Licensing of activities in energy sector of Latvia

Size: px
Start display at page:

Download "Licensing of activities in energy sector of Latvia"

Transcription

1 Licensing of activities in energy sector of Latvia Ainars Mengelsons Public Utilities Commission of Latvia Inogate Programme Riga, October 4, 2010

2 CONTENT Market overview Licences Main provisions of legal acts Process Monitoring

3 Electrical Ring of the BRELL network kV

4 Key statistics for the power sector year 2009 (Latvia) Electricity market size - 6,96 TWh Net electricity importer- 37% Generation hydro and renewables 36%, fossil fuel 27% Installed power capacity 2296 MW Available capacity to cover peak -1029MW Minimal load 412 MW Maximal load MW

5 Licences - power sector Trade 22 Transmission - 1 Distribution - 11 Production: Hydro - 2 Wind - 32 CHP - 52

6

7 Key statistics for the natural gas sector year 2009 Market size 1,5 billion m3 Net gas imported 100% Minimal load 1,7 Mcm/d Maximal load 20 Mcm/d Capacity of storage 4,3 bilion m3

8 Licences gas sector Trade 1 Transmission - 1 Distribution 1 Storage - 1 LPG distribution from underground reservoirs -7

9 Legal provisions power trade licence General provisions : Company is registered in the Register of Enterprises of Latvia; Statement issued by the State Revenue Service on applicant s registration as the tax payer and notice of tax payment; Overview of the applicant s last year activities and planned activities (business plan); Structure of existing or potential consumers; Fees or taxes: the annual state duty of 0,17% on the company s net turnover of regulated services in the previous year - from 2010 (this duty was 0,20% in previous years). Validity of the licence 5 years.

10 Legal provisions power distribution licence General provisions : Company is registered in the Register of Enterprises of Latvia; Statement issued by the State Revenue Service on applicant s registration as the tax payer and notice of tax payment; Overview of the applicant s last year activities and planned activities (business plan); Structure of existing or potential consumers; Validity of the licence 20 years; List of equipment required to provide services Service area with a map Consent of the major distributor if service areas are overlapping

11 Legal provisions power generation licence Company is registered in the Register of Enterprises of Latvia; Statement issued by the State Revenue Service on registration as the tax payer and notice of tax payment; Overview of the applicant s last year activities and planned activities (business plan); Structure of existing or potential consumers; Validity of the licence 20 years; Deadline to start production; List of equipment required to provide services; Address and location of the power plant;

12 Legal provisons - general Fees or taxes: The annual state duty of 0,17% on the company s net turnover of regulated services in the previous year - from 2010 (this duty was 0,20% in previous years).

13 Legal provisions gas storage licence Company is registered in the Register of the Enterprises of Latvia; Statement issued by the State Revenue Service on registration as the tax payer and notice of tax payment; Overview of the applicant s last year activities and planned activities (business plan); Structure of existing or potential consumers; Validity of the licence 20 years; Deadline to start production; List of equipment required to provide services; Map of storage area.

14 Legal provisions licensing process Simple application; Documents required are listed in the Regulations; Decision is taken within 30 days after submission of all documents required; Prior to issuing a license a draft text is sent to company for comments.

15 Legal provisions monitoring Regulations on submission of required information, data segments differentiated: by sectors; by type of activity Document is uploaded on the regulator s web page; Regulator sends reminder notices Legal provisions are put in place to impose sanctions on companies not fulfilling obligations

16 Thank you for attention!

TNUoS Tariffs in 10 minutes March 2018

TNUoS Tariffs in 10 minutes March 2018 TNUoS s in 10 minutes March 2018 An overview of TNUoS tariffs This information paper provides an overview of National Grid s Transmission Network Use of System (TNUoS) tariffs, applicable to transmission

More information

Introduction to the CFD. James Rushton Head of Commercial LCCC 1 December 2016

Introduction to the CFD. James Rushton Head of Commercial LCCC 1 December 2016 Introduction to the CFD James Rushton Head of Commercial LCCC 1 December 2016 Disclaimer This presentation (including all content, whether oral or in writing) has been prepared for the exclusive use and

More information

Required Pre-Implementation Review of Research Policies RIA-01 Page 1 of 6

Required Pre-Implementation Review of Research Policies RIA-01 Page 1 of 6 Required Pre-Implementation Review of Research Policies RIA-01 Page 1 of 6 SEATTLE CHILDREN S HOSPITAL RESEARCH INSTITUTE OPERATING POLICIES / PROCEDURES DEPARTMENT: Research Institute Administration POLICY

More information

Access application for the transportation of natural gas in the transmission system of the Republic of Latvia. On 201 No. /Place of preparation/

Access application for the transportation of natural gas in the transmission system of the Republic of Latvia. On 201 No. /Place of preparation/ 1 Access application for the transportation of natural gas in the transmission system of the Republic of Latvia Annex 1 to the Regulations of use of Natural Gas transmission system of the Joint-Stock Company

More information

PJM & MISO Assumptions and Criteria for Testing of New Resources

PJM & MISO Assumptions and Criteria for Testing of New Resources & Assumptions and Criteria for Testing of New Resources 1 Introduction These slides provide a description and comparison of the assumptions and criteria used by and during the study of customer proposed

More information

Fiji Electricity Authority

Fiji Electricity Authority Fiji Electricity Authority Tender Specifications for Environmental Impact Assessment (EIA) Study for 33/11kV Zone Substation at Naikabula, Lautoka MR46-2018 February 2018 1 Background The Fiji Electricity

More information

Regulation & market in Latvia. Ainars Mengelsons Public Utilities Commission of Latvia Head of energy department St.

Regulation & market in Latvia. Ainars Mengelsons Public Utilities Commission of Latvia Head of energy department St. Regulation & market in Latvia Ainars Mengelsons Public Utilities Commission of Latvia Head of energy department 28.02.2014 St. Petersburg Economics Development GDP : 2012 versus 2011 increase by 5.6 %

More information

EXHIBIT D STATEMENT OF COSTS AND FINANCING

EXHIBIT D STATEMENT OF COSTS AND FINANCING EXHIBIT D STATEMENT OF COSTS AND FINANCING HOLT HYDROELECTRIC PROJECT FERC NO. 2203 DRAFT LICENSE APPLICATION Alabama Power Company Birmingham, Alabama Prepared by: July 2012 EXHIBIT D STATEMENT OF COSTS

More information

FIRST QUARTER REPORT. YEAR-TO-DATE RESULTS For the period ended June 30, 2017

FIRST QUARTER REPORT. YEAR-TO-DATE RESULTS For the period ended June 30, 2017 FIRST QUARTER REPORT YEAR-TO-DATE RESULTS For the period ended OPERATIONAL HIGHLIGHTS The CNSC staff assessed NB Power s licence application and confirmed that the safety measures in place at PLNGS meet

More information

UNOFFICIAL TRANSLATION

UNOFFICIAL TRANSLATION UNOFFICIAL TRANSLATION Transmission System Service Contract No. Riga, 201_ Joint Stock Company Conexus Baltic Grid (unified registration No. 40203041605), hereinafter the Transmission system operator,

More information

Latvenergo Group Unaudited Results 6 months of 2018

Latvenergo Group Unaudited Results 6 months of 2018 Latvenergo Group Unaudited Results 6 months of 2018 Investor Conference Webinar Presentation 5 September 2018 Transcript Ladies and Gentlemen, good afternoon! Welcome to Latvenergo Investor Conference

More information

Clearing Manager. Financial Transmission Rights. Prudential Security Assessment Methodology. 18 September with September 2015 variation

Clearing Manager. Financial Transmission Rights. Prudential Security Assessment Methodology. 18 September with September 2015 variation Clearing Manager Financial Transmission Rights Prudential Security Assessment Methodology with September 2015 variation 18 September 2015 To apply from 9 October 2015 Author: Warwick Small Document owner:

More information

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46))

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46)) GOVERNMENT NOTICE NO. 77 published on 02/03/2018 THE ELECTRICITY ACT (CAP.131) RULES (Made under sections 18(5), 45 and 46)) THE ELECTRICITY (DEVELOPMENT OF SMALL POWER PROJECTS) RULES, 2018 1. Citation

More information

Latvenergo Group Presentation. Zane Kotāne Chief Financial Officer AS Latvenergo

Latvenergo Group Presentation. Zane Kotāne Chief Financial Officer AS Latvenergo Latvenergo Group Presentation Zane Kotāne Chief Financial Officer AS Latvenergo 6 December 2012 Latvenergo Group at a Glance General Wholly-owned by the State of Latvia Vertically integrated energy utility

More information

Electricity Retail Licence. Electricity Generation and Retail Corporation (t/a Synergy)

Electricity Retail Licence. Electricity Generation and Retail Corporation (t/a Synergy) Electricity Retail Licence Electricity Generation and Retail Corporation (t/a Synergy) ERL1, Version 6, 1 July 2015 Economic Regulation Authority ELECTRICITY INDUSTRY ACT 2004 (WA) Licensee Name: Electricity

More information

Contact Energy. rights issue. April 2011

Contact Energy. rights issue. April 2011 Contact Energy $350m pro rata rights issue April 2011 IMPORTANT NOTICE The Offer referred to in this presentation is being made pursuant to a simplified disclosure prospectus dated 28 April 2011. A copy

More information

Leading provider of comprehensive energy services

Leading provider of comprehensive energy services Leading provider of comprehensive energy services Suzanne Thoma, CEO Beat Grossenbacher, CFO Overview Financials FY 2013 and Outlook Strategy Summary page 2 Continued challenging business environment Neighbouring

More information

Latvijas Banka. 13 March 2014 Regulation No. 131

Latvijas Banka. 13 March 2014 Regulation No. 131 Latvijas Banka 13 March 2014 Regulation No. 131 Regulation for Compiling Credit Institution, Electronic Money Institution and Payment Institution Payment Statistics Report Note: As amended by Latvijas

More information

INVESTOR REPORT. For the year ended 31 December Elenia Group

INVESTOR REPORT. For the year ended 31 December Elenia Group elenia Group INVESTOR REPORT 2015 INVESTOR REPORT For the year ended 31 December 2015 Elenia Group This investor report provides information on the Elenia Group s ( Elenia ) business in 2015, including

More information

RATE DESIGN. The proposed distribution rates for each rate class over the Custom COS period are summarized in Table 1.

RATE DESIGN. The proposed distribution rates for each rate class over the Custom COS period are summarized in Table 1. Updated: 0-0-0 EB-0-0 Exhibit G Schedule Page of RATE DESIGN.0 INTRODUCTION The purpose of this evidence is to present the proposed rates designed to collect the revenue requirement as determined by the

More information

ACCESS APPLICATION. On 201 No. /Place of preparation/ Applicant:

ACCESS APPLICATION. On 201 No. /Place of preparation/ Applicant: 1 1 ACCESS APPLICATION Annex 2 to the Regulations of use of Inčukalns Underground Gas Storage Facility of the Joint-Stock Company Latvijas Gāze On 201 No. /Place of preparation/ Addressee: Applicant: Joint-Stock

More information

Georgeson Asset Reunification

Georgeson Asset Reunification Georgeson Asset Reunification Tracing and Engaging Missing Members The Impact of Unclaimed Assets on the Life and Pensions Sector: Results of an Industry survey Date: 28 February 2012 Presenters Name:

More information

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No. 2018 Erasmus+ Grant agreement multi-beneficiary Special conditions Agreement number: [complete] Standard grant agreement (multi beneficiaries) GRANT AGREEMENT for a: Project with multiple beneficiaries

More information

General Terms and conditions of PNB Print

General Terms and conditions of PNB Print General Terms and conditions of PNB Print 1. Quotations All quotations are based on Clients written inquiry. After receiving the price offer client is advised to exercise due care and attention when checking

More information

SSE Consolidated Segmental Statement (CSS) - year ending 31 March 2013

SSE Consolidated Segmental Statement (CSS) - year ending 31 March 2013 SSE Consolidated Segmental Statement (CSS) - year ending 31 March 2013 Generation Electricity Supply Gas Supply Aggregate Nondomestic Non- Supply Unit Domestic Domestic domestic Business 2013 2013 2013

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Maharashtra Electricity Regulatory Commission (Fees and Charges) Regulations, 2017

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Maharashtra Electricity Regulatory Commission (Fees and Charges) Regulations, 2017 MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Maharashtra Electricity Regulatory Commission (Fees and Charges) Regulations, 2017 ELECTRICITY ACT, 2003 No. MERC/Legal/2017/1771 - In exercise of

More information

Landlord s Guide How you respond to a dispute at the end of the tenancy

Landlord s Guide How you respond to a dispute at the end of the tenancy Landlord s Guide How you respond to a dispute at the end of the tenancy INSURED SCHEME This quick guide sets out what landlords and tenants need to do at the end of the tenancy where there is a dispute

More information

COUNCIL OF LATVIJAS BANKA. 16 September 2013 Procedure (internal regulation) No. 213/9 Riga

COUNCIL OF LATVIJAS BANKA. 16 September 2013 Procedure (internal regulation) No. 213/9 Riga COUNCIL OF LATVIJAS BANKA K. VALDEMĀRA IELA 2A RĪGA LV-1050 LATVIJA TĀLRUNIS +371 67022300 FAKSS +371 67022420 E-PASTS INFO@BANK.LV WWW.BANK.LV 16 September 2013 Procedure (internal regulation) No. 213/9

More information

SSE Consolidated Segmental Statement (CSS) - year ending 31 March 2014

SSE Consolidated Segmental Statement (CSS) - year ending 31 March 2014 SSE Consolidated Segmental Statement (CSS) - year ending 31 March 2014 Generation Electricity Supply Gas Supply Aggregate Nondomestic Non- Supply Unit Domestic Domestic domestic Business 2014 2014 2014

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 61411-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53858-E Schedule TOU-BIP Sheet 1 APPLICABILITY This Schedule is optional

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA. (Appearances are listed in Appendix H.)

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA. (Appearances are listed in Appendix H.) ALJ/RAB/abw Mailed 12/22/2000 Decision 00-12-058 December 21, 2000 BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA In the Matter of the Application of San Diego Gas & Electric Company

More information

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No. GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1 AGREEMENT NUMBER [EPLUS LINK Generated No.] This Agreement ( the Agreement ) is concluded between the following

More information

Hydro One Networks' Request for Leave to Sell Distribution Assets to Bell Canada

Hydro One Networks' Request for Leave to Sell Distribution Assets to Bell Canada Hydro One Networks Inc. 7 th Floor, South Tower 483 Bay Street Toronto, Ontario M5G 2P5 www.hydroone.com Tel: (416) 345-5393 Fax: (416) 345-6833 Joanne.Richardson@HydroOne.com Joanne Richardson Director

More information

How to structure a power purchase agreement on a market without feed-in-tariff. Sten Lillienau

How to structure a power purchase agreement on a market without feed-in-tariff. Sten Lillienau How to structure a power purchase agreement on a market without feed-in-tariff Sten Lillienau Neas Energy in brief Nordics 2000MW Wind Neas Energy is an independent energy asset management company that

More information

KOSOVO ENERGY CORPORATION J.S.C. Generation Division, TPP Kosova B

KOSOVO ENERGY CORPORATION J.S.C. Generation Division, TPP Kosova B LICENCE FOR COGENERATION OF ELECTRICITY AND THERMAL ENERGY ISSUED TO: KOSOVO ENERGY CORPORATION J.S.C Generation Division, TPP Kosova B Registration number: ZRRE/Libp_05/17_B Prishtinë, 13 April 2017 Address:

More information

SCHEDULE 85 COGENERATION AND SMALL POWER PRODUCTION STANDARD CONTRACT RATES

SCHEDULE 85 COGENERATION AND SMALL POWER PRODUCTION STANDARD CONTRACT RATES IDAHO POWER COMPANY FOURTH REVISED SHEET NO. 85-1 THIRD REVISED SHEET NO. 85-1 AVAILABILITY Service under this schedule is available for power delivered to the Company's control area within the State of

More information

STCP 19-2 Issue 005 Construction Process & Scheme Closure

STCP 19-2 Issue 005 Construction Process & Scheme Closure STCP 19-2 Issue 005 Construction Process & Scheme Closure STC Procedure Document Authorisation Party National Grid Electricity Transmission plc SP Transmission Ltd Scottish Hydro-Electric Transmission

More information

Application Process MR 15

Application Process MR 15 Application Process MR 15 Presented by Operations Enquiries: registration@onem.gov.ng 1 Application Process An Applicant Participant wishing to become a Participant shall submit the following documents

More information

UNOFFICIAL TRANSLATION

UNOFFICIAL TRANSLATION Balancing Agreement No. UNOFFICIAL TRANSLATION Riga 201 Joint Stock Company Conexus Baltic Grid (unified registration No. 40203041605), hereinafter the Transmission system operator, represented under the

More information

The BKW Group «We are shaping the future of energy straightforward, reliable and integrated»

The BKW Group «We are shaping the future of energy straightforward, reliable and integrated» The BKW Group «We are shaping the future of energy straightforward, reliable and integrated» COMPANY PRESENTATION, LONDON 28.04.2016 ROADSHOW LONDON BKW 28.04.2016 Contents Overview Financial results 2015

More information

COLBÚN PRESENTATION 2016 M A Y. Southern Cone & Andean Opportunities Conference J.P. Morgan

COLBÚN PRESENTATION 2016 M A Y. Southern Cone & Andean Opportunities Conference J.P. Morgan COLBÚN PRESENTATION 216 M A Y Southern Cone & Andean Opportunities Conference J.P. Morgan A G E N D A O VERVIEW OPERATIONS IN CHILE AND PERU FINANCIALS G R O W T H O P P O R T U N I T I E S VALUE PROPOSAL

More information

CA045 Arrangements for User Commitment

CA045 Arrangements for User Commitment Stage 02: Proposed System Operator Transmission Owner Code (STC) CA045 Arrangements for User Commitment What stage is this document at? 01 02 03 Initial Proposed Amendment Report This proposal seeks to

More information

Statkraft Investor Update. March 2014

Statkraft Investor Update. March 2014 Statkraft Investor Update March 2014 Disclaimer This presentation has been prepared by, and the information contained herein (unless otherwise indicated) has been provided by Statkraft AS (the "Company").

More information

Invitation to Tender

Invitation to Tender Invitation to Tender November 2016 BRIEF FOR CONSULTANT TO CARRY OUT A NETWORK ANALYSIS OF THE WESTERN ISLES GRID, A REVIEW OF BUDGET ESTIMATES RECEIVED AND A STUDY ON FUTURE INNOVATIVE CONNECTION OPTIONS

More information

DECISION AND ORDER ON PHASE 1

DECISION AND ORDER ON PHASE 1 Commission de l énergie de l Ontario DECISION AND ORDER ON PHASE 1 HYDRO ONE NETWORKS INC. Leave to construct a new transmission line and facilities in the Windsor-Essex Region, Ontario. Before: Ken Quesnelle

More information

Oil and gas clause in Crown Estate leases

Oil and gas clause in Crown Estate leases Oil and gas clause in Crown Estate leases Guidance on procedures for independent valuation where necessary June 2014 Crown copyright 2014 URN 14D/153 You may re-use this information (not including logos)

More information

Chapter 16 EQUITY SECURITIES PUBLICATION REQUIREMENTS. Role of the Exchange

Chapter 16 EQUITY SECURITIES PUBLICATION REQUIREMENTS. Role of the Exchange Chapter 16 EQUITY SECURITIES PUBLICATION REQUIREMENTS Role of the Exchange 16.01 Subject to rule 12.15, no listing document may be issued until the Exchange has confirmed to the issuer that it has no further

More information

Supporting document of the necessary arrangements to support the functioning of wholesale electricity markets in accordance to Article 30(6) of

Supporting document of the necessary arrangements to support the functioning of wholesale electricity markets in accordance to Article 30(6) of Supporting document of the necessary arrangements to support the functioning of wholesale electricity markets in accordance to Article 30(6) of Commission Regulation (EU) no 2016/1719 of 26 September 2016

More information

ELECTRICITY ACT, 2005

ELECTRICITY ACT, 2005 ELECTRICITY ACT, 2005 ARRANGEMENTOF SECTIONS Section PART 1 PRELIMINARY 1. Short title 2. Interpretation 3. Objectives PART II FUNCTIONS OF THE DEPARTMENT OF STATE 4. Functions of the Department of State

More information

- When did the regulation(s) regarding disclosure come into force? 12/5/2015

- When did the regulation(s) regarding disclosure come into force? 12/5/2015 Assessment of the implementation of the BPR: Cyprus Author: Dr. Michalis Syrimis Describe the actual implementation in the MS Date (yyyy/mm/dd) GENERAL Disclosure system implemented Disclosure Regulation

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 53895-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 50436-E Schedule SLRP Sheet 1 APPLICABILITY This Schedule is optional

More information

Alberta Coalition Presentation. BCUC Workshop - August 23, BCTC Network Economy and Open Access Transmission Tariff

Alberta Coalition Presentation. BCUC Workshop - August 23, BCTC Network Economy and Open Access Transmission Tariff C8-7 Alberta Coalition Presentation BCUC Workshop - August 23, 2006 BCTC Network Economy and Open Access Transmission Tariff August 23, 2006 Alberta Coalition 1 Overview of AC Evidence August 23, 2006

More information

Dominion Energy Virginia

Dominion Energy Virginia Request for Proposal 2017 Solicitation for New Photovoltaic Solar and Onshore Wind Power Supply Generation October 16, 2017 Dominion Energy Virginia TABLE OF CONTENTS Table of Contents PART I RFP Overview...

More information

Bidding Rules for the Auctions Under the Competitive Bidding Process of Ohio Power Company

Bidding Rules for the Auctions Under the Competitive Bidding Process of Ohio Power Company Bidding Rules for the Auctions Under the Competitive Bidding Process of Ohio Power Company CBP Rules Contents Contents Contents... i ARTICLE I. Introduction...1 I.1. Background...1 I.2. Overview...1 ARTICLE

More information

Eskom Presentation Standing Committee on Appropriations

Eskom Presentation Standing Committee on Appropriations Eskom Presentation Standing Committee on Appropriations 12 June 2015 Contents Content 1. Introduction 2. Financial situation 3. Eliminating Load shedding 2 Executive summary (1 of 2) Eskom is a fully integrated

More information

Regional Planning and Cost Allocation Review EB Working Group meeting #1 - Webinar

Regional Planning and Cost Allocation Review EB Working Group meeting #1 - Webinar Regional Planning and Cost Allocation Review EB-2016-0003 Working Group meeting #1 - Webinar Tuesday July 12, 2016 1 Agenda 1) Introduction OEB 2) Presentation IESO 3) Presentation Hydro One 4) Discussion

More information

RULES OF USE OF SIA TRANSACT PRO PREPAID GIFT CARDS

RULES OF USE OF SIA TRANSACT PRO PREPAID GIFT CARDS Approved by Resolution of the Board of Directors of SIA Transact Pro dated 05.05.2011 (Minutes No. V1/2011) With amendments approved by the Board of Directors' meeting of SIA Transact Pro dated 29.08.2012,

More information

BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission. [Docket No. IC ]

BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission. [Docket No. IC ] This document is scheduled to be published in the Federal Register on 03/25/2016 and available online at http://federalregister.gov/a/2016-06777, and on FDsys.gov BILLING CODE 6717-01-P DEPARTMENT OF ENERGY

More information

APPENDIX B: PORTFOLIO OPTIMIZATION MODEL

APPENDIX B: PORTFOLIO OPTIMIZATION MODEL APPENDIX B: PORTFOLIO OPTIMIZATION MODEL PUBLIC UTILITY DISTRICT #1 OF SNOHOMISH COUNTY Prepared by Generation, Power, Rates, and Transmission Management Division Snohomish County PUD DRAFT 2017 Integrated

More information

Alignment of Key Infrastructure Planning Processes by CPUC, CEC and CAISO Staff December 23, 2014

Alignment of Key Infrastructure Planning Processes by CPUC, CEC and CAISO Staff December 23, 2014 Introduction and Summary Alignment of Key Infrastructure Planning Processes Since the restructuring of California s electric industry in the late 1990s pursuant to AB 1890, electric infrastructure planning

More information

KINGDOM OF CAMBODIA NATION RELIGION KING ELECTRICITY AUTHORITY OF CAMBODIA REGULATIONS

KINGDOM OF CAMBODIA NATION RELIGION KING ELECTRICITY AUTHORITY OF CAMBODIA REGULATIONS KINGDOM OF CAMBODIA NATION RELIGION KING ELECTRICITY AUTHORITY OF CAMBODIA REGULATIONS ON GENERAL PRINCIPLES FOR REGULATING ELECTRICITY TARIFFS IN THE KINGDOM OF CAMBODIA Under Electricity Law of The Kingdom

More information

Practice for the Listing of Derivatives (Circular No. 3, CIR3)

Practice for the Listing of Derivatives (Circular No. 3, CIR3) Circular No. 3 Circular No. 3 Practice for the Listing of Derivatives (Circular No. 3, CIR3) Status on Basis 18 March 2014 Listing Rules, Additional Rules Derivatives, and implementing decrees This Circular

More information

Meridian Energy NZX retail investor presentation

Meridian Energy NZX retail investor presentation Meridian Energy NZX retail investor presentation 1 October 2018 Attached is a presentation Meridian Energy Limited is making at NZX retail investor evenings in early October 2018. ENDS Neal Barclay Chief

More information

Statkraft Investor Update. European Energy & Utilities Credit Conference 2013

Statkraft Investor Update. European Energy & Utilities Credit Conference 2013 Statkraft Investor Update European Energy & Utilities Credit Conference 2013 Disclaimer This presentation has been prepared by, and the information contained herein (unless otherwise indicated) has been

More information

Financial results for FY ended 3/2007 & Financial forecasts for FY ending 3/2008

Financial results for FY ended 3/2007 & Financial forecasts for FY ending 3/2008 (Investors meeting material) Financial results for FY ended 3/2007 & Financial forecasts for FY ending 3/2008 May 7, 2007 The Kansai Electric Power Co., Inc. Financial forecasts are subject to change depending

More information

UK ELECTRIC MARKET REFORM APPLICATION TO TEXAS POWER MARKET. Ingmar Sterzing CEIC Seminar April 10, 2013

UK ELECTRIC MARKET REFORM APPLICATION TO TEXAS POWER MARKET. Ingmar Sterzing CEIC Seminar April 10, 2013 UK ELECTRIC MARKET REFORM APPLICATION TO TEXAS POWER MARKET Ingmar Sterzing CEIC Seminar April 10, 2013 1 Ingmar Sterzing, Pittsburgh, PA, 2013 UK and ERCOT Strikingly Similar Similar generation infrastructure

More information

Electricity Integrated Regional Licence

Electricity Integrated Regional Licence Electricity Integrated Regional Licence Alinta Sales Pty Ltd EIRL8, Version 2, 1 July 2015 Alinta Sales Pty Ltd, EIRL8, 2, 1 July 2015 ELECTRICITY INDUSTRY ACT 2004 (WA) Licensee Name: Alinta Sales Pty

More information

Intraday Cross Border The Netherlands-Belgium

Intraday Cross Border The Netherlands-Belgium Intraday Cross Border The Netherlands-Belgium Content 1. Overall design 1. Process description 2. Capacity calculation 3. Elbas trading platform 4. Tradable products 5. Timeline & Nominations 2. Contractual

More information

Vattenfall at a glance

Vattenfall at a glance Overview Vattenfall at a glance Vattenfall at a glance Vattenfall is one of Europe s largest generators of electricity and the largest producer of heat. Electricity generation and sales of heat amounted

More information

Finland. Katri Joenpolvi, Ville Hailikari and Mikko Pirttilä. Krogerus

Finland. Katri Joenpolvi, Ville Hailikari and Mikko Pirttilä. Krogerus FINLAND Finland Katri Joenpolvi, Ville Hailikari and Mikko Pirttilä 1 Policy and law What is the government policy and legislative framework for the electricity sector? Securing energy supply, competitive

More information

Direct Debit Service Administration Memo for the Company 7 April 2014

Direct Debit Service Administration Memo for the Company 7 April 2014 I. Definitions Direct Debit Service Administration Memo for the Company 7 April 2014 direct debit means a payment method for regular payments in consideration for provided services. Agreement means a direct

More information

ScottishPower Segmental Generation and Supply Statements for the year ended 31 December 2012

ScottishPower Segmental Generation and Supply Statements for the year ended 31 December 2012 ScottishPower Segmental Generation and Supply Statements for the year ended 31 December 2012 Required under Standard Condition 16B of Electricity Generation Licences and Standard Condition 19A of Electricity

More information

Generation Licence Compliance

Generation Licence Compliance An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Generation Licence Compliance Guidance Notes for Licence Holders Version 1 August 2012 0 www.cru.ie Table of Contents Table of Contents...

More information

Long-Term Reliability Assessment

Long-Term Reliability Assessment Long-Term Reliability Assessment Key Findings and Long-Term Issues John Moura, Director of Reliability Assessment Topics Covered Today Background on NERC s Long-Term Reliability Assessment Emerging and

More information

The power of flexibility

The power of flexibility The power of flexibility new services included A Gasunie company The energy industry has entered a new era. Supply and demand are decentralizing at an accelerating pace. Traditional energy companies and

More information

THE JHARKHAND GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY

THE JHARKHAND GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY THE JHARKHAND GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY No. 419 9 Shrawan, 1932(s) Ranchi, Saturday 31th July, 2010 JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION, RANCHI (RENEWABLE PURCHASE OBLIGATION

More information

Directive 1: Admission of participants

Directive 1: Admission of participants SIX Swiss Exchange Ltd Directive : Admission of participants Dated 6 March 08 Entry into force: May 08 Directive : Admission of Participants 0/05/08 Content Purpose and principle... Admission as a participant....

More information

WECC Standard BAL-STD Operating Reserves

WECC Standard BAL-STD Operating Reserves A. Introduction 1. Title: Operating Reserves 2. Number: BAL-STD-002-0 3. Purpose: Regional Reliability Standard to address the Operating Reserve requirements of the Western Interconnection. 4. Applicability

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION SOUTHWESTERN PUBLIC SERVICE COMPANY S UNOPPOSED RESPONSE TO STAFF S COMMENTS

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION SOUTHWESTERN PUBLIC SERVICE COMPANY S UNOPPOSED RESPONSE TO STAFF S COMMENTS BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN ) PUBLIC SERVICE COMPANY S 2018 ) INTEGRATED RESOURCE PLAN FOR ) NEW MEXICO. ) CASE NO. 18-00215-UT ) SOUTHWESTERN PUBLIC

More information

MANITOBA HYDRO. Corporate Risk Management Middle Office Report June 2009

MANITOBA HYDRO. Corporate Risk Management Middle Office Report June 2009 MANITOBA HYDRO Corporate Risk Management Middle Office Report June 2009 A. Credit On-going review and advisory support is being provided to PS&O (Power Sales and Operations) credit function to assist in

More information

AEP Ohio Competitive Bidding Process November 2017 Auction

AEP Ohio Competitive Bidding Process November 2017 Auction AEP Ohio Competitive Bidding Process November 2017 Auction Bidder Webcast Thursday, October 5, 2017 Benjamin Chee, NERA Chantale LaCasse, NERA Disclaimer Any statements herein describing or referring to

More information

2011 IRP Public Input Meeting. October 5, Pacific Power Rocky Mountain Power PacifiCorp Energy

2011 IRP Public Input Meeting. October 5, Pacific Power Rocky Mountain Power PacifiCorp Energy 2011 IRP Public Input Meeting October 5, 2010 Pacific Power Rocky Mountain Power PacifiCorp Energy Agenda Morning Session IRP Schedule Update Energy Gateway Transmission Construction Update and Evaluation

More information

Newsletter. APEX Team International

Newsletter. APEX Team International Year 2018, Issue 11 APEX Team International Helesteului Str. 15 17, District 1 Bucharest 011986 Phone: +40 (0)31 809 2739 Contents: +40 (0)74 520 2739 Fax: +40 (0)31 805 7739 E mail: office@apex team.ro

More information

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES. CHAPTER Puc 2000 COMPETITIVE ELECTRIC POWER SUPPLIER AND AGGREGATOR RULES

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES. CHAPTER Puc 2000 COMPETITIVE ELECTRIC POWER SUPPLIER AND AGGREGATOR RULES CHAPTER Puc 2000 COMPETITIVE ELECTRIC POWER SUPPLIER AND AGGREGATOR RULES PART Puc 2001 PURPOSE AND APPLICATION OF THE RULES Puc 2001.01 Purpose. The purpose of Puc 2000 is to establish requirements for

More information

Fortum and Nordic power markets

Fortum and Nordic power markets Fortum and Nordic power markets Mikael Lilius President and CEO, Fortum Corporation Enskilda Securities, Finnish Blue Chip Seminar 2005 Helsinki, 22 September 2005 Fortum's strategy Fortum focuses on the

More information

Expansion of Direct Benefit Transfer (DBT) Mode of Payment to JSY Beneficiaries through Public Financial Management System PFMS (formerly, CPSMS)

Expansion of Direct Benefit Transfer (DBT) Mode of Payment to JSY Beneficiaries through Public Financial Management System PFMS (formerly, CPSMS) Expansion of Direct Benefit Transfer (DBT) Mode of Payment to JSY Beneficiaries through Public Financial Management System PFMS (formerly, CPSMS) Public Financial Management System PFMS (formerly, CPSMS)

More information

LIECHTENSTEIN INVOICE

LIECHTENSTEIN INVOICE Page 1 of 5 Our Client Company Reg. No.: 921530 Address to be advised Date: Monday, September 30, 2013 Invoice No: 2013 004 024 Professional services rendered Notes Year 1 Euro Year 2 Euro Liechtenstein

More information

Senate Bill No. 146 Senator Spearman

Senate Bill No. 146 Senator Spearman Senate Bill No. 146 Senator Spearman CHAPTER... AN ACT relating to energy; requiring certain electric utilities in this State to file with the Public Utilities Commission of Nevada a distributed resources

More information

APPENDIX B: PROTOCOL RE: YUKON DEVELOPMENT CORPORATION'S ROLE AS SOLE SHAREHOLDER OF YUKON ENERGY CORPORATION

APPENDIX B: PROTOCOL RE: YUKON DEVELOPMENT CORPORATION'S ROLE AS SOLE SHAREHOLDER OF YUKON ENERGY CORPORATION APPENDIX B: PROTOCOL RE: YUKON DEVELOPMENT CORPORATION'S ROLE AS SOLE SHAREHOLDER OF YUKON ENERGY CORPORATION PROTOCOL RE: YUKON DEVELOPMENT CORPORATION'S ROLE AS SOLE SHAREHOLDER OF YUKON ENERGY CORPORATION

More information

The update is to make a correction to sections 2.5 and 2.6 of the application as illustrated in the amended application attached to this letter.

The update is to make a correction to sections 2.5 and 2.6 of the application as illustrated in the amended application attached to this letter. Hydro One Networks Inc. 8 th Floor, South Tower 483 Bay Street Toronto, Ontario M5G 2P5 www.hydroone.com Tel: (416) 345-5722 Fax: (416) 345-5866 Greg.Van@HydroOne.com Greg Van Dusen Director - Distribution

More information

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No. GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1 AGREEMENT NUMBER [EPLUS LINK Generated No.] This Agreement ( the Agreement ) is concluded between the following

More information

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No. GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1 AGREEMENT NUMBER [EPLUS LINK Generated No.] This Agreement ( the Agreement ) is concluded between the following

More information

SE-109: Outage Management Process Redesign Interim Process & Online Outage Form Training. Mark Gojmerac, IESO January 15, 2014

SE-109: Outage Management Process Redesign Interim Process & Online Outage Form Training. Mark Gojmerac, IESO January 15, 2014 SE-109: Outage Management Process Redesign Interim Process & Online Outage Form Training Mark Gojmerac, IESO January 15, 2014 Agenda 1. Interim Process Review: Market Rule & Market Manual Changes: 3-day

More information

Ministry of the Interior. Employment Service) Board) No. 417 On procedures for residence permit. and Stateless Persons the Ministry of the Interior

Ministry of the Interior. Employment Service) Board) No. 417 On procedures for residence permit. and Stateless Persons the Ministry of the Interior Work Group On Administrative Barriers to Foreign Investments in Latvia. Subcommittee On Issues of Entry, Residence and Employment of Foreigners. ACTION PLAN Problem Objective Activities Responsible Institution.

More information

ScottishPower Consolidated Segmental Statement for the year ended 31 December 2017

ScottishPower Consolidated Segmental Statement for the year ended 31 December 2017 ScottishPower Consolidated Segmental Statement for the year ended 31 December 2017 Required under Standard Condition 16B of Electricity Generation Licences and Standard Condition 19A of Electricity and

More information

Thunder Bay Hydro Electricity Distribution Inc. 1-1 GENERAL (Input) Enter general information related to the Application. EDR 2006 MODEL (ver. 2.

Thunder Bay Hydro Electricity Distribution Inc. 1-1 GENERAL (Input) Enter general information related to the Application. EDR 2006 MODEL (ver. 2. Thunder Bay Hydro Electricity Inc. 1-1 GENERAL (Input) Enter general information related to the Application Version: 2.1 Name of Applicant Thunder Bay Hydro Electricity Inc. License EB -0259 File (s) RP

More information

Installed Capacity (ICAP) Market Introduction

Installed Capacity (ICAP) Market Introduction Installed Capacity (ICAP) Market Introduction Nicolé K. Grottoli Senior Market Trainer, NYISO Intermediate ICAP Course November 7-8, 2017 Rensselaer, NY 1 ICAP Market Introduction Module Objectives Upon

More information

Daishowa-Marubeni International Ltd.

Daishowa-Marubeni International Ltd. Decision 2011-299 25-MW Condensing Steam Turbine Generator July 8, 2011 The Alberta Utilities Commission Decision 2011-299: 25-MW Condensing Steam Turbine Generator Application No. 1606747 Proceeding ID

More information

Eskom 2018/19 Revenue Application

Eskom 2018/19 Revenue Application Eskom 2018/19 Revenue Application Nersa Public Hearings Klerksdorp 13 November 2017 Where we are coming from This revenue application is being made for the year 2018/19, after the Energy Regulator maintained

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 36. Congestion Revenue Rights... 3 36.1 Overview Of CRRs And Procurement Of CRRs... 3 36.2 Types Of CRR Instruments... 3 36.2.1 CRR Obligations... 3 36.2.2 CRR Options... 3 36.2.3 Point-To-Point

More information