FOREWORD. There are five sections to this document:

Similar documents
FOREWORD. There are five sections to this document:

FOREWORD. There are five sections to this document:

RAS PROJECTS THE GOOD, THE BAD, AND THE UGLY. Ryan Barborak, P.E. CST Flexible Pavements Branch

TEXAS DEPARTMENT OF TRANSPORTATION

CONSTRUCTION STAFFING. Mario R. Jorge, P.E. District Engineer San Antonio District

TEXAS TRANSPORTATION COMMISSION MEETING ATTACHED LISTS February 26, 2015 HIGHWAY MAINTENANCE AND BUILDING CONSTRUCTION CONTRACTS-STATE LET

EXHIBIT A DONATIONS Cullen Blvd, An Individual Series of Forefunders Partners, LLC. Houston District

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION

15,790. Bryan Waco Region. Do you own or lease a personal vehicle? What is your primary means of transportation?

17,321 13,351. Overall Statewide Results. How was the survey taken? Do you own or lease a personal vehicle?

Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates

TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE

L.zu? V fl1i. VARIOUS Counties MINUTE ORDER Page 1 of 1. VARIOUS Districts

December Update of 2018 UTP Category 2 and Category 10 CBI. Requested Amount

$ FACTS ABOUT TEXAS: WAGE STATE FACTS HOUSING MOST EXPENSIVE AREAS WAGE RANKING

EXHIBIT A DONATIONS April 26, 2018

$ Monthly Rent Affordable to Selected Income Levels Compared with Two-Bedroom FMR. Gap between Rent Affordable and FMR $66

UNIFIED TRANSPORTATION PROGRAM

TEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P

TEXAS TRANSPORTATION COMMISSION

SPECIAL PROVISION Legal Relations and Responsibilities to the Public

TEXAS TRANSPORTATION COMMISSION

Transportation Improvement Program Page 39

Texas: Sources of Children s Coverage by County,

6 MCF REPORT RESIDENTIAL GAS BILL ANALYSIS TEXAS DISTRIBUTION UTILITIES. Second Quarter Published by:

IN THIS ISSUE A MONTHLY NEWSLETTER OF THE TEXAS WORKFORCE COMMISSION. Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) 6.

EXHIBIT A DONATIONS December 13, 2018

These tariff sheets have an effective date of July 2, 2013.

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013

IN THIS ISSUE A MONTHLY NEWSLETTER OF THE TEXAS WORKFORCE COMMISSION. Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) 4.

Overview of the Homestead Exemption Increase (SJR 1 and SB 1, 84 th Legislature)

ABILENE MPO TRANSPORTATION POLICY BOARD MEETING

2016 Texas Economic Outlook: Riding the Energy Roller Coaster Keith Phillips Assistant Vice President and Senior Economist

Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted)

Construction Spending, Labor & Materials Outlook

Gary Halbrooks Vice Chair. Smith County. Jeff Sandford Bowie County. Robert Murray Bowie County

Map the Meal Gap 2018: Overall Food Insecurity in Texas by County in

Salvador Contreras University of Texas Rio Grande Valley January 27, Research Assistants: Jacob Almaguer Ruth Cano Ivan Vazquez

Texas Mid-Year Economic Outlook: The Skies are Beginning to Clear Keith Phillips Assistant Vice President and Senior Economist

SPECIAL PROVISION Legal Relations and Responsibilities to the Public

TXDOT CONGESTION RELIEF INITIATIVE, INCLUDING


The tariff sheets have an effective date of July 3, 2012.

Region 5 Upcoming Projects for Summer/Fall 2018

STATE BAR OF TEXAS Department of Research and Analysis

... TEXPERS. The Texas Association of Public Employee Retirement Systems

How to Read the Project Modification Listings - Roadway Section

FY STIP. Amarillo District May Quarterly Revisions STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY

Undergraduate Admissions

New York state medical malpractice coverage premiums

Fiscal Year nd Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending February 28, 2018

How to Read the Project Modification Listings Roadway Section

A A MONTHLY NEWSLETTER OF OF THE THE TEXAS WORKFORCE COMMISSION TEXAS

Funding Update. House Transportation Subcommittee on Long-Term Infrastructure Planning September 10, 2015, 9:00 A.M. Capitol Extension E2.

U.S. Economic Outlook

TEXAS TRANSPORTATION COMMISSION

The widening gap between home price and household

TEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY

... TEXPERS. The Texas Association of Public Employee Retirement Systems

Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) Growth in Total Nonagricultural Employment in Texas topped

Fiscal Year th Quarter Report Quarterly Report of Actual Traffic and Revenue For period ending August 31, 2017

Selected Economic Data for Texas Cooperative Extension, Central Texas District (8)

30C VARIOUS Counties MINUTE ORDER Page 1 of 1. VARIOUS Districts

Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) Total Nonagricultural Employment in Texas slid by 1,300 jobs in

Contribution and Benefit Decision-Making for Texas Public Retirement Systems

CDFI. Community Development Financial Institutions. By: Holly R. Logue IBAT Annual Convention September 21, 2015

Appendix D Total Project Cost and Year of Expenditure Breakdown

STATE BAR OF TEXAS DEPARTMENT OF RESEARCH & ANALYSIS

STATE PENSION REVIEW BOARD OF TEXAS ACTUARIAL COMMITTEE MEETING AGENDA. Tuesday, April 22, :00 AM

Public Hearing Tarrant County. April 14, 2009

Fiscal Year th Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending August 31, 2018

Texas CorCare. Employee Notice of Network Requirements

TEXAS METROPOLITAN MOBILITY PLAN: FUNDING NEW OPPORTUNITIES

2015 INCOME FACT SHEET. Published August 2016 Analysis by Invariance Dynamics Consulting Nils Greger Olsson, PhD

Regional Toll Revenue Annual Financial Report

FY February Quarterly Revision. Bryan DISTRICT

$+ 121 $+ 120 $+ 122 $+ 155 $+ 155 $+ 109 $+ 139 $+ 136 $+ 111 $+ 124 $ MINNEHAHA COUNTY TIP Projects !.!. !.!. Dell Rapids.

Statewide Transportation Improvement Program INTRODUCTION

Texas Economic Outlook: Tapping on the Brakes

Table of Contents. Study Overview. Corridor Needs Analysis. Financial Strategies. Legislative Review

MINUTES OF THE ABILENE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION POLICY BOARD. May 19, 2015

HB 20 Initial Report. Revenue Projections Funding Categories & Allocations Performance-Based Decision Making

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

FY STIP. Lufkin District. February 2012 Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Big Country Electric Cooperative Trust Operation Round Up Program

North Carolina Turnpike Authority Board of Directors Meeting

RECOMMENDATIONS REPORT WITH COMMENTS AND RESPONSES. October Submitted for Review to TxDOT Executive Management

Texas Economic Growth and Volatility

An Evaluation of the 2009 NHTS Add-on Surveys in Texas


Section C Forms

New Health Insurance Tax Credits in Texas

Pavement Preservation

Texas CorCare Employee Notice of Network Requirements

Decomposing Regional Variation in Publicly Funded Newborn Care

CASH MANAGEMENT & CONTRACT AWARDS

Dr. James P. Gaines Chief Economist. recenter.tamu.edu

Transcription:

9/2/2016 @ 2:38:38 PM FOREWORD * This document contains candidate projects which have been identified by districts as ready for letting or obligation of funds in fiscal year 2017 by TxDOT. There are five sections to this document: 1. Projects that are scheduled to let through the statewide letting process at Austin headquarters 2. Projects that are approved by the TxDOT administration to let by a local entity such as a city or county 3. Other financial obligations that do not go through a letting process 4. Project selected as Comprehensive Development Agreement 5. Projects selected as Design Build Projects and other financial obligations are funded by various funding sources, the details of which are provided on the following page. The State Highway is TxDOT s traditional method of project funding and in recent years the department has received additional financial tools from the Legislature to advance projects. The projects and financial obligations in this schedule are based on the current estimated construction costs of the projects and the current forecast of available funds for fiscal year 2017. Changing conditions may result in projects being removed or added to this Letting Schedule. These changes could include financial issues such as receiving more or less revenues than forecasted, adjustments to fit within obligation limits, the execution of funding agreements, bids on projects being higher or lower than the project estimates, and increasing or decreasing cost on existing contracts through change orders or quantity overruns. Likewise, some projects and financial obligations may move out of or into the Letting Schedule due to project development issues associated with receiving environmental clearance or required right of way, changes in project priorities at the local or statewide level, or conflicts with other ongoing construction or maintenance work. *The following list includes projects known at the time of publication based on input from the districts. The current letting schedule will be reflected each week according to district requested project scheduling changes.

9/2/2016 @ 2:38:38 PM FISCAL YEAR 2017 PLANNED STATEWIDE SUMMARY INCLUDES STATEWIDE LETTINGS, LOCAL LETTINGS AND OTHER OBLIGATIONS (In Millions) ALL S BASED ON CURRENT District State Highway 1 2 2 2 SIB Pass Rail Local Texas 1 Through s s Mobility Prog 1 Prog 2 Finance 14 Bond Toll Rev s SH 130 Conc s Total 5 ABILENE $140.09 $11.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $151.45 AMARILLO $86.85 $16.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $102.85 ATLANTA $72.50 $11.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2.74 $0.00 $86.63 AUSTIN $145.42 $70.16 $0.00 $0.00 $0.00 $0.00 $16.65 $0.00 $0.00 $0.00 $88.85 $0.00 $321.09 BEAUMONT $670.10 $27.37 $0.00 $0.00 $0.00 $0.00 $20.13 $0.00 $0.00 $0.00 $0.67 $1.75 $720.02 BROWNWOOD $111.39 $4.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $115.75 BRYAN $233.08 $18.44 $0.00 $0.00 $3.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.04 $100.00 $354.96 CHILDRESS $25.73 $5.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $31.55 CORPUS CHRISTI $169.33 $19.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2.90 $1.68 $193.10 DALLAS $396.90 $147.52 $0.00 $0.00 $0.00 $0.00 $0.00 $.90 $0.00 $14.38 $22.72 $0.00 $594.42 EL PASO $6.00 $14.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $50.00 $0.00 $190.85 FORT WORTH $328.43 $26.77 $0.00 $0.00 $0.00 $0.00 $0.00 $4.50 $0.00 $0.00 $15.23 $0.00 $374.92 HOUSTON $1,369.65 $215.66 $0.00 $0.00 $8.68 $0.00 $0.00 $0.00 $0.00 $0.00 $332.18 $60.75 $1,986.93 LAREDO $119.44 $17.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.09 $0.00 $137.13 LUBBOCK $83.09 $.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $95. LUFKIN $81.40 $7.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.05 $0.00 $88.89 ODESSA $85.50 $25.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3.00 $2.27 $0.00 $116.40 PARIS $81.21 $14.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $41.26 $0.00 $137.35 PHARR $8.46 $13.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $150.65 $0.00 $292.70 SAN ANGELO $41.19 $13.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3.00 $0.00 $0.00 $57.24 SAN ANTONIO $490.32 $51.84 $0.00 $0.00 $0.00 $0.00 $18.10 $0.00 $0.00 $0.00 $62.82 $0.00 $623.08 TYLER $68.69 $18.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.15 $0.00 $87.43 WACO $161.51 $22.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9.84 $0.00 $193.59 WICHITA FALLS $40.70 $6.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $47.38 YOAKUM $151.82 $31.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2.56 $4.68 $190.61 District Total: $5,408.80 $824.01 $0.00 $0.00 $.08 $0.00 $54.89 $17.40 $0.00 $20.38 $785.03 $168.86 $7,291.43 * Actual totals may include local letting and other obligations remaining to be obligated and/or concurrence of award. 1 State Highway consists of federal, state and local funds. 2 State Highway Revenue Bonds (osition and ostion 14) allow for the advancement of projects payable from future deposits to the State Highway. 3 State Infrastructure Bank Loans.

9/2/2016 @ 2:41:43 PM FISCAL YEAR 2017 PLANNED STATEWIDE LETTING SUMMARY (In Millions) BASED ON CURRENT District State Highway 1 2 2 2 SIB Pass Rail Local Texas 1 Through s s Mobility Prog 1 Prog 2 Finance 14 Bond Toll Rev s SH 130 Conc s Total ABILENE $140.09 $11.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $151.45 AMARILLO $86.85 $16.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $102.85 ATLANTA $72.50 $11.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2.74 $0.00 $86.63 AUSTIN $134.48 $70.16 $0.00 $0.00 $0.00 $0.00 $16.65 $0.00 $0.00 $0.00 $80.04 $0.00 $301.34 BEAUMONT $168.50 $27.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.01 $1.75 $197.62 BROWNWOOD $111.39 $4.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $115.75 BRYAN $186.98 $18.44 $0.00 $0.00 $3.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.04 $0.00 $208.86 CHILDRESS $25.73 $5.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $31.55 CORPUS CHRISTI $161.97 $19.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $181.16 DALLAS $353.62 $147.52 $0.00 $0.00 $0.00 $0.00 $0.00 $.90 $0.00 $0.00 $19.34 $0.00 $533.39 EL PASO $104.76 $14.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $15.00 $0.00 $134.61 FORT WORTH $303.70 $26.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $14.04 $0.00 $344.51 HOUSTON $800.11 $215.66 $0.00 $0.00 $8.68 $0.00 $0.00 $0.00 $0.00 $0.00 $32.32 $60.75 $1,117.52 LAREDO $115.29 $17.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.06 $0.00 $132.94 LUBBOCK $83.09 $.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $95. LUFKIN $81.40 $7.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.04 $0.00 $88.88 ODESSA $85.50 $25.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3.00 $2.27 $0.00 $116.40 PARIS $74.51 $14.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.30 $0.00 $89.69 PHARR $82.85 $13.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.13 $0.00 $97.56 SAN ANGELO $41.19 $13.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3.00 $0.00 $0.00 $57.24 SAN ANTONIO $462.65 $51.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $62.27 $0.00 $576.76 TYLER $68.19 $18.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $86.78 WACO $150.01 $22.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9.30 $0.00 $181.55 WICHITA FALLS $32.57 $6.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $39.25 YOAKUM $151.82 $31.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.61 $1.75 $186.73 District Total $4,079.75 $824.01 $0.00 $0.00 $.08 $0.00 $16.65 $.90 $0.00 $6.00 $240.52 $64.25 $5,256.16 1 State Highway consists of federal, state and local funds. 2 State Highway Revenue Bonds (osition and ostion 14) allow for the advancement of projects payable from future deposits to the State Highway. 3 State Infrastructure Bank Loans.

9/2/2016 @ 2:41:43 PM ABILENE DISTRICT FISCAL YEAR 2017 PLANNED STATEWIDE LETTING SUMMARY (In Millions) BASED ON CURRENT Month State Highway 1 Prog 1 Prog 2 14 s SIB Pass Through Finance Toll Rev s SH 130 Conc s Rail s Local s Texas Mobility Total SEPTEMBER $72.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $72.56 OCTOBER $.68 $2.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $15.46 NOVEMBER $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 DECEMBER $.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $.35 JANUARY $14. $3.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $17.74 FEBRUARY $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 MARCH $15.82 $1.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $17.04 APRIL $1.92 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.92 MAY $2.86 $3.44 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6.30 JUNE $2.49 $0.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2.79 JULY $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 AUGUST $5.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5.30 District Total: $140.09 $11.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $151.45

9/2/2016 @ 2:41:43 PM ABILENE DISTRICT ABILENE HOWARD VA 0908--022 8.153 SEP 2016 DESCRIPTION: CONSTRUCT NEW RELIEF ROUTE LIMITS FROM: IH 20 LIMITS TO: FM 700 0908--026 ABILENE HOWARD VA 0908--029 0.470 SEP 2016 DESCRIPTION: CONSTRUCT NEW OVERPASS LIMITS FROM: AT US 87 AND FM 700 CONTRACT CSJ: 0908--022 SEP 2016 2 Projects $ 68,228,713 PROJ NUM:DMO 1102(493) $ 4,331,017 PROJ NUM:NH 2017(297) $ 72,559,730 SEP 2016 TOTAL: 2 Projects 1 Contract $ 72,559,730 ABILENE TAYLOR IH 20 0006-06-099 1.966 OCT 2016 DESCRIPTION: REPLACE BRIDGE AND APPROACHES LIMITS FROM: IH 20 EAST BOUND LANE LIMITS TO: AT SH 351(AMBLER AVE IN ABILENE) ABILENE TAYLOR IH 20 0006-06-100 1.966 OCT 2016 DESCRIPTION: REPLACE BRIDGE AND APPROACHES LIMITS FROM: IH 20 WEST BOUND LANE LIMITS TO: AT SH 351(AMBLER AVE IN ABILENE) ABILENE TAYLOR SH 351 0011-01-035 0.180 OCT 2016 DESCRIPTION: REPLACE EXISTING FLEXIBLE PAVEMENT WITH CONCRETE PAVEMENT LIMITS FROM: EAST STAMFORD STREET LIMITS TO: EAST OVERLAND STREET CONTRACT CSJ: 0006-06-099 OCT 2016 3 Projects $ 4,411,196 PROJ NUM:BR 1602(557) $ 4,898,673 PROJ NUM:BR 1602(558) $ 3,0,176 PROJ NUM:NH 1602(559) $,322,045 ABILENE JONES US 180 0296-04-019 0.668 OCT 2016 DESCRIPTION: PLANING EXISTING PAVEMENT, BASE REPAIR, UNDERSEAL, ASPHALTCONCRETE PAVEMENT OVERLAY, AND CONCRETE INTERSECTION LIMITS FROM: NEAR ANSON WEST CITY LIMIT LIMITS TO: US 83 P1 $ 1,659,091 PROJ NUM:STP 2017(5) ABILENE JONES US 180 0296-05-032 0.705 OCT 2016 DESCRIPTION: PLANING EXISTING PAVEMENT, BASE REPAIR, UNDERSEAL, ASPHALTCONCRETE PAVEMENT OVERLAY, AND CONCRETE INTERSECTION LIMITS FROM: US 83 LIMITS TO: NEAR ANSON EAST CITY LIMIT CONTRACT CSJ: 0296-04-019 OCT 2016 P1 2 Projects $ 1,481,957 PROJ NUM:STP 2017(5) $ 3,141,048 OCT 2016 TOTAL: 5 Projects 2 Contracts $ 15,463,093 : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:43 PM ABILENE DISTRICT ABILENE DESCRIPTION: CALLAHAN SEAL COAT IH 20 0007-01-056 8.802 DEC 2016 LIMITS FROM: 640' E. OF FM 2047 (FRTG RDS ONLY) LIMITS TO: 1700' E. OF MEXIA CRK BRIDGE ABILENE TAYLOR SH 351 0011-01-037 3.008 DEC 2016 LIMITS FROM: ABILENE CITY LIMITS LIMITS TO: CALLAHAN COUNTY LINE ABILENE CALLAHAN SH 351 0011-02-015 0.650 DEC 2016 LIMITS FROM: TAYLOR COUNTY LINE LIMITS TO: JONES COUNTY LINE ABILENE JONES SH 351 0011-03-013 0.580 DEC 2016 LIMITS FROM: CALLAHAN COUNTY LINE LIMITS TO: SHACKELFORD COUNTY LINE ABILENE SHACKELFORD SH 351 0011-04-026 17.469 DEC 2016 LIMITS FROM: JONES COUNTY LINE LIMITS TO: US 180 ABILENE SHACKELFORD US 180 0011-06-046 11.415 DEC 2016 LIMITS FROM: ALBANY EAST CITY LIMITS LIMITS TO: STEPHENS COUNTY LINE ABILENE STONEWALL US 83 0032-07-034 15.597 DEC 2016 LIMITS FROM: US 380 LIMITS TO: KING COUNTY LINE ABILENE STONEWALL US 83 0033-01-041 13.241 DEC 2016 LIMITS FROM: FISHER COUNTY LINE LIMITS TO: US 380 IN ASPERMONT ABILENE FISHER US 83 0033-02-019 1.610 DEC 2016 LIMITS FROM: JONES COUNTY LINE LIMITS TO: STONEWALL COUNTY LINE ABILENE JONES US 83 0033-03-030 2.009 DEC 2016 LIMITS FROM: FISHER COUNTY LINE LIMITS TO: HAMLIN NORTH CITY LIMITS ABILENE SCURRY BU 84-H 0053-16-006 3.035 DEC 2016 LIMITS FROM: US 84 SOUTH OF HERMLEIGH LIMITS TO: US 84 NORTH OF HERMLEIGH ABILENE KENT SH 70 0106-03-034 13.261 DEC 2016 LIMITS FROM: US 380 IN JAYTON LIMITS TO: DICKENS COUNTY LINE ABILENE KENT US 380 0106-03-035 3.185 DEC 2016 LIMITS FROM: SH 70 IN JAYTON LIMITS TO: STONEWALL COUNTY LINE ABILENE STONEWALL US 380 0106-04-035 16.7 DEC 2016 LIMITS FROM: KENT COUNTY LINE LIMITS TO: US 83 NORTH OF ASPERMONT $ 1,335,255 PROJ NUM:NH 2017(364) $ 308,000 PROJ NUM:STP 2017(365) $ 27,080 PROJ NUM:STP 2017(366) $ 25,960 PROJ NUM:STP 2017(366) $ 753,000 PROJ NUM:STP 2017(366) $ 661,000 PROJ NUM:STP 2017(366) $ 769,000 PROJ NUM:STP 2017(366) $ 655,000 PROJ NUM:STP 2017(366) $ 73,4 PROJ NUM:STP 2017(366) $ 89,119 PROJ NUM:STP 2017(366) $ 107,000 PROJ NUM:STP 2017(366) $ 624,225 PROJ NUM:STP 2017(366) $ 140,055 PROJ NUM:STP 2017(366) $ 784,000 PROJ NUM:STP 2017(366) : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:43 PM ABILENE DISTRICT ABILENE DESCRIPTION: STONEWALL SEAL COAT US 83 0106-05-036 3.260 DEC 2016 LIMITS FROM: US 380 IN ASPERMONT LIMITS TO: US 380 NORTH OF ASPERMONT ABILENE SHACKELFORD SH 6 06-01-037 17.577 DEC 2016 LIMITS FROM: PECAN STREET LIMITS TO: CALLAHAN COUNTY LINE ABILENE CALLAHAN SH 6 06-02-018 2.284 DEC 2016 LIMITS FROM: EASTLAND COUNTY LINE LIMITS TO: SHACKELFORD COUNTY LINE ABILENE HASKELL BU 277F 0157-04-049 1.964 DEC 2016 LIMITS FROM: US 277 SOUTH OF HASKELL LIMITS TO: US 380 IN HASKELL ABILENE HASKELL US 277 0157-04-050.371 DEC 2016 LIMITS FROM: JONES COUNTY LINE LIMITS TO: BU 277-F SOUTH OF HASKELL ABILENE FISHER SH 70 0263-03-033 9.310 DEC 2016 LIMITS FROM: 80' SOUTH OF WEST SNYDER AVENUE LIMITS TO: KENT COUNTY LINE ABILENE FISHER US 180 0296-02-032 16.400 DEC 2016 LIMITS FROM: SCURRY COUNTY LINE LIMITS TO: SH 70 IN ROBY ABILENE FISHER US 180 0296-03-037 13.672 DEC 2016 LIMITS FROM: SH 70 IN ROBY LIMITS TO: JONES COUNTY LINE ABILENE TAYLOR US 277 0407-05-028 8.423 DEC 2016 LIMITS FROM: 1480' SOUTH OF CR 208 LIMITS TO: FM 89 ABILENE CALLAHAN US 283 0437-02-015 8.246 DEC 2016 LIMITS FROM: EAST 6TH STREET IN BAIRD LIMITS TO: SHACKELFORD COUNTY LINE ABILENE HOWARD FM 700 0668-03-007 2.817 DEC 2016 LIMITS FROM: IH 20 LIMITS TO: SH 350 ABILENE TAYLOR FM 707 0677-02-015 4.556 DEC 2016 LIMITS FROM: BI 20-Q IN TYE LIMITS TO: JONES COUNTY LINE ABILENE SCURRY FM 1605 1529-03-008 2.109 DEC 2016 LIMITS FROM: SH 350 IN SNYDER LIMITS TO: US 180 IN SNYDER ABILENE HASKELL FM 1661 1654-02-010 8.230 DEC 2016 LIMITS FROM: JONES COUNTY LINE LIMITS TO: SH 283 IN SAGERTON $ 192,000 PROJ NUM:STP 2107(366) $ 839,000 PROJ NUM:STP 2017(366) $ 93,298 PROJ NUM:STP 2017(366) $ 133,556 PROJ NUM:STP 2017(366) $ 699,414 PROJ NUM:NH 2017(364) $ 463,408 PROJ NUM:STP 2017(366) $ 536,098 PROJ NUM:STP 2017(366) $ 655,580 PROJ NUM:STP 2017(366) $ 439,000 PROJ NUM:STP 2017(366) $ 368,741 PROJ NUM:STP 2017(366) $ 3,814 PROJ NUM:STP 2017(365) $ 113,000 PROJ NUM:STP 2017(366) $ 171,000 PROJ NUM:STP 2017(365) $ 195,531 PROJ NUM:STP 2017(366) : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:43 PM ABILENE DISTRICT ABILENE KENT LIMITS FROM: US 380 IN CLAIREMONT ABILENE HASKELL LIMITS FROM: FM 2229 SH 208 2011-02-013 16.668 DEC 2016 LIMITS TO: DICKENS COUNTY LINE FM 2701 2711-02-005 0.496 DEC 2016 LIMITS TO: KNOX COUNTY LINE ABILENE DESCRIPTION: JONES SEAL COAT FM 2833 2859-01-010 7.021 DEC 2016 LIMITS FROM: TAYLOR COUNTY LINE LIMITS TO: FM 1082 CONTRACT CSJ: 0007-01-056 DEC 2016 3s $ 548,000 PROJ NUM:STP 2017(366) $ 13,000 PROJ NUM:STP 2017(366) $ 409,000 PROJ NUM:STP 2017(365) $,345,546 DEC 2016 TOTAL: 3s 1 Contract $,345,546 ABILENE MITCHELL BI 20-J 0005--013 5.926 JAN 2017 DESCRIPTION: ROADWAY REHABILITATION / ARMORING LIMITS FROM: IH 20 W OF COLORADO CITY LIMITS TO: IH 20 E OF COLORADO CITY CONTRACT CSJ: 0005--013 JAN 2017 P1 $ 3,616,900 PROJ NUM:STP ( ) $ 3,616,900 ABILENE NOLAN IH 20 0006-03-132.477 JAN 2017 DESCRIPTION: ROADWAY REHABILITATION / ARMORINGA LIMITS FROM: EAST BI 20-M IN SWEETWATER LIMITS TO: TAYLOR COUNTY LINE CONTRACT CSJ: 0006-03-132 JAN 2017 $ 14,118,595 PROJ NUM:NH ( ) $ 14,118,595 JAN 2017 TOTAL: 2 Projects 2 Contracts $ 17,735,495 : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:43 PM ABILENE DISTRICT ABILENE HOWARD IH 20 0005-05-110 8.815 MAR 2017 DESCRIPTION: ROADWAY REHABILITATION / ARMORING LIMITS FROM: MARTIN COUNTY LINE LIMITS TO: NEAR US 87_(EB LANES ONLY) CONTRACT CSJ: 0005-05-110 MAR 2017 $ 6,805,015 PROJ NUM:NH ( ) $ 6,805,015 : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:43 PM ABILENE DISTRICT ABILENE NOLAN BI 20-L 0006-14-004 0.400 MAR 2017 DESCRIPTION: HIGH FRICTION SURFACE TREATMENT OF CURVE AND INSTALLCHEVRONS ON CURVE LIMITS FROM: 0.8 MILE NORTH OF IH 20 LIMITS TO: 1.2 MILES NORTH OF IH 20 ABILENE TAYLOR US 83 0033-06-108 0.500 MAR 2017 DESCRIPTION: HIGH FRICTION SURFACE TREATMENT-CURVE,TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: 0.15 MI N OF IH 20 LIMITS TO: 0.35 MI S OF IH 20 ABILENE TAYLOR BU 83-D 0033-08-039 0.200 MAR 2017 DESCRIPTION: INSTALL CHEVRONS ON CURVE, HIGH FRICTION SURFACE TREATMENTON CURVE, PROFILE EDGELINE MARKINGS LIMITS FROM: AT SL 322 (EXIT RAMP) ABILENE TAYLOR BU 83-D 0033-08-040 0.180 MAR 2017 DESCRIPTION: INSTALL CHEVRONS ON CURVE, HIGH FRICTION SURFACE TREATMENTON CURVE, PROFILE EDGELINE MARKINGS LIMITS FROM: AT LP 322 ENTRANCE RAMP ABILENE SCURRY US 84 0053-07-038 0.676 MAR 2017 DESCRIPTION: INSTALL ADVANCE CURVE WARNING SIGNALS - EXISTING WARNINGSIGNS, INSTALL CHEVRONS ON CURVE LIMITS FROM: 0.200 MI S OF FM 6 LIMITS TO: 0.876 MI S OF FM 6 ABILENE SHACKELFORD US 283 05-04-030 5.500 MAR 2017 DESCRIPTION: INSTALL ADVANCE CURVE WARNING SIGNS, INSTALL CHEVRONS ONCURVES LIMITS FROM: THROCKMORTON COUNTY LINE LIMITS TO: 5.5 MILES SOUTH OF THROCKMORTON C/L ABILENE FISHER FM 57 0317-01-035 2.800 MAR 2017 DESCRIPTION: INSTALL ADVANCE CURVE WARNING SIGNS, INSTALL CHEVRONS ONCURVE LIMITS FROM: 5 MILES NORTH OF SH 70 LIMITS TO: 7.8 MILES NORTH OF SH 70 ABILENE TAYLOR US 277 0407-05-027 0.929 MAR 2017 DESCRIPTION: HIGH FRICTION SURFACE TREATMENT, LIMITS FROM: 1.6 MI N OF FM 89 LIMITS TO: 0.671 MI N OF FM 89 ABILENE CALLAHAN FM 2707 0452-02-037 0.400 MAR 2017 DESCRIPTION: INSTALL ADVANCE WARNING CURVE SIGNALS - EXISTING WARNINGSIGNALS - EXISTING WARNING SIGNS, PROFILE CENTERLINE MARKING LIMITS FROM: 0.9 MI S OF SH 36 LIMITS TO: 1.3 MI S OF SH 36 ABILENE JONES FM 6 0733-02-022 2.369 MAR 2017 DESCRIPTION: INSTALL CHEVRONS ON CURVE,_PROFILE CENTERLINE MARKINGS LIMITS FROM: 1 MILE SOUTH OF US 180 LIMITS TO: 3.4 MILES SOUTH OF US 180 ABILENE NOLAN FM 6 0733-04-023 0.539 MAR 2017 DESCRIPTION: HIGH FRICTION SURFACE TREATMENT ON CURVE, PROFILE_EDGELINEMARKINGS, PROFILE CENTERLINE MARKINGS LIMITS FROM: 1.3 MILES WEST OF FM 89 LIMITS TO: 1.8 MILES WEST OF FM 89 ABILENE BORDEN FM 1054 0933-05-019 1.400 MAR 2017 DESCRIPTION: INSTALL ADVANCE CURVE WARNING SIGNALS - EXISTING WARNINGSIGNS, PROFILE EDGLINE MARKINGS, PROFILE CENTERLINE MARKINGS LIMITS FROM: 3.7 MILES SOUTH OF FM 10 LIMITS TO: 5.1 MILES SOUTH OF FM 10 ABILENE CALLAHAN FM 604 0974-01-028 0.700 MAR 2017 DESCRIPTION: INSTALL ADVANCE CURVE WARNING SIGNALS - EXISTING WARNINGPROFILE CENTERLINE MARKINGS LIMITS FROM: 3.6 MILES NORTH OF SH 36 LIMITS TO: 2.9 MILES NORTH OF SH 36 $ 63,274 $ 79,837 $ 65,827 $ 49,404 $ 33,046 $ 50,100 $ 17,100 $ 460,935 $ 27,086 $ 47,954 $ 107,587 $ 53,020 $ 29,763 : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:43 PM ABILENE DISTRICT ABILENE JONES FM 605 0975-01-021 0.800 MAR 2017 DESCRIPTION: INSTALL CHEVRONS ON CURVE, PROFILE EDGELINE MARKINGS,PROFILE CENTERLINE MARKINGS LIMITS FROM: 0.7 MILE NORTHWEST OF FM 2404 LIMITS TO: 0.1 MILE EAST OF FM 2404 ABILENE HOWARD FM 821 1156-02-022 1.000 MAR 2017 DESCRIPTION: INSTALL ADVANCE CURVE WARNING SIGNALS - EXIST WARNING SIGNS LIMITS FROM: 4.491 MILES EAST OF FM 461 LIMITS TO: 5.491 MILES EAST OF FM 461 ABILENE TAYLOR FM 1750 1655-01-028 0.383 MAR 2017 DESCRIPTION: INSTALL ADVANCE CURVE WARNING SIGNALS - EXISTING WARNINGSIGNS LIMITS FROM: 0.8 MILE SOUTH OF SH 36 LIMITS TO: 1.2 MILES SOUTH OF SH 36 ABILENE FISHER FM 608 2379-01-011 1.161 MAR 2017 DESCRIPTION: INSTALL CHEVRONS ON CURVE, PROFILE CENTERLINE MARKINGS LIMITS FROM: 3.5 MILES SOUTH OF FM 611 LIMITS TO: 4.6 MILES SOUTH OF FM 611 ABILENE TAYLOR SL 322 2398-01-050 0.300 MAR 2017 DESCRIPTION: INSTALL ADVANCE CURVE WARNING SIGNALS - EXISTING WARNINGSIGNS, HIGH FRICTION SURFACE TREATMENT ON CURVE LIMITS FROM: 1.3 MI S. OF SH 36 (ON W. FRONT RD) LIMITS TO: 1.6 MI S. OF SH 36 ABILENE JONES FM 2404 2474-01-008 0.869 MAR 2017 DESCRIPTION: INSTALL CHEVRONS ON CURVE, PROFILE EDGELINE MARKINGS,PROFILE CENTERLINE MARKINGS LIMITS FROM: 2.3 MILES SOUTH OF FM 605 LIMITS TO: 3.2 MILES SOUTH OF FM 605 ABILENE TAYLOR FM 89 2935-01-014 2.079 MAR 2017 DESCRIPTION: INSTALL CHEVRONS ON CURVE, PROFILE EDGELINE MARKINGS,PROFILE CENTERLINE MARKINGS LIMITS FROM: 1.7 MILES EAST OF FM 6 LIMITS TO: 3.8 MILES EAST OF FM 6 CONTRACT CSJ: 0006-14-004 MAR 2017 20 Projects ( ) $ 40,291 $ 44,498 $ 22,846 $ 32,844 $ 72,463 $ 33,048 $ 71,000 $ 1,401,923 ABILENE CALLAHAN IH 20 0007-01-054 8.802 MAR 2017 DESCRIPTION: SPOT BASE REPAIR,1-COURSE SURFACE TREATMENT, 1" POROUSFRICTION COURSE OVERLAY P1 LIMITS FROM: NEAR BAIRD WEST CITY LIMIT_(WBL) LIMITS TO: APPROX 0.3 MI E OF MEXIA CREEK CONTRACT CSJ: 0007-01-054 MAR 2017 $ 4,227,049 PROJ NUM:NH ( ) $ 4,227,049 ABILENE HOWARD US 87 0069-01-056 0.266 MAR 2017 DESCRIPTION: INSTALL FRENCH DRAIN AND REBUILD ROADWAY LIMITS FROM: 1800 'NORTH OF RM 33 LIMITS TO: 400'NORTH OF RM 33 CONTRACT CSJ: 0069-01-056 P1 $ 1,200,000 PROJ NUM:NH ( ) $ 1,200,000 ABILENE DESCRIPTION: CALLAHAN 2"MILL AND 4"FILL US 283 0437-02-016 3.300 MAR 2017 LIMITS FROM: APPROX.16 MILES NORTH OF IH 20 LIMITS TO: APPROX REF MARKER 308 CONTRACT CSJ: 0437-02-016 $ 3,403,983 PROJ NUM:STP ( ) $ 3,403,983 MAR 2017 TOTAL: 24 Projects 5 Contracts $ 17,037,970 : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:43 PM ABILENE DISTRICT ABILENE TAYLOR IH 20 0006-04-079 13.435 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: NOLAN COUNTY LINE LIMITS TO: APPROX 270' EAST OF CR 287 ABILENE TAYLOR IH 20 0006-05-115 10.636 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: APPROX 270' EAST OF CR 287 LIMITS TO: CATCLAW CREEK ABILENE TAYLOR IH 20 0006-06-101 8.276 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: CATCLAW CREEK LIMITS TO: CALLAHAN COUNTY LINE ABILENE CALLAHAN IH 20 0006-07-078.940 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: TAYLOR COUNTY LINE LIMITS TO: APPROX.5 MI. EAST OF FM 2047 ABILENE CALLAHAN IH 20 0007-02-052 8.802 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: APPROX.3 MI. EAST OF MEXIA CREEK LIMITS TO: EASTLAND COUNTY LINE ABILENE SHACKELFORD US 180 0011-05-049 7.369 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: SH 351 LIMITS TO: SOUTH 4TH STREET IN ALBANY ABILENE TAYLOR US 83 0034-01-131 11.608 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: END OF CONC (BETWEEN LP322 & FM89) LIMITS TO: US 84 "Y" NORTHEAST OF TUSCOLA ABILENE TAYLOR US 83 0034-02-045 14.405 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: US 84 "Y" NORTHEAST OF TUSCOLA LIMITS TO: RUNNELS COUNTY LINE ABILENE SCURRY US 180 0053-17-031 2.377 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: SH 350 LIMITS TO: SH 208 ABILENE SCURRY BU 84-G 0053-17-032 5.773 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: US 84 LIMITS TO: US 180 ABILENE HOWARD US 87 0068-08-064 7.567 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: BI 20-G LIMITS TO: FM 1584 ABILENE HOWARD US 87 0069-01-055 13.111 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: GLASSCOCK COUNTY LINE LIMITS TO: BI 20-G ABILENE JONES US 277 0157-05-061 6.486 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: US 83 "Y" NORTH OF ANSON LIMITS TO: FM 1636 SOUTH ABILENE KENT US 380 0263-01-020 7.735 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: SH 70 (SOUTHBOUND) LIMITS TO: SH 70 IN JAYTON (NORTHBOUND) $ 84,367 PROJ NUM:NH ( ) $ 43,210 PROJ NUM:NH ( ) $ 70,433 PROJ NUM:NH ( ) $ 113,328 PROJ NUM:NH ( ) $ 77,886 PROJ NUM:NH ( ) $ 56,544 PROJ NUM:STP ( ) $ 102,006 PROJ NUM:NH ( ) $ 83,571 PROJ NUM:NH ( ) $ 46,1 PROJ NUM:NH ( ) $ 51,568 PROJ NUM:NH ( ) $ 92,234 PROJ NUM:NH ( ) $ 170,654 PROJ NUM:NH ( ) $ 119,504 PROJ NUM:NH ( ) $ 47,081 PROJ NUM:STP ( ) : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:44 PM ABILENE DISTRICT ABILENE FISHER SH 70 0263-04-030 9.133 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: NORTH 5TH STREET IN ROBY LIMITS TO: SH 92 ABILENE SCURRY US 180 0295-04-047 4.535 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: FM 1609 LIMITS TO: SH 350 ABILENE SCURRY US 180 0296-01-034 13.376 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: SH 208 LIMITS TO: FISHER COUNTY LINE ABILENE FISHER SH 92 0318-02-026 19.270 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: SH 70 LIMITS TO: JONES COUNTY LINE ABILENE SCURRY SH 208 0332-01-026.362 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: MITCHELL COUNTY LINE LIMITS TO: US 180 ABILENE SHACKELFORD US 283 0437-01-024 16.526 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: CALLHAN COUNTY LINE LIMITS TO: US 180 ABILENE MITCHELL SH 208 0454-03-044 8.991 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: COUNTY ROAD 345 LIMITS TO: FM 644 ABILENE HOWARD SH 176 0548-04-023 4.554 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: APPROX 1 MILE EAST OF FM 2599 LIMITS TO: IH 20 ABILENE HOWARD FM 700 0668-01-017 2.429 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: BI 20-G LIMITS TO: US 87 ABILENE HOWARD FM 700 0668-02-016 3.567 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: US 87 LIMITS TO: IH 20 ABILENE KENT SH 208 1361-02-025 13.820 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: SCURRY COUNTY LINE LIMITS TO: US 380 ABILENE SCURRY SH 208 1361-03-027 16.784 APR 2017 DESCRIPTION: INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVEPAVEMENT MARKERS LIMITS FROM: BU 84-G LIMITS TO: KENT COUNTY LINE CONTRACT CSJ: 0006-04-079 APR 2017 26 Projects $ 44,524 PROJ NUM:STP ( ) $ 29,587 PROJ NUM:STP ( ) $ 84,836 PROJ NUM:STP ( ) $ 89,453 PROJ NUM:STP ( ) $ 80,430 PROJ NUM:STP ( ) $ 81,856 PROJ NUM:STP ( ) $ 71,086 PROJ NUM:STP ( ) $ 30,073 PROJ NUM:STP ( ) $ 25,721 PROJ NUM:NH ( ) $ 61,997 PROJ NUM:NH ( ) $ 82,838 PROJ NUM:STP ( ) $ 84,003 PROJ NUM:STP ( ) $ 1,924,911 APR 2017 TOTAL: 26 Projects 1 Contract $ 1,924,911 : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:44 PM ABILENE DISTRICT ABILENE JONES US 83 0033-03-029 1.751 MAY 2017 DESCRIPTION: SPOT BASE REPAIR, 1-COURSE SURFACE TREATMENT, MILL EXISTINGPAVEMENT 4", FILL WITH 4" OF ASPHALTIC CONCRETE PAVEMENT LIMITS FROM: SH 92 LIMITS TO: HAMLIN NORTH CITY LIMITS P1 $ 4,156,018 PROJ NUM:STP ( ) ABILENE JONES US 83 0033-04-069 0.878 MAY 2017 DESCRIPTION: SPOT BASE REPAIR, 1-COURSE SURFACE TREATMENT, MILL EXISTINGPAVEMENT 4", FILL WITH 4" OF ASPHALTIC CONCRETE PAVEMENT LIMITS FROM: HAMLIN SOUTH CITY LIMITS LIMITS TO: SH 92 CONTRACT CSJ: 0033-03-029 MAY 2017 P1 2 Projects $ 2,140,979 PROJ NUM:STP ( ) $ 6,296,997 MAY 2017 TOTAL: 2 Projects 1 Contract $ 6,296,997 ABILENE TAYLOR US 83 0034-01-9 0.058 JUN 2017 DESCRIPTION: REMOVE THE EXISTING PAVEMENT AND REPLACE WITH CONCERETE TOCREATE A CONCRETE PAVEMENT INTERSECTION P1 LIMITS FROM: US 83 (UNDERPASS AND TURNAROUNDS) LIMITS TO: AT SOUTH 27TH (SOUTWEST DR.) CONTRACT CSJ: 0034-01-9 JUN 2017 ABILENE HASKELL US 277 0157-04-051 0.862 JUN 2017 DESCRIPTION: UPGRADE SAFETY LIGHTING LIMITS FROM: 0.436 MILE NORTH OF SH 6 LIMITS TO: 0.426 MILE SOUTH OF SH 6 ABILENE HOWARD FM 700 0668-01-018 0.437 JUN 2017 DESCRIPTION: UPGRADE SAFETY LIGHTING LIMITS FROM: WESTOVER ROAD LIMITS TO: US 87 ABILENE HOWARD FM 700 0668-02-017 0.540 JUN 2017 DESCRIPTION: UPGRADE SAFETY LIGHTING LIMITS FROM: US 87 LIMITS TO: 0.1 MILE EAST OF GOLIAD ST CONTRACT CSJ: 0157-04-051 JUN 2017 3 Projects $ 2,285,256 PROJ NUM:STP ( ) $ 2,285,256 $ 230,000 PROJ NUM:NH ( ) $ 160,000 PROJ NUM:NH ( ) $ 110,000 PROJ NUM:NH ( ) $ 500,000 JUN 2017 TOTAL: 4 Projects 2 Contracts $ 2,785,256 : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:44 PM ABILENE DISTRICT ABILENE DESCRIPTION: NOLAN REPLACE BRIDGE BI 20-M 0006-15-034 0.134 AUG 2017 LIMITS FROM: AT THE UPRR LIMITS TO: IN SWEETWATER (PSN 044) CONTRACT CSJ: 0006-15-034 AUG 2017 ABILENE CALLAHAN CR 0908-34-022 0.001 AUG 2017 DESCRIPTION: REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES LIMITS FROM: ON CR 152 (SIGNED CR 484) LIMITS TO: AT DEEP CREEK (PSN 2) CONTRACT CSJ: 0908-34-022 AUG 2017 ABILENE CALLAHAN CR 0908-34-023 0.100 AUG 2017 DESCRIPTION: REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES LIMITS FROM: ON CR 148 (CR 305 MCKINNEY RD) LIMITS TO: AT BATTLE CK (PSN 1) CONTRACT CSJ: 0908-34-023 AUG 2017 $ 4,000,000 PROJ NUM:BR ( ) $ 4,000,000 $ 437,580 PROJ NUM:BR 2016(763) $ 437,580 $ 437,580 PROJ NUM:BR 2016(765) $ 437,580 ABILENE CALLAHAN CR 0908-34-024 0.067 AUG 2017 DESCRIPTION: REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES LIMITS FROM: ON CR 211 (SIGNED CR 432) LIMITS TO: AT TURKEY CREEK TRIBUTARY (PSN 2) CONTRACT CSJ: 0908-34-024 AUG 2017 $ 211,630 PROJ NUM:BR 2016(764) $ 211,630 ABILENE CALLAHAN CR 0908-34-025 0.062 AUG 2017 DESCRIPTION: REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES LIMITS FROM: ON CR 2 (SIGNED CR 452) LIMITS TO: AT BRANCH OF TURKEY CK (PSN 1) CONTRACT CSJ: 0908-34-025 AUG 2017 $ 211,497 PROJ NUM:BR 2016(766) $ 211,497 AUG 2017 TOTAL: 5 Projects 5 Contracts $ 5,298,287 ABILENE 10s 20 Contracts $ 151,447,285 : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:44 PM AMARILLO DISTRICT FISCAL YEAR 2017 PLANNED STATEWIDE LETTING SUMMARY (In Millions) BASED ON CURRENT Month State Highway 1 Prog 1 Prog 2 14 s SIB Pass Through Finance Toll Rev s SH 130 Conc s Rail s Local s Texas Mobility Total SEPTEMBER $0.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.45 OCTOBER $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 NOVEMBER $15.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $15.56 DECEMBER $4.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4.00 JANUARY $0.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.37 FEBRUARY $8.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $8.70 MARCH $18.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $18.77 APRIL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 MAY $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 JUNE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 JULY $39.00 $16.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $55.00 AUGUST $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 District Total: $86.85 $16.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $102.85

9/2/2016 @ 2:41:44 PM AMARILLO DISTRICT AMARILLO DESCRIPTION: POTTER CRACK SEAL VA 0904-00-162 172.430 SEP 2016 LIMITS FROM: VARIOUS LOCATIONS DISTRICTWIDE CONTRACT CSJ: 0904-00-162 SEP 2016 $ 453,9 PROJ NUM:STP 2017(002) $ 453,9 SEP 2016 TOTAL: 1 Contract $ 453,9 : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:44 PM AMARILLO DISTRICT AMARILLO OCHILTREE DESCRIPTION: SEALCOAT LIMITS FROM: SH 15 AMARILLO OLDHAM DESCRIPTION: SEALCOAT LIMITS FROM: MM 16 (FRT RDS) US 83 0030-02-047 1.080 NOV 2016 LIMITS TO: PEER STREET (PERRYTON) IH 40 0090-03-062 18.207 NOV 2016 LIMITS TO: BI40-C WEST OF VEGA (FRT RDS) AMARILLO DESCRIPTION: CARSON SEALCOAT US 60 0169-03-038 1.231 NOV 2016 LIMITS FROM: AT FM 2373 INTERCHANGE AMARILLO HARTLEY US 54 0238-02-037 20.025 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: MIDDLEWATER LIMITS TO: DALLAM COUNTY LINE AMARILLO POTTER IH 40 0275-01-197 9.394 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: COULTER STREET (FRT RDS) LIMITS TO: US 287 SPLIT (FRT RDS) AMARILLO GRAY IH 40 0275-07-038 3.917 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: EAST OF SH 70 SOUTH (FRT RDS) LIMITS TO: WEST OF SH 70 NORTH (FRT RDS) AMARILLO GRAY SH 70 0309-01-042 23.887 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: US 60 LIMITS TO: IH 40 AMARILLO ARMSTRONG SH 207 0357-05-024 13.507 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: BRISCOE COUNTY LINE LIMITS TO: FM 2272 AMARILLO LIPSCOMB FM 1453 0460-02-015 4.520 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: US 60 LIMITS TO: HEMPHILL COUNTY LINE AMARILLO HEMPHILL FM 1453 0460-03-011 5.877 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: LIPSCOMB COUNTY LINE LIMITS TO: SOUTH 5.88 MILES AMARILLO GRAY SH 70 0490-01-036 2.580 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: LP 171 LIMITS TO: ROBERTS COUNTY LINE AMARILLO HUTCHINSON FM 2171 0557-07-015 4.261 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: SH 152 LIMITS TO: FM 280 AMARILLO MOORE FM 722 0727-04-020 15.228 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: US 87 LIMITS TO: HARTLEY COUNTY LINE AMARILLO HARTLEY FM 722 0727-06-010 9.448 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: US 385 LIMITS TO: MOORE COUNTY LINE $ 1,023,810 PROJ NUM:NH 2017(260) $ 1,140,180 PROJ NUM:NH 2017(260) $ 197,840 PROJ NUM:NH 2017(260) $ 1,065,130 PROJ NUM:NH 2017(260) $ 1,008,370 PROJ NUM:NH 2017(260) $ 307,370 PROJ NUM:NH 2017(260) $ 1,529,360 PROJ NUM:STP 2017(261) $ 514,610 PROJ NUM:STP 2017(261) $ 144,830 PROJ NUM:STP 2017(261) $ 174,280 PROJ NUM:STP 2017(261) $ 156,960 PROJ NUM:STP 2017(261) $ 150,040 PROJ NUM:STP 2017(261) $ 586,180 PROJ NUM:STP 2017(261) $ 288,390 PROJ NUM:STP 2017(261) : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:44 PM AMARILLO DISTRICT AMARILLO CARSON DESCRIPTION: SEALCOAT LIMITS FROM: US 60 FM 294 0788-01-019 9.750 NOV 2016 LIMITS TO: SKELLYTOWN AMARILLO DESCRIPTION: CARSON SEALCOAT FM 294 0788-02-027 1.470 NOV 2016 LIMITS FROM: ARMSTRONG COUNTY LINE LIMITS TO: IH 40 AMARILLO ARMSTRONG FM 294 0788-03-022 10.789 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: CARSON COUNTY LINE LIMITS TO: US 287 AMARILLO OCHILTREE FM 377 0790-08-022 14.305 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: US 83 LIMITS TO: LIPSCOMB COUNTY LINE AMARILLO LIPSCOMB FM 377 0790-09-011 0.987 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: OCHILTREE COUNTY LINE LIMITS TO: SH 23 AMARILLO DALLAM FM 297 0794-02-020 15.917 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: US 87 LIMITS TO: FM 807 NORTH AMARILLO HUTCHINSON FM 281 0794-06-021 9.411 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: MOORE COUNTY LINE LIMITS TO: SH 136 AMARILLO DEAF SMITH FM 59 43-02-030 2.850 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: US 60 LIMITS TO: FM 2943 AMARILLO LIPSCOMB SH 23 1337-02-011 11.050 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: 11.05 MI N OF US 83 LIMITS TO: US 83 AMARILLO DEAF SMITH SH 214 1491-01-018 22.931 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: FM 1058 LIMITS TO: FM 14 AMARILLO DEAF SMITH FM 14 1491-01-019 14.528 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: US 385 LIMITS TO: SH 214 AMARILLO DEAF SMITH SH 214 1491-02-011 5.548 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: FM 1058 LIMITS TO: PALMER COUNTY LINE AMARILLO HANSFORD FM 520 1621-01-016 10.075 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: SH 136 LIMITS TO: SHERMAN COUNTY LINE AMARILLO SHERMAN FM 520 1621-02-006 1.470 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: HANSFORD COUNTY LINE LIMITS TO: FM 1060 $ 370,490 PROJ NUM:STP 2017(261) $ 49,500 PROJ NUM:STP 2017(261) $ 338,230 PROJ NUM:STP 2017(261) $ 618,555 PROJ NUM:STP 2017(261) $ 40,532 PROJ NUM:STP 2017(261) $ 524,010 PROJ NUM:STP 2017(261) $ 373,040 PROJ NUM:STP 2017(261) $ 159,620 PROJ NUM:STP 2017(261) $ 523,330 PROJ NUM:STP 2017(261) $ 621,780 PROJ NUM:STP 2017(261) $ 398,450 PROJ NUM:STP 2017(261) $ 152,420 PROJ NUM:STP 2017(261) $ 292,020 PROJ NUM:STP 2017(261) $ 39,650 PROJ NUM:STP 2017(261) : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:44 PM AMARILLO DISTRICT AMARILLO DESCRIPTION: POTTER SEALCOAT FM 1719 1624-01-022 4.059 NOV 2016 LIMITS FROM: GIVENS ROAD LIMITS TO: SL 335 AMARILLO MOORE FM 2202 2001-01-009 5.1 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: FM 722 LIMITS TO: SH 354 AMARILLO CARSON FM 2373 2218-01-034 0.852 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: AT US 60 INTERCHANGE AMARILLO RANDALL FM 2186 2494-02-009 7.404 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: SL 335 LIMITS TO: BUSHLAND ROAD AMARILLO POTTER SL 335 2635-01-035 5.850 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: US 87 5 MILES SOUTH OF SH 136 AMARILLO DEAF SMITH FM 2856 2899-01-0 3.579 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: FM 1058 LIMITS TO: US 60 AMARILLO HEMPHILL RM 2758 2985-01-014 13.433 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: US 60 LIMITS TO: FM 1453 AMARILLO HEMPHILL RM 2758 2985-02-009 1.407 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: FM 1453 LIMITS TO: OKLAHOMA STATE LINE AMARILLO LIPSCOMB FM 3004 3076-01-009 7.321 NOV 2016 DESCRIPTION: SEALCOAT LIMITS FROM: FM 1454 LIMITS TO: OKLAHOMA STATE LINE CONTRACT CSJ: 0030-02-047 NOV 2016 37 Projects $ 339,850 PROJ NUM:STP 2017(261) $ 135,760 PROJ NUM:STP 2017(261) $ 130,770 PROJ NUM:STP 2017(261) $ 417,840 PROJ NUM:STP 2017(261) $ 826,950 PROJ NUM:NH 2017(260) $ 161,810 PROJ NUM:STP 2017(261) $ 479,010 PROJ NUM:STP 2017(261) $ 57,050 PROJ NUM:STP 2017(261) $ 224,330 PROJ NUM:STP 2017(261) $ 15,562,347 NOV 2016 TOTAL: 37 Projects 1 Contract $ 15,562,347 AMARILLO POTTER DESCRIPTION: OVERLAY LIMITS FROM: SONCY IH 40 0275-01-163 5.090 DEC 2016 LIMITS TO: IH 27 INTERCHANGE CONTRACT CSJ: 0275-01-163 DEC 2016 $ 4,000,000 PROJ NUM:NH 2017(367) $ 4,000,000 DEC 2016 TOTAL: 1 Contract $ 4,000,000 : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:44 PM AMARILLO DISTRICT AMARILLO HEMPHILL US 83 0030-06-059 0.566 JAN 2017 DESCRIPTION: INSTALL INTERSECTION FLASHING BEACON, INSTALL ADV WARN SIGNALS AND SIGNS, INSTALL PAV MARKINGS LIMITS FROM: AT SH 33 AMARILLO GRAY US 60 0169-07-047 0.001 JAN 2017 DESCRIPTION: INSTALL FLASHING BEACON LIMITS FROM: AT SL 171 INTERSECTION AMARILLO OCHILTREE SH 70 0490-03-026 1.000 JAN 2017 DESCRIPTION: INSTALL INTERSECTION FLASHING BEACON, INSTALL ADV WARN SIGNALS AND SIGNS, INSTALL PAV MARKINGS LIMITS FROM: AT FM 281 AMARILLO HUTCHINSON SH 136 0791-03-020 1.000 JAN 2017 DESCRIPTION: INSTALL INTERSECTION FLASHING BEACON, INSTALL ADV WARN SIGNALS AND SIGNS, INSTALL PAV MARKINGS LIMITS FROM: AT FM 281 AMARILLO DEAF SMITH FM 59 43-02-029 0.214 JAN 2017 DESCRIPTION: INSTALL LED FLASHING CHEVRONS LIMITS FROM: 2.935 MI EAST OF FM 2943 LIMITS TO: 3.149 MI EAST OF FM 2943 AMARILLO RANDALL FM 1541 1480-02-030 1.000 JAN 2017 DESCRIPTION: INSTALL INTERSECTION FLASHING BEACON, INSTALL ADV WARN SIGNAALS AND SIGNS, INSTALL PAVE MARKINGS LIMITS FROM: AT FM 1151 CONTRACT CSJ: 0030-06-059 JAN 2017 6 Projects $ 140,774 $ 17,000 $ 54,000 $ 54,000 $ 66,000 $ 37,200 $ 368,974 JAN 2017 TOTAL: 6 Projects 1 Contract $ 368,974 AMARILLO OCHILTREE US 83 0030-02-044 0.455 FEB 2017 DESCRIPTION: REHAB EXISTING ROADWAY LIMITS FROM: PEER STREET LIMITS TO: SL 143 CONTRACT CSJ: 0030-02-044 FEB 2017 AMARILLO CARSON SH 152 0455-02-027 0.053 FEB 2017 DESCRIPTION: REPLACE DECK AND STRUCTURAL REPAIRS LIMITS FROM: AT SPRING CREEK AMARILLO CARSON SH 152 0455-02-028 0.033 FEB 2017 DESCRIPTION: REPLACE DECK AND STRUCTURAL REPAIRS LIMITS FROM: AT WHITE DEER CREEK CONTRACT CSJ: 0455-02-027 FEB 2017 AMARILLO POTTER VA 0904-00-164 1.000 FEB 2017 DESCRIPTION: THERMOPLASTIC STRIPING LIMITS FROM: VARIOUS LOCATIONS DISTRICTWIDE CONTRACT CSJ: 0904-00-164 FEB 2017 2 Projects $ 3,000,000 PROJ NUM:STP 1602(301) $ 3,000,000 $ 2,100,000 PROJ NUM:BR ( ) $ 2,100,000 PROJ NUM:BR ( ) $ 4,200,000 $ 1,500,000 PROJ NUM:STP ( ) $ 1,500,000 FEB 2017 TOTAL: 4 Projects 3 Contracts $ 8,700,000 : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:44 PM AMARILLO DISTRICT AMARILLO RANDALL IH 27 0168-09-166 0.010 MAR 2017 DESCRIPTION: REPLACE AND WIDEN DECK, BACKWALLS AND STRUCTURAL REPAIR LIMITS FROM: ON IH 27 SBL AT 45TH AVE AMARILLO POTTER BI 40-D 0090-06-039 0.293 MAR 2017 DESCRIPTION: REHAB TRAFFIC SIGNALS LIMITS FROM: VARIOUS LOCATIONS IN AMARILLO 0090-06-041 AMARILLO RANDALL IH 27 0168-09-167 0.010 MAR 2017 DESCRIPTION: REPLACE AND WIDEN DECK, BACKWALLS AND STRUCTURAL REPAIR LIMITS FROM: ON IH 27 NBL AT 45TH AVE AMARILLO RANDALL IH 27 0168-09-168 0.001 MAR 2017 DESCRIPTION: IMPROVE TRAFFIC SIGNALS LIMITS FROM: AT 45TH AVENUE AMARILLO RANDALL IH 27 0168-09-169 0.813 MAR 2017 DESCRIPTION: RAMP AND FRT ROAD IMPROVEMENTS LIMITS FROM: SOUTH OF 45TH AVENUE LIMITS TO: NORTH OF GEORGIA STREET AMARILLO RANDALL IH 27 0168-09-170 0.330 MAR 2017 DESCRIPTION: RAMP AND FRT ROAD IMPROVEMENTS LIMITS FROM: NORTH OF 34TH AVENUE LIMITS TO: POTTER COUNTY LINE AMARILLO POTTER IH 27 0168-10-072 0.100 MAR 2017 DESCRIPTION: REPAIR BEARINGS,BACKWALL,APPROACHS AND ERIOSION LIMITS FROM: ON IH 27 NBL AT 26TH AVE AMARILLO POTTER IH 27 0168-10-073 0.100 MAR 2017 DESCRIPTION: WIDEN, REPAIR BEARINGS, BACKWALLS AND APPROACHES LIMITS FROM: ON IH 27 SBL AT 26TH AVE AMARILLO POTTER IH 27 0168-10-074 0.260 MAR 2017 DESCRIPTION: RAMP AND FRT ROAD IMPROVEMENTS LIMITS FROM: RANDALL COUNTY LINE LIMITS TO: NORTH OF 26TH AVENUE AMARILLO POTTER IH 40 0275-01-187 0.100 MAR 2017 DESCRIPTION: REPLACE BRIDGES WITH 1 BRIDGE LIMITS FROM: ON IH 40 AT BELL STREET AMARILLO POTTER IH 40 0275-01-189 0.241 MAR 2017 DESCRIPTION: FRONTAGE ROAD IMPROVEMENTS LIMITS FROM: WEST OF BELL STREET LIMITS TO: EAST OF BELL STREET 0275-01-195 AMARILLO POTTER IH 40 0275-01-194 0.468 MAR 2017 DESCRIPTION: RAMP IMPROVEMENT ON WBL LIMITS FROM: GEORGIA STREET LIMITS TO: CROCKETT STREET CONTRACT CSJ: 0168-09-166 MAR 2017 Projects $ 2,250,000 PROJ NUM:BR ( ) $ 958,216 PROJ NUM:STP 1602(188) $ 2,250,000 PROJ NUM:BR ( ) $ 109,937 $ 1,750,000 PROJ NUM:NH ( ) $ 500,000 PROJ NUM:NH ( ) $ 2,000,000 PROJ NUM:BR ( ) $ 2,000,000 PROJ NUM:BR ( ) $ 500,000 PROJ NUM:NH ( ) $ 4,600,000 PROJ NUM:BR ( ) $ 900,000 PROJ NUM:NH ( ) $ 950,000 PROJ NUM:NH ( ) $ 18,768,153 MAR 2017 TOTAL: Projects 1 Contract $ 18,768,153 : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:44 PM AMARILLO DISTRICT AMARILLO RANDALL SL 335 2635-03-018 1.669 JUL 2017 DESCRIPTION: CONVERT NONFREEWAY TO FREEWAY, CONSTR PARTIAL INTERCHANGE,MAINLANES AND FRONTAGE ROADS LIMITS FROM: FM 2590 LIMITS TO: IH 27 2635-03-019 P1 $ 45,000,000 PROJ NUM:STP ( ) AMARILLO RANDALL IH 27 0168-09-161 1.803 JUL 2017 DESCRIPTION: WIDEN FREEWAY AT SL 335, RAMP AND FRT RD IMPROVEMENTS LIMITS FROM: SUNDOWN LANE LIMITS TO: BELL STREET 0168-09-068 $ 8,000,000 PROJ NUM:DMO 20(757) AMARILLO RANDALL SL 335 2635-02-029 0.635 JUL 2017 DESCRIPTION: CONVERT NONFREEWAY TO FREEWAY, CONSTRUCT MAIN LANES ANDFRONTAGE ROADS. LIMITS FROM: IH 27 LIMITS TO: BELL STREET 2635-02-030 CONTRACT CSJ: 2635-03-018 JUL 2017 P1 3 Projects $ 2,000,000 PROJ NUM:NH ( ) $ 55,000,000 JUL 2017 TOTAL: 3 Projects 1 Contract $ 55,000,000 AMARILLO 64 Projects 9 Contracts $ 102,852,603 : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:44 PM ATLANTA DISTRICT FISCAL YEAR 2017 PLANNED STATEWIDE LETTING SUMMARY (In Millions) BASED ON CURRENT Month State Highway 1 Prog 1 Prog 2 14 s SIB Pass Through Finance Toll Rev s SH 130 Conc s Rail s Local s Texas Mobility Total SEPTEMBER $3.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3.87 OCTOBER $4.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4.87 NOVEMBER $21.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $21.22 DECEMBER $2.48 $1.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4.39 JANUARY $2.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2.60 FEBRUARY $3.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3.18 MARCH $2.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2.85 APRIL $6.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6.52 MAY $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2.74 $0.00 $2.74 JUNE $14.08 $9.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $23.57 JULY $4.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4.17 AUGUST $6.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6.66 District Total: $72.50 $11.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2.74 $0.00 $86.63

9/2/2016 @ 2:41:44 PM ATLANTA DISTRICT : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2

9/2/2016 @ 2:41:44 PM ATLANTA DISTRICT ATLANTA TITUS US 67 0010-06-041 7.730 SEP 2016 DESCRIPTION: PROFILE EDGELINE MARKINGS LIMITS FROM: US 271 LIMITS TO: FRANKLIN C/L ATLANTA CAMP SH 11 0083-08-049 3.785 SEP 2016 DESCRIPTION: TEXTURIZE SHOULDERS & CL TEXTURING LIMITS FROM: 1.0 MI. E. OF US 271 LIMITS TO: TITUS C/L ATLANTA CASS SH 11 0218-05-030 2.471 SEP 2016 DESCRIPTION: PROFILE EDGELINE MARKINGS LIMITS FROM: 2.5 MI. W. OF FM 130 LIMITS TO: FM 130 ATLANTA CASS SH 11 0218-06-025 6.879 SEP 2016 DESCRIPTION: PROFILE EDGELINE MARKINGS LIMITS FROM: SH 49 LIMITS TO: 2.5 W. OF FM 130 ATLANTA CASS SH 49 0222-04-056 7.734 SEP 2016 DESCRIPTION: TEXTURIZE SHOULDERS & CL TEXTURING LIMITS FROM: SH 11 LIMITS TO: SH 155 ATLANTA MARION SH 49 0223-02-030 8.000 SEP 2016 DESCRIPTION: PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS LIMITS FROM: SH 43 LIMITS TO: LA LINE ATLANTA CAMP FM 3384 0248-08-0 4.571 SEP 2016 DESCRIPTION: PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS LIMITS FROM: US 271 N LIMITS TO: US 271 S ATLANTA CASS SH 77 0277-02-049 6.787 SEP 2016 DESCRIPTION: PROFILE CENTERLINE & EDGELINE MARKINGSCENTERLINE BARS & EDGELINE BARS LIMITS FROM: CASS C/L LIMITS TO: FM 250 ATLANTA CASS SH 77 0278-01-055 9.372 SEP 2016 DESCRIPTION: TEXTURIZE SHOULDERS & CL TEXTURING LIMITS FROM: 0.2 MI E FM 1841 LIMITS TO: LOUISIANA STATE LINE ATLANTA BOWIE FM 1840 0330-01-031 3.517 SEP 2016 DESCRIPTION: TEXTURIZE SHOULDERS & CL TEXTURING LIMITS FROM: SH 98 LIMITS TO: SH 8 ATLANTA MARION FM 728 0843-03-014 3.636 SEP 2016 DESCRIPTION: PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS LIMITS FROM: 3.63 MI N OF SH 49 LIMITS TO: SH 49 ATLANTA CASS FM 250 0946-01-042 4.693 SEP 2016 DESCRIPTION: PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS LIMITS FROM: FM 130 LIMITS TO: SH 11 ATLANTA MORRIS FM 250 0946-02-024 5.237 SEP 2016 DESCRIPTION: PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS LIMITS FROM: CASS C/L LIMITS TO: US 259 ATLANTA MARION FM 729 1018-03-040 18.724 SEP 2016 DESCRIPTION: TEXTURIZE SHOULDERS & CL TEXTURING LIMITS FROM: MORRIS C/L LIMITS TO: SH 49 $ 143,011 PROJ NUM:STP 2017(053)HESG $ 76,401 PROJ NUM:STP 2017(054)HESG $ 38,682 PROJ NUM:STP 2017(055)HESG $ 107,955 PROJ NUM:STP 2017(056)HESG $ 148,740 PROJ NUM:STP 2017(057)HESG $ 166,853 PROJ NUM:STP 2017(058)HESG $ 95,714 PROJ NUM:STP 2017(059)HESG $ 143,919 PROJ NUM:STP 2017(060)HESG $ 189,475 PROJ NUM:STP 2017(061)HESG $ 55,951 PROJ NUM:STP 2017(062)HESG $ 77,529 PROJ NUM:STP 2017(063)HESG $ 105,504 PROJ NUM:STP 2017(064)HESG $ 118,206 PROJ NUM:STP 2017(065)HESG $ 372,723 PROJ NUM:STP 2017(066)HESG : LC = LET BY LOCAL ENTITY XX = NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2