Addendum 1 Downtown North CRA Sidewalks

Similar documents
Addendum 1 13 TH Street Streetscape. September 1, 2017

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

BID TABULATION BID REQUEST NO

REPLACEMENT OF MERCER COUNTY BRIDGE

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

Rock Chalk Park - Infrastructure Report. July 2013

Department of Public Works Engineering

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

CITY OF DEERFIELD BEACH Request for City Commission Agenda

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

Exhibit 4 Page 1 of 8

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No

PART A ROADWAY - BASE BID

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

RFB Addendum 3

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

Utility Committee Meeting AGENDA. October 3, 2017

TOTAL QUANTITY UNIT COST UNIT

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Reviax Constracting Corp. DeSantis Construction

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

City of Dade City Beauchamp Ave Drainage Improvements CDBG Contract #: 17DB-OL N19 City Project #: 1603ST

CITY OF TAMPA ADDENDUM 2. April 18, 2018

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

SUBDIVISION IMPROVEMENTS AGREEMENT

ADDENDUM No. 1 January 29, Paving Program Village of Milford

OKLAHOMA TURNPIKE AUTHORITY

8 EA $ 1, $ $ 1, $ 8, $ 1, $ 8, EA $ 6, $6, $ 7, $ 7, $ 5, $ 5,445.

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

Job No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL

1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) -

City of Palmer Action Memorandum No

Regular. NECESSARY RESOURCES/IMPACTS (OTHER) n/a. Fiscal Impact

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

Solicitation No. B RA 2010 Concrete Placement Work Order Construction Contract Package No. 2 PROPOSAL. PROPOSAL OF, a corporation a

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

Opinion of Probable Cost

CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

BID FORM WATER SERVICE REPLACEMENTS ON CRUISER LN., BELVEDERE ST. AND VIKINGS LN. CITY BID NO CITY OF ATLANTIC BEACH, FLORIDA

Engineer's Preliminary Estimate - 100% Submittal

CITY OF DEERFIELD BEACH Request for City Commission Agenda

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars

CITY OF SAN MARCOS ENGINEERING DIVISION

REQUEST FOR PROPOSALS ADA SIDEWALK RAMP REPLACEMENT 2019 Construction Season. SUBMITTAL DUE DATE: 2:00 p.m. on Tuesday, March 19, 2019

BID FORM. PROJECT: 2017 Water line replacement

PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST

CITY OF CHAMBLEE PIERCE DRIVE STORM SYSTEM EXTENSION PROJECT

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

Market Street Gateway Improvements Phase 1

The bid due date has been changed to 2:50 p.m. May 25, 2018.

PUBLIC WORKS DEPARTMENT CURB, GUTTER, SIDEWALK REPAIR AND CURB- RAMP INSTALLATION, PHASE 2 PROJECT NO. PW1531


A DESIGN-BUILD PROJECT

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

What are Capital Reserves?

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

LETTING : CALL : 056 COUNTIES : MILLE LACS

COUNTY OF SAN MATEO STATE OF CALIFORNIA NOTICE TO CONTRACTORS

3\1:s11, Date. Agenda Item is over 50 pages; may be viewed in the Minutes Department. Agenda Item #: 3-C-7

Right of Way Permits. Contact Information:

Transcription:

Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE OR CONTACT JULIE YOUNG AT THE CITY, 850-872-3015, PRIOR TO PROPOSAL OPENING TO RECEIVE A LISTING OF ALL ADDENDA. THE FOLLOWING NOTICE IS ISSUED BY THIS ADDENDUM: 1. The Due Date remains Tuesday, January 17, 2017 by 2:00 p.m. local time at the Purchasing Office, 519 E. 7th Street, Panama City, Florida, 32401. 2. Pre-bid meeting sign-in sheet and meeting notes are attached. 3. Revise sheets 56 and 59 for 9 th Street (Alt Bid) are attached. These sheets revise the angle of the culvert extension, the headwall length, and the water line replacement. 4. Revised Bid Schedule is attached for 9 th Street Alt. This schedule revises the culvert/headwall concrete line item to LS, revises the 6 white thermo striping line item to LF, and adds line items for the optional 6 line stops and HDPE WL. Note that the HDPE line item includes connections to the existing WL. 5. Revised bid schedules for Hamilton and Mercedes are attached. Sidewalk area and valve box adjustment quantities have been revised. End of Addendum 1 Page 1 of 1

DT North CRA Pre-Bid Meeting Notes Tuesday, January 3, 2017 10:00 am; City Hall Conference Room Bid date is Jan. 17 th at 2:00pm. We go by the Purchasing Office clock. Pre-bid meetings are not mandatory. Ty Farris will be the inspector on this project. Make sure you are pre-qualified you have until Jan. 5 th at 5:00pm. If you were already prequalified make sure it has not expired. They expire after 3 years. Concrete Flat Work Days of Completion is set for 180 days, there is a $500 on liquidated damages if you do not meet that completion date. The Proposal is unit price it is the contractors job to familiarize himself with the site work and work required. No work shall be done on weekends and holidays. If there is an addendum needed it will be posted by Friday January 13 th. FDOT Permit has been issued for this project and there was no stormwater permit needed for the 9 th St culvert extension on 9 th St. Add/Alt. Local Preference applies to this project Six streets are to be priced individually; city will determine if all or fewer than six (and which ones) will be constructed pending available funding Follow FDOT Specifications as amended by Special Provisions Finish soil layer is called for in plans/specs, even where sod is called for. Be advised that this may be a VE discussion item once bids are received, but is required for the bids Irrigation system adjustments are contractor responsibility. Include in applicable line item(s) City will determine if water meters are to be relocated instead of adjusted to final grade. If change is made it will be via addendum. Questions? Concrete psi Plans call out per FDOT Specs.

Summary of Pay Items Downtown North CRA Sidewalk Project - E. 9th St. Add/Alt Drawing name: J:\P16802\Roadway\East 9th Street\Roadway\SUMQRD01 - ADD-ALT 9th st..dwg Jan 12, 2017-5:07pm jlofaso No. Date Revision 1 2 3 4 SHEET NO. 59 - NOTE TO CONSTRUCT HEADWALL PER INDEX 251 SHEET NO. 59 - NOTE TO MATCH EXIST. HEADWALL ANGLE AT CONNECTION SHEET NO. 59 - REV. 6" DIP REALIGNMENT PER COMMENT SHEET NO. 56 - ADDED QUANTITIES FOR UTILITY PIPE AND LINE STOPS ITEM NO. PAY ITEM DESCRIPTION UNIT QUANTITY 101 1 MOBILIZATION LS 1 102 1 MAINTENANCE OF TRAFFIC LS 1 104 10 3 SEDIMENT BARRIER LF 289 110 1 1 CLEARING & GRUBBING AC 1 110 7 2 MAILBOX, RELOCATE EA 1 120 1 REGULAR EXCAVATION CY 70 120 6 EMBANKMENT CY 356 162 1 11 PREPARED SOIL LAYER, FINISH SOIL LAYER, 6" SY 593 400 3 1 CONCRETE, CLASS III (BOX CULVERT AND HEADWALL) LS 1 425 1 331 INLETS, CURB, TYPE P-3, <10' EA 1 425 1 421 INLETS, CURB, TYPE J-2, <10' EA 1 425 1 431 INLETS, CURB, TYPE J-3, <10' EA 1 425 2 43 MANHOLE, P-7, PARTIAL EA 4 425 6 VALVE BOX, ADJUST EA 1 430 174 118 PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 18" SD LF 220 515 1 2 PIPE HANDRAIL - GUIDERAIL, ALUMINIUM LF 32 520 1 10 CONCRETE CURB AND GUTTER, TYPE F LF 801 522 1 CONCRETE, 4" THICK SY 432 522 2 CONCRETE, 6" THICK SY 283 527 2 DETECTABLE WARNINGS SF 49 570 1 2 PERFORMANCE TURF, SOD SY 593 700 20 40 STD-OP, WHITE, SOLID, 6" LF 27 1050 41 206 UTILITY PIPE, POLYETHYLENE, F&I, WATER/SEWER, 6" LF 80 1080 27 106 UTILITY FIXTURE - LINE STOP ASSEMBLY, FURNISH AND INSTALL, 6" EA 2 By No. Date Revision By A Full Service A & E Firm Offices In: 5 Florida Architects M / E / P Puerto Rico Engineers Planners Connecticut 6 Environmental Surveyors Maryland 7 8 www.cphcorp.comlandscape ArchitectsTraffic/Transportation Texas SHEET NO. 56 - REVISED UNITS FOR CONCRETE AND STRIPING SHEET NO. 59 - ADDED BEGINNING AND END HEADWALL STATIONING Designed by: KRL Date: 1/12/2017 Drawn by: JS/CJT/ Scale: AS NOTED Checked by: JLT Approved by: Job No. KRL P16802 C 2017 Downtown CRA Sidewalk Project Panama City, Florida Plans Prepared By: CPH, Inc. 1031-C W. 23rd St. Panama City, FL 32405 Ph: 850.563.1490 Licenses: Eng. C.O.A. No. 3215 Arch. Lic. No. AA2600926 Survey L.B. No. 7143 Landscp. Lic. No. LC0000298 KURT R. LUMAN, JR., P.E. FL P.E. No. 65036 PLAN FINAL E. 9th St. Add/Alt Summmary of Pay Items Sheet No. 56

N S-101 26 27 28 9TH STREET S-102 CR-G McKENZIE AVENUE 27 9TH STREET S-102 Drawing name: J:\P16802\Roadway\East 9th Street\Roadway\PLANRD01(A) - 9th Add Alt.dwg Jan 12, 2017-4:52pm jlofaso No. Date Revision 1 2 3 4 SHEET NO. 59 - NOTE TO CONSTRUCT HEADWALL PER INDEX 251 SHEET NO. 59 - NOTE TO MATCH EXIST. HEADWALL ANGLE AT CONNECTION SHEET NO. 59 - REV. 6" DIP REALIGNMENT PER COMMENT SHEET NO. 56 - ADDED QUANTITIES FOR UTILITY PIPE AND LINE STOPS By No. Date Revision By A Full Service A & E Firm Offices In: 5 Florida Architects M / E / P Puerto Rico Engineers Planners Connecticut 6 Environmental Surveyors Maryland 7 8 www.cphcorp.comlandscape ArchitectsTraffic/Transportation Texas SHEET NO. 56 - REVISED UNITS FOR CONCRETE AND STRIPING SHEET NO. 59 - ADDED BEGINNING AND END HEADWALL STATIONING Designed by: KRL Date: 1/12/2017 Drawn by: JS/CJT/ Scale: AS NOTED Checked by: JLT Approved by: Job No. KRL P16802 C 2017 Downtown CRA Sidewalk Project Panama City, Florida Plans Prepared By: CPH, Inc. 1031-C W. 23rd St. Panama City, FL 32405 Ph: 850.563.1490 Licenses: Eng. C.O.A. No. 3215 Arch. Lic. No. AA2600926 Survey L.B. No. 7143 Landscp. Lic. No. LC0000298 KURT R. LUMAN, JR., P.E. FL P.E. No. 65036 E. 9th St. ADD/ALT Plan Sheet Sheet No. 59

ITEM NO. Downtown North CRA Sidewalk Project E. 9 th St. Add/Alt PAY ITEM DESCRIPTION UNIT QUANTITY PLAN UNIT COST COST 101 1 MOBILIZATION LS 1 $ $ MAITENANCE OF 102 1 TRAFFICE LS 1 $ $ 104 10 3 SEDIMENT BARRIER LF 289 $ $ 110 1 1 CLEARING & GRUBBING AC 1 $ $ 110 7 2 MAILBOX, RELOCATE EA 1 $ $ 120 1 REGULAR EXCAVATION CY 70 $ $ 120 6 EMBANKMENT CY 356 $ $ 162 1 11 PREPARED SOIL LAYER, FINISH SOIL LAYER, 6 SY 593 $ $ 400 3 1 CONCRETE, CLASS III (BOX CULVERT AND HEADWALL LS 1 $ $ 425 1 331 INLETS, CURB, TYPE P-3, <10 EA 1 $ $ 425 1 421 INLETS, CURB, TYPE J-2, <10 EA 1 $ $ 425 1 431 INLETS, CURB, TYPE J-3, <10 EA 1 $ $ 425 2 43 MANHOLE, P-7, PARTIAL EA 4 $ $ 425 6 VALVE BOX, ADJUST EA 1 $ $ 430 174 118 PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 18 SD LF 220 $ $ 515 1 2 PIPE HANDRAIL GUIDERAIL, ALUMINUM LF 42 $ $ 520 1 10 522 1 522 2 527 2 570 1 2 CONCRETE CURB AND GUTTER, TYPE F LF 801 $ $ CONCRETE, 4 THICK SY 432 $ $ CONCRETE, 6 THICK SY 283 $ $ DETECTABLE WARNINGS SF 49 $ $ PERFORMANCE TURF, SOD SY 593 $ $

700 20 40 STD-OP, WHITE, SOLID, 6 LF 27 $ $ 1080 27 106 6 LINE STOP EA 2 $ $ 1050 41 206 6 HDPE DR 11 (ISP)* LF 80 $ $ SUBTOTAL COST $ Includes connections to existing 6 WL. BID SUMMARY TABLE STREET SUBTOTAL COST GRACE AVE. $ LOUISIANA AVE. $ MAGNOLIA AVE. $ HAMILTON AVE.E. $ MERCEDES AVE. $ 9 TH ST. $ E. 9 TH ST. ADD/ALT $ TOTAL BID $ In words dollars and cents

ITEM NO. Downtown North CRA Sidewalk Project Hamilton Ave. PAY ITEM DESCRIPTION UNIT QUANTITY PLAN UNIT COST COST 101 1 MOBILIZATION LS 1 $ $ MAINTENANCE OF 102 1 TRAFFIC LS 1 $ $ 104 10 3 SEDIMENT BARRIER LF 952 $ $ 110 4 REMOVAL OF EXISTING CONCRETE SY 213 $ $ 110 7 1 MAILBOX, RELOCATE SINGLE EA 10 $ $ 120 1 REGULAR EXCAVATION CY 104 $ $ 120 6 EMBANKMENT CY 14 $ $ 162 1 11 PREPARED SOIL LAYER, FINISH SOIL LAYER, 6 SY 2,023 $ $ 425 6 VALVE BOXES, ADJUST EA 2 $ $ 520 1 10 CONCRETE CURB & GUTTER, TYPE F LF 74 $ $ 522 1 CONCRETE, 4 THICK SY 485 $ $ 522 2 CONCRETE, 6 THICK SY 432 $ $ 527 2 DETECTABLE WARNINGS SF 140 $ $ 570 1 2 PERFORMANCE TURF, SOD SY 2,023 $ $ 711 11 123 STD, WHITE, SOLID, 12 LF 316 $ $ 711 11 125 STD, WHITE, SOLID, 24 LF 11 $ $ $ $ SUBTOTAL COST $ Page 24 of 68

ITEM NO. Downtown North CRA Sidewalk Project Mercedes Ave. PAY ITEM DESCRIPTION UNIT QUANTITY PLAN UNIT COST COST 101 1 MOBILIZATION LS 1 $ $ 102 1 MAINTENANCE OF TRAFFICE LS 1 $ $ 104 18 INLET PROTECTION SYSTEM EA 7 $ $ 110 1 1 CLEARING & GRUBBING AC 1 $ $ 110 4 REMOVAL OF EXISTING CONCRETE SY 221 $ $ 110 7 2 MAILBOX, RELOCATE EA 5 $ $ REGULAR 120 1 EXCAVATION CY 237 $ $ 120 6 EMBANKMENT CY 14 $ $ 162 1 11 PREPARED SOIL LAYER, FINISH SOIL LAYER, 6 SY 2,181 $ $ 400 0 11 CONCRETE CLASS NS, GRAVITY WALL CY 6 $ $ 425 1 355 INLETS, CURB, TYPE P-5, PARTIAL EA 2 $ $ 425 6 VALVE BOX, ADJUST EA 4 $ $ 520 1 10 CONCRETE CURB & GUTTER, TYPE F LF 215 $ $ 522 1 CONCRETE, 4 THICK SY 1,047 $ $ 522 2 CONCRETE, 6 THICK SY 416 $ $ 527 2 DETECTABLE WARNINGS SF 154 $ $ 550 10 428 FENCING, WOOD FENCE, 5.1-6.0, RESET EXISTING LF 110 $ $ 550 10 618 FENCING, VINYL FENCE, 0.0-5.0, RESET EXISTING LF 130 $ $ 570 1 2 PERFORMANCE TURF, SOD SY 2,181 $ $ 700 1 50 SINGLE SIGN POST, RELOCATE AS 4 $ $ 711 11 123 STD, WHITE, SOLID, 12 LF 374 $ $ 711 11 125 STD, WHITE, SOLID, 24 LF 55 $ $ SUBTOTAL COST $ Page 25 of 68