The World Bank Kabeli-A Hydro Electric Project (P122406)

Similar documents
RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

Public Disclosure Copy

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

The World Bank NEITI Reporting Compliance (P162344)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008

The World Bank Social Assistance System Strengthening Project (P123960)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017

The World Bank Third Secondary and Local Roads Project (P148048)

SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT APPROVED ON JUNE 1, 2010 COORDINATION DU PATMUR,MINISTERE DE L'ECONOMIE, DES FINANCES ET DU PLAN

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010

The World Bank Malawi Strategic Program for Climate Resilience (P163245)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Nepal: Power Sector Reform and Sustainable Hydropower Development (IDA Credit 5728-NP) Implementation Support Review (September 12-15, 2017)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

The World Bank Disease Prevention and Control Project (P128442)

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

The World Bank Water and Sanitation in Tourist Areas (P054221)

The World Bank Indonesia Power Transmission Development Project (P117323)

The World Bank Industrial Waste Management and Cleanup Project (P122139)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

Role of Private Sector in the growth of Power Infrastructure in South Asia. Mukunda Paudyal, Joint Secretary, Investment Board, Government of Nepal

1. Paragraph (D) of the Preamble to the GEF Grant Agreement is deleted and the succeeding paragraph re-numbered accordingly.

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

Financing Agreement,.

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008

The World Bank Kenya Infrastructure Finance/PPP project (P121019)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

The World Bank MN-Mining Infrastructure Investment Supp (P118109) (P118109)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924)

The World Bank Climate Change and Green Growth in Vietnam (P155824)

Financing Agreement. (Environmental and Social Capacity Building for the Energy Sector Project) between THE REPUBLIC OF CAMEROON.

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

INTEGRATED COASTAL ZONE MANAGEMENT APPROVED ON JUNE 15, 2010 THE REPUBLIC OF INDIA

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RIO GRANDE DO SUL SWAP APPROVED ON MAY 1, 2012 STATE OF RIO GRANDE DO SUL, BRAZIL

Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program Grant Agreement

Deepak Rauniar, CEO 2

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SERBIA COMPETITIVENESS AND JOBS PROJECT (P152104) APPROVED ON SEPTEMBER 16, 2015

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MUNICIPAL SERVICES PROJECT LOAN 7885-TU

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INCOME SUPPORT AND EMPLOYABILITY PROJECT LOAN 7811-SV

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INFRASTRUCTURE TRANSPORT INVESTMENT PROJECT LOAN (ADDITIONAL FINANCING)

OFFICIAL MDTF-HRI GRANT NUMBER TF between REPUBLIC OF CAMEROON. and

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

Implementation Status & Results India Assam State Roads Project (P096018)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

Public Disclosure Copy

, Honorable Tendai Biti Minister of Finance Ministry of Finance

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

Financing Agreement OFFICIM. DOCUMENTS1 CREDIT NUMBER 5283-IN. (Low Income Housing Finance Project) between INDIA. and

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

Financing Agreement CONFORMED COPY GRANT NUMBER H732 -AF. (Financial Sector Rapid Response Project) between ISLAMIC REPUBLIC OF AFGHANISTAN.

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6343-RW. Public Disclosure Authorized. (Housing Finance Project)

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

Document of. The World Bank INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT APPRAISAL DOCUMENT ON A

Financing Agreement. (Strengthening Regional Cooperation for Wildlife Protection in Asia Project) between NEPAL. and

Implementation Status & Results Burkina Faso Local Government Support Project (P120517)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TAX MODERNIZATION PROJECT TO THE REPUBLIC OF TANZANIA AUGUST 30, 2006

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

The World Bank St. Petersburg Economic Development Project (P069063)

The World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992)

South Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) FINANCIAL ANALYSIS

Country Practice Area(Lead) Additional Financing Uzbekistan Energy & Extractives P133633,P165054

Public Disclosure Copy

OFFICIAL DOCUMENTS. Loan Agreement LOAN NUMBER 8734-GD. (OECS Regional Tourism Competitiveness Project) between GRENADA

Public Disclosure Copy

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION

Project development objective/outcomes

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-49320,IDA-H Jun ,274,997.95

Public Disclosure Copy

Transcription:

Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF KABELI-A HYDRO ELECTRIC PROJECT APPROVED ON JULY 1, 2014 TO NEPAL REPORT NO.: RES32467 Public Disclosure Authorized ENERGY & EXTRACTIVES SOUTH ASIA Public Disclosure Authorized Regional Vice President: Country Director: Country Manager: Senior Global Practice Director: Practice Manager/Manager: Task Team Leader: Hartwig Schafer Qimiao Fan Faris H. Hadad-Zervos Riccardo Puliti Demetrios Papathanasiou Pravin Karki, Subodh Adhikari

ABBREVIATIONS AND ACRONYMS CIA Cumulative Impact Assessment KAHEP Kabeli-A Hydroelectric Project DOED Department of Electricity Development KEL Kabeli Energy Limited EA Environmental Assessment MOEWI Ministry of Energy, Water Resources and Irrigation EMP Environmental Management Plan MOF Ministry of Finance HIDCL Hydroelectricity Investment and NEA Nepal Electricity Authority Development Company Limited IBN Investment Board of Nepal PDA Project Development Agreement IDA International Development Association SAP Social Action Plan IFC International Finance Corporation

BASIC DATA Product Information Project ID P122406 Original EA Category Full Assessment (A) Approval Date 01-Jul-2014 Financing Instrument Investment Project Financing Current EA Category Full Assessment (A) Current Closing Date 30-Dec-2019 Organizations Borrower Nepal Responsible Agency Kabeli Energy Limited,Investment Board of Nepal,Ministry of Energy, Water Resources and Irrigation Project Development Objective (PDO) Original PDO The project development objective is to increase hydropower generation capacity to supply NEA grid through public private investment. Summary Status of Financing Ln/Cr/Tf Approval Signing Effectiveness Closing Net Commitment Disbursed Undisbursed IDA-53380 01-Jul-2014 24-Nov-2014 20-Jun-2016 30-Dec-2019 40.00 7.06 30.39 IDA-H9000 01-Jul-2014 24-Nov-2014 20-Jun-2016 30-Dec-2019 6.00.60 5.11 Policy Waiver(s) Does this restructuring trigger the need for any policy waiver(s)? No

I. PROJECT STATUS AND RATIONALE FOR RESTRUCTURING A. Project summary 1. The Kabeli-A Hydroelectric Project was approved by the Board on July 1, 2014 and became effective on June 20, 2016. The Project Development Objective (PDO) is to increase hydropower generation capacity to supply NEA grid through public private investment. The Project consists of three parts: (1) Development of Kabeli A Hydro Electric Project (KAHEP), (2) Technical Assistance and Capacity Building for Ministry of Energy (MOE), and (3) Technical Assistance and Capacity Building for Investment Board of Nepal (IBN). 2. Part 1 (KAHEP component) is implemented by Kabeli Energy Limited (KEL). This component is financed by IDA credit of USD 40 million through Hydropower Investment and Development Company Limited (HIDCL) a GoN owned entity established to finance the hydropower projects in Nepal which acts as the financial intermediary in channeling the credit to the KEL for the construction of 37.5 Mega-Watt (MW) hydropower project in eastern Nepal. In addition to the IDA credit, KEL also has signed USD 28.5 million and USD 1 million loan agreement with International Finance Corporation (IFC) and NIC- ASIA, a local commercial bank, respectively. The proceeds of IDA credit from the Ministry of Finance (MOF) to KEL are subordinated to those of IFC and NIC-ASIA. 3. Part 2 (MOE component) supports the Ministry of Energy, which has changed its name to Ministry of Energy, Water Resources and Irrigation (MOEWI) in providing: (a) technical assistance to enable it to perform supervision and technical due diligence for Part 1 of the Project to ensure compliance with the agreements and plans such as Project Development Agreement (PDA), Environment Management Plan (EMP) and Social Action Plan (SAP); (b) technical, environmental and social safeguards capacity building on integrated river basin management and cumulative impacts management for sustainable hydropower development, and (c) incremental operating costs for the Project implementation. This Part is implemented by Department of Electricity Development (DOED) an MOEWI department. This component is financed by IDA credit of USD 2 million.

4. Part 3 (IBN component) provides technical assistance to Investment Board of Nepal (IBN) to provide for (a) technical assistance to IBN to enable it to: (i) conduct appropriate due diligence to assess readiness of large-sized hydropower projects proposed by private investors and to carry out negotiations with selected private investors for signing project development agreements, (ii) supervise the construction of the above-mentioned projects to ensure compliance with the terms and conditions of the project development agreements and sustainability of such projects, and (iii) build up its procurement, financial management, environmental and social safeguards and technical capacities; and (b) incremental operating costs for the Project implementation. This Part is implemented by IBN and financed by IDA credit of USD 4 million. B. Current project status 5. Overall, the project implementation has remained slow for all three parts. Under Part 1, the Project was initially delayed due to delay in signing the loan agreement with IFC and NIC-ASIA. In addition, the project was also delayed due to the delay in receiving necessary clearance from the GoN for the land acquisition to initiate the project construction. Notice to Proceed (NTP) to the contractor was issued by KEL only effective from January 1, 2018. 6. For Part 2, DOED is currently under negotiation with the consultant to enter into the contract for the Cumulative Impact Assessment (CIA) for the Tamor-Kabeli basin. The DOED has also initiated the supervision of the Kabeli-A project. 7. For Part 3, IBN has signed the Project Development Agreement (PDA) with project developers for two hydropower projects (900 MW Arun 3 and 900 MW Upper Karnali). In addition, IBN is currently under negotiation for the development of 600MW Upper Marsyangdi and 750 MW West Seti project in the central and western part of Nepal. As the IBN is mandated by the GoN to facilitate the development of hydropower projects of 500MW or more, it is also exploring the options of conducting the feasibility studies and expanding its pipeline. C. Rationale for Restructuring 8. This restructuring is based on the GoN requests received on March 05, 2018 (for Part 3), and on May 15, 2018 (for Part 2). In summary, for both Parts 2 and 3, the requests have been made to include the provisions of the procurement of goods, non-consulting services, trainings, workshops, and study tours in the Financing Agreement. For Part 3, the requests have been made to: (i) remove the provision for supervision of construction activities; and (ii) add provision for feasibility studies of hydropower projects in the Financing Agreement. 9. The eligible expenditure under Parts 2 and 3, as per the Financing Agreement, only included expenditure categories consultant s services and Incremental Operating Costs. Consequently, financing could not be withdrawn under Parts 2 and 3 for non-consulting services, trainings and workshops, study tours, and goods. a. Relevant training are important for both DOED and IBN and their staff to perform the activities/duties as envisaged under the Financing Agreement. Thus, as per the request made by GoN, the expenses for participation of relevant IBN/DOED/MOEWI staffs in training in concurrence with the World Bank is being made eligible. b. Goods such as relevant office equipment including laptops etc. are necessary for both DOED and IBN. Besides, due to increasing hydropower project pipeline, it is essential for both DOED and IBN to develop their institutional capacity to perform administration and monitoring of the projects as mandated by the GoN regulations. One of such capacities is to be able to travel to the site. Currently these institutions are planning to rent the vehicles for such visits. However, as the site visits become more frequent and often at

short notice, due to long GoN procurement process, renting of vehicles for such visits will not be practical. Expenditure on goods under Parts 2 and 3 is being made eligible. 10. Under the Part 3, due to the possible safeguards and fiduciary implications, it will be risky to utilize the World Bank s funding for the construction supervision, through consultants, of hydropower projects in which the World Bank is not involved in financing. Thus, it was agreed with the both IBN and MOF, that Bank will recuse itself from providing funding under this Project for the project supervision activities, omitting the requirement of the Schedule 1, Part 3.a.ii of the Financing Agreement. 11. Under the Part 3, MOF has requested funds for the feasibility studies of hydropower projects. MOF requested inclusion of this provision in the Schedule 1, Part 3 (a) of the Financing Agreement. IBN intends to conduct feasibility studies of large hydropower projects to prepare a pipeline of projects. Such projects will then be offered by IBN for development on a competitive basis. 12. In order to affect the above changes, a restructuring including the amendment to the Financing Agreement is needed. Based on the project status and outcome of the Mid Term Implementation Support and Review (MTR) conducted on October 8-16 and October 22-27, 2017, as well as the requests received from MOF, the restructuring of both Parts 2 and 3 of the Project is proposed as describe in section II below. II. DESCRIPTION OF PROPOSED CHANGES 13. The Financing Agreement will be modified as follows: A. Part 2: Technical Assistance and Capacity Building for MOEWI 14. Schedule 1, Part 2 Technical Assistance and Capacity Building for MOEWI, (c) of the Financing Agreement will be modified as follows: Current Provisions Proposed Provisions Part 2 Technical Assistance and Capacity Building for MOE (c) Provision of incremental operation costs for Project implementation. Part 2 Technical Assistance and Capacity Building for MOEWI (c) To be replaced with following: Provision of technical and operational assistance to support Project implementation, including coordination, technical matters, procurement, financial management, social and environmental safeguards, monitoring and evaluation, and reporting.

15. Schedule 2, Section IV. Withdrawal of the Proceeds of the Financing, A. 2. Category (3) of the Table of the Financing Agreement will be modified as follows: Current Provisions Proposed Provisions (2) Part 2 of the Project: consultants services and Incremental Operating Costs. (2) Part 2 of the Project: consultants services, goods, non-consulting services, Training and Workshops and Incremental Operating Costs. -- Underlined parts to be added B. Part 3: Technical Assistance and Capacity Building for IBN 16. Schedule 1, Part 3 Technical Assistance and Capacity Building for IBN, (a) and (b) of the Financing Agreement will be modified as follows: Current Provisions Proposed Provisions Part 3 Technical Assistance and Capacity Building for IBN (a) Provision of technical assistance to MOE to enable it, following applicable international performance, technical, environmental and social standards equivalent to relevant World Bank s Safeguard Policies, to (i) conduct appropriate due diligence to assess readiness of large-sized hydropower projects proposed by private investors, carry out negotiations with selected private investors for signing project development agreements, (ii) supervise the construction of the abovementioned projects to ensure compliance with the terms and conditions of the project development agreements and sustainability of such projects, and (iii) build up its procurement, financial management, environmental and social safeguards and technical capacities. Part 3 Technical Assistance and Capacity Building for IBN (a) Retained (i) Retained (ii) To be replaced with following: conduct appropriate assessment, investigation, and feasibility studies, on designs of hydropower projects for further development, and (iii) Retained (b) To be replaced with following: Provision of technical and operational assistance to support Project implementation, including coordination, technical matters, procurement, financial management, social and environmental safeguards, monitoring and evaluation, and reporting. (b) Provision of incremental operation costs for Project implementation.

17. Schedule 2, Section IV. Withdrawal of the Proceeds of the Financing, A. 2. Category (3) of the Table of the Financing Agreement will be modified as follows: Current Provisions Proposed Provisions (3) Part 3 of the Project: consultants services and Incremental Operating Costs (3) Part 3 of the Project: consultants services, goods, non-consulting services, Training and Workshops and Incremental Operating Costs -- Underlined parts to be added C. Appendix: Definition of Training and Workshops 18. A new Paragraph 37 in the Appendix of the Financing Agreement will be added as follows: 37. Training and Workshops means the reasonable costs of training required for the participation of personnel involved in training, workshops and study tours under Parts 2 and 3 of the Project, including travel and subsistence costs for training, workshop and study tour participants, costs associated with securing the services of trainers, rental of training and workshop facilities, preparation and reproduction of training and workshop materials, and other costs directly related to training, workshop or study tour preparation and implementation, but excluding fees of consultants. D. Change in name of the implementing agency 19. Paragraph 22 in the Appendix of the Financing Agreement will be modified as follows: Current Provisions Proposed Provisions 22. MOE means the Recipient s Ministry of Energy and any successor thereto. 22. MOEWI means the Recipient s Ministry of Energy, Water Resources and Irrigation and any successor thereto. 20. Any MOE acronyms used in the Financing Agreement will be modified as MOEWI.

III. SUMMARY OF CHANGES Changed Change in Institutional Arrangements Not Changed Other Change(s) Change in Implementing Agency Change in DDO Status Change in Project's Development Objectives Change in Results Framework Change in Components and Cost Change in Loan Closing Date(s) Cancellations Proposed Reallocation between Disbursement Categories Change in Disbursements Arrangements Change in Disbursement Estimates Change in Overall Risk Rating Change in Safeguard Policies Triggered Change of EA category Change in Legal Covenants Change in Financial Management Change in Procurement Change in Implementation Schedule Change in Economic and Financial Analysis Change in Technical Analysis Change in Social Analysis Change in Environmental Analysis IV. DETAILED CHANGE(S)