No No No 5) Western Boundary of Behnke(AsturiaEastern Boundary of Behnke 1.07 No Yes No 6) Eastern Boundary of Behnke Suncoast 0.82 No No No 7) Suncoast Bexley Ranch Blvd 0.63 No Yes No 8) Bexley Ranch Blvd Future Balantrae connection 0.84 Yes Yes Yes (2 lane only) 9) Future Balantrae connection Eastern Boundary of Bexley Ranch 2.15 No Yes No 10) Eastern Boundary of Bexley Ranch US 41 2.3 No No No 6.2 Summary of Costs Table B-2, below, summarizes the construction, right of way and mitigation costs for all 17 alternatives. As a measure of comparison the table shows the percentage of each alternative against Alternative 5, the lowest cost build alternative. B-4

The construction cost estimate for each alternative is provided in Appendix B-4. As noted in Section 4.2 above, only a summary of estimated right of way costs for each alternative derived from the use of the FDOT spreadsheets, without reference to parcel or owner, is included in Appendix B-5. As noted in Section 5.0, mitigation costs are directly computed from the area of direct impacts in acres times $150,000. Table B-2 Summary and Comparison of Costs Alternative No. Description Construction Costs (Dollars) % of Alternative 5 ROW Costs Mitigation Costs Total Costs (Dollars) (Dollars) (Dollars) Cost Comparison % of Alternative 5 1 No Action $0 0% $0 $0 $0 0% 2 4-Lane RRE - 6D $76,806,000 107% $22,405,000 $3,240,000 $102,451,000 134% 3 4-Lane RRE - 6E $75,713,000 105% $511,000 $4,065,000 $80,289,000 105% 4 4-Lane RRE - 6F $75,062,000 104% $8,832,000 $4,080,000 $87,974,000 115% 5 4-Lane RRE - 6G $71,966,000 100% $508,000 $4,185,000 $76,659,000 100% 6 4-Lane RRE Elevated $192,785,000 268% $508,000 $3,270,000 $196,563,000 256% 7 4-Lane RRE Partially Elevated $131,887,000 183% $508,000 $3,270,000 $135,665,000 177% 8 SR 52 Add 4-Lanes $129,463,000 180% $7,169,000 $390,000 $137,022,000 179% 9 SR 54 Add 4-Lanes $205,780,000 286% $7,785,000 $225,000 $213,790,000 279% 10 4-Lane Tower Rd $90,169,000 125% $7,408,000 $3,330,000 $100,907,000 132% 11 SR 54 4-Lane Elevated $1,365,268,000 1897% $3,854,000 $30,000 $1,369,152,000 1786% 12 13 14 15 16 17 2-Lane Tower Rd SR 54 Add 2-Lanes SR 52 Add 2-Lanes SR 54 Add 2-Lanes 2-Lane Tower Rd SR 52 Add 2-Lanes 2-Lane RRE 2-Lane Tower Rd 2-Lane RRE SR 52 Add 2-Lanes 2-Lane RRE SR 54 Add 2-Lanes $186,414,000 259% $8,615,000 $2,010,000 $197,039,000 257% $183,664,000 255% $8,547,000 $210,000 $192,421,000 251% $141,492,000 197% $11,542,000 $2,145,000 $155,179,000 202% $111,060,000 154% $6,164,000 $3,975,000 $121,199,000 158% $134,661,000 187% $6,097,000 $2,010,000 $142,768,000 186% $174,524,000 243% $2,868,000 $2,055,000 $179,447,000 234% 1. Elevated or partially elevated only within limits of Serenova preserve. The total estimated costs range from a low of $76,659,000 for Alternative 5, to a high of $1,369,152,000 for Alternative 11. Alternative 5 also had the lowest estimated construction cost at $71,966,000. B-5

The order of magnitude of Pasco County s annual expenditures for roadway design and construction costs is illustrated by the following summary of actual and budgeted design and construction expenditures as provided by Pasco County in March 2014 (see Appendix B-6). Actual Expenditures Budgeted Expenditures FY07/08 $19,445,126 FY13/14 $78,367,531 1 FY08/09 $16,196,837 FY14/15 $23,701,144 FY09/10 $29,685,423 FY15/16 $38,134,683 FY10/11 $32,476,733 FY16/17 $24,482,069 FY11/12 $24,342,346 FY17/18 $10,372,538 FY12/13 $16,742,916 1 Included RRE Based on the actual past and budgeted future expenditures by Pasco County for roadway design and construction it is evident that even the least expensive of the alternatives is well in excess of the County s typical annual expenditures. The proposed Pasco County Capital Improvement Plan (CIP) for Fiscal Year (FY) 2015-2019 (see Appendix B-6) includes just over $21 million in funding for Ridge Road Extension Phase I in FY 16. The total budgeted amount for Road Improvements in FY 16 is $47.5 million showing that over 40% of the budgeted funding is allocated to just Ridge Road Extension Phase I. The total amounted budgeted for Road Improvements in FY 15 through FY 19 is $184 million (CIP page E-14). This means that the cost for five of the alternatives represent more than 100% of the entire County budget for road improvements over the next five years and ten of the alternatives represent more than 70% of the entire County budget for road improvements over the next five years. The CIP also shows there are many other new/unfunded transportation projects with over $300 million in estimated construction costs (CIP page E-3). The County s roadway improvement needs exceed the available funds for the foreseeable future. B-6