FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Similar documents
RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ELECTRICITY SECTOR EFFICIENCY ENHANCEMENT PROJECT CR SE. April 25, 2005 TO THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

SHINING A LIGHT ON WOMEN

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT

Implementation Status & Results Philippines Rural Power Project (P066397)

ASIAN DEVELOPMENT BANK

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade and Distribution Project

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy

FOR OFFICIAL USE ONLY INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT

Public Disclosure Copy

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Oct ,000,000.00

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

OFF CIAL 6 L. October 15, H. E. Phouphet Khamphounvong Minister of Finance Ministry of Finance Vientiane Lao People's Democratic Republic

Poverty Reduction Fund Project II (under IDA Grant No. H685-LA, TF Grant No. TF012419, SDC and GOL Funding)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016

The World Bank Third Secondary and Local Roads Project (P148048)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO.

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008

The World Bank Kabeli-A Hydro Electric Project (P122406)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017

TA for Capacity Development in Hydropower and Mining Sector (P109736)

ICR Type: Core ICR Report Date: May 23, 2005

Implementation Status & Results Lebanon LB-EMERGENCY POWER SECTOR REFORM CAPACITY REINFORCEMENT (P104774)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROJECT TO IMPROVE EDUCATION QUALITY IN MALAWI PROJECT LOAN TO THE REPUBLIC OF MALAWI

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

The World Bank Climate Change and Green Growth in Vietnam (P155824)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

Financing Agreement. (Third Poverty Reduction Support Operation/Program) between LAO PEOPLE S DEMOCRATIC REPUBLIC. and

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROVINCIAL AND RURAL INFRASTRUCTURE PROJECT (CREDIT 3822-KH)

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-49320,IDA-H Jun ,274,997.95

The World Bank Second Karnataka State Highway Improvement (P107649)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

Public-Private Infrastructure Advisory Facility (PPIAF) Presentation to Financing Renewable Energy Projects Training Program October 11, 2012

FOR OFFICIAL USE ONLY

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INFRASTRUCTURE TRANSPORT INVESTMENT PROJECT LOAN (ADDITIONAL FINANCING)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT

FOR OFFICIAL USE ONLY

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

The World Bank Nam Theun 2 Social and Environment Project (P049290)

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE

Document of. The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Myanmar: Towards Universal Access to Electricity by 2030

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4040, IDA-H7560, TF-92394)

EDL-GENERATION PUBLIC COMPANY

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Financing Agreement. (Strengthening Regional Cooperation for Wildlife Protection in Asia Project) between NEPAL. and

Public Disclosure Copy

Loan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

The World Bank Social Assistance System Strengthening Project (P123960)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Myanmar Southeast Asia Disaster Risk Management Project (P160931)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EXPANDING ACCESS TO REDUCE HEALTH INEQUITIES PROJECT (APL III)

FOR OFFICIAL USE ONLY

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WEST AFRICA REGIONAL BIOSAFETY PROJECT

Loan Agreement. (Shandong Ecological Afforestation Project) between PEOPLE S REPUBLIC OF CHINA. and

Lao PDR World Bank Mission AIDE MEMOIRE April 1, 2002

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,450,000.00

Loan Agreement OFFIAL DOCUMENTS LOAN NUMBER 8229-AM. (Lifeline Road Network Improvement Project) between REPUBLIC OF ARMENIA. and

The World Bank Transport Connectivity and Asset Management Project (P132833)

Document of The World Bank

Global Environment Facility Trust Fund Grant Agreement

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT

Implementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

The World Bank NEITI Reporting Compliance (P162344)

Implementation Status & Results Lao People's De Lao PDR Trade Development Facility Project (P106165)

STATUS OF PROJECTS IN EXECUTION FY09 SOPE

The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT

FOR OFFICIAL USE ONLY

Public Disclosure Copy

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER PK. Public Disclosure Authorized

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007

US$M): US$M): (US$M. Cofinancing (US$M US$M):

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF RURAL ELECTRIFICATION PHASE II PROJECT IDA GRANT No. H538-LA AND GEF GRANT No. TF098662 East Asia and Pacific Region (BOARD APPROVAL DATE: JANUARY 12, 2010) TO THE LAO PEOPLE S DEMOCRATIC REPUBLIC October 28, 2013 Report No: 82348-LA This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

ABBREVIATIONS AND ACRONYMS APL BOO BOOT BOT EdL EGDF ESSF GEF IDA IOC IPP MEM O&M P2P PESCO PPP REF REP II RPF SDR SHS TF VOPS VPN Adaptable Program Loan Build, Own, Operate Build, Own, Operate, Transfer Build, Operate, Transfer Electricité du Laos Ethnic Group Development Framework Environmental and Social Safeguards Framework Global Environment Facility International Development Association Operating Costs Independent Power Producers Ministry of Energy and Mines Operations and Maintenance Power to the Poor Provincial Electrification Service Company Public Private Partnership Rural Electrification Fund Rural Electrification Phase II Resettlement Policy Framework Special Drawing Rights Solar Home System Trust Fund Village Off-Grid Promotion and Support Office Virtual Private Network Regional Vice President: Country Director: Sector Manager: Task Team Leader: Axel van Trotsenburg Ulrich Zachau Julia M. Fraser Veasna Bun ii

LAO PEOPLE'S DEMOCRATIC REPUBLIC RURAL ELECTRIFICATION PHASE II PROJECT P102398 CONTENTS Page A. SUMMARY... 1 B. PROJECT STATUS... 1 C. PROPOSED CHANGES... 2 iii

RURAL ELECTRIFICATION PHASE II PROJECT RESTRUCTURING PAPER A. SUMMARY The proposed changes to the IDA Grant No. H5380-LA, and the GEF Grant TF098662 include: (i) amendments to the description of project components as defined in Schedule 1 of the IDA Financing Agreement and the GEF Grant Agreement; (ii) reallocation of funds in both Grants; (iii) modifications of disbursement categories; (iv) addition of Public Private Partnership (PPP) arrangements under the description of methods for the procurement; (v) removal of an outcome indicator; and (vi) closing date extension. This will be the first extension. These changes are proposed to ensure the achievement of the Development Objectives (PDO) and the Global Environment Objectives (GEO). B. PROJECT STATUS Reasonable progress has been made towards the achievement of the first PDO to increase access to electricity of rural households in villages of provinces. About half of targeted rural households have been connected after three years of implementation. Over 15,000 solar home systems (SHS) have been procured, about onethird have been installed, and about 84 percent of targeted households under the Power to the Poor (P2P) program have already been connected. Despite these achievements, progress toward achieving the PDO is moderately satisfactory in view of the deterioration of the financial situation of Electricite du Laos (EdL) and the consequent risks towards achieving the second PDO to further improve the financial performance of EdL. To address this issue, the Government of Lao PDR (GOL) started increasing electricity tariffs in March 2012 and agreed to implement a time-bound action plan for the financial sustainability of the power sector including improvements in EdL s operational efficiency and its financial management systems. Achievement of the Global Environment Objectives under the GEF Grant rating is currently moderately unsatisfactory. The GEO on increasing EdL supply efficiency, particularly reducing electricity distribution losses below 13 percent may not be met by project closing. The GEO on increasing consumer demand efficiency is also under threat as the intended energy efficiency (EE) pilot projects have been delayed. Finally, the GEO to adopt substantial renewable energy in rural electrification program is also under threat. The revised business models for biogas and village hydro power pilot projects as an alternative rural electrification delivery model are not tested, and there is a high risk of a repeated bidding failure. 1

C. PROPOSED CHANGES Results and Indicators First, following EdL s corporate restructuring in December 2010, the original PDO financial outcome indicator "return on revalued assets" is no longer meaningful at EdL level as most profits are currently accrued at EdL Generation Company level. This restructuring proposes to drop this indicator. In addition, this restructuring proposes to reduce the PDO indicator debt service coverage ratio from 1.3 to 1.1 to also account for lower expected profits at EdL level. Second, this restructuring proposes to drop the PDO indicator self-financing ratio as EdL and EdL Generation Company are substantially increasing new investments in generation, transmission and distribution assets. During this investment ramp up period, the 15 percent self-financing ratios (after debt repayments) may not be met. Components Changes are proposed to the legal descriptions of the following components. Component A.1 Grid Extension : Changes to the description of this component include provision of training to improve the performance of EdL s project management unit under Part A.1 (b) of the Financing Agreement. Also, consultancy services for implementation supervision, production of modular specifications, review of design standards will be added. The remaining balance of US$1,304,000 of IDA funds under A.1 will be used to finance additional activities under components A.2 and A.3 as discussed below. Component A.2 Loss Reduction : Some US$0.29 million of IDA funds will be reallocated from component A1 to purchase critical testing equipment needed to identify losses in EdL s system and take appropriate actions. Changes to the description of this component are not necessary as the procurement of goods under Component A.2 is included in the Financing Agreement. Component A.3 Information Technology System and Financial Management : Changes to this component include a reallocation of some US$1.02 million of IDA funds from component A.1 to finance: (i) approximately US$0.34 million of Virtual Private Network and related computing and information technology equipment and software, which will facilitate EdL s financial management; and (ii) approximately US$0.68 million of technical assistance, goods and/or works, for upgrading EdL s accounting system. These changes will further enhance revenue collection and strengthen the financial management capacity of EdL as envisaged under the second action plan for financial sustainability of EdL and the Lao power sector 2013-17. Component B.1 Off-Grid Investment Program : During project implementation, a large number of homes targeted as beneficiaries of SHS have been instead connected to the grid, and the unit cost of SHS has been significantly reduced, resulting in savings of US$1,592,000 million under Component B.1. It is proposed that these savings be 2

reallocated to: (i) component B.2 Institutional Strengthening ; (ii) B.3 Alternative Rural Electrification Delivery Models ; and (iii) B.5 Organizational Strengthening of the Ministry of Energy and Mines (MEM) in order to enhance the capacity of the Ministry of Energy and Mines (MEM) to carry out its supervision and monitoring roles under the project. Component B.2 Institutional Strengthening : US$382,000 of IDA funds will be reallocated from Component B.1 to cover the costs of consultancy services to manage the village off-grid program (VOPS) and to monitor debt collection performance. Component B.3 Alternative Rural Electrification Delivery Models : Proposed amendments include the provision of financial resources to design, supply, install, and supervise pilot projects for village hydropower in Houaphan province, and biomass and/or biogas in Vientiane, to be developed under PPP schemes. The reallocation of US$1.0 million IDA funds from Component B.1 will cover: (i) approximately US$0.5 million for goods and/or works (such as hydropower turbines, generators, distribution lines, and switch controllers) for such pilot projects; and (ii) approximately US$0.5 million for technical assistance and supervision of the pilot projects. Proposed amendments to Component B.3 under the GEF Grant include the reallocation of US$20,000 originally under Component B.5: Organizational Strengthening of MEM, to this Component. The disbursement for works and consultant services is proposed to be included in the GEF disbursement categories. Component B.5 Organizational Strengthening of MEM : Some US$210,000 of IDA funds will be reallocated from component B.1 to enhance MEM s supervision and monitoring capacities through the purchase of vehicles and office equipment. The funds will also serve to ensure sufficient budget is available to cover supervision and monitoring costs. Safeguards This project was assigned as environmental assessment Category B at appraisal, and remains so through this restructuring. The village hydropower and biogas works to be carried out under Part B.3 under the alternative rural electrification delivery models, may include small-scale works consistent with the Appraisal Document, and do not require additional safeguard instruments. Safeguard instruments already in place, including the Environmental and Social Safeguards Framework (ESSFs), Resettlement Policy Framework (RPF), and Ethnic Group Development Framework (EGDF), remain valid. In addition, an Environmental Management Plan (EMP) for biogas projects is being prepared and will be incorporated in the bidding process after Bank review. 3

Costs Adjustments to IDA and GEF funding for components A and B are shown below: Costs (US$m.) IDA Grant H-538-LA TF098662 Components/Activities Current Proposed Current Proposed Component A: Implemented by EdL 15,900,000 15,900,000 999,000 999,000 A.1. Grid Extension 14,600,000 13,296,000 A.2. Loss Reduction 1,000,000 1,286,000 200,000 200,000 A.3. Information Technology Systems and 1,018,000 Financial Management A.4. Safeguards Capacity Building 1 A.5. Demand-Side Management and Energy 300,000 300,000 799,000 799,000 Efficiency Program Component B: Implemented by MEM 4,100,000 4,100,000 819,000 819,000 B.1. Off-Grid Investment Program 4,000,000 2,408,000 B.2. Institutional Strengthening 382,000 B.3. Alternative Rural Electrification Delivery 1,000,000 799,000 819,000 Models B.4. Rural Electrification Master Plan and Database B.5. Organizational Strengthening of MEM 100,000 310,000 20,000 Total A and B 20,000,000 20,000,000 1,818,000 1,818,000 Disbursement Arrangements The definition of Operating Costs (IOC) under the IDA Financing Agreement is expanded to include: (i) salaries for contract staff; and (ii) charges for the opening and operating bank accounts. Procurement Procurement under PPP arrangements including Build Operate Own (BOO), Build Operate Transfer (BOT), Build Own Operate Transfer (BOOT), concessions, and similar private sector arrangements will be added as a procurement method under Schedule 2, Section III of the IDA Financing Agreement to account for the procurement of Goods and/or Works under the village hydropower and biogas power pilot projects. Procurement under BOO/BOT/BOOT, concessions and similar private sector arrangements will be added under Schedule 1, Section III, Part B.2 of the GEF Grant Agreement (TF098662), in order to account for potential PPP schemes for the pilot biomass/biogas projects. For the biogas power pilot projects, MEM will hire private contractor(s) to supply and install the biogas power facilities at selected pig farms owned by pig farmers. The Bank s standard bidding document will be used for the selection of the supply and installation 1 Activities under subcomponent A.4 and B.4 are co-financed by other donors. 4

contractor(s). Separately, MEM will hire experienced operations and maintenance (O&M) consultants to operate and maintain the biogas power facilities. MEM will utilize IDA funds and/or GEF Grant to cover the cost of the supply and installation contract(s), the cost of O&M consultants, and supervision. For the village hydropower pilot projects, MEM will hire private licensees(s) to supply, install, operate and maintain the village hydropower facilities under bidding documents agreed by the Bank. In general, this bidding document calls for the supply and installation of the village hydropower facilities, connecting electricity users, O&M, and electricity tariff/connection fee collection services. MEM will utilize IDA funds and/or GEF Grant to cover the cost of the village hydropower facilities, connecting users, O&M, and supervision. Reallocation of Grant Proceeds Expenditure categories under the IDA Grant will be modified to include financing of goods, training, consultant services under category (1); and financing of goods, works, and consultant services under Category (2). Grant proceeds will be reallocated from Category (2) to Category (4) to cover IOC costs under B.5(a). IDA Grant No. H-538-LA Category of Expenditure Allocation (SDR) Percentage of Financing Current Revised Current Revised Current Revised (1) Goods, Works, 9,945,000 9,945,000 100% 100% Consultants Services, and Training under Parts A.1, A.2, A.3, and A.5 of the (1) Goods under Parts A.1(a), A.2(a), and A.5(a) of the (2) Goods under Parts B.1(a) and B.5(a) of the (3) Operating Costs under Parts A.1(a), A.2(a) and A.5(a) of the (4) Operating Costs under Part B.5(a) of the (2) Goods, Works, Consultants Services and Training under Parts B.1, B.2, B.3 and B.5 of the Operating Costs under Parts A.1, A.2 and A.5 of the Operating Costs under Part B.5 of the Total 12,600,000 12,600,000 2,525,000 2,491,000 100% 100% 65,000 65,000 100% 100% 65,000 99,000 100% 100% GEF TF098662 Changes under the TF098662 include under Category (2) financing of works, and under the same Category (2) GEF will no longer finance Component B.5. 5

Category of Expenditure Amount of the Grant Allocated (USD) Percentage of Financing Current Revised Current Revised Current Revised (1) Goods, services, training, Operating Costs under Part A.2(a) and A.5 of the Goods, Consultants Services, Training and Operating Costs under Part A.2(a) and A.5 of the 999,000 No change 100% 100% (2) Goods, services, training, and Operating Costs under Part B3 and B.5 of the (2) Goods, works, consultants services, Training and Operating Costs under Parts B.3 and B.5 of the Total 1,818,000 No change Closing Date 819,000 No change 100% 100%, except for any expenditures incurred on or after October 31, 2013 under Part B.5 The closing date of the IDA Grant No. H5380-LA and the GEF Grant TF098662 will be extended for 12 months from June 30, 2014 until June 30, 2015. The extension is necessary to ensure adequate time for project implementation after this restructuring. The major implementation delay issues have been addressed, which allowed grid extension construction to continue, installation of SHS to resume, and the village hydro and biogas power pilot projects to be rebid. This will be the first extension of the project. The PDO and GEO remain considerably achievable. Second Action Plan for Financial Sustainability of the Power Sector The Second Action Plan for Financial Sustainability of the Power Sector was developed for the period 2013 2017. This action plan will help address, inter alia, the adequacy of EdL electricity tariffs, the outstanding arrears on electricity bills, and cost reductions for financial sustainability of the power sector. 6